18
207 Sweeney Drive Toronto, Ontario M4A IV5 29 December, 2008 REGISTERED Ministry of North em Development and Mines 933 Ramsay Lake Road, 3rd Floor Sudbury, Ontario P3E 6B5 DEC 3 1 2 008 GEOSCIENCE ASSESSMENT OFFICE Attention: Mr. Clive Stephenson - Mining Recorder - Sudbury Dear Mr. Stephenson: Re: Mining Claims #4205079/575769 - Shakespeare Twp. - Client #109262 Attached in duplicate, are Reports - Assessement Work Performed on Mining Lands - November 2007 to December, 2008, Re Leased Claim 575769 and contiguous Claim 4205079. Ifthe Reports are acceptable to the Ministry, please apply Assessment Work Credits as follows: Claim 4205079 - $3490.69. Information for Ministry review follows:, I.Map 1 - In scale limits with astronomic bearings. It has claim lines, roads, trails, topographic items,north direction, water areas, rock types, etc. Refer to Maps 2,3,4 re work locations. 2.Map 2 - Shows Claims 575769 and contiguous adjoining Claims 4205079 - 1210828. 3.Map 3 - Shows work area location where soil samples were taken for assay. 4.Map 4 - Shows locations of soil samples by Contractor Vallillee and inspected by Blue (twice). 5.Exhibit 1 - Pgs 1 to 4 - Description offield work, contractor & self to obtain soil samples re assay, inspection of work etc. 5.Exhibit 2 - Three pages - Survey notes, topographic items, forest cover, overburden soil etc. 6.Exhibit 3 - One page - Description of activity and ground conditions. 7.Narrative/Expense Reports- Pages 1 to 4 - Contract, labour,miscellaneous, vehicle kilometer, re delivery of samples for assay, Post Office, correspondence, receipts etc. 8.Certificate of Analysis-Assays - etc. Pages 1 to 6 Yours truly, '1 /) Peter G. Blue
Transcript
Page 1: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

207 Sweeney Drive Toronto, Ontario M4A IV5

29 December, 2008 REGISTERED

Ministry of North em Development and Mines 933 Ramsay Lake Road, 3rd Floor Sudbury, Ontario P3E 6B5

DEC 3 1 2008 GEOSCIENCE ASSESSMENT

OFFICE

Attention: Mr. Clive Stephenson - Mining Recorder - Sudbury Dear Mr. Stephenson:

Re: Mining Claims #4205079/575769 - Shakespeare Twp. - Client #109262

Attached in duplicate, are Reports - Assessement Work Performed on Mining Lands - November 2007 to December, 2008, Re Leased Claim 575769 and contiguous Claim 4205079. Ifthe Reports are acceptable to the Ministry, please apply Assessment Work Credits as follows: Claim 4205079 - $3490.69. Information for Ministry review follows:,

I.Map 1 - In scale limits with astronomic bearings. It has claim lines, roads, trails, topographic items,north direction, water areas, rock types, etc. Refer to Maps 2,3,4 re work locations.

2.Map 2 - Shows Claims 575769 and contiguous adjoining Claims 4205079 - 1210828.

3.Map 3 - Shows work area location where soil samples were taken for assay.

4.Map 4 - Shows locations of soil samples by Contractor Vallillee and inspected by Blue (twice).

5.Exhibit 1 - Pgs 1 to 4 - Description offield work, contractor & self to obtain soil samples re assay, inspection of work etc.

5.Exhibit 2 - Three pages - Survey notes, topographic items, forest cover, overburden soil etc.

6.Exhibit 3 - One page - Description of activity and ground conditions.

7.Narrative/Expense Reports- Pages 1 to 4 - Contract, labour,miscellaneous, vehicle kilometer, re delivery of samples for assay, Post Office, correspondence, receipts etc.

8.Certificate of Analysis-Assays - etc. Pages 1 to 6

Yours truly, '1 / )

9~4t'~ Peter G. Blue

Page 2: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

: e , ~ '.

c- ~ ,

.' ' ,- .,,/" ... •. , . .- . . ,. : ,.. .

J . -0.'" ,

MAP 2,

TO •• 'M."

SHAK,ESFlE •.• . R.: A'M'.1STPtA·ff¥( Itf'

ESPANOLA~

.'II,a, IUYJSIO.

SUDBURY l" •• T\Tl.ESI REGllfTRY to

"SUDBURY ' . _

... (i) Ontkio .

. .. . . , -.-- .. -.. -

j

M'f1l!! .1',/ . !I Natui ~1 Reoo If '" :5

"

'" " ~. -.. (

-- ~--, ..... -,-~

Page 3: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

"li-'

lli,

,I

I' II',' , , I ,

rl III ~' LI ~

il :i il 111'

i'f , ,

/, " v<.~

t: x: t-I/;1'1 I ('1 '

f':Lf~ I

, ,

.''1

Mr. Peter G. Blue l 207 Sweeney Drive Toronto. Ontario M4A 1 V 5

.Rs: Soil SQ1llplillg September. 2008 UDf.~ m.i.ng claim 4205079 and ~~ Mining Claim S 5751'i9 beling the SW111.SllZ LOT 4 CON 1 ,~ituated in Shakespeare Township di.~bury M"ming Division

Dear Mr. Blue:

On 6'"'of September, in response to your November. 2007 letter. Bruce Poirier and I proceeded to the proporty and collected the samples All' you l'CqwlSted.

The new smnp!~ IfJ!~.m!9m 7lE; 7* 72:8. nw. 73E. 73W. gOE, SOW. 8IE. 804,.ifIld 9 wen estab1.isbed south from previous sample locations 70E, 70W, 83, using compaas and tape measure and become a continuation south of Center Line A, ~ter ~ .ll~,~ ~ line C,

The OPS coordiDates for the sample lOalltion No. 9 Are N 46 de~ 16 minute 52 seconds W 81 dct~~ 51 minute 28 seconds

(: ,,', The sampliag method was using a shoveL to dig below the hwnus layer to collect the mineral soil .. WI';\"C colloctod provioualy in Septe:mb::rr. 2001. The SlllDP1e locatiaDa wet6mNiFecf ifiii'fljjjpd- , simil."!pi to 1he p:evious . '. sample loeatioos. The flaa at each location was marlred witllL the sample, number.

We thank you for

'--cJJ C,I tr t,~ , - '>....:("~ ._2:' _____ _

David Vallillee

392 YorK Street Sudburv.UN

: . .1

ent fOr this WOlde..

concerns. please call.

Page 4: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

t: / Ii ( I~( r '. .

Shakespeare Township - Claims 4205079/575769 - 29 December 2008

Manual Work Log OfField Work Labour and Inspection - Conducted After Staking - 2007/8

P.G. Blue - 207 Sweeney Drive Toronto Ontario M4A 1 V5 J. E. Blue - 207 Sweeney Drive Toronto Ontario M4A ] V5

Equipment Used: Global Positioning System, shovel, tape measure, axe, saw.

Name of Worker Address

P. G. Blue - 207 Sweeney Drive-Toronto J. E. Blue - 207 Sweeney Drive-Toronto P.G. Blue - 207 Sweeney Drive-Toronto J. E. Blue - 207 Sweeney Drive-Toronto

Date Hrs Employed Work Done

03 June 08 03 June 08 13 Sept 08 13 Sept 08

6 Inspection of Contract Work(nt done) 6 Helper Assist - Safety Factor

6 Inspection of Contract Work (done) 6 Helper Assislt - Safety Factor

Total Daily Hours of each Worker 6 hrs x 2 = 12 hours for each worker x 2 = 24 hours total.

Allow $20.00 per hour for each worker = $120.00 per 6 hour day. 4 six hour days = $480.00

Total Labour Cost re Above Report = $480.00

Signature - P.G.Blue Signature - J.E.Blue

Note - Additional to above, hours shown on expense report re sorting, transporting soil samples Sudbury, to SGS in Toronto re assays. Also, hours spent on reports, letters, transportation etc.

Page 5: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

_.

/"'~ '\,' /i : -;7/­(I ( !:J t

I

(1 -7

Sweeney Drive Toronto, Ontario M4A IV5

27 November, 2007

Mr. David Vallillee Vallillee Exploration 392 York Street Sudbury, Ontario P3E 2A7

Dear David:

l • " rj L' " v

Year 2007 - Work Program - Mineral Exploration·· Shakespeare Township Claims

David, I have not been able to contact you by phone, so asswne you must be out of town. It may be too late in the year to do more soil sampling, but, if you c,m, I enclose instructions and money to cover the work. If you are tied up on other work, or if it is too late in 2007 to do the work, it can be deferred until next April or May. The reason I wish to move forward with the sampling now is because it has taken so long to get the assay results back from the Assayers. We are still waiting for the results to come back from Accurassay in Lively and it will be into December, before th~JJ.ssay results arrive here (maybe).

C. 1fJ10 1 ~\ . Encl.o~ed,!s cheque .for $450.00 (contract la~our, incidentals, mil~age t:~tc) to cove~ the work for obtammg ore soIl samples and for arrangmg for same to be shIpped to me here m Toronto. Once the work is done please let me know if this money is sufficient to cover the cost of your work .. Please advise me when the samples have been taken and when and where I can pick same up for assay.

Yours truly,

-; .-1}-v-Y- lL Ll.e ~ Peter G. Blue

Page 6: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

.. ~

l __ "\ ; .. I I

27 November, 2007

WORK PROGRAM - 2007 - SHAKESPEARE MINING CLAIMS - PETER G. BLUE

RECENT WORK - PHASE I and PHASE 2 work completed and reported to Ministry for Assessment Work Credits (A We).

PHASE 4

PHASE 3 Field work completed. As of 27November assay reports are pending. Once received the work will be reported to the Ministry for A We.

- Further soil sampling to be done as per the attached sketch, as follows: On Centre Line A, take soil samples at loeations (i?cm~ 9. v " v l!? '7' On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W ---

~ f\ /1

WORK PRIORITY - Center Line - 2 samples, East Line 5 samples, West Line 4 samples

WORK METHOD - Take GPS reading and record same at sarnple location #9. Place a stake and number it at each sample location. Use measuring tape, compass, plastic bags as necessary and label the location number on the sample container. At each sample site, dig circular hole about 15118 inches deep and obtain soil samples beneath the humus layer. Amount of soil in the sample should be simi liar in size to samples taken in Phases 1 to 3. Identify by location, each sample that is taken. Once sampling is done please contact Peter Blue, and advise him when the samples will be shipped to Toronto for assaying. Submit a wrtten summary to Peter Blue of work done and that would be acceptable to the Ministry when submitted for A WC.

Peter G. Blue 27 November, 2:007

Page 7: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

I I I I I i , mJ :J

"

I' _JH

, ~.

I I

..i I ~

i I (

~

t,t ~I t l --I

0. <. -:>' ~ iJJ II --c

.! ''0

" t

.. ~

-i~ Ul T "» -,

.rTl (n 'J

)'C>

II

ill ' " "'·1 j

/(("" /' ,

..

reO iii T Iii

1.'

' -r

r*~ _:< I '\

I ~o ) o. \ rn

!

I ------,/

I NO h y'"

\ \ I

~ I I

I ..---~

,(ex 1)\ 1 i 1£ P_ 0 ")

I \~!« 1 ~ I '----I ~// l " ",C B T',,'

J {Io!

" C'I "'-,

NO e. r '.

)~­

i i

--------------------~----,--------r-------------'----

,. 0 --1

-"

-i

0 ~ 2 (n Co

r, , 2:

II ()

' "

'" 0

Ul

TI ()

?

T y' <

" r-!> ;:

r-0

-1

i OT

f)1

OT

-.J. f SPR' ICC I

, { i"'1

" . ~. I

/

79 259 II!

z ...J

7::' 3:'>

70.93

6~N8 •

3 r~ 362

~I. 99

z

16 470

13 52

9. 85

I '. i

- I COl: Z

Pt..51.S Be a IOcm.W.lao. O.~"'. N. \ ~--- Sf< BY P"OPORT!ON 6ETW~p.' THE

t:- -i .... _ CLIFf

F---~~ ~.::ill.. TOP Of ~,ILL

~\, 1/ rMil" i !G~~~

?L S I .B. B C a 10 em. 'to', P O. 5 In. W_ o -:

()

0 TOP OF R(lC~ Y RISE Z

()

~_ - • I (T) [J) fOOT OF HLl L

Ul

0 Z

.-.

I 1r '-- --- - FIIOT OF HILL L

! ~. II' ~ \ OBS£RV:.TION S£RI£S; 1'0.',; \ ! ,\ I.'! I. " ~ ~\\VI I,

t) ~ TOP OF ~ILL

~~flI(\rrr '''\. C.\, " e" COlO''''.

I' : r"rtI""III1il1l1tm vERT!CAL CuFF

\_ __ ____ FOOT OF HILL

)

EDGE OF' SWAMP

PI. S I g 8 C Ii'< SHOULDER Of HIGHWAy

Sf T By PROPORTION IIfIWHN

THE 5 E CO~NER OF SI1A~ ESfOfAR! 'rWP

eZf~~: lC~NER C1' LDT 8 COt'LVI'

(,f J: t "/ r t

-,,\-

'~

.;1 oJ

Page 8: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

",

'.:' ,,'I; "'r ,if,.· ~ r .' I,;; inl' \ \ ~I("

".j

..

~)... ,

1# .. "'

,"" .- . • ,+, ••

14'" , .. " ',t"I'~ I' I,

1'1 ".fa. p .

11" ,. 1"1.# L

1;/ ,,,

../If # ""

'L •.• •

'",

L L

,I/? In 1.7

'-;~\\

Page 9: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

"

~:

i • III • ~

I • =-

!I,

I • .1,

I

f I

f , I t I ~, , " ~

.....

,. / .

./

IF -...JI J

@ .. Ii r'JI "

I '.

• • ~ ~ ~

~

;Ni-, -1"/'i

It ..

I' .;

.S j a , !.... ~ "") I~, i l ,I ('0:;.< '/; ,-::-'

,\ '< '0 I ).,J (\ (

, ~-""'~'1:"..:.' -;;:;jjI/:' .•• A.

. . J:1:-,.. ry "l:-

'. ~ ......

:o/{~/ttJ.

_Yl ... iltr ~~

. .,,'.,1#'" -....: ..... , .eco ~'1 ,."

.... "SO

. , '.1. 0

--:--t! .....

..•. ~ .-"

,y,.,.jZ.r 9.,..'11",,,. J"~'/' :. ",'

1/ ,) I" "

, .1i./

"

Page 10: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

EXHIBIT 3

Page 1 of 1

Shakspeare Twp-Claims 575769/4205079- 20 ]\rov 07 to 29 Dec 08 - Exploration-Soil Samples.

Description of Ground - Dense bush, rocky terrain. Verti4:;al cliffs, wide swamps. A few open areas of rough ground. Some hmd covered by overburden, with rock outcrops showing in places. Exhibit 2 attached descri'bes the terrain in detail,

1.10 Soil samples obtained 10 Sept, 08, tl~om Cllaims 575769 and 4205079, by Contractor Davi:d ValliLlee. On 3 June, 08 Blue and helper inspected site, but, samples had not been taken as of that date (see narrative). On 13 Sept, Blue and helper inspected site. The 10 samples had been taken by Vallillee. While on site one additional sample taken at locat:lon #71 and gathered information re future soil sampling that was done 24 Oct., 08 (has not been reported yet - still waHlllg lC::;UltS 01 assay~) un 1/ :sept 08 submitted 11 soil samples to SGS Labs in Toronto for assay. Duplicate of samples held for future evaluation.

Summary - Assay results received from SOS in Toronto" show elevated values of gold and 1)r~millm in some of the samples. 13 more soil samples were taken 24 October, 2008, and assay results are penc,:ng. Onc,e received, a decision VI/ill be made to do fu11her work if the assay results show a good re,t::=on to do so. In the interim, efforts will continue to get a reputable mining exploration comI'any involved in taking on the property.

n.LJ ///7

f$Y6.>? !5 k~ Peter G. Blue - 29 December, 2008

Page 11: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

I I I I

) .' L ___ ---'--.

WORK PROGRAM - 2007 - :.J. O(J '8

David Vallillee and Don O'Gor-man SHAKESPEAR TOWNSHIP

SUDBURY MINING DIVISION MINING LEASE S575769 and

UPATENTED MINING CLAIM 4205079

4205079

\

\ ,I) 25 1112006 '1

\ \

\

I S369223

·:)1, ... · ~'r I '

I

I !

'~:_ .• 1'1' ... _ . --.. ,I.,' , I

2007 1SA~PL J OD'd I

I

. '1-1

?30

J

...

230

I I

I _, IL .

I

I . •• 1.-'.- ~

- "n ....,.,_ . .-_ -~-+_ ...... " .

J

Page 12: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

d I N6/·i£t;,:: ioO'~ £ ~ ""'" ,'" " , "",;,,,: , .. ,1::::... L

C l ~ I ~ 't.f'j 0 i () r 1

f; () I L ';~ ~'M\)'PLL/11·'irri{t.:iJ J obhQ , I J.,. ... .;..{ ~ ~II.. '~)/:'Jr It' OJ V 1\ l. L I j,.[).f t.~" M pnro fl~il" '.',' ~ ( 'fl'~~'~~~'~""'--'-"-'~-£" 'W\'w:"L, "'7,"'" 'j" ,,;, '" ''1II(!AN\IftL't~~ ... 64,ti,.,;,'l"'I"!':' ,,'," 17 "~,~",,:,,, i~ '/"'i~"'('''';''

. \.1 a ~I 1....). 11.' T .". ..)1. 1" \ \~., ~ .~.\ "" \ . \ .: '. '::.JI ~

ML5' A ltI ~1> L it .- ft~'(~·I.,·--V' CJ'7 ®, , C { IV rl.· 13 t. I N if ~ it .. Sl>It. St\(\i\pLt:'5 ~ ~,OSt::Pf 0$ e, /'

ii ~...,

I~ '~~-

I r, ~

L-JtvJ • til

. "f

4), w

431AJ • •

, . !' >,"'.,'; 1

" "

· ,.,)

""'J' '

"

i1; ·/2P.:C-;"!J-l'·t:{"C-'~'--'''·''·:---' '" 70'w' ~ ~

7! \V ..

'.

,J , i

Ii A .q'!(~ .I /f,! ,c , ,\C-----:·, t.lott .,' ., , ;

43ft: - .. ,' , ~$" () i£

It. ,";

, \' ,

~ , '

.1ll(e ,,'.; " i iJ ~ 8

.731:$, '

, 8J)g:~ . .i"~'J\';· :

. . ~ .

• ~.\!~ 61

I

Q

I' • ,,\."

,: •• ,'I',' (I '.".'

.. ~ .: , 'c. .. ; •• ,

1

j )

"I 'I

~

1\ . ,j

1 ,

" .~" !'i" '" ,:'t) , J

··'f

,I

:~

",I.,','" 1"~: :1

Page 13: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

SG$ Certificate of Analysis

Work Order: T0103331

To: Peter Blue Date Dec 11,2008 Attn Peter G. Blue 207 Sweeney Drive TORONTO ONTARIO M4A 1B5

PO No. Project No. No. Of Samples Date Submitted Report Comprises

DEFAULT 11 Sep 18. 2008 Pages -I to 6 (Inclusive of Cover Sheet)

Distribution of unused material:

Return to client 11 Solis

Certified BV ------;,7 Gavin McGill

Operations Manager

SGS Minerals Services (Toronto) is accredited by Standards Council of Can.~da (SCC) and conforms to the mquirements of ISOIIEC 17025 for specific tests as indicated on the scope of accreditation to be found at http://www.scc.ca/en/programsllab/mineral.shtml

Report Footer: L.N.R n.a

= Listed not received = Not applicable

I.S = InsuffiCient Sample

= No result

"INF = Composition 01 thiS sample makes detection Impossible by thiS method

M after a result denotes ppb to ppm conversion. % denotes ppm to % conversion

Methods marked with an as':ensk (e 9 'NAA08V) were subcontracted

Methods marked with the @ symbol (e.g @AAS21E) denote accredited tests

ThiS document IS Issued by the Company under ts General Con~j tlons of Service accessible at http .'IW'N\N sas corn/terms and conditions htm A tentlon IS drawn to ~he ilmttatloP of liability Indemnification and junsdlctlon Issues defined therein

WARNING The sample(s) to 'Nt"1ICh Ire findmgs recorded herein ,~he 'Findings) relate was (were) drawn and i or prOVided by ttle Client or by a thll"d party acting at the Client's

d'irection The Filidings constitute no warranty of the sample s reoresentatlvlty of the 'joods and o;tnctly relat;~ to the sample(s) The Company accepts no liability with regard to the origin or source from which the sarnple(s) Is/are said to be extracted The findings repcrt on the sampl'~s proVided by the client and an~ not Intended far commercial or contractual settlement purposes Any unauthOrized 3iteratlon forgery or falSification of Ire conten~ -Jr 3ppearance of thiS documen: IS urlawful and l)ffenders may be prosecuted to the fullest extent of the law

SGS Canada Inc Minerai Ser,/lces 1885 Leslie Street Toconto O~ M3B '~M3 1(416) 445-5755 1(416) 445-4152 www s~ls.com

Member of the SGS Group (So(:iete Generale de SUlveliliance)

Page 14: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

Page 2 of 6

Element -0180mm VVtKg Au I)t Pd AI Ba Ca Cr

Method SCR30 WGH79 @FA1313 @FA1313 @FA1313 IMS12B IMS12B IMS12B IMS12B

Det.Lim. 0.01 0001 1 10 1 0.01 5 0.01

Units 0/ Kg PPB PPB PPB (i/o PPM % PPM

9 0276 <10 <1 1.34 71 039 50

*Rep 9 <0001 2 <10 <1 134 70 039 52

71E 0174 2 <10 2 402 292 048 108

72E 0229 2 <1J 2.56 192 057 76

72W 0215 2 <1J <1 1.90 154 049 65

73E 0270 15 <1J <1 169 119 047 58

73W 0286 14 <1) <1 125 71 032 46

80E 0353 3 <1J <1 1.54 97 041 56

80W 0360 2 <1J <1 1.72 112 043 64

81E 0.339 <1 'J <1 1.87 123 047 64

84 0238 6 <10 <1 272 205 066 85

71 0063 3 <10 2 427 271 047 107

ThiS document IS Issued by the Company under Its General Conclltions:)f Service accessible at 'lttp IlwwN ~;gs C8rrlterms and CO"-'dillors hIm Attention IS drawn to the limitation of

liability Indemnification and Jursdlctlon Issues defined therein

WARNING The sample(s) to which the findings recorded herem ,the 'F'ndlngs ~elate was (wer::!) drawn arJ / or provided bv Ire Client or by a third party acting at the Client 5

direction The Flndmgs constlh"te 10 warranty 01 :he sample's representatlvlt~ (If the goods and ~;tflctly relate ~o Ire sample(s) 1he 2.ompany accepts no liability with regard to the orlgm or source from which the sample(s) Is/are said to be extracted Trle findings report on the samples provided 'Jy the client and are net ,nterded for commerCial or contractual settler1ent purposes Any unauthorized alteration forgery or falSification of tile content or appearance of 'hiS document IS unlawful and offerders mal be prosl:;!cuted to the fullest extent of the law

SGS Canada Inc Mineral Services 1885 _eslle Street Toronto ON M3B 2M3 t(416:,445-5755 f(416) 445-4152 wwwsgs.com

Cu IMSI2B

0.5 PPM

13.2

10.8

40.0

34.0

22.5

15.7

10.2

180

166

207

30.5

327

Member of the SGS Group {Societe Generale de Sur,eillance)

Page 15: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

Page 3 of 6

Element Fe .<; Mg ~In Na P Sr Ti Zn

Method IMS12E! IMS12S IMS12B IMS1<'B IMS12B IMS12B IMS12B IMS12B IMS12B

Oet.Lim. 00'1 C 01 001 5 001 50 05 0.01

Units % % % PPM "/0 PPM PPM 'Yo PPM

9 20;> C 10 076 366 002 300 20.3 009 70

'Rep 9 2.00 o 10 077 355 002 310 201 0.09 72

71E 565 025 0.96 1140 002 1760 34.1 0.06 186

72E 318 019 0.89 848 002 760 29.3 0.07 127

72W 2.56 017 084 405 002 420 23.3 009 72

73E 2.37 a 15 081 4~~4 002 470 22.1 0.08 65

73W 194 a 10 0.66 474 001 310 18.7 0.08 80

80E 22:1 0.14 075 4B4 002 450 22.0 009 79

BOW 2.49 017 0.84 497 002 480 22.0 009 66

B1E 2.60 017 087 559 002 560 25.8 009 85

B4 3.19 022 1 as 658 002 490 279 009 110

71 4 B8 028 0.B6 6Ei7 002 2300 322 005 173

TillS document IS Issued by the Com~;any under Its General CondItIons of ServIce accessIble at http flwww.sgscOMJ1erms ana cordltlons htm A.ttertlon IS drawn to the limitatIon of liability Indemnification and Jurrsdlctlon Issues defined therein

WARNING The sample(s) to '·",hl:.::h the findings recorded herelr (the 'Flndlrgs ) relate was (wei e) jrawn and I or provided tly ttle Client Of by a third party acting at the C118m's

direction The Findings constitute no warranty of the sample's representatlvlty Jf the goods and stnctly relatl;'! to the 5ample(s) -'le Comf=:any accepts no liability with regard to the origin

or source from which the samplels) Is/are said to be extracted 'he findings reDort on the samples provldec: by the client ancl are not Intended for commercial or contractual setttement purposes Any unauthorized alteration forgery or falsification of :he content Dr appearance of ~n,s document s ufllawful and 8ffenders may be pro~,ecuted to the fullest extent of the law

SGS Canada Inc Minerai Services 1885 Leslie Street Tcronto ON M3B 2M3 1(.·16) 445-5755 1(4"6) 445-4152 wwwsgs.com

Ag IMS12B

01

F'PM

<0.1

<01

0.4

0.3

0.1

02

<0.1

0.2

<01

0.2

0.3

0.5

Momber of the SGS Group (Societe Genaralo d. SUl"Veillance)

Page 16: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

Page 4 of 6

Element As 81 Cd Ce Co Ga rig La Mo

Method IMS12B IMS12B IMS12B I'v1S123 IMS128 IMS128 IMS128 IMS128 IMS128

Det.Lim. 002 001 0.05 01 01 001 01 0.05

Units PPtI! P:>M PPM PPM PPM PPM PPM PPM PPM

9 o 15 024 493 128 69 002 16.7 0.34

'Rep 9 L' 015 026 467 12.1 69 001 16.1 0.29

71E 036 047 915 258 149 004 471 1.33

72E 3 025 037 843 168 10 3 009 43 a 0.88

72W L- 019 0.12 760 127 79 003 35.7 049

73E 017 0.14 691 127 72 0.04 354 044

73W ~t 013 0.15 40 4 12.0 60 0.01 181 040

80E 017 0.22 572 13.6 73 <0 01 24.7 042

80W 016 0.15 55 a 13.2 77 001 22.4 0.35

81E 019 024 765 142 81 002 35.3 040

84 ~~ 0.26 0.24 1S3 16.1 101 004 568 041

71 6 037 046 657 20 a 167 007 32.0 179

ThiS document IS Issued by the Company under Its General Conditions of Service accessible at http IIWWVli SaS t:orY1fterms ancj conditions htm ~,ttentlon IS drawn to the Ilmltaticn of liability indemnification and juriSdiction Issues defined therein

WARNING The sample(s) to NhlCh the findings recorded herew dhe 'Findings', relate was (were) drawn and (cr provided I)y the :llent or by a third party acting at the Client's direction The Findings constitute no warranty of the sample 5 representatlv ty ::If the goods and strictly relate to the sample(s) The Company aCCE~pts no liability with regard to the origin or source from which the sam:Jle,:s) Is/are said to be extracted. The findings report on the saMples provided by the ,:llent an,j a:-e not Intended f'Jr ,:ommerclal or contractual settlement purposes Any unauthorized alter atlon forgery cr falsification of the ::onteN or appearance of t~ IS document IS unlawful and offenders may be pro3ecuted to the fullest extent of the law

SGS Canada Inc Mineral Ser>! ces 1885 Leslie Street Turonto Ol'j M3B 2M3 1(416) 445-5755 f(416) 445-4152

NI IMS128

as FPM

:14.4

:13.8

667

502

42.6

369

;'81

:14.2

40.0

42.8

!i95

!i9.9

Member of the SGS Gr<)up (Soc::iete Gene ... lI. de Su,rv'Jiliance)

Page 17: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

Page 5 of 6

Element Pb Rn Sb Sc Sn Th TI U V

Method IMS12E: IMS12B IMS12B I\i1S123 IMS12B IMS123 IMS12B IMS12B IMS12B

Oet.Lim. 0.2 0.2 005 o 1 03 01 002 005 1

Units PPM PPM PPM PPM PPM PPM PPM PPM PPM

9 10.2 18.5 0.06 45 05 69 010 1.88 39

'Rep 9 104. 17.9 <005 45 05 6.6 011 189 37

71E 19.1" 429 0.06 146 0.9 167 032 8.19 79

72E 121" 38 1 0.10 91 0.6 120 022 9.85 53

72W 9 Ei 232 <0.05 78 05 130 017 1.69 42

73E 9 ,. " 239 <0.05 66 0.5 10.8 014 1 59 39

73W 85 21 9 <0.05 41 04 6.5 010 152 36

80E 9.:1 272 <005 53 05 86 o 13 2.65 42

80W 9C1 28.6 <005 67 0.5 10.5 o 15 185 43

81E 10.:1 298 <0.05 66 05 10.8 016 5.41 46

84 13 Ei 31 9 <0.05 98 0.7 15.7 021 3.07 53

71 25 a 454 012 132 12 127 036 516 85

ThiS document IS Issued by ~rle Company under Its General Conditions Jf SerJlce accessible al httpJlww.", sas -:;olYl/terms ancj cOfldltlons htm t·ttentlon IS drawn to the Ilmltatlcn of liability Indemnification and Juns.jlctlon Issues defined therein

WARNING The sample(s) to which the findings recorded herein (the 'F ndlngs' I relate was ('NE~e) d~awn c'-'d I or prJvlded I)y the ~llent or by a third party actmg at the Cller,t's

direction The Findings constitute no warranty of the sample s representatlvlty Jf the goods and stnc:ly relate to the samplel s) The Company accepts no liability with regard to the ongln or source from which the sarrplels) Is/are said to be extracted rhe findings report on the saml=les provide,] by tt'e :::lIent anj a,"e not Intended for ::;ommercla! or contractual settlement

purposes Any unauthorized alteration forgery or falsification of the ::::ontent 01 appearance Of nliS dccumert IS unlaVo/ful and offenders may be prosecuted to the fullest extent of the law

SGS Canada inc Mineral Services 1885 Leslie Street Toronto OI'J M3B 2M3 t(416) 445-5~'55 f(416) 445-4152 wwwsgscom

\Iv IMS12B

01 PPM

<01

<01

<01

<01

<01

<01

<01

<01

<01

<01

<0.1

<0.1

Member of the SGS Group (Societe Generale de Surv,!illance)

Page 18: GEOCHEMICAL SAMPLING RPT SHAKESPEARE TWP · On East Line B, take soil sample:s at locations #~T2E' 73E, 80E, 8lE On West Line C, take soil samples at locations 1t~i)72W, 73W, 80W

,

Page 6 of 6

Element y

Method IMS12E:

Det.Lim. o O~, Units PPM

9 5.64

'Rep 9 554

71E 185

72E 175

72W 12.9

73E 13 ·1

73W 5.52

80E 793

80W BAil

81E 123

84 23 :J

71 10 !3

This document IS Issued by :he Company under Its General CCHldltlons o· Service accessible at http :/W'/','N sgs com/terrn~. and conditions htm Attention IS drawn to the ilmltatlon of liability Indemnification and IUrlsdlctlon Issues defined therein

WARNING The samplers) to which the findings recorded herein (the 'Flrdlnl~s ') relate was \here) jrawn and I or prov1deej by :he Cller:! or by a lhlnj party acting at the Client's direction The Findings constitute no warranty Jf the sample 5 "epresentatlvlty of the goods ard strictly ~e .ate to the sample(s: The :ompany ac-:epts no liability With reganj to the ongln or source from which the s3rnple{sl Is/are said to be extracted The flndlrgs "eport on the san-Dies provided by the client and are not intendeo for commercial or cortractual settlement purposes Any unauthorized 3lterat,on forgery or falSification :)f the content or appearance :Jf this ':ocuml?nt IS Jnlawful ard cffenders may be prosecuted to the fullest exlE'nt of the law

SGS Canada Inc Mineral Services 1B85 Leslie Street ~oronto ON M3B 2M3 1:(416) 445~'i755 f(416) 445~4152 wwwsgscom