We reserve all rights in this document and in the information contained herein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. © GE 2017 File name: 2017 111 28 TJK acoustic panels Isolite Limex Doboj GE POWER GAS POWER SYSTEMS SUPPLIER INTERVENTION REPORT GE Power Document Code: Page 2017 11 28 TJK Isolite Limex acoustic panles 1 / 16 Prepared by Departme nt Location Popescu Department Baden Project Unit Supplier TJK # Isolite / Limex Equipment / Part / Description WP no. Place of Intervention Acoustic panels # Doboj, BIH Quality Control Plan / I&TP Intervention Date Report Date Supplier quality plan 72121-9110, rev - # 28.11.2017 28.11.2017 Equipment Specification Purchase Order Number GT acoustic enclosure 4101381997 Additional Relevant Project Information # Type of Intervention Expediting Quality Inspection Acceptance Test Other Other Attendees supplier or representing Attendees General Electric or representing Stefan Ristic, project engineer Limex Marius Popescu Jelenko Jokic, project manager Limex Nikola Ristic, project engineer Limex Milan Milotic, technical director Limex Roland De Sousa, project manager Isolite SUMMARY Limex is a suitable contractor for acoustic panels. Limex meets all requirements to successfully produce acoustic panels. Limex is certified according ISO 2001:2015. The 3D model produced in Solidworks in Limex was sent back to Isolite for overlaying (put the 3D solidworks model over the original 3D Autocad model), checking and production release. Limex has dedicated and suitable areas for -powder paint application and handling of panels respectively curing the panels in convection oven -assembly areas for panels -cutting, punching and bending of the metal sheets INSPECTION DETAILS Engineering/manufacturing drawings Isolite has produced the 3 D model in Autocad for GT enclosure and generator. The 3D model was sent electronically to Limex as step file together with the pdf 2D drawings and part list. Limex is using Solidworks for 3D drawings and Autocad for 2D drawings. The original 3D model was rebuilt in Limex using Solidworks software to include all manufacturing details like dimensions, bending and cutting details, assembly rivet locations.
Transcript

We reserve all rights in this document and in the information contained herein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. © GE 2017 File name: 2017 111 28 TJK acoustic panels Isolite Limex Doboj

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

GE Power Document Code: Page

2017 11 28 TJK Isolite Limex acoustic panles 1 / 16

Prepared by Department

Location

Popescu Department Baden

Project Unit Supplier

TJK # Isolite / Limex

Equipment / Part / Description WP no. Place of Intervention

Acoustic panels # Doboj, BIH

Quality Control Plan / I&TP Intervention Date

Report Date

Supplier quality plan 72121-9110, rev - # 28.11.2017 28.11.2017

Equipment Specification Purchase Order Number

GT acoustic enclosure 4101381997

Additional Relevant Project Information

#

Type of Intervention

☐ Expediting ☒ Quality Inspection

☒ Acceptance Test

☐ Other ☐ Other

Attendees supplier or representing Attendees General Electric or representing

Stefan Ristic, project engineer Limex Marius Popescu

Jelenko Jokic, project manager Limex

Nikola Ristic, project engineer Limex

Milan Milotic, technical director Limex

Roland De Sousa, project manager Isolite

SUMMARY

Limex is a suitable contractor for acoustic panels. Limex meets all requirements to successfully produce acoustic panels. Limex is certified according ISO 2001:2015. The 3D model produced in Solidworks in Limex was sent back to Isolite for overlaying (put the 3D solidworks model over the original 3D Autocad model), checking and production release. Limex has dedicated and suitable areas for -powder paint application and handling of panels respectively curing the panels in convection oven -assembly areas for panels -cutting, punching and bending of the metal sheets

INSPECTION DETAILS

Engineering/manufacturing drawings Isolite has produced the 3 D model in Autocad for GT enclosure and generator. The 3D model was sent electronically to Limex as step file together with the pdf 2D drawings and part list. Limex is using Solidworks for 3D drawings and Autocad for 2D drawings. The original 3D model was rebuilt in Limex using Solidworks software to include all manufacturing details like dimensions, bending and cutting details, assembly rivet locations.

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 2 / 16

Furthermore, all 2D manufacturing drawings were also produced in Solidworks from the 3D model. Only the 2D cutting drawings from Solidworks were converted to Autocad dwg because the CNC cutting machine is recognizing Autocad dwg format. The 3D model produced in Solidworks in Limex was sent back to Isolite for overlaying (put the 3D solidworks model over the original 3D Autocad model), checking and production release. Design of acoustic panels There are 2 types of panels: roof panels and wall panels. Each wall panel includes a built-in sealing rubber along the length of the panel and is already assembled in the work shop. That means there is no need to send the rubber loose to the site for this connection of the wall panels. A connection / joint between 2 panels was tested in Fraunhofer Institute Stuttgart for acoustic measurements. The connection / joint for the roof panels is different from the wall panels. The roof panels are just lying side by side without need to be riveted. For the roof panels, the rubber between 2 panels is put on site. Assembly of the panels (valid for both wall and roof panels): Outside: Al-HDG galvanized metal sheet (carbon steel): AZ185 (185 g / m^2) with a thickness of 22 microns. On this metal sheet a 3 layers powder coated paint was applied (thickness 200 microns): 2 x layers (DFT 80 microns + 80 microns) of primer (Polyflex EP-20-Korroflexprimer NT-GU). Before applying the primer the surface was degreased and slightly abraded using sand paper. The final layer is a top coat DFT 40 microns (Polyflex PES-135) BS386 (leigt bej) – light and weathering resistant. The application of both primer and top coat was done manually (dry electrostatic manual application followed by backing/curing in convection oven at 180 grad C for 15 min - top coat and 160 grad C and 15 min for primer coat). Internal metal sheet of the panel is a perforated meatal sheet Aluminium alloy Al Mg3 (EN 5754 H22). This internal metal sheet is not painted. The connection/joint between the perforated metal sheet and the outer metal sheet is done by using rivets. Between the perforated sheet and metal sheet there is layer of mineral wool (Knauf DPF-40). Between the mineral wool and perforated sheet there is a thin layer of protection to stop mineral wool coming out of the panel. The rivets are made of aluminium steel zinc plated (3 microns).

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 3 / 16

Quality control All panels have been 100% dimensionally inspected in Limex. The results are recorded on the control lists. The powder coating DFT has also been 100% inspected and measured. The results are recorded in control lists. After dimensional check, the panels are packed on the wooden pallets (according IPPC standard for the treated wood) and send to Isolite for container packing. Each panel is marked with the drawing and position number. The preliminary packing list is done in Limex and send to Isolite together with the packed panels. Production area Limex has dedicated and suitable areas for -powder paint application and handling of panels respectively curing the panels in convection oven -assembly areas for panels -cutting, punching and bending of the metal sheets Limex has adequate and suitable machines for cutting and punching (3x machines: 1.5 width, length up 11m, 1x 2 m width and 11 m length: thickness up 5 mm) and bending (2x machines up to 6m respectively up to 4m). The perforated sheets are punched in Limex out of metal sheets. Other production machines: Steel beams cutting machine 1x: up to 600 mm height and 1x machine for drilling, tapping and milling and can also place marking on the piece. Welding table for pre-assembly the parts before welding. Trial Assembly During the visit, a trial assembly of the enclosure removable panels has been carried out with satisfactory results. Cross-cut test During the visit a cross-cut test was carried out on a sample coated metal sheet with satisfactory results. Material Test Certificates The mill certificates were checked for following items: panel metal sheet, panel perforated metal sheet, rivets, powder paint, mineral wool and treated wood. Acoustic measurement values were shown as checked in the FI.

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 4 / 16

DISCREPANCIES / FINDINGS

Ref. Image Description Action & due Date

IMAGES

Figure 1

Figure 2

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 5 / 16

Figure 3

Figure 4

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 6 / 16

Figure 5

Figure 6

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 7 / 16

Figure 7

Figure 8

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 8 / 16

Figure 9

Figure 10

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 9 / 16

Figure 11 – panels during powder coating application

Figure 12 – panels during curing in the oven

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 10 / 16

Figure 13 – trial assembly

Figure 14

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 11 / 16

Figure 15

Figure 16

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 12 / 16

Figure 17

Figure 18 – dimensional spot check

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 13 / 16

Figure 19 – power coating application

Figure 20 – punching machine

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 14 / 16

Figure 21

Figure 22 – bending machine

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 15 / 16

Figure 23 – perforated sheets for the door

Figure 24

GE POWER GAS POWER SYSTEMS

SUPPLIER INTERVENTION REPORT

File Name: Page

2017 11 28 TJK Isolite Limex acoustic panles2017 11 28 TJK

Isolite Limex acoustic panels 16 / 16

Figure 25

The supplier must notify GE POWER supplier quality department immediately after the discrepancies detailed above have been

corrected. GE Power reserves the right to verify that the corrective actions have been taken to correct the discrepancies.

GE witnessed the above-mentioned activity without acceptance of liability. Supplier remains liable for complying with all applicable

specifications under the purchase order. Signature by GE of this report does not relieve supplier from any liability or guarantee of quality

under the purchase order.


Recommended