Global Drive Test Report – Multan – W-49
Confidential Page 1 Alcatel-Lucent Pakistan Ltd
GLOBAL DRIVE TEST REPORT
MULTAN CITY
W49-2010
Global Drive Test Report – Multan – W-49
Confidential Page 2 Alcatel-Lucent Pakistan Ltd
Table of contents 1 EXECUTIVE SUMMARY ................................................................................................................. 4
2 DRIVE TEST RESULTS .................................................................................................................. 5
3 COVERAGE PLOTS ................................................................................................................... 6
3.1 COVERAGE PLOT #1 ................................................................................................................... 6
3.2 COVERAGE PLOT #2 ................................................................................................................... 7
3.3 RX_LEV DISTRIBUTION: .............................................................................................................. 8
4 QUALITY PLOTS ........................................................................................................................... 9
4.1 QUALITY PLOT #1 ...................................................................................................................... 9
4.2 QUALITY PLOT # 2 ................................................................................................................... 10
FIGURE 5: QUALITY PLOT #2 OF MOBILINK MULTAN NETWORK ..................................................................... 10
4.2.1 Bad Rx_Qual Patches in Plot #1 ............................................................................... 11
MUL7921 DCs Down .................................................................................................................... 14
4.2.2 Bad Rx_Qual Patches in Plot # 2.............................................................................. 15
4.3 RX_QUAL DISTRIBUTION:.......................................................................................................... 17
5 VOICE QUALITY .......................................................................................................................... 18
5.1 FER PLOT #1: ......................................................................................................................... 18
5.2 FER PLOT #2: ......................................................................................................................... 19
5.3 FER DISTRIBUTION: ................................................................................................................. 20
6 C/I WORST PLOTS ...................................................................................................................... 21
6.1 C/I WORST PLOT #1: .............................................................................................................. 21
6.2 C/I WORST PLOT #2: .............................................................................................................. 22
6.3 C/I WORST DISTRIBUTION: ....................................................................................................... 23
7 TIMING ADVANCE: ................................................................................................................. 24
8 NETWORK KPIS: ......................................................................................................................... 25
9 PROBLEMS & SUGGESTIONS .................................................................................................... 26
9.1 HO FAILURES ........................................................................................................................... 26
9.2 CALL DROPS .................................................................................................................................. 27
9.3MUTE CALLS: ................................................................................................................................. 28
10 CONCLUSION ........................................................................................................................... 29
10.1 CALL DROP SUMMARY ............................................................................................................... 29
10.2 HO FAIL SUMMARY ................................................................................................................... 29
10.3 MUTE CALLS: ........................................................................................................................... 29
Global Drive Test Report – Multan – W-49
Confidential Page 3 Alcatel-Lucent Pakistan Ltd
List of figures
Figure 1: Coverage Plot #1 of Mobilink Multan Network ..................................................................... 6
Figure 2: Coverage Plot #2 of Mobilink Multan Network ..................................................................... 7
Figure 3: Rx_Lev (Sub) Distribution ....................................................................................................... 8
Figure 4: Quality Plot #1 of Mobilink Multan Network ........................................................................ 9
Figure 5: Quality Plot #2 of Mobilink Multan Network ...................................................................... 10
Figure 6: Rx_Qual (Sub) Distribution ................................................................................................... 17
Figure 7: FER Plot #1 of Mobilink Multan Network ............................................................................ 18
Figure 8: FER Plot #2 of Mobilink Multan Network ............................................................................ 19
Figure 9: FER Distribution .................................................................................................................... 20
Figure 10: C/I Worst Plot #1 of Mobilink Multan Network ................................................................ 21
Figure 11: C/I Worst Plot #2 of Mobilink Multan Network ................................................................ 22
Figure 12: C/I Worst Distribution......................................................................................................... 23
Figure 13: Timing Advance Distribution .............................................................................................. 24
Figure 14: KPIs of Mobilink Multan Network ...................................................................................... 25
Global Drive Test Report – Multan – W-49
Confidential Page 4 Alcatel-Lucent Pakistan Ltd
1 EXECUTIVE SUMMARY
This report is based on the Global Drive Test that was performed for Multan city in W49-2010 (01-12-2010 to 03-12-2010) under the scope of the Optimization Services Contract.
Global Drive Test Report – Multan – W-49
Confidential Page 5 Alcatel-Lucent Pakistan Ltd
2 DRIVE TEST RESULTS
This section presents the Coverage & Quality of Mobilink network which has been measured during the global drive test. In addition to the Coverage & Quality plots, Network KPIs have also been included in the report.
Alcatel has used TEMS Investigation Drive Test tool for this Air Interface Measurement
and the KPIs have been processed using TEMS Reporter Generator. However, CSSR & CDR are calculated on real count basis so as to have more accurate KPIs.
Global Drive Test Report – Multan – W-49
Confidential Page 6 Alcatel-Lucent Pakistan Ltd
3 Coverage Plots 3.1 Coverage Plot #1
Figure 1: Coverage Plot #1 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 7 Alcatel-Lucent Pakistan Ltd
3.2 Coverage Plot #2
Figure 2: Coverage Plot #2 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 8 Alcatel-Lucent Pakistan Ltd
3.3 Rx_Lev Distribution:
Figure 3: Rx_Lev (Sub) Distribution
Global Drive Test Report – Multan – W-49
Confidential Page 9 Alcatel-Lucent Pakistan Ltd
4 Quality Plots
4.1 Quality Plot #1
Figure 4: Quality Plot #1 of Mobilink Multan Network
dsjf
Global Drive Test Report – Multan – W-49
Confidential Page 10 Alcatel-Lucent Pakistan Ltd
4.2 Quality Plot # 2
Figure 5: Quality Plot #2 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 11 Alcatel-Lucent Pakistan Ltd
4.2.1 Bad Rx_Qual Patches in Plot #1
Case # Problem Recommendation
1 Call was dragged on “MUL8050A” degrading the quality. 1201_08 Log file
High FER on the cell degrading the SQI at the time of DT, also restricting HO to other potential neighbors, Outages on the site reported to OAN;
2
Call was HO from MUL3376B to micro cell “MUL7412A” which degraded the quality with degraded levels. 1201_06 Log file
Change L_RXLEV_CPT_HO from 25 to 30; S: MUL3376B, D: MUL7412B
Global Drive Test Report – Multan – W-49
Confidential Page 12 Alcatel-Lucent Pakistan Ltd
MUL8050A HW outages
Global Drive Test Report – Multan – W-49
Confidential Page 13 Alcatel-Lucent Pakistan Ltd
Case # Problem Recommendation
1
Call dragged in the inner zone of “MUL7255C” and then made an intracell HO to outer zone at bad levels. 1201_24_01 Log file
Delayed HO to logical neighbor “MUL8402A” due to intracell HO; For MUL7255C Change OFFSET_HO_MARGIN_INNER(dB) from 10 to 5
2 IncHO Congestion on MUL7921A. Call dragged on MUL3364B at bad levels and quality. 1201_25_02 Log file
Down DCS and HW outages on MUL7921 reported to OAN, still not resolved.
Global Drive Test Report – Multan – W-49
Confidential Page 14 Alcatel-Lucent Pakistan Ltd
MUL7921 DCs Down
Global Drive Test Report – Multan – W-49
Confidential Page 15 Alcatel-Lucent Pakistan Ltd
4.2.2 Bad Rx_Qual Patches in Plot # 2
Case # Problem Recommendation
1 DCS Frequency “643” on MUL4616B found interfered with “MUL7219A”. 1201_25_03 Log file
Re-design proposed for overshooting MUL7219A, also change frequency for MUL4616B from 643 to 630. Change RXLEV_DL_ZONE(dBm) from -88 to -85.
2
Call dragged in the inner zone of “MUL7219A” and then made an intracell HO to outer zone at bad levels. 1201_25_04 Log file
For MUL7219A Change OFFSET_HO_MARGIN_INNER(dB) from 10 to 5.
Global Drive Test Report – Multan – W-49
Confidential Page 16 Alcatel-Lucent Pakistan Ltd
Case # Problem Recommendation
1 TRX 2[TRE 9] for MUL3388C has degraded Quality Distribution with good levels on the day of DT. 1202_06_01 Log file
Reset the TRE; RMS data will be kept under observations.
Global Drive Test Report – Multan – W-49
Confidential Page 17 Alcatel-Lucent Pakistan Ltd
4.3 Rx_Qual Distribution:
Figure 6: Rx_Qual (Sub) Distribution
Global Drive Test Report – Multan – W-49
Confidential Page 18 Alcatel-Lucent Pakistan Ltd
5 Voice Quality Voice quality is judged upon the Frame erasure rate. Even while experiencing bad Rx_Qual, the voice Quality still could be maintained.
5.1 FER Plot #1:
Figure 7: FER Plot #1 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 19 Alcatel-Lucent Pakistan Ltd
5.2 FER Plot #2:
Figure 8: FER Plot #2 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 20 Alcatel-Lucent Pakistan Ltd
5.3 FER Distribution:
Figure 9: FER Distribution
Global Drive Test Report – Multan – W-49
Confidential Page 21 Alcatel-Lucent Pakistan Ltd
6 C/I Worst Plots
6.1 C/I Worst Plot #1:
Figure 10: C/I Worst Plot #1 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 22 Alcatel-Lucent Pakistan Ltd
6.2 C/I Worst Plot #2:
Figure 11: C/I Worst Plot #2 of Mobilink Multan Network
Global Drive Test Report – Multan – W-49
Confidential Page 23 Alcatel-Lucent Pakistan Ltd
6.3 C/I Worst Distribution:
Figure 12: C/I Worst Distribution
Global Drive Test Report – Multan – W-49
Confidential Page 24 Alcatel-Lucent Pakistan Ltd
7 Timing Advance:
Figure 13: Timing Advance Distribution
Global Drive Test Report – Multan – W-49
Confidential Page 25 Alcatel-Lucent Pakistan Ltd
8 Network KPIs:
Figure 14: KPIs of Mobilink Multan Network
CALLS ATTEMPTED (A) 369
CALLS SETUP SUCCESSFULLY (B) 364
CALL SETUP FAILURES (C) 05
CALLS DROPPED (D) 0
HANDOVER ATTEMPTS (E) 447
HANDOVERS SUCCESSFUL (F) 447
HANDOVER FAILURES (G) 0
Location Updates 60
KPIs
CSSR (B/A) 98.64 %
CDR (D/B) 0.00 %
HSR (F/E) 100 %
HFR (G/E) 0.00 %
Global Drive Test Report – Multan – W-49
Confidential Page 26 Alcatel-Lucent Pakistan Ltd
9 PROBLEMS & SUGGESTIONS
9.1 HO Failures
X = HO FAILURES No HO Failures found during the complete Global Drive Test of Multan City during the Week 49-2010.
Global Drive Test Report – Multan – W-49
Confidential Page 27 Alcatel-Lucent Pakistan Ltd
9.2 Call Drops
= CALL DROPS No Call drop encountered during the complete Global Drive Test of Multan City during the Week 49-2010.
Global Drive Test Report – Multan – W-49
Confidential Page 28 Alcatel-Lucent Pakistan Ltd
9.3Mute Calls:
No Mute call was encountered during the complete Global Drive Test of Multan City during the Week 49-2010.
Global Drive Test Report – Multan – W-49
Confidential Page 29 Alcatel-Lucent Pakistan Ltd
10 Conclusion The CSSR has maintained on 98.64%.Around 369 calls were attempted and 05 calls were blocked. The HSR remains at 100% with 447 HO attempts. No HO failure and No Call Drop occurred which were deeply analyzed and Recommendation and actions were also taken accordingly. Bad Quality and Coverage Areas are also highlighted and necessary actions are also taken to resolve the problem.
Region Week start
WEEK No
Area
Total Drops
Dropped Calls
(Quality)
Dropped Calls
(Coverage)
Dropped Calls (H
W)
Dropped Calls
(Outages)
Dropped Calls
(Netw
ork)
Total Quality Issues
Quality Issues
Quality Issues
(Outage)
Quality Issues (H
W)
HO Attempts
HO Failures
HSR
Poor Coverage Issues
Multan 06-12-10
WEEK 49
Central III
0 0 0 0 0 0 7 4 0 3 447 0 100% 0
10.1 Call Drop Summary No Call drop encountered during the complete Global Drive Test of Multan City during the Week 49-2010. 10.2 HO Fail Summary No HO Failures found during the complete Global Drive Test of Multan City during the Week 49-2010.
10.3 Mute Calls:
No Mute call was encountered during the complete Global Drive Test of Multan City during the Week 49-2010.