Form B Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2) Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 1 of 13 General Application Information See the following “Form B – Instructions” link for detailed information on completing this application form: Applicants This Application Form is for FIT, Large Renewable Procurement (LRP), Net Metering, Load Displacement or Energy Storage Generators with a project size over 10 kilowatts (kW) and who are applying for a Connection Impact Assessment (“CIA”) to Hydro One Networks Inc., including: New Generators applying for a new CIA New Generators applying for revision(s) to their original CIA Existing Generators to verify information related to current connection to the Hydro One system as part of their overall Distribution Connection Agreement. Technical Requirements For technical requirements of Hydro One’s Distributed Generation projects, refer to the “Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below”, available at: . Application Submission Instructions Please return the completed form, fees and other required documents by mail to: Hydro One Networks Inc. Attn: Dx Generation Connections Generation Connection Application 185 Clegg Road Markham, Ontario L6G 1B7 Important Notes Applicants are cautioned NOT to incur major expenses until Hydro One approves to connect the proposed generation facility. All technical submissions (Form B, Single Line Diagrams, etc.) must be signed and sealed by a licensed Ontario Professional Engineer (P.Eng.). If your project is between 1 and 10 kW in size (such as a microFIT project), please fill out Hydro One’s “Micro- Generation Connection Application (Form C)” available at: If you are applying for connection of a Load Displacement or Energy Storage facility, the assessment performed by Hydro One is a called a Detailed Technical Connection Assessment or “DTCA”. For such facilities, the term Connection Impact Assessment or “CIA” as it appears throughout this Form B Application shall be interpreted to mean Detailed Technical Connection Assessment or “DTCA”. All fields in this application are mandatory, except where noted. Incomplete applications will be returned by Hydro One. Failure to provide the minimum information requirements will result in delays in processing your application.
Transcript
Page 1: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B Connection Impact Assessment (CIA) Application

Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 1 of 13

General Application Information

See the following “Form B – Instructions” link for detailed information on completing this application form:

Applicants

This Application Form is for FIT, Large Renewable Procurement (LRP), Net Metering, Load Displacement or Energy Storage Generators with a project size over 10 kilowatts (kW) and who are applying for a Connection Impact Assessment (“CIA”) to Hydro One Networks Inc., including:

• New Generators applying for a new CIA • New Generators applying for revision(s) to their original CIA • Existing Generators to verify information related to current connection to the Hydro One system as part of their overall

Distribution Connection Agreement.

Technical Requirements

For technical requirements of Hydro One’s Distributed Generation projects, refer to the “Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below”, available at: https://www.hydroone.com/businessservices_/generators_/Pages/technicalrequirements.aspx.

Application Submission Instructions

Please return the completed form, fees and other required documents by mail to:

Hydro One Networks Inc. Attn: Dx Generation Connections Generation Connection Application 185 Clegg Road Markham, Ontario L6G 1B7

Important Notes

• Applicants are cautioned NOT to incur major expenses until Hydro One approves to connect the proposed generation facility.

• All technical submissions (Form B, Single Line Diagrams, etc.) must be signed and sealed by a licensed Ontario Professional Engineer (P.Eng.).

• If your project is between 1 and 10 kW in size (such as a microFIT project), please fill out Hydro One’s “Micro-Generation Connection Application (Form C)” available at:https://www.hydroone.com/business-services/generators/fit

• If you are applying for connection of a Load Displacement or Energy Storage facility, the assessment performed by Hydro One is a called a Detailed Technical Connection Assessment or “DTCA”. For such facilities, the term Connection Impact Assessment or “CIA” as it appears throughout this Form B Application shall be interpreted to mean Detailed Technical Connection Assessment or “DTCA”.

• All fields in this application are mandatory, except where noted. Incomplete applications will be returned by Hydro One. Failure to provide the minimum information requirements will result in delays in processing your application.

https://www.hydroone.com/business-services/generators/fit

208335
Typewritten Text
Page 2: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 2 of 13

Section A – Administrative Information

Date: Application Type: (choose one)

ENGINEERING STAMP: (choose one)

Existing generator on the property: Yes No

IESO Contract # for existing generator(s): If existing generator(s) on property, select generation type and provide IESO Contract or Hydro One Project ID:

Biomass Solar (PV) Gas Turbine Wind Diesel Engine Water CHP/Cogen

Other (please specify) Revised fields: If this is a CIA Revision Application, list the fields that have changed from your previous CIA Application: (Example: “Original CIA Project ID#, IESO Contract Number and Type of Connection”) Revised fields: 1. (a) Original CIA Project ID # (if applicable): (XX,XXX)

(b) Project Name: 2. IESO Contract Number: (F-XXXXXX-XXX-XXX-XXX)

IESO Reference Number: (FIT-FXXXXXX) or (FIT-GXXXXXX) 3. Ontario Corporate Number OR Business Identification Number: 4. Proposed In-service Date: (mm/dd/yyyy)

Section B – Project Information 5. Type of Connection (choose one): Single phase Three phase 6. Project Size (TOTAL requested DG output capacity):

Must match IESO contract (if applicable). See section 2.1.2 of Hydro One's Technical Interconnection Requirements kW

7. Equipment Capacity:Total Nameplate Capacity or equipment rating as per manufacturer's stamp kVA

8. Project Location Address:

City/Town/Township: Postal Code:

Lot Number(s): Concession Number(s): 9. Project Contact Information

Single Point of Contact for the project: (choose one) Owner Consultant Owner Information (same as Generator) Consultant Information

Contact Person: Company Name & Physical Mailing Address: (incl. Postal Code). No P.O. BOXES or Rural Routes will be accepted)

Work Tel. Number:

Cell:

Fax:

E-mail

Program Type:

208335
Typewritten Text
Page 3: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 3 of 13

10.

Customer Status

Yes No If “Yes” to 10(a), provide Hydro One 12-digit account number of the property:

(b) Customer name registered on existing account:

(c) Is the owner an HST registrant?

Yes

No

- RT

(f) Barcode of nearest Hydro pole serving project location: (Only provide this if you did NOT answer 10(b) above):

11. Fuel / Renewable Energy Type Biomass Solar (PV) Gas Turbine Wind Diesel Engine Water CHP/Cogen

Other (please specify):

For water projects only: Please answer (a) and (b):

(a) Is water your primary energy source?: Yes No (b) Is your generation facility located on provincial Crown or federally-regulated lands?: Yes No

Section C – Project Connection Information

See “Form B – Instructions” for definitions of “Point of Connection (POC)” and “Point of Common Coupling (PCC).” 12. Generation Facility and New Line Map

On a cut-out from the Hydro One DOM (Distribution Operating Map) provide the location of the generation facility with proposed line routings for connection to Hydro One’s distribution system. It should identify the POC, the PCC and the location of new lines between the generation facility and the POC (i.e. on private property or public road right-of-ways).

Drawing / Sketch Number: Revision Number:

13.

Connection to Hydro One Distribution System: (a) Proposed or existing connection voltage to Hydro One’s distribution system:

If this is a CIA revision application, list the kV as stated in your original CIA study agreement kV

(b) Station Name: (c) Feeder:

(d) GPS coordinates: (GPS Format: Latitude, Longitude - Degree Decimal e.g. X: 49.392 Y:-75.570)

POC GPS Coordinates:

PCC GPS Coordinates:

Generation Facility GPS Coordinates:

(e) Please select ONE applicable connection figure from Appendix A: A1 A2 A3

(f) Length of line from the POC to the PCC: km

(g) Length of line from PCC to the Generation Facility. Important: The line must NOT be shared with any other DG (refer to Appendix A):

km Conductor Type/Size: /

(h) Fault contribution from the Generator’s Facilities, with the fault location at the PCC:

Three-phase generators: 3-phase short circuit

Single-phase generators: 1-phase short circuit

(a) Is there an existing Hydro One customer account at the project location?: If “No”, skip to 10(e)

(d) Is the account holder aware of this application?

(e) If you are an HST registrant, provide your HST number:

Yes No

208335
Typewritten Text
If not listed, please type name
208335
Text Box
X
208335
Text Box
X
208335
Text Box
X
208335
Text Box
Y
208335
Text Box
Y
208335
Text Box
Y
208335
Typewritten Text
If not listed, please type name
Page 4: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 4 of 13

IMPORTANT NOTES:

• If this project requires line expansion work between the POC and PCC, Hydro One will provide a cost estimate to construct any line located on public road right-of-way. The cost estimate will include a breakdown of Uncontestable work (i.e. overbuild to existing line) that can only be performed by Hydro One, as well as Contestable work (i.e. new construction/green-field) that can be performed by the Generator, their contractor or Hydro One. (Both Uncontestable work and Contestable work requires the design to Hydro One specifications). Hydro One will become the owner of the line expansion.

• For Generator-owned line, the Generator may choose to apply for installation of the line on existing Hydro One-owned poles.

This is known as an application for Joint Use (JU) of poles. If the application is accepted, Hydro One will provide the Generator with information on initial connection costs, annual pole-space rental and emergency service (ES) fees, and required JU & ES Agreements.

14.

Single Line Diagram (“SLD”)

Provide an SLD of the Generator’s facilities including the PCC, transformer and connecting station, feeder and supply voltage. Along with the SLD, provide the following information:

SLD Drawing Number: Revision Number:

Section D – Generation Characteristics 15. Generation Characteristics

(a) Existing Generation: Are there any existing generators at the PCC?: Yes No

(b) Characteristics of Proposed Generation: Note for facilities with multiple generators: Provide the manufacturer’s technical data (electrical) for the generator or inverter. If your generators have different characteristics, please provide the characteristics for each generator on an additional sheet(s).

Number of Generating Units:

Manufacturer: Type or Model Number:

Rated Capacity of each unit: kW kVA Generator Output Voltage: kV

Generator Type: Rotating Static (PV, fuel cell, battery)

Generator Phasing: Single phase Single phase connecting to three phase system Three phase

Power Conversion Technologies:

Synchronous Induction Full inverter interfaced

Other (Please Specify) (If the machine type is “Other”, please provide values equivalent to a Synchronous or Induction type Generator)

Limits of range of reactive power at the machine output:

i. Lagging (over-excited): kVAR Power Factor:

ii. Leading (under-excited): kVAR Power Factor:

Limits of range of reactive power at the PCC:

iii. Lagging (over-excited): kVAR Power Factor:

iv. Leading (under-excited): kVAR Power Factor:

Maximum Starting inrush current: (multiple of full load current)

pu Generator Winding Connection: Delta Star

Neutral grounding method of star Solid Ungrounded

Page 5: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 5 of 13

connected generator: Impedance: R: ohms X: ohms

For Synchronous Units:

a) Nominal machine voltage: kV (LL)

b) Unsaturated reactances on: kVA base kV base

Direct axis subtransient reactance, Xd’’: pu

Direct axis transient reactance, Xd’: pu

Direct axis synchronous reactance, Xd: pu

Subtransient time, Td”: ms

Transient time, Td’: ms

Zero sequence reactance, X0: pu

For Induction Units:

a) Nominal machine voltage: kV

b) Unsaturated reactances on: kVA base kV base

Direct axis subtransient reactance, Xd’’ pu

16.

(a) Transformer Ownership: Customer / Hydro One If transformer is Hydro One owned, provide the Hydro One Account No. OR complete (b) to (h) below:

(b) Transformer Rating: kVA

(c) Nominal voltage of high voltage winding: kV

(d) Nominal voltage of low voltage winding: kV

(e) Transformer Type: Single phase Three phase

(f) Impedances on: kVA base kV base

R: pu X: pu

(g)

High voltage winding connection: Delta Star

Grounding method of star connected high voltage winding neutral:

Solid Ungrounded Impedance: R: ohms X: ohms

(h)

Low voltage winding connection: Delta Star

Grounding method of star connected low voltage winding neural:

Solid Ungrounded

Impedance: R: ohms X: ohms

• The term ‘High Voltage’ refers to the connection voltage to Hydro One’s distribution system and ‘Low Voltage’ refers to the generation or any other intermediate voltage.

• Providing a picture of transformer equipment along with this application may help expedite your application quicker.

IMPORTANT NOTES: • At the Generator’s expense, and, if requested, Hydro One may provide transformation up to a maximum of 500 KVA

three-phase, as described in the Hydro One Conditions of Service (Section 3.5, item C.4).

Energy Storage Information

Interface Step-Up Transformer Characteristics 17.

For Induction Units:

Energy Storage Unit Size:

Number of Units:

kWh kWh

kVA

Total Energy Storage Size:

Inverter Size: Enter 0 if inverter isshared with generation unit(s)

Page 6: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 6 of 13

18. Do you have an intermediate transformer? Yes No

(a) Transformer Rating: kVA

(b) Nominal voltage of high voltage winding: kV

(c) Nominal voltage of low voltage winding: kV

(d) Transformer Type: Single phase Three phase

(e) Impedances on: kVA base kV base

R: pu X: pu

(f)

High voltage winding connection: Delta Star

Grounding method of star connected high voltage winding neutral:

Solid Ungrounded

Impedance: R: ohms X: ohms

(g)

Low voltage winding connection: Delta Star

Grounding method of star connected low voltage winding neural:

Solid Ungrounded

Impedance: R: ohms X: ohms

IMPORTANT NOTE: The term ‘High Voltage’ refers to the intermediate voltage that is input to the interface step-up transformer and the ‘Low Voltage’ refers to the generation voltage.

19. High-Voltage Grounding Transformer Characteristics (if applicable)

Type: Zig-zag Star-delta

Zig-zag Grounding Transformer zero sequence impedance (Z0): R: ohms X: ohms

Star-delta Grounding Transformer zero sequence impedance (Z0): R: ohms X: ohms

20.

Load information

(a) Maximum consumption of DG facility: kVA kW

(c) Maximum load current (referred to the nominal voltage at the connection point to Hydro One system): A

(d) Maximum inrush current to loads (referred to the nominal voltage at the connection point to Hydro One system): A

(e) For load displacement generation facilities, please attach a schedule of the forecasted maximum generation output (as a function of loading of the facility). At a minimum, include the forecasted generation output information (i.e. Watts and VARs) during the minimum and maximum load of the load facility to which the load displacement generator is connecting. (See Appendix B for template)

21.

Energy Storage Facility Control Strategy: (Choose one of the following if applicable, see Appendix C for templates)

Peak Shaving (Note: Facility will act as a generator during the on-peak times and a load during off-peak times. Please submit a detailed schedule of operating times, Var and Watt schedules, etc.)

Dynamic VAR Support (Note: Please submit a detailed description of control strategy, Var and Watt schedules, etc.)

Frequency Support (Note: Please submit a detailed description of the frequency support control strategy, such as cut-in/cut-off frequency, Var and Watt schedules, etc.)

Other (Note: Please attach a detailed description of the proposed control mode.) NOTE: Hydro One reserves the right to modify the control strategy as part of its Detailed Technical Connection Assessment.

(b) Average monthly consumption:

208335
Text Box
kW
Page 7: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 7 of 13

22. For Load Displacement Projects: (Choose one of the following)

Operating parallel to grid

Operating non-parallel to grid

23.

For Emergency Backup Generators: (Choose one of the following)

Closed transition (“make before break”) Time for which generator remains parallel to grid (in milliseconds): _______________ ms

Open transition (“break before make”)

Attached Documents

Item No. Description Document

No. No. of Pages

1

2

3

4

Attached Drawings

Item No. Description Document

No. No. of Pages

1

2

3

4

Section E – Checklist

Please ensure the following items are completed prior to submission. The application will be returned if Hydro One determines it is incomplete. Please also see the “Common Errors Customer Checklist” for detailed checklist.

Completed Form B stamped by a Professional Engineer

Payment in full by cheque including applicable taxes. Cheque should be made payable to “Hydro One Networks Inc.”). See section E1

Signed Study Agreement (original signature is required)

Single Line Diagram (SLD) of the Generator’s facilities, must be stamped by a Professional Engineer

DOM (Distribution Operating Map)

Load Displacement Generation Facility’s Load and Generation schedules - Section 19(d) (if applicable)

Load Displacement Generation Facility’s mode of operation - Section 21 (if applicable)

Energy Storage Facility operating strategy description and parameters - Section 20 (if applicable)

Emergency Backup Generation Facility’s mode of operation - Section 22 (if applicable)

Page 8: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 8 of 13

Section E1 – CIA Application Fee Checklist

Please ensure the following items are completed prior to submission. The application will be returned if Hydro One determines it is incomplete. Check all that apply:

Applicable CIA Fee See the Connection Impact Assessment Fee Schedule on our website for costs. Please enter the amount from the fee schedule.

$ _______________ +HST

Transmission Customer Impact Assessment (TxCIA) Fee (If Applicable) A TxCIA is also required if the total nameplate generation of the project is greater than 10MW.

$15,000.00 +HST

IESO System Impact Assessment (SIA) Fee (If Applicable) A SIA Deposit is required if the total nameplate generation of the project is greater than 10MW. The total cost of the SIA will be Trued Up/Down upon the receipt of the SIA from the IESO. See the IESO’s SIA application for costs. (http://www.ieso.ca/Documents/forms/IMO_FORM_1536-SIAA-Generation.doc)

$ ________________

Note: when there is an upstream LDC, an additional $10,000 +HST will be required for costs associated with this LDC’s CIA

Section F – Notes

Important

By submitting a Form B, the Proponent authorizes the collection by Hydro One Networks Inc. (“Hydro One”), of any agreements and any information pertaining to agreements made between the Proponent and the Ontario Power Authority from the Ontario Power Authority, the information set out in the Form B and otherwise collected in accordance with the terms hereof, the terms of Hydro One’s Conditions of Service, Hydro One’s Privacy Policy and the requirements of the Distribution System Code and the use of such information for the purposes of the connection of the generation facility to Hydro One’s distribution system.

Page 9: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) ApplicationHydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

9

OFFICE USE ONLY: PLEASE SUBMIT WITH APPLICATION

Page 10: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 10 of 13

Figure A-1: Hydro One Owns Entire Tap Line

Figure A-2: Generator Owns Entire Tap Line

New Generator Owned Tap Line which cannot be shared with any other DG

Page 11: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 11 of 13

Figure A-3: Hydro One Owns a Portion and Generator Owns a Portion of Tap Line

New Generator Owned Tap Line which cannot be shared with any other DG

Page 12: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 12 of 13

Appendix B: Minimum Generation Output Information required for Load Displacement Generation Facilities

Figure B-1: Example Schedule with Minimum Information required for Load Displacement Projects

Page 13: General Application Information · PDF file · 2018-01-12If your project is between 1 and 10 kW in size ... 5. Type of Connection ... kVA Total Energy Storage Size: Inverter Size:

Form B - Connection Impact Assessment (CIA) Application Hydro One Distributed Generation Group | [email protected] | 1-877-447-4412 (Option 2)

Hydro One Connection Impact Assessment Application (Form B) | Version | | Pg 13 of 13

Appendix C: Minimum Control Strategy Information required for Energy Storage Facilities

Figure C-1: Peak Shaving

Figure C-2: Dynamic VAR Support

Figure C-3: Frequency Support

Figure C-4: Other