Gold Ray Dam Interagency Technical Team Meeting
Transcript
Page 1: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Gold Ray Dam Interagency Technical Team Meeting

Page 2: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

NEPA UpdateDeconstruction PlansHydraulic ModelingNext Steps

Agenda

Page 3: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Upstream habitat (wetlands, fish, frogs, riparian areas)

Well levels Downstream domestic water intakes Sediment quality Recreation Economic impacts (fishing and river guides) Alternatives – dam rehab and power

generation

NEPA Update

EA Issues from Scoping Mtg

Page 4: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Section 1 – Introduction Section 2 – Purpose and Need and Alternatives

Purpose and need – complete No action Alternative 1 – Dam Removal

• Deconstruction plan• Restoration plan

Alternative 2 – Dam Rehabilitation• Dam, forebay walls, etc. (structural)• Fish Ladder• Fish Screening• Power generation – optional?

NEPA Update

EA Progress

Page 5: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Section 3 – Affected Environment and Environmental Consequences

Section 4 - Preparers and Agencies Consulted Section 5 – Abbreviations/Acronyms Section 6 – References

NEPA Update

EA Progress

Page 6: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Dam complex SHPO coordinationDetermination of eligibility (DOE) nearly complete Likely eligible for National RegisterRemoval likely “adverse effect” but mitigated

Archaeology SHPO coordination doneDOE underway – no shovel testing required

NEPA Update

Cultural Resources

Page 7: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

“Level 1” – based on records and site visit; no testing

Look for indicators for contamination Recommend testing locations in power

house and former transformer sites

NEPA Update

Environmental Site Assessment

Page 8: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Biological Assessment Content largely completed Confirm the action area Incorporate demo/restoration plan

information

Project Approach

Page 9: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Wetlands Report Submitting 2 wetland reports: Delineation

Report and Indirect Wetland Impact Report

Reports are drafted; waiting for 2 year event modeling to finalize maps

Project Approach

Page 10: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Schedule Review draft EA and permit applications in

middle of January Draft EA – 30 day review and revision Goals:

Submit BA and permit applications in early February

EA out for public review in mid to late February

Project Approach

Page 11: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Deconstruction Plan Multi-step plan with controlled

drawdown of reservoir Minimizes risk for County Ensures dam removal and fish

passage when complete

Project Approach

Page 12: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

1934 Log Crib Dam (PacifiCorp)

Page 13: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

1940 Log CribDam (PacifiCorp)

Page 14: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

1941 Gold Ray Dam Construction (PacifiCorp)

Page 15: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

1941 Gold Ray Dam Construction (PacifiCorp)

Page 16: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

November 14, 1941 (PacifiCorp)

Page 17: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Project Approach

Page 18: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Project Approach

Page 19: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Fish Passage Plan

Page 20: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Fish Passage Plan

Page 21: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Page 22: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Project Approach

Page 23: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Project Approach

DATE

5/24

/10

5/31

/10

6/7/

106/

14/1

06/

21/1

06/

28/1

07/

5/10

7/12

/10

7/19

/10

7/26

/10

8/2/

108/

9/10

8/16

/10

8/23

/10

8/30

/10

9/6/

109/

13/1

09/

20/1

09/

27/1

010

/4/1

010

/11/

10

CONSTRUCTION (June 15 - August 31 in-water)Access site on south side / mobilize equipment

Construct south side cofferdamRemove southern portion of concrete dam

Divert river to south channel opened by dam removal (fish passage delay)Construct north side cofferdam

Remove northern portion of concrete damRestore river to permanent channel

Construct restoration portions of project (Kelly Slough/Tolo Slough/Bear Creek)Remove existing powerhouse and fish ladders

Deconstruction Schedule

Page 24: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Restoration PlanProject Approach

Page 25: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Hydraulic Modeling

Page 26: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Next Steps Finalize deconstruction plan Run hydraulic modeling DRAFT NEPA Continue with public outreach

Summary

Page 27: Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.

Recommended