J Q % I (ý,< GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel Weld ID: V-3-C ASME Code Category: B-A Calibration Sheets: C-004, C-1 18, C-1l19 and C-120 Supporting Data: Examination Data Sheets E-1 1-00 thru E-1 1-03, Indication Data Sheets 11-001 thru 11-004, Screen Prints, Exam Patch Location Map, Exam Coverage Plots, GERIS 2000 Setup Records and Manual Examination Data Sheets D-046, D-047, D-048 and D-049. Examination Summary The ultrasonic examination of weld V-3-C resulted in no recorded indications that exceed the allowable standards of IWB-3500, ASME Section XI, 1986 Edition, No Addenda. The ASME Section XI required examination volume was examined with the GERIS 2000 System from the RPV inside surface utilizing Procedure No. GE-UT-700, Rev. 2. This examination was limited due to the feedwater sparger and the core spray downcomer. Areas that could not be examined using the GERIS 2000 and accessible from the outside surface were examined by the manual technique utilizing Procedure No. GE-UT-300, Rev. 6, FRR-004. The total examination coverage was calculated to be 70%. The GERIS 2000 utilizes an array of search units arranged to effectively examine the weld and adjacent base material parallel and perpendicular to the weld axis in two directions. The transducer package consisted of 00 longitudinal, 45° and 600 shear wave, and 70° refracted longitudinal (RL) wave search units, The GERIS 2000 recorded indications with the weld metal scans and the 450 and 60° shear wave scans that were evaluated and found to be acceptable per the referencing Code section. The manual technique utilized 0* longitudinal, 450 and 60° shear wave search units both parallel and perpendicular to the weld axis in two directions to effectively examine the weld and adjacent base material. The manual examination recorded one (1) geometric indication with the 0* search unit due to a core spray sparger support bracket. Fabrication records and previous examination results were reviewed prior to the completion of this examination summary. .'1 I- I , GERIS Analyst(jk' y 4 GE Reviewer: \)LbL~L~xa2 LEVFELý4L / DATE: /Z,/) LEVEL: -L DATE: k-g1 UTILITY Review: ~ /4t~S 1 AN II Review:7 TITLE: DATE: I ~ /'{ TITLE: DATE:/A; ___ ___ __ ___ __ ___ __ DATE: f 1 23 2 .) 00120
Transcript
Page 1: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

JQ % I (ý,<

GGERIS 2000 ExaminationGE Nuclear Energy Summary Sheet

Project: TVA, Browns Ferry Nuclear Plant, Unit 3

System: Reactor Pressure Vessel

Weld ID: V-3-C ASME Code Category: B-A

Calibration Sheets: C-004, C-1 18, C-1l19 and C-120

Supporting Data: Examination Data Sheets E-1 1-00 thru E-1 1-03, Indication Data Sheets 11-001 thru 11-004, Screen Prints,Exam Patch Location Map, Exam Coverage Plots, GERIS 2000 Setup Records and Manual Examination Data SheetsD-046, D-047, D-048 and D-049.

Examination Summary

The ultrasonic examination of weld V-3-C resulted in no recorded indications that exceed the allowable standards of IWB-3500, ASME SectionXI, 1986 Edition, No Addenda.

The ASME Section XI required examination volume was examined with the GERIS 2000 System from the RPV inside surface utilizingProcedure No. GE-UT-700, Rev. 2. This examination was limited due to the feedwater sparger and the core spray downcomer. Areas thatcould not be examined using the GERIS 2000 and accessible from the outside surface were examined by the manual technique utilizingProcedure No. GE-UT-300, Rev. 6, FRR-004. The total examination coverage was calculated to be 70%.

The GERIS 2000 utilizes an array of search units arranged to effectively examine the weld and adjacent base material parallel and perpendicularto the weld axis in two directions. The transducer package consisted of 00 longitudinal, 45° and 600 shear wave, and 70° refracted longitudinal(RL) wave search units,

The GERIS 2000 recorded indications with the 0° weld metal scans and the 450 and 60° shear wave scans that were evaluated and found to beacceptable per the referencing Code section.

The manual technique utilized 0* longitudinal, 450 and 60° shear wave search units both parallel and perpendicular to the weld axis in twodirections to effectively examine the weld and adjacent base material.

The manual examination recorded one (1) geometric indication with the 0* search unit due to a core spray sparger support bracket.

Fabrication records and previous examination results were reviewed prior to the completion of this examination summary.

.'1 I- I ,

GERIS Analyst(jk' y 4 GE Reviewer: \)LbL~L~xa2

LEVFELý4L / DATE: /Z,/) LEVEL: -L DATE: k-g1UTILITY Review: ~ /4t~S 1 AN II Review:7

TITLE: DATE: I ~ /'{ TITLE: DATE:/A;___ ___ __ ___ __ ___ __ DATE: f

1 23 2 .) 00120

Page 2: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

* GERIS 2000 Examination'~' E Nclea EnrgyData Sheet

Project, TVA, Browns Ferry, Unit 3

Weld ID: V-3-CExam Data Sheet: E-1 1-00

ProceRev

;dure No.: GE-UT-700

Islon No.: 2

FRR No.: N/A

Patch Data Sh. Date Start Stop MinX MaxX Min Y Mar Y Disk No. Examiner

BF-058 E-1 1-01 10/15/93 2237 2310 746.00 773.75 515.25 535.50 57A JCG

BF-059 E-11-02 10/16/93 0929 1009 746.00 757.50 424.00 470.00 60A ROF

BF-060 E-1 1-03 10/27/93 0449 0611 741.00 760.50 383.75 426.00 103A JCG

Comments: N/A

Limitations: Examination limited due to Feedwater Sparger and Core Spray Downcomer.

AnalystCQ} /• Reviewed B

Level: . Date: /ZIV.4 /? Level: • Date: i z.//3

EXAM-OSt VA 91S/9S3 MO ASIl5.

00I2

Page 3: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

a GE Nuclear EnergyGERIS 2000 Examination

Data SheetL

Project: TVA, Browns Ferry, Unit 3

Weld ID: V-3-C

Cal. ID: C-004

Channel Anale Dirnetion

Exam Data Sheet No.: E-1 1-01

Patch ID: BF-058

Ind. Data Sheet Series: 11 -XXX

Ind. Ind. Ind. Ind. Ind.Ind. flM• Rh_ flntt •h_ flna Rh_ f~tn Rh_ f)ntn R•hec

1 0 WM N/A NRI .....

2 0 WM N/A NRI ...

3 70 RL 0 UP NRI Note I..

4 70 RL 90 CW NRI ...

5 70 RL 180 DN NRI Note 1-....

6 70 RL 270 CCW NRI ...

7 45 RS 0 UP NRI ...

8 45 RS 90 CW NRI ...

9 45 RS 180 DN NRI Note 1I...

10 45 RS 270 CCW NRI .....

11 60 RS 0 UP NRI .....

12 60 RS 90 CW NRI .....

13 60 RS 180 DN NRI Note I..

14 60 RS 270 CCW NRI .....

15 OBM N/A NRI .....

16 0 BM N/A NRI ...

Comments: Note 1: Indications seen on the shell 4 side of C-3-4. These indications are not within V-C-3"s required exam volume.

See weld C-3-4.

Data Sheet Codes: G-XXX; "G" = Geometry ( may be typical), 6-XXX; "6" = Weld Sequence, XXX = Sheet NumberIndication Codes: 1 = Flaw, 2 = OD Surface, 3 = OD Attachment. 4 = Nozzle, 5 = Other

Analyst: _ __ Reviewed By:

Level: 32 Date: /?-,,/ Level:i-?J)- Date: %Z J113 6/1.3

EXAM-DS2 V.1 9128193 E-112012.XaS

00122lof 22-

Page 4: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

* GERIS 2000 ExaminationGE Nuclear Energy Data Sheet

Project: TVA, Browns Ferry, Unit 3

Weld ID: V-3-C

Cal. ID: C-004

Exam Data

Ind. Data She

Sheet No.: E-1 1-02

Patch ID: BF-059

set Series: 11 -XXX

Ind. Ind. Ind. Ind. Ind.Data Rh. Data Sh. Data Rh_ Data Rh D~ata RhiantChannel Angle Dlrection Ind.

Dieto Ind Data. ... .. ...DaaS . DaaS...... ..... Dat Sheet..

1 0WM N/A NRI - -..

2 O WM N/A No Exam - -..

3 70 RL 0 UP NRI - -..

4 70 RL 90 CW NRI - -..

5 70 RL 180 DN NRI - -..

6 70 RL 270 CCW NRI -.

7 45 RS 0 UP NRI - -..

8 45 RS 90 CW NRI - -..

9 45 RS 180 ON No Exam - -..

10 45 RS 270 CCW NRI - -..

11 60 RS 0 UP NRI - -..

12 60 RS 9O CW NRI -....

13 60 RS 180 DN No Exam -...

14 60 RS 270 CCW NRI -...

15 O BM N/A NRI -...

16 O BM N/A NRI - -..

Comments: No exam channels 2, 9 and 13 due to scan limitations.

Data Sheet Codes: G-XXX; "G" = Geometry ( may be typical), 6-XXX; "6" = Weld Sequence, XXX = Sheet Number

Indication Codes: 1 = Flaw, 2 = OD Surface, 3 = OD Attachment, 4 = Nozzle, 5 = Other

Analyst: " IZ1. ReviewedB

Level: I Date: /E/1 Level: - Date:

tXAM*OS2 V.1 /12819

V,0 1TTrLý ci-2j.

Page 5: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

"" , t:' ,' .

* GERIS 2000 ExaminationGE Nuclear Energy Data Sheet

ProJect. TVA, Browns Ferry, Unit 3

Weld ID: V-3-C

CaL ID: C-004

Channel Angle Direction

Exam Data Sheet No.: E-1 1-03

Patch ID: BF-060

Ind. Data Sheet Seriles: 11-XXX

Ind. Ind. Ind.

Ind. Data Sh. Data Sh. Data Sh.

Ind. Ind.

Data Sh. Data SheetI OWM N/A 1 11-001 11-002 ~ -

2 O WM N/A 1 Note 1 Note 1~ ~ ~

3 70 RL 0 UP NRI - - -

4 70 RL 90 CW NRI - - -

5 70 RL 180 DN NRI - - -

6 70 RL 270 CCW NRI -...

7 45 RS 0 UP NRI .....

8 45 RS 90 CW NRI -....

9 45RS 180 0N 1 11-003 ...

10 45 RS 270 CCW NRI -....

11 60 RS 0 UP NRI .....

12 60 RS 90 CW NRI -....

13 6ORS 180 DN 1 11-004 ....

14 60 RS 270 CCW NRI -..

15 OBM N/A NRI .....

16 0 BM N/A NRI .....

Comments: Note 1: See indications 11-001 and 11-002

Data Sheet Codes: G-XXX; "G" = Geometry ( may be typical), 6-XXX; "6" = Weld Sequence, XXX = Sheet NumberIndication Codes: 1 = Flaw, 2 = OD Surface, 3 = OD Attachment, 4 = Nozzle, 5 = Other

Analyst: Reviewed By:

Level: Date: __&11ZI13 Level: 7M.17 Date: %-z. 1 .

MXAM-DSM V.1 912193 * 001245 05, 23

Page 6: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

G GERIS 2000 IndicationS GE Nuclear Energy IData Sheet

Project: TVA, Browns Ferry, Unit 3

Weld ID: V-3-C

CaL ID: C-004

Indication: 11-001

Exam Data Sheet No.: E-1 1-03

Patch ID: BF-060

Ind. Data Sheet No.: 11-001

Channel: I Angle: 0 Direction: 0

20%Min Y

50%

MP MIn YAmp. X@Max

UP Y50% 20%

MP Max Y MP Max Y MP Remarks

41.6% 756.40 - .- - 393.50 5.00 - -. .

106.4% 756.65 - - 393.00 5.00 393.50 4.98 393.75 5.00 - - ~

100.0% 756.90 - - 393.00 5.06 393.25 5.02 393.50 5.00 - - -

113.4% 757.15 - - 392.75 5.06 393.00 5.05 393.50 5.05 - - ~

113.1% 757.40 - - 393.00 5.06 393.25 5.05 393.50 5.00 - ~

Comments: Backwall maintained.Indication evaluated as a laminar reflector and is acceptable in accordance with IWB-3510-2,ASME Section Xl, 1986 Edition, no Addenda.

Analyst: Q.2g . Reviewed By: 0.

Level: • Date: /Z//Z /V-- Level:: Date: .2..L3•./3

EX~tkDS0 V.2 10/22193 / 1 ~ Q) 1 90iS

Page 7: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

GE Nuclear Energy GERIS 2000 IndicationData Sheet

Project: TVA, Browns Ferry, Unit 3Weld ID: V-3-C

CaL ID: C-004

Exam Data Sheet No.: E-1 1-03

Patch ID: BF-060

Ind. Data Sheet No.: 11-002

Indication: 11-002 Channel: 1 Angle: 0 Direction: 0

20% 50% @ Mar 50% 20%Amp. X MIn Y MP Min Y MP Y MP Max Y MP Max Y MP Remarks

Comments: Backwall maintained.Indication evaluated as a laminar reflector and is acceptable in accordance with IWB-3510-2,ASME Section XI, 1986 Edition, no Addenda.

Analyst: (- • A .x Reviewed By: 0.

Level: j Date: /_-/,Z_ /27 Level: - Date: T1I 349g

eUAMODSS V.2 10/22193 1 26j111 .XLS00126

Page 8: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

* GERIS 2000 IndicationGE Nuclear Energy DaaShe

Project;Weld ID:

Cal. ID:

TVA, Browns Ferry, Unit 3

V-3-CC-004

Exam Data Sheet No.: E-11-03

Patch ID: BF-060

Ind. Data Sheet No.: 11-003

Indication: 11-003 Channel: 9 Angle: 45 Direction: 180

200% 50% @ Max 50% 20%Min Y MP MIn Y MP Y MP Max Y MP Max Y MP

Comments: No apparent tip signals.

Thruwall size determined by Rea. Guide 20% beam soread ornrecrted method.

Indication has no determinable thruwall dimension and is acceptable to IWB 3510-1.

TW 0 L= 0.25 S = 1.59 with clad

Analyst: ( - ,' .1. Reviewed By: - .e,

Level: • Date: /1Z, -T Level:-' __ Date:

EXUA4-OS3 V.2 10/22/93 unam"..LS00127

Page 9: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

•:: ,:!~. .. . . . . . . ..iil 0 I•

GE Nulear nerg GERIS 2000 Indicationa GENuclar EergyData Sheet

Project: TVA, Browns Ferry, Unit 3

Weld ID: V-3-CExam Data Sheet No.: E-1 1-03

Patch ID: BF-060

Ind. Data Sheet No.: 11-004Cal. ID: C-004

Indicaifon: 11-004 Channel: 13 Angle: 60 Direction: 180

209A 50% @ Max 50% 20%

Amp. X Min Y MP MIn Y Mp Y MP Max Y MP Max Y MP Remarks

Comments: No apparent tip signals.Thruwall size determined by Reg. Guide 20% beam spread corrected method.Indication has no determinable thruwall dimension and is accentable to IWB 3510-1.

TW 0 L= 0.5 S= 1.28 with clad

Analyst: t(2 0, Reviewed By: eLevel: j Date: _______ Level: " - - Date: %Z / 9 3

EXAM- S3 V.2 10122/83

(ýOIF Jh &t 00 121r.

Page 10: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

Q[024]

81[000 1

Slo 0 :I *-ca OF 00:

FREE JUOSCL ICA 01 VDO 14A

I-A CIE -H GA I C AE 11 I I - IE GAT

I11-00140 ~ _L_

AUWA&A.6.1ý- Uý

00TI

U

A

0*0

391.61 395. 12 *

Line = 0024, Trigger = 0075X = 756.90Dn, V = 393.27in 2 = 5.021nLog

Page 11: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

T(070]ABS

420.25-

414.75-

409.25 - '

403.75-

398.25-

392.75-

357.25738.15 746.15 754.15

X = 757.65in, V = 411.75inDAC-LOG

T[078]

B C 000 ]160~~-

1st/Time Start = 3.72, End = 3.72, Diff = 0.00mn'itmurp ct+4" m 71 QR md 71 02R n4ff A nnII U. - )1 OR

ABSDAC

-0.37 -0.37

0.75 0.75

1.87

3.00 3.00

4.12.4.12.

5.24.5.24-

6.36. 6.36-

7.49.

0

- -1-1

H)

0

.6(I\

7.49-

8.61. 8.61

754.01 757.

Lne = 0098, Trigger = OW

391.61 39. 12 398.60

mne = 0098, Trigger : 0078= 757.65in, V = 411.861n 2 = 3.75in

.Iue. 9 1I 4Uh OZ su,. I I 4 1£ . alb. lU

-0

0.,

Page 12: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

L jUCGJ LLUZflJ FREZ f .~ t~vf*L I-f.1 1* II DL _j L4NAV*T[0541 T[054 Iý - IT OFA13S T[54 SC1-l A

414.75-

409.25-

403.75"NI tt

398.25-

392.75-

387.25

741.00 749.00 757.00

X = 754.501n, V = 394.25inDAC-LOG ....

0.42-

1.30-

6C 0. 390.97 393.97 1 -A -k2 =. . . . .. . . .67 17 3.657 ý.8 6.'B.6 60 11".19 12.69....... U etal path inches

1.761

Dist/Tinle Start = 2.25, End = 2.28, Diff = 0.03

Amplitude Start = 52.95, lEnd = 52.95, Diff = 0.00, Mean 52 5.95

8.92

753.89 758.88 381.64 387.63 393.65 399.67 405.64 41\,67 417.64 423.66 429

tir = 0020, Trigger = 0054 Line = 0020, Trigger = 0054N = 754.SOin, V = 392.29in 2 = i.59tnLog

Page 13: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

L[0201T [95418[000]

160%-

I -004

ti\.N

AJiDAC

0.63

25.93 59

Line = 0020, Trigger =0

,.a0,9:1 Ai.. I j..

387

I20 '3.26 ý.31 L 3 8 . 4 '1.50 '13.56 '15.63 , 17.69

r•tal path inches

e Start = 2.56, End = 2.56, Diff = O.0O? Start = 58.39, End = 58.39, Diff = 0.00, Neon = 58.39g

BS

6.33-

375 30 301.76 380.27

1he = 0020, Trigger = 0054= 754.50Dn, V = 392.17in 2 = 1.4Zin

0C

0-1~1

~'0

(A

394.78 401.30 407.75 414 420.70

Page 14: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

0 0

BROWNS FERRY UNIT-3 WELD LOCATIONS

O0 9 0* 1800 210" 330' 3600 EL, 745" VESSEL FLANGE

C-5-FLG

C-4-5

C-3-4

C-2-3

C-1-2

C-BH-1

EL, 706"

EL. 5730

EL. 524.5"

EL. 404' TOP OF SHROUD-EL. 391,5'

EL. 372' 1BELTLINE REGION

EL, 258.5"

EL, 204'

EL. 125.5' SHROUD SUPPORT

EL. 121,5' BAFFLE PLATEIc ,r U

0-

GE NUCLEAR ENERGY BROWNS FERRY UNIT 3 VESSEL ROLLOUT & AS SCANNED PATCH LOCATIONS BF-3-VMA REV 0

Page 15: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

0

775.93"1 771.947770.45"

759.93"747.92" 743.93'f

CH. ANGLE DIR. MIN X MAX XNominal Clad T = 3/16"Nominal Base Metal T = 6 3/8"

1 Degree - 2.19"

1 0 W 0 754.00 765.872 0 W 90 754.00 765.873 70 UP 0 754.00 765.874 70 CW 90 749.41 765.875 70 DN 180 754.00 765.876 70 CCW 270 754.00 770.457 45 UP 0 754.00 765.878 45 CW 90 747.92 765.879 45 ON 180 754.00 765.87

10 45 CCW 270 754.00 771.9411 60 UP 0 754.00 765.87

12 60 CW 90 743.93 765,8713 60 DN 180 754.00 765.8714 60 CCW 270 754.00 775.9315 0 BM 0 754.00 775.9316 0 BM 90 743.93 765.87

0

GE NUCLEAR ENERGY BROWNS FERRY UNIT 3 WELD V-3-C EXAM VOLUME SCALE: NONE DWG. BF3-VERT REV. 0

Page 16: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

WELD

Nominal Clad T = 3/16"Nominal Base Metal T = 6 3/8"1 Degree = 2.19"

CI\A

GE NUCLEAR ENERGY BROWNS FERRY UNIT 3 CS DNCMR AUTOMATED SCAN LIMIT SCALE: NONE DWG. V-3CCSDN REV. 0

Page 17: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

WELD

S CW CCW .

Nominal Clad T 3116'Nominal Base Metal T =6 3/8"1 Degree =2.19"

I TI

GE NUCLEAR ENERGY BROWNS FERRY UNIT 3 CS DNCMR AUTOMATED SCAN LIMIT SCALE: NONE DWG. V-3CCSDN REV. 0

Page 18: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

.A ('

ULTRASONIC EXAMINATION DATA SHEET(MANUAL RPV VESSEL WELDS)

SITE, 2'RO&JAJ&S FrERV PROCEDURE NO.: , - '"-,3o0o

UNIT- -3

PROJECT NO., OO•d

REPORT NO.: E -t I

DATA SHEET NO.:DzI2L.o

CALIBRATION SHEET NO.: Or -L8O

45. iJ/A 6- _ /AFRR NO.: 004'

SYSTEM. Lk1V EXAM SURFACE TEMP 73 -F COUPLANT: uli-paudiC EXAMSTART: 1357

WELD ID, V---- THERMOMETER SIN'1-026 L BATCH NO.: D9311. EXAM END.: /AZ-

BEAM ANGLE: Co 0- 0 4r [3 W-0 QOTIER 41144L.... SURFACE CONDITON: 13 SMOOTH 0 GROUND 0 OTHER_______

MATERIAL TYPE [1 CS 0 33 C3 OTHER EXAM SUFC OI MOD)

L REFERENCE -0 SCAN SENSITIVITY ',,, dB4R C SCAN SENSITIVITY A!/ dB

WREFERENCE W60 SCAN SENSITIVITY , dB

NOZZLE WELD REFERENCE SYSTEM (Lo AND Wo ARE WELD REFERENCE SYSTEM (Lo AND Wo AREINTERCHANGED WHEN SCANNING FOR REFLECTORS INTERCHANGED WHEN SCANNING FOR REFLECTORS

TRANSVERSE TO THE WELD) TRANSVERSE TO THE WELD)o "_ C L

20" L a

W=ELD C.

L

W2 WMAX Wl Wo

% WI WFi WM WF2 W2 MPi MPFI MP MPF2 MP2 CONTINUOUS (C) cwmcw

LIR DAC 20% "o% MAX m 20. 20% on MAX - 20 OR SPOT(S) TOP OR( )TRANSVERSE M BOTTOM

(MAX) DAC A DAC DAC DAC DAC MAC DAC DAC OR PARALLEL (P)

REMARKS: k A/ 1 I

EXAMINEO BY LEVEL DATE UTILITY REVIEW DA

____R_ _WED_ ATE J__PAGE: l O L.

GE REVIEWED BY DATE ANIl REVIEW DT ou- e

Elm

cn 00 1 37 00137 V 23

Page 19: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

ULTRASONIC EXAMINATION DATA SHEETGE Nuclear Energy (MANUAL RPV 00 BASE MATERIAL)

SITE A)O AAS ",Rfy PROCEDURENO. •-."3.O REPORT NO. ---

UNIT 3 REVISION 4 DATA SHEET NO. D- 0 qy

PROJECT NO. 3 FRR NO. b fl 9 CALIBRATION SHEET 0.

SYSTEM SURFACE TEMP 1 °F COUPLANT U 1464661 EXAM START 135L

WELD ID V/3- THERMOMETER SIN L & ISO e-L BATCH NO. 093 Q// EXAM END 135"7

SURFACE CONDITION: IN SMOOTH 2 GROUND El OTHER gu/A

MATERIAL TYPE: EK CS El SS El OTHER AJI/ EXAM SURFACE: El ID W'OD

Lo REFERENCE rO•"& OIr=A09D C-3-1 Wo REFERENCE (AL.D - 0° SCANNING SENSITIVITY 5'Z dB

Wi WI W2 W2 CWlCCWIND. No. L % LOSS BW AMP 50% 100% 100% 50% TOP/BOTTOM

-I---- ZL. s- /I-, 3 a."

1. ,36.12 o 7.0 z.o-_._uj_3 C.• so Z~o 4.5- 4/' 1-

Eymb.rttq4n~ Lo kicE& fP•.ea-_ •. -At P•cyrt- t4~ or- 0i.5" -ro 52-4,5".

& A__ T k ai ______A 4T C-A t - ur- t 4e t K~ r' ; 1

REMARKS 4 ,,-yxic aa,,.7/ dug ti, iýpr Serab 4peagggo- 5LAe04-

EXAMIED BY nATE _ _ _ _ _ _ _

G BY ANII REVIEW DATE PAGE W OF: E A,

00138 tO 'A 0 - It.'

Page 20: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

I!

ULTRASONIC EXAMINATION DATA SHEET_E (MANUAL RPV VESSEL WELDS)

SE_ o N.REPORT NO.: E - I_

DATA SHEET NO.:-A)UNIT_ . __ REVISION NO.

CALIBRATION SHEET NO.: V. rIAPROJECTNO-A 0 ;19 FRRNO.: (-O/l' l w46s-. 0 J

SYSTEM , &i- EXAM SURFACE TEMP- -19 IF COUPLANT: 1LL4'6elV EXAM START:

WELD ID: J,-" ".-." THERMOMETER S/N L.OO tA-- BATCH NO.: 0 EXAM END.: IYE9 -

arv~l.. ' w Mo..Jr.~ r-l ~m A/A SURFACE CONOMrtI M SMOOTH [) GROUND M OTHER -VI

MATERIAL IYM Z S COs [3oTMER

Wo REFERENCE ( o J/r'L )

NOZZLE WELD REFERENCE SYSTEM (Lo AND Wo AREINTERCHANGED WHEN SCANNING FOR REFLECTORSTRANSVERSE TO THE WELD)

0-

E)"M SURFACE. M 5 0 00

oV SCAN SENSITIVITY dB450 SCAN SENSITIVITY L, .. dB

6V SCAN SENSITIVITY dB

WELD REFERENCE SYSTEM (Lo AND Wo ARE.INTERCHANGED WHEN SCANNING FOR REFLECTORSTRANSVERSE TO THE WELD)

CL

Lo

LL

W2 WMAX Wi Wo

WELD ~

MPF2 MP2 0o""uous (')OR SPOT (S)o 20% TRANSVERSE M

I DAC AC OR PARALLEL (P)

00139 .ac OF -1

Page 21: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

ULTRASONIC EXAMINATION DATA SHEET

(MANUAL RPV VESSEL WELDS)

ulrJM 3,

PROJECT NO" 00 7

PROCEDURENO.: ("r-aL"-r-300

REVISION NO (

FRRNO.: foci

REPORT NO.: E_. _. -

DATA SHEET NO.:- e "-c/

CALIBRATION SHEET NO.: am 0 I-

46- J/A . C-. .- / zoFRR NO.:

SYSTEM. , EXAM SURFACE TEMP: 73,•. EF COUPLANT: u£dt.ioAl-= EXAM START: / L

WELD IV* v- 3 - THERMOMETERS/N L-o • O _.L. BATCHNO.: 043011 EXAMEND.: .L'/

-AM AN•-L 00o 0E4•" oV E OER "SR,=E CO•NDI•TOk SMOOTH 0o.ROND 0OTHER

%AEL~m CS Oss 0onme ____________ EXAM SURPACE 03 [D 00O

LoREFERENCE TrOE" n•u.D 0-3-A O-SCAN SENSITIVITY &Ala dB

4s" SCAN SENSITIVITY .idi/ dBWo REFERENCE WJp G sr"sCAN SENSITIVITY - dB

NOZZLE WELD REFERENCE SYSTEM (Lo AND Wo ARE WELD REFERENCE SYSTEM (Lo AND Wo AREINTERCHANGED WHEN SCANNING FOft REFLECTORS -INTERCHANGED WHEN SCANNING FOR REFLECTORSTRANSVERSE TO THE WELD) TRANSVERSE TO THE WELD) -

-. CL

La20 LL

-L I I0!

LW2 WMAX Wi We

% Wa Wpi Wm WF2 W2 MPa MPFI MP MPF2 MP2 C0NnNUOUS (c) CWr..WL/R AC D% % MX 5 2D. 2% & MA 5n 20% OR SPOT (s) TOP OR

(DAC j 5% MAX) W .. opl DI D: TRANSVERSE M) BOTTOMMAX) DAC A~ D DAC DAC DAC D AC DAC DAC OR PARALLEL IP)

-I -s __al __ __ __ __ __ __ _____-

r-:)4 ddYO - ___ ___A-- ________-... / f - I o_0 1

EX INED BY LEVEL DATE UTLI RDEVAEW DATE

c?, /iVý _ __ _ PAGE:LLý OFW-JGE REVIEWED BY DATE ANII REVIEW DATE

00,140

Page 22: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

0

BROWNS FERRY UNIT-3 WELD LOCATIONS

O0 90* 1800 2100 3300 360' EL. 745" VESSEL FLANGE

C-5-FLG

C-4-5

C-3-4

C-2-3

C-I -2

C-BH-I

EL. 706"

EL. 573"

EL. 524.5"

EL. 404" TOP OF SHROUD-EL, 391,5"

EL, 372" 1BELTLINE REGION

EL, 258,5"

EL, 204'

EL, 125.5" SHROUD SUPPORT

0 EL, 121.5" BAFFLE PLATEn)UQou

GE NUCLEAR ENERGY BROWNS FERRY UNIT 3 VESSEL ROLLOUT & MANUAL PICKUP AREAS BF-3-VMA REV 0

Page 23: GGERIS 2000 Examination GE Nuclear Energy …GGERIS 2000 Examination GE Nuclear Energy Summary Sheet Project: TVA, Browns Ferry Nuclear Plant, Unit 3 System: Reactor Pressure Vessel

I I

798.10"

WELD

Nominal Clad T 3/16"Nominal Bose Metal T = 6 3/8"

(-A

GE NUCLEAR ENERGY G BROWNS FERRY UNIT 3 WELD V-3-C MANUAL PICKUP SCALE: NONE DWG. MANV-3-C REV. 0