Get Detailed with SAPExpense Planning
Wayne KirkendallSession Code 1610GB Enterprises
Overview of Alpha
Agenda
Configuring and Using Personnel Cost Planning
Cost Center/Cost Element PlanningConfigurationGuiXT Components
Cost Center/Resource Planning
Manager Training/AcceptanceiTutor of PCP
Our Business Requirments for Expense Planning
Alpha Overview
• Alpha Technologies was founded in 1976 to provide power supplies to the cable industry. These products, which still comprise a significant portion of Alpha's total business, provide critical power conditioning and emergency backup to cable television delivery networks.
• Rapid growth in global communications, and the critical connection between system power and overall network reliability, created a strong demand for Alpha's products across a wide array of communication applications. Today, Alpha Technologies is a leading supplier of power systems to the broadband communications industry.
• Alpha’s customer base includes major cable television system operators, telecommunication service providers, as well as some of the most progressive full-service communication providers.
• For more information go to www.alpha.com
Overview of Alpha
Agenda
Configuring and Using Personnel Cost Planning
Cost Center/Cost Element PlanningConfigurationGuiXT Components
Cost Center/Resource Planning
Manager Training/AcceptanceiTutor of PCP
Our Business Requirments for Expense Planning
Expense Planning Requirements
Eliminate in house Access Database system
Leverage Central SAP database
Reduce budgeting manager’s consolidation time
Leverage in process employee master project
Get away from centrally loading and managing spreadsheets or database extracts
Expense Planning Requirements
Plan Certain Expenses by employee
Initial Planning Requirements
Personnel Costs: Salary/Wages, Taxes, Bonuses, Commissions
Employee Related: Travel, Employee Development
What we ended up doing
Planned Personnel Costs by Position in PCP and transferred to CO
Planned Employee Related Costs in CO
Final CO Reports
Overview of Alpha
Agenda
Configuring and Using Personnel Cost Planning
Cost Center/Cost Element PlanningConfigurationGuiXT Components
Cost Center/Resource Planning
Manager Training/AcceptanceiTutor of PCP
Our Business Requirments for Expense Planning
General CO Versions
CO HR Planning Connection
Click to add text
CO HR Planning Connection
Personnel Cost Planning IMG
Configuration Wizard
Integrate with Accounting?
Set Plan Source
Default Values
Evaluation Path
Employees/ Required Positions
Calculation Parameters
Authorization Check
Excel Integration
Completion Check
Table View of PCP Config
Wage Types
Wage Types
Wage Types Percentages
Wage Type Groupings
Effect of Percentage Wage Types
PCP Data Flow to CO
1) Data planned on a position level in infotype 1015
2) PCP Scenario Groups Created/Modified
3) Administration tool sends Scenario to Cost Centers
Sales Manager
CSR Sales Rep
AdminSales
Plan Scenario 1
Sales Admin
PO13 – Maintain Position
PO13 – Change Cost Planning
Creating PCP Scenario Groups
Projected Pay
Payroll Results
Basic Pay
Actual Results
Requires SAP HR Payroll
Based on Infotypes 1015 & 1011
Based on Infotype 0008
Click to add text
PP28 – Projected Pay Planning Basis
Assign Costs to Cost Objects
Assign Cost Object to Cost Center
Assign Cost Object to Cost Center
Scenario Structure
Plan Version – HR Plan Version not CO Plan Version
Scenario
Overall bucket that holds 1 or many scenario groups
Scenario Group – Structure that contains the planned values
Release and Transfer to CO
PP27 – Release Plan Scenario
PP2U – Save/Cancel Plan Scenario
PCP Scenario Group Report
Overview of Alpha
Agenda
Configuring and Using Personnel Cost Planning
Cost Center/Cost Element PlanningConfigurationGuiXT Components
Cost Center/Resource Planning
Manager Training/AcceptanceiTutor of PCP
Our Business Requirments for Expense Planning
KP65 – Create Planning Layout
…
One Entry Field
Several Informational Fields
•Month Break Down
•Prior Year Plan
•Prior Year Actuals
Define Planner Profiles
Assign Planning Layout to Planner Profile
Assign Default Parameters
Integrated Excel Planning Layout
KP06 – Cost Center/Cost Element Planning
KP06 – Data Entry Screen
GuiXT additons
Detailed Plan Entry Screen
GuiXT additons
Detailed Distribution Screen
GuiXT additons
Detail Expense Reporting
No standard report for displaying detailed cost items
Can be done in either ABAP query or Standard ABAP
No direct link between detail planned item and actual posting
What I wanted to do…
…was combine all three into one screen.
Overall Cost Center Plan
Detail Items
Detail Item Distribution
Need Input Assistant…More $$$
Script Files
GuiXT Basics
Components•GuiXT – Included•Input Assistant – $$$•Designer – $$$•Viewer – $$$
Storage
Deployment
Script Files
GuiXT Basics
Components
Storage
Deployment
•Text File with GuiXT Syntax
•Manually written
•Generated with Designer
Script Files
GuiXT Basics
Components
Storage
Deployment
•Network
•SAP Web Repository
•Individual PC
http://updates.guixt.com/docu/Webhelp/GuiXT_Profile/doc_sapwr.html
Script Files
GuiXT Basics
Components
Storage
Deployment
•GuiXT.EXE
•GuiXT.INI
•Possible Registry Settings
Overview of Alpha
Agenda
Configuring and Using Personnel Cost Planning
Cost Center/Cost Element PlanningConfigurationGuiXT Components
Cost Center/Resource Planning
Manager Training/AcceptanceiTutor of PCP
Our Business Requirments for Expense Planning
Resource Planning
Provides quanity planning for cost elements
Allows for standard rates to be set by planners
Does not allow actual postings
Allows for unique breakdown/rollup of cost elements
Setup master data item for resource
Resource Planning Steps
Assign to one specific Cost Element or
Allow assignment to any Cost Element
Assign Rates to ResourcesKP06: Extras -> Resource Planning -> Maintain Prices
Planner profile:SAPR&R or create your own
Plan Cost Center/Resource/Cost ElementKP06
Planner profile:SAPR&R or create your own
Need to have Access sequences and condition type defined in configuration
KPR2 – Create Resource Master Data
Required Fields:
ResourceValidity DatesResource UnitName
Optional Fields:
Cost ElementPlantMaterialBase Planning Object
KP06 – Plan resources / Set Prices
Set Resource Prices
KP06 – Plan resources / Set Prices
CO Planning Long Text Reporting
Program Name: COOMDISPLAYPTEXTS
Overview of Alpha
Agenda
Configuring and Using Personnel Cost Planning
Cost Center/Cost Element PlanningConfigurationGuiXT Components
Cost Center/Resource Planning
Manager Training/AcceptanceiTutor of PCP
Our Business Requirments for Expense Planning
Demostration of PCP via iTutor
Manager Training/Acceptance
Survey
“It’s Excel, but it’s not Excel”
Somewhat combersome
Fragmented procedures
Thank you for attending!Please remember to complete and return your evaluation form following this session.
Session Code: 1610