GÜLGÜN MACHINE METAL INDUSTRY
AND TRADING COMPANY LIMITED
OUR HİSTORY Our company was established in 1973 and has been aiming to serve in a quality and
systematic way in the ongoing time. and machining all kinds of valves, various engine parts and hydraulic parts.
Since 1975, we are one of the most important suppliers of the automotive industry. We are making machining of automotive parts manufactured by casting method. These automotive parts we produce for the company are generally used in the vehicles produced by the Renault main industry.
Since 2003, we have been manufacturing contract manufacturing for valve industry.
In 2005, ISO9001 Quality Management Certificate was initiated and in 2006 this certificate was obtained. In 2019, IATF 16949 studies were started.
We are currently serving in two shifts to the Automotive, Hydraulic, Industrial Machinery and Valve sectors.
MACHİNE PARK
BROTHER RX450 X1CNC VERTICAL PROCESSING DOUBLE PALLET (450*320) DELTA SEIKI MV5 CNC VERTICAL MACHINING CENTER (550*400*500) DELTA SEIKI MV7 CNC VERTICAL MACHINING CENTER (720*450*500) DELTA SEİKİ MV5 CNC VERTICAL MACHINING CENTER (550*400*500) DELTA SEİKİ FCL‐20 CNC LATHE (350*500) DELTA SEIKI DL‐30 CNC LATHE (350*500) AUTOMATIC BAND SAW DRİLL (3 PC) MARKING MACHİNE FORKLİFT 3 TON
REFERENCES FERRO DÖKÜM SAN. VE DIŞ TİC. A.Ş.
DUYAR VANA MAK. SAN. A.Ş.
ALTAN HİDROLİK MÜH. A.Ş.
HAYTAŞ DÖKÜM A.Ş.
GİACOMİNİ UNİTES TESİSAT LTD. ŞTİ.
TOKMAN RAKOR LTD. ŞTİ.
DEKMA TAVUKÇULUK TİC LTD. ŞTİ.
UÇAR METAL TİC LTD. ŞTİ.
TEKMİL SANAYİ VE TİCARET LTD. ŞTİ.
SOME OF OUR REFERENCE PARTS
ALUMINUM GROUP
ALUMINUM GROUP
ALUMINUM GROUP
CASTING GROUP
MISCELLANEOUS PARTS
IMAGES FROM OUR MACHINE PARK
MILLING SECTION
MILLING DEPARTMENT
LATHE DEPARTMENT
MECHANICAL MANUFACTURING
QUALITY CERTIFICATE
MEASUREMENT ANALYSIS‐IMPROVEMENT
Some of the main topics that are regularly monitored and accepted as sources of improvement are as follows; Customer Satisfaction Customer Comlaints Employee Satisfaction Employee Advice Employee Performances Supplier Performances Incorrect Production Data Error Sources Corrective Actions Delivery Delays Planned Trainings and Training Activity Results
QUALITY CONTROL PROCESS
Any product is subjected to different control processes at different points before being shipped to the customer. All of these activities are guaranteed to deliver the product of the desired quality to the customer.
All components that affect the product after the purchase are subjected to the Introduction Quality Control process according to the control plans.
During production, any product must be subjected to serial approval before starting production. Process intermediate controls are performed depending on the control plans.
Any product undergoes Final Quality Control before being shipped to the customer.
FACTORY AREA
FACTORY AREA
WE THANK YOU