8
GENERATING UG PROGRESS REPORTS IN REPORT MANAGER https://reports.intra.ecu.edu/Reports/Pages/Folde r.aspx?ItemPath=%2fecuBIC%2fStudent%2fCollege+of+ Education%2fAssessment%2fProgress+Reports&ViewMod e=List
Transcript
Page 2: Generating UG progress Reports  in Report Manager

STEP 1: FOLLOW THE LINK BELOW FOR IMMEDIATE ACCESS TO THE COE UG PROGRESS REPORT PAGE.

(NOTE: ONLY PROGRAM AREA COORDINATORS HAVE BEEN GRANTED ACCESS TO THESE DATA SCREENS.)HTTPS://REPORTS.INTRA.ECU.EDU/REPORTS/PAGES/FOLDER.ASPX?ITEMPATH=%2FECUBIC%2FSTUDENT%2FCOLLEGE+OF+EDUCATION%2FASSESSMENT%2FPROGRESS+REPORTS&VIEWMODE=LIST

Page 3: Generating UG progress Reports  in Report Manager

STEP 2: CHOOSE THE FILE LABELED “PROGRESS REPORT 4”

Page 4: Generating UG progress Reports  in Report Manager

STEP 3: SELECT THE ACADEMIC PERIOD FROM THE DROP DOWN MENU.

(EX. FALL 2010)

Page 5: Generating UG progress Reports  in Report Manager

STEP 4: SELECT THE UG PROGRAM AREA(S) FROM THE DROP DOWN MENU.

(NOTE: PROGRAM AREA COORDINATORS WHO ARE RESPONSIBLE FOR MORE THAN ONE PROGRAM ARE ABLE TO CHOOSE MULTIPLE AREAS AT ONE TIME.)

Page 6: Generating UG progress Reports  in Report Manager

STEP 5: CLICK ON THE “VIEW REPORT” BUTTON IN THE TOP RIGHT CORNER OF THE REPORT.

Page 7: Generating UG progress Reports  in Report Manager

THE GENERATED REPORT WILL APPEAR AS SEEN BELOW.(NOTE: THE COLUMN LABELED “VISIT” REFERS TO THE FOURTH INTERNSHIP OBSERVATION

VISIT. ALSO, STUDENTS WHO HAVE RECEIVED SCORES OF ALL ZEROS MAY NOT HAVE PASSED OR COMPLETED THE SENIOR II INTERNSHIP SEMESTER.

Page 8: Generating UG progress Reports  in Report Manager

EXPORTING THE REPORT INTO EXCEL:STEP 1: CLICK ON THE BLUE DISKETTE ICON AT THE TOP OF THE REPORT TOOLBAR AND CHOOSE EXCEL FROM THE DROP DOWN MENU.

STEP 2: SAVE THE FILE TO THE DESIRED LOCATION. YOU WILL NOW BE ABLE TO MANIPULATE/FILTER THE COLUMNS AS AN EXCEL SPREADSHEET.