Dr. Franz Pacher I Foro Internacional Ferroviario BCNRail Gotthard Base Tunnel Construction and Railway- Technical Equipment Dipl. Ing. Dr. techn. Franz Pacher CEO ALPINE-Bau GmbH (Schweiz) Seestrasse 72b CH-6052 Hergiswil Dr. Franz Pacher I Foro Internacional Ferroviario BCNRail 2 x 30 km Construction of the Gotthard Base Tunnel 2 x 57 km Railway-Technical Equipment .....is building at the longest railway tunnel in the world Contract sum 1‘485 Mio. CHF Basis 2000 ca. 1’220 Mio. € Contract sum 1‘574 Mio. CHF w ithout Options ca. 1’290 Mio. €
Transcript
  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Gotthard Base TunnelConstruction and Railway-

    Technical EquipmentDipl. Ing. Dr. techn. Franz Pacher

    CEOALPINE-Bau GmbH (Schweiz)

    Seestrasse 72bCH-6052 Hergiswil

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    2 x 30 km Construction of the Gotthard Base Tunnel

    2 x 57 km Railway-Technical Equipment

    ….....is building at the longest railway tunnel in the world

    Contract sum 1‘485 Mio. CHF Basis 2000ca. 1’220 Mio. €

    Contract sum 1‘574 Mio. CHF without Optionsca. 1’290 Mio. €

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Location and Situation

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Location and Situation

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Bodio

    Faido

    Sedrun

    Erstfeld

    Amsteg

    existing Gotthard-Railway LineNew Gotthard Base TunnelAccess Tunnel, Access Shaft

    Construction Lots of the Base Tunnel

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    TBM

    TBM

    TBM

    TBM

    D&BD&

    B

    Multifunctional Stations

    Erstfe ld

    Amsteg

    Sedrun

    Faido

    Bodio

    15.1 km

    16.6 k

    m

    6.2 km

    11.4 k

    m

    7.4 km

    Total L

    ength:

    56.7 k

    m

    Crosspassages

    Construction Lots of the Base Tunnel

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Inner l

    ining w

    orks

    in prog

    ress

    Work in progress per October 2011

    Dr. Franz Pacher

    Excava

    tion and

    inner l

    ining

    finishe

    dExcava

    tion and

    inner l

    ining

    finishe

    dExcava

    tion and

    inner l

    ining

    finishe

    dExcava

    tion and

    inner l

    ining

    finishe

    d

    Install a

    tion of

    railway

    techno

    logy

    in prog

    ressInst

    all at ion

    of

    railwa

    y techn

    ology

    in prog

    ress

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Concrete BatchingPlant Office

    Portal LodgingsWorkshop

    Rotary Dumping Facilities Info Centre

    Material Processing

    Installation Site Bodio

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Erection of the Tunnel Boring Machine East Bodio

    8.80 m

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Erection of the Tunnel Boring Machine East Bodio

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Equipment for the Inner LiningConstruction East and West Bodio

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Transport Equipment based on Rail

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Rotary Dumping Facility Bodio

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Construction Sites in the Tunnel

    3

    Drill & Blast Excavation of Crosspassages 3

    6

    Inner Lining for Crosspassages 6

    7

    Inner Lining for the Portal Part 7

    4

    Inner Lining Sites East and West 4 + 5

    5

    1

    Excavation with TBM East and West 1 + 2

    2

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Logistics

    - Per Day 850 m3 Concrete and Spray Concrete

    - Per Day 6‘000 m3 Excavation Material, 12‘000 to

    - Maximum: 54 Pcs. Loks, 260 Pcs. Waggons > 4 km

    - Per Day 180 Trains Movements

    - Maximum: 190 Pcs. Switches, 95 km Track System

    Organisation of Logistics

    Track Constructi onMaintenance

    Track SystemDispositionAbove Ground

    Rolling stockEngine drivers

    Rotar y dumper Z-Hall

    Concrete batchingCA Depot

    CA Manager„Platzchef“

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Main Controlling Centre for the Train Movements Bodio

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Special Situations – TBM Excavation

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Special Situations – TBM Excavation

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Normal Situations – TBM Excavation

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Breakthrough Bodio-Faido

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Concrete Batching Plant

    LodgingsMaterial Processing

    WorkshopOffice

    Cantine

    Storage Place

    Installation Site Faido

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Situation of the Multifunctional Station Faido

    MFS – Basis Disposition TenderMFS – Basis Disposition „New Tunnel System North“MFS – Basis Disposition „Relocation MFS to South,

    with new ventilation system“MFS – Basis Disposition „IST“ / „Actual“

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    H = 22 mH

    = 1

    4 m

    TUNNEL Junction: L = 200 m

    D = 9

    .30 m

    EST

    Excavation MFS Faido

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Tunnel Junction MFS Faido

    Connection Tunnel

    EST West to Bodio

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Geological Problems MFS Faido

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Geological Problems MFS Faido

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Transport of the TBM through MFS Faido

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Trailing Back up System passing through MFS Faido

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Erection of the TBM MFS Faido

    9.40 m

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Special Situations – TBM Excavation Faido

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Fault Zone TBM-Excavation Faido

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Reprofiling the Tunnel Faido-Sedrun

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Maintenance Work at the Cutter Head of the TBM

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Passing through the Inner Lining Installation MFS Faido

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Concrete Works MFS Ventilation System

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Concrete Works MFS Ventilation System

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    from tunnel construction to railway tunnel

    Railway-technical Equipment

    One General Contractor

    One Lump Sum Offer

    1.7 bil. CHF

    8 years project execution

    Equipped tunnel

    Commercial operation

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Works Committee

    QM

    CommercialMgmt.

    GeneralMgmt.

    General Project Manager

    Head ofConstruction

    Head of Internal Work

    TractionPower16.7Hz

    TC/ IT&

    Signalling

    Communication

    Legal Service

    PowerSupply

    50Hz&

    Cabling

    Rail Track

    Controlling

    Head of Contract Mgmt.

    Permanent Installations Temporary Installations

    Project Management

    Site Communications

    Power Supply

    Site ventilation/Cooling

    Logistics/ Transports

    Railway-technical Equipment – Organisation

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Rail track Traction current16.7Hz

    Power supply 50Hz& cable installations

    Telecommunications & Safety Installations

    Scheduling

    Coordination of implementation

    Commissioning

    Planning

    Contract Management

    Risk Management

    Joints Management

    Communications

    Quality Management

    Training

    System Documentation

    Temporary Installations

    FRACAS

    RA MS

    Maintenance

    Safety

    Requirement Tracing System

    Construction Management

    Earthing

    Business Management

    Logistics

    Environment

    Railway-technical Equipment – Overall Tasks

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Permanent Installations • Rail Track• Power Supply 50Hz & cabling• Traction Power 16.7Hz• Telecom• Signalling

    Temporary Installations

    40%60%

    Railway-technical EquipmentOverall Tasks

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Logistics/ Transportation• Setting up and operating installation positions• Organisation of safety• Installation Logistics

    Installation of ventilation/cooling• Maximum temperature 28 °C • Fresh air supply

    Power supply• Temporary power supply 50Hz• Lighting• Earthing

    Site communications• Landline• Wireless

    Railway-technical EquipmentTemporary Installations

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Railway-technical EquipmentPermanent Installations

    Telecommunications &

    Safety Installations

    Track system

    Power supply 50 Hz Cable installations

    Traction current 16.7 Hz

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Trackworks – Track System

    •114 km slab track•14 km open track•Concrete works with concrete train•40 km ballast track•30 switches and crossings

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Power Supply 50 Hz & Cable Installations

    •Over 5800 km cable•Control cabinets, 2000 pcs•Control systems 50 Hz

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Traction Power 16.7Hz

    •114 km catenary in tunnel• 40 km catenary open track• earthing• switch gears• monitoring and control 16.7 Hz

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Telecommunication & Signalling

    • Interlocking, ETCS Level 2• Railway control systems• Tunnel radio network• Tunnel control system / IT-Systems

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Permanent Installations

    Tunnel radio cable

    Line feederReturn

    conductor

    Clearanceprofile

    Handrail

    Data cable

    Emergencylighting

    Low voltage cableBalise

    Return conductorContact linesupport structure

    Contact linecompensation system

    Main signal board

    High voltage cable

    Rail track

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Sections of Installation

    Installation viaIP South

    Transportation and Installation only possible via entrance North and South

    Installations via rail track in up to four line sections at the same time

    Turn over and crossing hardly impossible

    Installation via IP North

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    One General Contractor

    One Lump Sum Offer

    1.57 Bil. CHF

    16 Years Project Time

    Alp Transit Gotthard and Transtec Gotthard have signed the Contract on April 29th, 2008 for the Railway-technical Equipment.

    Work in Progress2006 Placing the Offer

    Signing the Contractg the ContractPlaning/Installation South

    Finish Works

    2007

    Guarantee

    2008

    2012

    2017

    2024

    Works Start from South

    Works Start from North

    2009

    Start of Operation

    2010

    2016

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Accommodation/Control room/Railway station

    IP area75,000 square metres

    3 sheds: 7,000 square metres

    Office

    Canteen

    Visitors

    Test track

    Installation Site South Biasca

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Installation Site South Biasca

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Installation Site North

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Slab Track (LP3x)

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Slab Track (LP3x)

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Cables (LP4x)

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Catenary (LP5x)

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Catenary (LP5x)

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Telecommunication & Signalling LP6x

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Telecommunication & Signalling LP70

  • Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail

    Telecommunication & Signalling (LP8x)

    Dr. Franz Pacher

    I Foro Internacional Ferroviario BCNRail