1
Use ofGeospatial Services
in Indian Railways
Vision & Mission of Railway Ministry
Providing safe, efficient, affordable, custom focused andenvironmentally sustainable integrated transportationsolution.
VISION-
MISSION Areas (amenable to space inputs) -
Augment capacity by• Constructing new lines & double lines• Signalling Improvements.
Innovate & update in terms of technologicaladvancement to achieve best possible standards ofsafety in train operation
IR – Network and Resources At a Glance
• 66,000 Route Km;
• Predominantly Broad Gauge – 58,177 Route km s(88%)
• Electrified route km -39% (26,300 Route Kms)
• 7,133 Stations ,10500 Locomotives , 250000 wagons & 66,000 coaches
• 3 Passenger CaoachManufacturing Units, 2 Locomotive Manufacturing Units, 2 Wheel and Axle Plant and 1 Locomotive Rebuilding Plant
• 1.33 Million Employees
IR – Network at a Glance
High Density Corridor
Golden Quadrilateral + Diagonals
16% of route Km carries 52% of passenger & 58 % of freight
Transportation Statistics
Freight Operations
• 1052 million Ton
• 666 billion Net Ton KM
• Major commodities –coal, iron ore, steel, cement, fertilizer, POL, container
• 7000 + freight trains per day
Passenger Operations
• 8450 million Originating Passengers;
• 53% suburban, 47% non suburban
• 1098 billion Passenger KM; 14% suburban, 86% non suburban
• 12,000+ passenger trains per day (23m pass /day)
The Next 5 years … Eastern and Western Dedicated Freight
Corridors (3300 km)
New Lines – 4000 km
Doubling – 7500 km
Gauge Conversion – 5500 km
Electrification – 10,000 Route kms
Develop High speed Corridors
New terminals and terminal development
Past & Current Usage of Space Technology Past & Current Usage of Space Technology
Use of Space Technology grouped in two categoriesUse of Space Technology grouped in two categories
Remote Sensing based
applications
Satellite Communicationbased
applications
Past & Current Usage of Space Technology Past & Current Usage of Space Technology
Remote Sensing based Applications
Satellite Imaging for new railway line alignment. Geo-fencing applications for Mobile unreserved
ticketing. Asset Mapping – Pilot for Delhi division done.
Work in progress for complete Railways.
Remote Sensing based Applications
Satellite Imaging for new railway line alignment. Geo-fencing applications for Mobile unreserved
ticketing. Asset Mapping – Pilot for Delhi division done.
Work in progress for complete Railways.
New Line Survey Land Asset Mapping
Remote Sensing based Applications (Contd…)
Remote Monitoring of Locomotives.
Passenger Information System in Mumbai Suburban trains.
GPS based clocks for synchronised timings.
Remote Sensing based Applications (Contd…)
Remote Monitoring of Locomotives.
Passenger Information System in Mumbai Suburban trains.
GPS based clocks for synchronised timings.
Past & Current Usage of Space Technology Past & Current Usage of Space Technology
PIS in Mumbai Suburban train
Past & Current Usage of Space TechnologyPast & Current Usage of Space Technology
Satellite Communication based Applications
Emergency/Disaster Communication from remote locations using Satellite phones and V-SAT Terminals.
V-SAT terminals for extending the connectivity to the remote locations for passenger reservation system, fright operation information system.
Wi-Fi internet connectivity in 3 rakes of Howrah Rajdhani Express.
On board satellite TV (Palace on Wheels).
Satellite Communication based Applications
Emergency/Disaster Communication from remote locations using Satellite phones and V-SAT Terminals.
V-SAT terminals for extending the connectivity to the remote locations for passenger reservation system, fright operation information system.
Wi-Fi internet connectivity in 3 rakes of Howrah Rajdhani Express.
On board satellite TV (Palace on Wheels).
GIS Enablement of Indian Railways
• Group to be served– External Customers– Internal Users (customers) – O&M
• External Customers– Passengers– Freight customers
11
• External customers - Passengers– Passengers planning their journey
• Train options & Route options• Can be served with/on WMS with relevant attributes• Linkage with –
– Passenger Reservation System (PRS) – National Train Enquiry System (NTES)
– Query about Train Running• To Board or to Receive• Linkage with –
– Control Office Application (COA) & NTES
12
GIS Enablement of Indian Railways
• External customers – Freight – Running status of identified BULK freight trains– Linkage with –
• COA & FOIS
13
GIS Enablement of Indian Railways
• Internal Users – Operation & Maintenance– Train running query – similar to external
customers• Linkage with – COA & NTES
– Maintenance of Assets• WMS/WFS service with identified attributes• In different layers with defined authorisation
– Viz. Track, Bridges, Signal, Electrical installations, Land, Building & structures, etc.)
• Linkage with –– Respective RDBMS Applications
14
GIS Enablement of Indian Railways
• Internal Users – Operation & Maintenance– Project Management/Monitoring
• WMS service• Linkage with – Respective P.M. Application• Video feed
15
GIS Enablement of Indian Railways
• Disaster Management– WMS/WFS Service from all layers– Linkage with various RDBMS Applications– Info from external resources
• Viz. hospitals, PS, Distt. Hq., road network, etc– Linkage with – Bhuvan, SOI wms/wfs feed,
google map, Bing map, mapmyindia, etc
16
GIS Enablement of Indian Railways
• What is needed : Action Points– Survey & Mapping– GIS Portal, Data centre– Application development– Route and Asset publishing– Linkage with other Applications (PRS, COA,
TMS, LAMS, SMS, etc)
17
GIS Enablement of Indian Railways
• Survey & Mapping – SBAS– Routes, lines, yards etc
• Geo-mapping & Chainage mapping
– Assets –• On/Along Track – level crossings, bridges, signals, electrical
assets, other track features, stations, cabins, etc.– Geo-mapping & Chainage mapping
• Off Track – Productions Units, Workshops, buildings & structures, land, electrical installations, etc.
– Geo-mapping
18
GIS Enablement of Indian Railways
• GIS Portal, Data centre– GIS Platform (CRIS and Railways)– Hardware & Software (CRIS & External Agency)– Application development (CRIS and external agency)– Route & Asset data scrutiny and publishing– Linkage with other Applications (PRS, COA, TMS,
LAMS, SMS, etc)
19
GIS Enablement of Indian Railways
• Route & Asset Survey– On/Along Track –
• RDPS (Route Data File Preparation system) – trolley mounted device.
• POC completed in Delhi division• Started in other divisions.• Target date : 12/2015
– Off Track Assets –• Hand held devices with pre-defined forms to be used.
20
GIS Enablement of Indian Railways
Route Data (File) Preparation System (RDPS)
Mapping of Land Asset
Mapping of Land Asset
Mapping of Land Asset
Mapping of Land Asset
Mapping of Land Asset
Land plan on satellite Imagery
Land plan on satellite Imagery
Land plan area
Authenticated land plan
Check on encroachment
• POC of Delhi division completed• Planning done for Pan-India done and work being
started.• Satellite nodes of Bhuvan and SOI• WMS/WFS feed bundled with GIS platform• Data centre in CRIS, Delhi.• Indian Railways’ Geo-Portal being established.
6/3/2015 B. P. Awasthi 32
GIS Enablement of Indian Railways
New Initiatives PlannedNew Initiatives Planned
• Passenger Information System in all coaches of mainline superfast trains
• Mapping of IR Assets including land, monitoring of encroachments, establishing IR Geo-portal
• Feasibility study for new Routes & Alignments
• Identification and assessment of flooding vulnerability of rail bridges
• Mapping of Land slides in Hilly Area/ Ghat Sections
• Feasibility of usage to increase safety at Unmanned Level Crossing without intervention of train drivers
• Disaster support, Disaster Management and Disaster vulnerability mapping
Expected Benefits from New InitiativesExpected Benefits from New Initiatives
• Enhancing safety in Train operations.
• Dissemination of information to Passengers on Real time basis.
• Effective utilization of Railways assets.
• Effective Asset/Land utilisation & Encroachmentmonitoring and prevention
• Significant cost and time reduction in Project implementation
• Identification of vulnerable stretches with respect to floods, landslides etc,
• Effective and efficient management of Railways
Institutionalization & Capacity BuildingInstitutionalization & Capacity Building
• MoU between Railways and ISRO is under finalisation.
• Establishing BHUVAN node in Railways Data Centre for departmentalapplications and citizen centric services
• This will provide Bhuvan imagery WMS service to Indian RailwaysGeoPortal
• Capacity Building –
• Training of Trainers for Centralized Training Institutes of IndianRailways.
• Customized courses on Geospatial Technology Tools for RailwayOfficials.
• Technical guidance for various geospatial applications
36
Lets Change Lets Change TheThe
Way We Way We Think n WorkThink n Work