GENERAL NOTES 1. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK TO BE PERFORMED UNTIL A PERMIT HAS BEEN ISSUED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SURVEY MONUMENTS AND/OR VERTICAL CONTROL BENCHMARKS WHICH ARE DISTURBED OR DESTROYED BY CONSTRUCTION. A LAND SURVEYOR MUST FIELD LOCATE,REFERENCE,AND/OR PRESERVE ALL HISTORICAL OR CONTROLLING MONUMENTS. IF DESTROYED,SUCH MONUMENTS SHALL BE REPLACED WITH APPROPRIATE MONUMENTS BY A LAND SURVEYOR. A CORNER RECORD OR RECORD OF SURVEY,AS APPROPRIATE SHALL BE FILED AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS ACT. IF ANY VERTICAL CONTROL IS TO BE DISTURBED OR DESTROYED,THE CITY OF SAN DIEGO FIELD SURVEY SECTION MUST BE NOTIFIED,IN WRITING,AT LEAST 3 DAYS PRIOR TO THE CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE COST OF REPLACING ANY VERTICAL CONTROL BENCHMARKS DESTROYED BY THE CONSTRUCTION. 3. IMPORTANT NOTICE: SECTION 4216 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A "PERMIT TO EXCAVATE" WILL BE VALID. FOR YOUR DIG ALERT 1.0. NUMBER,CALL UNDERGROUND SERVICE ALERT,TOLL FREE 1-800-422-4133,TWO DAYS BEFORE YOU DIG. 4. CONTRACTOR SHALL IMPLEMENT AN EROSION AND SEDIMENT CONTROL PROGRAM DURING THE PROJECT GRADING AND/OR CONSTRUCTION ACTIVITIES. THE PROGRAM SHALL MEET ALL APPLICABLE REQUIREMENTS OF THE STATE WATER RESOURCE CONTROL BOARD AND THE CITY OF SAN DIEGO MUNICIPAL CODE AND STORM WATER STANDARDS MANUAL. 5. "PUBLIC IMPROVEMENT SUBJECT TO DESUETUDE OR DAMAGE." IF REPAIR OR REPLACEMENT OF SUCH PUBLIC IMPROVEMENTS IS REQUIRED,THE OWNER SHALL OBTAIN THE REQUIRED PERMITS FOR WORK IN THE PUBLIC RIGHT-OF-WAY,SATISFACTORY TO THE PERMIT- ISSUING AUTHORITY. 6. PRIOR TO ANY DISTURBANCE TO THE SITE,EXCLUDING UTILITY MARK-OUTS AND SURVEYING,THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR A PRE-CONSTRUCTION MEETING WITH THE CITY OF SAN DIEGO FIELD ENGINEERING DIVISION (858) 627-3200. 7. DEVIATIONS FROM THESE SIGNED PLANS WILL NOT BE ALLOWED UNLESS A CONSTRUCTION CHANGE IS APPROVED BY THE CITY ENGINEER OR THE CHANGE IS REQUIRED BY THE CITY INSPECTOR. 8. AS-BUil T DRAWINGS MUST BE SUBMITTED TO THE RESIDENT ENGINEER PRIOR TO ACCEPTANCE OF THIS PROJECT BY THE CITY OF SAN DIEGO. 9. THE AREA WHICH IS DEFINED AS A NON GRADING AREA AND WHICH IS NOT TO BE DISTURBED SHALL BE STAKED PRIOR TO START OF THE WORK. THE PERMIT APPLICANT AND ALL OF THEIR REPRESENTATIVES OR CONTRACTORS SHALL COMPLY WITH THE REQUIREMENTS FOR PROTECTION OF THIS AREA AS REQUIRED BY ANY APPLICABLE AGENCY. ISSUANCE OF THE CITY'S GRADING PERMIT SHALL NOT RELIEVE THE APPLICANT OR ANY OF THEIR REPRESENTATIVES OR CONTRACTORS FROM COMPLYING WITH ANY STATE OR FEDERAL REQUIREMENTS BY AGENCIES INCLUDING BUT NOT LIMITED TO CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD,CALIFORNIA DEPARTMENT OF FISH AND GAME. COMPLIANCE MAY INCLUDE OBTAINING PERMITS,OTHER AUTHORIZATIONS,OR COMPLIANCE WITH MANDATES BY ANY APPLICABLE STATE OR FEDERAL AGENCY. GROUND WATER DISCHARGE 1. ALL GROUND WATER EXTRACTION AND SIMILAR WASTE DISCHARGES TO SURFACE WATER NOT TRIBUTARY TO THE SAN DIEGO BAY ARE PROHIBITED UNTIL IT CAN BE DEMONSTRATED THAT THE OWNER HAS APPLIED AND OBTAINED AUTHORIZATION FROM THE STATE OF CALIFORNIA VIA AN OFFICIAL "ENROLLMENT LETTER" FROM THE REGIONAL WATER QUALITY CONTROL BOARD IN ACCORDANCE WITH THE TERMS,PROVISIONS AND CONDITIONS OF SATE ORDER NO R9-2009-0002 NPDES CAG919002. 2. THE ESTIMATED MAXIMUM DISCHARGE RATES MUST NOT EXCEED THE LIMITS SET IN THE OFFICIAL "ENROLLMENT LETTER" FROM THE REGIONAL BOARD UNLESS PRIOR NOTIFICATION AND SUBSEQUENT AUTHORIZATION HAS BEEN OBTAINED,AND DISCHARGE OPERATIONS MODIFIED TO ACCOMMODATE THE INCREASED RATES. 3. ALL GROUND WATER EXTRACTIONS AND SIMILAR WASTE DISCHARGES TO SURFACE WATERS NOT TRIBUTARY TO THE SAN DIEGO BAY ARE PROHIBITED UNTIL IT CAN BE DEMONSTRATED THAT THE OWNER HAS APPLIED AND OBTAINED AUTHORIZATION FROM THE STATE OF CALIFORNIA VIA OFFICIAL "ENROLLMENT LETTER" FROM THE REGIONAL WATER QUALITY CONTROL BOARD IN ACCORDANCE WITH THE TERMS,PROVISIONS AND CONDITIONS OF STATE ORDER NO R9-2007-0034 NPDES NO. CAG919001. SHEET INDEX TITLE SHEET ______________ SHEET 1 AUBURN CREEK CHANNEL MMP MAP#76 ______ SHEET 2 AUBURN CREEK CHANNEL MMP MAP # 7Q _ _ _ _ _ SHEET 3 MAINTENANCE METHODOLOGIES AND BMP NOTES _____________ SHEET 4 MASTER MAINTENANCE PROGRAM (MMP) PROTOCOL REQUIREMENTS AND PEIR ENVIRONMENTAL MITIGATION MEASURES ______ SHEET 5 REFERENCE DRAWINGS PLANS FOR THE IMPROVEMENT OF HOME AVENUE,SPILLMAN DRIVE, STANTON ROAD,DARNELL ROAD,42ND STREET,AND PUBLIC RIGHTS OF WAY IN AND ADJACENT TO MELISSA PARK CITY OF SAN DIEGO DWG NO. 3705-D PLANS FOR THE IMPROVEMENT OF HOME AVENUE IN VALLE GRANADO CITY OF SAN DIEGO DWG NO. 12728-L MAINTENANCE PLANS FOR: AUBURN CREEK CHANNEL MMP MAP#70 & 76 -� TOPOGRAPHY SOURCE CITY OF SAN DIEGO SANGIS 2014 2 FOOT CONTOURS,NAVD88 BENCHMARK 6" CONC. MON. AT S.E. CORNER MELISSA PARK ELEV. 198.62 CITY DATUM MAP #76 SEE SHEET 2 z 0 w X> SPILLMAN DRIVE KEY MAP NO SCALE 0 C z < STORM WATER PROTECTION NOTES 0 C z < 1. lS PROCT JS BCT MUCIPAL SRM WA ~R MIT ORD NO. R920070001 � AND RI LELE: ECK ONE BOW µ � D C RI LEL 1 D C LEL 2 D C RI LEL J 2. ID NO : NOT A LIÊB LE J. CHE ONE D D D C L TE 1 C LUP TE 2 C L TE J D lS PROT LL E MAXIMUM DISRBED ARê LIMI ERïORE A A ER IGí ACON PLAN (WTAP) IS REQUIRí. D lS PROT LL LLOW PSí DING NOT EXÎí ACR P PHASE. µ NOT APPLIÊBLE 4. E CONACR SHALL CPLY E REQUIREN OF E �CP OR S�PP AS APPLIÊBLE 5. WA ~Rí: PUEBLO SAN DIEGO 6. HROLOC SUB AREA NAME: OLLAS 7. HROLOC SUB AREA NUMB: 908.22 WATER POLLUTION CONTROL PLAN FOR AUBURN CREEK CHANNEL MAINTENANCE PROJECT PREPARED BY: McGRATH CONSULTING PO BOX 2488 EL CAJON,CA.92021 (619) 443-3811 DECLARATION OF RESPONSIBLE CHARGE I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK F OR THIS PROJECT,THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE,AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY OF SAN DIEGO IS CONFINED TO A REVIEW ONLY AND DOES NOT RELI EVE ME,AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. CARSON P. EDGINGTON R.C.E. NO. 76519 DATE " RICK ENGINEERING COMPANY CONSTRUCTION CHANGE TABLE CHANGE DA EFFECTED OR ADDED SHEET NUMBERS APPROVAL NO. f --------------------------- [ WARNING 0 1/2 SAN DIEGO) STREET NAME STREET DATA TABLE CLASSIFICATION SPEED (MPH) ! --------------------------- ' �--------------------------- IF IS BAR DOES NOT MEASURE 1" EN DRAWING IS NOT TO SCALE. DEVELOPMENT SERVICES DEPARTMENT 5620 FRIARS ROAD SAN DIEGO, CA 92110 619-291-0707 (FAX) 619-291-4165 ADT (HIQES) R/W (FT) WORK TO BE DONE THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE ACCORDING TO THESE PLANS AND THE SPECIFICATIONS AND STANDARD DRAWINGS OF THE CITY OF SAN DIEGO. MAINTENANCE OF CONCRETE & EARTHENED CHANNELS TO REMOVE ACCUMULATED SEDIMENT AND OTHER DEBRIS STANDARD SPECIFICATIONS: DOCUMENT NO. PITS070112-01 PITS070112-02 PITS070112-04 PITS070112-06 STANDARD DRAWINGS DOCUMENT NO. PITS070112-03 PITS070112-05 CASQA MANUAL LEGEND EXISTING IMPROVEMENTS ITEM DESCRIPTION STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK),2012 EDITION CITY OF SAN DIEGO STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (WHITEBOOK),2012 EDITION CALIFORNIA DEPARTMENT OF TRANSPORTATION MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,2012 EDITION CALIFORNIA DEPARTMENT OF TRANSPORTATION U.S. CUSTOMARY STANDARD SPECIFICATIONS,2010 EDITION DESCRIPTION CITY OF SAN DIEGO STANDARD DRAWINGS FOR PUBLIC WORKS CONSTRUCTION,2012 EDITION CALIFORNIA DEPARTMENT OF TRANSPORTION U.S. CUSTOMARY STANDARD PLANS,2010 EDITION CALIFORNIA STORMWATER QUALITY ASSOCIATION, STORMWATER BEST MANAGEMENT PRACTICE HANDBOOK PORTAL: CONSTRUCTION,JANUARY 2015 SYMBOL EXIST. CONTOURS ·· ·· ·· ·· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· · ----- EXIST. LOT LINE ············································································································································· -- -- - EXIST. CURB INLET ········································································································································ EXIST. STORM DRAIN MAIN· ·· SD-- EXIST. SEWER MAIN........ .. ..... ... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... ... ... ... ... ... ... ... ... ... ... .. - - s - - EXIST. WATER MAIN....................................................................................................................................... w -- MECHANIZED EQUIPMENT CHANNEL MAINTENANCE AREA -············································I ACCESS & LOADING AREA ..................................................................................................................... STAGING AREA . .. .. .. .. .. ··························································································· STORM WATER MANAGEMENT BMPs ITEM SYMBOL STREET SWEEPING AND VACUUMING DAILy . ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL SE-7 SANDBAG BARRIER ··· ··· ··· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL SE-8 STORM DRAIN INLET PROTECTION ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CAS QA MANU AL SE-10 SCHEDULING ··········································································································· SEE CASQA MANUAL EC-1 PRESERVE EXISTING VEGETATION · ······················································ SEE CASQA MANUAL EC-2 GRAVEL OR SAND BAG BARRIERS ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CAS QA MAN UAL SE-6 FIBE R ROLLS OR STRAW WATTL ES ············ ············ ············ ············· SEE CASQA MANUA L SE-5 DIVERT RUN-ON FROM SURROUNDING AREAS ··························· SEE CASQA MANUAL EC-9 CHECK DAMS ········································································································· SEE CASQA MANUAL SE-4 SPILL PREVENTION AND CONTROL · ····················································· SEE CASQA MANUAL WM-4 SOLID WASTE MANAGEMENT ···································································· SEE CASQA MANUAL WM-5 LIQUID WASTE MANAGEMENT ··································································· SEE CASQA MANUAL WM-10 SANITARY WASTE MANAGEMENT · ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL WM-9 CONCRETE WASTE MANAGEMENT ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CAS QA MAN UAL WM-8 STOCKPILED WASTE MANAGEMENT ··················································· SEE CASQA MANUAL WM-3 MATERIAL STORAGE · ··· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL WM-1 MATERIAL HANDLING ······················································································ SEE CASQA MANUAL WM-2 VEHICLE AND EQUIPMENT FUELING ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL NS-9 ILLICIT CONNECTION/DISCHARGE CONTROL · ·································· SEE CASQA MANUAL NS-6 WATER CONVERSTION PRACTICE · ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL NS-1 DEWATERING OPERATIONS · ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL NS-2 WIND EROSION CONTROL ·············································································· SEE CASQA MANUAL WE-1 CONSTRUCTION SI STORM WATER PRIORI: LOW TITLE SHEET FOR= AUBURN CREEK CHANNEL MMP MAP#70 & 76 C OF S DIEGO, COIA ANORON AND ORMR DEPARENT SHEET 1 OF 5 SHîTS FOR CITY ENGINEER DESCRIPTION BY ORIGINAL REC AS-BUILTS DATE APPROVED DATE 1.0. NO. ____ _ P.T.S NO.____ _ V.T.M._____ _ FILMED XXXX-XXXX NAD83 COORDINATES XXX-XXXX LAMBERT COORDINATES CONTRACTOR ______ DATE STARTED_____ -1-D INSPECTOR DATE COMPLETED ___ _ 9 ________________ ____ ____________________________________________________________ ___________ __ _______ __________________ _______ W, \1720L-L_ T0•39_ I �HA_FY1 7\7_Aubur-n Cr-eek Mop 70 7E\CTv I I \Sheets\1720LL_AuburnCreekC1. dqn • \1720�-L- -0#39_ HHA_F�17\ 7_Auburn Cr-eek Map 70 76\Civi I \Sets\SD :orpStds 2005. dscr-i t 07-JUN-217 10,28
Transcript
Page 1: GENERAL NOTES MAINTENANCE PLANS FOR: AUBURN CREEK … · 2020. 9. 24. · 4.contractor shall implement an erosion and sediment control program during the project grading and/or construction

GENERAL NOTES

1. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK TO BE PERFORMED UNTIL APERMIT HAS BEEN ISSUED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SURVEY MONUMENTS AND/OR VERTICAL CONTROL BENCHMARKS WHICHARE DISTURBED OR DESTROYED BY CONSTRUCTION. A LAND SURVEYOR MUST FIELD LOCATE, REFERENCE, AND/OR PRESERVE ALL HISTORICAL OR CONTROLLING MONUMENTS. IF DESTROYED, SUCH MONUMENTS SHALL BE REPLACED WITHAPPROPRIATE MONUMENTS BY A LAND SURVEYOR. A CORNER RECORD OR RECORD OF SURVEY,AS APPROPRIATE SHALL BE FILED AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS ACT. IF ANY VERTICAL CONTROL IS TO BEDISTURBED OR DESTROYED, THE CITY OF SAN DIEGO FIELD SURVEY SECTION MUST BE NOTIFIED, IN WRITING, AT LEAST 3 DAYS PRIOR TO THE CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE COST OF REPLACING ANY VERTICAL CONTROL BENCHMARKS DESTROYED BY THE CONSTRUCTION. 3. IMPORTANT NOTICE: SECTION 4216 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BEISSUED BEFORE A "PERMIT TO EXCAVATE" WILL BE VALID. FOR YOUR DIG ALERT 1.0. NUMBER, CALL UNDERGROUND SERVICE ALERT, TOLL FREE 1-800-422-4133, TWO DAYS BEFORE YOU DIG. 4. CONTRACTOR SHALL IMPLEMENT AN EROSION AND SEDIMENT CONTROL PROGRAM DURING THE PROJECT GRADINGAND/OR CONSTRUCTION ACTIVITIES. THE PROGRAM SHALL MEET ALL APPLICABLE REQUIREMENTS OF THE STATE WATERRESOURCE CONTROL BOARD AND THE CITY OF SAN DIEGO MUNICIPAL CODE AND STORM WATER STANDARDS MANUAL. 5. "PUBLIC IMPROVEMENT SUBJECT TO DESUETUDE OR DAMAGE." IF REPAIR OR REPLACEMENT OF SUCH PUBLICIMPROVEMENTS IS REQUIRED, THE OWNER SHALL OBTAIN THE REQUIRED PERMITS FOR WORK IN THE PUBLIC RIGHT-OF-WAY, SATISFACTORY TO THE PERMIT- ISSUING AUTHORITY. 6. PRIOR TO ANY DISTURBANCE TO THE SITE, EXCLUDING UTILITY MARK-OUTS AND SURVEYING, THE CONTRACTOR SHALLMAKE ARRANGEMENTS FOR A PRE-CONSTRUCTION MEETING WITH THE CITY OF SAN DIEGO FIELD ENGINEERING DIVISION (858) 627-3200.7. DEVIATIONS FROM THESE SIGNED PLANS WILL NOT BE ALLOWED UNLESS A CONSTRUCTION CHANGE IS APPROVED BYTHE CITY ENGINEER OR THE CHANGE IS REQUIRED BY THE CITY INSPECTOR. 8. AS-BUil T DRAWINGS MUST BE SUBMITTED TO THE RESIDENT ENGINEER PRIOR TO ACCEPTANCE OF THIS PROJECT BYTHE CITY OF SAN DIEGO. 9. THE AREA WHICH IS DEFINED AS A NON GRADING AREA AND WHICH IS NOT TO BE DISTURBED SHALL BE STAKEDPRIOR TO START OF THE WORK. THE PERMIT APPLICANT AND ALL OF THEIR REPRESENTATIVES OR CONTRACTORS SHALL COMPLY WITH THE REQUIREMENTS FOR PROTECTION OF THIS AREA AS REQUIRED BY ANY APPLICABLE AGENCY. ISSUANCE OF THE CITY'S GRADING PERMIT SHALL NOT RELIEVE THE APPLICANT OR ANY OF THEIR REPRESENTATIVES OR CONTRACTORS FROM COMPLYING WITH ANY STATE OR FEDERAL REQUIREMENTS BY AGENCIES INCLUDING BUT NOT LIMITED TO CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, CALIFORNIA DEPARTMENT OF FISH AND GAME. COMPLIANCE MAY INCLUDE OBTAINING PERMITS, OTHER AUTHORIZATIONS, OR COMPLIANCE WITH MANDATES BY ANY APPLICABLE STA TE OR FEDERAL AGENCY.

GROUND WATER DISCHARGE

1. ALL GROUND WATER EXTRACTION AND SIMILAR WASTE DISCHARGES TO SURFACE WATER NOT TRIBUTARY TO THE SANDIEGO BAY ARE PROHIBITED UNTIL IT CAN BE DEMONSTRATED THAT THE OWNER HAS APPLIED AND OBTAINED AUTHORIZATION FROM THE STA TE OF CALIFORNIA VIA AN OFFICIAL "ENROLLMENT LETTER" FROM THE REGIONAL

WATER QUALITY CONTROL BOARD IN ACCORDANCE WITH THE TERMS, PROVISIONS AND CONDITIONS OF SATE ORDER NO R9-2009-0002 NPDES CAG919002.

2. THE ESTIMATED MAXIMUM DISCHARGE RA TES MUST NOT EXCEED THE LIMITS SET IN THE OFFICIAL "ENROLLMENTLETTER" FROM THE REGIONAL BOARD UNLESS PRIOR NOTIFICATION AND SUBSEQUENT AUTHORIZATION HAS BEEN

OBTAINED, AND DISCHARGE OPERATIONS MODIFIED TO ACCOMMODATE THE INCREASED RATES.

3. ALL GROUND WATER EXTRACTIONS AND SIMILAR WASTE DISCHARGES TO SURFACE WATERS NOT TRIBUTARY TO THE SANDIEGO BAY ARE PROHIBITED UNTIL IT CAN BE DEMONSTRATED THAT THE OWNER HAS APPLIED AND OBTAINED

AUTHORIZATION FROM THE STA TE OF CALIFORNIA VIA OFFICIAL "ENROLLMENT LETTER" FROM THE REGIONAL WATER QUALITY CONTROL BOARD IN ACCORDANCE WITH THE TERMS, PROVISIONS AND CONDITIONS OF STATE ORDER NO R9-2007-0034 NPDES NO. CAG919001.

SHEET INDEX

TITLE SHEET ______________ SHEET 1

AUBURN CREEK CHANNEL MMP MAP#76 ______ SHEET 2

AUBURN CREEK CHANNEL MMP MAP#7Q _ __ __ _ SHEET 3

MAINTENANCE METHODOLOGIES AND BMP NOTES _____________ SHEET 4

MASTER MAINTENANCE PROGRAM (MMP) PROTOCOL REQUIREMENTS AND PEIR ENVIRONMENT AL MITIGATION MEASURES ______ SHEET 5

REFERENCE DRAWINGS

PLANS FOR THE IMPROVEMENT OF HOME AVENUE, SPILLMAN DRIVE, STANTON ROAD, DARNELL ROAD, 42ND STREET, AND PUBLIC RIGHTS OF WAY IN AND ADJACENT TO MELISSA PARK CITY OF SAN DIEGO DWG NO. 3705-D

PLANS FOR THE IMPROVEMENT OF HOME AVENUE IN VALLE GRANADO CITY OF SAN DIEGO DWG NO. 12728-L

MAINTENANCE PLANS FOR:

AUBURN CREEK CHANNEL MMP MAP#70 & 76

,-------� 1-: �

TOPOGRAPHY SOURCE

CITY OF SAN DIEGO SANGIS 2014 2 FOOT CONTOURS, NAVD88

BENCHMARK

6" CONC. MON. AT S.E. CORNER MELISSA PARK ELEV. 198.62 CITY DATUM

)-

MAP #76SEE SHEET 2

z 0

(/) w X> :r <(

SPILLMAN DRIVE

KEY MAP

NO SCALE

,, l>

::0 ;:: 0 C z--i

l> <re

STORM WATER PROTECTION NOTES

,, l>

::0 ;:: 0 C z --i

l> <re

1. n-llS PROJECT JS SUBJECT TO MUNICIPAL STORM WA 7ER PERMIT ORDERNO. R920070001 � AND RISK LEVEL/TYPE: CHECK ONE BELOW

181 �CP D CGP RISK LEVEL 1D CGP RISK LEVEL 2D CGP RISK LEVEL J

2. WDID NO: NOT APPLICABLEJ. CHECK ONE

D D D

CGP LUP TYPE 1 CGP LUP TYPE 2 CGP LUP TYPE J

D n-llS PROJECT 'MLL EXC££D n-lE MAXIMUM DISTURBED AREA LIMIT,n-lEREFORE A WEA n-lER TRIGGERED ACTION PLAN (WTAP) IS REQUIRED.

D n-llS PROJECT 'MLL FOLLOW PHASED GRADING NOT TO EXCEED FIVE (5)ACRES PER PHASE.

181 NOT APPLICABLE

4. n-lE CONTRACTOR SHALL COMPLY 'Mn-I n-lE REQUIREMENTS OF n-lE �CPOR S�PP AS APPLICABLE.

5. WA 7ERSHED: PUEBLO SAN DIEGO

6. HYDROLOGIC SUB AREA NAME: CHOLLAS

7. HYDROLOGIC SUB AREA NUMBER: 908.22

WATER POLLUTION CONTROL PLAN FOR AUBURN CREEK CHANNEL MAINTENANCE PROJECT PREPARED BY: McGRATH CONSULTING PO BOX 2488 EL CAJON,CA.92021 (619) 443-3811

DECLARATION OF RESPONSIBLE CHARGE

I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE,AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS.

I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY OF SAN DIEGO IS CONFINED TO A REVIEW ONLY AND DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN.

CARSON P. EDGINGTON R.C.E. NO. 76519 DATE

"

RICK ENGINEERING COMPANY

CONSTRUCTION CHANGE TABLE

� CHANGE DA TE EFFECTED OR ADDED SHEET NUMBERS APPROVAL NO. f1-----+----+--------------------+---------,

[

WARNING

0 1/2 SAN DIEGO) STREET NAME

STREET DATA TABLE

CLASSIFICATION SPEED (MPH)

!I----+----+-------------------+-------,

�' �I----+----+-------------------+-------,

IF TIHIS BAR DOES NOT MEASURE 1" TIHEN DRAWING IS NOT TO SCALE.

DEVELOPMENT SERVICES DEPARTMENT

5620 FRIARS ROAD SAN DIEGO, CA 92110 619-291-0707(FAX) 619-291-4165

ADT (VEHIQES)

R/W (FT)

WORK TO BE DONE THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE ACCORDING TO THESE PLANS AND THE SPECIFICATIONS AND STANDARD DRAWINGS OF THE CITY OF SAN DIEGO.

MAINTENANCE OF CONCRETE & EARTHENED CHANNELS TO REMOVE ACCUMULATED SEDIMENT AND OTHER DEBRIS

ST AND ARD SPECIFICATIONS: DOCUMENT NO. PITS070112-01

PITS070112-02

PITS070112-04

PITS070112-06 STANDARD DRAWINGS DOCUMENT NO. PITS070112-03

PITS070112-05

CASQA MANUAL

LEGEND

EXISTING IMPROVEMENTS

ITEM

DESCRIPTION ST AND ARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK), 2012 EDITION CITY OF SAN DIEGO ST AND ARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (WHITEBOOK), 2012 EDITION CALIFORNIA DEPARTMENT OF TRANSPORTATION MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, 2012 EDITION CALIFORNIA DEPARTMENT OF TRANSPORTATION U.S. CUSTOMARY STANDARD SPECIFICATIONS, 2010 EDITION

DESCRIPTION CITY OF SAN DIEGO STANDARD DRAWINGS FOR PUBLIC WORKS CONSTRUCTION, 2012 EDITION CALIFORNIA DEPARTMENT OF TRANSPORTION U.S. CUSTOMARY ST ANDA RD PLANS, 2010 EDITION CALIFORNIA STORMWATER QUALITY ASSOCIATION, STORMWATER BEST MANAGEMENT PRACTICE HANDBOOK PORTAL: CONSTRUCTION, JANUARY 2015

SYMBOL EXIST. CONTOURS ·· ·· ·· ·· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· · ----­EXIST. LOT LINE············································································································································· -- -- -EXIST. CURB INLET········································································································································ "l EXIST. STORM DRAIN MAIN··· SD--EXIST. SEWER MAIN ........ .. ... .. ... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... ... ... ... ... ... ... ... ... ... ... .. - - s - -

EXIST. WATER MAIN....................................................................................................................................... w --MECHANIZED EQUIPMENT CHANNEL MAINTENANCE AREA -············································I""

""'""' ,v,."j

ACCESS & LOADING AREA ..................................................................................................................... � STAGING AREA . .. .. .. .. .. ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ··· ·V�#M

STORM WATER MANAGEMENT BMPs ITEM SYMBOL

STREET SWEEPING AND VACUUMING DAIL y. ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL SE-7

SANDBAG BARRIER ··· ··· ··· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL SE-8 STORM DRAIN INLET PROTECTION ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL SE -10

SCHEDULING ··········································································································· SEE CASQA MANUAL EC-1

PRESERVE EXISTING VEGETATION ······················································· SEE CASQA MANUAL EC-2

GRAVEL OR SAND BAG BARRIERS ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL SE -6

FIBER ROLLS OR STRAW WATTLES ················································· SEE CASQA MANUAL SE-5

DIVERT RUN-ON FROM SURROUNDING AREAS ··························· SEE CASQA MANUAL EC-9

CHECK DAMS ········································································································· SEE CASQA MANUAL SE -4 SPILL PREVENTION AND CONTROL ······················································ SEE CASQA MANUAL WM-4 SOLID WASTE MANAGEMENT ···································································· SEE CASQA MANUAL WM-5 LIQUID WASTE MANAGEMENT ··································································· SEE CASQA MANUAL WM-10

SANITARY WASTE MANAGEMENT · ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL WM-9

CONCRETE WASTE MANAGEMENT ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL WM-8

STOCKPILED WASTE MANAGEMENT ··················································· SEE CASQA MANUAL WM-3

MATERIAL STORAGE · ··· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL WM-1

MATERIAL HANDLING ······················································································ SEE CASQA MANUAL WM-2

VEHICLE AND EQUIPMENT FUELING ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL NS-9

ILLICIT CONNECTION/DISCHARGE CONTROL ··································· SEE CASQA MANUAL NS-6

WATER CONVERSTION PRACTICE · ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL NS-1

DEWATERING OPERATIONS · ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· ·· SEE CASQA MANUAL NS-2

WIND EROSION CONTROL·············································································· SEE CASQA MANUAL WE-1

CONSTRUCTION SITE STORM WATER PRIORITY: LOW

TITLE SHEET FOR=

AUBURN CREEK CHANNEL

MMP MAP#70 & 76

CITY OF SAN DIEGO, CALIFORNIA TRANSPORTATION AND STORMWAlER DEPARTMENT

SHEET 1 OF 5 SHEETS

FOR CITY ENGINEER DESCRIPTION BY

ORIGINAL REC

AS-BUILTS

DATE APPROVED DATE

1.0. NO. ____ _ P.T.S NO. ____ _

V.T.M. _____ _FILMED

XXXX-XXXX

NAD83 COORDINATES

XXX-XXXX LAMBERT COORDINATES

CONTRACTOR ______ DATE STARTED_____ -1-DINSPECTOR DATE COMPLETED ___ _

9._ __________________________________ ...._ ____ __. ________________________________________________________________ ...._ _______________ ...._ __ ...._ _______ .._ __________________ .._ _______ .., W, \1 720L-L_ T0•39_ I �HA_FY1 7\7 _Aubur-n Cr-eek Mop 70 7E\CTv I I \Sheets\1720LL_AuburnCreekC1. dqn

'N• \ 1720�-L--0#39_ HHA_F�17\ 7 _Auburn Cr-eek Map 70 76\Civi I \Sl"leets\SD :orpStds 2005. dscr-i :,t

07-JUN-2::>17 10,28

MMills
Typewritten Text
Appendix A
Page 2: GENERAL NOTES MAINTENANCE PLANS FOR: AUBURN CREEK … · 2020. 9. 24. · 4.contractor shall implement an erosion and sediment control program during the project grading and/or construction

WE-1

2

2

0

GRAPHIC SCALE 1" = 50'

50 25 50 100 150

HOME AVENUE

SPILLM

AN D

RIVE

42N

D S

TREET

STANTO

N R

OAD

INTERSTATE 805

LOT LINE (TYP.)

APPROXIMATE

DRAIN (TYP.)EXIST. STORM

MAIN (TYP.)EXIST. WATER

MAIN (TYP.)EXIST. SEWER

AREA

ACCESS AREA

STAGING

BY-PASS PUMP

HOSE LINE

TEMPORARY DIVERSION

CENTERLINE

AUBURN CREEK CHANNEL

#76

CREEK CHANNEL PER MAP

MAINTENANCE FOR AUBURN

BEGINNING OF

STA. 10+00

SE-7

SE-10

SE-8

NOT TO SCALE

SECTION A-A

GROUND

EXISTING

& VEGETATION WITHIN CHANNEL

CLEAR 6"-18" OF SEDIMENT

15'

1.5:1

1.5:1

5'-6" MIN

2'

6"

A

A

RIP-RAP

1' LIGHT STONE

PER MAP #76

AUBURN CREEK CHANNEL

END OF MAINTENANCE FOR

STA. 11+60.38

(150 FT AWAY)

WM-10,WE-1,NS-9

WM-4,WM-5,WM-8,WM-9,

SE-5,WM-1,WM-2,WM-3,

SE-7

MAINTENANCE PLANS FOR:

XXX-XXXX

XXXX-XXXX

FOR CITY ENGINEER

- -D

CARSON P. EDGINGTON R.C.E. 76519 DATE

STA N

IA

REGIS

TER

ED P

ROFESSIONAL ENGIN

EER

N

OT

GNI

GDE .P

NO

SR

AC

No.76519

TE OF CALIFOR

CITY OF SAN DIEGO, CALIFORNIA

DESCRIPTION

ORIGINAL

BY

REC

APPROVED

DATE

DATE FILMED

AS-BUILTS

CONTRACTOR

INSPECTOR

DATE STARTED

DATE COMPLETED

LAMBERT COORDINATES

NAD83 COORDINATES

V.T.M.

P.T.S NO.

07-JUN-2017 09:08

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\SD CorpStds 2005.dscript

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\17204L_AuburnCreek02.dgn

c2017

Rick Engineering Co

mpany

ENGINEER OF WORK

I.O. NO.

TRANSPORTATION AND STORMWATER DEPARTMENT

SHEET OF SHEETS

J-17204-L

MMP MAP #70 & 76AUBURN CREEK CHANNEL

10

11

12

13

14 15

16

17 1819

20

21

22

5

NS-2

Page 3: GENERAL NOTES MAINTENANCE PLANS FOR: AUBURN CREEK … · 2020. 9. 24. · 4.contractor shall implement an erosion and sediment control program during the project grading and/or construction

HOME AVENUE

JOCELYN STREET

LA

URIN

DA P

LA

CE

FAIR

MO

UN

T A

VE

NU

E

MAIN (TYP.)EXIST. WATER

MAIN (TYP.)EXIST. SEWER

DRAIN (TYP.)EXIST. STORM

SE-7

LOT LINE (TYP.)

APPROXIMATE

AREA

STAGING

AREA

ACCESS

BY-PASS PUMP

BY-PASS PUMP

INTE

RS

TA

TE 8

05

HOSE LINE

TEMPORARY DIVERSION

SE-8

3

3

0

GRAPHIC SCALE 1" = 50'

50 25 50 100 150

NOT TO SCALE

SECTION A-A

GROUND

EXISTING

6' MIN

12'

30' EASEMENT

1.5:1

1.5:1

4" CLASS "A" PCC

12"

6"

18"

GUNITE LINED

A

A

& VEGETATION WITHIN CHANNEL

CLEAR 6"-18" OF SEDIMENT

HOSE LINE

TEMPORARY DIVERSION

SE-7

(150 FT AWAY)

WM-10,WE-1,NS-9

WM-4,WM-5,WM-8,WM-9

SE-5,WM-1,WM-2,WM-3,

MAINTENANCE PLANS FOR:

XXX-XXXX

XXXX-XXXX

FOR CITY ENGINEER

- -D

CARSON P. EDGINGTON R.C.E. 76519 DATE

STA N

IA

REGIS

TER

ED P

ROFESSIONAL ENGIN

EER

N

OT

GNI

GDE .P

NO

SR

AC

No.76519

TE OF CALIFOR

CITY OF SAN DIEGO, CALIFORNIA

DESCRIPTION

ORIGINAL

BY

REC

APPROVED

DATE

DATE FILMED

AS-BUILTS

CONTRACTOR

INSPECTOR

DATE STARTED

DATE COMPLETED

LAMBERT COORDINATES

NAD83 COORDINATES

V.T.M.

P.T.S NO.

07-JUN-2017 15:45

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\SD CorpStds 2005.dscript

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\17204L_AuburnCreek03.dgn

c2017

Rick Engineering Co

mpany

ENGINEER OF WORK

I.O. NO.

TRANSPORTATION AND STORMWATER DEPARTMENT

SHEET OF SHEETS

J-17204-L

MMP MAP #70 & 76AUBURN CREEK CHANNEL

28

29

30

31

32

33

34

35

36

37 38 3940

41

42

43

5

#70

CHANNEL PER MAP

AUBURN CREEK

MAINTENANCE FOR

BEGINNING OF

STA. 40+23.73

#70

CHANNEL PER MAP

AUBURN CREEK

MAINTENANCE FOR

END OF

STA. 42+98.07

WE-1

NS-2

Page 4: GENERAL NOTES MAINTENANCE PLANS FOR: AUBURN CREEK … · 2020. 9. 24. · 4.contractor shall implement an erosion and sediment control program during the project grading and/or construction

MAINTENANCE METHODOLOGY TABLES FOR:

XXX-XXXX

XXXX-XXXX

FOR CITY ENGINEER

- -D

CARSON P. EDGINGTON R.C.E. 76519 DATE

STA N

IA

REGIS

TER

ED P

ROFESSIONAL ENGIN

EER

N

OT

GNI

GDE .P

NO

SR

AC

No.76519

TE OF CALIFOR

CITY OF SAN DIEGO, CALIFORNIA

DESCRIPTION

ORIGINAL

BY

REC

APPROVED

DATE

DATE FILMED

AS-BUILTS

CONTRACTOR

INSPECTOR

DATE STARTED

DATE COMPLETED

LAMBERT COORDINATES

NAD83 COORDINATES

V.T.M.

P.T.S NO.

09-JUN-2017 14:30

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\SD CorpStds 2005.dscript

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\17204L_AuburnCreek04.dgn

c2017

Rick Engineering Co

mpany

ENGINEER OF WORK

I.O. NO.

TRANSPORTATION AND STORMWATER DEPARTMENT

SHEET OF SHEETS

J-17204-L

MMP MAP #70 & 76AUBURN CREEK CHANNEL

4

4

MAINTENANCE BMPs

NECESSARY PROJECT SPECIALIST (BIOLOGIST, HISTORICAL MONITOR, ETC.)

18. FINAL LOCATION OF CHANNEL CENTERLINE WILL BE DETERMINED IN THE FIELD AND COORDINATED WITH THE

25 MONTHS AFTER PLANTING.

MAINTENANCE ACTIVITIES. THE REVEGETATED AREAS WILL BE MONITORED FOR A PERIODS OF NOT LESS THAN

17. PREVIOUSLY UNDISTURBED STAGING AREAS WILL BE REVEGETATED WITHIN 30 DAYS OF COMPLETION OF

PERSON. COMPLETED INSPECTION CHECKLIST WILL BE KEPT WITH THE WPCP.

PERFORM ANY NECESSARY BMP MAINTENANCE/REPAIRS, AND REPORT THE RESULTS TO THE QUALIFIED CONTACT

THE MONITOR WILL CHECK THE NATIONAL WEATHER SERVICE FORECAST, COMPLETE BMP INSPECTION CHECKLIST,

16. THE QUALIFIED CONTACT PERSON WILL ASSIGN A MONITOR FOR DAILY INSPECTION OF THE BMPs EACH MORNING.

INSPECTION, AND MAINTENANCE OF ONSITE BMPs.

15. CONTRACTOR SHALL PROVIDE TRAINING FOR ALL PERSONNEL RESPONSIBLE FOR THE PROPER INSTALLATION,

BE IMPLEMENTED TO REMEDIATE EROSION AREAS AND TO MINIMIZE FUTURE EROSION.

SUBSTANTIAL EROSION HAS OCCURRED, EROSION CONTROL MEASURES RECOMMENDED BY THE FIELD ENGINEER WILL

14. CHANNELS WILL BE INSPECTED WITHIN 72 HOURS OF THE FIRST 2-YEAR STORM FOLLOWING MAINTENANCE. IF

SHALL BE CONDUCTED AS DETERMINED NECESSARY BY THE CITY OF SAN DIEGO.

13. SAMPLING AND ANALYSIS, MONITORING AND REPORTING, AND POST-MAINTENANCE MANAGEMENT OF THE PROJECT

ENTERING THE CHANNELS. NO CONSTRUCTION ACTIVITIES SHALL OCCUR DURING RAIN EVENTS.

SITE SHALL BE SECURED TO PREVENT ANY CONSTRUCTION RELATED MATERIALS FROM LEAVING THE SITE AND

12. THE CONTRACTOR SHALL MONITOR THE 5 DAY WEATHER FORECAST. IF ANY PRECIPITATION IS FORECASTED, THE

OF SUCH EQUIPMENT.

VEHICLES, ETC.) ON-SITE DURING ALL PHASES OF PROJECT ACTIVITIES, ALONG WITH TRAINED PERSONNEL FOR USE

11. THE CONTRACTOR SHALL PROVIDE EQUIPMENT NECESSARY TO EXTINGUISH SMALL BRUSH FIRES (FROM SPARKING

SHALL BE AVAILABLE ONSITE AT ALL TIMES.

10. SPILLS SHALL BE MANAGED FOLLOWING THE GUIDANCE OF BMP FACT SHEET WM-4. SPILL CLEANUP MATERIALS

TO CWC 13260.

IN ACCORDANCE WITH WASTE DISCHARGE REQUIREMENTS ESTABLISHED BY THE SAN DIEGO WATER BOARD PURSUANT

9. THE TREATMENT, STORAGE, AND DISPOSAL OF WASTEWATER DURING THE LIFE OF THE PROJECT MUST BE DONE

MATERIALS CLEAN-UP/REMEDIATION SERVICE SHALL BE LOCALLY AVAILABLE ON CALL.

LOCAL, STATE AND FEDERAL REGULATIONS. A REGISTERED FIRST-RESPONSE, PROFESSIONAL HAZARDOUS

WATER FACILITIES. HAZARDOUS MATERIALS SHALL BE MANAGED AND STORED IN ACCORDANCE WITH APPLICABLE

8. HAZARDOUS MATERIALS USED DURING MAINTENANCE WILL NOT BE STORED WITHIN 50 FEET FROM STORM

LEAVING THEM IN PLACE.

MAINTENANCE UNLESS THEIR REMOVAL WOULD RESULT IN GREATER ENVIRONMENTAL IMPACT THAN

7. TEMPORARY EROSION OR SEDIMENT CONTROL MEASURES WILL BE REMOVED UPON COMPLETION OF

-PRODUCING RAINFALL.

6. CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER AFTER EACH RUNOFF

SERVICE FORECAST.

GREATER CHANCE OF LIKELY PRECIPITATION OF 0.1 INCH OR GREATER BY THE NATIONAL WEATHER

5. WEATHER TRIGGERED ACTION PLAN SHALL BE IMPLEMENTED WHEN THERE IS A FORECASTED 50% OR

FOLLOWING THE GUIDANCE OF BMP FACT SHEET SE-7.

PAVED SURFACES DUE TO EXCAVATION ACTIVITIES. STREET SWEEPING AND VACUUMING WILL BE MANAGED

4. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF SILT AND MUCH ON STREETS AND OTHER

AREA FOLLOWING THE GUIDANCE OF BMP FACT SHEET EC-2.

3. EXISTING VEGETATION TO BE PRESERVED IN PLACE SHALL BE CLEARLY MARKED WITH A BUFFER

2. CONTRACTOR WILL LIMIT ALL CONSTRUCTION RELATED ACTIVITIES TO THE PROJECT FOOTPRINT.

GRANTED IN CONFORMANCE WITH ALL APPLICABLE PERMITS.

SHALL BE COMPLETED BETWEEN SEPTEMBER 15TH AND FEBRUARY 15TH UNLESS AN EXTENSION IS

WILL BE RESPONSIBLE FOR IMPLEMENTING THE WATER POLLUTION CONTROL PLAN (WPCP). ALL WORK

WITH CONSTRUCTION AND MAINTAINED THROUGHOUT THE PROJECT. A QUALIFIED CONTACT PERSON

1. ALL BEST MANAGEMENT PRACTICES (BMPs) WILL BE IMPLEMENTED PRIOR TO OR CONCURRENT

FACILITY/CHANNEL

DIMENSIONS

MECHANIZED SEDIMENT & VEGETATION REMOVALMETHOD

MAINTENANCE

10 DAYS- 6:00 AM TO 6:00 PM

IN CHANNEL MAINTENANCE WILL TAKE APPROXIMATELY SCHEDULE

STAFFING 10 TO 14 PEOPLE

CHANNEL SEQUENCE

AREA(S)

ACCESS & LOADING

STOCKPILE AREA

STAGING &

LEGAL DISPOSAL SITE (MIRAMAR LANDFILL).

ALL MATERIALS WILL BE HAULED IMMEDIATELY TO A

ON SITE AT THE ACCESS EASEMENTS MENTIONED ABOVE.

DOZER/EXCAVATOR/FRONT-END LOADER WILL BE STAGED

METHODOLOGY

POST-MAINTENANCE

OTHER NOTES

STTHHOME AVENUE- 805 NORTH OFF-RAMP TO 46

- MAP NO.70AUBURN CREEK CHANNEL

*6" PUMP (S) OR SMALLER

*DUMP TRUCKS(S) (12 YD)

*VACTOR

*FRONT-END LOADER (CAT 966)

*EXCAVATOR (CAT 349)

*DOZER (CAT D6)

*GRADALL (5100 SERIES)

SIZE/TYPE)

SMALLER IN

EQUIVALENT OR

WILL BE

EQUIPMENT(EQUIPMENT

2.REMOVE TEMPORARY CONSTRUCTION BMPS.

1.DEMOBILIZE EQUIPMENT

MAINTENANCE LIMITS.

DISCHARGED JUST SOUTH-WEST OF THE PROJECT

EQUIPMENT ENTERING THE CHANNEL. WATER WILL BE

LOCATIONS TO REMOVE PONDED WATER PRIOR TO

3.DEWATERING PUMP(S) MAY BE USED AT VARIOUS

LEAST 150' FROM WATERS OF US/STATE.

2.EQUIPMENT FUELED OUTSIDE CHANNEL & LOCATED AT

SITES NIGHTLY.

RIGHTS-OF-WAY & IMMEDIATE TRUCK LOADING

1.SWEEPERS WILL SWEEP ADJACENT PUBLIC

MAINTENANCE PROCEDURE

IMP MAINTENANCE METHODOLOGY TABLEAUBURN CREEK CHANNEL MMP MAP NO. 70

FACILITY/CHANNEL

DIMENSIONS

MECHANIZED SEDIMENT & VEGETATION REMOVALMETHOD

MAINTENANCE

SCHEDULE 7 DAYS- 6:00 AM TO 6:00 PM

IN CHANNEL MAINTENANCE WILL TAKE APPROXIMATELY

10 TO 14 PEOPLESTAFFING

CHANNEL SEQUENCE

AREA(S)

ACCESS & LOADING

DISPOSAL SITE (MIRAMAR LANDFILL).

MATERIALS WILL BE HAULED IMMEDIATELY TO A LEGAL

AT THE ACCESS EASEMENTS MENTIONED ABOVE. ALL

DOZER /FRONT-END LOADER WILL BE STAGED ON SITE

STOCKPILE AREA

STAGING &

METHODOLOGY

POST-MAINTENANCE

OTHER NOTES

HOME AVENUE- SPILLMAN DR TO 805 SOUTH ON-RAMP

- MAP NO.76AUBURN CREEK CHANNEL

2.REMOVE TEMPORARY CONSTRUCTION BMPS.

1.DEMOBILIZE EQUIPMENT

MAINTENANCE LIMITS.

DISCHARGED JUST SOUTH-WEST OF THE PROJECT

EQUIPMENT ENTERING THE CHANNEL. WATER WILL BE

LOCATIONS TO REMOVE PONDED WATER PRIOR TO

3.DEWATERING PUMP(S) MAY BE USED AT VARIOUS

LEAST 150' FROM WATERS OF US/STATE.

2.EQUIPMENT FUELED OUTSIDE CHANNEL & LOCATED AT

SITES NIGHTLY.

RIGHTS-OF-WAY & IMMEDIATE TRUCK LOADING

1.SWEEPERS WILL SWEEP ADJACENT PUBLIC

MAINTENANCE PROCEDURE

IMP MAINTENANCE METHODOLOGY TABLEAUBURN CREEK CHANNEL MMP MAP NO. 76

STATION 10+00 TO 11+60.38

4465-4467 HOME AVE.

RAMPS AT 1) 4333 HOME AVE, 2) 4355 HOME AVE & 3)

ON PAVED AREAS ENTER THE CHANNEL VIA ACCESS

DOZER/EXCAVATOR/FRONT-END LOADER LOADS TRUCKS

LOADING AREA(S) - (STATION 42+98.07) -

4465-4467 HOME AVE

STREET AT: 1) 4333 HOME AVE, 2) 4355 HOME AVE & 3)

CHANNEL EASEMENTS FROM EXISTING PAVED ASPHALT

DOZER/EXCAVATOR/FRONT-END LOADER ENTER/EXIT(S)

ACCESS AREA(S) - (STATION 31+76.62) -

SPILLMAN DRIVE, AND LOADS TRUCKS.

GRADALL SITS ABOVE CHANNEL, AT REAR OF 4122

LOADING AREA: (STATION 19+40.33) - EXCAVATOR/

EARTHEN RAMP AT 4122 SPILLMAN DRIVE.

LOADER/ DRIVES INTO CHANNEL VIA ESTABLISHED

ACCESS AREA: (STATION 10+00.00)- DOZER/FRONT-END

STATION 40+23.73 TO 42+98.07

/TYPE)

SMALLER IN SIZE

EQUIVALENT OR

WILL BE

EQUIPMENT(EQUIPMENT

*6" PUMP(S) OR SMALLER

*VACTOR DUMP TRUCKS(S) (12 YD)

*FRONT-END LOADER (CAT 966)

*EXCAVATOR (CAT 349)

*DOZER (CAT D6)

*GRADALL (5100 SERIES)

MAXIMUM CUBIC YARDS OF MATERIAL REMOVAL: 150

150 CUBIC YARDS OF SEDIMENT

0.5'-1.0' OF SEDIMENT

5' IN DEPTH

12' BOTTOM WIDTH

APPROX. 30' TOP WIDTH

274' LENGTH

CONCRETE LINED BANKS, EARTHEN BOTTOM CHANNEL

MAXIMUM CUBIC YARDS OF MATERIAL REMOVAL: 250

100 CUBIC YARDS OF VEGETATION

150 CUBIC YARDS OF SEDIMENT

0.5'-1.5' OF SEDIMENT

6' IN DEPTH

15' BOTTOM WIDTH

APPROX. 35' TOP WIDTH

160' LENGTH

TRAPEZOIDAL EARTHEN CHANNEL

& HOSES REMOVED.

8.DRY WEATHER DIVERSION BERM, DIVERSION PUMP(S)

DISCHARGING INTO THE CHANNEL.

7.VACTOR FLUSHS ALL HEADWALL OUTFALLS

6.DOZER/ FRONT-END LOADER EXIT CHANNEL.

SITE.

5.DUMP TRUCKS HAUL MATERIAL TO LEGAL DISPOSAL

WITHIN ACCESS AREA.

MATERIAL INTO WAITING DUMP TRUCKS, LOCATED

4.EXCAVATOR/GRADALL SCOOPS MATERIAL & LOADS

CHANNEL, WITHIN ACCESS & LOADING AREA(S).

EXCAVATOR/ GRADALL, STATIONED OUTSIDE OF

3.DOZER PUSHES VEGETATION & SEDIMENT TO

CHANNEL AT ACCESS & LOADING AREA(S).

2.DOZER/ FRONT-END LOADER ENTER/EXIT(S)

MAINTENANCE LIMITS.

TO A DISCHARGE AREA NORTH-WEST OF THE PROJECT

THE SOUTHERN SIDE OF THE CHANNEL AND EXTENDED

DIVERSION PIPES WILL BE PLACED ON

CLEANING.

WILL BE PLACED AT SOUTHERN LIMITS OF CHANNEL

DAM/SANDBAGS) & PUMP(S)

1.DRY WEATHER FLOW DIVERSION BERM (TIGER

& HOSES REMOVED.

7.DRY WEATHER DIVERSION BERM, DIVERSION PUMP(S)

CHANNEL.

6.DOZER/EXCAVATOR/FRONT-END LOADER EXIT

SITE.

5.DUMP TRUCKS HAUL MATERIAL TO LEGAL DISPOSAL

OCATED AT BOTTOM OF ACCESS RAMP(S).

LOADS MATERIAL INTO WAITING DUMP TRUCKS, L

4.EXCAVATOR/FRONT-END LOADER SCOOPS MATERIAL &

OF CHANNEL, WITHIN ACCESS & LOADING AREA(S).

EXCAVATOR/FRONT-END LOADER, STATIONED INSIDE

3.DOZER PUSHES VEGETATION & SEDIMENT TO

AREA(S).

ENTER/EXIT(S) CHANNEL AT ACCESS & LOADING

2.DOZER/EXCAVATOR/FRONT-END LOADER

MAINTENANCE LIMITS.

A DISCHARGE AREA SOUTH-WEST OF THE PROJECT

AND SOUTHERN SIDE OF THE CHANNEL AND EXTEND TO

DIVERSION PIPES WILL BE PLACED ON THE NORTHERN

SIDE OF THE CHANNEL FOR CHANNEL CLEANING.

WILL BE PLACED AT THE SOUTHERN AND NORTHERN

DAM/SANDBAGS) & PUMP(S)

1.DRY WEATHER FLOW DIVERSION BERM (TIGER

5

Page 5: GENERAL NOTES MAINTENANCE PLANS FOR: AUBURN CREEK … · 2020. 9. 24. · 4.contractor shall implement an erosion and sediment control program during the project grading and/or construction

MAINTENANCE PLANS FOR:

XXX-XXXX

XXXX-XXXX

FOR CITY ENGINEER

- -D

CARSON P. EDGINGTON R.C.E. 76519 DATE

STA N

IA

REGIS

TER

ED P

ROFESSIONAL ENGIN

EER

N

OT

GNI

GDE .P

NO

SR

AC

No.76519

TE OF CALIFOR

CITY OF SAN DIEGO, CALIFORNIA

DESCRIPTION

ORIGINAL

BY

REC

APPROVED

DATE

DATE FILMED

AS-BUILTS

CONTRACTOR

INSPECTOR

DATE STARTED

DATE COMPLETED

LAMBERT COORDINATES

NAD83 COORDINATES

V.T.M.

P.T.S NO.

21-MAR-2018 11:10

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\SD CorpStds 2005.dscript

W:\17204-L_TO#39_IHHA_FY17\7_Auburn Creek Map 70 76\Civil\Sheets\17204L_AuburnCreek05.dgn

c2018

Rick Engineering Co

mpany

ENGINEER OF WORK

I.O. NO.

TRANSPORTATION AND STORMWATER DEPARTMENT

SHEET OF SHEETS

J-17204-L

MMP MAP #70 & 76AUBURN CREEK CHANNEL

5

5

MASTER MAINTENANCE PROGRAM (MMP) PROTOCOL REQUIREMENTS:

ATTACHMENT 1 TO THIS IMP.

MAINTENANCE ACTIVITY. TO FULFILL THIS REQUIREMENT, THE MMRP IS INCLUDED IN ITS ENTIRETY AS

(PEIR) BE INCLUDED WITH THE MAINTENANCE DOCUMENTS AND CONTRACT SPECIFICATIONS FOR EACH

ADOPTED FOR THE MMP REQUIRES ALL OF THE MITIGATION MEASURES IDENTIFIED IN THE PROGRAM EIR

GENERAL MITIGATION MEASURE 1 OF THE MITIGATION MONITORING AND REPORTING PROGRAM (MMRP)

ADDITIONAL MAINTENANCE REQUIREMENTS

TO LEAVE THE MAINTENANCE AREA UNHARMED.

4. IF ANY WILDLIFE IS ENCOUNTERED DURING THE COURSE OF MAINTENANCE, SAID WILDLIFE SHALL BE ALLOWED

IF MAINTENANCE IS TO OCCUR BETWEEN JANUARY 15 AND AUGUST 31.

-NESTING BIRDS HAVE BEEN IDENTIFIED AND NECESSARY MAINTENANCE SETBACKS HAVE BEEN ESTABLISHED

AND/OR

-NOISE ATTENUATION MEASURES NEEDED TO PROTECT SENSITIVE WILDLIFE ARE IN PLACE AND EFFECTIVE;

MAINTENANCE HAS BEEN IMPLEMENTED;

-FENCING, FLAGGING, SIGNAGE OR OTHER MEANS TO PROTECT SENSITIVE RESOURCES TO REMAIN AFTER

THE MONITORING BIOLOGIST SHALL VERIFY THAT THE FOLLOWING ACTIONS HAVE BEEN TAKEN, AS APPROPRIATE:

3. PRIOR TO COMMENCING ANY MAINTENANCE ACTIVITY WHICH MAY IMPACT SENSITIVE BIOLOGICAL RESOURCES,

2. AVOID THE INTRODUCTION OF INVASIVE PLANT SPECIES WITH PHYSICAL EROSION CONTROL MEASURES.

1. WORK SHALL COMPLY WITH ALL APPLICABLE PERMITS.

AS FIBER BLANKETS, TO REMEDIATE SUBSTANTIAL EROSION WHICH HAS OCCURRED AND TO MINIMIZE FUTURE EROSION.

FOLLOWING MAINTENANCE. IMPLEMENT EROSION CONTROL MEASURES RECOMMENDED BY THE FIELD ENGINEER, SUCH

19. WQ-10: INSPECT EARTHEN-BOTTOM STORM WATER FACILITIES WITHIN 30 DAYS OF THE FIRST 2-YEAR STORM

AND REMOVE ANY TRASH RECEPTACLES REGULARLY (AT LEAST WEEKLY).

18. WQ-8: STORE MAINTENANCE-RELATED TRASH IN AREAS AT LEAST 50 FEET FROM STORM WATER FACILITIES,

STATE, AND FEDERAL REGULATIONS.

FACILITIES. HAZARDOUS MATERIALS SHALL BE MANAGED AND STORED IN ACCORDANCE WITH APPLICABLE LOCAL,

17. WQ-7: AVOID STORING HAZARDOUS MATERIALS USED DURING MAINTENANCE WITHIN 50 FEET FROM STORM WATER

MAINTENANCE OF ON-SITE BMPS.

16. WQ-4: PROVIDE TRAINING FOR PERSONNEL RESPONSIBLE FOR THE PROPER INSTALLATION, INSPECTION, AND

OFF-SITE SEDIMENT TRANSPORT.

15. WQ-3: STORE BMP MATERIALS ON-SITE TO PROVIDE COMPLETE PROTECTION OF EXPOSED AREAS AND PREVENT

THEM IN PLACE.

MAINTENANCE UNLESS THEIR REMOVAL WOULD RESULT IN GREATER ENVIRONMENTAL IMPACT THAN LEAVING

TRANSPORT VEHICLES. REMOVE TEMPORARY EROSION OR SEDIMENT CONTROL MEASURES UPON COMPLETION OF

FIBER ROLLS AND/OR BERMS) FOR MATERIAL STOCKPILES; AND PROPERLY FITTED COVERS FOR MATERIAL

STABILIZED MAINTENANCE ACCESS POINTS (E.G., SHAKER PLATES); CONTAINMENT BARRIERS (E.G., SILT FENCE,

AREAS. INSTALL BMPS SUCH AS SILT FENCES, FIBER ROLLS; GRAVEL BAGS; TEMPORARY SEDIMENT BASINS;

SEDIMENT CONTROLS WITHIN STORM WATER FACILITIES, ALONG ACCESS ROUTES AND AROUND STOCKPILE/STAGING

14. WQ-2: PREVENT OFF-SITE SEDIMENT TRANSPORT DURING MAINTENANCE THROUGH THE USE OF EROSION AND

FROM APPLIANCES AND DISPOSED IN ACCORDANCE WITH THIS PROTOCOL.

HAZARDOUS MATERIALS (E.G., MACHINE OIL, MERCURY SWITCHES, AND REFRIGERANT GASES) SHALL BE REMOVED

SHALL HAVE THE APPROPRIATE TRAINING TO HANDLE, STORE, TRANSPORT, AND/OR DISPOSE THE MATERIAL.

WASTE STORAGE, RECYCLING, TREATMENT OR DISPOSAL FACILITY. PERSONNEL HANDLING HAZARDOUS MATERIALS

13. WM-4: LOG AND TRANSPORT ANY HAZARDOUS MATERIALS ENCOUNTERED DURING MAINTENANCE TO A HAZARDOUS

TO AN APPROPRIATE DISPOSAL FACILITY.

TRANSPORTED UNDER A COMPLETED COMPREHENSIVE TRIP LOG (CTL) TO DOCUMENT THAT THE TIRES WERE TAKEN

FACILITY. IF MORE THAN NINE TIRES ARE IN A VEHICLE OR WASTE BIN AT ANY ONE TIME, THEY SHALL BE

12. WM-3: SEPARATE WASTE TIRES FROM EXCAVATED MATERIAL AND TRANSPORT THEM TO AN APPROPRIATE DISPOSAL

ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS.

OR OTHER RAW MATERIAL USES. RE-USED MATERIAL (AGGREGATES, SOIL, SAND OR SILT) SHALL BE DOCUMENTED IN

11. WM-2: RE-USE EXCAVATED MATERIAL, WHENEVER POSSIBLE, AS FILL MATERIAL, AGGREGATE SAND REPLENISHMENT,

IF AVAILABLE.

10. WM-1: DISPOSE AND TRANSPORT COMPOSTABLE GREEN WASTE MATERIAL TO AN APPROVED COMPOSTING FACILITY,

IMPACTS, AND DIRECT CREWS OR OTHER PERSONNEL TO PROTECT SENSITIVE HISTORICAL RESOURCES AS NECESSARY.

TO BE AVOIDED DURING MAINTENANCE, IDENTIFY ANY SPECIFIC MEASURES WHICH SHOULD BE IMPLEMENTED TO MINIMIZE

TO SENSITIVE HISTORICAL RESOURCES. THE QUALIFIED ARCHAEOLOGIST SHALL POINT OUT SENSITIVE HISTORICAL RESOURCES

9. HIST-2: CONDUCT A PRE-MAINTENANCE MEETING ON-SITE PRIOR TO ANY ACTIVITY THAT MAY OCCUR WITHIN OR ADJACENT

8. HIST-1: FLAG, CAP OR FENCE ALL HISTORICAL RESOURCES PRIOR TO INITIATION OF MAINTENANCE ACTIVITIES.

LEFT THE NEST.

NORTHERN HARRIER'S NEST, OR 500 FEET OF ANY OTHER RAPTOR'S NEST UNTIL ANY FLEDGLINGS HAVE

7. BIO-7: AVOID MECHANIZED MAINTENANCE WITHIN 300 FEET OF A COOPER'S HAWK NEST, 900 FEET OF A

CUT AND PAINT METHOD SHALL BE APPLIED TO ALL RESPROUTS.

FOR UP TWO YEARS, OR UNTIL NO RESPROUTING IS OBSERVED DURING AN INSPECTION. IF RESPROUTING IS OBSERVED, THE

DISPOSED OFFSITE. AFTER THE INITIAL TREATMENT, THE AREA OF REMOVAL SHALL BE INSPECTED ON A QUARTERLY BASIS

REMOVAL OF SEDIMENT CONTAINING RHIZOMES, LOOSE RHIZOME MATERIAL SHALL BE REMOVED FROM THE CHANNEL AND

SEDIMENT SHALL BE EXCAVATED TO A DEPTH SUFFICIENT TO REMOVE THE RHIZOMES, WHEREVER FEASIBLE. FOLLOWING

WHEN ARUNDO IS INTERMIXED WITH NATIVE PLANTS. WHEN SEDIMENT SUPPORTING ARRUNDO MUST BE REMOVED, THE

CUT AND PAINT (CUTTING STEMS CLOSE TO THE GROUND AND SPRAYING OR PAINTING HERBICIDE ON CUT STEM SURFACE)

HERBICIDE ON LEAVES AND STEMS WITHOUT CUTTING FIRST) WHEN ARUNDO OCCURS IN MONOTYPIC STANDS, OR (2)

6. BIO-6: REMOVE ARUNDO THROUGH ONE, OR A COMBINATION OF, THE FOLLOWING METHODS;(1) FOLIAR SPRAY (SPRAYING

ENVIRONMENTAL REVIEW UNDER CEQA WILL BE REQUIRED.

COVERED BY THE PEIR, SWD SHALL CONTACT THE APPROPRIATE WILDLIFE AGENCIES AND ADDITIONAL

SPECIES. IF SENSITIVE ANIMAL SPECIES ARE IDENTIFIED DURING PRE-MAINTENANCE SURVEYS THAT ARE NOT

QUALIFIED BIOLOGIST TO AVOID SIGNIFICANT DIRECT AND/OR INDIRECT IMPACTS TO IDENTIFIED SENSITIVE ANIMAL

MITIGATION MONITORING AND REPORTING PLAN (MMRP) SHALL BE IMPLEMENTED UNDER THE DIRECTION OF A

THE PROGRAM ENVIRONMENTAL IMPACT REPORT (PEIR) ARE IDENTIFIED, THEN APPLICABLE MEASURES FROM THE

SEASON OF A SENSITIVE ANIMAL SPECIES (JANUARY 15 TO AUGUST 31). IF SENSITIVE ANIMAL SPECIES COVERED BY

5. BIO-5: CONDUCT APPROPRIATE PRE-MAINTENANCE SURVEYS IF MAINTENANCE IS PROPOSED DURING THE BREEDING

4. BIO-4: AVOID THE INTRODUCTION OF INVASIVE PLANT SPECIES WITH PHYSICAL EROSION CONTROL MEASURES.

ENTANGLE WILDLIFE).

METHODS TO CONFIRM THEY WILL NOT POSE RISK TO WILDLIFE (E.G., NON-BIODEGRADABLE BLANKETS MAY

BIOLOGICAL RESOURCES AS NECESSARY. THE BIOLOGIST SHALL ALSO REVIEW THE PROPOSED EROSION CONTROL

FLAG/DELINEATE SENSITIVE RESOURCES TO BE AVOIDED, REVIEW SPECIFIC MEASURES TO PROTECT SENSITIVE

BIOLOGIST SHALL POINT OUT OR IDENTIFY SENSITIVE BIOLOGICAL RESOURCES TO BE AVOIDED DURING MAINTENANCE,

AND OTHER KEY PERSONNEL CONDUCTING OR INVOLVED IN CHANNEL MAINTENANCE ACTIVITIES. THE QUALIFIED

SHALL INCLUDE A QUALIFIED BIOLOGIST, FIELD ENGINEER, PLANNER, EQUIPMENT OPERATORS/SUPERINTENDENT

THAT OCCURS WITHIN OR ADJACENT TO SENSITIVE BIOLOGICAL RESOURCES. THE PRE-MAINTENANCE MEETING

3. BIO-3: CONDUCT A PRE-MAINTENANCE MEETING ON SITE PRIOR TO THE START OF ANY MAINTENANCE ACTIVITY

INDIVIDUAL MAINTENANCE PLAN (IMP) PREPARED FOR THE WORK.

INDIVIDUAL BIOLOGICAL ASSESSMENT (IBA), INDIVIDUAL HYDROLOGY AND HYDRAULIC ASSESSMENT (IHHA), AND/OR

MAINTENANCE AREA PRIOR TO INITIATION OF MAINTENANCE ACTIVITIES IN ACCORDANCE WITH THE SITE SPECIFIC

2. BIO-2: FLAG AND DELINEATE ALL SENSITIVE BIOLOGICAL RESOURCES TO REMAIN WITHIN OR ADJACENT TO

1. BIO-1: RESTRICT VEHICLES TO ACCESS DESIGNATED IN THE MMP.

5

PEIR ENVIRONMENTAL MITIGATION MEASURES


Recommended