GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel : (02) 9679 8733 PO Box 1543, Macquarie Centre. North Ryde, NSW 2113 Fax : (02) 9679 8744 Report Geotechnical and Salinity Investigation Proposed New Building - Australian Christian College Lot 90 DP 1224210 No 69 Farm Road Riverstone NSW Prepared for Australian Christian College C/- Lippmann Partnership 570 Crown Street SURRY HILLS NSW 2010 Ref: JG09370B-r2 June 2018
Transcript
Page 1: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel : (02) 9679 8733

PO Box 1543, Macquarie Centre. North Ryde, NSW 2113 Fax : (02) 9679 8744

Report

Geotechnical and Salinity Investigation

Proposed New Building - Australian Christian College

Lot 90 DP 1224210 No 69 Farm Road

Riverstone NSW

Prepared for

Australian Christian College

C/- Lippmann Partnership

570 Crown Street

SURRY HILLS NSW 2010 Ref: JG09370B-r2

June 2018

Page 2: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5/39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel : (02) 9679 8733

PO Box 1543, Macquarie Centre. North Ryde, NSW 2113 Fax : (02) 9679 8744

15th June 2018

Our Ref: JG09370B-r2

Lippmann Partnership

570 Crown Street

SURRY HILLS NSW 2158

Attention: Mr Ed Lippmann

Dear Sir

Re Geotechnical and Salinity Report

Proposed New Building

Lot 90 DP 1224210 No 69 Farm Road, Riverstone

We are pleased to submit our site investigation report for the proposed new building to be

constructed at the above address.

This report contains information on sub-surface conditions and our comments and

recommendations on geotechnical issues for the proposed development.

Should you have any queries, please contact the undersigned.

Yours faithfully

GeoEnviro Consultancy Pty Ltd

Solern Liew CPEng (NPER)

Director

D:\09JOB\370\JG09370B-r2.DOC

Page 3: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

TABLE OF CONTENTS

Section Page

1. INTRODUCTION .................................................................................................. 1

2. THE SITE .............................................................................................................. 1

3. INVESTIGATION METHODOLOGY ................................................................. 2

3.1 Fieldwork ................................................................................................................. 2

3.2 Laboratory Testing ................................................................................................. 3

4. RESULTS OF THE INVESTIGATION............................................................... 4

4.1 Subsurface Conditions ............................................................................................ 4

4.2 Laboratory Test Results ......................................................................................... 5

5. COMMENTS AND RECOMMENDATIONS ...................................................... 7

5.1 Site Preparation and Building Platform Construction ........................................ 7

5.2 Retaining Walls and Slope Batters ........................................................................ 8

5.3 Footings .................................................................................................................... 9

5.4 Floor Slabs and Pavement .................................................................................... 10

5.5 Salinity and Soil Aggressiveness .......................................................................... 10

6 LIMITATIONS .................................................................................................... 12

REFERENCES

LIST OF DRAWINGS

Drawing No 1 Test Pit Location Plan

LIST OF APPENDICES

Appendix A Table A : Summary of Test Pit Profiles.

Appendix B Laboratory Test Report – Geotechnical

Appendix C Laboratory Test Report – Salinity

Appendix D Explanatory Notes and Graphic Symbols

Page 4: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

1. INTRODUCTION

This report presents the results of a geotechnical investigation for the proposed new building

to be constructed at the Australian Christian College, Lot 8 DP 2518 No 69 Farm Road,

Riverstone, as shown on Drawing No 1. The investigation was commissioned by Mr Simon

Lea of Lippmann Partnership in his email dated 6th May 2015, following our fee proposal Ref

PG09173B dated 12th February 2015.

We understand that the proposed development will include construction of a new college

building to accommodate 900 students. The proposed building will have approximate

dimensions of about 30m by 60m and this building will be 3-storey high consisting of a light

weight structure with concrete slab on ground. The proposed development will also include

construction of external canopy in front of the building and internal circulation road and a car

park.

The purpose of the investigation was to assess the subsurface condition at the proposed

building site and based on the information obtained, to present the following;

• Comments on site preparation and earthworks including fill construction

specification.

• Assessment on Site Classification in accordance with AS2780

• Assessment on soil aggressiveness and salinity

• Recommendations on retaining wall and batter slope design parameters.

• Footing types and foundation design parameters including soil reactivity.

• Recommendations on pavement design.

2. THE SITE

The Australian Christian College is located on the southern side of Farm Road, Riverstone

and is roughly rectangular in shape with an approximate 160m frontage along Farm Road by

about 270m deep. The proposed new college building will be situated at the front north

eastern portion of the property as shown on Drawing No 1.

Page 5: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 2 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

The site is situated on gently undulating terrain. Ground surface within the site is

approximately level. Based on the survey drawing provided, the ground surface along the

western site boundary is at about Reduced Level (RL) 19m to 20m Australian Height Datum

and the ground surface along the eastern site boundary is at about RL 20.5m to 22m AHD.

Based on the 1:100,000 geological map of Penrith, the site is underlain by Laterized sand and

clay with ferricrete bands; includes silcrete. The underlain bedrock consists of Bringelly

Shale which typically comprises of shale, carbonaceous claystone, claystone, laminite, fine to

medium-grained lithic sandstone, rare coal and tuff.

The front western half portion of the site consists of a number of school buildings with a

bitumen car parking area at the north western corner. The north eastern corner of the site

where the proposed new building will be constructed is occupied by a house and a number of

out buildings with a small dam located to north west of the house.

The remaining rear portion of the property consists of undeveloped land. The immediate

adjoining eastern and western properties consist of semi rural residential land.

3. INVESTIGATION METHODOLOGY

3.1 Fieldwork

Fieldwork for the investigation was carried out on the 27th May 2015 and involved excavation

of 6 test pits (TP 1 to TP 6) in the proposed building site and car parking area using a rubber-

tyred backhoe. Access to the proposed car parking area is limited due to the presence of the

dam and thick vegetation. The test pits were excavated through fill, topsoil, natural clay and

into shale to depths ranging from 2.3m to 3.4m below existing ground surface.

To assess the strength of the subsurface profiles, hand penetrometer tests were carried out on

the test pit walls. The test pits were observed for groundwater seepage during and upon

completion of the site investigation.

The investigation was supervised on a full-time basis by a geotechnical engineer from this

company who was responsible for locating the test pits, performing field testing, soil

sampling and logging of subsurface profiles encountered.

Page 6: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 3 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

Upon completion of the test pit investigation, the test pits were backfilled with excavation

spoil and compacted using the backhoe bucket. The field test results, together with details of

the subsurface profile encountered are presented on the Table A Summary of Test Pit Profile

in Appendix A. The test pit locations as indicated on Drawing No 1 were approximated by

off-set measurement relative to existing site features and boundaries shown on the plan

provided.

Explanatory notes and Graphic Symbols for Soil and Rock are attached in Appendix D.

3.2 Laboratory Testing

Geotechnical

One “undisturbed” U50 sample was taken from the site to our NATA accredited laboratory for

Shrink-Swell Index testing to aid assessment of soil reactivity to moisture variation. One

subgrade sample was taken for 4-days Soaked California Bearing Ratio testing to aid

assessment of pavement subgrade characteristics.

The laboratory test results are summarised on the Laboratory Test Report in Appendix B.

Salinity

Salinity soil samples were collected from topsoil and at lower depths for laboratory analysis

to assess the likely impact of soil salinity to the proposed development. The following

laboratory analysis was carried out;

• pH

• Electrical Conductivity (Ec)

• Chloride (Cl)

• Sulphate (S04)

• Resistivity

The salinity analysis was carried out by Envirolab Services; a laboratory accredited by the

National Association of Testing Authorities (NATA) for the tests performed. The laboratory

test reports for the salinity are attached in Appendix C of this report.

Page 7: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 4 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

4. RESULTS OF THE INVESTIGATION

4.1 Subsurface Conditions

Reference should be made to the attached Table A in Appendix A for details of subsurface

profiles encountered. The following is a summary of the subsurface profiles encountered;

Fill

Fill was encountered on the surface in TP 2, 4 and 5 with thickness ranging from 0.2m to

0.5m. The fill in TP 2 was found to consist of Gravelly Clayey Silt of low liquid limit with

some asphaltic concrete lumps and roots. In TP 4 and 5, the fill consists of Clayey Silt of low

liquid limit.

Topsoil

Topsoil was encountered on the surface in TP 1, 3 and 6 and beneath the fill in TP 4 and 5.

The topsoil consists of low liquid limit Clayey Silt with some roots. Thickness of the topsoil

ranges from 250mm to 400mm. The topsoil was generally found to be moist.

Natural Soil

Underlying the topsoil and fill, natural soil was encountered at depths ranging from 0.25m to

0.9m below existing ground surface. The natural soil consists predominantly of medium to

high plasticity Silty Clay with some ironstone gravel. Gravelly Silty Clay of medium

plasticity was encountered in all test pits except TP 4 at depths ranging from 0.65m to 1.2m

below existing ground surface.

Based on the hand penetrometer test results, the natural clayey soil was generally assessed to

be very stiff and the moisture content of the natural clay was generally found to be

approximately equal to the plastic limit. In TP 4, 5 and 6, the upper 1.8m of the natural clay

was found to be relatively wetter (ie greater than the plastic limit) and relatively weaker (ie

stiff to very stiff)

Page 8: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 5 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

Bedrock

Bedrock was not encountered in any of the test pits which were taken to a maximum depth of

3.4m below existing ground surface. Based on our previous investigation of the western

portion of the site, shale/siltstone was encountered at depths of about 3m below existing

ground surface.

Groundwater

All test pits were found to be dry during and upon completion of the site investigation. We

expect some perched ground water to exist in the area within close proximity to the dam at

the front portion of the site.

4.2 Laboratory Test Results

Geotechnical

The laboratory test results indicate the natural clay to be moderately to highly reactive to

moisture variation. The following is a summary of the Shrink-Swell test results for the

sample taken from TP 3 (0.4-0.65m);

Swell = 0.5%

Shrinkage = 5.0%

Shrink/Swell Index = 2.9%/pF

A CBR value of 2.5% was obtained from the subgrade sample taken from TP 4 (0.9-1.1m).

Page 9: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 6 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

Salinity

The following is a summary of the laboratory test results;

Sample Depth (m) pH Ece Cl SO4 Resistivity

mg/kg mg/kg ohm cm

TP1 0.0-0.1 6.1 0.23

0.5-0.6 5.2 3.2 410 25 2500

1.8-1.9 5 5.25 1100

TP2 0.0-0.1 8.3 0.85

0.5-0.6 4.8 5.52 590 430 1400

1.5-1.6 4.9 4.875 740 280

TP3 0.0-0.1 6.3 0.18

0.5-0.6 4.8 5.76 940 330 1400

1.5-1.6 4.9 6.3 1100 160

TP4 0.0-0.1 5.6 1.1

0.9-1.1 4.7 6.24 1200 140

1.5-1.6 4.7 6.75 1500 170 1100

TP5 0.0-0.1 8 0.89

0.6-0.7 6 6.64 1000 560 1200

1.9-2.1 6.6 6.375 1400 180

TP6 0.0-0.1 5.3 1.5

0.6-0.7 5.1 2.96 340 260

1.6-1.7 5.1 5.25 860 210 1400

Note: ESP – Exchangeable Sodium Percentage (%)

CL – Chloride (mg/kg)

SO4- Sulphate (mg/kg)

Resistivity – ohm m

Page 10: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 7 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

5. COMMENTS AND RECOMMENDATIONS

5.1 Site Preparation and Building Platform Construction

We understand that the proposed new building will be constructed at the north eastern front

corner of the site and an internal circulation road will be constructed along the northern front

boundary and eastern boundary and around the existing school buildings on No 69 Farm

Road to connect to the car park at the front north western corner of the school premises.

The site investigation revealed the proposed building area to be underlain by topsoil and fill

up to about 0.5m thick overlying natural clayey soil to depths in excess of 3.2m below

existing ground surface. As the insitu fill was found to be underlain by topsoil and in the

absence of field density test results, the fill would not be classified as “Controlled” according

to the definition outlined in AS 3798-2007 “Guidelines on bulk earthworks for commercial

and residential development” and therefore not considered suitable as a bearing stratum

beneath permanent structures such as building and pavements.

Based on the foregoing, we anticipate site and building platform preparation to include the

following:

• The area should be stripped of topsoil and all “uncontrolled” fill should be

excavated to exposed the natural clay.

• Proof rolling of the exposed natural clay to delineate soft and heaving areas.

Any soft and heaving areas delineated by the proof rolling should be further

excavated and replaced with a select granular fill having a maximum particle

size of 75mm.

• Moisture conditioning of the insitu fill by spreading the wet fill over an area

and tilling under good weather condition to dry the fill or mixing of the insitu

fill with dryer fill.

• Placement of fill if required should be placed in layers not exceeding 250mm

loose thickness and compacted to a minimum 98% Stand Maximum Dry

Density (SMDD) at within 2% of Optimum Moisture Content (OMC).

Page 11: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 8 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

• Field density testing during fill placement by a NATA accredited laboratory.

The earthwork should be closely monitored by a geotechnical engineer and

density test should be carried out an appropriate frequency and level of

supervision as detailed in AS 3798-2007.

5.2 Retaining Walls and Slope Batters

We anticipate some minor site regrading by cut and fill will be required for proposed

building platform preparation and access road construction. Site regrading by excavation and

fill if required should be battered to not steeper than 1 Vertical to 2 Horizontal, otherwise a

retaining wall system should be constructed.

For retaining walls which will be propped by the ground floor slabs, the walls should be

designed to limit deflection using an “At-rest” lateral earth pressure coefficient (Ko).

Cantilevered walls or gravity walls may be designed to “yield” using an “Active” lateral earth

pressure coefficient (Ka).

The following lateral earth pressure coefficients may be adopted;

Material Ko Ka Bulk Density

(kN/m3)

Compacted Fill 0.55 0.36 17.5

Natural Clay 0.5 0.33 19.0

Weathered Shale 0.35 0.15 22.0

Permanent subsurface drains should be provided at the back of the retaining wall, or half-

hydrostatic ground water pressures should be taken into account in the design. Surcharge due

to adjacent structures, construction loads and sloping backfill should be taken into account in

the design.

Page 12: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 9 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

5.3 Footings

Subject to building platform prepared in accordance with the recommendations outlined in

Section 5.1 of this report, shallow footings such as stiffened raft slab, waffle slab or strip and

pad footings may be adopted for the proposed building. For shallow footings founded on

natural very stiff clay or compacted fill (ie “Controlled Fill”), an allowable bearing capacity

of 100 kPa may be adopted for the proposed footings.

Should the proposed building be subjected to concentrated loads, deep footings such as bored

piers, grout injected piers, continuous flight auger (CFA) piers or steel screw piers may be

adopted.

For bored piers, grout injected piers or CFA piers taken to a minimum depth of 5.0m below

existing ground surface on natural very stiff clay or to refusal on weathered shale, an

allowable end bearing capacity of 500kPa may be adopted. If steel screw piles are considered

the preferred option, further consultation should be made with the proprietary piling

contractor to obtain indicative pile load capacities and this piling system would need to

consider durability design.

If bored piles are adopted, we note that shale deteriorates rapidly causing loss of strength

upon exposure to weathering and therefore concreting should be carried out as soon as

possible after pier boring. Should this be not possible, the base of the piers should be

covered with a blinding layer. Care should be taken to ensure that the bases of piers are

cleaned of loose and remoulded debris.

The laboratory test results indicate the natural clay to have a moderate to highly reactivity to

moisture variations and as the natural clayey profile was found to be relatively deep in excess

of 3.4m, we recommend that the building footings be adequately designed to accommodate

some shrink-swell movements proportioned to a Class ‘H1’ (Highly Reactive) site in

accordance with AS2870.

Page 13: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 10 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

5.4 Floor Slabs and Pavement

The building concrete floor slabs may be designed as ground bearing provided the building

platform is prepared as outlined in Section 5.1.

For external pavements and concrete slabs, a CBR value of 2.5% and a Modulus of Subgrade

Reaction of 28mm/kPa may be adopted in the design.

5.5 Salinity and Soil Aggressiveness

The topsoil and Gravelly Clayey Silt layer were generally assessed to be Non to Slightly

saline with EC values ranging from 0.18dS/m to 1.5dS/m. The underlying natural Silty Clay

and Gravelly Silty Clay soils were assessed to be Slightly to Moderately saline with EC

values ranging from 2.96dS/m to 6.37dS/m.

The subsurface soil was found to have low Sulphate and in an environment with the lowest

pH of 4.7 the soil is considered to be Mildly Aggressive to buried concrete structure. The

subsurface soil was generally found to have low Chloride and in an environment with the

lowest pH of 4.4 and a lowest Resistivity of 1100 Ohm cm, the soil was considered to be

Mildly Aggressive to buried steel.

The underlying Silty Clay and Gravelly Silty Clay were assessed to be Moderately to Highly

dispersive based on our previous investigation of the multi purpose building with the college

premise.

As the site is situated within a saline prone environment, we recommend the following;

➢ Appropriate batter slope for excavations should be adopted to prevent erosion

and scouring. Under a good drainage condition, the batter slope may be designed

for 2 Horizontal : 1 Vertical.

➢ The site should be regularly inspected for erosion and scouring, and stabilization

may be done using 3% weight of lime and cover the area with good quality

sandstone. Trenching for underground services should be done in a manner to

reduce displacement of original soil profile and excavation deeper than 1 meter

should be backfilled in the same order.

Page 14: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 11 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

➢ A high impact waterproof membrane, not just a vapour proof membrane, should

be lain under house slabs (refer to NSW Building Code of Australia). The

waterproof membrane must be extended to the outside face of the external edge

beam up to the finishing ground level, as detailed in the Building Code of

Australia (BCA).

➢ For masonry building construction, the damp proof course must consist of poly-

ethylene or poly-ethylene coated metal and correctly placed in accordance with

BCA. Ground levels immediately adjacent to masonry walls must be kept below

the damp proof course.

➢ Utilise native and deep rooted vegetation in order to minimise soil erosion and

limit the rising of the water table

➢ The exposure classification for concrete based on AS2870-2011 is “B1” and the

minimum concrete strength for slab is 32MPa. Concrete footings should have a

minimum cover to reinforcement of 60mm from unprotected ground and 50mm

from a membrane in contact with the ground

➢ If concrete piers with reinforcements are adopted, the cast in-situ concrete should

be constructed using Class 40 MPa concrete, or sulphur resisting concrete with a

water cement ratio of 0.5.

➢ Use Copper or non-metallic pipes instead of galvanised iron

➢ Slabs must be vibrated and cured for a minimum 3 days

➢ Admixtures for waterproofing and /or corrosion prevention may be used

Page 15: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building 12 JG09370B-r2

Lot 90 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

6 LIMITATIONS

This is a geotechnical report providing our assessment on site conditions and

recommendations on geotechnical issues considered relevant to the proposed development.

This report does not address issues relating to site contamination.

The interpretation and recommendations submitted in this report are based in part upon data

obtained from a limited number of test pits. There is no investigation which is thorough

enough to determine all site conditions and anomalies, no matter how comprehensive the

investigation program is as site data is derived from extrapolation of limited test locations.

The nature and extent of variations between test locations may not become evident until

construction. Groundwater conditions were only briefly examined in this investigation. The

groundwater conditions may vary seasonally or as a consequence of construction activities on

or adjacent to the site.

The statements presented in this document are intended to advise you of what should be your

realistic expectations of this report and to present you with recommendations on how to

minimise the risk associated with groundworks for this project. The document is not

intended to reduce the level of responsibility accepted by GeoEnviro Consultancy Pty Ltd,

but rather to ensure that all parties who may rely on this report are aware of the

responsibilities each assumes in to doing.

Your attention is drawn to the attached “Explanatory Notes” in Appendix D and this

document should be read in conjunction with our report

C:\\09JOB\370\JG09370B-r2

15/06/18 2:30 PM

Page 16: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Legend

Test Pit

Drawn By: SL

GeoEnviro Consultancy Pty LtdChecked By: SL

Unit 5, 39-41 Fourth Avenue, Blacktown

NSW 2148, Australia

Tel: (02) 96798733 Fax: (02) 96798744

Scale: Proportional A4 Project No: JE15591B-r2 Drawing No: 1

c:\\lab\report\R011 Form No. R011/Ver02/06/07

Revision: Date:

Lippmann Partnership

Lot 90 DP 1224210 Farm Road Riverstone

Test Pit Location Plan

Date: 15/6/18

Date: 15/6/18

TP

TP 1

TP 2TP 3

TP 4

TP 5

TP 6

Page 17: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building JG09370B-r2

Lot90 8 DP 1224210 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

APPENDIX A

Table A: Summary of Test Pit Profiles

Page 18: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

GeoEnviro Consultancy Pty Ltd Unit 5, 39-41 Fourth Avenue, Blacktown NSW 2148, Australia

Tel: (02) 96798733 Fax: (02) 96798744

Table A : Summary of Test Pit Profile

Test Pit

Number Samples (m) From To

1 0-0.1 0.00 0.25

0.5-0.6 0.25 0.90

1.8-1.9 0.90 2.30

2.30 3.40

2 0-0.1 0.00 0.30

0.5-0.6

1.5-1.6 0.30 0.90

0.90 1.80

1.80 2.30

2.30 3.00

3 0-0.1 0.00 0.40

(U50) 0.4-0.65 0.40 0.65

0.5-0.6 0.65 1.30

1.5-1.6 1.30 2.85

2.85 3.10

4 0-0.1 0.00 0.50

(CBR) 0.9-1.1 0.50 0.90

0.9-1.1 0.90 1.20

1.5-1.65

1.20 1.80

1.80 3.20

5 0-0.1 0.00 0.20

0.6-0.7 0.20 0.60

1.9-2 0.60 1.20

1.20 1.80

1.80 3.20

6 0-0.1 0.00 0.50

0.6-0.7 0.50 1.10

1.6-1.7

1.10 2.30

c:/lab/reports/R022-A

PL = Plastic Limit.

PP = Pocket Penetrometer.

Notes:

MC = Moisture Content.

(CI-CH) Gravelly Silty Clay, medium to high plasticity, red grey, MC>=PL, very stiff

(PP=280-300kPa)

(CH) Gravelly Silty Clay, high plasticity, grey, MC>PL, very stiff (PP=370-380kPa)

(CI) Silty Clay, medium plasticity, grey, dry to moist

Topsoil: Sandy Clayey Silt, low liquid limit, brown, moist

(CH) Silty Clay, high plasticity, brown, with traces of gravel, MC>PL, very stiff

(PP=250kPa)

(CH) Silty Clay, high plasticity, grey, with trace gravel, MC>=PL, very stiff

(CI) Silty Clay, medium plasticity, grey, with trace gravel, dry to moist, hard (PP=550kPa)

Fill: Silty Clay, low plasticity, brown, dry to moist

Topsoil: Clayey Silt, low liquid limit, brown, moist

(CH) Silty Clay, high plasticity, red grey, MC>=PL, very stiff (PP=250kPa)

(CL-CI) Gravelly Silty Clay, low to medium plasticity, brown, dry

Fill: Silty Clay, low plasticity, brown, with some gravel, dry

Topsoil: Clayey Silt, low liquid limit, brown, moist

(CH) Silty Clay, high plasticity, brown red, with trace gravel, moist, hard (PP=400-

450kPa)

(CI-CH) Silty Clay, medium to high plasticity, grey, with trace gravel, moist, hard (PP=500kPa)

Topsoil: Clayey Silt, low liquid limit, brown, moist

(CH) Silty Clay, high plasticity, brown, with traces of gravel, moist, very stiff (PP=250-350kPa)

(CI) Gravelly Silty Clay, medium plasticity, red grey, dry to moist

(CI) Gravelly Silty Clay, medium plasticity, grey, dry to moist, hard (PP=400kPa)

Fill: Gravelly Clayey Silt, low liquid limit, brown, with asphaltic concrete, with roots, dry to

moist

(CH) Silty Clay, high plasticity, red grey, moist, very stiff (PP=300kPa)

(CI) Gravelly Silty Clay, medium plasticity, grey red, with fine to coarse grain gravel, dry to

moist

(CI) Gravelly Silty Clay, medium plasticity, grey, with fine to coarse grain gravel, dry to moist

Topsoil: Clayey Silt, low liquid limit, brown, moist

(CH) Silty Clay, high plasticity, brown grey

(CI) Gravelly Silty Clay, medium plasticity, grey red, with fine to coarse grain gravel, dry to

moist

(CI) Silty Clay, medium plasticity, grey, with ironstone gravel, dry to moist, hard (PP>600kPa)

Material Description

Form No. R022-A/Ver 05/06/10

Job Number: JG09370B-r2(rev)

Sheet 1 of 1

LOCATION: Lot 90 DP 1224210 Farm Road Riverstone

PROJECT: Proposed New Australian Christian College Building

CLIENT: Lippman Partnership Pty Ltd

Date: 27/05/2015

Logged By: SG

Depth (m)

Page 19: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building JG09370B-r2

Lot 90 DP 1224210 2518 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

APPENDIX B

Laboratory Test Reports – Geotechnical

Page 20: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

GeoEnviro Consultancy Pty Ltd Unit 5, 39-41 Fourth Avenue, Blacktown NSW 2148, Australia

Tel: (02) 96798733 Fax: (02) 96798744

Test Results - Shrink/Swell Index

Client / Address: Lippman Partnership Pty Ltd /Surry Hills Job No: JG09370B-r2(rev)

Project: Proposed New College Building Date: 28/8/2015

Location: Lot 90 DP 1224210 No 69 Farm Road, Riverstone Report No: R01A

Test Procedure: AS 1289 7.1.1

Remarks

c:/lab/reports/R013

Accredited for compliance with ISO/IEC 17025.

NATA Accredited Laboratory Number: 14208.

Authorised Signatory

Form No. R013/Ver 07/07/13

This document shall not be reproduced except in full.

Solern Liew 27/8/15

Material

Description Silty Clay, brown grey

Before Test kPa

Estimated UCS

210

Index %/pF

Swell %

Shrinkage %

Shrink/Swell

5.0

0.5

SR9600

28-May-15

AS 1289 2.1.1

After Test kPa

Sample Identification

Sample Register No

Sample Date

Test Results

Moisture Content

TP 3 (0.4-0.65m)

140

2.9

Sample Procedure AS 1289 1.1, 1.2.1 (6.5.4)

Test Date 28-May-15

Test Procedure

Test Procedure AS 1289 7.1.1

Initial %

27.5

24.5

Final %

Page 21: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

GeoEnviro Consultancy Pty Ltd Unit 5, 39-41 Fourth Avenue, Blacktown NSW 2148, Australia

Tel: (02) 96798733 Fax: (02) 96798744

Test Results - California Bearing Ratio

Client / Address: Lippman Partnership Pty Ltd /Surry Hills Job No: JG09370B-r2(rev)

Project: Proposed New College Building Date: 28/08/2015

Location: No 90 DP 1224210 No 69 Farm Road, Riverstone Report No: R02A

SAMPLE INFORMATION Test Methods

SR9601

28-May-15

02-Jun-15

Laboratory Specimen Description

Laboratory Compaction & Moisture Content - Test Methods AS1289 5.1.1 Mould A and AS1289 2.1.1

Maximum Dry Density t/m3 1.65

Optimum Moisture Content % 21.5

Field Moisture Content % 21.0

% Of Oversize 19mm -

Replacement of Oversize (See note B) -

California Bearing Ratio - Test Method AS1289 6.1.1

1.64

1.60

C 99.5

B 97.0

R Moisture Content 21.0

% 23.0

T 4

E 6.75

S Moisture Content 35.0

T After Test % 23.0

Swell After Soaking % 2.7

Penetration mm 2.5

CBR Value % 2.5

Notes: (A) Test specimen was compacted to a target dry density of 100 percent standard (AS 1289 5.1.1)

(B) If specified the percentage of oversize retained on the 19mm may be replaced by an equal portion of –19mm to +4.75mm

Remarks

C:\\Lab\report\R003 Form No. R003/Ver07/07/13

Accredited for compliance with ISO/IEC 17025.

NATA Accredited Laboratory Number: 14208.

Authorised Signatory

This document shall not be reproduced except in full.

Solern Liew 27/8/15

Date Tested

Density Ratio %

Date Sampled

Lab Reference No.

Dry Density t/m3

After Soaking

Before Soaking

Sample Identification

TEST RESULTS

Silty Clay, brown

red, with gravel

Whole Sample

Top 30mm

TP 4 (0.9-1.1m)

Surcharge kg

Number of Days Soaked

After Soaking

Before Soaking

After Soaking

Before Soaking

Page 22: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building JG09370B-r2

Lot 90 DP 1224210 2518 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

APPENDIX C

Laboratory Test Report – Salinity

Page 23: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

CERTIFICATE OF ANALYSIS 129017

Client:

Geoenviro Consultancy Pty Ltd

PO Box 1543, Macquarie Centre

North Ryde

NSW 2113

Attention: Solern Liew

Sample log in details:

Your Reference: JG09370A-r4, Riverstone

No. of samples: 18 Soils

Date samples received / completed instructions received 02/06/15 / 02/06/15

Analysis Details:

Please refer to the following pages for results, methodology summary and quality control data.

Samples were analysed as received from the client. Results relate specifically to the samples as received.

Results are reported on a dry weight basis for solids and on an as received basis for other matrices.

Please refer to the last page of this report for any comments relating to the results.

Report Details:

Date results requested by: / Issue Date: 11/06/15 / 11/06/15

Date of Preliminary Report: Not Issued

NATA accreditation number 2901. This document shall not be reproduced except in full.

Accredited for compliance with ISO/IEC 17025. Tests not covered by NATA are denoted with *.

Results Approved By:

Page 1 of 7Envirolab Reference: 129017

Revision No: R 00

Page 24: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Client Reference: JG09370A-r4, Riverstone

Misc Inorg - Soil

Our Reference: UNITS 129017-1 129017-2 129017-3 129017-4 129017-5

Your Reference ------------- TP1 TP1 TP1 TP2 TP2

Depth ------------ 0.0-0.1 0.5-0.6 1.8-1.9 0.0-01 0.5-0.6

Date Sampled

Type of sample

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

Date prepared - 04/06/2015 04/06/2015 04/06/2015 04/06/2015 04/06/2015

Date analysed - 05/06/2015 05/06/2015 05/06/2015 05/06/2015 05/06/2015

pH 1:5 soil:water pH Units 6.1 5.2 5.0 8.3 4.8

Electrical Conductivity 1:5 soil:water µS/cm 23 400 700 85 690

Chloride, Cl 1:5 soil:water mg/kg [NA] 410 1,100 [NA] 590

Sulphate, SO4 1:5 soil:water mg/kg [NA] 240 190 [NA] 430

Resistivity in soil* ohm m [NA] 25 [NA] [NA] 14

Misc Inorg - Soil

Our Reference: UNITS 129017-6 129017-7 129017-8 129017-9 129017-10

Your Reference ------------- TP2 TP3 TP3 TP3 TP4

Depth ------------ 1.5-1.6 0.0-01 0.5-0.6 1.5-1.6 0.0-0.1

Date Sampled

Type of sample

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

Date prepared - 04/06/2015 04/06/2015 04/06/2015 04/06/2015 04/06/2015

Date analysed - 05/06/2015 05/06/2015 05/06/2015 05/06/2015 05/06/2015

pH 1:5 soil:water pH Units 4.9 6.3 4.8 4.9 5.6

Electrical Conductivity 1:5 soil:water µS/cm 650 18 720 840 110

Chloride, Cl 1:5 soil:water mg/kg 740 [NA] 940 1,100 [NA]

Sulphate, SO4 1:5 soil:water mg/kg 280 [NA] 330 160 [NA]

Resistivity in soil* ohm m [NA] [NA] 14 [NA] [NA]

Misc Inorg - Soil

Our Reference: UNITS 129017-11 129017-12 129017-13 129017-14 129017-15

Your Reference ------------- TP4 TP4 TP5 TP5 TP5

Depth ------------ 0.9-1.1 1.5-1.6 0.0-0.1 0.6-0.7 1.9-2.1

Date Sampled

Type of sample

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

Date prepared - 04/06/2015 04/06/2015 04/06/2015 04/06/2015 04/06/2015

Date analysed - 05/06/2015 05/06/2015 05/06/2015 05/06/2015 05/06/2015

pH 1:5 soil:water pH Units 4.7 4.7 8.0 6.0 6.6

Electrical Conductivity 1:5 soil:water µS/cm 780 900 89 830 850

Chloride, Cl 1:5 soil:water mg/kg 1,200 1,500 [NA] 1,000 1,400

Sulphate, SO4 1:5 soil:water mg/kg 140 170 [NA] 560 180

Resistivity in soil* ohm m [NA] 11 [NA] 12 [NA]

Page 2 of 7Envirolab Reference: 129017

Revision No: R 00

Page 25: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Client Reference: JG09370A-r4, Riverstone

Misc Inorg - Soil

Our Reference: UNITS 129017-16 129017-17 129017-18

Your Reference ------------- TP6 TP6 TP6

Depth ------------ 0.0-0.1 0.6-0.7 1.6-1.7

Date Sampled

Type of sample

28/05/2015

Soil

28/05/2015

Soil

28/05/2015

Soil

Date prepared - 04/06/2015 04/06/2015 04/06/2015

Date analysed - 05/06/2015 05/06/2015 05/06/2015

pH 1:5 soil:water pH Units 5.3 5.1 5.1

Electrical Conductivity 1:5 soil:water µS/cm 150 370 700

Chloride, Cl 1:5 soil:water mg/kg [NA] 340 860

Sulphate, SO4 1:5 soil:water mg/kg [NA] 260 210

Resistivity in soil* ohm m [NA] [NA] 14

Page 3 of 7Envirolab Reference: 129017

Revision No: R 00

Page 26: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Client Reference: JG09370A-r4, Riverstone

Method ID Methodology Summary

Inorg-001 pH - Measured using pH meter and electrode in accordance with APHA latest edition, 4500-H+. Please note

that the results for water analyses are indicative only, as analysis outside of the APHA storage times.

Inorg-002 Conductivity and Salinity - measured using a conductivity cell at 25oC in accordance with APHA latest edition

2510 and Rayment & Lyons.

Inorg-081 Anions - a range of Anions are determined by Ion Chromatography, in accordance with APHA latest edition,

4110-B.

Inorg-002 Conductivity and Salinity - measured using a conductivity cell at 25oC in accordance with APHA 22nd ED 2510

and Rayment & Lyons. Resistivity is calculated from Conductivity.

Page 4 of 7Envirolab Reference: 129017

Revision No: R 00

Page 27: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Client Reference: JG09370A-r4, Riverstone

QUALITY CONTROL UNITS PQL METHOD Blank Duplicate

Sm#

Duplicate results Spike Sm# Spike %

Recovery

Misc Inorg - Soil Base ll Duplicate ll %RPD

Date prepared - 05/06/2

015

129017-1 04/06/2015 || 04/06/2015 LCS-1 04/06/2015

Date analysed - 05/06/2

015

129017-1 05/06/2015 || 05/06/2015 LCS-1 05/06/2015

pH 1:5 soil:water pH Units Inorg-001 [NT] 129017-1 6.1 || 6.2 || RPD: 2 LCS-1 102%

Electrical Conductivity

1:5 soil:water

µS/cm 1 Inorg-002 <1 129017-1 23 || 25 || RPD: 8 LCS-1 98%

Chloride, Cl 1:5

soil:water

mg/kg 10 Inorg-081 <10 [NT] [NT] LCS-1 118%

Sulphate, SO4 1:5

soil:water

mg/kg 10 Inorg-081 <10 [NT] [NT] LCS-1 120%

Resistivity in soil* ohm m 1 Inorg-002 <1.0 [NT] [NT] [NR] [NR]

QUALITY CONTROL UNITS Dup. Sm# Duplicate Spike Sm# Spike % Recovery

Misc Inorg - Soil Base + Duplicate + %RPD

Date prepared - 129017-11 04/06/2015 || 04/06/2015 129017-17 04/06/2015

Date analysed - 129017-11 05/06/2015 || 05/06/2015 129017-17 05/06/2015

pH 1:5 soil:water pH Units 129017-11 4.7 || 4.8 || RPD: 2 [NR] [NR]

Electrical Conductivity 1:5

soil:water

µS/cm 129017-11 780 || 720 || RPD: 8 [NR] [NR]

Chloride, Cl 1:5 soil:water mg/kg 129017-11 1200 || 1100 || RPD: 9 129017-17 107%

Sulphate, SO4 1:5

soil:water

mg/kg 129017-11 140 || 120 || RPD: 15 129017-17 109%

Resistivity in soil* ohm m [NT] [NT] [NR] [NR]

Page 5 of 7Envirolab Reference: 129017

Revision No: R 00

Page 28: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Client Reference: JG09370A-r4, Riverstone

Report Comments:

Asbestos ID was analysed by Approved Identifier: Not applicable for this job

Asbestos ID was authorised by Approved Signatory: Not applicable for this job

INS: Insufficient sample for this test PQL: Practical Quantitation Limit NT: Not tested

NA: Test not required RPD: Relative Percent Difference NA: Test not required

<: Less than >: Greater than LCS: Laboratory Control Sample

Page 6 of 7Envirolab Reference: 129017

Revision No: R 00

Page 29: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Client Reference: JG09370A-r4, Riverstone

Quality Control Definitions

Blank: This is the component of the analytical signal which is not derived from the sample but from reagents,

glassware etc, can be determined by processing solvents and reagents in exactly the same manner as for samples.

Duplicate : This is the complete duplicate analysis of a sample from the process batch. If possible, the sample

selected should be one where the analyte concentration is easily measurable.

Matrix Spike : A portion of the sample is spiked with a known concentration of target analyte. The purpose of the matrix

spike is to monitor the performance of the analytical method used and to determine whether matrix interferences exist.

LCS (Laboratory Control Sample) : This comprises either a standard reference material or a control matrix (such as a blank

sand or water) fortified with analytes representative of the analyte class. It is simply a check sample.

Surrogate Spike: Surrogates are known additions to each sample, blank, matrix spike and LCS in a batch, of compounds

which are similar to the analyte of interest, however are not expected to be found in real samples.

Laboratory Acceptance Criteria

Duplicate sample and matrix spike recoveries may not be reported on smaller jobs, however, were analysed at a frequency

to meet or exceed NEPM requirements. All samples are tested in batches of 20. The duplicate sample RPD and matrix

spike recoveries for the batch were within the laboratory acceptance criteria.

Filters, swabs, wipes, tubes and badges will not have duplicate data as the whole sample is generally extracted

during sample extraction.

Spikes for Physical and Aggregate Tests are not applicable.

For VOCs in water samples, three vials are required for duplicate or spike analysis.

Duplicates: <5xPQL - any RPD is acceptable; >5xPQL - 0-50% RPD is acceptable.

Matrix Spikes, LCS and Surrogate recoveries: Generally 70-130% for inorganics/metals; 60-140%

for organics (+/-50% surrogates) and 10-140% for labile SVOCs (including labile surrogates), ultra trace organics

and speciated phenols is acceptable.

In circumstances where no duplicate and/or sample spike has been reported at 1 in 10 and/or 1 in 20 samples

respectively, the sample volume submitted was insufficient in order to satisfy laboratory QA/QC protocols.

When samples are received where certain analytes are outside of recommended technical holding times (THTs),

the analysis has proceeded. Where analytes are on the verge of breaching THTs, every effort will be made to analyse

within the THT or as soon as practicable.

Page 7 of 7Envirolab Reference: 129017

Revision No: R 00

Page 30: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

SAMPLE RECEIPT ADVICE

Client Details

Client Geoenviro Consultancy Pty Ltd Attention Solern Liew

Sample Login Details

Your Reference JG09370A-r4, Riverstone

Envirolab Reference 129017 Date Sample Received 02/06/2015 Date Instructions Received 02/06/2015 Date Results Expected to be Reported 11/06/2015

Sample Condition

Samples received in appropriate condition for analysis YES

No. of Samples Provided 18 Soils Turnaround Time Requested Standard Temperature on receipt (°C) 10.3 Cooling Method Ice Pack Sampling Date Provided YES

Comments Samples will be held for 1 month for water samples and 2 months for soil samples from date of receipt of samples

Please direct any queries to:

Aileen Hie Jacinta Hurst

Phone: 02 9910 6200 Phone: 02 9910 6200

Fax: 02 9910 6201 Fax: 02 9910 6201

Email: [email protected] Email: [email protected]

Sample and Testing Details on following page

Page 31: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Sample Id

Ch

lori

de,

Cl 1

:5

soil:

wa

ter

Elec

tric

al

Co

nd

uct

ivit

y 1

:5

soil:

wa

ter

pH

1:5

so

il:w

ate

r

Res

isti

vity

in s

oil*

Sulp

ha

te, S

O4

1:5

soil:

wa

ter

TP1-0.0-0.1 ✓ ✓

TP1-0.5-0.6 ✓ ✓ ✓ ✓ ✓

TP1-1.8-1.9 ✓ ✓ ✓ ✓

TP2-0.0-01 ✓ ✓

TP2-0.5-0.6 ✓ ✓ ✓ ✓ ✓

TP2-1.5-1.6 ✓ ✓ ✓ ✓

TP3-0.0-01 ✓ ✓

TP3-0.5-0.6 ✓ ✓ ✓ ✓ ✓

TP3-1.5-1.6 ✓ ✓ ✓ ✓

TP4-0.0-0.1 ✓ ✓

TP4-0.9-1.1 ✓ ✓ ✓ ✓

TP4-1.5-1.6 ✓ ✓ ✓ ✓ ✓

TP5-0.0-0.1 ✓ ✓

TP5-0.6-0.7 ✓ ✓ ✓ ✓ ✓

TP5-1.9-2.1 ✓ ✓ ✓ ✓

TP6-0.0-0.1 ✓ ✓

TP6-0.6-0.7 ✓ ✓ ✓ ✓

TP6-1.6-1.7 ✓ ✓ ✓ ✓ ✓

Page 32: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel
Page 33: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

Proposed New College Building JG09370B-r2

Lot 90 DP 1224210 2518 Farm Road, Riverstone June 2018

GeoEnviro Consultancy

APPENDIX D

Explanatory Notes

Graphic Symbols For Soil

Page 34: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

GeoEnviro Consultancy Pty Ltd

EXPLANATORY NOTES Introduction These notes have been provided to amplify the geotechnical report with regard to investigation procedures, classification methods and certain matters relating to the Discussion and Comments sections. Not all notes are necessarily relevant to all reports. Geotechnical reports are based on information gained from finite sub-surface probing, excavation, boring, sampling or other means of investigation, supplemented by experience and knowledge of local geology. For this reason they must be regarded as interpretative rather than factual documents, limited to some extent by the scope of information on which they rely. Description and Classification Methods The methods the description and classification of soils and rocks used in this report are based on Australian standard 1726, the SSA Site investigation Code, in general descriptions cover the following properties - strength or density, colour, structure, soil or rock type and inclusions. Identification and classification of soil and rock involves to a large extent, judgement within the acceptable level commonly adopted by current geotechnical practices. Soil types are described according to the predominating particle size, qualified by the grading or other particles present (eg sandy clay) on the following bases:

Soil Classification Particle Size Clay Less than 0.002mm Silt 0.002 to 0.6mm

Sand 0.6 to 2.00mm Gravel 2.00m to 60.00mm

Soil Classification Particle size Clay less than 0.002mm Silt 0.002 to 0.06mm Sand 0.06 to 2.00mm Gravel 2.00mm to 60.00mm Cohesive soils are classified on the basis of strength, either by laboratory testing or engineering examination. The strength terms are defined as follows:

Classification Undrained Shear Strength kPa Very Soft Less than 12

Soft 12 - 25 Firm 25 - 50 Stiff 50 - 100

Very Stiff 100 - 200 Hard Greater than 200

Non-cohesive soils are classified on the basis of relative density, generally from the results of standard penetration tests (SPT) or Dutch cone penetrometer test (CPT), as below: Relative Dense SPT 'N' Value

(blows/300mm) CPT Cone

Value (qc-Mpa) Very Loose Less than 5 Less than 2

Loose 5 - 10 2 - 5 Medium Dense 10 - 30 5 - 15

Dense 30 - 50 15 - 25 Very Dense > 50 > 25

Rock types are classified by their geological names, together with descriptive terms on degrees of weathering strength, defects and other minor components. Where relevant, further information

regarding rock classification, is given on the following sheet. Sampling Sampling is carried out during drilling to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provided information on plasticity, grained size, colour, type, moisture content, inclusions and depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin walled sample tube (normally know as U50) into the soil and withdrawing a sample of the soil in a relatively undisturbed state. Such Samples yield information on structure and strength and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Details of the type and method of sampling are given in the report. Field Investigation Methods The following is a brief summary of investigation methods currently carried out by this company and comments on their use and application. Hand Auger Drilling The borehole is advanced by manually operated equipment. The diameter of the borehole ranges from 50mm to 100mm. Penetration depth of hand augered boreholes may be limited by premature refusal on a variety of materials, such as hard clay, gravels or ironstone. Test Pits These are excavated with a tractor-mounted backhoe or a tracked excavator, allowing close examination of the insitu soils if it is safe to descend into the pit. The depth of penetration is limited to about 3.0m for a backhoe and up to 6.0m for an excavator. A potential disadvantage is the disturbance caused by the excavation. Care must be taken if construction is to be carried out near, or within the test pit locations, to either adequately recompact the backfill during construction, or to design the structure or accommodate the poorly compacted backfill. Large Diameter Auger (eg Pengo) The hole is advanced by a rotating plate or short spiral auger generally 300mm or larger in diameter. The cuttings are returned to the surface at intervals (generally of not more than 05m) and are disturbed, but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers and is usually supplemented by occasional undisturbed tube sampling. Continuous Spiral Flight Augers The hole is advanced by using 90mm - 115mm diameter continuous spiral flight augers, which are withdrawn at intervals to allow sampling or insitu testing. This is a relatively economical means of drilling in clays and in sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the augers flights, but they are very disturbed and may be highly mixed with soil of other stratum. Information from the drilling (as distinct from specific sampling by SPT or undisturbed samples) is of relatively low reliability due to remoulding, mixing or softening of samples by ground water, resulting in uncertainties of the original sample depth.

C:\\lab\reports\r016-1 Form No. R016-1/Ver02/0104 1

Page 35: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

ii

C:\\lab\reports\r016-2 Form No. R016-2/Ver02/0104

Continuous Spiral Flight Augers (continued) The spiral augers are usually advanced by using a V - bit through the soil profile refusal, followed by Tungsten Carbide (TC) bit, to penetrate into bedrock. The quality and continuity of the bedrock may be assessed by examination of the recovered rock fragments and through observation of the drilling penetration resistance. Non - core Rotary Drilling (Wash Boring) The hole is advanced by a rotary bit, with water being pumped down the drill rod and returned up the annulus, carrying the cuttings, together with some information from the "feel" and rate of penetration. Rotary Mud Stabilised Drilling This is similar to rotary drilling, but uses drilling mud as a circulating fluid, which may consist of a range of products, from bentonite to polymers such as Revert or Biogel. The mud tends to mask the cuttings and reliable identification is again only possible from separate intact sampling (eg SPT and U50 samples). Continuous Core Drilling A continuous core sample is obtained using a diamond tipped core barrel. Providing full core recovery is achieved (which is not always possible in very weak rock and granular soils) this technique provides a very reliable (but relatively expensive) method of investigation. In rocks an NMLC triple tube core barrel which gives a core of about 50mm diameter, is usually used with water flush. Portable Proline Drilling This is manually operated equipment and is only used in sites which require bedrock core sampling and there is restricted site access to truck mounted drill rigs. The boreholes are usually advanced initially using a tricone roller bit and water circulation to penetrate the upper soil profile. In some instances a hand auger may be used to penetrate the soil profile. Subsequent drilling into bedrock involves the use of NMLC triple tube equipment, using water as a lubricant. Standard Penetration Tests Standard penetration tests are used mainly in non-cohesive soils, but occasionally also in cohesive soils, as a means of determining density or strength and of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289 "Methods of testing Soils for Engineering Purpose"- Test F31. The test is carried out in a borehole by driving a 50mm diameter split sample tube under the impact of a 63Kg hammer with a free fall of 769mm. It is normal for the tube to be driven in three successive 150mm increments and the "N" value is taken as the number of blows for the last 300mm. In dense sands, very hard clays or weak rocks, the full 450mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form:

In a case where full penetration is obtained with successive blows counts for each 150mm of, say 4, 6, and 7 blows.

as 4, 6, 7

N = 13

In a case where the test is discontinued short of full penetration, say after 15 blows for the first 150mm and 30 blows for the next 40mm.

as 15,30/40mm

The results of the tests can be related empirically to the engineering properties of the soil. Occasionally the test

methods is used to obtain samples in 50mm diameter thin walled samples tubes in clays. In these circumstances, the best results are shown on the bore logs in brackets. Dynamic Cone Penetration Test A modification to the SPT test is where the same driving system is used with a solid 600 tipped steel cone of the same diameter as the SPT hollow sampler. The cone can be continuously driven into the borehole and is normally used in areas with thick layers of soft clays or loose sand. The results of this test are shown as 'Nc' on the bore logs, together with the number of blows per 150mm penetration. Cone Penetrometer Testing and Interpretation Cone penetrometer testing (sometimes referred to as Dutch Cone-CPT) described in this report, has been carried out using an electrical friction cone penetrometer and the test is described in Australian Standard 1289 test F5.1. In the test, a 35mm diameter rod with cone tipped end is pushed continuously into the soil, the reaction being provided by a specially designed truck or rig, which is fitted with a hydraulic ram system. Measurements are made of the end bearing resistance on the cone and the friction resistance on a separate 130mm long sleeve, immediately behind the cone. Transducer in the tip of the assembly are connected by electrical wires passing through the centre of the push rods to an amplifier and recorder unit mounted on the control truck. As penetration occurs (at a rate of approximately 20mm per second) the information is output on continuous chart recorders. The plotted results in this report have been traced from the original records. The information provided on the charts comprises:

Cone resistance - the actual end bearing force divided by the cross sectional area of the cone, expressed in Mpa.

Sleeve friction - the frictional force on the sleeve divided by the surface area, expressed in kPa.

Friction ratio - the ratio of sleeve friction to cone resistance, expressed in percentage.

There are two scales available for measurement of cone resistance. The lower "A" scale (0-5Mpa) is used in very soft soils where increased sensitivity is required and is shown in the graphs as a dotted line. The main "B" scale (0-50Mpa) is less sensitive and is shown as a full line. The ratios of the sleeve resistance to cone resistance will vary with the type of soil encountered, with higher relative frictions in clays than in sands. Friction ratios of 1% to 2% are commonly encountered in sands and very soft clays, rising to 4% to 10% in stiff clays. In sands, the relationship between cone resistance and SPT value is commonly in the range: qc (Mpa) = (0.4 to 0.6) N (blows per 300mm) In clays the relationship between undrained shear strength and cone resistance is commonly in the range: qc = (12 to18) Cu

Interpretation of CPT values can also be made to allow estimate of modulus or compressibility values to allow calculation of foundation settlements. Inferred stratification, as shown on the attached report, is assessed from the cone and friction traces, from experience and information from nearby boreholes etc.

Page 36: GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 · 2018-09-28 · GeoEnviro Consultancy Pty Ltd ABN 62 084 294 762 Unit 5, 39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel

iii

C:\\lab\reports\r016-3 Form No. R016-3/Ver02/0104

Cone Penetrometer Testing and Interpretation continued This information is presented for general guidance, but must be regarded as being to some extent interpretive. The test method provides a continuous profile of engineering properties and where precise information or soil classification is required, direct drilling and sampling may be preferable. Portable Dynamic Cone Penetrometer (AS1289) Portable dynamic cone penetrometer tests are carried out by driving a rod in to the ground with a falling weight hammer and measuring the blows per successive 100mm increments of penetration. There are two similar tests, Cone Penetrometer (commonly known as Scala Penetrometer) and the Perth Sand Penetrometer. Scala Penetrometer is commonly adopted by this company and consists of a 16mm rod with a 20mm diameter cone end, driven with a 9kg hammer, dropping 510mm (AS 1289 Test F3.2). Laboratory Testing Laboratory testing is carried out in accordance with Australian Standard 1289 "Methods of Testing Soil for Engineering Purposes". Details of the test procedures are given on the individual report forms. Engineering Logs The engineering logs presented herein are an engineering and/or geological interpretation of the sub-surface conditions and their reliability will depend to some extent on frequency of sampling and the method of drilling. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, however, this is not always practicable or possible to justify economically. As it is, the boreholes represent only a small sample of the total sub-surface profile. Interpretation of the information and its application to design and construction should take into account the spacing of boreholes, frequency of sampling and the possibility of other than "straight line" variations between the boreholes. Ground water Where ground water levels are measured in boreholes, there are several potential problems:

In low permeability soils, ground water although present, may enter the hole slowly, or perhaps not at all, during the investigation period.

A localised perched water table may lead to a erroneous indication of the true water table.

Water table levels will vary from time to time, due to the seasons or recent weather changes. They may not be the same at the time of construction as indicated in the report.

The use of water or mud as a drilling fluid will mask any ground water inflow. Water has to be blown out of the hole and drilling mud must be washed out of the hole if any water observations are to be made.

More reliable measurements can be made by installing stand pipes, which are read at intervals over several days, or weeks for low permeability soils. Piezometers sealed in a particular stratum may be interference from a perched water table or surface water. Engineering Reports Engineering reports are prepared by qualified personnel and are based on the information obtained and on current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal is changed, say to a twenty storey building. If this occurs, the company will be pleased to review the report and sufficiency of the investigation work.

Every care is taken with the report as it relates to interpretation of sub-surface conditions, discussions of geotechnical aspects and recommendations or suggestions for design and construction. However, the company cannot always anticipate or assume responsibility for:

Unexpected variations in ground conditions. The potential for this will depend partly on bore spacing and sampling frequency.

Changes in policy or interpretation of policy by statutory authorities.

The actions of contractors responding to commercial pressures.

If these occur, the company will be pleased to assist with investigation or advice to resolve the matter. Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, the company request immediate notification. Most problems are much more readily resolved when conditions are exposed than at some later stage, well after the event. Reproduction of Information for Contractual Purposes Attention is drawn to the document “Guidelines for the Provision of Geotechnical Information trader Documents”, published by the Institute of Engineers Australia. Where information obtained for this investigation is provided for tender purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. The Company would be pleased to assist in this regard and/or make additional copies of the report available for contract purpose, at a nominal charge.

Site Inspection

The Company will always be pleased to provide engineering inspection services for geotechnical aspect of work to which this report is related. This could range from a site visit to confirm that the conditions exposed are as expected, to full time engineering presence on site Review of Design Where major civil or structural developments are proposed, or where only a limited investigation has been completed, or where the geotechnical conditions are complex, it is prudent to have the design reviewed by a Senior Geotechnical Engineer.