    SOLOMON ISLANDS:

    GIZO URBAN PROFILE

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    2/40

    ACKNOWLEDGEMEN S

    Te Gizo own Prole was prepared by ony Hou and Donald Kudu with information collected through interviews withkey urban stakeholders in Gizo. We wish to thank them for their time, efforts and contributions toward this report. Tisproject and report was coordinated by Peter Buka (Director of Lands in Gizo) and Stanley Wale, the Under Secretary of theMinistry of Lands, Housing and Survey (MLHS) with constructive inputs provided by Sarah Mecartney, UN-Habitats PacicProgramme Manager based in Suva, Fiji and the Senior Human Settlements Officer, UN-Habitat Regional Office for thePacic, Mr. Chris Radford.

    Design and layout: Moses Ochieng

    Copyright@ United Nation Human Settlements Programme (UN-Habitat), 2012

    All rights reserved

    United Nations Human Settlements Programme publications can be obtained from

    UN-Habitat Regional and Informal Offices or directly from:

    P. O. Box 30030, GPO 00100 Nairobi, Kenya,

    Fax: + (254 20) 762 42667

    E-mail: [email protected]

    Website: http://www.unhabitat.org

    HS Number: HS/079/12E

    ISBN Number (Series): 978-92-1-132023-7

    ISBN Number (Volume): 978-92-1-132493-8

    DISCLAIMER

    Te designation employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city orarea, or of its authorities, or concerning delimitation of its frontiers or boundaries, or regarding its economic system or degreeof development. Te analysis, conclusions and recommendations of the report do not necessarily reect the views of the UnitedNations Human Settlements Programme (UN-Habitat), the Governing Council of UN-Habitat or its Member States. Any

    weaknesses of the report remain with the authors. Excerpts from this publication may be reproduced without authorization,on condition that the source is indicated.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    3/40

    TABLE OF CONTENTS

    SOLOMON ISLANDS:GIZO URBAN PROFILE

    FOREWORD 5

    EXECUTIVE SUMMARY 6BACKGROUND 8

    GOVERNANCE 12

    INFORMAL SETTLEMENTS AND HOUSING 15

    URBAN-RURAL ECONOMY 18

    SECURITY AND RESILIENCE 21

    LAND AND PLANNING ISSUES 23

    PROJECT PROPOSALSGOVERNANCE 26

    INFORMAL SETTLEMENTS AND HOUSING 28

    URBAN-RURAL ECONOMY 18

    SECURITY AND RESILIENCE 21

    LAND AND PLANNING 34

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    4/40

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    5/40

    5

    F O R E W O R D

    FOREWORD

    According toresearch publishedin UN-Habitats 1 agship report, TeState of the WorldsCities 2010-2011,all developingregions, includingthe African,Caribbean andPacic states, willhave more peopleliving in urban thanrural areas by theyear 2030. Withhalf the worldspopulation already living in urban areas, the challenges

    we face in the battle against urban poverty, our quest forcities without slums, for cities where women feel safer,for inclusive cities with power, water and sanitation,and affordable transport, for better planned cities, andfor cleaner, greener cities is daunting.

    But as this series shows, there are many interestingsolutions and best practices to which we can turn. Afterall, the gures tell us that during the decade 2000 to2010, a total of 227 million people in the developingcountries moved out of slum conditions. In other

    words, governments, cities and partner institutions havecollectively exceeded the slum target of the MillenniumDevelopment Goals twice over and ten years ahead ofthe agreed 2020 deadline.

    Asia and the Pacic stood at the forefront of successfulefforts to reach the slum target, with all governmentsin the region improving the lives of an estimated 172million slum dwellers between 2000 and 2010.

    In sub-Saharan Africa though, the total proportionof the urban population living in slums has decreasedby only 5 per cent (or 17 million people). Ghana,Senegal, Uganda, and Rwanda were the most successfulcountries in the sub-region, reducing the proportions ofslum dwellers by over one-fth in the last decade.Some 13 per cent of the progress made towards theglobal slum target occurred in Latin America and theCaribbean, where an estimated 30 million people havemoved out of slum conditions since the year 2000.

    Yet, UN-Habitat estimates conrm that the progressmade on the slum target has not been sufficient tocounter the demographic expansion in informalsettlements in the developing world. In this sense,efforts to reduce the numbers of slum dwellers areneither satisfactory nor adequate.

    1 UN-Habitat - United Nations Human Settlements Programme

    As part of our drive to address this crisis, UN-Habitatis working with the European Commission and theBrussels-based Secretariat of the African, Caribbeanand Pacic (ACP) Group to support sustainable urbandevelopment. Given the urgent and diverse needs, wefound it necessary to develop a tool for rapid assessmentand strategic planning to guide immediate, mid andlong-term interventions. And here we have it in theform of this series of publications.

    Te Participatory Slum Upgrading Programme is basedon the policy dialogue between UN-Habitat, the ACPSecretariat and the European Commission which datesback to the year 2002. When the three parties met atUN-Habitat headquarters in June 2009, more than 200

    delegates from over 50 countries approved a resoundingcall on the international community to pay greaterattention to these urbanization matters, and to extendthe slum upgrading programme to all countries in the

    ACP Group.

    It is worth recalling here how grateful we are that theEuropean Commissions 9th European DevelopmentFund for ACP countries provided EUR 4 million (USD5.7 million at June 2011 rates) to enable UN-Habitatto conduct the programme which now serves 59 citiesin 23 African countries, and more than 20 cities in sixPacic, and four Caribbean countries.

    Indeed, since its inception in 2008, the slum upgradingprogramme has achieved the condence of partners atcity and country level in Africa, the Caribbean and inthe Pacic. It is making a major contribution aimedat helping in urban poverty reduction efforts, as eachreport in this series shows."

    I wish to express my gratitude to the EuropeanCommission and the ACP Secretariat for theircommitment to this slum upgrading programme. Ihave every condence that the results outlined in thisprole, and others, will serve to guide the developmentof responses for capacity building and investments inthe urban sector.

    Further, I would like to thank each Country eam fortheir continued support to this process which is essentialfor the successful implementation of the ParticipatorySlum Upgrading Programme.

    Dr. Joan ClosExecutive Director, UN-Habitat

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    6/40

    FOREWORD

    Te populationof the Pacic isrelatively small by

    world standards,but it is facing a fastrate of urbanisationand high populationgrowth. Te 2009national censusrevealed that almost20% (102,030) ofSolomon Islandstotal populationlived in urban areas.But populationgrowth is rapidlyincreasing, with the annual rate of 4.7% urban growth,

    it is projected that by 2020, 26% of the countryspopulation will be living in urban and peri-urban areasif the present trend continues.

    In the Solomon Island, urban growth is often negativelyperceived as unemployment and environmentaldegradation have increased and poorly serviced informalsettlements have continued to develop. Tese trendshave been exacerbated by weak planning, managementand governance and national polices which haveprioritised rural development over urban development.Consequently, it is hoped that this Urban Prolingstudy will assist in mitigating these unfortunate trends.Gizo is the provincial centre for Western Province andis located approximately 370 kilometres from Honiara,the capital of Solomon Islands. It serves as the maineconomic link between Honiara and the rural villages inthe Western province. Gizo has a population of 7,177and has grown rapidly over recent decades to becomethe second largest town in the Solomon Islands.

    Gizo is renowned for its lagoon and prime diving sitesand is a major tourism destination in the country. But,in spite of this favourable economic condition, Gizostill experiences incidents of poverty as reected inthe rapid growth of sub-standard housing, inadequate

    water supply and a lack of amenities (sanitation andsolid waste management in particular). Te majorconcerns for the Western Provincial Authority (WPA)are: (1) good governance and effective town planningand management of informal settlements and landmobilization to meet the demands of the growing townpopulation and, (2) the provision of quality urban

    environmental services. Te Gizo Urban Prole examinesve key areas (governance, informal settlements andhousings, the urban-rural economy, urban safety andresilience, and land and planning issues) which havehighlighted the ineffective town administration andpoor urban planning and management partially due toa lack of technical and experienced human resources,limited nancial support from the central government,poor internal revenue, and bad governance.

    Tis study intends to assist Gizo authorities to identifydevelopment needs and capacity issues that will supportthem to design enabling policies and regulations focusingmore on poverty reduction at the provincial and rurallevels. Tis is an important contribution towards the

    Solomon Islands national efforts to achieve MillenniumDevelopment Goals (MDG) 7, arget C (reducing byhalf the number of people without sustainable access tosafe drinking water) and arget D (achieving signicantimprovements in the lives of at least 100 million peopleliving in informal settlements by 2020). As part of thegovernments efforts to achieve the MDG 7 ( arget D)the Ministry of Lands Housing and Survey has includedin their Corporate Plan a policy intention to regularise

    emporary Occupation Licences to more secure xedterm estates by 2020 (MLHS, 2010).

    On behalf of the Western Provincial Authority and theresidents of the city, I fully endorse the Gizo UrbanProle and look forward for further engagement withUN-Habitat to support the efforts and plan to improvethe image and progress of our city.

    George LiloPremier, Western Province

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    7/40

    7

    E X E C U T I V E

    S U M M A R Y

    EXECUTIVE SUMMARY

    INTRODUCTION

    Te Participatory Slum Upgrading Programme(PSUP) is an accelerated and action-oriented urbanassessment of needs and capacity-building gaps at thecity level. Te programme is supported by funds fromthe European Commissions European DevelopmentFund and it is currently being implemented in over 30

    African, Caribbean and Pacic Countries. PSUP usesa structured approach where priority interventionsare agreed upon through consultative processes. TePSUP methodology consists of three phases: (1) arapid participatory urban proling at national andlocal levels, focusing on Governance, Local EconomicDevelopment, Land, Gender, Environment, Slums and

    Shelter, Basic Urban Services, and Waste Management,and proposed interventions; (2) detailed priorityproposals; and (3) project implementation. PSUP inSolomon Islands encompasses a national prole, as wellas proles for Honiara, Auki and Gizo, each publishedas a separate report. Tis is the Gizo report and itconstitutes a general background, a synthesis of the vethemes; governance, informal settlements and housing,urban-rural economy, security and resilience, and landand planning.

    BACKGROUND

    Gizo is the provincial centre for Western province andis located approximately 370 kilometres from Honiara,the capital of Solomon Islands. It serves as the maineconomic link between Honiara and the rural villages inthe Western province. Gizo has a population of 7,177and has been growing rapidly over the recent decades tobecome the second largest town in the Solomon Islands.

    Gizo is renowned for its sparkling lagoon and primediving sites and is a major tourist destination in thecountry. But, in spite of this favourable economiccondition, Gizo still experiences high rates of poverty asreected in the rapid growth of sub-standard housing.Inadequate water supply, lack of amenities (sanitationand solid waste management in particular), and a risein informal settlements are key features of Gizo. Temajor concerns for the Western Provincial Authority 1 (WPA) are: (1) good governance, effective townplanning and management of informal settlements andland mobilization to meet the demands of the growingtown population and, (2) the provision of quality urbanenvironmental services.

    GOVERNANCE

    Te Western Provincial Authority is mandated underthe Provincial Government Act (PGA) and the ownand Country Planning Act ( CPA) to provide town1 Western Provincial Authority (WPA) and Gizo authority are

    used interchangeably. They refer to the provincial executive orgovernment that heads the provincial administration.

    planning and urban management to the urban and ruralpopulation on behalf of the central government. Tecapacity to deliver better services and good governanceare the main concerns that the Western Provincial

    Authority faces as it tries to respond to new challengesafter years of neglect and political interference. Te

    Authority is under-resourced, poorly equipped andlacks skilled human resources. It is further constrainedby the dependence on (limited) central governmentgrants and poor internal revenue, which is currentlyaddressed through the operation of the ProvincialGovernment Strengthening Project (PGSP).

    Public participation in civic issues affecting the welfare

    of citizens is weak. Te setting up of the Gizo ownCommittee (G C) and a Local Business Group(LBG) in Gizo may provide the entry point forbetter governance. It will also require coordinationby the Western Provincial Authority to improvecommunication and meaningful participation fromvarious stakeholders in Gizo.

    INFORMAL SETTLEMENTS AND HOUSING

    About 25 percent of Gizos population (7,177) residesin four informal settlements and pockets of temporaryhousing located on crown land. Informal settlements are

    situated on vulnerable locations such as on steep slopesand swampy areas. Te residents of these settlementslack water, sanitation, health services, power, security,garbage collection facilities, and security of land tenure.Tey are at risk should the Commissioner of Lands givethe land to property developers. Te quality of housesin these settlements is poor as they are erected frombush materials. Residents of these settlements dependentirely on informal economic activities for their dailysurvival.

    Gizo Authority is unable to effectively address theincreased demand for better infrastructure and servicesin these settlements. Te Authority does not have apolicy to manage or upgrade informal settlements orthe resources and personnel to implement an actionplan. Te key challenge for Gizo authorities andphysical planners is to improve planning and effectivelyimplement a strategic action plan that better managesinformal human settlements.

    THE URBAN-RURAL ECONOMY

    Gizo Authority relies on three main sources of revenuefor its budget; internal revenue (shing, logging,business licenses, land rent, property rates, andtransport levies), which contribute 45 percent, annualgrants from the central government (42 percent) andthe remaining 13 percent from the Provincial CapacityDevelopment Fund (PCDF). Internal revenuecollection has improved from 47.5 percent in 2009 to

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    8/40

    EXECUTIVE

    SUMMARY

    75 percent in 2010. Businesses contribute 38 percent

    of Gizo Authoritys total internal revenue, followedby return from investments (36 percent). Tere is aneed to diversify the economic base, to build properroad networks and improve inter-island shipping toencourage more rural people to participate in the localeconomy.

    SECURITY AND RESILIENCE

    Law and order is provided by the Central Governmentthrough the Royal Solomon Islands Police Force(RSIPF). Te Gizo police station is manned by 34staff who work with few resources under poor workingconditions. Te security situation in Gizo is describedas peaceful except for minor incidences relating todrinking beer in public. Te major challenge for thepolice is to contain drinking beer in public places andto provide effective policing as the population in Gizoincreases.

    URBAN RESILIENCE

    Gizo town is located along the coast and is vulnerable tosea level rise. Te itian and Fishing Village are locatedless than ten metres from the shoreline and are the mostvulnerable settlements on Gizo Island. Climate changeand natural disasters are a growing concern with theincreased frequency and intensity of weather events(earthquakes, landslides and storm surges). However,people continue to build their houses on steep gradients,along the coastal and low-lying areas. Te key challengefor the Gizo Authority and the central governmentis to relocate the most vulnerable settlements and toensure zoning and development controls are in place toprevent future construction on steep sites and along thecoast in the future.

    LAND AND PLANNING ISSUES

    Access to land is a critical issue in Gizo as the processof acquiring land is lengthy given that power to allocateland rests with the Commissioner of Lands in Honiara.Gizo town suffers badly from ineffective planningas evidenced by poor parking, poor road design, lackof recreational areas, and poor drainage. Te rapidgrowth of informal settlements and erection of sub-standard housing on steep slopes are signs of ineffectiveplanning and poor enforcement of land and planningregulations. Te key challenge for policy makers andphysical planners is to effectively and systematicallyaddress the rising number of unregulated settlementsin Gizo. Shortage of skilled personnel, funds, and

    resources are additional obstacles in the improvementof the towns management.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    9/40

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    10/40

    GZO U

    RBA

    NPROFLE-BACKGROUND

    0

    THE TOWN ADMINISTRATION

    Te Western Provincial Authority is mandatedunder the Provincial Government Act and the ownand Country Planning Act to provide effective andsustainable town planning and management, servicedelivery and administration to residents of Gizo andthe surrounding areas. Te Provincial Government

    Act allows for the Western Provincial Authority to setproperty rates, market fees and business licenses andto collect such revenues. In executing these duties,the Western Provincial Authority has been historicallyaffected by bad governance and weak nance andtechnical capacity, leading to poor delivery of qualityadministration and planning. High dependency on

    (limited) central government grants3

    a small internalrevenue base and weak collection continues to affecteffective service delivery in Gizo.

    Te ongoing political interference in the budget,staff appointments and promotions has hamperedthe effective administration of Gizos affairs over thepast years. However, following the operation of theProvincial Government Strengthening Project (PGSP)4 internal revenue collection has improved and soundnancial management practices are in place, leading toimproved work ethic and work outputs (Rodi, 2011).Te Western Provincial Authority however, still lackscapable personnel in some of its departments, partly due

    to lack of housing availability in Gizo and a constrainedoperational budget, limiting the Western Provincial Authoritys ability to effectively execute its mandatoryduties and functions.

    Te Western Provincial Administration has a total staffof 190, of which 130 are direct employees and 60 havebeen transferred from the central government. Directemployees occupy the lower and middle technicallevel and about 10 percent of the upper managementlevel. Many of these employees are inexperienced andunskilled and lack the technical and administrativecapacity to execute their duties effectively. Prioritytherefore, should be given to these direct employeesfor long and short term training in technical andmanagerial areas.

    3 WPA received 62.5 percent or SBD$13, 645,621 from theCentral Government and 37.5 percent or SBD$5,117,107 frominternal revenue (Western Province, 2009/10).

    4 The Provincial Government Strengthening Project (PGSP) isfunded by the UNDP and operates through the Ministry ofthe Provincial Government. It is aimed at building the capacityof the Gizo Authority in terms of nancial management andplanning.

    Gizo authorities face many critical capacity issues. Acorporate planning framework, which integrates otherstakeholders (civil society, donors, private sector, andgovernment) to provide a platform that can ensureeffective delivery of services to Gizo residents and ruralcitizens, is recommended. Te framework is likely toenhance effective planning, management and controlin areas of settlement planning and illegal developmentand to enforce Gizo policies on standard buildings anddesign in the interest of the long term planning andmanagement of the town. Tere is need to strengthenlocal governance in order to sustain its legitimacy andimprove capacity of other institutions and departmentsto discharge their functions (Storey, 2006:6) moreeffectively. Tis requires a combination of legal,administrative and nancial reforms.

    BASIC URBAN SERVICES

    As Gizos population grows rapidly, so does the solid waste generated from households, industries, offices,local markets, and shops, which has a negative impacton the coastal environment. Gizos high urban growthrate places a heavy demand on already stressed servicesand infrastructure. Te existing water and seweragereticulation systems, which were designed for apopulation of 1,000 people in the 1950s, cannot cope

    with the present demands.

    SOLID WASTE MANAGEMENT

    Te town lacks proper landll facilities and dumpingand burning of solid waste on open land is common.Gizo town suffers badly from littering and lackof regular rubbish collection. Tese problems arecompounded as Western Provincial Authorities lack thenancial resources, proper refuse facilities and skilledhuman resources. Solid waste management is therefore,a critical environmental issue for the Western Provincial

    Authorities.

    WATER

    Gizo town has been experiencing deteriorating water quantity and quality over recent years. Teexisting water system was designed in the 1950s for apopulation of 1,000 and cannot cope with the presentdemand. Solomon Islands Water Authority (SIWA)is yet to formally set up in Gizo. About 60 percent of1,335 households in Gizo that have access to the watersupply, which includes shared communal stand pipes,have no metres. Water is an issue that needs urgentattention by the Water Provincial Authorities in closeconsultation with donors, the private sector, and civilsociety organizations.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    11/40

    11

    G I Z O

    U R B A

    N P R O F I L E -

    B A C K G R O U N D

    SANITATION

    Gizo has a sewerage system that serves less than 30percent of 1,335 houses in Gizo. Te new buildingsuse septic tanks. Te majority of houses that are locatedalong the coast dump their human waste into the bushand near the sea.

    EDUCATION

    Gizo and nearby villages have six pre-schools, fourprimary and three secondary schools, with more than2,000 students and 96 staff members. Tese schools

    were destroyed during the April 2007 tsunami andhave been rehabilitated with nancial support from theNew Zealand Agency for International Development, Australian Agency for International Development andEuropean Union (EU), allowing for adequate spacefor students and staffing needs. Student to staff ratioin most schools has been reduced to 35:1 comparedto 60:1 in 2008. Tere is still a need to improve theexisting teaching facilities in some schools and to builddecent houses for teachers.

    HEALTH

    Gizo town and surrounding communities are servedby Gizo hospital and two aid posts, with a total staffof 62 (42 nurses, three doctors and 17 nurse aides).Te hospital has 3 wards and 30 beds with a staff topatient ratio of 1:50. Acute respiratory diseases suchas pneumonia, malaria and diarrhoea are the mostcommon diseases. Te existing hospital was built inthe 1950s and was badly damaged by the April 2007tsunami. Te Japanese Government funded a newhospital, which was officially handed over to the centralgovernment on 19 August 2011. Te new hospital willbe a referral hospital; therefore it is critical that theexisting aid posts are upgraded to the status of clinicso that accessibility to health services is improved forGizo residents and other villagers near the town. Te

    major challenge for the Western Provincial Authorityis to maintain the standard of the new hospital and itsfacilities.

    GARBAGE COLLECTION

    Garbage collection is a critical environmental issue inGizo. Te Western Provincial Authority set up the Gizoown Committee 5 and receives an annual grant of SBD

    150,000 to carry out garbage collection in the town.Gizo own Committee lacks proper landll equipmentand the use of open spaces for garbage disposal andburning is frequently practiced in Gizo. Te mainlandll is located on the coast, approximately threekilometres from the town. Garbage is often pushed intothe sea polluting the marine and coastal environments.

    Lack of proper refuse facilities, shortage of workers andlimited funds continues to affect service collection inGizo. Tis has led to residents dumping their garbage inthe bushes and along the roads which is an eyesore. Solid

    waste generated from shops, households and offices aredumped on the roadside and often not collected for

    weeks, creating public health and road safety risks andresulting in the degradation of the environment.

    Te current environmental regulations and by-lawsneed re-enforcement and reviewing to better reectthe changing socio-economic climate (for example,regulation governing littering in public places).

    raining in environmental planning and assessmentfor staff is vital as well as environmental awarenessprogrammes for Gizo residents. Te need to work

    together with all urban stakeholders with regards toenvironmental planning and management is critical, ifthe environmental image of Gizo is to be improved andin order to enhance tourism development.

    Tere is need for wider participation from the Gizocommunity in waste management and to educateresidents to be more responsible for their waste. Techallenge for the Gizo own Committee is to providerubbish bins in strategic locations in the town and toresume with garbage collection on a regular basis.

    5 Gizo Town Committee consists of representatives from theWorld Wildlife Fund, Telekom, Red Cross, and the community.The committee works closely with the Western ProvincialAuthority in managing the urban environment in Gizo town.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    12/40

    GZO U

    RBA

    NPROFLE-BACKGROUND

    2

    PUBLIC TRANSPORT

    Public transport is yet to be formalized in Gizo, buttransport providers cooperate informally to set theircharges, which results in uniform, zone based fares. Temain road in Gizo is tar-sealed, while other feeder roadsthat lead to residential areas in Gizo and to the informalsettlements and villages are not properly maintained.Te use of out-board motor boats is common for travelbetween the town and other islands. Air transportroutes connecting Gizo to other islands and Honiaraare also reliable but too costly for the majority of thepopulation. Inter-island transport linking Honiaraand other islands in the province operate in Gizo.Tis makes Gizo town alive and busy as people from

    different islands and provinces are able to interact witheach other on a daily basis.

    ELECTRICITY SUPPLY

    Te Solomon Islands Electricity Authority (SIEA)provides power for about 50 percent of householdsin Gizo. Te informal settlements and pockets oftemporary houses in the town boundary are not servedby the Solomon Islands Electricity Authority powersupply. Most of these households rely on kerosenelamps, rewood and candlesticks as their sources ofpower.

    Power supply in Gizo is sufficient to meet the presentdemand, but with the increase in development activitiesin and around Gizo, there is need for the SolomonIslands Electricity Authority to assess its capacity tomeet increased demand for electricity in the future.

    COMMUNICATION AND BANKING SERVICES

    elecommunication services in Gizo and surroundingareas are provided by elekom and B-mobile. Postal andbanking services are provided by the Australia and NewZealand Bank (ANZ) and the Bank of the South Pacic

    (BSP). Accessing loans from banks usually requireshuge capital and collateral items for security, whichmany people lack, especially the urban poor and low-middle income earners. Te challenge for the WesternProvincial Authority is to assist low-income earners toaccess commercial banks and other available micro-loanschemes.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    13/40

    13

    G I Z O

    U R B A

    N P R O F I L E -

    G O V E R N A N C E

    GOVERNANCE

    Te Provincial Government Act provides for three levelsof governance,1 where the central government transferscertain functions and powers to the provincial andarea levels to administer on its behalf. Te Act allowsfor transfer of personnel from the central governmentto the provincial level and creates a dependency linkbetween these levels of governments and duplication2 of resources.

    Te Western province has 26 wards and each wardelects their provincial member for a four year term. Teelected provincial members then, elect the Premier tohead the provincial executive. Te Premier appointsits ministers to oversee the overall administration ofdifferent departments.

    Governance in Gizo over the years has been consistentlyplagued by malpractices, limited nance, poor internalrevenue collection, inadequate and lack of skilled andexperienced personnel, and poor accountability. Teseissues have impaired effective administration and servicedelivery in Gizo and surrounding rural areas which hasbeen exacerbated by dependence on (limited) centralgovernment grants and poor internal revenue collection.

    Te Western Provincial Authority does not have ahuman resource development policy or a system to

    1 The current legal instrument provides for three levels ofgovernment: national, provincial and area council.

    2 The central government makes laws, budget and plans fordevelopment at the national level, so does the provincialand area councils at their respective levels. Each levels ofgovernment operate independently and as a result each has itsown budgets and development plans.

    measure work performance of individual employees.Promotions and recruitments are done on the basisof who you know best or wantok bisnis and this hasresulted in poor work outputs and poor service delivery.

    Accountability and transparency is weak, partly due tolack of technical and managerial capabilities. Politiciansoften interfere in planning decisions, staff promotions,allocation of funds, awarding of contracts, andappointment of staff. As a result, basic urban services inGizo have not been improved and no new investmentshave been made in the area of basic urban serviceprovision.

    Tere is lack of public participation in town mattersaffecting the welfare of the citizens and local andinternational NGOs active in Gizo appear to work inisolation with no formal mechanism in place to allowfor partnership. Gender equity is given low priorityand consideration by the management of the WesternProvincial Authority. Te recent establishment of theGizo own Committee and a Local Business Group(LBG) in Gizo may provide the entry point for bettergovernance. Tis needs coordination by the WesternProvincial Authority to improve communication linksand meaningful participation from various stakeholdersin Gizo.

    Te Western Provincial Authority lacks the capacity

    and resources to implement policies effectively.Building strong partnership with key stakeholderssuch as local and international NGOs, donors andthe private sector is therefore critical. Partnership

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    14/40

    GIZO U

    RBA

    NPROFILE-GOVERNANCE

    4

    arrangement often enhances sharing of information;

    reduces duplication of actions and resources andbuilds good working relationships among differentstakeholders. Storey (2005:6) for instance, states thatcreating better communication through partnershipand the ability to respond to issues, rather than to lead,are seen as building blocks of effective local governance.Te challenge for the Western Provincial Authority is tobuild and maintain a strong development partnership

    with all stakeholders in Gizo.

    THE INSTITUTIONAL SET UP

    Te Western Provincial Authority depends on the

    central government (through the Ministry of theProvincial Government) for its budgetary support, which is inadequate to improve services in Gizo.It also receives tied-funds for specic projects andprogrammes.

    Insufficient funds and weak administrative capacitycontinue to impede the effective delivery of servicesand physical planning.

    Decision making is still heavily top-down. A number of civil society groups are actively involved

    in urban affairs but no formal mechanisms exists to

    formalize their activities such as a public forum tocollectively engage all stakeholders in civic affairs,and

    Outsourcing of services (example garbage collectionand infrastructure maintenance) to the private sectoris an alternative option for improved service deliveryand employment creation. Tis is yet to be criticallyexplored by the Western Provincial Authorities.

    REGULATORY FRAMEWORK

    Te Public Health Act (PHA) empowers Gizo

    authority to enforce health and environmentalstandards in the town. Te Western Provincial Authority has the power

    under the Provincial Government Act to makeby-laws, ordinances and regulations to controlgovernance at the provincial level.

    Under the Provincial Government Act, the Ministerfor Provincial Government has the power to dissolvelocal government if they commit malpractices andto appoint a new competent team.

    Te own and Country Planning Act ( CPA)empowers the Physical Planning Departmentthrough the Provincial own and Country PlanningBoard (P CPB) to carry out physical planning anddevelopment control in Gizo, but lacks resource and

    technical capacity to plan and manage Gizo town,

    especially the informal settlements. Te Western Provincial Authority has a building by-

    law to guide the standard of buildings and designin Gizo.

    PERFORMANCE AND ACCOUNTABILITY

    Tere is no performance and appraisal system thatexists and often direct employees are promoted onthe basis of who you know best or wantok bisnis.

    Effective and efficient service delivery is a majorchallenge for the Western Provincial Authoritypartly due to the rapid urban population growth.

    Te Premier is elected by the provincial membersand is often more accountable to them than to thecitizens.

    Financial accountability has improved afterthe operation of the Provincial GovernmentStrengthening Project in 2009, but there is still needfor improvement in planning and budgeting.

    Weak internal revenue, poor work ethics and limitednancial support from the central governmentcontinues to affect the ability of Gizo authority todeliver quality services as expected by the citizens.

    Civil Society Organizations are active in Gizobut lack effective coordination with provincialauthorities.

    RESOURCE MOBILISATION

    Te Western Provincial Authority receives anannual grant from the central government withconsiderable shortfalls to meet the minimumrequirement for basic service delivery to the urbanand rural population.

    Te Western Provincial Authority receives internalrevenue which is too little to improve basic servicedelivery in Gizo.

    Te internal revenue collection is still weak due toshortage of staff and outdated system of revenuecollection.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    15/40

    15

    G I Z O

    U R B A

    N P R O F I L E -

    G O V E R N A N C E

    AGREED PRIORITIES Design new strategies to improve internal

    revenue collection and diversify revenuebase.

    Develop a comprehensive training policyand undertake staff development based oncapacity gaps and competence.

    Design mechanisms to allow for wider participation from stakeholdersoperating in Gizo in order to improveaccountability and transparency.

    Review the Western Province ownCouncil Ordinance 1995 to give moreadministrative and nancial powers to theGizo own Committee.

    Improve the budget and planningformulation processes to enable morecost-effective use of funds to give the bestreturn to the community.

    Develop a framework that allows for localauthorities, stakeholders and communityparticipation in the project processes to

    improve project sustainability.

    GOVERNANCEN1

    Project proposal Page 27

    Review the Western ProvincialTown Council (1995) Ordinance

    GOVERNANCEN2

    Project proposal Page 27

    Devise a new mechanisms toimprove internal revenue collectionand diversify revenue base

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    16/40

    GIZOURBA

    NPROFILE-INFORMALSETTLEMENTSANDHOUSING

    6

    INFORMAL SETTLEMENTS AND HOUSING

    An estimated 51 percent of Gizos total population residesin four main informal settlements1 and several scatteredpockets of temporary houses located within and on theedge of the Crown land (Zutu, 2007, SIG, 2011). Highpopulation growth rates and the inux of rural-urbanmigration are primarily considered as key factors for theprolic growth of informal settlements in Gizo. Teseinformal settlements exert additional pressure on theexisting basic urban services infrastructure, especiallyon the water, health and education services.

    Te popular places for new rural migrants andurban poor to erect their houses are on steep slopesand swampy areas which are considered unsuitablefor formal development. Most people prefer to settlein such areas because the risk of being evicted by the

    Western Provincial Authority is low.

    Informal settlements in Gizo are often excluded fromthe mainstream of urban management and physicalplanning. Tey are poorly served and lack water,sanitation, health, electricity, security, and garbagecollection services. Dumping of waste in open spaceshas resulted in pollution and degradation of the naturalenvironment. Access to water supply is limited to fewcommunal shared stand pipes and most householdsuse kerosene lamps and candlesticks as their sources ofpower and rewood for cooking.

    1 Informal settlements are; Mile six, Fishing Village, Nusu Baruku,and District.

    Te rising numbers of informal settlements in Gizoare not going to just go away. Te Western Provincial

    Authority needs to factor in the informal settlements inthe physical planning of the town. Te key challengefor Gizos physical planners and policy makers is toreverse the rapid growth of informal settlements. As

    Jones (2010:8) puts it there needs to be a mindsetchange towards the informal settlements; they must beincluded as part of the western provincial main strategicmanagement plans.

    Unemployment and poverty 2 are growing in theseinformal settlements as reected by the rising numberof informal economic activities, illegal and illicitactivities taking place in the settlements. Te rise offood prices in Gizo market due to limited food supplyhas made it even more difficult for residents of informalsettlements to meet their nutritional requirements andhas further pushed the urban poor into the povertytrap. Te World Wildlife Fund (WWF) has set upthree marine conservation areas and several incomegenerating activities to assist residents of informalsettlements to earn a living, but the projects lack thecapacity to generate enough food or money to sustainthe increasing number of residents in the informalsettlements.

    2 While it is difcult to gure out the exact levels of poverty inGizo due to lack of data, the SIG/UNDP (2008:9) estimatesthat poverty in all provincial centres (including Gizo) representabout 13.6 percent of the total urban population (101,000) inSolomon Islands.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    17/40

    17

    G I Z O U R B A

    N P R O F I L E -

    I N F O R M A L S E T T L E M E N T S A N D H O U S I N G

    Tere are a number of internally displaced people stillliving in tents, despite the Solomon Islands Governmentallocation of SBD 5million to assist people who wereaffected in the April 2007 tsunami (Solomon Star,20/04/11:3). Poor people in Gizo usually face growingdaily hardship as they rely on limited cash and foodfor their survival. Tey must weigh expenditure choiceson a daily basis often having to forego basic needslike food in order to pay school fees. Tere is need forthe Western Provincial Authority to collaborate withnational leaders, donors and NGOs to better respondto the needs of the urban poor in Gizo.

    HOUSING

    Tis is a critical issue for residents of Gizo and the Western Provincial Authority. Te quality of housing inthe informal settlements is poor. Houses are constructedfrom a combination of bush material and Kapa whichis pijin English for corrugated iron roong sheets cup-board, plywood, and under-size timber. Mosthouses occupy about 16 square metres of land andaccommodate an average household of seven people.

    Te government houses in Gizo were built during thecolonial period and have been poorly maintained formany years, resulting in a large number of houses beingdeemed uninhabitable. Most of these houses have nowbeen sold to private developers. Further, the workingenvironment in Gizo is not conducive for productivityas most office buildings have deteriorated and are old,poorly designed and lack space and furniture. Tere isurgent need for the Western Provincial Authority toimprove the existing staff houses and provide decentstaff houses as well as an office complex in order toattract and motivate staff.

    INSTITUTIONAL SET UP

    Te power to undertake physical planning in Gizo isvested in the Provincial own and Country PlanningBoard. Te physical planning office is responsiblefor settlement planning and development controlin Gizo, but it is under-resourced, ill-equipped andlacks the technical capacity to execute responsibilitieseffectively.

    A mechanism exists within the own and CountryPlanning Act that allows for wider participation inthe planning processes. But without a Local PlanningScheme (LPS), wider participation remains to bedemonstrated.

    A lack of physical planning in Gizo, in spite of asub-division plan.

    Te power to allocate land rests with theCommissioner of Lands in Honiara. Te Lands Unitin Gizo coordinates land matters and makes relevantrecommendations to the Commissioner of Landsfor decision on land allocation and registration.

    REGULATORY FRAMEWORK

    Te own and Country Planning Act guides thedevelopment of Crown Land. Te power is delegatedto the Provincial own and Country Planning Boardof each provincial town including the Honiara CityCouncil (HCC).

    Te Lands and itle Act (L A) administrates theallocation and registration of land. An existing building ordinance to guide building

    constructions exists but it is not enforced due tolack of staff.

    Tere is no land policy or implementation planspecically designed to assist residents of informalsettlements to acquire decent housing.

    Gizo has no Local Planning Scheme to ensureorderly development of the town.

    Lack of a building inspector to carry out enforcementnotices on illegal developers has led to an increase inillegal developments.

    RESOURCE MOBILISATION

    Gizo town has no budgetary support for developmentof new residential sites.

    Te Ward Development Grant (WDG) is limitedand often directed by personal decisions rather thanby strategic plans.

    Politicians have access to a number of funds (RuralConstituency Development Fund, Micro-schemeand Livelihood) but such funds have not been usedto improve the livelihoods of Gizos residents.

    Lack of partnership arrangements to permit orencourage wider community participation in servicedelivery particularly in the informal settlements.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    18/40

    GIZOURBA

    NPROFILE-INFORMALSETTLEMENTSANDHOUSING

    8

    AGREED PRIORITIES Develop a base-line settlement survey

    to determine the level of informalsettlements in Gizo town.

    Regularize informal settlements throughsubdivision plans so that settlers are giventhe opportunity to acquire Fixed ermEstates (F E).

    Develop a comprehensive policy and plansfor informal settlement upgrading.

    Establish community groups to coordinateactivities such as garbage collection.

    Undertake awareness programmes in theinformal settlements so that residentsknow and better understand their rightsand obligations as squatters.

    Establish development partnerships withstakeholders to administer and coordinateNGO and donor assistance to thesettlements.

    Upgrade the existing government staffhouses and build additional houses anda new office complex for the WesternProvincial Authority.

    INFORMALSETTLEMENTSAND HOUSINGN1

    Project proposal Page 29

    Develop a base-line survey todetermine the trends and socio-economic conditions of informalsettlements

    INFORMALSETTLEMENTSAND HOUSINGN2

    Project proposal Page 29

    Develop subdivision plans for theinformal settlements in Gizo

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    19/40

    19

    G I Z O U R B A

    N P R O F I L E -

    T H E U R B A N - R U R A L E C O N O M Y

    THE URBAN-RURAL ECONOMY

    Western Province depends on three main sourcesof income for its budget. Internal revenue (businesslicenses, land rent, basic rates, property rates, returnfrom investments, and transport levies) is expected tocontribute 45 percent, central government grants 42percent and Provincial Capacity Development Fund(PCDF) 13 percent towards it 2011/12 scal year (SBD17,967,295). Tere is still lack of a major shoppingcentre in Gizo. More than 30 retail shops operate inGizo, of which 85 percent are owned and managedby Chinese descendants. Te business sector generates

    just above 38 percent of Gizo internal revenue. Asmall part of Western Provincial Authoritys internalrevenue comes from tourism1, land rent, basic rates, andproperty rates. Internal revenue collection has improved

    from 37.5 percent in 2009 to 75 percent in 2010 scalyear (Western Province 2009/10 budget).

    Gizo serves as the main economic link betweenHoniara and the rural villages in the Western province.International NGOs such as World Vision, Red Cross,Save the Children, and World Wildlife Fund (WWF)have established their branches in Gizo to enhanceservice delivery to the urban and rural population.Te commercial sector is increasing with major privaterms such as elekom, Australia and Zealand Banking(ANZ), Bank of the South Pacic (BSP) Dalgro,Bowmans Hardware, and South Pacic Oil (SPO)operating in Gizo alongside small tourism operators.1 Gizo has a hotel which provides more than 150 rooms and

    15 motels providing around 300 rooms that are owned andmanaged by local residents. There is potential for tourismto grow in Gizo if the government assist tourism operatorsnancially to grow their businesses.

    Statutory rms like the Solomon Airlines, SolomonIslands National Provident Fund, and Solomon IslandsElectricity Authority have also set up offices in Gizoand contribute to the local economy.

    Gizo has beneted from three major multi-milliondollar projects, making the town an attractive place forinter-island migration more so than other sub-stationsin the province. Te new hospital in Gizo was fundedby the Japanese Government and has been officiallyhanded over to the central government Te upgradingof the existing playing eld to a new sport stadiumfunded by Solomon Islands Football Federation (SIFF)

    will further stimulate economic growth in Gizo once itis completed.

    Economic activities in Gizo have created considerableemployment opportunities for the local population. Tepublic sector provides up to 60 percent of employmentopportunities for the urban population in Gizo,followed by the service sector (30 percent) and donorprojects (10 percent). Gizo also holds major sportingevents and cultural shows annually, which contributeto the local economy.

    THE INFORMAL SECTOR

    Unregulated informal economic activities exist in Gizoand include the selling of betel nuts, cigarettes, greencoconut, sh, and plastic bags next to the local market.Gizo market has limited places for market vendorsto display their products and is often overcrowded

    with traders. People employed in the informal sector

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    20/40

    GIZOURBA

    NPROFILE-THEURBAN-RURALECONOMY

    work for longer hours in unhygienic and unsafe

    environments. Given the importance of the informalsector for the unskilled and unemployed rural andurban dwellers, it is of critical economic importancethat the Western Provincial Authority and Gizo ownCommittee improve the existing market conditions andavoid congestion.

    LINKING RURAL-URBAN ECONOMIES

    Western province consists of ve main islands and manysmaller ones. Terefore there is need to decentralise anddeconcentrate certain services and functions from thecentral government to the provincial level in order toimprove service delivery to the rural areas. As part ofthe implementation strategy, the central governmenthas established beside Gizo town, four substations(Noro, Seghe, Munda, and Ringi) at the rural level toimprove service delivery to the rural villages. At therural level, not all rural areas are the same. Developmentissues vary from one region to another and from onevillage to another. Depending on where the village islocated, the services and economic opportunities alsodiffer. Economic opportunities for some rural villagesdepend on accessibility to markets in Gizo, Noro andMunda. Some politicians have recently promotedconstituency development strategies as a means toimprove servicesdelivery to the rural villages.

    At the national level, the central government sets theoverall rural development framework and expects the

    Western Provincial Authority to devise its own strategiesthat are appropriate to local conditions. However,urbanization policies remain neglected in the physicalplanning process in Solomon Islands.

    TRANSPORTATION LINKS

    Te provision of effective transport networks play acrucial role in enticing major investments to the ruralareas and improves the economic capacity of existingbusinesses. Improved access enhances populationmobility and creates opportunities for the rural peopleto travel to the urban areas to sell their produce and alsoaccess government and banking services.

    Western province has four substations scatteredthroughout the province. Gizo is the main centrefor the province but lacks efficient links betweensubstations. Tere are disparities between these stationsin terms of socio-economic opportunities and thespatial distribution of basic services. In Gizo, there isan existing road that connects settlements on the islandto the town, but it has not been maintained for severalyears due to lack of funds and negligence by past localauthorities. Provision of basic urban services in thesubstations is poor.

    A number of roads that connect rural villages to thecoast have not been maintained for several years makingtravel between sub-stations difficult. Most people relyon out-board motorboats to travel to Gizo, Noro, Ringi,Seghe, and Munda. Bad weather and rising costs of fuelhave negatively affected this transportation system. Airtransport between the main islands is well establishedand helps to promote tourism to the province. Te

    Western province lacks a coherent and integratedtransport and communication system. Efficienttransport and communication networks are needed inorder to accelerate socio-economic development andservice delivery in the province.

    Te Bank of the South Pacic and Australia and

    Zealand Banking provide banking services in Noro,Munda, Ringi, and Gizo. Tis has improved access tobanking services for government workers and the ruralpopulation. Provision of telecommunications throughmobile phones also improved signicantly in the ruralareas as elekom and B-mobile continue to spreadinto the rural areas throughout the country. Te majorchallenge for these two companies is to maintain qualityservices at an affordable rate, given the remoteness ofthe islands and rural villages.

    THE INSTITUTIONAL SET UP

    Te central government is responsible for theprovision of all rural and urban infrastructure andthe Western Provincial Authority relies on thecentral government for budgetary support to meetinfrastructure development needs and operationalmatters.

    Most government activities are sectorally-based with little coordination between agencies, leadingto duplication of projects and inefficient use ofresources.

    Te Western Provincial Authority is under-resourcedand poorly equipped. As a result, the authority is

    not able to effectively implement its policies and toimprove on service delivery in Gizo and surroundingareas.

    Te Western Provincial Authority needs to providea conducive business environment with incentivesfor the private sector to greater engage in economicactivities in the rural areas.

    A number of local and international NGOs andchurch based groups are actively involved in servicedelivery in Gizo and the surrounding areas, but thereis no formal mechanism to harness this potentialpartnership.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    21/40

    21

    G I Z O U R B A

    N P R O F I L E -

    T H E U R B A N - R U R A L E C O N O M Y

    REGULATORY FRAMEWORK

    Te Provincial Government Act empowers the Western Provincial Authority to pass ordinance andregulations that are seen as appropriate to enhanceeconomic growth in both rural and urban settings.

    Te Provincial Government Act also gives powerto the Minister of the Provincial Government tosuspend any provincial government officials formalpractices and irregularities in the administrationof the town.

    Rural and urban people elect representatives to theNational Parliament and Provincial Assembly torepresent their interests.

    PERFORMANCE AND ACCOUNTABILITY

    Te provision of quality services for both ruraland urban areas remain a key challenge for Gizoauthorities.

    Poor internal revenue collection and limitednancial help from the central government hinderseffective delivery of services and rural development.

    Lack of skilled human resources and weakadministrative capacity contributes to poor service

    delivery. Civil society organizations and churches are active

    development partners in the rural developmentprocess, but lack government support.

    Each provincial member is expected to ensure thatthere is fair distribution of economic benets intheir region.

    RESOURCE MOBILIZATION

    Western Provincial Authority depends on central

    government annual grants to enable them provideservices to the people of Gizo and surrounding areas. Internal revenue collected is weak and inadequate to

    meet quality service delivery. Donors provide nancial support for a number

    of urban and rural service projects and create anopportunity to stimulate the local economy.

    AGREED PRIORITIES Improve existing basic urban services and

    housing in Gizo and other sub-stationsto entice public servants to work in theprovince.

    Upgrade the existing road infrastructureand communication links in order toenhance effective delivery of basic urbanservices, especially to the rural areas.

    Upgrade the existing market facilities toimprove environmental, security and

    health issues faced by market vendors. Build better infrastructure which is critical

    for promoting investment in the ruralareas.

    Decentralize more governmentfunctions and power to the area level ofgovernment.

    LOCALECONOMYN1

    Project proposal Page 31

    Upgrade the existing Gizo market

    LOCALECONOMYN2

    Project proposal Page 31

    Upgrade the existing water supplyin Gizo

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    22/40

    GZOURBA

    NPROFLE

    SECURTYANDRESLENCE

    SECURITY AND RESILIENCE

    Law and order is provided by the Central Governmentthrough the Royal Solomon Islands Police Force(RSIPF). Gizo is considered to be peaceful with nomajor incidences of crime or insecurity except for minorincidences related to drinking beer and homemadealcohol (kwaso) in public places. Juvenile delinquency,personal assault, domestic violence, and house-break-ins are common in Gizo. Te rise in crime is partly as aresult of a high rate of rural-urban migration, increasein unemployment rates among the youth, high rates ofalcohol consumption, and erosion of cultural values.Most of the crimes are committed by unemployedyouths in the informal settlements.

    Poor street lighting in the towns commercial andresidential areas has contributed to rising crime, declinein public safety and frequent shop and household break-ins in Gizo. Te situation threatens personal safetyand has wider repercussions on the local economy,investment and tourism industry.

    Te delay in the construction of a new CorrectionalService Centre1 (CSC) in Gizo was as a result of aland dispute with squatters contesting a court orderinstructing them to move from the site. A new sitehas now been identied for the project. Tis incidentindicates that squatters are seen as a threat to newinvestment and pose a security threat for Gizo residentsas the population in the informal settlements continue

    to increase.1 The Gizo Correctional Service Centre is funded by the AustalianAgency for International Development through RAMSIstrengthening programmes in the Ministry of Police, NationalSecurity and Legal Affairs.

    While the police have performed well in response to crisissituations, public perception that they are undisciplinedand corrupt persists (Solomon Star, 14/5/11:2). Tislack of public condence has led to private rms, NGOsand government bodies hiring private security rms toprotect their premises. Tis makes private security athriving business in Gizo. Te judicial system is alsoineffective as cases are not dealt with in a reasonabletime frame. Te situation is worsened by the fact thatthere is no Principal Magistrate Officer in Gizo to hearcourt cases that are beyond the power of the currentMagistrate Officer. Tis makes it harder for the policeand at times may discourage them from executing theirmandatory duties effectively.

    Te police officers in Gizo police station work with insufficient logistical support from the centralgovernment, in a poor working environment and withlimited cooperation from the communities to ghtagainst crime. Te police also live in poor housingconditions. Given the rise in crime in Gizo in the recentyears, it is crucial that the number of policemen and

    women is increased and that they are provided withadequate resources to enable them to ght crime andprovide adequate security.

    URBAN RESILIENCE

    Te Solomon Islands and in particular those villagesand towns located along the coast and near the swampyareas are susceptible to climate change and naturaldisasters. In Gizo, vulnerability to climate change and

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    23/40

    23

    G I Z O

    U R B A

    N P R O F I L E -

    S E C U R I T Y A N D R E S I L I E N C E

    natural disasters is becoming a major concern as manypeople continue to build their houses on steep gradientsand along the coastal and swampy areas which areprone to natural disasters like earthquakes, landslidesand storm surges. After the April 2007 tsunami, manyvictims refused to return to their original homesdue to fear of future disasters. However, due to landdisputes and lack of clarity over the land tenure, areasfor re-settlements were not identied. Tis resulted inresidents continuing to rebuild their damaged homesin vulnerable areas (UNHCR, 2011). Some people inthe informal settlements have returned to their originalsettlements close to the sea as the Western Provincial

    Authority failed to secure land for them to relocate to.Te key challenge for the Western Provincial Authorityis to ensure that land for relocation is made availableand to look to the Ministry of Environment for possiblenancial support.

    THE INSTITUTIONAL SET UP

    Te Royal Solomon Islands Police Force of thecentral government is responsible for providinglaw and order throughout the country. Te policestation in Gizo is urgently in need of upgrading asthe building is old, deteriorating and lacks space.

    A better working environment is likely to improvepolicing.

    Te Correctional Service Centre (CSC) providesrehabilitation programmes for prisoners as wellas engaging churches to visit prisoners. Teseprogrammes need to be strengthened to involveparticipation of community leaders and civil societyas well.

    RESOURCE MOBILIZATION

    Te Royal Solomon Islands Police Force dependsentirely on the central government for funds tocarry out policing throughout the country. Lack ofsufficient funds and logistics have often constrainedthe police from executing effective policingthroughout the province, especially in the informalsettlements of Gizo.

    Local courts are under-resourced and poorlyequipped, leading to court cases piling up andtaking up to several years to be heard. Tere is needto strengthen and provide sufficient resources tolocal courts so that they can operate effectively andenhance public condence and trust.

    Te Western Provincial Authority needs to workalongside the Royal Solomon Islands Police Forcein terms of planning for security and safety in Gizo.

    Private security rms are actively involved in theprovision of security in several private premises inGizo.

    PERFORMANCE AND ACCOUNTABILITY

    Tere is lack of coordination between the lawenforcement and the justice systems.

    Family disintegration and erosion of cultural valueshas led to lawlessness and decline in public safety.

    Tere is need to improve community policing inand around Gizo by providing training and logisticalsupport to communities to enable them to betterrespond to crime and insecurity.

    AGREED PRIORITIES Strengthening the coordination between

    law enforcement agencies, the WesternProvincial Authority and communities.

    Improve the working environment andcapacity needs for the police.

    Improve logistics and resources forcommunity policing.

    Empower the youth through capacitybuilding programmes to engage inlegitimate income earning activities.

    Relocation of settlements and houses thatare most vulnerable to sea storms andlandslides.

    Public awareness programmes about theeffects of climate change.

    Provide recreational facilities in Gizo.

    SECURITY ANDRESILIENCEN1

    Project proposal Page 33

    Develop a detailed plan for a multi-purpose hall for youth in Gizo

    SECURITY ANDRESILIENCEN2

    Project proposal Page 33

    Develop local climate change andresilience plans

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    24/40

    GIZO U

    RBA

    NPROFILE-LANDANDPLANNING

    4

    LAND AND PLANNING

    Gizo Island is small and covers approximately 37 squarekilometres of land (UNHCR, 2011:10). It is also aCrown land. Gizo town however occupies a small partof this island (141.5 hectares of land).

    Te process of acquiring land in Gizo is lengthy (seetable 1) and the power to allocate land rests with theCommissioner of Lands in Honiara. Te long processof acquiring land is partly responsible for increasedillegal occupation of land. Tis problem was addressedby the Lands Strengthening Project (SIISLAP) byopening up a Land Centre in Gizo. Te Lands Centrein Gizo1 however lacks adequate and skilled humanresources, and is poorly equipped, which often resultsin ineffective land management and administration.

    1 The Lands Centre in Gizo is staffed with two ofcers whohandle ling and recording of xed term estate holders andland applications. They also provide recommendations to theCommissioner of Lands in Honiara for Land Allocation.

    PLANNING

    Gizo town suffers from ineffective planning in spiteof the existence of a Provincial own and CountryPlanning Board2. Tere is no local planning schemein Gizo, although a subdivision plan at the area levelis carried on a piece meal basis and lacks propercoordination resulting in a disorderly subdivision plan.

    Effective planning in Gizo town is hampered byshortage of skilled personnel (to devise proper buildingcodes and site planning regulations to guide planningapproval), lack of funds and lack of building inspectorsto carry out inspections and enforcement of notices onillegal developers.

    Gizo town needs a proper drainage system, wellplanned parking areas, landscaping, installation ofmore street lights, and an improved road network.Physical planning and decisions making in Gizo seemsto be internally focused and there is little effort to allowfor wider public participation.

    2 The Gizo Authority recommends to the Minister of Lands,Housing and Survey candidates (then formally appoints them)

    to be members of the Provincial Town and Country PlanningBoard. They represent the Solomon Islands Water Authority,Telekom, Business Group, Environment, Works, and the Ministerfor Lands (Chariman) for a period of two years. A PhysicalPlanner normally is the Secretary of the Board.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    25/40

    25

    G I Z O

    U R B A

    N P R O F I L E -

    L A N D A N D P L A N N I N G

    While there is still enough registered land available inGizo town, lack of effective town planning has resultedin increased land use conict. Tis may affect the futuredevelopment growth of Gizo and effective physicalplanning is seen as a critical issue that needs to be giventop priority. Te challenge for the Gizo authority andphysical planners is to improve urban planning andprovide good quality and affordable housing for thepoor.

    THE INSTITUTIONAL SET UP

    Te power to undertake physical planning in Gizorests with the Provincial own and Country Planning

    Board. Te physical planning office is responsiblefor settlement planning and development control inGizo and other government substations.

    Te physical planning office in Gizo is under-resourced and is currently without an urban planner.

    Te own and Country Planning Act allows forstakeholders to take part in the development of alocal planning scheme.

    Te power to allocate land rests with theCommissioner of Lands in Honiara. Gizo LandsOfficers coordinate land matters and forward

    recommendations to the Commissioner of Lands fordecision making on land allocation and registration.

    REGULATORY FRAMEWORK

    Te own and Country Planning Act is the onlyexisting legislation that determines the way Crownland is to be used and managed. Power is delegatedto the Provincial own and Country Planning Boardof each provincial town including the Honiara CityCouncil.

    Planning appeals are referred to the Minister for

    Lands, Housing and Survey, who has the powerunder the own and Country Planning Act, toreject decisions made by the Provincial own andCountry Planning Board and grant nal decisions.

    Te Lands and itle Act administers the allocationand registration of land.

    Tere are no building by-laws to guide buildingdesigns.

    Tere is no land policy specically designed to assistthe urban poor and squatters.

    Tere are no building inspectors to carry outenforcement notices on illegal developers and tocarry out building inspections.

    RESOURCE MOBILISATION

    Gizo town has no budgetary support for developmentof new residential sites.

    Te Ward Development Grant is limited and thereis lack of transparency in the allocation of funds.

    Tere is no partnership arrangement in place toallow community participation in service deliverysuch as garbage collection.

    AGREED PRIORITIES Improve the logistic and human resource

    capacity of the Physical Planning and theLands Centre to effectively carry out theirduties.

    Develop a local planning scheme for Gizotown including plans to upgrade informalsettlements in Gizo.

    Improve coordination between developers,the own and Country Planning Boardand the Physical Planning Office inGizo to avoid squatting and illegal

    developments on state land. Improve land administration and planning

    processes. Enforce planning regulations and Western

    province building ordinance.

    LAND AND

    PLANNINGN1

    Project proposal Page 35

    Develop a Local Planning Schemefor Gizo

    LAND ANDPLANNINGN2

    Project proposal Page 35

    Design ways to improve landadministration and planningprocesses

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    26/40

    GIZO U

    RBA

    NPROFILE-LANDANDPLANNING

    6

    PROCESS OF ACQUIRING LAND

    Step 1 Commissioner of Lands to identify an area of land and direct the Physical Planning Ofce toprepare a subdivision plan for the site.

    Step 2 Physical Planners prepare a subdivision plan for the site, seek approval from the Gizo Town andCountry Planning Board and Country Planning Board, and forward the plan to the SurveyorGeneral Ofce.

    Step 3 Surveyor General prepares survey instructions. Upon approval of a subdivision plan by theSurveyor General, parcel and lot numbers are prepared and the subdivision plan submitted to theCommissioner of Lands for approval.

    Step 4 Lot and parcel numbers are submitted to the registrars ofce for registration.Step 5 The Commissioner of Lands advertises vacant land for the public to apply for.

    Step 6 Screening of applications and allocation of land to successful applicants by the Commissioner ofLands.

    Note: The Commissioner of Lands has the power under the Land and Title Act to decide on what sort of measures to be used whenallocating state land. Currently, direct allocation is commonly used which is susceptible to corruption.

    TABLE 1:

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    27/40

    27

    P R O J E C T P R O P O S A L S -

    G O V E R N A N C E

    GOVERNANCE

    STRENGTHS WEAKNESSES OPPORTUNITIES THREATS PRIORITIES

    ProvincialGovernmentStrengthening Projectcapacity building andtraining initiative.

    Existing activities ofNGOs, churches anddonors in servicedelivery in Gizo.

    Political support fromthe current Western

    Provincial Authority.The WesternProvincial Authorityhas appointed aTown Clerk and newmembers of the GizoTown Council.

    Annual subventionof SBD150,000 forGizo Town Councilfrom the WesternProvincial budget.

    Existing by-laws forcontrolling littering.

    Lack of a legaladvisor, ofce, skilledstaff, and resources.

    Lack of adequatenancial support fromthe Western ProvincialAuthority.

    Continued diversionof funds to otherdevelopment areasand weak links

    between the civilsociety groups,donors and theWestern ProvincialAuthority.

    Lack of formaltraining for workers.

    Corruption andwantok bisnis stillexists.

    Existing WesternProvince by-lawsare not enforcedeffectively.

    The Gizo TownCouncil lacks nancialautonomy to spendits budget.

    Donor support islikely for identiedpriority interventions.

    The Ministry of Lands,Housing and Surveys corporate plansto support urbanprogrammes.

    Improving thestatus of Gizo TownCouncil to effectively

    discharge itsmandated roles.

    Fighting corruptionleads to improvedaccountability andtransparency.

    There is room forwider civil societyparticipation in theurban planning andmanagement of Gizo.

    Internal revenue islikely to rise due toincreased compliancefrom the tax payers.

    Political uncertaintyand politicalinterference inplanning anddecision-makingprocesses.

    Lack of adequatenancial support.

    Need for improvedincorporation of Gizourban prole as part

    of work plans andpolicies.

    Weak technicaland administrativecapacity.

    Corruption and lackof forward planning.

    Review the WesternProvince TownCouncil Ordinance(1995) to give moreadministrative andnancial power toGizo Town Council.

    Design new strategiesto improve internalrevenue collectionand diversify revenuebase.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    28/40

    PROJECTPROPOSALS-GOVERNANCE

    8

    GOVERNANCEN1

    Project proposal

    Review the current WesternProvincial Town Council 1995Ordinance

    GOVERNANCEN2

    Project proposal

    Devise new mechanisms toimprove internal revenue collectionand diversify revenue base

    LOCATION: Gizo own

    DURATION: 6 months

    BENEFICIARIES: Gizo Provincial Authority, Gizoown Council and civil society in Gizo

    IMPLEMENTING PARTNERS: Gizo Provincial Authority, Gizo own Council and civil societymembers with support from UN-Habitat

    ESTIMATED COST: USD 25,000

    BACKGROUND: Te Western Provincial ownCouncil (1995) Ordinance mandates the Gizo ownCouncil to be responsible for garbage management inthe town. Te Gizo own Council however, is poorlyequipped and resourced due to lack of sufficient funds.Te Council receives limited revenue from market fees,property rates and septic disposals. It lacks the power and

    technical capacity to effectively control funds as all itsrevenue has to be deposited in one basket and managedby the Western Provincial Authority. In most cases, thebudgetary allocation for the Gizo own Council is oftendiverted by the Western Provincial Authority to meetother expenses.

    OBJECTIVE: o improve the nancial andadministrative powers of the Gizo own Council.

    ACTIVITIES: (1) Engage a consultant to carry out areview of the existing Western Provincial own Council(1995) Ordinance. (2) Assess the areas that need to beamended. (3) Undertake consultations with relevant

    key stakeholders in Gizo. (4) Develop a revised report.OUTPUT INDICATORS: A revised WesternProvincial own Council Ordinance is completed,

    which gives more nancial and administrative autonomyto the Gizo own Council.

    STAFF REQUIRED: One experienced consultant(with planning and legal qualications) with assignedfocal points in Gizo own Council and WesternProvincial Authority.

    LOCATION: Gizo own

    DURATION: 8 months

    BENEFICIARIES: Gizo Provincial Authority, Gizoown Council Business Sectors, tax payers, the informal

    sector, and civil society membersIMPLEMENTING PARTNERS: Western Provincial

    Authority, Gizo own Council, and business people with support from UN-Habitat

    ESTIMATED COST: USD 30,000

    BACKGROUND: Te Western Provincial Authorityurgently needs an improved revenue collection systemand to diversify its revenue base. Inadequate fundsconstrain the ability of the Western Provincial Authorityto effectively deliver better services to the people and topay for ongoing operation costs. Tere is need to assess

    the existing institutional situation to review processes,assess the alternative revenue sources, establish acomputerized system, and consult taxpayers and otherstakeholders. Tis will in turn provide the basis forrecommendations to improve and strengthen the overallrevenue collection system of the Western Provincial

    Authority and in particular the proposed restructureand strengthening of the Gizo own Council.

    OBJECTIVE: o improve revenue collection in the Western Provincial Authority, compliance, transparencyand efficient nancial management, monitoring andreporting.

    ACTIVITIES: (1) Undertake an institutional needsassessment of the Western Provincial Authoritysnancial management systems through review ofrevenue collection and nancial management withstakeholders. (2) Conduct consultations with keydepartments within the Western Provincial Authorityto agree upon revenue collections priorities. (3) Assessalternative revenue sources. (4) Conduct public debates

    with stakeholders and other ratepayers to determine ways of achieving compliance and improving nancialmanagement.

    OUTPUT INDICATORS: (1) A report highlightingthe areas for improvement. (2) A computerised revenuecollection system. (3) Alternative revenue sourcesidentied.

    STAFF REQUIRED: wo qualied staff members with backgrounds in nance.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    29/40

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    30/40

    PROJECTPROPOSALS-INFORMALSETTLEMENTSANDHOUSING

    0

    INFORMALSETTLEMENTSAND HOUSINGN1

    Project proposal

    Develop a base-line surveyto determine the trends andsocio-economic conditions ofinformal settlements in Gizo

    INFORMALSETTLEMENTSAND HOUSINGN2

    Project proposal

    Prepare sub-division plans forthe informal settlements

    LOCATION: Gizo own

    DURATION: 6 months

    BENEFICIARIES: Gizo Provincial Authority, GizoPhysical Planners and residents of informal settlements

    IMPLEMENTING PARTNERS: Gizo Provincial Authority, Gizo Physical Planners, and civil society withsupport from UN-Habitat

    ESTIMATED COST: USD 25,000

    BACKGROUND: Approximately 51 percent of Gizospopulation (Census Report, 2009) live in the informalsettlements with poor access to water, sanitation, roads,housing, and garbage collection. Te Gizo Provincial

    Authority does not have reliable data available todetermine the trends of informal settlements and thechallenges that residents of informal settlements face.

    OBJECTIVE: Document the scope of the socio-economic conditions and trends of informal settlementsin Gizo so that they can be used for future planning andpolicy formulation.

    ACTIVITIES: (1) Engage a consultant to carry out asocio-economic household survey in existing informalsettlements. (2) Identify and assess the standard ofexisting infrastructure. (3) Undertake consultations

    with relevant key stakeholders and informal settlementsresidents. (4) Develop an assessment report and database.(5) Digitise the information into a comprehensivedatabase.

    OUTPUT INDICATORS: A computerized databaseand a report on the socio-economic situation in theinformal settlements.

    STAFF REQUIRED: wo local consultants(Geographic Information Systems and Social Scientist)and four eldworkers.

    LOCATION: Gizo own

    DURATION: 12 months

    BENEFICIARIES: Gizo Provincial Authority, GizoPhysical Planners and informal settlements in Gizo

    IMPLEMENTING PARTNERS: Gizo Provincial Authority, Gizo Physical Planners, civil society members,and UN-Habitat

    ESTIMATED COST: USD 100,000

    BACKGROUND: In 2009, more than 50 percent ofGizos population lived in informal settlements withpoor access to water supply, sanitation, roads, housing,and garbage collection. Te Gizo Provincial Authorityhas not put in place any plans or policies to upgradeinformal settlements or to assist residents of informalsettlements to obtain security of tenure.

    OBJECTIVE: Develop subdivision plans that arereadily available to guide land allocation and includeinput from beneciaries.

    ACTIVITIES: (1) Engage a planning consultant todesign subdivision plans for informal settlements.(2)Undertake consultations with relevant stakeholders andinformal settlements. (3) Identify and assess informalsettlements and residents that are likely to be affected.(4) Digitise the plans and ensure that they are approvedby the Western Provincial own and Country PlanningBoard. (5) Supervise eld survey.

    OUTPUT INDICATORS: (1) Subdivision plans arecomputerized and surveyed. (2) A report on informalsettlements and residents that are affected will becompleted.

    STAFF REQUIRED: wo local consultants(Geographic Information Systems expert and a qualiedsurveyor).

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    31/40

    31

    P R O J E C T P R O P O S A L S -

    T H E U R B A N - R

    U R A L E C O N O M Y

    THE URBAN-RURAL ECONOMY

    STRENGTHS WEAKNESSES OPPORTUNITIES THREATS PRIORITIES

    The local marketis under themanagement of GizoTown Council.

    Plans are underway toupgrade the existingmarket.

    The WesternProvincial Authorityhas appointed newmembers to the GizoTown Council.

    The Private Sectoris willing to providemaintenance ofthe existing marketbuildings.

    Donors (AsianDevelopment Bankand AustralianDevelopment AidProgramme) fundedthe existing waterreticulation in Gizo.

    Asian DevelopmentBank is currentlyfunding drainageclearance in Gizotown.

    Limited space andmarket facilities tocater for the largenumber of traders.

    Lack of storage andlanding facilities formarket vendors.

    Lack of adequateparking space forvehicles and lackof land for futureexpansion.

    Lack of sufcientbudgetary supportfrom the WesternProvincial Authoritytowards thedevelopment of basicurban services in Gizotown.

    Continuous diversionof limited fundsallocated to theWorks Unit to otheruse.

    The Works Unit of theWestern ProvincialAuthority lacksproper equipmentand machines toeffectively dischargeits duties.

    Lack of coordinationbetween donors andthe Works Unit withregard to drainage

    improvement.

    Upgrading theexisting marketfacilities willstimulate economicdevelopment.

    An Improvedsocio-economicenvironment formarket vendors andthe general public.

    Establish partnershipnetworks betweendonors, communitygroups and theWestern ProvincialAuthority with regardto service delivery inGizo.

    Storm surges andsea level rise (climatechange) leadingto destruction ofproperty.

    Social insecurity forthe vendors.

    Unhygienic conditionsin the market whichputs vendors andbuyers at risk.

    Change of provincialgovernment whomay not support theupgrading of themarket.

    The present marketsite is limited and maynot be an ideal areafor the market.

    Upgrade the existingmarket facilitiesto improve theenvironment, security,and health issuesfaced by marketvendors.

    Improve delivery ofbasic urban services.

    Upgrade theexisting road andcommunication linksto enhance effectivedelivery of services tothe rural areas, suchas education andhealth.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    32/40

    PROJECTPROPOSALS-THEURBAN-RURALECONOMY

    URBAN-RURALECONOMYN1

    Project proposal

    Upgrade the existing Gizo market

    URBAN-RURALECONOMYN2

    Project proposal

    Upgrade the existing water supplyin Gizo

    LOCATION: Gizo own

    DURATION: 5 months

    BENEFICIARIES: Gizo Provincial Authority, Gizoown Council and residents of Gizo

    IMPLEMENTING PARTNERS: Gizo Provincial Authority, Gizo own Council, civil society members,and UN-HabitatESTIMATED COST: USD 25,000

    BACKGROUND: Gizo has a population of 7,177(Census Report, 2009) who depend on the local marketas their main source of food supply. Local markets linkthe rural and urban economies as rural-based goods aresold at the Gizo market. Informal economic activitiesin Gizo provide job opportunities for residents of thetown and nearby rural areas. Gizo market lacks adequatespace which results in overcrowding. Te market alsolacks basic services such as storage facilities for marketvendors, sanitation and parking space. Market vendorscontinue to face daily hardships as they often work inunhygienic and unsafe environments.

    OBJECTIVE: Improve the existing conditions in Gizomarket to cater for the increasing number of marketvendors.

    ACTIVITIES:

    (1) Hire an architect to design a new market.

    (2) Assess the existing site or identify an alternative sitefor the market.

    (3) Undertake consultations with relevant keystakeholders.

    (4) Develop a proposed plan for the construction andexpansion of the market.

    OUTPUT INDICATORS: A detail design plan for theproposed Gizo market is completed.

    STAFF REQUIRED: An architect.

    LOCATION: Gizo own

    DURATION: 4 months

    BENEFICIARIES: Gizo Provincial Authority andGreater Gizo area residents (including informalsettlements residents)

    IMPLEMENTING PARTNERS: Gizo Provincial

    Authority, Gizo own Council, civil society, members,and UN-Habitat

    ESTIMATED COSTS: USD 25,000

    BACKGROUND: Water supply in Gizo is inconsistentand unreliable. Te existing water reticulation wasdesigned in the 1950s for a population of 1,000 andcannot cope with the present demand. Approximately,60 percent of households in Gizo which have access tothe existing water supply (including shared communalstand pipes in three informal settlements) are notmetered. Tis makes it difficult for the Gizo ownCouncil to charge households adequately for their water

    usage. Te Gizo own Council through the WesternProvincial Authority has submitted a proposal to JapanInternational Cooperation Agency to upgrade the watersystem in Gizo, which is pending approval.

    OBJECTIVE: o ensure that water supply is reliableand that water is accessible to all residents of Gizo.

    ACTIVITIES: (1) Engage a consultant to improvethe existing water supply reticulation. (2) Identify newroutes to link the old water line to the newly built watertanks. (3) Undertake consultations with relevant keystakeholders. (4) Design a detail proposal for the Gizo

    water supply upgrading.

    OUTPUT INDICATORS: A detailed design plan forthe proposed Gizo water supply system is completed

    with associated costs.

    STAFF REQUIRED: A number of qualied technicalstaff are required.

  • 8/12/2019 Gizo Town Profile - Solomon Islands

    33/40

    33

    P R O J E C T P R O P O S A L S -

    S E C U R I T Y A N D R E S I L I E N C E

    SECURITY AND RESILIENCE

    STRENGTHS WEAKNESSES OPPORTUNITIES THREATS PRIORITIES

    Capacity buildingexercises for the policeand improved housingconditions.

    Regular policesurveillance in thetown.

    The WesternProvincial Authorityhas an EnvironmentalUnit to deal with

    environmental issuesand climate resilience.

    The NationalGovernment throughits Ministry ofEnvironment andConservation has setaside some funds tosupport relocation ofthe most vulnerablesettlements in thecountry.

    Awarenessprogrammes onclimate changeundertaken by NGOs.

    National Policy andPlans for climatechange programmes.

    Planning regulations torestricts developmenton swampy land andon steep slopes.

    Lack of funds.

    Lac


Recommended