GEOTECHNICAL INVESTIGATION
Proposed WONDERLAND MONTESSORI ACADEMY
Stonebrook Parkway
Frisco, Texas
PROJECT NO. 18-DG9175
Prepared for:
Mr. SANJAY JOSHI
Flower Mound, Texas
Prepared by:
GEOSCIENCE
ENGINEERING & TESTING, INC.
Dallas, Texas
June, 2018
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc.
CONTENTS
INTRODUCTION
Project Description .................................................................................................................. 1
Site Description ......................................................................................................................... 1
Purposes and Scope of Work ................................................................................................ 1
Report Format ......................................................................................................................... 1
FIELD INVESTIGATION............................................................................................................................. 2
LABORATORY TESTING........................................................................................................................... 2
Review ...................................................................................................................................... 3
GENERAL SUBSURFACE CONDITIONS
Stratigraphy................................................................................................................................ 3
Subsurface Water Conditions ............................................................................................... 4
ANALYSIS AND RECOMMENDATIONS
Construction Consultation and Monitoring ........................................................................ 4
Soil Movement .......................................................................................................................... 4
FOUNDATION RECOMMENDATIONS .................................................................................................. 5
A. Under-Reamed Bell Piers ................................................................................................... 5
B. Straight Shaft Piers ............................................................................................................... 5
Soil Induced Uplift Loads .................................................................................................. 6
Pier Installation .................................................................................................................... 6
Grade Beams ...................................................................................................................... 7
Floor Systems ...................................................................................................................... 7
C. Slab-on-Grade Type of Foundation ................................................................................ 9
Building Pad Preparation ..................................................................................................... 10
Select Fill ................................................................................................................................... 11
Flex Base ................................................................................................................................... 11
PAVEMENT AND SUBGRADE ............................................................................................................... 11
SITE GRADING and DRAINAGE .......................................................................................................... 13
CLOSURE ...................................................................................................................................... 14
ILLUSTRATIONS
LOCATION PLAN .................................................................................................................................... A
BORING LOGS ....................................................................................................................................... 1-7
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 1 -
INTRODUCTION
Project Description
This report presents the results of a Geotechnical Investigation performed by our firm at the
referenced project located in Frisco, Texas. Based on the project information provided, it is our
understanding that construction will consist of a Montessori academy and associated parking
and driveway area. Information regarding structural loads was not available at the time of this
investigation; however, we anticipate the loads will be light. It is expected that the finished floor
elevation of the proposed building will be above the surrounding surfaces. Grading plans and
other information regarding the referenced project were not available at the time of this
investigation.
Site Description
The site of the referenced project is located north side Stonebrook Parkway and far west side of
Teel Parkway in the City of Frisco, Texas. At the time of this investigation, the site was vacant land
covered with native vegetation and trees. The general location and orientation of the site is
shown in the Illustrations section of this report.
Purposes and Scope of Work
The principal purposes of this investigation were to
1). Develop subsurface soil and rock stratigraphy at the boring locations;
2). Evaluate soil swell potential and provide alternatives to reduce soil movement;
3). Provide recommendations for foundation design parameters;
4). Provide pavement recommendations and
5). Provide site preparation recommendations
Report Format
The first sections of this report describe the field and laboratory phases of the study. The
remaining sections present our engineering analysis that was used to develop geotechnical
parameters for the type of foundation system proposed for this site. Boring logs and laboratory
test results are presented in the Illustrations section of this report.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 2 -
FIELD INVESTIGATION
The field portion of this investigation involved drilling and sampling a total of seven (7) test
borings. Test borings B-1 to B-3 were drilled to a depth of 30 feet below ground surface in the
proposed building pad area and test borings B-4 to B-7 were drilled to a depth of 5 feet in the
proposed paved area. The approximate locations of the borings are indicated on Plate A in the
Illustrations Section of this report. Boring logs with descriptions of the soils sampled are attached
on Plates 1 and 7. Soil strata boundaries shown on the boring logs are approximate.
The borings were advanced using continuous flight auger techniques. Undisturbed cohesive soil
samples were obtained using a 3-inch diameter thin-walled tube sampler pushed into the soils.
The un-drained compressive strength of cohesive soils was estimated in the field using a
calibrated pocket penetrometer.
To evaluate the relative density and consistency of harder formations, Texas Department of
Transportation Cone Penetrometer tests were performed at selected locations. The actual test
consists of driving a three-inch diameter cone with a 170-pound hammer freely falling 24 inches.
In relatively soft materials, the penetrometer cone is driven one foot and the number of blows
required for each six-inch penetration is tabulated at respective test depths, as blows per six
inches on the boring log. In hard materials, the penetrometer cone is driven with the resulting
penetrations, in inches, accurately recorded for the first and second 50 blows for a total of 100
blows. The penetration for the total 100 blows is recorded at the respective testing depths on the
boring log.
All soil samples were removed or extruded from the samplers in the field, visually classified, and
placed in appropriate containers to prevent loss of moisture or disturbance during transfer to the
laboratory. The borings were advanced using dry auger procedures to observe the water level
at the time of the exploration. These water level observations are recorded on the boring logs.
LABORATORY TESTING
Engineering properties of the foundation soils were evaluated in the laboratory by tests
performed on representative soil samples, a series of moisture contents were performed to
develop soil moisture profiles at the boring locations and to aid in evaluating the uniformity of soil
conditions. Plastic and liquid limit (Atterberg limits), dry unit weight determinations and
percentage passing number 200 sieve tests were performed on selected samples from the
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 3 -
borings to confirm visual classification and to evaluate soil volume change potentials. Shear
strengths of cohesive soils were estimated by field pocket penetrometer and laboratory
unconfined compression tests performed on selected samples. The results of these tests are
presented on the boring logs.
Review
Descriptions of subsurface materials obtained in the field at the time the boring was drilled were
modified in accordance with results of laboratory tests and visual examination in the laboratory.
All recovered soil samples were examined and classified in accordance with ASTM D 2487 and
described as recommended in ASTM D 2488 and the Unified Soil Classification procedures.
Classification of the soils and finalized material descriptions are shown on the boring logs.
GENERAL SUBSURFACE CONDITIONS
Stratigraphy
Based on our interpretation of the borings drilled for this investigation, the subsurface stratigraphy
at this site consists predominately of clay soils underlain by calcareous clay followed by shaly
clay soils deeper by gray shale.
More specifically, the subsurface stratigraphy encountered within the depths of the test borings
drilled for this study consisted of:
Dark brown underlain by brown and tan CLAY (CH) soils with calcareous nodules from existing
ground surface elevation to a depth of 3.5 to 6 feet in test borings B-1 to B-3 and B-7, and to the
completion depth of shallower test borings B-4 to B-6 drilled. Below 3.5 to 6 feet in test borings B-1
to B-3 and B-7, tan and occasional light gray CALCAREOUS CLAY (CH) soils with limestone and
shaly clay seams were encountered and remained visible to a depth of 14.5 to 15 feet in test
borings B-1 to B-3 and to the completion depth of shallower test boring B-7 drilled. Below 14.5 to
15 feet in test borings B-1 to B-3, tan and gray SHALY CLAY (CH) soils with calcareous nodules
were encountered and remained visible to a depth of 25.5 to 27.5 feet in the deeper drilled test
borings. At 25.5 to 27.5 feet in test borings B-1 to B-3, gray weathered SHALE was encountered
and remained in evidence to the completion depths of test borings B-1 to B-3 drilled.
Detailed descriptions of the subsurface stratigraphies encountered at this site are presented on
the boring logs in the Illustrations Section of this report.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 4 -
Subsurface Water Conditions
The borings were advanced using dry auger drilling procedures in order to observe any
groundwater seepage levels. At the time of this investigation, groundwater seepage was
encountered to a depth of 24.5 to 25.5 feet during drilling and 23 to 26 feet upon completion of
drilling in test borings B-1 to B-3 drilled. NO groundwater seepage was encountered in the
shallower test borings B-4 to B-7 drilled at the time of this study. It should be noted however that
future construction activities may alter the surface and subsurface drainage characteristics of
this site. As such, we suggest re-verifying the depth to groundwater just prior to and during
construction. If there is a noticeable change from the conditions reported herein, this office
should be notified immediately to review the effect that it may have on the design
recommendations. Based on short-term observations, it is not possible to accurately predict the
magnitude of subsurface water fluctuations that might occur. Also water seepage may
encounter within the fractures of the soils particularly after a period of heavy rainfall.
ANALYSIS AND RECOMMENDATIONS
Construction Consultation and Monitoring
We recommend that GETI be given an opportunity to review the final design drawings and
specifications to ensure that the recommendations provided in this report have been properly
interpreted. Wide variations in soil conditions are known to exist between the boring locations,
particularly in the vicinity of this site. Further, unanticipated variations in subsurface conditions
may become evident during construction. During the excavation and foundation phases of the
project, we recommend that a reputable Geotechnical Engineering firm be retained to provide
construction surveillance services in order to 1) observe compliance with the geotechnical
design concepts, specifications and recommendations, and 2) observe subsurface conditions
during construction to verify that the subsurface conditions are as anticipated, based on the
boring performed for this investigation. Geoscience is available to perform the aforementioned
services.
Soil Movement
The near surface subgrade soils encountered at this site exhibited plasticity indices between 31
and 48. These type soils are considered as highly expansive in nature and are capable of
significant vertical and horizontal ground movements due to soil swell and shrinkage which
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 5 -
occurs with changes in soil moisture content(s). The magnitude of the movements experienced
by the foundation will depend on one or a combination of several factors including the moisture
content and the depth at which plastic soils are encountered at the time of construction, soil
plasticity, rainfall moisture index, local drainage characteristics, and other related factors.
Potential Vertical Movement was calculated using Texas Department of Transportation method
(TxDOT 124-E). Based on the aforementioned method, the estimated moisture induced Potential
vertical movement of the soils at the time of this investigation is at the location of the test borings
drilled is on the order of 4.75 to 5.5 inches. Considerably more movement will occur in areas
where water ponding is allowed to occur during and/or after construction-or- in areas where
additional fill other than select fill is placed –or- if the thickness of the clay soils is greater than
that encountered in the test borings. Site grading may also increase or decrease the potential
for the movement.
FOUNDATION RECOMMENDATIONS
The site is located in the Eagle Ford Formation and west of Preston Road. The soils in this region
are known to contain some concentrations of soluble sulfate. Sulfate resistance concrete should
be used for all the foundation construction.
A. Under-reamed Pier Type Foundation System
Based on the findings of this study, the structural loads of the proposed structure can be
supported by auger excavated, under-reamed, steel reinforced, cast-in-place concrete piers.
The piers should extend to a depth of at least 15 feet from finished ground surface elevation.
Some adjustment to the pier depth may require in the event water bearing material is
encountered at the pier depth. The piers may be sized using an allowable net end bearing
pressure of 3,500 psf. The under-reamed piers should have a bell to shaft diameter ratio ranging
between 2.5 to 3. The bearing capacity should be reduced for piers closer than 3-bell diameters
center-to-center.
B. Straight Shaft Pier Type Foundation System
The structural loads can be supported by auger excavated straight-sided, cast-in-place,
reinforced concrete piers. The piers should be founded at 3 feet within gray weathered shale
encountered at a depth of 25.5 to 27.5 feet at the location of deeper drilled test borings. The
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 6 -
net allowable end bearing capacity of 14,000-psf and skin friction of 1,800 psf in compression
and 1,500 psf in tension can be used. The skin friction component should only be applied to the
portion of the shaft located in the bearing material below the recommended minimum
penetration. We recommend that our firm should monitor the pier drilling operation in order to
assure that the pier has been installed within limestone stratum
Soil Induced Uplift Loads
The drilled shafts will be subjected to some uplift loads due to heaving in the overlying clay soils.
The uplift loads can be approximated by assuming a uniform uplift of 1,800 psf over the shaft
perimeter of 10 feet of the pier length. The uplift pressure can be neglected for the depth of
select fill if placed to reduce the soil swell potential. The uplift loads can be reduced to 1,000 psf
to a depth of moisture conditioned soils. To resist the net tensile load, the shaft must contain
sufficient continuous vertical reinforcement to the full depth of the pier.
Foundation piers designed and constructed in accordance with the information provided in this
report will have a factor of safety in excess of 2.5 against shear type failure and will experience
minimal settlement (less than one inch).
Pier Installation
The construction of all piers should be observed by experienced geotechnical personnel during
construction to ensure compliance with design assumptions and to verify: (1) the bearing
stratum; (2) the minimum penetration; (3) the removal of all smear zones and cuttings; (4) that
groundwater seepage is correctly handled; and (5) that the shafts are vertical and within
acceptable tolerance levels. Our Firm is available to provide these services upon request.
Reinforcing steel and concrete should be placed immediately after the excavation has been
completed and observed. In no event should a pier excavation be allowed to remain open for
more than 8 hours. Concrete should be placed in such a manner to prevent segregation of the
aggregates. Subsurface conditions at the time our borings were advanced indicate that
temporary casing will be required for straight shaft piers only.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 7 -
Grade Beams
Grade beams should be structurally connected into the top of the piers or spread footings. The
soil swell potential should be reduced to less than an inch by moisture conditioning the subgrade
soils as per the procedure outlined in later section of this report.
Alternatively, the grade beam cab be suspended (most positive option). A minimum void space
of 10 inches should be provided beneath the grade beams. This void space allows movement
of the soils below the grade beams without distressing the structural system. Structural cardboard
forms are typically used to provide this void beneath grade beams. Cardboard forms must have
sufficient strength to support the concrete grade beams during construction.
Our previous experiences indicate that major distress in the grade beams will occur if the
integrity of the void box is not maintained during and after construction. The excavation that the
void box lays in must remain dry. Cardboard cartons can easily collapse during concrete
placement if the cardboard becomes wet. Backfill material must not be allowed to enter the
carton area below grade beams as this reduces the void space which underlying soils need to
swell.
Floor Systems
In conjunction with piers, two types of floor systems may be considered for use at this site:
i) Suspended Floor System (most positive option) - The most positive floor system for pier
type foundation systems in areas with expansive soils consists of a suspended floor system. The
floor system of the proposed building should be structurally supported on the foundation piers
and a minimum void space of 10 inches should be provided between the bottom of the slab
and the underlying soils.
ii) Ground Supported Slab - A ground-supported slab may be considered for use at this
site, provided the risk of some post-construction movement is acceptable. The slab may be of a
grid-type grade beam and slab reinforced with conventional rebar type foundation system. A
ground-supported slab, if used, then the soil swell potential should be reduced to one inch.
There are several methods generally used in DFW area which include chemical or water pressure
injection, placement of select fill soils and moisture conditioning the subgrade soils.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 8 -
Due to present of limestone seams within calcareous clay at the location of borings drilled,
chemical or water pressure injection may not be applicable and placement of select fill soil is
not economically feasible. To reduce the soil swell potential to one inch, subgrade soils should
be improved by moisture conditioning method.
• Moisture conditioning method:
Remove the subgrade soils to a depth of 10 feet below the finished grade elevation and
stockpile. The exposed surface should be watered and proof- rolled with heavy equipment. The
previously removed soils should be placed back in the building pad area in 6 to 8 inches loose
lifts and mixed thoroughly to form a homogenous consistent soil and each lift should be
compacted to between 93 and 98 percent of the maximum standard proctor dry density with a
minimum moisture content of 4 points above optimum. We recommend the improvements
extend an additional five feet beyond the perimeter of the building pad and should include all
the areas sensitive to the movement. The upper one foot of the soils should consist of select fill
soils –or- onsite lime stabilized soils –or- flex base materials.
In the event that select fill soil is planned to be used as a cap, then it should be placed in 6 to 8
inches loose lifts and compacted between 95 and 100 percent of the maximum dry density as
per ASTM D 698 with moisture contents within three points of optimum moisture as per ASTM D
698. We recommend select fill soils not be extended beyond the building line however; the
perimeter outside the grade beam should be capped with high plasticity index clay soils in order
to retard any water seepage underneath the foundation.
In the event that lime stabilization to the existing subgrade is planned as a cap, then it should be
stabilized with a minimum of 36 pounds per square yard of lime for 6-inch-thick soil.
If the flex base is used as a cap atop of moisture conditioned soils, then the flex base should be
placed in 6 to 8 inches loose lifts compacted to a minimum of 98 percent of maximum dry
density as per ASTM D 698 and the moisture content should be between -2 to +3 percent points
above optimum.
Field density tests should be taken at the rate of at least one test per each 2,500 square feet, per
lift, in the area of all compacted fill. For areas where hand tamping is required, the testing
frequency should be increased to approximately one test per lift, per 100 linear feet of area.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 9 -
Construction of the building slab should start shortly upon completion of the subgrade
improvement process. Moisture loss of the improved soils should not be allowed to occur
between the time the improvement procedures are completed and the start of the
construction.
A net allowable bearing capacity of 1,500 psf can be used to design the grade beam and slab
for the moisture conditioned soils and 2,000 psf for select fill soils. A moisture barrier of
polyethylene sheeting or similar type material should be placed between the slab and the
subgrade soils to retard moisture migration through the slab. Grade beams and floor slabs should
be adequately reinforced to minimize cracking as normal movements occur in the foundation
soils. It should be understood that a soil-supported foundation system will experience some
movement over time.
C. Slab-on-Grade Type Foundation
In the event that the structural loads are light, then a slab-on-grade type foundation system is a
feasible option for use at this site provided:
• All vegetation, trees and tree roots (if any) and loose soil are completely removed and
disposed of the site.
• The risk of some post-construction movement is acceptable. Slab on grade type of
foundation system require periodic cosmetic repairs to building finishes. Additionally,
there is a risk that the ground movements could be greater than anticipated which
could lead to the need for more extensive repairs. These circumstances are most often
associated with poor drainage around the slab perimeter, sub-slab plumbing leaks, or
trees or shrubs planted too close to the foundation. The potential for these movements,
risks associated with long-term performance of slab-on-grade foundations, and owner
maintenance responsibilities should be fully understood.
• The PVR is reduced to one inch by moisture conditioning method as per the procedure
outlined in previous section of this report.
• Additional fill soil if is required should consist of select fill soils.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 10 -
The foundation should be designed with exterior and interior grade beams adequate to provide
sufficient rigidity to the foundation system to sustain the vertical soil movements expected at this
site. Where heavier column loads are anticipated we recommend shallow footings be used. The
depth of the spread/shallow footings should be a minimum of 3 feet below finished grade. A net
allowable bearing capacity of 2,000 psf can be used for the spread footing bearing in moisture
conditioned soils.
The grade beam should be a minimum of 2 feet deep and 12 inches wide and should be
installed within moisture conditioned soils or select fill soils. A net allowable soil bearing pressure
of 1,500 pounds per square foot may be used for design of all grade beams and slab bearing in
moisture conditioned soils and 2,000 psf for select fill soils. The bottom of the beams should be
free of any loose or soft material prior to the placement of the concrete. All grade beams and
floor slabs should be adequately reinforced to minimize cracking as normal movements occur in
the foundation soils. Also, a moisture barrier of polyethylene sheeting or similar material should
be placed between the slab and the subgrade soils to retard moisture migration through the
slab. It should be understood by all parties that a soil-supported foundation system will
experience movement with time.
Building Pad Preparation
Prior to the placement of fill soils, all loose soils and any vegetation should be removed and
disposed of the site until hard stratum is encountered.
For a suspended floor system, after removal of all above referenced items, the exposed
surface should be scarified to a minimum depth of 6 inches water as required and compacted
between 95 and 100 percent of the maximum dry density as defined by ASTM D 698 (Standard
Proctor Test) at a moisture content between optimum and 4 points above optimum. Additional
fill, if required, should consist of clean on-site or off-site soils compacted to resist the initial
concrete loads. Placement of select fill soils is not required for suspended floor system.
For a ground supported floor system: upon removal of all the referenced above items,
then the soils swell movement should be reduced to an inch or less by moisture conditioning
method as per the procedure outlined in previous section of this report. Additional fill, if is
required, should consist of select fill soils only.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 11 -
Select fill materials should be placed in six (6) to eight (8)-inch loose lifts at moisture contents
between optimum and 3 percentage points above optimum. Each lift compacted to between
95 and 100 percent of the maximum dry density as defined in ASTM D 698. Field density tests
should be taken at the rate of one test per every 2,500 square feet per lift, or a minimum of 3
tests per lift in the area of all compacted fill. For areas where hand tamping is required, the
testing frequency should be increased to approximately one test per lift, per 100 linear feet of
area.
Select Fill
"Select fill," as referred to in this report, should consist of clayey sands free of organic materials
with a Plasticity Index between 6 and 16, a Liquid Limit of 38 or less, and between 15 and 45
percent passing a No. 200 sieve. Placement and compaction of the select fill should be
performed in accordance with the "Building Pad Preparation" section of this report. It is
preferable to place the select fill above the surrounding ground surface. The provision of a
subsurface drainage system will be required in areas where the select fill is placed below the
surrounding ground surface.
Flex Base
TxDOT 247 -Type 1.
PAVEMENT AND SUBGRADE
General
Specific wheel loading and traffic volume characteristics were not available at the time of this
investigation. However, we have assumed that light passenger vehicle traffic will be most
predominant in the parking areas and the relatively heavier fire truck traffic will occur in the
drive areas area around and behind the structure, and in the fire lane.
Based on assumed loading conditions, we have developed the following Portland cement
concrete pavement design sections for use at this site.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 12 -
Minimum
Thickness
(inches)
Light Traffic
Portland Cement Concrete 5
Minimum Lime Stabilized Subgrade 6
Heavy Traffic
Portland Cement Concrete 6
Minimum Lime Stabilized Subgrade 6
Prior to the placement of any fill in the pavement area, we recommend that all loose and fill (if
any) soils and any vegetation should be removed and disposed of the site until hard stratum is
encountered.
The exposed surface should be scarified to a depth of 6 inches water as required and
compacted to 95 and 100 percent of maximum dry density. Additional fill soil if is required,
should consist of onsite natural clay soils. The fill soils should be compacted between 95 and 100
percent of the maximum dry density as defined by ASTM D 698 (Standard Proctor Test) at
moisture content between optimum and 4 points above optimum.
The upper 6 inches of the final grade in all the areas of the pavement should then be stabilized
with lime. We estimate approximately 6 to 10 percent of hydrated lime (between 32 and 36
pounds of lime per square yard for 6-inch-thick soil) will be required to stabilize the subgrade soils
(to reduce the plasticity index to 15 or less). It should be noted that after the final grade is
complete, the actual amount of lime required should be calculated by lime series test in the
laboratory.
The site is located in the Eagle Ford Formation and west of Preston Road. The soils in this region
are known to contain some concentrations of soluble sulfate. Given the fact that sulfate tends to
negate the effects of lime, we recommend a Sulfate Analysis be performed on the finished
grade of the paving area prior to lime stabilizing the subgrade. In the event that lime stabilization
of the subgrade soils is not economically feasible or the sulfate concentration is higher than 1000
ppm, then the thickness of the concrete can be increased by an additional 1 inch or City
recommended thickness as an alternative and Sulfate resistance concrete should be used for all
the paving area.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 13 -
Design of the concrete pavement should specify a minimum 28-day concrete compressive
strength of 3000 psi for all the pavement and 4000 psi for the fire lane with 4 percent to 6 percent
entrained air. The concrete should be placed within one and one-half hours of batching. During
hot weather, the concrete placement should follow ACI 311 Hot Weather concreting and in no
case should the concrete temperature be allowed to exceed 95ºF. To avoid excessive heat
periods, consideration should be given to limiting concrete placement to a time of day that will
minimize large differences in the ambient and concrete temperature.
Past experience indicates that pavements with sealed joints on 15 to 20-foot spacings, cut to a
depth of at least one-quarter of the pavement thickness, generally exhibit less uncontrolled post-
construction cracking than pavements with wider spacings. As a minimum, expansion joints
should be used wherever the pavement abut a structural element subject to a different
magnitude of movement, e.g., light poles, retaining walls, existing pavement, building walls, or
manholes. After construction, the construction and expansion joints should be inspected
periodically and resealed, if necessary. The pavement should be reinforced using at least No. 3
bars, 24 inches on center, each way and for fire lane the rebar should be No. 4 rebars 24 inches
c/c or city standards should be followed.
SITE GRADING and DRAINAGE
All grading should provide positive drainage away from the proposed structures and should
prevent water from collecting or discharging near the foundations. Water must not be permitted
to pond adjacent to the structures during or after construction.
Surface drainage gradients should be designed to divert surface water away from the buildings
and edges of pavements and towards suitable collection and discharge facilities. Unpaved
areas and permeable surfaces should be provided with steeper gradients than paved areas.
Pavement drainage gradients within 5 feet of buildings should be constructed with a minimum
slope of one inch per foot to prevent negative drainage gradients (ponding water conditions)
from developing due to differential upward pavement movements. Sidewalk drainage gradients
should be along maximum slopes allowed by local codes.
Roofs should be provided with gutters and downspouts to prevent the discharge of rainwater
directly onto the ground adjacent to the building foundations. Downspouts should not discharge
into any landscaped bed near the foundations. Downspouts should discharge directly into storm
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 14 -
drains or drainage swales, if possible. Roof downspouts and surface drain outlets should
discharge into erosion-resistant areas, such as paving or rock riprap. Recessed landscaped
areas filled with pervious sandy loam or organic soil should not be used near the foundation. All
trees should be a minimum of one-half their mature height away from the building or pavement
edges to reduce potential moisture losses. Water permitted to pond in planters, open areas, or
areas with unsealed joints next to structures can result in on-grade slab or pavement
movements, which exceed those, indicated in this report.
Exterior sidewalks and pavements will be subject to some post construction movement as
indicated in this report. These potential movements should be considered during preparation of
the grading plan. Flat grades should be avoided. Where concrete pavement is used, joints
should be sealed to prevent the infiltration of water. Some post-construction movement of
pavement and flatwork may occur. Particular attention should be given to joints around the
building. These joints should be periodically inspected and resealed where necessary.
CLOSURE
It should be noted that some variations in soil and moisture conditions may exist between boring
locations. Statements in this report as to subsurface variations over given areas are intended as
estimations only, based upon the data obtained from specific boring locations.
The results, conclusions, and recommendations contained in this report are directed at, and
intended to be utilized within the scope of work outlined in this report. The report is not intended
for use in any other manner. Geoscience Engineering and Testing, Inc., makes no claim or
representation concerning any activity or condition falling outside the specified purposes for
which this report is directed; said purposes being specifically limited to the scope of work as
defined herein. Inquiries regarding scope of work, activities and/or conditions not specifically
outlined herein, should be directed to GETI.
The completed landscaping should be carefully inspected to verify that plantings properly drain.
Soil in plantings may settle, which will tend to pond water, or plantings may block entrances to
surface drains. Therefore, maintaining positive drainage from landscape irrigation will be an
ongoing concern.
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc. - 15 -
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc.
ILLUSTRATIONS
Proposed WONDERLAND MONTESSORI ACADEMY Stonebrook Parkway Frisco, Texas
GEOSCIENCE, Inc.
Approximate Boring Location BORING LOCATION PLAN
Proposed WONDERLAND MONTESSORU ACADEMY
Stonebrook Parkway
Frisco, Texas
Project No. 18-DG9175 Plate A
0
5
10
15
20
25
30
P4.5+
P4.5+
P4.5+
P4.5
P3.25
P3.25
P1.0
T100/5.2"
5
14.5
26.5
30
Dark brown CLAY (CH) with calcareous nodules
-brown and tan below 3'
Tan CALCAREOUS CLAY (CH) with limestone andshaly clay seams
Tan and light gray SHALY CLAY (CH) withcalcareous nodules
Gray weathered SHALE
10
15
16
14
16
22
30
40
52
64
21
23
31
41
106
96
2.3
1.8
66
LOG OF BORING NO. B-1Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/29/2018
Completion Depth: 30
Groundwater Information:Seepage Encountered During Drilling: 25.5Upon Completion: 26
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 1Geoscience Engineering & Testing
0
5
10
15
20
25
30
P4.5+
P3.75
P4.5+
P4.5
P3.25
P1.0
P1.0
T100/5.7"
6
15
27.5
30
Dark brown CLAY (CH) with calcareous nodules
-brown and tan below 2'
Tan and light gray CALCAREOUS CLAY (CH) withlimestone seams
-increase in limestone seams below 9'
Tan and light gray SHALY CLAY (CH) withcalcareous nodules
Gray weathered SHALE
17
22
24
17
17
30
33
42
71
50
26
20
45
30 103 2.1
84
67
LOG OF BORING NO. B-2Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/29/2018
Completion Depth: 30
Groundwater Information:Seepage Encountered During Drilling: 25Upon Completion: 25.5
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 2Geoscience Engineering & Testing
0
5
10
15
20
25
30
P4.5+
P4.5+
P4.5+
P4.5
P4.0
P0.5
P0.5
T100/6.2"
3.5
14.5
25.5
30
Dark brown CLAY (CH) with calcareous nodules
Tan CALCAREOUS CLAY (CH) with limestone andshaly clay seams
Tan and light gray SHALY CLAY (CH) withcalcareous nodules
-saturated below 20'
Gray weathered SHALE
22
22
14
24
24
35
33
47
76 28 48
98
78
LOG OF BORING NO. B-3Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/29/2018
Completion Depth: 30
Groundwater Information:Seepage Encountered During Drilling: 24.5Upon Completion: 23
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 3Geoscience Engineering & Testing
0
5
10
15
20
25
30
P4.5+
P4.5+
P4.5+ 5
Dark brown CLAY (CH) with calcareous nodules
-brown and tan below 3.5'
27
17
17 74 25 49
LOG OF BORING NO. B-4Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/30/2018
Completion Depth: 5
Groundwater Information:Seepage Encountered During Drilling: NoneUpon Completion: Dry
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 4Geoscience Engineering & Testing
0
5
10
15
20
25
30
P4.5+
P4.5+
P4.5+ 5
Dark brown CLAY (CH) with calcareous nodules
-brown and tan below 3.5'
23
19
17
73 25 48 103
LOG OF BORING NO. B-5Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/30/2018
Completion Depth: 5
Groundwater Information:Seepage Encountered During Drilling: NoneUpon Completion: Dry
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 5Geoscience Engineering & Testing
0
5
10
15
20
25
30
P4.5+
P4.5+
P4.5+ 5
Dark brown CLAY (CH) with calcareous nodules
-brown and tan below 2.5'
18
18
21 75 27 48 97
LOG OF BORING NO. B-6Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/30/2018
Completion Depth: 5
Groundwater Information:Seepage Encountered During Drilling: NoneUpon Completion: Dry
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 6Geoscience Engineering & Testing
0
5
10
15
20
25
30
P4.5+
P3.5
P4.5+
3.5
5
Dark brown CLAY (CH) with calcareous nodules
Tan CALCAREOUS CLAY (CH) with limestone seams
20
22
23 68 25 43
LOG OF BORING NO. B-7Proposed "Wonderland Montessori School"
Stonebrook ParkwayFrisco, Texas
Project No. 18-DG9175
REMARKS:
TUBESAMPLE
AUGERSAMPLE
SPLIT-SPOON
ROCKCORE
THDCONEPEN.
NORECOVERY
DEPTH
(ft
.)
FIELD DATA
SO
IL &
RO
CK
SY
MBO
L
SA
MPLE T
YPE
P: H
AN
D P
EN
., T
SF
T: TH
D, BLO
WS/F
T.
N: SPT, BLO
WS/F
T.
STRA
TU
M D
EPTH
(FT.)
DESCRIPTION OF STRATUM
Location: See Location Plan
Surface Elevation: Unknown
Drilling Method: CFA
Date Boring Drilled: 05/30/2018
Completion Depth: 5
Groundwater Information:Seepage Encountered During Drilling: NoneUpon Completion: Dry
WA
TER C
ON
TEN
T, %
LABORATORY DATA
LIQ
UID
LIM
IT
PLA
STIC
LIM
IT
PLA
STIC
ITY
IN
DEX
UN
IT D
RY
WEIG
HT
(PC
F)
UN
CO
NFIN
ED
STREN
GTH
(TSF)
% P
ASSIN
G N
O. 200
SIE
VE
SO
IL S
UC
TIO
N T
EST
(TO
TA
L C
M. O
F
WA
TER)
Plate 7Geoscience Engineering & Testing