hNext PhasesFresh Pond Reservation, Cambridge, MA
Public Presentation
29 February 2012y
Agenda
• Introductions
P j t O i• Project Overview
• Previous Phases
• Restoration Approach
• Schedule and Next Steps• Schedule and Next Steps
• Questions and Comments
2/29/2012
2
Project Overview
Phased Restoration Approach
• Slope stabilization and gully repair
• Community‐based restoration plantings
• Improved Drainage ‐ Perimeter Rd
d l h• Integrated Upper Slope with Glacken Field re‐design
2/29/2012
3
Previous Phases
Phase 1 ‐ Stormwater Infiltration(C l t d S 2010)(Completed Summer 2010)
Phases 2 and 3 – Slope Stabilization and Restoration Plantings( l d )(Completed Summer 2011)
Phase 1 – Golf Course Clubhouse
• Level Spreader
• Bioretention Swale
• Rain Garden
• Porous Paving Terrace
2/29/2012
4
2/29/2012
5
Phases 2 and 3 –Upper and Lower Slope
• In asi e Species Remo al• Invasive Species Removal
• Gully Stabilization
• Slope Breaks
• Soil Amendments
• Restoration Plantings
2/29/2012
6
2/29/2012
7
2/29/2012
8
Phased Restoration Approach
Phased Approach
2/29/2012
9
Lower Slope Stabilization
• Gully Restoration
• Slope Stabilization
• Restoration Plantings
Existing Site Conditions
Erosion and Compaction
2/29/2012
10
Canopy dominated by Black Locust (35%) and Red Oak (22%)
Invasive species removed include Norway Maple, y p ,Buckthorn, Oriental Bittersweet
2/29/2012
11
Restoration Planting Approach
• Diversify native plant community
• Increase wildlife h bit t lhabitat value
• Enhance topsoil layer
Perimeter Road Improvements
• Porous Pavement
• Refurbish Perimeter Fence
• Re‐set Curb
2/29/2012
12
Pooling, Muddy Conditions
2/29/2012
13
High Infiltration
RatesRates
Porous Paving – Winter Conditions
2/29/2012
14
Porous Paving – Winter Conditions
Upper Slope/Glacken Fields Interface
2/29/2012
15
Next Steps
• Spring 2012 Bid process for Phase 4 (Lower Slope) Only( p ) y
• Spring/Summer 2012 Phase 4 Slope Stabilization, Gully Repair and Planting
• Summer 2013 Phase 5
Perimeter Road Improvements
• Spring/Summer 2014 (TBD) DesignPhase 6 (Upper Slope) Restoration