+ All Categories
Home > Documents > gOOD_BW7-3

gOOD_BW7-3

Date post: 25-Oct-2014
Category:
Upload: nmadhukar
View: 54 times
Download: 0 times
Share this document with a friend
Popular Tags:
83
Upgrade to NetWeaver BW 7.30 New features with ABAP Upgrade Roland Kramer, Solution Architect BW/BI/In-Memory Customer Insight & Action for SAP EMEA December 2010
Transcript
Page 1: gOOD_BW7-3

Upgrade to NetWeaver BW 7.30New features with ABAP Upgrade

Roland Kramer, Solution Architect BW/BI/In-MemoryCustomer Insight & Action for SAP EMEADecember 2010

Page 2: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 2

Agenda

1. Technology/Roadmap facts

2. What’s new with the Upgrade to BW 7.30

3. Usage of the ASU toolbox for BW

4. General checks prior to the Upgrade

5. Details of the Upgrade Process

Page 3: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 3

Planned Roadmap HANA & SAP NetWeaver BW

Major releaseBW AcceleratorNew features andimprovements across allcomponents

BW 7.0 / BWA 7.0

200920112010

Real-time operational analytics onmass dataRapid creation of agile data martsNon disruptive deployments ofHANA side by side ERP and/orBW

HANA V1.0 Additional calculationcapabilitiesPrimary persistence layerunder BW; eliminates needfor separate databaseModels for SAP businesscontent enabling newapplications

HANA V1.x

Go-to release forintegration with SAPBusiness Objects BI

BW 7.0 EhP1 (7.01)

Major step on EnterpriseData Warehousingscalability and flexibilityBW Accelerator: additionalperformanceIntegration Improvementswith SAP BusinessObjectsData Services

BW 7.3 / BWA 7.2

BW running on HANA asthe underlying In-MemoryDB PlatformIn-Memory for EnterpriseData WarehousingIntegrated Planning In-Memory enabled

BW 7.3x

2006

SAP NetWeaver BW evolving to afully In-Memory enabled EDWsolution on top of HANA

Futuredirection

This presentation and SAP's strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. This document is provided without a warranty of any kind, either express or implied, including but not limited to, the implied warranties ofmerchantability, fitness for a particular purpose, or non-infringement.

Page 4: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 4

BW 7.30 - Executive Summary

Enhanced Scalability & Performance for faster decision makingRemarkably accelerated data loadsNext level of performance for BW Accelerator

Increased flexibility through SAP BusinessObjects BI and EIM integrationTighter integration with SAP BusinessObjects Data ServicesEnhanced integration with SAP BusinessObjects Metadata Management

Reduced TCO and improved development efficiencyAutomated creation of Semantic Partitioned ObjectsGraphical data flow modeling and best practice data modeling patterns

Simplified configuration and operational managementAdmin Cockpit integrated into SAP Solution ManagerWizard based system configuration

Major benefits of SAP NetWeaver BW 7.3 are:

This presentation and SAP's strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. This document isprovided without a warranty of any kind, either express or implied, including but not limited to, the implied warranties ofmerchantability, fitness for a particular purpose, or non-infringement.

Important timelinesBeta Shipment starting in July 2010Ramp Up starting in November 2010

Page 5: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 5

Upgrade to BW 7.30 - ABAP

NetWeaver Java 7.30 is now shipped together with BW 7.30. Optionally you can separate theJava Stack prior to the Upgrade of the ABAP Backend, if not already done. The Upgrade of aDoublestack is also supported You can do either:The new split tool for the Java Stack in SAPInst is available with EhP2 or with the SAPInstdelivered with Abap 7.30There is a SEM Add-On available with BW 7.30. The SEM Add-On will be available end ofQ1/2011 for Ramp-Up CustomersBW 7.30 and BWA 7.30 brings together some new improvements not only for the SAP usage

together with Explorer 2.0 acceleratedtogether with BOe XI 3.1 and BI 4.xtogether with DS XI 3.2 and DI 4.x accessing non-SAP Systems and data lineage

The BICS are moving to the upcoming SAP BusinessObjects Application Platform BI 4.0,which is also a prerequisite for the full usage of the BEx successor - Analysis -The Java component BW-IP modeler is redeveloped for BW 7.30 in ABAP HTTP, so the JavaServer will not be used anymore for the BW-IP infrastructure in the future after BW 7.30The new BI Authorization concept is now mandantory. Despite the fact that you either create a7.0x System beforehand to migrate the old BW Authorization, a potential Upgrade from BW3.5 to 7.30 would be possible.

Some technology facts and updates

Page 6: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 6

SAP NetWeaver BW 7.01 vs. BW 7.30Comparison

Criteria BW 7.01 BW 7.30

FunctionalEnhancements Strong Extreme

Availability Established In Ramp-Up

BO Integration Strong BO Focus Lessons Learned

Upgrade Support Tools ASU and CTC ASU and CTC

Performance / Usability Tuned for BO since 7.01 Same as 7.01 +New

BW Accelerator Known Improvements New Innovations

Analysis Authorizations Recommended Required

Integrated Planning Based on Java Based on ABAP

SBOP Explorer Explorer Ready Explorer Ready +

Page 7: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 7

New authorization concept must be in placeFormer and new authorization concept

It is mandatory to setup/migrate to the new concept prior to the upgradeThe former authorization concept is no longer supported with BW 7.30You cannot switch back to the former conceptNew Transaction RSECADMIN, see SAP Notes 942799 and 944929

Page 8: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 8

Example Project schedule for the MigrationCombined technical Upgrade & Authorization Migration

Plan phase (6 weeks)UpgradeAuthorizations

DEV system (4 weeks)Upgrade & TestAuthorization migration

QAS system (5 weeks)Upgrade & TestAuthorization Test

PRD system (1 weekend)Upgrade & GoLiveCutover & Golive

KickOffLegend: Duration MilestoneStart Upgrade

1st month 2nd month 3rd month 4th month 5th month <month>

GoLive

RemarkOverall project duration dependents on the system complexity.Given example is based on a higher complexity.To match with typical technical Upgrade Plan, start two month in advance.

Page 9: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 9

Separation of ABAP and JAVA Stack with EhP1Upgrade of the Doublestack to 7.30 is still possible

BusinessWarehouse

ABAP

BW

BEx Web

Java

BW Java

EP & EP-C

Java

BW Java

EP & EP-C

ABAP

BW

Page 10: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 10

General Guidelines and Notes

Managing your Upgrade with Innovative Toolshttp://www.sdn.sap.com/irj/sdn/index?rid=/webcontent/uuid/b039ebc5-304f-2b10-499e-97dabda45e48

New Features with BW 7.30http://www.sdn.sap.com/irj/sdn/bw-73

Links to Guides (Master and Upgrade)http://service.sap.com/instguides

NetWeaver BW 7.30 Online Helphttp://help.sap.com/saphelp_nw73/helpdata/en/ca/6fbd35746dbd2de10000009b38f889/frameset.htm

Useful NotesNote 1403832 - Central Note: Upgrade Systems on SAP NetWeaver 7.3Note 1390477 - Additional info for upgrade to SAP NetWeaver 7.3 (using SUM)Note 1484437 - BI_CONT 7.35: Information about installation and upgradeHinweis 1022704 - Upgrade Phase EHP_INCLUSION und SPSTACK_REQUESTHinweis 1171648 - [INTERN] Solution Manager: PPMS Produktdaten fehlenNote 1405878 - SAP Solution Manager - Basic functions SP22 and higherNote 1088717 - Active services for Web Dynpro ABAP in transaction SICFNote 1403827 - Central Note - Software Update Manager 1.0 [lmt002]Note 1476239 - SAP system migration to Windows 2008/2008 R2Note 1503599 - SQL Server: wrong compatibility level in system copy

Page 11: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 11

Agenda

1. Technology/Roadmap facts

2. What’s new with the Upgrade to BW 7.30

3. Usage of the ASU toolbox for BW

4. General checks prior to the Upgrade

5. Details of the Upgrade Process

Page 12: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 12

System Switch Upgrade

New upgrade directory now located at \\sapmnt\<SID>\upg

New with NetWeaver EhP1 onwards

Page 13: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 13

New Upgrade UIfollowing the EhP development guidelines

Page 14: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 14

New Upgrade UIProviding the JCE Jurisdiction Policy Files beforehand

New Security Concept used:See Notes 1240081 and 1238121

Start of SAPupSTARTUP „JCE_POLICY_ZIP = <jce policy zip file>"If JCE_POLICY_ZIP already set in the Environmentyou can directly use STARTUP without Parameter

Page 15: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 15

Put all components/patches/updates to onedirectory and all Add-On‘s as SAINT packages

All Add-On’s/Patches will befound automatically in the EPSinbox

Create your XML Files for ABAPSupport Packages on SMP

Page 16: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 16

New Preconfiguration Modes availableOr manual selection see Upgrade Guide Page 46

Page 17: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 17

Upgrade Planningworking until Downtime is possible now

Page 18: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 18

Changeability of BW Objects during Upgrade

Page 19: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 19

Agenda

1. Technology/Roadmap facts

2. What’s new with the Upgrade to BW 7.30

3. Usage of the ASU toolbox for BW

4. General checks prior to the Upgrade

5. Details of the Upgrade Process

Page 20: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 20

Accelerated Upgrade to NetWeaver BW 7.30Your single source for all pre and post upgrade steps

Use the predefined content for:upgrade to NetWeaver 7.x BWupgrade to ERP 6.0 EhPx (upcoming)upgrade to any SAP Product based onthe NetWeaver 7.x Platform (upcoming)create/modify own content (XML based)

Complete Business Suite 7connectivity (with EhP1):

abap - java connection (available) forconnection BW-IP, EP, ESS/MSS, etc.abap - abap (with EhP1) for backendconnection e.g. ERP, CRM, BW, PI, etc.java - java (upcoming) for frontendconnection e.g. FPM, etc.Note 1178800

Lower your TCO and time effortsby Managing your Upgrade with innovative tools

1. ASU toolbox (incl. BW Content)one single truth for all pre/post Upgrade Steps(Note 1000009)

2. CTC for BW-Javaautomatic connection between Abap and Java

(Note 983156)

Check out the success story from the German Customer Karcher:https://websmp204.sap-ag.de/~sapidp/011000358700000162292010E/

Page 21: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 21

Application Postchecks and functionaltestsTechnical post Stepsand Go-LivePreparation

Application testingNew 7.0 EDW featuresTechnical testingBI-Java CTC andtesting of new 7.0features

Application checks/cleansing andUpgrade PreparationTechnical checks andUpgrade preparationAgree on result

Last checksPREPAREUPGRADE

Pre UpgradeSteps

PREPARE/UPGRADE

Post UpgradeSteps Testing

Upgrade Process with the ASU toolbox for BWin average 3 days per systems

1 day 1 day 1 day 1 Week

Note: Elapsed time may be longer due to scheduling and lags, etc.

Key Highlights of the ASU toolbox for BWOne single source of all pre and post steps for a successful upgradeClear distribution of tasks between SAP Basis Administration and the Application DevelopmentAdditions, Remarks, Documentation can be added immediately as wellXML editor makes adoptions to other SAP upgrades easy.

Page 22: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 22

Typical Scenario for an UpgradeSee Details in SAP Note 1000009

SAP Solution Manager SAP UP SAP System

Start Upgrade RoadMap

Start ASU-Toolboxbefore Upgrade Phase(download Content from Marketplace)

Start Prepare Running Prepare-Jobs

Running ASU-Reports viaSchedule Manager

Start technical UpgradeASU-Toolboxbefore Upgrade Phase finished

Prepare finished

Running technical Upgrade

Start ASU-Toolboxafter Upgrade Phase

Technical Upgrade finished

Running ASU-Reports viaSchedule Manager

ASU-Toolboxafter Upgrade Phase finished

Monitoring of all startedASU-Reports viaSolution Manager

ASU-Upgrade-Note-Display

Page 23: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 23

Typical Upgrade Project Plantypical duration 6-8 weeks for a 3-System Landscape

Start after first comp. Stack(2d/Sys)

3d

3d + 1w Test

Ongoing (several weeks)

Steps/Milestones

3d + 1w Test

3d

Start after first Upgrade(2d/Sys.)

2w

Upgrade Tasks

Upgrade Planning

Upgrade of Development

Additional testing

Setup of BOe/Explorer/BWA

Upgrade of Test

Upgrade of Production

SAP Java Server/EP

BU Requirements/BWA

todayLegend: Duration Milestone 6 weeks 8 weeks

Time in total: 9d Upgrade, 10+d testing, 6d Java Inst, 6d BOe/Explorer, 5+d SBO Explorer Implementation

Page 24: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 24

Pre Steps of ASU toolbox for BW - 1

IT/SAP Basis/Application Owner

Application Owner

IT/SAP Basis

Page 25: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 25

Pre Steps of ASU toolbox for BW - 2

Application Owner

Page 26: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 26

Post Steps of ASU toolbox for BW - 1

IT/SAP Basis

Application Owner

Depending on timing/after Post Steps

Page 27: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 27

Post Steps of ASU toolbox for BW - 2

Depending on Project/existing App.

Application Owner

Page 28: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 28

ASU toolbox – BW specificInstall latest ST-PI 2008 Add-On

XML can now be changed within thesame screen, e.g. new or changeditems/checks can be added immediate.

Page 29: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 29

Agenda

1. Technology/Roadmap facts

2. What’s new with the Upgrade to BW 7.30

3. Usage of the ASU toolbox for BW

4. General checks prior to the Upgrade

5. Details of the Upgrade Process

Page 30: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 30

New with NetWeaver 7.0x Daemon processStop all Deamon Process with Transaction RSRDA

Page 31: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 31

Activate all DataStore ObjectsValid for all BW Releases 3.x and 7.0x

Page 32: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 32

Further general Upgrade ChecksSAP_DROP_TMPTABLES and RSUPGRCHECK

Page 33: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 33

Check the Secure Storage with SECSTOREe.g. if System is a copy from Test/Production

Page 34: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 34

Transaction SECSTORE

Page 35: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 35

Check for missing TLIBG entryNew check from NetWeaver BW 7.0x onwards

2EETG013 "Function group frame program" "CRM_BUPA_FRG0060_BAPI" "exists without TLIBG entry"2EETG013 "Function group frame program" "LXE_SE63_Z_EDITOR" "exists without TLIBG entry"

Page 36: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 36

Create the Stack XML FileUse the Maintenance Optimizer from your Solution Manger

Page 37: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 37

The upgraded System must appear here for selection

Example: http://sptmain.wdf.sap.corp:1080/sap/bc/webdynpro/sap/wda_mopz_plan?sap-language=EN

Create the Stack XML File

Page 38: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 38

Create the Stack XML FileChoose the Option Maintenance for the Upgrade

Page 39: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 39

Create the Stack XML FileConfirm the Major Target

Page 40: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 40

Create the Stack XML FileThe XML File is created and available for download or in the EPSinbox

Page 41: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 41

Agenda

1. Technology/Roadmap facts

2. What’s new with the Upgrade to BW 7.30

3. Usage of the ASU toolbox for BW

4. General checks prior to the Upgrade

5. Details of the Upgrade Process

Page 42: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 42

Upgrade UI – Start Pagehttp://<server>.<domain>.<ext>:4239

Page 43: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 43

Start the Software Upgrade Manager (SUM)startup.bat jce_policy_zip=c:\java\SAPJVM6_crypto.zip

Page 44: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 44

SAP JVM location/environment variablesstart DSUGui.bat separately

Page 45: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 45

Upgrade UIDetails for Step Initialization

Page 46: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 46

Upgrade Password provided in Note 1390477Put all updates from SMP into the download directory

startup.bat "jce_policy_zip=SAPJVM6_crypto.zip"Password:KEYWORD: 6782622

Page 47: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 47

Add all main DVD hereRemove empty lines in advance Add-On’s as SAINTpackages

Page 48: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 48

Include the Stack XML from Solution ManagerA correct configured Maintenance Optimizer is a prerequisitenow

Page 49: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 49

Solution Manger Upgrade Key readySolution Manager – MOPZ connection later necessary

Page 50: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 50

Check for missing ABAP correctionsThis will also appear even if you on the right SP Stack Level

Page 51: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 51

Upgrade UI Note 96317 and 962955check with Page 88 of the Upgrade Guide modify /etc/hosts

Page 52: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 52

New Upgrade pre configuration optionsHigh resource use (minimal downtime, fast import, archiving off)

Page 53: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 53

Overview of upgrade configurationAccept choice

Page 54: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 54

Overview of manual upgrade configurationManual selection will not apply maximum values

Page 55: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 55

Procedure with further Add-On’sAdd additional packages as SAINT packages into EPS/in

Page 56: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 56

Mandantory connection to MOPZ neededAs alternative create a Stack XML for BW 7.30 (no EhP included)

Page 57: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 57

Decision about EhP1 during Upgrade to 7.30Note 1022704 EHP_INCLUSION and SPSTACK_REQUEST

Page 58: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 58

Further descission about Add-On’sUPG WITH SAINT PACK or DELETE (for ST-PI possible)

Page 59: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 59

Decision about included Support Packages

Page 60: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 60

Decision about included SPAM update

Page 61: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 61

Optional: include SPDD and/or SPAU request

Page 62: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 62

ASU toolbox for BWEven that ASU toolbox is optional, it contains ALL pre and poststeps

Page 63: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 63

Installing BI_CONT on SAP NetWeaver 7.3

3800300version „7.35“

Page 64: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 64

Development is locked after this PhaseDepending on your Upgrade preconfiguration

Page 65: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 65

Decision about SPDD prior the ACT phaseFor BW type system you can continue without adjustments

Page 66: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 66

Unlock/Lock the shadow system is necessaryA friendly reminder/recap

D:\usr\sap\trans\bin>tp unlocksys FBMpf=TP_DOMAIN_FBM.PFL

This is tp version 372.04.65 (release 700, unicodeenabled)

tp finished with return code: 0

meaning:

Everything OK

D:\usr\sap\trans\bin>tp unlock_eu FBMpf=TP_DOMAIN_FBM.PFL

This is tp version 372.04.65 (release 700, unicodeenabled)

tp finished with return code: 0

meaning:

Everything OK

D:\usr\sap\trans\bin>tp locksys FBMpf=TP_DOMAIN_FBM.PFL

This is tp version 372.04.65 (release 700, unicodeenabled)

tp finished with return code: 0

meaning:

Everything OK

D:\usr\sap\trans\bin>tp lock_eu FBMpf=TP_DOMAIN_FBM.PFL

This is tp version 372.04.65 (release 700, unicodeenabled)

tp finished with return code: 0

meaning:

Everything OK

Page 67: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 67

Reset the Upgrade with report RSUPGRESAnother friendly reminder/recap

Note 417670 - Additional information on resetting upgrade as of Release 6.10

Page 68: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 68

Decision about ACT phaseAccept non-severe errors will be solved in a later phase

Page 69: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 69

Old “PREPARE” is now finishedUntil this phase working with the system was possible

Please Note:from BW Perspective is is nownot possible anymore tochange the following objects,even that you are not jet in thedowntime phase

Query structuresInfoPackages definitionsProcess Chains

This behavior didn’t changedfrom former BW Upgrades priorto EhP1 (7.01)

Page 70: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 70

End of phase PreprocessingTo ensure the recovering please backup the upgrade directory

Page 71: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 71

End of phase Downtime backup of DBUpgrade is already over the top

Page 72: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 72

End of phase PostprocessingThink about the start of BTCTRNS2 after the post work is finished

Page 73: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 73

End of phase PostprocessingThink about the start of SGEN after the post work is finished

Page 74: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 74

End of phase PostprocessingMight not occure with higher support package

Page 75: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 75

End of phase PostprocessingDecision about SPAU create transport for further upgrades

Page 76: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 76

End of phase PostprocessingYour technical Upgrade is finished

Page 77: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 77

Technical Upgrade has endedEnd of phase Finalization

Page 78: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 78

Example runtime for BW 7.30 upgradeRunning at the end of the technical upgrade

Page 79: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 79

Postwork after 7.30 upgrade - newNote 1165059 - ALE: Generating and reading change pointers after upgrade

Page 80: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 80

Migrate the BI Authorization to 7.30

More Details:http://help.sap.com/saphelp_nw73/helpdata/en/45/5ae49cee142a50e10000000a11466f/frameset.htm

Page 81: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 81

Postwork after 7.30 upgrade - existing

Get everything which is needed here:Managing your Upgrade with Innovative Toolshttp://www.sdn.sap.com/irj/sdn/index?rid=/webcontent/uuid/b039ebc5-304f-2b10-499e-97dabda45e48

The „upgrade Bible“ from page 52http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/60ecc07d-3a4b-2b10-ef83-c988e6ecabf6

Check the generic post upgrade steps from here

Page 82: gOOD_BW7-3

© SAP AG 2009. All rights reserved. / Page 82

Thank you!

Roland KramerSolution Architect BW/BI/In-Memory

Customer Insight & Action for SAP EMEA

Phone +49 (7672) 481178Mobil +41 (79) 215 8418

[email protected]://www.sap.com

Page 83: gOOD_BW7-3

Copyright

© Copyright 2010 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information

contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries,

xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+,

POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect,

RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks

of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States

and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP products and services mentioned herein as well as their

respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business

Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects S.A. in the

United States and in other countries. Business Objects is an SAP company.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational

purposes only. National product specifications may vary.

These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational

purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only

warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if

any. Nothing herein should be construed as constituting an additional warranty.


Recommended