G
Â
Bindarri NP
Sherwood NR
Ulidarra NP
Moonee Beach NR
Garby NR
Bindarri SCA
Coffs Coast RP
Dorrigo NP
Kororo NR
Coramba NR
Muttonbird Island NR
South West Solitary Island NR
Split Solitary Island NR
CORAMBA
NANA GLEN
ARRAWARRAGLENREAGH
WOOLGOOLGA
SANDY BEACH
MOONEE BEACH
COFFS HARBOUR
EMERALD BEACH
0
Orara Way
PACIFIC HIGHWAY
Sherwood Road
Hogbin Drive
Tallawudjah Creek Road
Dairyville Road
Murphys Road
Mcrae
s Roa
d
Boyd
s Roa
d
Upper Orara Road
Gentle Annie Road
Store
Road
Shelter Road
Morrows Road
Loop Road
Bray StreetBagawa Road
Boffs Road
Morto
ns R
oad
Parberrys Spur Road
Grah
am D
rive
Eggin
s Driv
e
Bark Hut Road
Bark
Hut C
reek R
oad
Wears
Roa
dCy
clewa
y
Red W
hite An
d Blue
Road
Bennetts Road
South Boambee Road
Waihou Road
Kelly Road
Korora Basin Road
Old Bucca Road
Mastons Road
Dingo Creek Road
Newmans Road
Batte
ry Ro
ad
Mcalpine Way
Polyosma Road
Winters
Road
Linden Avenue
Star Ridge Road
Lost Hut Trail
Bucca Road
West Korora Road
Nashs Road
Condons Road
Isles D
riveFerretts Road
Kratz Drive
Solita
ry Isl
ands
Way
Mack
ays R
oad
Gale Street
-1
Wedds Road
Fawc
ett S
treet
Bluff Road
Brewers Road
0Orara
Way
0
0
BAGAWA
CONGLOMERATE
ORARA EAST
WEDDING BELLS
ORARA WEST
NANA CREEK
TUCKERS NOB
LOWER BUCCA
BOAMBEE
KANGAROO RIVER
495000
495000
500000
500000
505000
505000
510000
510000
515000
515000
520000
520000
6645
000
6645
000
6650
000
6650
000
6655
000
6655
000
6660
000
6660
000
6665
000
6665
000
6670
000
6670
000
6675
000
6675
000
³
0 2,100 4,200 6,300 8,4001,050Meters
Map Sheets: 1:100,000 Coffs Harbour 95371:25,000 Moonee Beach 9537-1SScale: 100,000
Projection: GDA_1994_MGA_Zone_56Datum: GCS_GDA_1994
Coffs Harbour Management AreaLocality
Compartments 7389-7392Wedding Bells State Forest
MAP FEATURESHarvest Area
Flora ReservesState ForestNational Park & Nature ReserveBuilt Up Area
Plantations Ñ Safety Points
SAFETY POINTSHelicopter Landing Areaf
Shannon Creek Rd
ROADSSealedAll Weather, UnsealedDry Weather, UnsealedFour Wheel DriveProposed HaulageDrainage Feature
Map Produced By: S. Pickering Date: 27/2/2017
Â
×
×
×
B
H
AC
D
E
CONGLOMERATE349
WEDDINGBELLS
360
530
550
551
558
7390
7392
7391
7389
CrabtreeRoad
Crabtree Road
Herds Road
7392/1 Road
7391/1 Road
Midd
leRo
ad
MciversRoad
7391/1 Road
Bridge Track
Ten FortyTwo Road
7389
/1 Ro
ad
7390/1 Road
DuckRoad
7390/2
Road
7389/5 Road7389/4Road
7391/2 Road
7389/2Road
Sherw
ood R
oad
Turpe
ntine
Road
Flooded GumRoad
180/752834180/752834
58/752837
4/966975
83/752837
4/787538
4/787538
231/802447
844/731276
09
509000m.E
510
510
6665
000m
. N
65
66 66
³
0 160 320 480 64080Meters
Map Sheets1:25,000 Moonee Beach 9537-4S1:100,000 Coffs Harbour 9537
Projection: GDA_1994_MGA_Zone_56Datum: GCS_GDA_1994
V2.2Prepared By: S. PickeringDate: 4/12/2017
Coffs Harbour Management AreaHarvest Plan Operational Map
Compartments 7389 - 7392Wedding Bells State Forest
Wet Weather Harvesting× Houses HelipadY Dumpú Crossingl External Gate (Closed)
Internal Gate (Open)r Crossings not to be used"u Heritage Site
Property Lot/DP No.
RoadsAll Weather, UnsealedDry Weather, UnsealedFour Wheel DriveNew ConstructionNon Haulage RoadsKoalaStream PZ 1st and 2nd Order (10m)Stream PZ 3rd and 4th Order (20m)Non-forestry Use (FMZ 7)
Plantation AreasThinClearfallNot plantationNative Forest - retain
MAP FEATURESState Forest Boundary
! ! !Compartment Boundary1 Km Grid10 / 100 m ContourState ForestNational Park EstateDrainage LineIndicative Drainage Feature
1:10,000
CONGLOMERATE349
WEDDINGBELLS
360
530
550
551
558
7390
7392
7391
7389
CrabtreeRoad
Crabtree Road
Herds Road
7392/1 Road
7391/1 Road
Midd
leRo
ad
MciversRoad
7391/1 Road
Bridge Track
Ten FortyTwo Road
7389
/1 Ro
ad
7390/1 Road
DuckRoad
7390/2
Road
7389/5 Road7389/4Road
7391/2 Road
7389/2Road
Sherw
ood R
oad
Turpe
ntine
Road
Floode
dGum
Road
09
509000m.E
510
510
6665
000m
. N
65
66 66
³
0 160 320 480 64080Meters
Map Sheets1:25,000 Moonee Beach 9537-4S1:100,000 Coffs Harbour 9537Scale: 10,000 Projection: GDA_1994_MGA_Zone_56
Datum: GCS_GDA_1994
Prepared By: S. PickeringDate: 17/10/2017
Coffs Harbour Management AreaSilvicultural Intent Map
Compartments 7389 - 7392Wedding Bells State Forest
RoadsAll Weather, UnsealedDry Weather, UnsealedFour Wheel DriveNew ConstructionNon Haulage RoadsMGA Grid 100m
Proposed SpeciesBlackbuttSydney Blue GumStream PZ 1st and 2nd Order (10m)Stream PZ 3rd and 4th Order (20m)Non-forestry Use (FMZ 7)Native Forest
Silvicultural IntentClearedClearfall - ReplantThin
MAP FEATURESState Forest Boundary
! ! !Compartment Boundary1 Km Grid10 / 100 m ContourState ForestNational Park EstateDrainage LineIndicative Drainage Feature
CONGLOMERATE349
WEDDINGBELLS
360
530
550
551
558
7390
7392
7391
7389
CrabtreeRoad
Crabtree Road
Herds Road
7392/1 Road
7391/1 Road
Midd
leRo
ad
MciversRoad
7391/1 Road
Bridge Track
Ten FortyTwo Road
7389
/1 Ro
ad
7390/1 Road
DuckRoad
7390/2
Road
7389/5 Road7389/4Road
7391/2 Road
7389/2Road
Sherw
ood R
oad
Turpe
ntine
Road
Flooded GumRoad
19991999
2003
2003
1999
2003
2004
1999
2003
2003
2003
1999
2003
2004
2003
09
509000m.E
510
510
6665
000m
. N
65
66 66
³
0 160 320 480 64080Meters
Map Sheets1:25,000 Moonee Beach 9537-4S1:100,000 Coffs Harbour 9537Scale: 10,000 Projection: GDA_1994_MGA_Zone_56
Datum: GCS_GDA_1994
Prepared By: S. PickeringDate: 31/5/2017
Coffs Harbour Management AreaSpecies Type/Age Class MapCompartments 7389 - 7392Wedding Bells State Forest
RoadsAll Weather, UnsealedDry Weather, UnsealedFour Wheel DriveNew ConstructionNon Haulage RoadsMGA Grid 100mStream PZ 1st and 2nd Order (10m)Stream PZ 3rd and 4th Order (20m)Non-forestry Use (FMZ 7)
Plantation SpeciesBlackbuttE.GRAE.DUNC.CGROTHERClearedNative Forest
MAP FEATURESState Forest Boundary
! ! !Compartment Boundary1 Km Grid10 / 100 m ContourState ForestNational Park EstateDrainage LineIndicative Drainage Feature
Harvest Plan no.: 2017-0003 Version No.: 1 Page 1 of 8
Hardwood Forests Division
Plantation Harvest and Haul Plan
State Forest Wedding Bells Compartments 7389/7390/7391/7392
Management Area Coffs Harbour Plantation Ageclass 1999/2003/2004
Harvest Plan No. Thinning: HP 2017-0003
JN 9016628
Clearfall HP 2017-0005
JN 9016630
Plantation Authorisation No. GR0616P
Legal Conditions Plantation harvesting under the Plantations and Reafforestation Act 1999 and Regulation (Code) 2001.
Certification Timber products removed from the plan area are within the Defined Forest Area covered by Australian Forestry Standard and ISO14001 Certificate 13761
Prepared by Senior Planner
SIGNED Date: 31/5/17
Steve Pickering
Reviewed and Approved by
Planning Supervisor SIGNED
Date: 4/12/17 Matthew Kinny
Abbreviations FT = Forest Technician, HC = Harvesting Coordinator, PtS= Protection Supervisor, HS = Harvesting Supervisor, RS = Roading Supervisor, RC = Roading Coordinator, Crew = Harvest Contractor/Forest Operators, Code = Plantations and Reafforestation (Code) Regulation 2001 IFOA = Integrated Forestry Operations Approval, TSL = Threatened Species Licence, EPL = Environment Protection Licence, FL = Fisheries Licence, CH = Cultural Heritage, SOP = Standard Operating Procedure.
1. Harvest Area Details (all Slope info is LiDAR derived)
Cpt 7389 Cpt 7390 Cpt 7391 Cpt 7392 Total
Gross Area (ha) 62 43 52 58 217
Harvest Area (ha) 34.3 27.9 37.2 45.4 144.8
Slope 0 – 16 degrees (%) 99.2 90.1 99.6 100 97.7
Slope 16 – 22 degrees (%) 0.8 8.5 0.4 0 2.0
Slope 22 – 25 degrees (%) 0 1.2 0 0 0.2
Slope 25 – 30 degrees (%) 0 0.3 0 0 0.1
Contractor must ensure timber removed is allocated to the correct compartment when entered into Electronic Delivery Docket.
Harvest Plan no.: 2017-0003 Version No.: 1 Page 2 of 8
2. Harvesting Objectives
Silviculture Type Harvesting Objectives, Plantation Condition and History
High Quality Blackbutt
Plantation Thinning *
Location: Refer to Operational Map
The objective is to achieve a thinning of the stand and removal of suppressed stems (thinning from below) to achieve final stocking of 250 stems per hectare. This thinning is designed to minimize risk to the stand of windthrow. This thinning is expected to produce a small volume of domestic and export poles as well as pulp.
White Gum & Flooded Gum (conversion at end of rotation)
Plantation Thinning *
Location: Refer to Operational Map
The objective is to achieve a thinning of the stand and removal of suppressed stems (thinning from below) to achieve final stocking of 250 stems per hectare. These stands are generally small patches located below blackbutt earmarked for thinning and consequently unsuitable for clearfall at this time. This thinning is designed to minimize risk to the stand of windthrow. This thinning is expected to produce a small volume of domestic and export poles as well as pulp.
White Gum, defective Blackbutt & other species (suitable for conversion to Blackbutt)
Plantation Clearfell
Location: Refer to Operational Map
The objective is to replace non-blackbutt or very poor quality blackbutt stands with more productive blackbutt plantation on all sites suitable for this species. Species planted included flooded gum, Eucalyptus dunnii, E. camaldulensis/E. grandis hybrid, and a range of other species trials.
A silvicultural intent map shows areas to be thinned and areas to be clearfelled and replanted with different species. The HC may approve minor variations to this strategy in consultation with planning and stewardship functions.
* Plantation thinning
damage standards
Plantation thinning operations must not damage greater than 5% of retained stems. Damage is to be assessed as per the “Progressive Thinning Assessment” procedure. (available on request)
3. Expected Yields
Forest Type Flooded Gum Dunns White
Gum Other Blackbutt
Area (ha) 11.9 33.2 22.1 76.7
Yield (m3/ha) 100 100 100 80
High Quality Sawlogs (m3) 60 0 0 467
Poles (m3) 0 0 0 2057
Veneer (m3) 0 0 0 3086
Low Quality Sawlogs (m3) 60 2 2 1350
Pulp/Residue (m3) 1100 3330 3200 6383
Total (m3) 1220 3332 3202 13342
Harvest Plan no.: 2017-0003 Version No.: 1 Page 3 of 8
4. Harvesting Exclusions, Modified Harvest Areas and Boundary Management
Exclusion/Boundary Conditions
Locating Private Property boundaries
The operational area is well defined with roads, trails, drainage features and fencelines. Crew to locate boundaries using GPS.
Retained native forest Larger patches of native habitat trees have been mapped as exclusions.
Crown Road Reserve
(Powerline)
There is a crown road reserve traversing the property which is not State Forest. There is a powerline and clearing located on this road reserve. Snigging across the road reserve is permitted, however log processing and dump activities are not to be undertaken in the reserve.
Forest Management Zones (FMZ)
FMZ 5 – Hardwood Plantation – Available for harvesting in accordance with the conditions of this harvest plan (yellow and pink on operational map).
Plots There are numerous plots and species trials throughout the plantation areas earmarked for harvest as shown on the HPOM. No special conditions apply to these plot or species trials and they should be clearfelled or thinned based on the prescriptions in Section 2 ‘Harvesting Objectives’ and the HPOM.
Heritage Old farm sheds and slabs on the side of Crabtree Road as shown on the HPOM. Harvesting must not impact on these buildings. The buildings themselves are not structurally sound. Personell are not to enter the buildings themselves.
Tropical Soda Apple Tropical Soda Apple (a Class 1weed) has been detected on the property. The plant can spread via vegetative matter or by spread of seeds.
Crew to review the identification notes supplied and report all detections of the weed to the HC. Do not under any circumstances continue working in an area with plants in seed.
The crew must ensure the loading site and access roads are free from the weed at all times.
All harvesting equipment must be cleaned thoroughly from any woody debris prior to leaving the site. Avoid working on the site when seed is being set.
5. Haulage Route and Contractor Travel Route
Haul Route Haulage is planned to access the Pacific Highway via Sherwood Road to Bucca Road
Signage to be placed on haulage routes notifying of log truck usage
BEWARE –Sherwood Road is regularly used by the public.
B-double Haulage Permit Details
Permit Expiry date:24/11/2019
Permit No.20076 The following conditions apply:
A 40km/hr speed limit applies to B-double log trucks
Speed limits signs are to be placed on Sherwood Road
Advisory signage regarding log truck usage must be erected on Sherwood Road and must include a UHF channel
km markers to be placed on Sherwood Road
Travel is restricted to daylight hours only
Harvest Plan no.: 2017-0003 Version No.: 1 Page 4 of 8
Speed Limit A 60km/hr maximum speed limit applies to log trucks on Sherwood Road.
Non-haulage Roads There are a number of non-haulage roads as indicated on the operational map. They may be used with HC approval for snigging or extraction provided they are drained to the appropriate specifications. They may be used for vehicular access where they have been assessed by the HC prior to use, and are in a stable condition unlikely to cause environmental harm.
6. Community
Issue Conditions
Maintaining public access on Sherwood Road
The HC, in consultation with the HS, Crew and adjacent neighbors, must develop and implement a traffic management plan to ensure safe public access along Sherwood Road, adjacent to the private property during roading and harvesting operations. Refer to FCNSW WHS Procedure 4.11 Traffic Management for guidance.
Noise A number of residences exist in close proximity to the harvest area and may be impacted by noise (as shown on the HPOM) . Mitigative measures to lessen the impact must be developed on a site specific basis by the Crew in consultation with FCNSW.
7. Infrastructure
Infrastructure Conditions
All Mapped Trails Mapped trails must be reinstated to similar or better condition to that prior to harvesting/extraction and comply with the Code. Where trails do not comply with the Code the HC, in consultation with the RS, must determine the most appropriate maintenance work.
Powerline There is a powerline and clearing traversing the area as shown on the HPOM. The crew must conduct a risk assessment and develop safe working procedures prior to working within 2 tree lengths of the powerline.
Fences and Gates The harvesting area is currently occupied under a grazing permit. When occupied with stock, all gates external to the plan area (gates are shown on the operational map) must be left closed. Where possible, use these main gates as the safety barrier for entry to the operation to minimise the possibility of gates being left open.
There are various fences throughout the harvest area as well as along boundaries. The contractor must use directional felling to avoid damage to any fences or gates. Any damage must be repaired immediately by the contractor. If it is necessary to pass through an internal fence, limit the number of openings and install queenslander style gates.
8. Flora, Fauna and Endangered Ecological Communities
Condition Prescription
Koalas The HC and Crew must look for koalas, and evidence of koalas (scats), throughout the operation. The Planning Supervisor must be notified immediately if a koala is
Harvest Plan no.: 2017-0003 Version No.: 1 Page 5 of 8
detected within the plantation area.
If a koala is located during harvesting, the inhabited tree must be marked by the HC or Crew, a 50m buffer instigated around the inhabited tree and a temporary corridor of unharvested vegetation retained (collectively referred to as the temporary protection zone (TPZ)) to link the inhabited tree to the nearest retained native vegetation. Harvesting operations may then proceed around the TPZ. When the koala has moved from within the TPZ, all available trees within this area may be harvested.
Native Habitat Trees Native habitat trees must be retained during harvesting. Native habitat trees should be easily identified due to the presence of hollows and their large size, compared to the surrounding plantation trees. To avoid doubt, native habitat trees do not include crop trees or plantation ingrowth by native species.
9. Protecting Soil and Water
Issue Conditions
Drainage Lines While permitted under the Code, harvesting within 5m of any drainage line (the 5m zone) is not permitted under this plan. Harvesting trees between 5m and 10m from a drainage line is permitted, but harvesting machinery is not permitted within the 10m buffer (‘reach in’ techniques must be used).
This clause does not apply to mapped drainage lines that are identified as drainage depressions in the field (see clause below)
Rivers
(3rd order or higher stream with permanent flow)
All 3rd order and higher drainage lines within the plantation will be conservatively managed as rivers with a 20m buffer. This is additional protection not required under the Code. The crew must identify the boundary using GPS.
Drainage feature mapping To assist in locating drainage line features the operational map contains indicative LIDAR derived drainage features and associated exclusion zones. The mapping has assessed the stream bank and exclusion conservatively. However due to the wide flat drainage features and poor Lidar coverage there will be some errors in the mapping of exclusion zones.
The HC may measure and approve harvesting in a mapped drainage feature exclusion where there is a mapping error.
Slope Limits for Harvesting Machinery
Note: while the Code permits clearfell harvesting up to 30 degrees it is not permitted under this plan. The following conservative slope limits apply.
< 22 degrees: No restrictions apply. (99.7% of harvest area)
22 - 25 degrees: Areas should be harvested using a tree length harvesting system and where possible tree heads should be bunched to facilitate disposal and direct planting. Ideally, shovel logging should be used to minimise soil disturbance. Where a skidder is used to pull logs to roadside, snig tracks must be located on stable ground and drained after use.
25 – 30 degrees: Areas must only be thinned, with a maximum 60% basal area removal. Harvesting over 25 degrees must utilise shovel logging
Harvest Plan no.: 2017-0003 Version No.: 1 Page 6 of 8
techniques. Snigging is not permitted. Clearfelling is not permitted.
> 30 degrees: Harvesting is not permitted
Condition 59(2) of the Code, regarding the assessment of slope within the majority of the plantable area, applies to this operation.
Ground Cover Any areas of significant soil disturbance must be stabilised by the Crew to prevent soil erosion (e.g. spreading grass seed).
Log Dumps Refer to Conditions 60, 61 and 61A of the Code
Roading Management During Harvesting
HC is responsible for monitoring road and crossing drainage during haulage.
Wet Weather Harvesting Refer to Condition 64C of the Code.
Indicative areas suitable for wet weather harvesting are marked on the operational map (brown dots).
Crew is responsible for implementing automatic closures and following notified closures.
HC is responsible for ensuring crew notified when notified closure is lifted.
Extraction Tracks Refer to Condition 64A and 64B of the Code.
Crew is responsible for progressive drainage of extraction tracks.
10. Drainage Line Crossing Approvals
Crossing Conditions
Several drainage line crossing points have been identified during planning and are shown on the HPOM
Where practical extraction routes must avoid drainage line crossings.
Slash crossings must be used to cross drainage lines and depressions, but only if there is no water flowing in the channel or depression.
The HC must assess indicative drainage line crossing points and determine the most suitable location. The HC must authorise the use of drainage lines crossings prior to use.
Harvesting machinery must cross drainage lines at authorised crossings as per conditions 37-41 the Code.
11. Required Documentation
Document Conditions
Plantations and Reafforestation Regulation 2001 (Code)
FCNSW staff and Crew must hold a copy of the Code onsite and ensure the operation remains compliant.
Harvest Plan no.: 2017-0003 Version No.: 1 Page 7 of 8
12. Operational Plan Briefing: A briefing of this operational plan was conducted by
Person Role Nature of Briefing Date
Acknowledgement of Briefing: I acknowledge that I have received a copy of the plan documents and that I
have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in
the plan and take responsibility for the implementation of plan conditions relevant to my responsibilities
Name Role Signature Date
Harvest Plan no.: 2017-0003 Version No.: 1 Page 8 of 8
Operational Diary:
Date Issue Action Required
Action Completed
Initials
Record: Daily activities (eg tree marking, dump 2); Condition 5.2 of TSL items - EEC locations, rocky outcrops, koala scats, feed tree identification etc), discussions with stakeholders/neighbours/ site visitors; areas of impenetrable understorey; unviable areas not marked, non-conformances; harvesting issues identified, twice weekly road and crossing drainage checks
ROADING PLAN – Wedding Bells State Forest, Compartments 7389/7390/7391/7392
1
FORESTRY CORPORATION OF NSW – NORTH EAST REGION
ROADWORKS PLAN
Wedding Bells State Forest; Compartments 7389-7392
ASSOCIATED HARVEST PLAN NO. HP 2017-0003
Certification
Prepared by:
Senior Planner SIGNED
Date: 31/5/17
Steve Pickering
Approved by:
Planning Supervisor SIGNED
Date: 17/10/17
Matthew Kinny
Road Works and Operational Expenditure Approved by:
Acting Roading Manager SIGNED
Date: 11/10/17
Tamara Campbell
Duration of Approval:
The above approval is valid until 12 months from date of signature. Contents
1. Cover Page
2. Operational Map
3. Costings
4. Roadworks Plan Text/Prescriptions/Road and crossings work sheets
5. Locality Map
6. Safety Plan HAMEEP
7. Harvesting Plan
8. Harvesting Notification List (Operations Team Leader and Roading Supervisor Only)
ROADING PLAN – Wedding Bells State Forest, Compartments 7389/7390/7391/7392
2
This
page
is
intentionally
Blank
ROADING PLAN – Wedding Bells State Forest, Compartments 7389/7390/7391/7392
3
1. Objectives
Roadworks are required to service plantation harvesting operations within the above compartments. These compartments are scheduled for harvest commencing late 2017.
These operations involve an initial thin of blackbutt and flooded gum stands, followed in 3-5 years by a second thin of these stands. A clearfall of other species stands will also be scheduled concurrently.
The operational map shows the location of the proposed works.
Attachments: Financial Analysis Spreadsheet gives full details of costs, benefits, material & plant requirements.
2. Specifications and Legal Conditions
This operation must comply with:
Technical Guidance Notes for Roadworks.
State Forests of NSW Forest Practices Code - Part 1 Timber Harvesting in Forests NSW Plantations 2005 and Forest Practices Code Part 4 Forest Roads and Fire Trails (February 1999).
Plantations and Reafforestation Act (1999).
Plantations and Reafforestation (Code) Regulation (2001), subject to the conditions described in Attachment 1 of the Authorisation for the timber plantation.
3. Special Conditions
Feature Conditions
Cultural Heritage Yes – Do not disturb old farmhouse buildings as marked on HPOM
Threatened Species No special conditions
Dispersible Soils Hazard No
Mass Movement Hazard No
Seasonality No
Engineering Design No
Environmental impacts i.e. Dust, Noise, Water, Visual
No
Haulage Standards No special conditions
National Park No
Private Property No special conditions
Permit to enter Not required
Quarries and Gravel Pits No special conditions
Underground/Overhead Utilities Yes
There are powerlines bisecting compartments 7391 and 7392. Conduct a risk assessment prior to operating within 2 tree lengths of these lines.
Safety Issues (includes hazards, public use of roads)
Yes
See Hazard Assessment in the Site Safety Pack
Note Hazards of public road users and derelict farm buildings
ROADING PLAN – Wedding Bells State Forest, Compartments 7389/7390/7391/7392
4
Tropical Soda Apple Tropical Soda Apple (a Class 1weed) has been detected on the property. The plant can spread via vegetative matter or by spread of seeds.
All operators to review the identification notes supplied and report all detections of the weed to the RC. Do not under any circumstances continue working in an area with plants in seed.
The crew must ensure the work site and access roads are free from the weed at all times.
All machinery must be cleaned thoroughly from any woody debris prior to leaving the site. Avoid working on the site when seed is being set.
Fences and Gates The harvesting area is currently occupied under a grazing permit. When occupied with stock, all gates external to the plan area (gates are shown on the operational map) must be left closed. Where possible, use these main gates as the safety barrier for entry to the operation to minimise the possibility of gates being left open.
There are various fences throughout the harvest area as well as along boundaries. All operators must use directional felling to avoid damage to any fences or gates. Any damage must be repaired immediately. If it is necessary to pass through an internal fence, limit the number of openings and install queenslander style gates.
-
4. General Conditions
Tree removal should be undertaken mechanically where possible. Refer to Safety Procedures 4.25 “Manual Tree Felling” and 4.26 “Management of Hazardous Trees & Overhead Hazards”.
Remove vegetation within 3m of the road prism only where required to maintain safe sight distance and passage of trucks.
Note: Clearing is generally permitted within 3m of the road prism for all roads. Ground disturbance and tree debris may impact outside this 3m either side of the road prism as is required to effect clearing within 3m of the road prism. Conditions 5, 6 and 47 Schedule 5 of the EPL must apply.
5. Works Schedule
See attached worksheets
ROADING PLAN – Wedding Bells State Forest, Compartments 7389/7390/7391/7392
5
6. Operational Control
Roading Supervisor to sign here
I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions as the principle controller of the operation.
I will brief any other operators not present at this briefing prior to them starting any work on site and ensure that risk assessment for the Safety Management Plan is completed for this area prior to operations commencing
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
ROADING PLAN – Wedding Bells State Forest, Compartments 7389/7390/7391/7392
6
7. Handover Briefing
I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan.
Position - Company Name Signature Date
Road Maintainence/Upgrade
Road Name 7389/1 Road
Length (m) 400Location From Crabtree Road to 7389/2 Road
Upgrade Length (m) 400
Formation Width (m) N/A
Location na
Curve Widening na
Upgrade Spoil N/A
N/A
N/A
N/A
Full length grass removal
N/A
0-200 m
Gravel Length (m) 400Wheel track only full length
Remove vegetation only in accordance to general condition #
N/A
Comments:
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 0
See general condition 4
Size: 0 Sets: 0
Sets: 2
Sets: 0
Sets: 0
Max Clearing width (m) 3
Permanent
Monday, 20 November 2017 Page 1 of 10
Road Name 7389/3 Road
Length (m) 120Location From 7389/2 Road to End (gate)
Upgrade Length (m) 0
Formation Width (m) N/A
Location na
Curve Widening na
Upgrade Spoil N/A
N/A
N/A
N/A
Full length
N/A
N/A
Gravel Length (m)
Remove vegetation only in accordance to general condition #
N/A
Comments:
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 120
See general condition 4
Size: 0 Sets: 0
Sets: 2
Sets: 0
Sets: 0
Max Clearing width (m) 3
Permanent
Monday, 20 November 2017 Page 2 of 10
Road Name 7389/4 Road
Length (m) 150Location 150m off Crabtree Road to dump
Upgrade Length (m) 0
Formation Width (m) N/A
Location 0
Curve Widening N/A
Upgrade Spoil N/A
N/A
N/A
N/A
Full length
N/A
N/A
Gravel Length (m) 150Full length wheel track
Remove vegetation only in accordance to general condition #
N/A
Comments:
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 150
See general condition 4
Size: 0 Sets: 0
Sets: 0
Sets: 0
Sets: 0
Max Clearing width (m) 3
Temporary
Monday, 20 November 2017 Page 3 of 10
Road Name 7389/5 Road
Length (m) 180Location 180 m from Crabtree Road to dump
Upgrade Length (m) 0
Formation Width (m) N/A
Location na
Curve Widening na
Upgrade Spoil N/A
N/A
N/A
N/A
Full length
N/A
Full length
Gravel Length (m) 180Full length wheel track
Remove vegetation only in accordance to general condition #
N/A
Comments:
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 180
See general condition 4
Size: 0 Sets: 0
Sets: 0
Sets: 0
Sets: 0
Max Clearing width (m) 3
Temporary
Monday, 20 November 2017 Page 4 of 10
Road Name 7390/1 Road
Length (m) 600Location From Crabtree Road to dump through gate
Upgrade Length (m) 0
Formation Width (m) N/A
Location No
Curve Widening No
Upgrade Spoil na
N/A
Entrance to gate, last 50 m of Road
N/A
N/A
N/A
N/A
Gravel Length (m) 100Either side of crossing A
Remove vegetation only in accordance to general condition #
N/A
Comments: Remove trees around existing gate, last 50 m of road
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 600
See general condition 4
Size: 0 Sets: 0
Sets: 3
Sets: 3
Sets: 0
Max Clearing width (m) 3
Permanent
Monday, 20 November 2017 Page 5 of 10
Road Name 7390/2 Road
Length (m) 150Location From Crabtree Road to dump
Upgrade Length (m) 0
Formation Width (m) N/A
Location na
Curve Widening na
Upgrade Spoil N/A
N/A
N/A
N/A
Full length
N/A
Full length
Gravel Length (m) 150Full length wheel track
Remove vegetation only in accordance to general condition #
N/A
Comments: Entrance gate under lantana
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 150
See general condition 4
Size: 0 Sets: 0
Sets: 2
Sets: 0
Sets: 0
Max Clearing width (m) 3
Temporary
Monday, 20 November 2017 Page 6 of 10
Road Name 7391/1 Road
Length (m) 1100Location From Sherwood Road to dump at end
Upgrade Length (m) 800
Formation Width (m) N/A
Location na
Curve Widening na
Upgrade Spoil N/A
N/A
N/A
N/A
Full length
N/A
Full length
Gravel Length (m) 400300m east and 100m west of xing D
Remove vegetation only in accordance to general condition #
N/A
Comments: Widen to two lanes from Sherwood to 7392/1 Road. Do not remove native trees
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 300
See general condition 4
Size: 0 Sets: 0
Sets: 0
Sets: 0
Sets: 0
Max Clearing width (m) 3
Permanent
Monday, 20 November 2017 Page 7 of 10
Road Name 7391/2 Road
Length (m) 550Location From 7391/1 Road to dump xxx
Upgrade Length (m) 600
Formation Width (m) N/A
Location na
Curve Widening na
Upgrade Spoil N/A
N/A
N/A
N/A
Full length
N/A
Full length
Gravel Length (m) 0
Remove vegetation only in accordance to general condition #
N/A
Comments:
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) -50
See general condition 4
Size: 0 Sets: 0
Sets: 0
Sets: 0
Sets: 0
Max Clearing width (m) 3
Permanent
Monday, 20 November 2017 Page 8 of 10
Road Name 7392/1 Road
Length (m) 700Location From Sherwood Road to dump
Upgrade Length (m) 0
Formation Width (m) N/A
Location No
Curve Widening No
Upgrade Spoil N/A
N/A
No
N/A
Full length grass
N/A
Full length
Gravel Length (m) 700Existing gravel full length
Remove vegetation only in accordance to general condition #
N/A
Comments: Widen to two lanes from 7391/1 Road to end. Do not remove native trees
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 700
See general condition 4
Size: 0 Sets: 0
Sets: 0
Sets: 0
Sets: 0
Max Clearing width (m) 3
Permanent
Monday, 20 November 2017 Page 9 of 10
Road Name Crabtree Road
Length (m) 1450Location From Sherwood Road to forest boundary
Upgrade Length (m) 0
Formation Width (m) N/A
Location No
Curve Widening No
Upgrade Spoil N/A
N/A
N/A
N/A
Full length, grass only
N/A
Full length
Gravel Length (m) 1450Existing, top up only
Remove vegetation only in accordance to general condition #
1 only in low spot
Comments:
Works >30 Slopes
Mass Movement
Dispersible
Widening
Grade Lowering
Realignment
Reopening
WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS
Clear veg/debris
Repair surface
Crown/Crossfall
Gravel
Remove trees >20 cm
Remove trees <20 cm
Batter Repair/Upgrade
Culverts
Mitres
ROD/Spoon
Belts/Channels
Drop Downs
Silt Trapping
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Sit
e In
fo
Pav
emen
t
Dra
ina
ge
Ro
ad
sid
e/B
att
ers
Category
N/A
Up
grad
e
Mai
nten
ance
Maintenance Length (m) 1450
See general condition 4
Size: 0 Sets: 0
Sets: 0
Sets: 0
Sets: 0
Max Clearing width (m) 5
Permanent
Monday, 20 November 2017 Page 10 of 10
Construction
Note: If possible trees along alignment of 7389/2 Road should be harvested prior to
construction
Road Name 7389/2 Road Road Category Permanent
Road Length (m) 260 Road Location From 7389/2 Road to fenceline
Mass Movement No
Dispersible No
Ground Slope (°) 15
>30° Slopes No
Proximity Drainage 180
Prism Width (m) 8
Formation Width (m) 3.7
Pavement Width (m) 3
Roadside Width (m) 10
Max Grade (°) 6
Angle Cut Batter 1:3/4 (Standard)
Angle Fill Batter Angle of Repose
Gravel 0
Culvert Size 0 Culvert Set Number 0
Drop Down Type Jutemesh
Sediment Trap NA
Site Information
Specifications
Drainage
Soil Erosion and Stabilisation Controls
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Culvert
Belt/Channel
Mitre
Rod/Spoon
Gravel Length 0
Channel/Belt No: 0
Rod/Spoon No: 7
Max Length Batter: 260
Max Height Batter: 1
Road Length > 10Deg 0
Drainage for >10Deg: Nil
Soil Stabilisation/erosion: Compact Fill Batters >1m & Grass Seed
Soil Stabilisation Interval: Fortnightly or after Storm Event
Monday, 20 November 2017 Page 1 of 1
Crossing Works
Diagram
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Crossing Name A Road Name 7390/1 Road
Drainage Feature 1st Order Stream Stream Permanency Intermittent
Location 350m west of Crabtree Road
Existing CrossingPipe
Size900
Stability StatusStable (maintnenance)
Crossing RequiredPipe
Size (mm/m)
900FuturePermanent
Reshape Bed/banks Reduce overflow causeway height
Disposal of Spoil NA
Inlet Clean
Outlet Existing arnoured/vegetated
Stabilisation Not required
ErosionControl Not required
Approaches Gravel within 20m
Temporary Drainage "No"
5-30m Upstream Left Use existing rollover
5-30m Upstream Right Existing rollover
Practices where no 5-30 N/A
OutletControl Rock armouring
TableDrain Natural vegetation
Crossing Works Approaches and Road Drainage
Existing gravel surface Maintain
existing structure as required
Pavement/Structure
Monday, 20 November 2017 Page 1 of 4
Diagram
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Crossing Name D Road Name 7389/1 Road
Drainage Feature 3rd Order Stream Stream Permanency Intermittent
Location 200 m north of Crabtree Road
Existing CrossingCauseway
Size Stability StatusStable (maintnenance)
Crossing RequiredCauseway
Size (mm/m) FuturePermanent
Reshape Bed/banks Push back banks to lower grade in and
Disposal of Spoil NA
Inlet Existing arnoured/vegetated
Outlet Existing arnoured/vegetated
Stabilisation Not required
ErosionControl Not required
Approaches Armour with gravel/rock
Temporary Drainage "No"
5-30m Upstream Left Install rollover
5-30m Upstream Right Existing crest
Practices where no 5-30 N/A
OutletControl Natural vegetation
TableDrain Natural vegetation
Crossing Works Approaches and Road Drainage
Existing gravel surface Install rock
on outlet and surface, do not
elevate further
Pavement/Structure
Monday, 20 November 2017 Page 2 of 4
Diagram
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Crossing Name E Road Name 7389/1 Road
Drainage Feature 3rd Order Stream Stream Permanency Intermittent
Location 100 m north of Crabtree Road
Existing CrossingCauseway
Size Stability StatusStable (maintnenance)
Crossing RequiredCauseway
Size (mm/m) FuturePermanent
Reshape Bed/banks Smooth/grade approaches, install clean
Disposal of Spoil Not required
Inlet Existing arnoured/vegetated
Outlet Existing arnoured/vegetated
Stabilisation Not requiredd
ErosionControl Not required
Approaches Armour with gravel/rock
Temporary Drainage "No"
5-30m Upstream Left Existing crest
5-30m Upstream Right Install rollover
Practices where no 5-30 Armour approach with gravel
OutletControl Natural vegetation
TableDrain Natural vegetation
Crossing Works Approaches and Road Drainage
Existing gravel surface Add rock
base to crossing, gravel either side,
install rollover
Pavement/Structure
Monday, 20 November 2017 Page 3 of 4
Diagram
Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days):
Date Event Initial
Crossing Name H Road Name 7391/1 Road
Drainage Feature 3rd Order Stream Stream Permanency Intermittent
Location 600 m from Sherwood Road
Existing CrossingCauseway
Size Stability StatusStable (maintnenance)
Crossing RequiredCauseway
Size (mm/m) FuturePermanent
Reshape Bed/banks Not required
Disposal of Spoil NA
Inlet Existing arnoured/vegetated
Outlet Install drop downrock dissipator
Stabilisation Not required
ErosionControl Not required
Approaches Armour with gravel/rock
Temporary Drainage "No"
5-30m Upstream Left Install rollover
5-30m Upstream Right Install rollover
Practices where no 5-30 N/A
OutletControl Rock armouring
TableDrain Natural vegetation
Crossing Works Approaches and Road Drainage
Existing natural surface Install
rollovers either side, gravel dam
wall and approaches
Pavement/Structure