  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    1/21

    1

    GE Proprietary and Confidential

    GE GE ENERGY

    "#$%&'()High Efficiency Clean Renewable Energy

    *+,-./0.12)34 &5678Case study of Jenbacher Biogas

    application

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    2/21

    2

    GE Proprietary and Confidential

    )*+,-.)Where is Biogas from?

    /*01Animal Manure

    2 Pig3 Cow4 Chicken5 Duck!

    67* Plant89 Stalk

    :;Grass cutting!

    :?Waste@ABC Food WasteDE:? Brewery & Ethanol wasteFGBCMunicipal waste!

    HI Treatment

    JK Fermentation,LGasification!

    )*M,Biogass

    +,NO Composition:

    50 " 70% CH4

    30 " 50% CO2

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    3/21

    3

    GE Proprietary and Confidential

    JKP! Conditions of the fermentation process

    9: Temperature"QRJK mesophile process (30 - 38SC)

    "TRJK thermophile process (45 - 55SC)

    ;5? Retention time"UVminimum 15W

    "XYRange : 20 - 50 W

    "Z[ Common: 25 - 30W

    @34AB Dry matter concentration"\]JKDry fermentation : 20 - 30%

    "^]JKWet fermentation : 10 - 15%

    04

    GE Jenbacher

    /CDEGas mixture composition"_` Methane: 50 - 70%

    "abLcCO2: 30 - 50%

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    4/21

    4

    GE Proprietary and Confidential

    FGHI&J/KBLMNOPQIRSQI

    TIU3VWIX3YIZ[\]^_\]`3QI

    abc1defghijk_

    fgVWIlmnm

    0 100 200 300 400 500 600 700Std. mbiogas / ton

    06

    GE Jenbacher

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    5/21

    5

    GE Proprietary and Confidential

    Standard mbiogas / ton

    0 100 200 300 400 500 600 700

    cattle manure

    pig anure

    potato peelings

    grass cuttings

    beet

    brewery

    municipal biowaste

    food waste

    grass silage

    corn silage

    corn-cob-mix

    grease trap contents

    waste bread

    waste wheat

    minimum

    variation

    Biogas yields of 1t suitable organic materials

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    6/21

    6

    GE Proprietary and Confidential

    )34&o2 B1pCqr (LSU) = 500 kgCs

    1 LSU = 0.6 - 1.2tnuvuLSU'K)1.3mJ/wxyz{| 6.0 kWh/Nm

    1 LSU = 2 - 6luvuLSU'K)1.5mJ/wxyz{| 6.0 kWh/Nm

    1 LSU = 250 - 320}uvuLSU'K)2mJ/wxyz{| 6.5kWh/Nm

    03

    GE Jenbacher

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    7/21

    7

    GE Proprietary and Confidential

    ~ About Minhe"#$% General overviewdefghijklYmno6i.iLpqrstuviwQpxhiyz{iOz|z}~2004!"#$%&q{vi50'()o

    p*+,--./01423vi4de56)

    One of leading agriculture industrialization, important member of china

    stockbreeding association,#top 50 of Asia fowl#in 2004, biggest

    chicken plant in China. Located at Penglai, Shandong.

    &'() Farm Sizedefghi23H34789:14130;

  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    8/21

    8

    GE Proprietary and Confidential

    FGHIJKL CTQ and Solution

    $ MNOPEnergy loss

    $ QRST

    Environment Pollution$ UIP#

    Cost to handle

    V!18;E40180K tons manure/yr

    12;ESW120K tons of waste water

    XY Situation Z[ Issues KL Solutions

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    9/21

    9

    GE Proprietary and Confidential

    5,000,000,}5,000,000 Chicken

    150,}uv'K)1-.[J/1m3 methane per 150 Chicken daily

    J320 = 10,632-.[/vJ320 needs 10,632 m3 per day

    3 X J320,

    3x1063 kW

    34701J\O]Analysis on PG with Chicken Manure

    ~J/30,000 m3/v~30,000 m3 gas per day

    J/xy=20.9/01/-.[Gas LHV:20.9MJ/m3

    28

    GE Jenbacher

    J320:23 Electricity output1063KW

    #3 Efficiency 40.84

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    10/21

    10

    GE Proprietary and Confidential

    /C56789:;;5?

    /@J/

    ;5A

    9BC

    D/

    xEFGH

    x BC

    )KI'JK&c1L

    08

    GE Jenbacher

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    11/21

    11

    GE Proprietary and Confidential

    /C56MN Gas Requirement

    l ^_Pressure: 80 - 200 mbar

    l R`Temperaturea< 40SC

    l bc^`Relative Humiditya

  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    12/21

    12

    GE Proprietary and Confidential

    BOPN7#3EQ Energy balance

    9BC Electricity Output

    x BC Thermal OutputRST Cooling waterUVTLube oilW/XYCooling airD/ Exhaust gas

    J/BZ Methane Input

    B[\ Energy Loss891]^Consumed by Genset:;_xsystem cooling

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    13/21

    13

    GE Proprietary and Confidential

    ghi`jXkl Project Schedule

    `abcContract Sign

    deEfEquip Delivery

    :;ghInstallation

    ijklCommissionin

    g

    mn89Operation

    6 Months 4 Weeks 2 Weeks 2009!mn

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    14/21

    14

    GE Proprietary and Confidential

    FGo"pqO] Investment/Payback analysis

    `a Items oBAmountrstu(vw) PG capacity (KW) 3x1063

    !xyz{ (Operation hrs/year) 8,000|z (Hours)

    J\u (KWH/year) ~2,500;` 25MM KWH

    \} Tariff (RMB) 0.75

    \Pp" Income of Tariff (RMB) ~1900;(19MM)

    d~? Heat Output (KWH/yr) 2640; (26.4MM KWH)

    abLc!" CO2 Reduction (tons/yr) ~80000E/!

    CDMp" CDM Income (RMB) 600; (6MM)

    #oM Total Investment (RMB) 7500; (75MM)

    $p% Payback * 4.82!(4.82 years)

    !pq& ROI* 26.9%

    20!#pq 20 years income (RMB) >2.3C (>230MM)

    *:CDM x pqrcst20CDM and Heat income Notincluded.

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    15/21

    15

    GE Proprietary and Confidential

    uvwx5678Other typical applications

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    16/21

    16

    GE Proprietary and Confidential

    '(W)*++,J\Henan Tianguan Ethanol Power Generation

    D.+,a500,000 m3 biogas per day

    J\,-Configuration: 4 X J620 CHP System

    ?Output :\~ Electrical-6 x 2.738MWd~ Thermal -10MW

    .& Efficiency aElectricity 42.8%- Thermal 40%

    /0oxz{Commissioning: 2011.07

    /0pq Expected benefit

    $!J\uAnnual Electricity Generationa7.7 ;1wz>Gwhs@

    $!\Pp"Annual Tariff Incomea/04v; >About RMB40MM@

    $!Vc"2CO2 Mitigationa1,110,000 E *

    *:yz{`a|D}~After phase 2 completion

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    17/21

    17

    GE Proprietary and Confidential

    "J/#6

  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    18/21

    18

    GE Proprietary and Confidential

    dejk/56Land Fill Gas Application

    3e45BC67,gh Guangdong Xinfeng LFG Project

    DHIBCDaily Wastea 4000E(tons)DHI.,u Daily LFG: ~87,000m3

    J\,-PG equipmenta 3x JGC320

    J\8& Electrical output: 3,000 kW

    9$z{Commissioning: 2004!7n (July 2004)

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    19/21

    :;?Annual Op. HoursC7000 hrs

    U89BAnnual Electricity GenerationC1.4GwhsU89pZAnnual Tariff IncomeC9pVqY RMB9MMZ CO2rs MitigationC87,000[/UYtons/yrZ

    t Note: 1. Heated water value not included2. CDM income not included

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    20/21

    20

    GE Proprietary and Confidential

    Qp+,J>?@ Overview of China Biomass

    uv(wxyz{Govn!t plan and incentivepolicy

    &U2020!A#uBC440CDEF

    Utilization to reach 44B m3 by 2020.

    &GHIJKJLTIJ\}

    Encourage feed-in grid, and increase tariff&J>p*=M~NsN

    Develop domestic CDM

    'K)2000|Mm3J/(200+B m3 Methane)

    2010U#6BF}84Less than 7% utilization

    ~KN.oazSustained market needs, Huge opportunities

    PDF !"#"pdfFactory Pro" $#%&'(www.fineprint.cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/
  • 7/27/2019 GEJ-Biogas Case Study (20110506)

    21/21

    21

    GE Proprietary and Confidential

    #2011 GE Jenbacher GmbH & Co OHG

    PDF !"# "pdfFactory Pro" $#%&'( www fineprint cn

    http://www.fineprint.cn/http://www.fineprint.cn/http://www.fineprint.cn/

Recommended