Melbourne ‘04 ITALIAN ROADMAP: ITALIAN ROADMAP: Project’s Proposal for CSLF G. Girardi Italian Delegate in the CSLF Technical Group SEPCA SEPCA: Advanced Technologies for CO 2 Separation and Capture for Existing and Innovative Fossil Fired Power Plants CO CO 2 2 STOIT STOIT : Italian Geological survey for CO 2 storage and experimental tests CCP CCP: already proposed during Rome CSLForum C S L Forum 2nd Ministerial Meeting
Transcript
Page 1: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 1 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

ITALIAN ROADMAP: ITALIAN ROADMAP: Project’s Proposal for CSLF

G. GirardiItalian Delegate in the CSLF Technical Group

∅∅ SEPCASEPCA: Advanced Technologies for CO2 Separation and Capture for Existing and Innovative Fossil Fired Power Plants

∅∅ COCO22STOIT STOIT : Italian Geological survey for CO2 storage and experimental tests

CCPCCP: already proposed during Rome CSLForum

C S L Forum2nd Ministerial Meeting

Page 2: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 2 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

SEPCA: main goal

Development and demonstration of new generation plants for Development and demonstration of new generation plants for electricity and hydrogen production from fossil fuelselectricity and hydrogen production from fossil fuels

Technologies, components and new systems for hydrogenhydrogen production production and and forfor HH22/CO/CO22 separationseparation

Oxy firing: HH22--OO22 combustion with steam recyclingcombustion with steam recycling

GasificationGasification of coal (and biomass) + CCS

High efficiency / ultra low - zero emissions combustioncombustion

Plant IntegrationPlant Integration; Pre combustion technologies integrated in advancedhigh temperature gas turbine cycles

Page 3: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 3 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

SEPCA: Short term obiectives

Improvement and optimisation of highhigh--sulphur coals gasificationsulphur coals gasification

Testing and evaluation of different high and high and lowlow temperature temperature desulphurizationdesulphurization processes

Development and validation of simulation modelssimulation models, collection of experimental data for the scaling-up of pilot plant sections

Optimisation of waterwater--gas gas shift processshift process and catalysts characterisation

Testing and evaluation of differentdifferent COCO22 Separation processesSeparation processes

Lab testing on membrane membrane separation separation processes (CMR in particular)

Pilot scale testing on sorbent capture sorbent capture processes

Development of hydrogen purificationhydrogen purification systems

Page 4: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 4 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

SEPCA: Short-mid term milestones

Short/mediumShort/medium--term milestonesterm milestones

Realization of pilot plant (1 MW) for coal gasification and H2/electricity generation

Realisation of low scale integrated test rig for H2 and electricity production from coal

Experimental tests for development of advanced technologies

Medium/long Medium/long –– term milestonesterm milestones

Realization of industrial scale demonstration plant (10 to 100 MW) for coal gasification and H2/electricity generation

Demonstration of processes, components and integrated system

Page 5: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 5 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

SEPCA: Partners and funds

PartnersANSALDO – ENEL – CESI – SOTACARBO - CSMENEA - UNIVERSITIES: Genoa, Cagliari, Romne, Milan, Naples, etc..ENI (in CCP)

Funding

Ministry of Productive Activities (onward MAP)

Special fund for R&D on the Electricity System (MAP Decree26/01/2000)

Ministry of University Instruction and Research (onward MUIR):National Research ProgrammeOther funds

18M EURO actually

Cofunded by partners

Page 6: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 6 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

1 MW pilot plant

Gasification plant Depulverisation Desulphurization CO-shift

CO2 removalHydrogenseparation

Power generationsection

Elecrticpower

Coal

CO2

SynGas

CO

2ST

OR

AG

E

Page 7: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 7 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

Low temperature absorption:- Amine + water- Alkali Salts - Other sorbent

Desulphurization Section

Hot gas desulphurization:- copper and manganese oxides- zinc oxides- other metallic sorbents

DedustedSyngas

To shiftreactor

Syngas cleaning section (2)

Page 8: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 8 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

CO2 capture technologies to be tested

ShiftedSyngas

H2 richedSyngas

CO2

Solvent Absorption- Chemical solvent e.g. MEA- Physical solvent e.g. Selexol TM

Adsorption on a solid- Pressure Swing Adsorption (PSA)- Temperature Swing Adsorption (TSA

Membrane system

CO2 Capture Technologies

Page 9: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 9 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

COCO22STOITSTOIT

Italian Geological survey for CO2 storage and experimental tests.

it is divided in 3 lines:

∅∅ CONFIGEOLITCONFIGEOLIT: Italian Geological Survey for CO2 - from Electricity and Hydrogen Production Plants - storage

∅∅ SIBILLASIBILLA: EOR in Adriatic sea∅ feasibility study∅ demonstration tests

∅∅ PROMECASPROMECAS: ECBM prefeasibility study in Sardinia

Page 10: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 10 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

CONFIGEOLIT: Strategy and obiectives

to create an interdisciplinary group of stakeholders, and an agreement toward Policymakers and consequently the population

to define the feasibility in Italy of the “CO2 geological sequestration”

∅ to localise possible storage sites in Italy

∅ to characterize and assess CO2 storage capacity

∅ to define the better localization sites for fossil fired hydrogen hubs

Geological sequestration in Italy has a wider interest, as it isa good example of storage in a tectonic active area

Page 11: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 11 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

CONFIGEOLIT: 2 stages (3+5 years)

first stagethe selection of the best sites in the different geologic domainsthe location of the main industrial CO2 sources and sites for the storageto define the better localization sites for fossil fired hydrogen hubsa first analysis on the CO2 pipelines costs and safety

The project will then (5 years) develop new techniques and efforts to find and characterize other CO2 storage sites, in view of siting advanced fossil fired hydrogen hubs.

Page 12: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 12 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

CONFIGEOLIT: Partners

OGSINGVENIENEACESIENEL Universities (La Sapienza Rome, Roma3, Padua, Polytechnic School of Milan, ..)Consortium of universities and CNR institutes dealing with CO2 storage researchConsortium of private companies involved in CO2 storage expertises

Page 13: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 13 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

CONFIGEOLIT: Funds

Ministry of Environment (onward MATT)Ministry of Productive Activities (onward MAP)Special fund for R&D on the Electricity System (MAP Decree 26/01/2000)Ministry of University Instruction and Research (onward MUIR)IndustryCO2 emissions stakeholders consortium (steel/power/refinery industries, environmental protection agencies, etc…)

Page 14: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 14 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

WHERE IN ITALY

The saline aquifers, oil and gas depleted reservoirs, either on-shore or off-shore, are particularly well distributed in the Padanian back-arc basin and in the Adriatic see.These geological structures are extended from the Padania Valley to the Sicily. They offer the presence of different natural analogues and depleted oil and gas reservoirs, useful for the project.

Page 15: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 15 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

SIBILLA: Italy EOR Demonstration Site

Objective 2Objective 2Recovery of approx. 6 million barrels of crude oil in 10 years.

Objective 1Objective 1sequestration of 1.5 million tonnes of CO2now produced (vented) by the Falconara gassifier.Captured @ 550 tonnes/day (83 Bars) peak. 10 years.

60 km to connect: two pipelines (CO2, oil) along pre-existing natural gas pipeline corridor

Page 16: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 16 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

Existing water injector (1)

Existing oil producer (3)

New oil producer (3)

New CO2 injector (2)

Existing well site (2)

Existing well (4)

New well (2)

New sidetrack (3)

Santa Maria Oil Field

EOR SIBILLA

WaterAlternatinggas

Page 17: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 17 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

0

0,1

0,2

0,3

0,4

0,5

0,6

0,7

0,8

0,9

1

1,1

1,2

1,3

1,4

1,5

1,6

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

cum

ulat

ive

CO

2 st

ored

(mill

ion

ton)

Projected CO2 Storednet of recycled CO2

0,16 0,16 0,16 0,160,15 0,15 0,15 0,15

0,13 0,13

0

0,02

0,04

0,06

0,08

0,1

0,12

0,14

0,16

0,18

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

CO

2 st

ored

(mill

ion

ton

/ yea

r)

BASE CASE

approximately 1.5 million ton of CO2 stored2007 - 2016

CONFIDENTIAL

Page 18: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 18 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

SIBILLA: Partners and Funding

INGV (Project management and know how)API (refinery, petrol retailing: CO2 producerIndipendent Energy Solution (know how)Edison (oil wells)

Ministry of Environment (onward MATT)Cost: 0.5 Meuro (MATT)

PARTNERS

FUNDING

Page 19: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 19 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

PROMECAS

The SULCIS coal basin exhibits a general deepening of the productive strata reaching 800 m injection depth.

main goal:to exploit an ECBM technique throughout the Sulcis Coal Province, mainly aimed at CH4 production

Main expected results:∅ feasibility study for the ECBM technique development for the

coal bed strata deeper than 800 m to inject CO2 at supercritical conditions

∅ Environmental / energetic analysis

Funding

Regional Government of Sardinia, cofunded by partners

a prefeasibility study for ECBM in Sardinia

Page 20: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 20 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

Sulcis-Iglesiente Coal Field

SardiniaS-W area

Partners

SOTACARBOINGVENEAUNIVERSITY OF CAGLIARI

Page 21: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 21 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

PROMECAS Project phases

Phase 3:Selection and Evaluation of engineering solutions

Survey of CO2 sources in the Sulcis area

Phase 1 :Mineralogical, chemical and physical characterisation

of Sulcis coal

Phase 2:Survey of geological, hydro-geological Sulcis coalfield.

(particularly on deep coal seams (500- 1500 m under sea level)Verification of ECBM technology applicability

Page 22: Girardi G Wed Pal AB 1100 - CSLForum€¦ · 15.09.2004  · C S L Forum 2nd Ministerial Meeting. Page 2 of 33 Melbourne ‘04 Italian Technology Roadmap: Project’s proposal for

Page 22 of 33

Melbourne ‘04

Italian Technology Roadmap: Project’s proposal for CSLF CSLForum Melbourne, 13 – 15 September 2004

Conclusion

Italian Companies Italian Companies and and Research InstitutionsResearch Institutionsare are cooperating for developmentcooperating for development

and and application application of of advanced technologiesadvanced technologies