+ All Categories
Home > Documents > Global Wire Mesh Security Part

Global Wire Mesh Security Part

Date post: 16-Oct-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
4
globalindustrial .com WIRE MESH SECURITY PARTITION Assembly Instructions Customer Service 1-800-645-2986 PANEL PARTS DOOR PARTS Floor Socket Wall Clip Top Capping Splice Plate Top Capping Corner Splice Plate 3-Way Splice Plate 3-Way Clip Corner Post Channel Stiffener Post Fill-A-Gap Panel Latch Receiver (Already Attached) Bottom Slam (Already Attached) Track Hanger Track Hanger Splice Hanger Wheel Trolley Slide Lock (Already Installed) Swing Lock (Already Installed) Top Capping Channel ROOF PARTS Roof Beam Roof Beam Splice Beam Support Bracket Roof Mounting Angle Yoke Bracket (Included As part Of Roof Beam Splice Kit) Wall Mount Slotted Angle WIRE MESH SECURITY PARTITION Assembly Instructions 1-800-645-2986 ROOF PANEL CHANNEL STIFFENER CHANNEL STIFFENER POST DETAIL “E” ROOF PANEL SEE DETAIL “E” Attach yoke bracket to channel stiffener post. Assemble roof panels. Bolt panels to roof mounting angle and roof beam. Tighten all nuts and bolts. WITH WARNING LABEL FACING UP 6 7 9 NOTE: MAKE SURE THAT CHANNEL STIFFENER POST ARE IN A PLUMB POSITION BY USING A LEVELING DEVICE ON (2) SIDES OF THE CHANNEL STIFFENER POST. Attach channel stiffener post at junction of 4 roof panels. Post must be secured to floor (hardware not supplied). 8 8 1 Global Wire Mesh Security Part 1/31/05 11:36 AM Page 1
Transcript
Page 1: Global Wire Mesh Security Part

globalindustrial.com

WIRE MESH SECURITY PARTITION

AssemblyInstructions

Customer Service1-800-645-2986

PANEL PARTS

DOOR PARTS

Floor Socket Wall Clip Top CappingSplice Plate

Top CappingCorner Splice Plate

3-Way Splice Plate 3-Way Clip

Corner Post Channel StiffenerPost

Fill-A-Gap Panel

Latch Receiver(Already Attached)

Bottom Slam(Already Attached)

Track Hanger

Track Hanger Splice Hanger

Wheel Trolley Slide Lock(Already Installed)

Swing Lock(Already Installed)

Top CappingChannel

ROOF PARTS

Roof Beam Roof Beam Splice Beam SupportBracket

Roof MountingAngle

Yoke Bracket(Included As part Of

Roof Beam Splice Kit)

Wall Mount Slotted Angle

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

ROOF PANEL

CHANNEL STIFFENER

CHANNEL STIFFENER POST

DETAIL “E”

ROOF PANEL

SEE DETAIL “E”

Attach yoke bracketto channel

stiffener post.

Assemble roof panels.Bolt panels to roofmounting angle androof beam.

Tighten all nuts and bolts.

WITH WARNINGLABEL

FACING UP6 7

9NOTE:MAKE SURE THAT CHANNEL STIFFENERPOST ARE IN A PLUMB POSITION BY USINGA LEVELING DEVICE ON (2) SIDES OF THECHANNEL STIFFENER POST.

Attach channelstiffener post atjunction of 4 roofpanels. Post must besecured to floor(hardware notsupplied).

8

8 1

Global Wire Mesh Security Part 1/31/05 11:36 AM Page 1

Page 2: Global Wire Mesh Security Part

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

5'

5'

5'

5'

5' 5' 5' 5'23'7"

5'

5'

20'

3'

FLEX -O-PANEL

HINGED DOOR

SLIDINGDOOR

WALL CLIPSWALL CLIPS

SERVICEWINDOW

MASONRY WALL

CHANNELSTIFFENER

CHANNELSTIFFENER

CHANNELSTIFFENER

5'

5'

7"

HOW TO PLAN AND ORDER1. Make a rough floor plan of the area to be enclosed and

take measurements showing them on the drawing.

2. Indicate panels, doors, service windows, size andlocation of doors on the drawing. Show the direction ofthe door slide or hinges either left or right handed,swinging in or out.

3. At least 2 people required to assemble partition.

4. Snap chalk lines indicating walls.

5. If starting at an existing wall, start first panel from wall.If it is a free-standing room, start at a corner.

6. Bolt panels together loosely. DO NOT secure floorsockets to the floor until fully assembled.

7. Install channel stiffener posts every 10-15 feet. Channelstiffener posts are included with doors. See drawing forplacement.

8. After all panels and doors are assembled, attach topcapping channel. Top capping channel should spanpanels and splices should be in the middle of a panel formaximum strength. For rooms with roofs see page 5 forassembly instructions.

9. Tighten panel bolts.

10. Attach floor sockets using appropriate hardware(NOT Included)

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

ALIGN SURFACES

SEE DETAIL “C”

SEE DETAIL “A” AND “B”

SEE DETAIL “D”

DETAIL “C”

DETAIL “B”

CUT ANGLEDETAIL “A”

DETAIL “D”

Attach wall mount slotted angle to wall

(hardware notincluded).

ROOF ASSEMBLYAttach roof mounting angles to wire partition walls.4

5

WALL CLIPS WALL CLIPS

SLIDINGDOOR

CHANNELSTIFFENER

CHANNELSTIFFENER

CHANNELSTIFFENER

SERVICEWINDOW

FILL-A-

GAPPANEL

HINGEDDOOR

72

Global Wire Mesh Security Part 1/31/05 11:36 AM Page 3

Page 3: Global Wire Mesh Security Part

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

PANEL ASSEMBLY

WALL CLIPINSTALLATION

ADJUSTABLEFILL-A-GAP

PANEL

TOP CAPPINGCHANNEL

TOPCAPPING

If predrilled holes do not line up,drill a 5/16” hole

Bolt panels together loosely.DO NOT secure floor socketsto the floor until fullyassembled.

Floor SocketInstallation

3-Way ClipInstallation

3-Way Splice Plate Channel StiffenerInstallation

Panel to Panel BoltHole Alignment

Trim leg abovefloor socket for3 way clipinstallation

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

ROOF ASSEMBLY

ROOF BEAMASSEMBLY

Assemble splicer to roof beams.

Attach beam support bracket to roof beam.

Attach roof beamassembly to wirepartition.

-Rooms with a roof do not use top capping-

12

3

6 3

Global Wire Mesh Security Part 1/31/05 11:36 AM Page 5

Page 4: Global Wire Mesh Security Part

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

SLIDE DOOR ASSEMBLY

ChannelStiffener

REVERSIBLE DOOR

HangBar

HangBar

Strike platebolted tochannelstiffeners

Hinged Left Swing Out

Hinged RightSwing In

Hinged Left Swing In

Hinged LeftSwing In

LatchReceiver

TransomBar

BottomSlam

BottomTrack

Remove lockand reverse if

necessary

WIRE MESH SECURITY PARTITIONAssembly Instructions1-800-645-2986

ROOF BEAM LAYOUT CHART

54

Global Wire Mesh Security Part 1/31/05 11:36 AM Page 7


Recommended