Goshen Area Bus Reconfiguration

Date post: 22-Feb-2016
Category:
Upload: tarika
View: 38 times
Download: 0 times
Share this document with a friend
Description:
Goshen Area Bus Reconfiguration. Presented by PacifiCorp Grid Operations. Pre-Contingency Load Shed Event. December 4, 2013 Pre-contingency load shed required to prevent post-contingency violation on underlying 161 kV system for loss of 345 kV source into Goshen - PowerPoint PPT Presentation
Popular Tags:
19
Goshen Area Bus Reconfiguration Presented by PacifiCorp Grid Operations Jefferson A ntelope G oshen B ig G rassy A m ps R eno LostR iver W est R exburg 115 kV R ound Valley n.o. To A naconda via P eterson Flat Tap (IP C ) To Dillon R uby Bernice W olverine C reek Jolly H ills Palisades Arco Kinport(IPC ) Borah (IPC ) Fishcreek G race Populus Sunbeam To Bridger To M idpoint Future 115 kV BPA 161 kV Path C American Falls (IPC ) To Ben Lom ond/ Terminal To W heelon Malad Mudlake Dubois Blackfoot (IPC ) Spar C anyon Threem ile Knoll S oda Sw an Valley Drum m ond Idaho Falls Targhee IPC Scoville (IN L) Treasureton Brady (IPC ) 69 kV 46 kV 345 kV 230 kV Foreign O w ned 138 kV 161 kV Rigby R exburg SugarC ity BPA BPA BPA
Transcript
Page 1: Goshen Area Bus Reconfiguration

Goshen Area Bus Reconfiguration

Presented by PacifiCorp Grid Operations

Jefferson

Antelope

Goshen

Big Grassy

Amps

Reno

Lost River

West Rexburg

115 kV

Round Valley n.o.

To Anaconda via Peterson Flat Tap (IPC) To Dillon

RubyBernice

Wolverine Creek

Jolly Hills

Palisades

Arco

Kinport (IPC)

Borah (IPC) Fishcreek

GracePopulus

Sunbeam

To Bridger

To Midpoint

Future 115 kV BPA

161 kV

Path C

American Falls (IPC)

To Ben Lomond/TerminalTo Wheelon

Malad

Mudlake

Dubois

Blackfoot (IPC)

Spar Canyon

Threemile Knoll

Soda

Swan Valley

Drummond

Idaho Falls

Targhee

IPC

Scoville (INL)

Treasureton

Brady (IPC)

69 kV46 kV

345 kV230 kV

Foreign Owned

138 kV161 kV

Rigby

RexburgSugar City

BPA

BPA

BPA

Page 2: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 2

Pre-Contingency Load Shed Event– December 4, 2013

Pre-contingency load shed required to prevent post-contingency violation on underlying 161 kV system for loss of 345 kV source into Goshen

– Since event, PacifiCorp has taken steps to prevent another pre-contingency load shed event.

Page 3: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 3

Why was load shed required?– NERC standard FAC-011-2 R2.1

Highest available facility rating cannot be exceeded for a credible outage at any time.

– Peak RC enforcing these standards, via Peak RC SOL Methodology

– To prevent NERC standards violation, amount of load in the Goshen area reduced to level where 161 kV system could serve remaining load, and stay within all facility ratings following contingency

Page 4: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 4

– Example from Peak RC

Emergency Rating

4 Hour Rating

Normal Rating

Why was load shed required?

Page 5: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 5

Preventing future load shed– Short Term Solutions:

Reconfiguring Goshen 345 kV bus (Completed) Procedure to serve Goshen area load radial off 345 kV source

(Completed) Additional relay settings on 161 kV system (Completed) Splitting Goshen 161 kV bus to prevent complete loss of load

(Completed)– Long Term Solutions:

Local Area Protection Scheme (Under study)

– Additional Transmission Capacity under study

Page 6: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 6

Reconfiguring the Goshen 345 kV bus – Goshen 345 kV bus had a weakness

If one breaker out of service, single contingency could disconnect 345 kV source from 161 kV source• December 4: Goshen CB 303 was out of service for critical

maintenance

– Extensive engineering work performed to reconfigure the Goshen 345 kV bus, minimize risk to load

– Bus reconfigured: single breaker outage cannot remove both 345 kV sources

Page 7: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 7

Radial load procedure– Procedure calls for opening up 161 kV ties into Goshen 161

kV bus 3 operated by PacifiCorp, 1 by Idaho Power

– If 345 kV bus is lost, all load served out of Goshen lost– Prevents pre-contingency load shedding– Not automatic– Trips all load in the area once a threshold has been exceeded

Page 8: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 8

161 kV relaying– In coordination with Idaho Power and Northwestern Energy,

relay settings placed on 161 kV ties into Goshen area to protect 161 kV lines

– Relay settings open breakers if the elements are overloaded– Prevents pre-contingency load shed – Load can survive certain outage conditions versus radial

procedure– Automatic protection: load only lost if contingency occurs– Still trips all load in the area once threshold exceeded, if

contingency occurs

Page 9: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 9

Goshen 161 kV bus split– Solution serves portion of the Goshen area load off

east bus, leaves 161 kV ties, generation, some load on west bus

– Each bus has own 345 kV transformer source– If one (or both) sources lost

West bus served off the 161 kV ties East bus is lost

– Prevents total loss of Goshen area load

Page 10: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 10

Goshen 161 kV bus split

Page 11: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 11

Goshen 161 kV bus split

Page 12: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 12

Risk to load– Without bus reconfiguration, 100% of load served in

the Goshen area at risk for an N-1-1– Preserves as much load as possible given current

transmission system– Next two slides show amount of load at Goshen at

risk for radial and split bus configuration

Page 13: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 13

Risk to load

Page 14: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 14

Risk to load

Page 15: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 15

Sectionalizing benefits– Palisades loop and wind generation remain online– Facilitates faster restoration– Unilateral implementation– Does not require complex relay logic

Page 16: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 16

Load risk probability– Now, 4 conditions need to occur simultaneously for load loss

at Goshen Peak loading conditions Minimal generation Single 345 kV line out of service (maintenance, permanent fault) Additional 345 kV line suffering a permanent fault

– 1-2 can occur at same time, third is rare– Prior to PacifiCorp’s actions, only 3 of these need to occur to

trigger action (pre-contingency load shed)

Page 17: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 17

Local area protection scheme– Local Area Protection Scheme (LAPS) potential– Will require redundancy and WECC RASRS

approval– Based on real-time system and loading conditions– LAPS could determine required amount of load to

shed for each system condition– An appropriate amount of load selected for loss of

345 kV source

Page 18: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 18

Additional system reinforcements– 161 kV transmission capacity reinforcement

Goshen-Sugarmill line scheduled to be re-conductored in November 2014

– Additional 161 kV reinforcements under study

Page 19: Goshen Area Bus Reconfiguration

© 2

014

PAC

IFIC

OR

P | P

AG

E 19

Questions

Jefferson

Antelope

Goshen

Big Grassy

Amps

Reno

Lost River

West Rexburg

115 kV

Round Valley n.o.

To Anaconda via Peterson Flat Tap (IPC) To Dillon

RubyBernice

Wolverine Creek

Jolly Hills

Palisades

Arco

Kinport (IPC)

Borah (IPC) Fishcreek

GracePopulus

Sunbeam

To Bridger

To Midpoint

Future 115 kV BPA

161 kV

Path C

American Falls (IPC)

To Ben Lomond/TerminalTo Wheelon

Malad

Mudlake

Dubois

Blackfoot (IPC)

Spar Canyon

Threemile Knoll

Soda

Swan Valley

Drummond

Idaho Falls

Targhee

IPC

Scoville (INL)

Treasureton

Brady (IPC)

69 kV46 kV

345 kV230 kV

Foreign Owned

138 kV161 kV

Rigby

RexburgSugar City

BPA

BPA

BPA


Recommended