GENERAL DEMOLITION NOTES: ALL NEW MASONRY WALLS AND INFILL THAT ARE IN CONTINUANCE WITH EXISTING MASONRY WALLS SHALL BE TOOTHED INTO THE EXISTING COURSING TO ACHIEVE A UNIFORM JOINT PATTERN AND MORTAR STRIKE TO MATCH THE EXISTING FIELD VERIFY ALL EXISTING WALL THICKNESSES. IN ALL RENOVATED AREAS OF THE WORK, THE INTENT OF THESE CONTRACT DOCUMENTS IS TO PROVIDE A LEVEL OF QUALITY FOR ALL PATCHED SUBSTRATES AND SURFACES EQUAL TO THAT OF NEW SURFACES, INCLUDING BUT NOT LIMITED TO PLASTER, GYPSUM WALL BOARD AND MASONRY. ALL EXISTING SUBSTRATES AND FINISHES DISTURBED OR INTERRUPTED BY THE WORK SHALL BE REPLACED OR "FILLED IN" TO ACHIEVE UNIFORM COLOR, TEXTURE, PATTERN AND APPEARANCE TO MATCHING ADJACENT SUBSTRATES AND FINISHES. TRANSITIONS BETWEEN EXISTING TO EXISTING AND NEW TO EXISTING SUBSTRATES AND FINISHES SHALL BE ACHIEVED IN STRAIGHT HORIZONTAL AND OR VERTICAL LINES BETWEEN DIFFERENT AND OR NEW SUBSTRATES AND FINISHES. PATCH ALL HOLES IN FLOORS, WALLS, CEILINGS, AND ROOF LEVEL WITH EXISTING ADJACENT SUBSTRATES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION TO COMPLETE THE WORK. MATCH THE EXISTING ADJACENT SUSTRATES, PATTERNS, TEXTURES AND FINISHES. PATCH, REPAIR OR REPLACE ALL EXISTING FINISHES AND SUBSTRATES DISTURBED DURING CONSTRUCTION OR AS A RESULT OF DEMOLITION OR REMOVAL OF AN ITEM. ALL REPAIR OR REPLACEMENT SHALL MATCH ADJACENT EXISTING AND/OR NEW SUBSTRATES, PATTERNS AND FINISHES. SEE ROOM FINISH SCHEDULE AND SPECIFICATIONS FOR NEW FINISHES. PREPARE EXISTING REMAINING WORK SUBSTRATES TO RECEIVE NEW FINISHES AS INDICATED ON THE ROOM FINISH SCHEDULE AND IN SPECIFICATIONS. SUBSTRATE PREPARATION SHALL BE IN CONFORMANCE WITH THE INSTALLATION REQUIREMENTS OF EACH NEW FINISH. ALL NEW WALLS SHOWN WITH MASONRY HATCHING WITHIN THE EXISTING BUILDING SHALL BE TOOTHED INTO EXISTING MASONRY. MATCH EXISTING COURSING, JOINT PATTERN AND THICKNESS UNLESS NOTED OTHERWISE. AT THE DEMOLITION OF AN EXISTING ITEM, REMOVE ALL TRACES OF THE DEMOLISHED ITEMS COMPONENTS FROM THE SURFACE OF THE REMAINING FLOOR, WALLS, CEILING, AND ROOF. AT THE REMOVED FASTENERS IN ALL EXISTING MASONRY WALLS AND FLOORS, PATCH HOLE WITH GROUT LEVEL WITH EXISTING ADJACENT SUBSTRATES IN ORDER TO RECEIVE NEW FINISHES. AT EXISTING FLOORS: WHERE WALLS ARE SCHEDULED FOR DEMOLITION AND EXTEND TO BELOW THE CONTINUOUS CONCRETE FLOOR SLAB, THE WALL SHALL BE DEMOLISHED TO BELOW THE FLOOR THICKNESS. THE FLOOR SHALL BE PATCHED WITH CONCRETE AND GRANULAR FILL TO MATCH THE EXISTING THICKNESS, PROVIDE NEW VAPOR BARRIER TO THE PATCHED AREA. PATCH FLUSH TO ADJACENT EXISTING ELEVATIONS. APPLY CEMENTITIOUS UNDERLAYMENT TO PRODUCE A UNIFORM SURFACE IN ALL AREAS RECEIVED NEW FINISH AS INDICATED ON ROOM FINISH SCHEDULE. PATCHED JOINTS SHALL NOT TELEGRAPH THRU THE NEW FINISH. AT WALL SURFACES TO BE PAINTED, WHERE PATCHING OCCURS IN THE WORK OF AN EXISTING PAINTED SURFACE, THE PATCHED AREA SHALL BE SPACKLED, FILLED, PRIMED AND INTERMEDIATE PAINT COATS APPLIED PRIOR TO APPLICATION OF FINAL FINISH PAINT COATS. APPLY FINAL FINISH PAINT COATS OVER THE ENTIRE WALL SURFACE CONTAINING THE PATCH. WHERE PAINTING IS LIMITED TO PATCH, THE WORK AREA SHALL INCLUDE THE SURFACE FROM THE JOINT AT THE WALL / FLOOR INTERSECTION TO THE JOINT AT THE WALL / CEILING INTERSECTION. IT SHALL EXTEND HORIZONTALLY FROM LEFT SIDE OF THE PATCH TO RIGHT SIDE OF THE PATCH AND SHALL INCLUDE THE ENTIRE PATCH. PROVIDE ADDITIONAL SPACKLING AND PAINT COATS UNTIL THE PATCH AREAS BLEND COMPLETELY WITH THE EXISTING ADJACENT WALL SURFACE. PATCHES AT CEILINGS SHALL BE TREATED IN SAME FASHION AS DESCRIBED ABOVE. AT ALL CERAMIC TILE AREAS TO BE PATCHED / REPAIRED THE FOLLOWING WORK SHALL OCCUR AT DEMOLISHED ITEMS AND DAMAGED AREAS, FILL ALL HOLES IN EXISTING CERAMIC WALL AND FLOOR TILE THAT ARE UP TO 1" DIAMETER WITH A COLOR EPOXY GROUT TO MATCH THE EXISTING CERAMIC TILE COLOR. REMOVE AND REPLACE EXISTING ADJACENT AROUND AREAS WHERE HOLES EXCEED 1" DIAMETER. REPLACE WITH NEW TILES THAT MATCH AS CLOSELY AS POSSIBLE TO EXISTING TILES . MATCH PATTERN, SIZE, SHAPE, COLOR, TEXTUREAND COMPOSITION. FINAL SELECTION OF TILE TO BE INSTALLED SHALL BE BY THE ARCHITECT AND OWNERS REPRESENTATIVE. FOLLOWING ANY DEMOLITION AND / OR REMOVAL, PATCH AND REPAIR ALL EXISTING DISTURBED SUBSTRATES AND FINISHES TO MATCH EXISTING SUBSTRATES AND FINISHES, OR PREPARE EXISTING ADJACENT CONSTRUCTION TO ACCOMODATE NEW CONSTRUCTION AND SCHEDULED FINISHES. GENERAL ALTERATION / RENOVATION NOTES: DASHED LINES INDICATE GENERAL EXISTING CONSTRUCTION TO BE REMOVED. GENERAL CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION REQUIRED FOR INSTALLATION OF NEW CONSTRUCTION SHOWN ELSEWHERE ON DRAWINGS. SEE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS FOR OTHER DEMOLITION WORK REQUIRED. ANY DEMOLITION OF MECHANICAL, ELECTRICAL, OR PLUMBING EQUIPMENT SHOWN ON THESE DRAWINGS, IS FOR COORDINATION ONLY. COORDINATE ALL WORK BY OTHER CONTRACTORS INCLUDING CAPPING AND DISCONNECTING OF BUILDING SERVICES SUCH AS WATER, SEWER, ELECTRIC, GAS, COMMUNICATIONS, ETC. BEFORE DEMOLITION AND THROUGHOUT CONSTRUCTION, GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW WITH OWNER'S REPRESENTATIVE ALL ITEMS BEING REMOVED BY THEIR TRADES. ALL ITEMS DESIGNATED DURING THIS REVIEW TO REMAIN OWNER'S PROPERTY, SHALL BE MAINTAINED IN GOOD CONDITION AND TURNED OVER TO OWNER. ALL ITEMS DESIGNATED TO BE REUSED AS PART OF NEW CONSTRUCTION SHALL BE MAINTAINED IN A REUSABLE CONDITION AND STORED ON SITE BY CONTRACTOR IN A CLEAN, DRY LOCATION UNTIL INSTALLATION. ALL REMAINING ITEMS AND MATERIALS DEEMED TO BE TRASH SHALL BE DISPOSED OF PROPERLY BY LAW, OFF SITE BY THE RESPONSIBLE CONTRACTOR. EXISTING CONDITIONS AS THEY APPEAR IN THESE CONTRACT DOCUMENTS MAY VARY WITH ACTUAL CONDITIONS BECAUSE OF ITEMS REMOVED BY THE OWNER'S STAFF. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING AND REPAIR WORK AS A RESULT OF THE OWNER'S REMOVAL OF SUCH ITEMS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL EXISTING BUILDING DIMENSIONS AND CONDITIONS, INCLUDING FINISHES AND MATERIALS, SYSTEMS SHOWN AND DESIGNATED AS EXISTING TO REMAIN ON CONTRACT DRAWINGS PRIOR TO STARTING DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT OF ANY AND ALL DISCREPANCIES IN INFORMATION INDICATED ON CONTRACT DRAWINGS PRIOR TO STARTING OF DEMOLITION AND CONSTRUCTION. VERIFICATION AND COORDINATION OF CLEARANCES REQUIRED FOR ALL NEW WORK BY ALL AND ANY ASSOCIATED CONFLICT RESOLUTION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE BUILDING RECEIVING MAJOR DEMOLITION WORK, AND DOES NOT REPRESENT THE DEMOLITION FOR THE PROJECT IN ITS ENTIRETY. REFER TO CONTRACT DRAWINGS FOR ADDITIONAL DEMOLITION WORK REQUIRED BY OTHER SUB CONTRACTORS. OTHER SUB CONTRACTORS DEMOLITION WORK SHALL BE COORDINATED BY THE GENERAL CONTRACTOR WITH REGARDS TO BUT NOT LIMITED TO SCHEDULE AND SEQUENCE. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DEMOLITION CONDITIONS RELATED TO ANY ACCEPTED ALTERNATE BIDS. INCLUDING FINISHES AND MATERIALS, SYSTEMS SHOWN AND DESIGNATED AS EXISTING OR NEW ON THE CONTRACT DRAWINGS PRIOR TO STARTING OF DEMOLITION AND CONSTRUCTION. ANY DISCREPANCIES IN INFORMATION INDICATED ON CONTRACT DRAWINGS SHALL BE DIRECTED IN WRITING TO THE ATTENTION OF THE ARCHITECT PRIOR TO STARTING OF DEMOLITION AND CONSTRUCTION. THE OWNER RESERVES THE RIGHT TO SALVAGE AND REMOVE ANY EXISTING ITEMS BEFORE OR DURING DEMOLITION WORK. THE GENERAL CONTACTOR IS RESPONSIBLE FOR ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE BUILDING AFTER ANY DEMOLITION WHICH RENDERS ANY PART OF THE BUILDING STRUCTURALLY UNSTABLE. NO DEMOLITION SHALL OCCUR WHICH LEAVES THE BUILDING INTERIOR WITHOUT WEATHER PROTECTION. ALL DEMOLITION OF EXTERIOR SURFACES SHALL BE FOLLOWED IMMEDIATELY BY PROTECTIVE CONSTRUCTION. GENERAL CONTRACTOR SHALL INSURE THAT TEMPORARY PROTECTION FROM WEATHER IS PROVIDED AND INSTALLED AT ALL EXPOSED OPENINGS. GENERAL CONTRACTOR SHALL TAKE ALL POSSIBLE PRECAUTIONS AGAINST DAMAGING ANY EXISTING CONSTRUCTION THAT IS TO REMAIN. ALL DAMAGES CAUSED BY THE OPERATIONS OF THIS CONTRACT SHALL BE REPAIRED AT THAT CONTRACTORS EXPENSE TO THE COMPLETE SATISFACTION OF THE OWNER. PRIOR TO COMMENCING ANY EXCAVATION, THE GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES AND / OR MUNICIPAL AUTHORITIES. TYPICAL EXISTING FOUNDATIONS REMOVAL - REMOVE ALL EXISTING FOUNDATIONS TO ACCOMODATE INSTALLATION OF NEW FOUNDATIONS OR ANY NEW CONSTRUCTION. SHOWN ELSEWHERE ON DRAWINGS. GENERAL CONTRACTOR SHALL BE AWARE THAT THE EXISTING BUILDING WILL BE OCCUPIED AND IN USE DURING THE CONTRACT SCHEDULE. ALL CONTRACTORS SHALL CONDUCT THEIR OPERATIONS SO THAT THERE WILL BE MINIMAL INTERFERENCE WITH THE CONTINUED OPERATIONS OF THE ADJACENT SPACES AND SITE AREAS. ANY INTERFERNCE OR INCONVENIENCE WITH THE CONTINUED OPERATION OF THE FACILITY SHALL BE REVIEWED WITH THE ARCHITECT AND THE OWNER PRIOR TO APPROVAL. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSURING THE STRUCTURAL STABILITY OF THE EXISTING STRUCTURE IN THE AREAS INVOLVING NEW WORK AND FOR PROTECTING THE EXISTING STRUCTURE FROM DAMAGE DURING THE COURSE OF THE WORK. THIS SHALL INCLUDE SUPPLYING AND INSTALLING LINTELS, SHORING, BULKHEADS AND ANY OTHER ITEMS NECESSARY FOR THE PROTECTION AND STABILITY OF THE BUILDING. NO WORK THAT WILL JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE BUILDING SHALL BE DONE WITHOUT CONSULTING THE STRUCTURAL ENGINEER AND THE ARCHITECT. REFER TO SPECIFICATIONS AND PHASING DRAWINGS FOR CONSTRUCTION PHASING OR SEQUENCEING WHICH MAY AFFECT THE SCHEDULE OF REMOVALS. DEMOLITION PLANS REFLECT LOCATIONS OF DEMOLITION . EXTENT OF WORK SHALL BE ALL CONSTRUCTION WORK NECASSARY TO PROPERLY COMPLETE THE PROJECT. REVIEW WALL SECTIONS AND OTHER DRAWINGS FOR FULL SCOPE OF DEMOLITION AS REQUIRED. D1. D2. D3. D4. D5. D6. D7. D8. D9. D10. D11. D12. D13. D14. D15. D16. D17. D18. R1. R2. R3. R4. R5. R6. R7. R8. R9. R10. R11. R12. REMOVE WELDED ALUM. METAL SLEEVE INFILL EXISTING EXTERIOR WALL OPENING WITH BRICK VENEER TO MATCH EXISTING EXISTING EPDM MEMBRANE PATCH EXISTING OPENING WITH EPDM FLASHING MATERIAL EXISTING ROOF REMOVE EXISTING METAL WALL COPING REMOVE UNCURED FORMFLASH CONTINUOUS LAP JOINT INFILL EXISITNG OPENING WITH 6" CMU PROJECT PLOT SCALE: FILENAME: DATE: 01 MM-DD-YR DESCRIPTION OF CHANGES NAME R E V I S I O N S www.cra-architects.com ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES. CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION. © CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016 CRABTREE ROHRBAUGH & ASSOCIATES - ARCHITECTS 250 WEST MAIN STREET, SUITE 200 CHARLOTTESVILLE VA 22902 434-975-7262 FAX 434-975-7263 401 EAST WINDING HILL ROAD MECHANICSBURG PA 17055 717-458-0272 FAX 717-458-0047 VDOE: 008-47-00-101 As indicated DEMOLITION LEGEND AND GENERAL NOTES SEPTEMBER 28, 2015 2846 D1.0 AUGUSTA COUNTY PUBLIC SCHOOLS WILSON MIDDLE SCHOOL ADDITIONS 232 HORNET ROAD, FISHERSVILLE , VA 22939 3" = 1'-0" D1.0 A EXISTING SCUPPER INFILL DETAIL
Transcript
Page 1: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

GENERAL DEMOLITION NOTES:

ALL NEW MASONRY WALLS AND INFILL THAT ARE IN CONTINUANCE WITH EXISTING MASONRY WALLS SHALL BE TOOTHED

INTO THE EXISTING COURSING TO ACHIEVE A UNIFORM JOINT PATTERN AND MORTAR STRIKE TO MATCH THE EXISTING

FIELD VERIFY ALL EXISTING WALL THICKNESSES.

IN ALL RENOVATED AREAS OF THE WORK, THE INTENT OF THESE CONTRACT DOCUMENTS IS TO PROVIDE A LEVEL OF

QUALITY FOR ALL PATCHED SUBSTRATES AND SURFACES EQUAL TO THAT OF NEW SURFACES, INCLUDING BUT NOT

LIMITED TO PLASTER, GYPSUM WALL BOARD AND MASONRY.

ALL EXISTING SUBSTRATES AND FINISHES DISTURBED OR INTERRUPTED BY THE WORK SHALL BE REPLACED OR "FILLED IN"

TO ACHIEVE UNIFORM COLOR, TEXTURE, PATTERN AND APPEARANCE TO MATCHING ADJACENT SUBSTRATES AND

FINISHES. TRANSITIONS BETWEEN EXISTING TO EXISTING AND NEW TO EXISTING SUBSTRATES AND FINISHES SHALL BE

ACHIEVED IN STRAIGHT HORIZONTAL AND OR VERTICAL LINES BETWEEN DIFFERENT AND OR NEW SUBSTRATES AND

FINISHES.

PATCH ALL HOLES IN FLOORS, WALLS, CEILINGS, AND ROOF LEVEL WITH EXISTING ADJACENT SUBSTRATES TO RECEIVE

NEW FINISHES AND/OR CONSTRUCTION TO COMPLETE THE WORK. MATCH THE EXISTING ADJACENT SUSTRATES,

PATTERNS, TEXTURES AND FINISHES.

PATCH, REPAIR OR REPLACE ALL EXISTING FINISHES AND SUBSTRATES DISTURBED DURING CONSTRUCTION OR AS A

RESULT OF DEMOLITION OR REMOVAL OF AN ITEM. ALL REPAIR OR REPLACEMENT SHALL MATCH ADJACENT EXISTING

AND/OR NEW SUBSTRATES, PATTERNS AND FINISHES. SEE ROOM FINISH SCHEDULE AND SPECIFICATIONS FOR NEW

FINISHES.

PREPARE EXISTING REMAINING WORK SUBSTRATES TO RECEIVE NEW FINISHES AS INDICATED ON THE ROOM FINISH

SCHEDULE AND IN SPECIFICATIONS. SUBSTRATE PREPARATION SHALL BE IN CONFORMANCE WITH THE INSTALLATION

REQUIREMENTS OF EACH NEW FINISH.

ALL NEW WALLS SHOWN WITH MASONRY HATCHING WITHIN THE EXISTING BUILDING SHALL BE TOOTHED INTO EXISTING

MASONRY. MATCH EXISTING COURSING, JOINT PATTERN AND THICKNESS UNLESS NOTED OTHERWISE.

AT THE DEMOLITION OF AN EXISTING ITEM, REMOVE ALL TRACES OF THE DEMOLISHED ITEMS COMPONENTS FROM THE

SURFACE OF THE REMAINING FLOOR, WALLS, CEILING, AND ROOF. AT THE REMOVED FASTENERS IN ALL EXISTING

MASONRY WALLS AND FLOORS, PATCH HOLE WITH GROUT LEVEL WITH EXISTING ADJACENT SUBSTRATES IN ORDER TO

RECEIVE NEW FINISHES.

AT EXISTING FLOORS: WHERE WALLS ARE SCHEDULED FOR DEMOLITION AND EXTEND TO BELOW THE CONTINUOUS

CONCRETE FLOOR SLAB, THE WALL SHALL BE DEMOLISHED TO BELOW THE FLOOR THICKNESS. THE FLOOR SHALL BE

PATCHED WITH CONCRETE AND GRANULAR FILL TO MATCH THE EXISTING THICKNESS, PROVIDE NEW VAPOR BARRIER TO

THE PATCHED AREA. PATCH FLUSH TO ADJACENT EXISTING ELEVATIONS. APPLY CEMENTITIOUS UNDERLAYMENT TO

PRODUCE A UNIFORM SURFACE IN ALL AREAS RECEIVED NEW FINISH AS INDICATED ON ROOM FINISH SCHEDULE. PATCHED

JOINTS SHALL NOT TELEGRAPH THRU THE NEW FINISH.

AT WALL SURFACES TO BE PAINTED, WHERE PATCHING OCCURS IN THE WORK OF AN EXISTING PAINTED SURFACE, THE

PATCHED AREA SHALL BE SPACKLED, FILLED, PRIMED AND INTERMEDIATE PAINT COATS APPLIED PRIOR TO APPLICATION

OF FINAL FINISH PAINT COATS. APPLY FINAL FINISH PAINT COATS OVER THE ENTIRE WALL SURFACE CONTAINING THE

PATCH. WHERE PAINTING IS LIMITED TO PATCH, THE WORK AREA SHALL INCLUDE THE SURFACE FROM THE JOINT AT THE

WALL / FLOOR INTERSECTION TO THE JOINT AT THE WALL / CEILING INTERSECTION. IT SHALL EXTEND HORIZONTALLY FROM

LEFT SIDE OF THE PATCH TO RIGHT SIDE OF THE PATCH AND SHALL INCLUDE THE ENTIRE PATCH. PROVIDE ADDITIONAL

SPACKLING AND PAINT COATS UNTIL THE PATCH AREAS BLEND COMPLETELY WITH THE EXISTING ADJACENT WALL

SURFACE. PATCHES AT CEILINGS SHALL BE TREATED IN SAME FASHION AS DESCRIBED ABOVE.

AT ALL CERAMIC TILE AREAS TO BE PATCHED / REPAIRED THE FOLLOWING WORK SHALL OCCUR AT DEMOLISHED ITEMS

AND DAMAGED AREAS, FILL ALL HOLES IN EXISTING CERAMIC WALL AND FLOOR TILE THAT ARE UP TO 1" DIAMETER WITH A

COLOR EPOXY GROUT TO MATCH THE EXISTING CERAMIC TILE COLOR. REMOVE AND REPLACE EXISTING ADJACENT

AROUND AREAS WHERE HOLES EXCEED 1" DIAMETER. REPLACE WITH NEW TILES THAT MATCH AS CLOSELY AS POSSIBLE

TO EXISTING TILES . MATCH PATTERN, SIZE, SHAPE, COLOR, TEXTUREAND COMPOSITION. FINAL SELECTION OF TILE TO BE

INSTALLED SHALL BE BY THE ARCHITECT AND OWNERS REPRESENTATIVE.

FOLLOWING ANY DEMOLITION AND / OR REMOVAL, PATCH AND REPAIR ALL EXISTING DISTURBED SUBSTRATES AND

FINISHES TO MATCH EXISTING SUBSTRATES AND FINISHES, OR PREPARE EXISTING ADJACENT CONSTRUCTION TO

ACCOMODATE NEW CONSTRUCTION AND SCHEDULED FINISHES.

GENERAL ALTERATION / RENOVATION NOTES:

DASHED LINES INDICATE GENERAL EXISTING CONSTRUCTION TO BE REMOVED. GENERAL CONTRACTOR IS RESPONSIBLE

FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION REQUIRED FOR INSTALLATION OF NEW

CONSTRUCTION SHOWN ELSEWHERE ON DRAWINGS.

SEE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS FOR OTHER DEMOLITION WORK REQUIRED.

ANY DEMOLITION OF MECHANICAL, ELECTRICAL, OR PLUMBING EQUIPMENT SHOWN ON THESE DRAWINGS, IS FOR

COORDINATION ONLY. COORDINATE ALL WORK BY OTHER CONTRACTORS INCLUDING CAPPING AND DISCONNECTING OF

BUILDING SERVICES SUCH AS WATER, SEWER, ELECTRIC, GAS, COMMUNICATIONS, ETC.

BEFORE DEMOLITION AND THROUGHOUT CONSTRUCTION, GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW

WITH OWNER'S REPRESENTATIVE ALL ITEMS BEING REMOVED BY THEIR TRADES. ALL ITEMS DESIGNATED DURING THIS

REVIEW TO REMAIN OWNER'S PROPERTY, SHALL BE MAINTAINED IN GOOD CONDITION AND TURNED OVER TO OWNER. ALL

ITEMS DESIGNATED TO BE REUSED AS PART OF NEW CONSTRUCTION SHALL BE MAINTAINED IN A REUSABLE CONDITION

AND STORED ON SITE BY CONTRACTOR IN A CLEAN, DRY LOCATION UNTIL INSTALLATION. ALL REMAINING ITEMS AND

MATERIALS DEEMED TO BE TRASH SHALL BE DISPOSED OF PROPERLY BY LAW, OFF SITE BY THE RESPONSIBLE

CONTRACTOR.

EXISTING CONDITIONS AS THEY APPEAR IN THESE CONTRACT DOCUMENTS MAY VARY WITH ACTUAL CONDITIONS

BECAUSE OF ITEMS REMOVED BY THE OWNER'S STAFF. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

PATCHING AND REPAIR WORK AS A RESULT OF THE OWNER'S REMOVAL OF SUCH ITEMS.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL EXISTING BUILDING DIMENSIONS AND

CONDITIONS, INCLUDING FINISHES AND MATERIALS, SYSTEMS SHOWN AND DESIGNATED AS EXISTING TO REMAIN ON

CONTRACT DRAWINGS PRIOR TO STARTING DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT OF ANY AND ALL

DISCREPANCIES IN INFORMATION INDICATED ON CONTRACT DRAWINGS PRIOR TO STARTING OF DEMOLITION AND

CONSTRUCTION. VERIFICATION AND COORDINATION OF CLEARANCES REQUIRED FOR ALL NEW WORK BY ALL AND ANY

ASSOCIATED CONFLICT RESOLUTION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE BUILDING RECEIVING MAJOR

DEMOLITION WORK, AND DOES NOT REPRESENT THE DEMOLITION FOR THE PROJECT IN ITS ENTIRETY. REFER TO

CONTRACT DRAWINGS FOR ADDITIONAL DEMOLITION WORK REQUIRED BY OTHER SUB CONTRACTORS. OTHER SUB

CONTRACTORS DEMOLITION WORK SHALL BE COORDINATED BY THE GENERAL CONTRACTOR WITH REGARDS TO BUT NOT

LIMITED TO SCHEDULE AND SEQUENCE.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DEMOLITION CONDITIONS RELATED TO ANY

ACCEPTED ALTERNATE BIDS. INCLUDING FINISHES AND MATERIALS, SYSTEMS SHOWN AND DESIGNATED AS EXISTING OR

NEW ON THE CONTRACT DRAWINGS PRIOR TO STARTING OF DEMOLITION AND CONSTRUCTION. ANY DISCREPANCIES IN

INFORMATION INDICATED ON CONTRACT DRAWINGS SHALL BE DIRECTED IN WRITING TO THE ATTENTION OF THE

ARCHITECT PRIOR TO STARTING OF DEMOLITION AND CONSTRUCTION.

THE OWNER RESERVES THE RIGHT TO SALVAGE AND REMOVE ANY EXISTING ITEMS BEFORE OR DURING DEMOLITION

WORK.

THE GENERAL CONTACTOR IS RESPONSIBLE FOR ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN THE STRUCTURAL

INTEGRITY OF THE BUILDING AFTER ANY DEMOLITION WHICH RENDERS ANY PART OF THE BUILDING STRUCTURALLY

UNSTABLE.

NO DEMOLITION SHALL OCCUR WHICH LEAVES THE BUILDING INTERIOR WITHOUT WEATHER PROTECTION. ALL DEMOLITION

OF EXTERIOR SURFACES SHALL BE FOLLOWED IMMEDIATELY BY PROTECTIVE CONSTRUCTION. GENERAL CONTRACTOR

SHALL INSURE THAT TEMPORARY PROTECTION FROM WEATHER IS PROVIDED AND INSTALLED AT ALL EXPOSED

OPENINGS.

GENERAL CONTRACTOR SHALL TAKE ALL POSSIBLE PRECAUTIONS AGAINST DAMAGING ANY EXISTING CONSTRUCTION

THAT IS TO REMAIN. ALL DAMAGES CAUSED BY THE OPERATIONS OF THIS CONTRACT SHALL BE REPAIRED AT

THAT CONTRACTORS EXPENSE TO THE COMPLETE SATISFACTION OF THE OWNER.

PRIOR TO COMMENCING ANY EXCAVATION, THE GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES

AND / OR MUNICIPAL AUTHORITIES.

TYPICAL EXISTING FOUNDATIONS REMOVAL - REMOVE ALL EXISTING FOUNDATIONS TO ACCOMODATE INSTALLATION OF

NEW FOUNDATIONS OR ANY NEW CONSTRUCTION. SHOWN ELSEWHERE ON DRAWINGS.

GENERAL CONTRACTOR SHALL BE AWARE THAT THE EXISTING BUILDING WILL BE OCCUPIED AND IN USE DURING

THE CONTRACT SCHEDULE. ALL CONTRACTORS SHALL CONDUCT THEIR OPERATIONS SO THAT THERE WILL BE MINIMAL

INTERFERENCE WITH THE CONTINUED OPERATIONS OF THE ADJACENT SPACES AND SITE AREAS. ANY INTERFERNCE OR

INCONVENIENCE WITH THE CONTINUED OPERATION OF THE FACILITY SHALL BE REVIEWED WITH THE ARCHITECT AND

THE OWNER PRIOR TO APPROVAL.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSURING THE STRUCTURAL STABILITY OF THE EXISTING STRUCTURE

IN THE AREAS INVOLVING NEW WORK AND FOR PROTECTING THE EXISTING STRUCTURE FROM DAMAGE DURING THE

COURSE OF THE WORK. THIS SHALL INCLUDE SUPPLYING AND INSTALLING LINTELS, SHORING, BULKHEADS AND ANY

OTHER ITEMS NECESSARY FOR THE PROTECTION AND STABILITY OF THE BUILDING. NO WORK THAT WILL

JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE BUILDING SHALL BE DONE WITHOUT CONSULTING THE STRUCTURAL

ENGINEER AND THE ARCHITECT.

REFER TO SPECIFICATIONS AND PHASING DRAWINGS FOR CONSTRUCTION PHASING OR SEQUENCEING WHICH MAY

AFFECT THE SCHEDULE OF REMOVALS.

DEMOLITION PLANS REFLECT LOCATIONS OF DEMOLITION . EXTENT OF WORK SHALL BE ALL CONSTRUCTION WORK

NECASSARY TO PROPERLY COMPLETE THE PROJECT.

REVIEW WALL SECTIONS AND OTHER DRAWINGS FOR FULL SCOPE OF DEMOLITION AS REQUIRED.

D1.

D2.

D3.

D4.

D5.

D6.

D7.

D8.

D9.

D10.

D11.

D12.

D13.

D14.

D15.

D16.

D17.

D18.

R1.

R2.

R3.

R4.

R5.

R6.

R7.

R8.

R9.

R10.

R11.

R12.

REMOVE WELDED ALUM.

METAL SLEEVE

INFILL EXISTING EXTERIOR WALL

OPENING WITH BRICK VENEER TO

MATCH EXISTING

EXISTING EPDM MEMBRANE

PATCH EXISTING OPENING

WITH EPDM FLASHING

MATERIAL

EXISTING ROOF

REMOVE EXISTING METAL WALL

COPING

REMOVE UNCURED

FORMFLASH

CONTINUOUS LAP JOINT

INFILL EXISITNG OPENING WITH

6" CMU

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

As indicated

DEMOLITION LEGEND AND

GENERAL NOTES

SEPTEMBER 28, 2015

2846

D1.0

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

3" = 1'-0"D1.0

A EXISTING SCUPPER INFILL DETAIL

Page 2: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

AB

CA

CB

RESOURCE

B105

EIGHTH GRADE

B107

EIGHTH GRADE

B111

SCIENCE LAB

B113

SCIENCE LAB

B112

EIGHTH GRADE

B110

EIGHTH GRADE

B106

RESOURCE

B104

ADMIN AREA

BAND

D109

CHORAL

D103

ART

D117 COMPUTER LAB

D127

FORUM

AG ED

RESOURCE

D130

TECH LAB

B136

WORK & FAMILY

D102

RESOURCE

D101

ADMIN AREA

EIGHTH GRADE

B108

EIGHTH GRADE

B109

RESOURCE

D120

D1.4

1

D1.5

1

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/16" = 1'-0"

OVERALL FIRST FLOOR

DEMOLITION PLAN

SEPTEMBER 28, 2015

2846

D1.1

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.

1/16" = 1'-0"D1.1

1 OVERALL FIRST FLOOR DEMOLITION PLAN

Page 3: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

AB

CA

CB

SCIENCE LAB

B211

SCIENCE LAB

B212

SEVENTH GRADE

B209

SEVENTH GRADE

B205

SEVENTH GRADE

B210

COMMONS

LIBRARY AREA

SIXTH GRADE

D209

SIXTH GRADE

D205

RESOURCE

D203

SCIENCE LAB

D211

SCIENCE LAB

D214

SIXTH GRADE

D216

SEVENTH GRADE

B208

SEVENTH GRADE

B206

RESOURCE

B204

RESOURCE

B203

SEVENTH GRADE

B207

SIXTH GRADE

D207

RESOURCE

D202

SIXTH GRADE

D212

SIXTH GRADE

D206

D1.6

1

D1.7

1

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/16" = 1'-0"

OVERALL SECOND FLOOR

DEMOLITION PLAN

SEPTEMBER 28, 2015

2846

D1.2

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

1/16" = 1'-0"D1.2

1 OVERALL SECOND FLOOR DEMOLITION PLAN

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.

Page 4: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

EXISTING RIDGE

EX

IST

ING

RID

GE

EXISTING RIDGE

EX

IST

ING

RID

GE

EXISTING RIDGE

EXISTING RIDGE

CA

AB

CB

EXISTING ROOF

ACCESS HATCH

EXISTING ROOF

ACCESS HATCH

7

4

7

7

4

7

5

6

7

7

.

.

8

7

8

.

10

10

11

EX

IST

ING

RT

U

EXISTING RTU

EXISTING RTU

EXISTING RTU

EXISTING RTU

EXISTING RTU

3

3

3

11

11

.

.

7

7

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/16" = 1'-0"

OVERALL ROOF DEMOLITION

PLAN

SEPTEMBER 28, 2015

2846

D1.3

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

1/16" = 1'-0"D1.3

1 OVERALL ROOF DEMOLITION PLAN

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.

Page 5: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

UP

UP

UP

AB

CA

EXISTING EIGHTH GRADE

B111

EXISTING EIGHTH GRADE

B107

EXISTING RESOURCE

B105

EXISTING SCIENCE LAB

B112

EXISTING SCIENCE LAB

B113

EXISTING EIGHTH GRADE

B110

EXISTING EIGHTH GRADE

B106

EXISTING RESOURCE

B104

EXISTING EIGHTH GRADE

B108

EXISTING EIGHTH GRADE

B109

EXISTING LAB PREP

BOY'S TOILET

EXISTING

GIRL'S TOILET

EXISTING

TEACHERS

WORKROOM

EXISTING

STORAGE

EXISTING

TOILETEXISTING

JANITOR

EXISTING

ELECTRIC

ELEVATO

R

EXISTING

STORAGE

EXISTING

EMR

EXISTING SPECIAL ED

EXISTING

STORAGE

EXISTING

CONFERENCE

EXISTING

ELEC

EXISTING CLINIC

EXISTING

PRINCIPAL

EXISTING

VALUT

EXISTING

STORAGE

EXISTING

WORK ROOM

EXISTING

WAITING

EXISTING ASST

PRINCIPAL

EXISTING

STORAGE

1

1.

2

.

2

12

13

13

12

12

EXISTING STAIRS

EXISTING STAIRS 12

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN -

UNIT "A"

SEPTEMBER 28, 2015

2846

D1.4

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

1/8" = 1'-0"D1.4

1 FIRST FLOOR DEMOLITION PLAN - AREA "A"

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.

Page 6: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

UP

UP

UP

UP

UP

UP

CB

EXISTING BAND

D109

EXISTING CHORAL

D103

EXISTING ART

D117

EXISTING COMPUTER LAB

D127

EXISTING FORUM

EXISTING AG ED

D132

EXISTING WORK/FAMILY

D102

EXISTING RESOURCE

D130

EXISTING TECH LAB

B136

EXISTING RESOURCE

D120

EXISTING OFFICEEXISTING STORAGE

EXISTING

TOILET

EXISTING STORAGE

EXISTING OFFICE

EXISTING BOOK STORAGE

EXISTING OFFICEEXISTING OFFICE

EXISTING STORAGE

EXISTING

STORAGE

D129

EXISTING

ELEC

EXISTING

JAN

EXISTING

GIRLS TLT

EXISTING

BOYS TLT

EXISTING STORAGEEXISTING OFFICE

EXISTING SPECIAL ED

EXISTING SPECIAL ED

EXISTING

TEACHER'S LOUNGE

EXISTING

STORAGE

EXISTING

STORAGE

EXISTING

ELEC

EXISTING CLINIC

EXISTING

STORAGE

EXISTING

STORAGE

12

14

SEE CIVIL DRAWINGS FOR EXTENT OF

CONCRETE SIDEWALK REMOVAL

EXISTING STAIRS

EXISTING STAIRS

12

1212

12

15

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN -

UNIT "B"

SEPTEMBER 28, 2015

2846

D1.5

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

1/8" = 1'-0"D1.5

1 FIRST FLOOR DEMOLITION PLAN - UNIT "B"

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.

Page 7: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

UP

UP

UP

AB

CA

EXISTING SCIENCE LAB

B212

EXISTING SCIENCE LAB

B211

EXISTING SEVENTH GRADE

B209

EXISTING SEVENTH GRADE

B205

EXISTING SEVENTH GRADE

B210

COMMONS

EXISTING LIBRARY AREA

EXISTING SEVENTH GRADE

B206

EXISTING RESOURCE

B204

EXISTING RESOURCE

B203

EXISTING SEVENTH GRADE

B208

EXISTING SEVENTH GRADE

B207

EXISTING STORAGE

ELEVATO

R

EXISTING STORAGE

EXISTING WORKROOMEXISTING A / V

EXISTING LAB PREP

EXISTING BOY'S

TOILET

EXISTING

GIRL'S TOILET

EXISTING TEACHERS

WORKROOM

STAFF

TOILET

EXISTING

TOILET

EXISTING

ELECTRIC

EXISTING JANITOR

1

1

.

2

12

212 12

12

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/8" = 1'-0"

SECOND FLOOR DEMOLITION

PLAN - UNIT "A"

SEPTEMBER 28, 2015

2846

D1.6

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

1/8" = 1'-0"D1.6

1 SECOND FLOOR DEMOLITION PLAN - UNIT "A"

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.

Page 8: GENERAL DEMOLITION NOTES · general demolition notes: ... building services such as water, sewer, electric, gas, communications, etc. ... no demolition shall occur which leaves the

UP

UP

UP

AB

CB

COMMONS

EXISTING LIBRARY AREA

EXISTING SIXTH GRADE

D209

EXISTING SIXTH GRADE

D205

EXISTING RESOURCE

D203

EXISTING SCIENCE LAB

D211

EXISTING SCIENCE LAB

D214

EXISTING SIXTH GRADE

D216

EXISTING SIXTH GRADE

D206

EXISTING RESOURCE

D202

EXISTING SIXTH GRADE

D207

EXISTING SIXTH GRADE

D212

CHASE

EXISTING COMPUTER LAB

EXISTING LAB PREP

EXISTING

BOY'S TLT

EXISTING

GIRL'S TLT

EXISTING

ELEC

EXISTING

TEACHER

WORKROOM

EXISTING

JANITOR

EXISTING STORAGE

EXISTING STORAGE

EXISTING

STAFF TLT

1

1

9

2

12

.

2

12

12

.

.9

SEE OVERALL ROOF DEMOLITION

PLAN FOR ADDITIONAL DEMO NOTES

SEE OVERALL ROOF DEMOLITION

PLAN FOR ADDITIONAL DEMO NOTES

12

12

12

A

B

C

PROJECT

NORTH

CONST.

NORTH

PROJECT

PLOT SCALE:

FILENAME:

DATE:

01 MM-DD-YR DESCRIPTION OF CHANGESNAME

R E V I S I O N S

K E Y P L A N

ww

w.c

ra-a

rch

ite

cts

.com

ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS

PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.

CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND

OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION

OF THE MATERIAL HEREIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF

CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE

UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.

© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2015, 2016

CR

AB

TR

EE

RO

HR

BA

UG

H &

AS

SO

CIA

TE

S -

AR

CH

ITE

CTS

250

WE

ST

MA

IN S

TR

EE

T, S

UIT

E 2

00

CH

AR

LO

TTE

SV

ILLE

V

A 2

2902

434-9

75-7

262 F

AX

434-9

75-7

263

401

EA

ST W

IND

ING

HIL

L R

OA

D

ME

CH

AN

ICS

BU

RG

P

A 1

7055

717-4

58

-02

72 F

AX

717

-45

8-0

047

VDOE: 008-47-00-101

1/8" = 1'-0"

SECOND FLOOR DEMOLITION

PLAN - UNIT "B"

SEPTEMBER 28, 2015

2846

D1.7

AU

GU

ST

A C

OU

NT

Y P

UB

LIC

SC

HO

OLS

WIL

SO

N M

IDD

LE

SC

HO

OL A

DD

ITIO

NS

232 H

OR

NE

T R

OA

D, F

ISH

ER

SV

ILLE

, V

A 2

2939

1/8" = 1'-0"D1.7

1 SECOND FLOOR DEMOLITION PLAN - UNIT "B"

DEMOLITION LEGEND

TAG DEMOLITION NOTE

1 REMOVE PORTION OF EXISTING WALL AND ALL ASSOCIATED COMPONENTS INCLUDING BUT NOT LIMITED TO: DOORS,

WINDOWS OR LOUVERS TO ACCOMODATE A NEW OPENING. TOOTH IN NEW CMU TO MATCH EXISTING PATCH AND

REPAIR ALL EXISTING ADJACENT SUBSTRATES AND FINISHES TO RECEIVE NEW WORK/FINSISHES AS SCHEDULED

2 REMOVE EXISTING WALL BASE.

3 REMOVE EXISTING ROOF DRAIN. SEE PLUMBING DRAWINGS.

4 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY AND PREPARE FOR

CONSTRUCTION WITH EXPANSION JOINT.

5 REMOVE EXISTING LADDER. SALVAGE AND STORE FOR REINSTALLATION DURING NEW CONSTRUCTION. SEE NEW

FLOOR PLANS FOR LOCATION

6 NEW NEOPRENE GASKET TO BE INSTALLED ON EXISTING HATCH CURB AND HATCH BOLTED OR WELDED SHUT.

7 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIREETY AND PREPARE

FOR NEW EXTERIOR WALL.

8 REMOVE EXISTING METAL COPING FROM TOP OF EXISTING MASONRY PARAPET IN ITS ENTIRETY. PREPARE FOR NEW

MEMBRANE FLASHING AND COPING.

9 REMOVE PORTION OF EXISTING WALLS TO BELOW SECOND FLOOR SLAB. PREPARE TO RECEIVE NEW

CONSTRUCTION.

10 REMOVE EXISTING ROOFING MEMBRANE AND RIGID INSULATION DOWN TO EXISTING CONCRETE SLAB. PREPARE

EXISTING SLAB TO RECEIVE NEW CONSTRUCTION.

11 REMOVE EXISTING THRU-WALL SCUPPER IN ITS ENTIRETY. INFILL WITH MATCHING BRICK AND GROUT TO ADJACENT

FINISHES. SEE DETAIL A/D1.0

12 TEMPORARILY REMOVE AND SALVAGE EXISTING ACT FOR ABOVE CEILING PROPOSED WORK.

13 REMOVE AND SALVAGE EXISTING SPEAKERS. SEE ELECTRICAL DRAWINGS.

14 REMOVE EXISTING LOUVER IN ITS ENTIRETY.

15 REMOVE PORTION OF GYPSUM BOARD SOFFIT AS REQUIRED TO REMOVE EXISTING PIPING.


Recommended