GE84PLN 1 Regional Radiocommunication Seminar - Niamey 20-24 April 2015 ATU/ITU - REGIONAL RADIOCOMMUNICATION SEMINAR for Africa 2015 Niamey 20 - 24 April 2015
Transcript

GE84PLN

1Regional Radiocommunication Seminar - Niamey 20-24 April 2015

ATU/ITU-REGIONAL RADIOCOMMUNICATION SEMINAR for Africa 2015

Niamey 20-24 April 2015

Overview

GE84PLN is an application designed to assist administrations the planning of VHF-FM sound broadcasting services in accordance with the GE84 Agreement.

It is recommended that the latest BRIFIC is installed so that characteristics of frequency assignments and proposed modifications are available.

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 2

Download GE84PLNhttp://www.itu.int/en/ITU-R/terrestrial/broadcast/Pages/Services.aspx

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 3

Select the preferences

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 4

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 5

Creating test notices

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 6

Running compatibility analysis with respect to other assignments in the Plan

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 7

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 8

Results of compatibility analysis

Detailed Analysis

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 9

Usually you don’t have to worry about interference caused to stations of your own Administration.

According to 4.3.7.1 you should verify if any stations of other Administrations have an Eu increase of 0.5 dB or more.

SOCHI KRAS 88.1MHzinterference to other emissions

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 10

Propagation zones According to Chapter 2 , No 2.1.1• T (Terre / Land)• Z2 (Cold Sea)• Z3 (Warm Sea)• Z4 (Super-refractivity)

Distance site to site & information concerning the various paths

SOCHI KRAS 88.1MHzinterference to other emissions

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 11

Propagation zones According to Chapter 2 , No 2.1.1• T (Terre / Land)• Z2 (Cold Sea)• Z3 (Warm Sea)• Z4 (Super-refractivity)

ERP at pertinent Azimuth Protection ratio (see Tables 2.1 to 2.3 of Annex 2 of GE84 Agreement) depending on:• Frequency spacing• Transmission System• Steady/tropospheric interference

SOCHI KRAS 88.1MHzinterference to other emissions

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 12

Eu Ref : Eu calculated at the time the assignment entered the Plan (n/a if not yet RECORDED)

NFS = Fs received + PR

n/c : Eu is not calculated (n/c) for the case Nuisance FS is more than 10dB (user selectable) below Eu Ref

Determining available frequencies for new services

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 13

Find the most suitable channel

14Regional Radiocommunication Seminar - Niamey 20-24 April 2015

The maximum nuisance field gives an indication of the Euat site. The complete analysis also involves calculating caused interference. (if too high, the frequency is unusable)

Creating TB2, TB3 and TB5 notices

Regional Radiocommunication Seminar - Niamey 20-24 April 2015 15

Thank you for your attention

16

[email protected]

Regional Radiocommunication Seminar - Niamey 20-24 April 2015