41N01SW2001 2 .17627 OLSEN 010 GEOLOGICAL REPORT ' ~WHN(| - - * V R E (: *- , ' O AUGSf 1997 OH THE OLSEN TOWHSHIP PROPERTY OLSEH TOWNSHIP, ONTARIO SAULT STE. MARIE MINING DIVISION ONTARIO NTS 41 N/l RECEIVE AUG 2 1 GEOSCIENCE _____ OFFICE Dan Patrie O- v DAN PATRIE EXPLORATION LTD August. 20,1997
Transcript
Page 1: GEOL RPT ON THE OLSEN TP PROP

41N01SW2001 2 .17627 OLSEN 010

GEOLOGICAL REPORT

' ~WHN(|- - *V

R E (: *- , ' O AUGSf 1997

OH THE

OLSEN TOWHSHIP PROPERTY

OLSEH TOWNSHIP, ONTARIO

SAULT STE. MARIE MINING DIVISION

ONTARIO

NTS 41 N/l

RECEIVEAUG 2 1

GEOSCIENCE _____ OFFICE

Dan Patrie O- v

DAN PATRIE EXPLORATION LTD

August. 20,1997

Page 2: GEOL RPT ON THE OLSEN TP PROP

41N01SH2001 2.17627 OLSEN 010C

TABLE OF COHTEHTS

PAGE

INTRODUCTION l

SUMMARY AND RECOMMENDATIONS l

PROPERTY 2

CLAIM DESCRIPTION 2

LOCATION AND ACCESS 2

TOPOGRAPHY AND VEGETATION 2

PREVIOUS WORK 2

GEOLOGY 3

REGIONAL GEOLOGY 3

PROPERTY GEOLOGY 3

CURRENT WORK 4

WORK DONE 4

INTERPRETATION 4

CONCLUSIONS 4

REFERENCES

APPENDIX ( geological mapping by Paul Leahy )

CERTIFICATE OF QUALIFICATION

Page 3: GEOL RPT ON THE OLSEN TP PROP

1. IHTRODUCTIOM

The Olsen Township Property, which consists of five unpatented mining claims (55 units)numbered 1197495, 1179314, 1164171, 1214552

and 1214590 inclusive is situated in Olsen Township, northern Ontario approximately 60 km north of Sault Ste. Marie.

The subj ect claim group covers a large shear zone running

southeast that is strongly serricitized and carbonated and that carries quartz veins and disseminated pyrite.

Paul Leahy carried out a mapping survey for Dan Patrie, Yves Desjardins and Bryan Patrie property owners on the Olsen Township property. The property was mapped during the summer of 1996. The following report summarizes the results of previous work , the work carried out during the current programme and the results obtained from that work.

2. SUMMARY and RECOMMEHDATIOHS

Between June and September 1996 a program of mapping survey was completed on a portion of the Olsen Township property. A

total of 22 days was spent mapping by Paul Leahy Geologist. The mapping showed areas of carbonate alteration zones and quartz carbonate and quartz stringers running anomalous gold. Mapping of the property is included in a map in the appendix of this report.

Since there has been no detailed geological work carried out

on the property, the geological interpretation is speculative. It is recommended that the following programme be carried out on the property to complete the evaluation.

1. Completion of the grid lines spaced at 100 metres over the total claim group of the 2 claims of 16 units total.

2. Geological mapping and prospecting of the property to identify zones of mineralization.

3. Completion of the magnetometer, VLF-EM surveys.4. Induced polarization survey.

Following completion of this work and contingent upon the

results then additional work could be considered to further evaluate the economic potential of the property for gold

mine r ali z ati on. Respectfully submitted, Daniel F. PatrieGeology and Geophysics Technologist August 10, 1997

Page 4: GEOL RPT ON THE OLSEN TP PROP

Page 2

PROPERTY

3.1 CLAIM DESCRIPTION

The property consists of 5 unpatented mining claims (55 units) which are numbered 1197495,1179314,1164171, 1214552 and 1214580 inclusive. Sault Ste Marie Mining Division, Sault Ste Marie, Ontario.

3.2 LOCATION AMD ACCESS

The Olsen property is located at 47 47 T N latitude, 82 48 T W

longitude in Olsen township, District of Sault Ste Marie, Sault Ste Marie Mining Division approximately 60 Km north of Sault Ste Marie

to the Chippewa/Harmony River (Chippewa Falls) and continue an additional l Km to the first road on the right. Turn east and follow this logging road approximately 30 Km to a bush road whch

turns left (northwest) approximately 3 Km to the property.

3.3 TOPOGRAPHY AHD VEGETATIOH

The property is hilly, covered by maple and birch forest which gives way to alders and cedar in low areas. There is one creek

which run through the centre of the property with 2 small swamps to the north. Rock outcrops make up approximately 10 S of the property.

4. PREVIOUS WORK

The property has been covered partly with line cutting, magnetometer survey and a small induced polarization survey as of

fall of 1996. In 1979, the Ontario Geological Survey took one lake sediment sample from the property and there is a recorded pyrite

showing near the northeastern edge of the property. (GDIF 131).

Page 5: GEOL RPT ON THE OLSEN TP PROP

page 3

5. GEOLOGY

5.1 REGIONAL GEOLOGY

The Olsen Township Property is located in the central portion of the east-northeast trending Batchawa Bay Greenstone Belt.

Predominate lithologies within the belt include Archean mafic to felsic metavolcanics and metasediments with lesser amounts of

gabbro, diorite, granitic rocks and northwest trending diabase dykes (Giblin et al., 1978). Government mapping at a scale of l

inch to 1/4 mile by Armburst, 1965, indicates that the majority of the property area is underlain by mafic to intermediate metavolcanics with lesser amounts of felsic metavolcanics and

diabase.

5.2 PROPERTY GEOLOGY

The property is underlain dominantly by intermediate to mafic metavolcanic rocks which strike east-west and dip vertically.

The property shows a well developed vertical foliation trending 110 degrees with local variations due to cross-structures.

Based on the work done, it is considered that there is one broad zone of deformation and strong carbonate alteration trending east-

west across the central part of the property. Associated with the deformation zones are banded iron formations considered to be

favourable to hold gold mineralization.

Page 6: GEOL RPT ON THE OLSEN TP PROP

page 4

6. CURRENT WORK

6.1 WORK POKE

A program of mapping the olsen property grid on lines spaced

at 100 metres spacing. The work was carried out in June, 1997 till September, 1997 with field supervision of D. Patrie and Yves Desjardins. The survey covered claim 1197495.

7. IHTERPRETATIOH

The property is underlain dominantly by intermediate to mafic

metavolcanic rocks which strike in an east-west direction and dip vertically. The property shows a well developed vertical foliation trending 110 degrees with local variations due to cross structures.

Based on all the ork done to date, it is considered that there is a broad zone of deformation and strong carbonate alteration

trending east-est across the property. Associated with the deformation zones are banded iron formations considered to be

favourable to hold gold mineralization in areas found in the past.

7. COHCLUSIOMS

The property shows considerable merit and should be looked at more carefully for its potential for gold and base metals.

Due to a lack of geological and geophysics information from the property, it is suggested that on-going work should consist of

a programme of geological mapping, and prospecting to ground evaluate the results obtained during this survey. In addition, since the current work only covered one claim, it is proposed that the other claim adjoining to the east be covered by line-cutting, geophysical surveys, geological mapping and prospecting and areas

not covered on grid.

Daniel F. PatrieGeology ang Geophysics Technologist

August 20, 1997

Page 7: GEOL RPT ON THE OLSEN TP PROP

REFEREHCES

Armburst, G.A., 1966. Township 26, Range 13;Ont. Dept. of Mines Preliminary Geological Map P. 363, Scale = l inch to mile.

GDIF 131. Olsen Township, District of Algoma;

Ont. Geol. Survey, Geological Data Inventory Folio.

Giblin, P.E., Leahy E.J., and Robertson, J.A., 1978;

Sault Ste. Marie - Elliot lake; Ont. Geol. Survey, Geological Compilation Series Map 2419, Scale l inch to 4 miles.

Desjardins, Yves, 1996. Personnel contact.

Geophysics reports by Dan Patrie Exploration Ltd

Leahy, Paul., 1996. Geological mapping. As appendix to this report.

Page 8: GEOL RPT ON THE OLSEN TP PROP

CERTIFICATE OF QUALIFICATION

I, Daniel Patrie do hereby certify:

1. that I am a geology and geophysics Technologist and reside at

Hwy. 17 west, Massey, Ontario, P.O. Box 45, POP 1PO,

2. that I graduated from Cambrian College of Applied Arts and

Technology in 1987 with a Diploma in Geological Technology with

a one-year certificate in geophysics,

3. that I have practised my profession continuously since that time

and prior to that since 1972, I have been an active prospector,

4. that I supervised the mapping survey in part on the Olsen

Township property, Sault Ste Marie, Mining Division, District of

Algoma, and was present during some of the mapping during the

summer of 1996,

Daniel F. Patrie

Geology and Geophysics Technologist

August 20, 19970

Page 9: GEOL RPT ON THE OLSEN TP PROP

Q ^-t StVi

S b ± L\*\\ "WS'S

S-VIip Ji"X) S S "D Q

Page 10: GEOL RPT ON THE OLSEN TP PROP

Xve,s De-sarc^in. orv. C lo, t m S.S.M.l

8 mn. i i" c l o, i m is i rv, O I sea, ~Tvvp. on.

ex. ^ o ne. o-f co^bo AoAe. (xA

On

Q v^OvV" ^l -\- CLO^V^ Voo ^(xv ^- .S^vi^o^rs Ko^.v^ IsxLCxW l o c CX.T e (k W

s '

j i

HvciVxvAjcsy ^ 7 o-r\^s. o- o. row*, l ^o 0^^ "hKo\.\ C*S.T o^k O S r

^s 'S V^/K-y /-O^ciVx. A Oft-Tvwo^k O"^

s - Ov^os^ ^ S -Hxe, ^cxltrv! -VVvoJV x^'vVVx "^ 1^\^ ol^o-^mci VAj\

VA /3O\i^V OVX-VWe, CJ\OS.\VY^ Os.CC ft. 4S\No\t, \o -y A rX- ^- .

y r o s p e, cr m a

M. 'l^a

\A/ o-u.J

Os.

I h e. rook over* ^Vi e, crv4-ire, c,lcx\'trv is e.SJtKi'i Mly Q-

s ^ u VK Q-in c. e- C3^ py ro c^o.. s-V\c. Q. . 'K\5 '15 ^. QjV ^ v ina. \ ne. (X -Prom

some, o -^ VVe, lc/.^^^ o v^c CL, v-o p s vjjVy.^^e., cx.V-V^^ oAvciw ^losi

e A o-^ ori^ l ncx\ S'VrvM^'Vvjv.rC^ . WKe^e. C ex r- -

is

Page 11: GEOL RPT ON THE OLSEN TP PROP

0-5S-X)Vii

01

\\~Q vu s -a wo S

"3 3 J X*

~-j o

VI

"^ "Srv

V T ' S ^ W CJ "Z. VlQ-\ \-v3 j* -^ Vi -NO

'Z.v

v9ii\'

v

\ -wd rs

w-oiNi-n bu i

O

\ -*

^M \ '\i.\

rOSi

Page 12: GEOL RPT ON THE OLSEN TP PROP

*

l/)C0. **

1 C o)ll0JV

rv

oVo.

^ ,)

2o

t- x

-*^

J?V

00

7" rf

C o)

o s

5 ^

o- -*t

^

0

0.

^

-* f

^

t-3

.io* it *o

x5

1 *

5

*Q?

2 S

"a rf

• - ^-*

M-

J

v 5?

rf x*

f

*

l *

*

ZJ0?C.

-^

t)-t-o)V5 3J

o*?3

0

"o

t*-

^

O

^

W)CT

C"^

rfvfl

x^5/"e'4to)

Vo-

-5*0J ^t,-4-Vf|

*t

* C,

.-*

yVrfco vi

J J o)C-t- otWl

CCi-

O*

6 S~1J"?Jo oK)

O

^

i^O1

5:Vl.-*--6s-f-^

' V^tH- 0tno)<

0iO5'1

- --*-t- u ^ ^^^, ^3 o1v/)

J"9.i 1 . -s-0*

rf

-o, 2

^ 0

4 ^

*

-f-

T. ^

- 1

vn V

rf rf

c4- J

0

S^

-a^

v/) 0

o

J

^

o) W

**

rf ^

o

J S

^'

J o

-^-^

oJ*

i

f 2!

' 1

^'-C

8O

"~~

o- v

f -5

"3 ^

^ ^. -r.

^

'3

7

"a,d ^o 40?C^•vo)•s6o)

H-UTO0-i"u J •/io?-^

^

^ o

V^

6 --65

^d

^^ ^tf

t!o

\~*

w^

"*-

' ?

o i

"^ O

J

0t-

1?

! ^

' 5

^

fl

0

offl

^ c

0

a)V/l

9)

oj 7

^ -4-

-f ^

0

^i

-f-t *

1 c

o) ( —

^ "j

o ^

J? - h Jo-p

IJ l

0

c'1

S

" *

0

t-o

o ^

*fo

IJ?

^ 1

"^

^o

0 •-

V^*7

Je

10

\

*rt

^

J

^J

0*-

-4-

O

(?

S ^

JU'J

20-

o

a) O

v t

^

*

^

2*

0

^

5^

i\

0 ^

V4

- U

r

^i, ^ti>1yur0 w^ d <*~

iM J*0z•J\rf?9- ^E/"o1-^o)u"

o"3

11 *4cyo •4-0?

^..^?

J^ ; f j

0-

J

•o f

^

- o--

-^^

is i^

30

-3 j

* 2

0

.c.5

-Jo)

4tf

s/

^ 3 -

^

2 -^

^ i

-o i r2 - 1. 2 '

^ ^

-6 o

. *

*o

Zt

> ^

^ -J

f *

•~.

0*

^

O

1

2

^ t

-5 -

S j

i -2

c>

93

J-r -hi*~.\n(Tt ro-Sin.LO^ 'jo c0*0f)6 -ZNNH-s0-

W)

^C(3J(P ^)

^6ft -*

O-

Oorse

Page 13: GEOL RPT ON THE OLSEN TP PROP

"b(~'fei^T-i\lVV*

M t ;-.i

Page 14: GEOL RPT ON THE OLSEN TP PROP

Ontario '^^ ^rr^t Clinton of ASMM**nt Work vjnuaiiu iMMto, -u"" Performed on Mining Land

Ulnlna M. Subeeetton 98(2) and M0). R.9.0.1MO

41N01SW2001 2 .17627

ority of subsecttone 65(2) and 66(3) of the Mining Act. Under section 8 of the led to review the assessment work and correi )ond with the mining land holder lining Recorder, Ministry of Northern Dev

OLSEN 900

Instructions: - For work performed on Crown Lands before recording a claim, use form - Please type or print in ink.

1. Recorded holder(s) (Attach a list if necessary)2-17627

SUDBURYRECEIVED

240. AU6 2 1 1997pjy,

Name Client Number

Address Telephone Number

Ma 0 Po P t ffiFax Number

ro i - rio r-*-/

Client Number

Address f Telephone Number

7-0 rFax Number

2. Type of work performed: Check ( ^ ) and report on only ONE of the following groups for this declaration.

rpr^Geotechnical: prospecting, surveys, i — i Physical: drilling, stripping, l — l Rehabilitation L^-J assays and work under section 18 (regs) L-1 trenching and associated assays l— '

Work Type

(T C.0 lOS iC&f (t ftPP f*"* C

Dates Work c Performed From 1 5 i 7^ To ' l t \ 'P

D*y | Month | YnT D*y | Month | Y**Global Positioning System Data (If available) Township/Area j

M or G-Plan Number

Office UseCommodity

Total S Value of Work Claimed

NTS Reference

Mining Division

Resident Geologist District

Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

3. Person or companies who prepared the technical report (Attach a list if necessary)Name

Address

Name , 1 MIS l

Address 3x^^ ( i

^r — - —————^ f \ji Mf / e. A7x?x^/^-

Nama '

Address

4. Certification

i, Van i c, J

Telephone Number

Fax Number

Telephone Number~-f^o *T~ ^V^-^/T^ST

Fax Number

Telephone Number

F *HfcUEIVEuAU6 2 1 1997 fa

by Recorded Holder or Agent GEOSCIENCE ASSclsMENlV ^

(- l /a~lrf-e- , do hereby certify that 1 have personal knowledge dT the facts set(Print Nafne)

forth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.

Page 15: GEOL RPT ON THE OLSEN TP PROP

the mining land wnere work was performed, at the time work was performed. A map muttiamiTOfcwJWf tem* ...' .':... '' ' ; ; . ' W!--

Mta** Claim Numbar. 0* M work WH dona on othar aHglbla mining land, show In thto column tha location numbar . Indlcalad on tha claim map.

.99 .

V

eg

1

2

3

•••: ' 4 '

5

6

7

8

9

10

11

12

13

14

15

^,, ;.TB7827- r

; '**' ; , 1^234587,

1234568

y/^*//^ /y y 9 y? " ^^ —//-l 9 S H/z/ y^sri.

Number of Ctatai Unita. For othar mining land, Mat hectares.

16 ha

12

2

.

f

?

/X

G

Column Totals

part omad on thto dahn or othar mining land.

528, 825

0

$ 8 , 892

iSoto00

— G ————

isho

Vahif ofwerfcappNadtothto etaiffl.

N/A

S24.000

S 4.000 ^/a'

3 206 AJO'tOCiO flrij . 2t^ f

T x -^ Jy1 'J

~

^

n IM

Vania •ft|Miil{ xr -,.;

mining cjalmt. ;.,.'

S24,boO.- : i-

•o .'.;- .:;

0 ' ~

•.•.vv/.-v;:.

io-nnOf

\.

(D.M0

TBanlfcVIIW'aTwMj; to ba dMrfcutad

,.'-: : - 12,825- -:-

•:- -' -o; j - :

. 54,892,

/Tt0

'i : -' - '

• ' -

/YfaF- , do hereby certify that the above work credits are eligible under

(Print FM Name)subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to*- 'the claim where the work was done.Signature of Recorded Holder or Agent Authorized in Writing

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check ( v ) in the boxes below to show howyou wish to prioritize the deletion of credits:

G3i. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated, Q^2. Credits are to be cut back starting with the claims listed last, working backwards; or - . D 3. Credits.are to be cut back equally over all claims listed in this declaration; or O 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: H you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary. . .

For Office Use Only _________ . , Received Stamp ' .; -, :

0241 (02/08)

Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 16: GEOL RPT ON THE OLSEN TP PROP

Ontario fflnWryotNorthern Developmentand Mines

Statement of Costs for Assessment Credit

Transaction, Numberietlos Iwe) -

Personal information collected on this form Is obtained under the authority of subsection 6(1) of the Assessment Work Regulation 6/96. Under section 8 of the Mining Act, the Information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Minlnffiecorder,~Mirtlslry of Northern Development and Mines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5. "

:order,-Mird^rv of

Work Type

(r s a f f c ( C*? f Afji,(if^.pt . /A I

J L/ p -f. -x- (S l J' ft *~)

1

Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.

2 2 C/AVSf

Associated Costs (e.g. supplies, mobilization and demobilization).

Transportation Costs

Food and Lodging Costs

Cost Per Unit of work

.740

Total Value of Assessment Work

Total Cost

^f./^

•^ 2/jtti

/, 2 trt

//0

t /*#1

/5~n /.a

Calculations of Filing Discounts:

1. Work filed within two years of performance is claimed at 10007o of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at 5007o of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:

TOTAL VALUE OF ASSESSMENT WORK 0.50 Total S value of worked claimed.

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of arequest for verification and/or correction/clarification. If verification and/or Minister may reject all or part of the assessment work submitted.

, the

Certification verifying costs:

r~' /? ~AUG 2 1 1997

(please print full name), do hereby certify, that the ; i

reasonably be determined and the costs were incurred while conducting assessment work on the lands

as may

indicated on

the accompanying Declaration of Work form as

to make this certification.(recorded holder, agent, or state company position with signing authority)

l am authorized

0212 (02/96)

Signature Date

Page 17: GEOL RPT ON THE OLSEN TP PROP

©Ontario Ministers duOevetoppsment du Nortjj et des Mines

aux fins du*..n de travail

*N..

Las renseignements personnels contenus dans la presente formute aont receulllls en vertu du paragraph* 6 (1) du Reglement aur les travaux d'evaluation. Aux termes de ('article 8 de la Lol tur tot /n/ne*. le public a acces a ces renselgnementa, qul serviront a revolr lea travaux d'evaluation et a correspondre avec le detenteur du terrain minier. Adressez toute question sur la collects de ces renselgnements au registrateur de claims en chef, ministers du Devetoppement du Nord et des Mines, 6* etage, 933 Ramsey Lake Road, Sudbury (Ontario), P3E 685.

Type de travaux

Unites de travailIndiquez le nombre d'heures de travail/Jour, de metres de forage, de kilometres de llgnes de quadrlllage, d'echantillons, etc., selon la nature des travaux.

CoOts connexes (p.ex. fournitures, mobilisation et demobilisation).

Frais de transport

Frals de nourrlture et d'hebergement

Cout par unite de travail

Valeur totale des travaux d'evaluation

CoOt total

Calcul des remises pour depdt:

1. Les travaux dont le rapport est depose dans les deux ans apres leur date d'execution donnent droit ^ des credits a 100 "/b de la valeur totale susmentionnee des travaux d'evaluation.

2. Les travaux dont le rapport est depose entre deux et cinq ans apres leur date d'execution donnent droit a des credits a 50 W seulement de la valeur totale des travaux d'evaluation. Si cela s'applique a vos claims, utilisez la formule suivarvte :VALEUR TOTALE DES TRAVAUX D'EVALUATION x 0,50 = Valeur totale des travaux demandee.

Nota :- Les travaux executes il y a plus de cinq ans ne sont pas admissibles a des credits.- Le titulaire enregistre peut etre tenu de verifier les depenses indiquees dans la present etat des couts dans les 45 jours suivant une demande de verification, de correction ou de clarification. Le ministre peut rejeter la totalitd ou une partie des travaux d'evaluation presentes si le titulaire ne respecte pas cette exigence.

Attestation des coQts :

Je soussigne, _ —————^^—.^^—^———— , atteste par la presente que les montants indiques sont aussi(nom et prenom en lettres moulees)

exacts que possible et que les couts ont ete engages pour executer les travaux d'evaluation sur les terrains indiques

dans la declaration ci-jointe d'execution. A litre de

autorisd a faire cette attestation.

(titulaire enregistre, representant ou indiquez le poste occup^ dans I'entreprise vous autorisant A signer)

, je suis

0212F (04/86)

Signature Date

Page 18: GEOL RPT ON THE OLSEN TP PROP

Ministry of Minlstere duNorthern Development DeVeloppement du Nordand Mines et des Mines Ontario

Geoscience Assessment Office 933 Ramsey Lake Road

June 12, 1998 6th FloorSudbury, Ontario

DANIEL F. PATRIE P3E 6B5BOX 45MASSEY, Ontario Telephone: (888) 415-9846POP-1 PO Fax: (705)670-5881

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Dear Sir or Madam: S ubmission Number: 2 .17627

Status Subject: Transaction Number(s): W9750.00737 Approval

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact Lucille Jerome by e-mail at [email protected] or by telephone at (705) 670-5858.

Yours sincerely,

ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 12421

Copy for: Assessment Library

Page 19: GEOL RPT ON THE OLSEN TP PROP

Work Report Assessment Results

Submission Number: 2 .17627

Date Correspondence Sent: June 12,1998 ____ __ Assessor:Lucille Jerome_____ ^^^^

Transaction First ClaimNumber Number Township(s) l Area(s) Status Approval Date

W9750.00737 1197495 OLSEN Approval May 14, 1998

Section:12 Geological GEOL

Assessment work credit has been approved as outlined on the attached Distribution of Assessment Work Credit sheet.

Correspondence to: Recorded Holder(s) and/or Agent(s):Resident Geologist DANIEL F. PATRIESault Ste. Marie, ON MASSEY, Ontario

Assessment Files Library BRYAN CALVIN PATRIESudbury, ON SPANISH, Ontario

Page: 1Correspondence ID: 12421

Page 20: GEOL RPT ON THE OLSEN TP PROP

Distribution of Assessment Work Credit

The following credit distribution reflects the value of assessment work performed on the mining land(s).

Date: J une 12, 1998

Submission Number: 2 .17627

Transaction Number: W9750.00737

Claim Number Value Of Work Performed

1197495 6,446.00

Total: S 6 ,446.00

Page: l

Correspondence ID: 12421

Page 21: GEOL RPT ON THE OLSEN TP PROP

Natural , Northern Development Resources and Miness**!J yf^ J^v^r? ~^ '^^

arm V\\A \\ ^J *V. l\ ) C^-v' Ji-** N1 ^lr^ i M* r^;^INDEX TO LAND DISPOSITION

M.N.R. ADMINISTRATIVE DISTRICT

SAULT STE. MARIEMINING DIVISION

SAULT STE. MARIELAND TITLES/REGISTRY DtVISIQN

ALGOMA

PtAN

G -2380

OLSEN

•^ -^Contour Interval 10 Metre*

AREAS WITHDRAWN FROM DISPOSITION

MRO - Mining Rights OnlySRO- Surface Rights OnlyM H- S - Mining and Surface Rights

SYMBOLSBoundary

Township, Meridian, Baseline.

Road allowance; surveyed shoreline.

Lot/Concession; surveyed, unsurveyed

Parcel; surveyedunsurveyed

Right-of-way; roadrailway utility.

Reservation

Cliff, Pit, Pile

ContourInterpolatedApproximateDepression

Control point (horizontal)

Flooded, land

Mine h

Pipeline (above ground)

Railway; single track double track abandoned

Road; highway, county, township access trail, bush

Shoreline (original).

Transmission line

Wooded area......................

l^mm^:^^'.M%^ ^^~Mr'>; i'^'O xTS-\

\ /(f Tr^

J l l* *rf. l #^^:

t THE i9j***GNETX aeARW* APPROX,ANNUAL CHANGE jjtflE AS1NG

DISPOSITION OF CROWN LANDSPatent

Surface ft M ining Rights Surface Rights Only Mining Rights Only

LeaseSurface 4 Mining Rights Surface Rights Only . . . . Mining Rights Only

Licence of Occupation

Order-in-Council.wnTHE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HEREON.

Cancelled

Reservation

Sand ft Gravel.

^ V--." HOX\-O v -^ -XX.:- - -^-X...^

MMDCED DEC

MKCTON tins

Map baa* and land disposition dr? f"-Q hy Surveys and Branch, Ministry of Natural Reso'" '

The disposition of land, location of lot ' - -index was compiled for admins ...

parcel boundaries onD only.

41N01SW2001 2.17627 OLSEN

Page 22: GEOL RPT ON THE OLSEN TP PROP

1750 E

40OE2 00,E ,^- /SOOE I5OOF/OOOE

SOON -3OON-

-2DON-

X#5 -/OON

S. S.iv\. 11793!-*

aoos

TO ""MILE. 38 T O H 1GH W AY 17

TO S.S.

RECEIVEDAUG 2 1 1997

/20O E /300E MOOE GEOSCIENCE ASSESSMENT7OOE /OOOE l SOOE//OOE

-300 S-

4OOS-3-00 S-

OE /COE ZOOE 300E 40OE Ali

Lit

MAINCROSSING CLAIfv\

-- SKlO fiOAPVEIN

T (5.D

INTERMIT G NT S T R E

FAUL

OAfA

PIT

THE. ROUGH TOPOGRAPHY

CEDAR.OPEN MAR S H

s MOT SHOWN/

CARBONATE.

l CLASTIC SEDIMENT

OUTCROP WITH P.OCKTYPE

STRIKE. AMD PIP OF BANDING AND FELSIC TVFF

FELSIC

l

O TUFF

E. FLOW t 1WTR.VJS IVE ?

STRIKE. AWO DIP Of FOLIATION

SAMPLING LOCATION

j TNTERMEm A-TC PV a o CL A 5Ti KS - T UFS CH

C. W. CARBONATE

———— SECTION OFCLAlM

WES DESTARDINTS CLAIMOLSEN TNA/p

GEOLOGV

PAUL PT LEAHY OCT. n ^G l :

41N01SW2001 2.17627 OLSEN210


Recommended