GOVERNMENT OF INDIA OUTCOME BUDGET OF MINISTRY OF STEEL 2015-2016
Transcript
Page 1: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

GOVERNMENT OF INDIA

OUTCOMEBUDGET

OF

MINISTRY OF STEEL

2015-2016

Page 2: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized
Page 3: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

GOVERNMENT OF INDIA

OUTCOME BUDGET

OF

MINISTRY OF STEEL

2015-2016

Page 4: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized
Page 5: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

CONTENTS

CHAPTER

NO.

SUBJECT

PAGE

NO.

EXECUTIVE SUMMARY I-II

I. INTRODUCTION 1-5

1. Functions 2. Organisation

3. Public Sector Undertakings 4. Research & Development in Iron & Steel Sector

1

2-5

5

II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19

1. Normal Saving/surrender of non utilized fund in projects/schemes run under Government Budgetary Support

19

III. REFORM MEASURES AND POLICY INITIATIVES 20-27

1. Liberalisation of the Indian Steel Sector

2. Major Initiatives taken by Ministry of Steel

3. New National Steel Policy

20-21

22-27

27

IV. REVIEW OF PAST PERFORMANCE OF SCHEMES OF 2013-14 &

2014-15

28-68

V. FINANCIAL REVIEW 69-75

1. Total Requirement of Funds for 2015-16

2. Actual Expenditure - 2012-13 to 2014-15

3. Non-Plan Expenditure

4. Plan Expenditure

5. Brief on R&D Scheme

6. Annual Plan Outlay for 2015-16 (BE)

7. Year-wise analysis of Gross Budgetary Support for 12th Plan

8. Plan Outlay and Actual Expenditure during 2014-15

9. Status of Outstanding Utilisation Certificates

69

69

70

70-71

71

72-73

74

75

75

Page 6: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized
Page 7: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

I

EXECUTIVE SUMMARY

The Outcome Budget of the Ministry of Steel highlights the Ministry’s specific role

and objectives, its programmes, projects, schemes and activities undertaken to realise

these objectives and the outcome of various major schemes/programmes implemented

by the Ministry and its Public Sector Undertakings (PSUs). The document also

highlights the physical and financial targets, achievements for previous years and also

the projections in the year 2015-16.

Chapter - I gives a brief introductory note on organisational set up and the objectives of

the Ministry of Steel, the broad programme classification and agencies engaged in their

implementation.

Chapter - II gives the break-up of outlays and outcomes/ targets in respect of major

schemes and projects implemented by the PSUs under the Ministry. As the schemes/

projects of the PSUs are too many and varied, and mostly related to their day to day

operations, only major schemes with estimated/ sanctioned cost of Rs. 50 crore and

above have been covered. For 2015-16, 40 such major Plan schemes have been

included in the outcome budget statement. Out of 40 Plan schemes, Steel Authority of

India Ltd. (12 schemes), Rashtriya Ispat Nigam Ltd. (21), MOIL Limited (02) and

National Mineral Development Corporation Limited (NMDC Ltd.) (04) are implementing

schemes with entire expenditure funded from their Internal & Extra Budgetary

Resources (I&EBR) and 1 scheme by the Ministry of Steel for promotion of research

and development in iron and steel sector with Plan budgetary support. The estimated/

sanctioned cost, outlay for 2015-16, processes/ timelines, risk factors, projected

physical outputs and projected outcomes in respect of these 40 major schemes have

been given in the statement.

Chapter - III details the reform measures and policy initiatives of the Ministry of Steel.

This chapter also covers the important policy measures, which have been taken by the

Government in the post-liberalisation era for the growth and development of the

domestic iron and steel industry. An important policy initiative taken in this regard by the

Ministry was the announcement of the National Steel Policy (NSP) in 2005. Process of

drafting of new National Steel Policy to replace the existing National Steel Policy 2005

has been initiated for development of steel industry with the focus on achieving the

targeted production of 300 mtpa of steel by 2025. The long-term objective of the NSP

is to achieve a modern and efficient domestic steel industry of world standards, catering

to diversified steel demand. The focus of the policy is to achieve global competitiveness

not only in terms of cost, quality and product-mix but also in terms of global benchmarks

Page 8: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

II

of efficiency and productivity. The major thrust areas where supportive

measures/policies may need to be provided to make India globally competitive in the

iron and steel sector have also been highlighted in this chapter.

Chapter - IV gives a review of the past performance of the Plan Schemes of the

Ministry of Steel and the major schemes and projects with estimated/ sanctioned cost of

Rs. 50 crore or more of the PSUs in terms of the projected outcomes/ targets indicated

in the Outcome Budget of 2013-14 and 2014-15. The actual achievements vis-à-vis

the intended outcome in respect of the 45 of major Plan schemes included in Outcome

Budget 2013-14 and 39 of the 2014-15 have been highlighted.

Chapter - V gives break-up of the financial outlays and financial requirements of

Ministry of Steel and the Public Sector Undertakings/ Organizations under its

administrative control. As against budgetary provision (Gross) of Rs. 92.92 crore in

Budget Estimates (BE) 2014-15 and Rs. 78.10 crore in Revised Estimates (RE) 2014-

15, a provision of Rs. 88.13 crore has been provided in BE 2015-16 under Demand No.

95 for the Ministry of Steel. A provision of Rs. 13085.47 crore (I&EBR Rs. 13070.47

crore and Plan Gross Budgetary Support Rs. 15.00 crore) has been made in BE 2015-

16. The overall trends in expenditure vis-à-vis BE/RE in 2014-15 and BE of financial

year 2015-16 are covered in this chapter.

*****

Page 9: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-I/Introduction

1

CHAPTER - I

INTRODUCTION 1. FUNCTIONS The main functions of the Ministry of Steel are:

(a) Development of Steel Plants in Public and Private Sectors, the re-rolling industry and ferro-alloys.

(b) Policy formulation regarding production, distribution, pricing of iron & steel and Ferro alloys.

(c) Development of iron ore mines in the public sector and other ore mines like manganese ore, chrome ore, limestone and other minerals used in the iron and steel industry (but excluding mining lease or matters related thereto).

(d) Providing a platform for interaction of all producers and consumers of steel in the country.

(e) Identification of infrastructural and related facilities required by steel industry.

(f) Overseeing the performance of 8 PSUs, their subsidiaries and one Special Purpose Vehicle (Joint Venture Company) called International Coal Ventures Pvt. Ltd. (ICVL).

Ministry of Steel –facilitator for development of Steel Industry

The Ministry of Steel is expected to play a crucial role in ensuring harmonious and integrated growth of the Steel Sector. Being a core sector, its sustained growth is a prerequisite for attaining the high level of Gross Domestic Product (GDP) growth. The industry has strong forward and backward linkages with other sectors of the economy and, therefore, its own growth pattern is also influenced by other sectors of the economy specially infrastructure development, real estate, auto mobiles/auto components etc. The environment in which the domestic steel sector operates calls for a greater promotional role by the Ministry of Steel specially as a facilitator to remove sectoral bottlenecks/constraints like availability of raw materials, development of infrastructure and also interaction with other concerned Ministries/Departments of the Government for appropriate policy formulation and implementation. 2. ORGANISATION

The Ministry of Steel is headed by Union Minister of Steel and one Minister of State duly assisted by a Secretary to the Government of India, an Addl. Secretary and Financial Adviser, three Joint Secretaries, one Economic Adviser, a Chief Controller of Accounts, seven Directors, two Deputy Secretaries and other officers and supporting staff. For dealing with technical aspects relating to the iron and steel industry, there is a separate Technical Wing.

Prior to deregulation of the sector, Ministry of Steel had an attached office viz.

the Office of the Development Commissioner for Iron & Steel (DCI&S), located at Kolkata. Based on the recommendations of the Expenditure Reforms Commission, an administrative decision was taken to close the four Regional Offices of DCI&S with effect from 23.5.2003.

Page 10: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-I/Introduction

2

There is no statutory or autonomous body under the administrative control of Ministry of Steel. 3. PUBLIC SECTOR UNDERTAKINGS Ministry of Steel has the following Public Sector Undertakings under its administrative control:

I. Steel Authority of India Limited, (SAIL), New Delhi

II. Rashtriya Ispat Nigam Limited, (RINL), Visakhapatnam

III. NMDC Limited, Hyderabad

IV. MOIL Ltd., Nagpur

V. KIOCL Ltd., Bangalore

VI. Hindustan Steelworks Construction Limited (HSCL), Kolkata

VII. MECON, Ranchi

VIII. MSTC, Kolkata (I) Steel Authority of India Limited (SAIL) : (Registered office at Ispat Bhavan,

Lodi Road, New Delhi – 110003) has the following Units under its overall control: -

a) Bokaro Steel Plant, Bokaro (Jharkhand) b) Bhilai Steel Plant, Bhilai (Chattisgarh) c) Durgapur Steel Plant, Durgapur (West Bengal) d) Rourkela Steel Plant, Rourkela (Orissa) e) Alloy Steel Plant, Durgapur (West Bengal) f) Salem Steel Plant, Salem (Tamilnadu) g) IISCO Steel Plant, Burnpur h) Visvesvaraya Iron & Steel Plant, Bhadravati (Karnataka) i) Central Marketing Organisation, Kolkata (West Bengal) j) Research and Development Centre for Iron & Steel, Ranchi (Jharkhand) k) Raw Materials Division, Kolkata (West Bengal) l) Centre for Engineering & Technology, Ranchi (Jharkhand), and m) Corporate Office, New Delhi n) SAIL refractory unit o) Chandrapur Ferro Alloy Plant

In addition, SAIL has incorporated a new subsidiary company, namely ‘SAIL Refractory Co. Ltd.” (SRCL) for absorbing Salem Refractory Unit of M/s. Burn Standard Co. Ltd. SAIL is in the process of enhancing its hot metal production capacity from the level of 13.82 million tonnes per annum to 23.46 million tonnes under its current phase of expansion and modernization which is expected to be completed by financial year 2015-16. It has further plans to take up its capacity to 50 million tonnes by 2025.

(II) Rashtriya Ispat Nigam Ltd. (RINL): (Registered Office at 'A' Block, Visakhapatnam -530 031), is the first shore based Integrated Steel Plant set up in India. The company is a port based integrated Steel Plant commissioned in 1992 with capacity of 3 Million Tonnes Liquid Steel per annum. The plant has been built to match international

Page 11: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-I/Introduction

3

standards with state -of-the-art technology, incorporating extensive energy saving and pollution control measures. The company has drawn its Corporate Plan aiming to reach 20 Million tonnes by 2032-33 in phases, and has completed its first phase of expansion of liquid steel production to 6.3 Million tonnes from 3.0 Million tonnes. The entire cost of the project would be met from the internal resources and borrowings and there would be no budgetary support from the Government.

As approved by Government, the three operational companies under the

erstwhile Bird Group of Companies, namely Eastern Investments Ltd. (EIL), Bisra Stone Lime Company Ltd. (BSLC) and Orissa Minerals Development Company (OMDC) have become Public Sector Undertaking with effect from 19.03.2010 and are subsidiaries of RINL.

(III) NMDC Ltd.: The company was established on 15th November, 1958 as a Public Sector Undertaking and is the single largest producer of iron ore and diamonds in the country and is engaged in exploration, development and exploitation of various other minerals such as Dolomite, Lime stone, Magnesite etc. NMDC’s large mechanized Iron ore mines are being operated at Bailadila Iron ore Mines, Kirandul Complex which operates Dep-14 & Dep-11C mines, Bacheli Complex which operates Dep-5 & Dep-10&11A mines in Chattisgarh state and Donimalai Iron ore Mines in Karnataka state. NMDC has got India’s only mechanized Diamond mine at Panna, Madhya Pradesh. NMDC is contemplating a major expansion to meet the demand of Iron ore. Deposit-11B mine at Kirandul, Bailadila and Kumaraswamy Mine at Donimalai in Kartnataka are the projects in progress.

NMDC plans to produce 34 MTPA iron ore production by 2014-15, 75 MTPA by 2018-19 and 100 MTPA by 2024-25. The company can produce about 78 MTPA from existing mines and it needs to produce more mines to enhance its production.

As a part of the Greenfield expansion/diversification programme, NMDC is setting up an Integrated Steel Plant of 3 MTPA capacity at Nagarnar. The project is estimated to cost about Rs. 15525 crore.

The Company is also setting up a Pellet Plant at Donimalai with an estimated cost of Rs. 572 crore which is expected to be commissioned in June’ 2015.

NMDC has diversified its activities in the field of renewable energy by setting up Wind Mill in Karnataka and is exploring the possibilities in solar energy. NMDC has planned to expand its business through horizontal integration in the field of Coal, Rock Phosphate, Lime stone, Gold and Diamond.

The Company has 78.56% shareholding in Legacy Iron Limited, an ASX listed entity based in Perth, Australia. Legacy has 60% interest in Mt. Bevan Iron Ore Project from Hawthorn Resources Ltd. in Western Australia.

NMDC has also signed an MoU with Railways for doubling of 150 kms of railway line from Kirandul to Jagdalpur, Chhattisgarh to create an additional capacity of evacuation upto 12 mt / annum.

Page 12: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-I/Introduction

4

(IV) MOIL Ltd : The company which was formed in 1962 (Registered office at MOIL Bhavan, 1A, Katol Road, Nagpur – 440013) is the largest domestic producer of high grade manganese ore, a basic raw material for manufacturing of Ferro-Alloys – an essential input for steel making – and dioxide ore for manufacturing dry batteries. With the increase in the domestic demand for high grade manganese and dioxide ores, the Company embarked upon various capital schemes for development and modernization of its mines and increasing of its mines and increasing the production capacity from 1.1 Million Tons to 2.0 Million Tons by 2020-21. To improve business volume and profitability, MOIL diversified its activities into manufacture of value added products during 90’s. As part of diversification, the company set up a project for manufacture of Electrolytic Manganese Dioxide in the year 1991 and a Ferro Manganese Plant of 10000 MT capacity at Balaghat in Madhya Pradesh during the year 1998. Further, the company also has Wind Power Electricity Generation capacity of 20 MW at Nagda hills in Madhya Pradesh.

Considering the necessity for expanding the operation of company, MOIL has also entered into joint ventures with SAIL and RINL for setting up Ferro Alloys manufacturing unit mainly to cater the Ferro alloys requirement of these companies. Total cost of this project as per initial estimates is around at Rs. 600 crore and MOIL’s share of investment is estimated to be around Rs. 150 crore. In view of increase in cost of power, an essential ingredient for manufacturing of ferro alloys, possibilities of sourcing power at cheaper rates are being explored to go ahead with the implementation of the project. (V) KIOCL., (Registered office at 11 Block, Koramangala, Bangalore – 560 034), a fully owned Government Company was established in 1976 as a 100% Export Oriented Unit (EOU) with mining operations at Kudremukh. In 1980, a beneficiation plant at Kudremukh was established with a capacity of 7.50 mtpa iron ore. In 1987, a Pellet Plant at Mangalore was set up with a capacity of 3 mtpa which was subsequently increased to 3.5 mtpa. In 2001 Pig Iron Plant at Mangalore was set up under a JV namely KISCO which has since been merged with KIOCL w.e.f. 1.4.2007. The Blast Furnace Operation was stopped w.e.f. 5.8.2009 due to economically unviable conditions. The mining activity at KIOCL Ltd. was stopped as per the Hon’ble Supreme Court Verdict w.e.f. 1.1.2006. At present KIOCL is mainly operating the pellet plant at Mangalore by sourcing Iron Ore from the market. (VI) Hindustan Steelworks Construction Limited (HSCL): Hindustan Steelworks Construction Limited (HSCL) is one of the major construction agencies in the Public Sector established in 1964 under the administrative control of Ministry of Steel. The mandate for its incorporation was to mobilize indigenous capability for putting up integrated steel plants in the country. The organization rose to the occasion and successfully met the challenge by bringing together competent human resources and mobilizing a fleet of updated construction equipment. HSCL has diversified its activities. As an example, in the construction of rural roads, the Company has a proud privilege of participating in the Bharat Nirman Programme of Govt. of India in the North Eastern State of Tripura under PMGSY, HSCL has been working as a Project Implementation Unit there with the responsibility starting from preparation of DPR to the maintenance of the roads for five years after construction. The Company has been engaged in implementation of 1073 Km of rural roads under PMGSY in the State of Tripura and

Page 13: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-I/Introduction

5

2543 Km in Jharkhand. The value of work under PMGSY is Rs. 2100 crore at present, which is likely to increase with a considerable number of DPRs awaiting approval of NRRDA.

(VII) MECON Limited : (Registered office at MECON Building, P.O. Hinoo, Ranchi – 834002) is the first consultancy and engineering organisation in the country to be accredited with ISO:9001-2008 and registered with the World Bank, Asian Development Bank, European Bank of Reconstruction and Development, African Development Bank (AFDB) and United Nations Industrial Development Organisation. The company is one of the leading multi disciplinary design, engineering, consultancy and contracting organization in the field of Metal, Power, Oil & Gas and infrastructure sectors. The company’s mission is to provide technical consultancy-design and engineering, design and supply of plant, equipment and systems, implementation of new industrial ventures from concept to commissioning.

Presently MECON is involved in almost all the mega steel projects in India both in public and private sectors. The Company is also deeply entrenched in other fields of diversification being Power, Oil & Gas and Infrastructure and is involved in large number of assignments in public and private sectors.

MECON has also spread its wings in International market providing quality design, engineering & consultancy services for about 130 projects in different countries like Indonesia, Qatar, Saudi Arabia, Oman, UAE, Vietnam, USA etc. MECON has an overseas office in Nigeria to effectively cater to the opportunities in African states.

(VIII) MSTC Limited: (Registered Office at 225 C, A.J.C. Bose Road, Kolkata – 700 020) is a trading concern previously designated as the canalising agency of the Government for import of carbon steel melting scrap for distribution to mini-steel plants. Its Head Office is located at Kolkata. The company lost its status as a canalising agency with effect from February, 1992, and is now operating in a totally free and competitive environment like any other private trader. The company undertakes trading activities, e-commerce, disposal of ferrous and non-ferrous scrap and surplus stores mostly from Public Sector Undertakings and Govt. Departments, including Ministry of Defence. MSTC is the Holding Company of Ferro Scrap Nigam Ltd. (FSNL) whose 100% paid up equity shares are held by MSTC.

4. RESEARCH & DEVELOPMENT (R&D) IN IRON & STEEL SECTOR

R&D in Indian Steel Sector is carried out mainly by major steel plants and some of the national laboratories like National Metallurgical Laboratory (NML) Jamshedpur & Institute of Minerals and Materials Technology (IMMT), Bhubaneswar. The R&D projects mainly comprise short term initiatives for solving day to day problems faced by the Industry with minimum emphasis on development of innovative/ disruptive technologies. Consequently, investment in R&D is very low @ 0.15-0.30% of the turnover of the steel companies, as against 1-2% in the reputed steel companies abroad. To increase the R&D expenditure in R&D, Ministry of Steel is pursuing 2 schemes with financial assistance from plan fund and Steel Development Fund.

*****

Page 14: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

6

CHAPTER – II

OUTCOME BUDGET FOR 2015-16 OF MAJOR SCHEMES

The concept of Outcome Budget was introduced in 2005-06 by the Government with

the objective of improving the quality of development programmes by making their

conceptualization, design and implementation „outcome‟ oriented. It is based on the premise

that „outlays do not necessarily mean outcomes‟. The intention of outcome budgeting is to

track not only the intermediate physical „outputs‟ that are more readily measurable, but also

the „outcomes‟ which are the end objectives of State intervention. This requires strong

project/ programme formulation, appraisal capabilities, as well as effective delivery systems.

The development outcomes need to be defined in measurable terms, with benchmarking of

unit cost of delivery, making the entire exercise moniterable. This also requires better

utilization of physical assets and manpower, and steps to improve project management and

programme implementation, including effective monitoring. Outcome Budget is, therefore, an

effort to put in place a mechanism to measure the development outcomes of all major

programmes.

In the 11th Plan (2007-12), a new scheme for “promotion of Research & Development

in Iron and Steel sector” was included with a budgetary provision of Rs. 118.00 crore for

promotion of research & development in the domestic iron and steel sector. The scheme has

been continued in the 12th Five Year Plan with a budgetary provision of Rs. 200 crore. Under

the scheme, a total of ten (10) R&D projects have been approved. Total cumulative amount

of Rs 34.63 crore has been released under the scheme upto December, 2014 during 12th

Five Year Plan.

In BE 2015-16, which is the fourth year of 12th Five Year Plan (2012-17) Rs. 15.00

crore has been earmarked for the scheme. For new component i.e. Development of

Technology for Cold Rolled Grain Oriented (CRGO) Steel Sheets and other value added

innovative steel products a budgetary provision of Rs. 1.00 crore has been provided and

budgetary provision of Rs. 14.00 crore has been provided for new projects under the existing

scheme.

The PSUs under the administrative control of the Ministry formulate and implement

various schemes/ programmes related to their respective area of operations. The schemes of

the PSUs are components of their respective Annual or long term plans. Since each PSU

has several schemes, most of which are related to the normal day to day functioning as well

as MOU linked operations of the company, it would be difficult to cover all schemes of the

PSUs in the Outcome Budget. A view was, therefore, taken that only projects with

sanctioned/estimated cost of more than Rs.50.00 crore will be covered as given in the

following table.

Page 15: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

7

Sta

tem

en

t o

f O

utl

ays a

nd

Ou

tco

mes/T

arg

ets

(2

015-1

6)

(Sch

em

es w

ith

esti

mate

d/s

an

cti

on

ed

co

st

mo

re t

ha

n R

s.5

0.0

0 c

rore

)

(Rs.

In c

rore

) N

o

Nam

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

A.

SC

HE

ME

S W

ITH

ES

TIM

AT

ED

/SA

NC

TIO

NE

D C

OS

T M

OR

E T

HA

N R

S. 50.0

0 C

RO

RE

1.

ST

EE

L A

UT

HO

RIT

Y O

F I

ND

IA L

TD

. (S

AIL

)

(a)

Bh

ilai S

teel P

lan

t (B

SP

)

(i)

Cold

Repair o

f C

OB

-9

To

m

eet

the s

hort

fall

in

coke

dem

and

as

well

as

sta

bili

zin

g

coke

oven

gas

bala

nce

and

to

reduce

em

issio

n

level

332.6

5

--

--

100.0

0

Impro

ved

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n

norm

s

of

Min

istr

y

of

Environm

ent

and

Fo

rests

.

Will

ensure

susta

inable

opera

tio

n

of

the p

lant

Aug’1

4

Jun’1

5

• D

ela

y in

desig

n engin

eerin

g by

M/s

Mecon

• S

hort

age o

f re

fracto

ry b

ricks f

or

Batt

ery

Pro

per

(ii)

Expansio

n o

f B

SP

In

cre

ase

in

pro

ductio

n

of

hot

meta

l &

cru

de

ste

el

thro

ugh

sta

te-o

f-th

e-

art

technolo

gy;

Phasin

g

out

of

low

yie

ld

and

energ

y

inte

nsiv

e

units,

Reductio

n

of

sem

is

by

enhancin

g

fin

ished

ste

el

pro

ductio

n;

Bro

adenin

g

and

valu

e

additio

n

in

pro

duct-

mix

fo

r hig

her

fle

xib

ility

and

pro

fita

bili

ty;

M

eetin

g

requirem

ent

of

India

n R

ailw

ays

17266.0

0

--

--

2286.7

2

Incre

ase

in

HM

capacity

from

4.0

8 M

tpa t

o 7

.5

Mtp

a

Once

the

facili

ty

is

com

mis

sio

ned

the

overa

ll in

cre

ase

of

the p

roductio

n

capacity

will

in

cre

ase by 2

.7 M

TP

A --

Mar’1

3

Sep’1

5

(1 c

onvert

er

two c

aste

r)

Th

e S

MS

-III

Package g

ot

aff

ecte

d a

s

the

initia

l contr

act

for

civ

il w

ork

package w

ith M

/s R

atn

a I

nfr

a h

ad t

o

be te

rmin

ate

d due to

slo

w pro

gre

ss

of

work

and fr

esh contr

act

aw

ard

ed

to M

/s H

SC

L i

n F

eb’1

1 a

t risk &

cost

of

M/s

R

atn

a

Infr

a.

Subsequently

contr

act

with M

/s H

SC

L a

lso h

ad t

o

be t

erm

inate

d d

ue t

o p

oor

pro

gre

ss &

ord

er

for

bala

nce

civ

il w

ork

s

has

been p

laced o

n M

/s S

imple

x a

t risk &

cost

of

M/s

H

SC

L.

Th

e

equip

me

nt

ere

ctio

n p

ackage a

lso h

ad t

o b

e r

e-

tendere

d

sin

ce

suffic

ient

ere

ctio

n

fronts

could

not

be

handed

over

within

contr

actu

al

com

ple

tio

n p

erio

d.

Fre

sh c

ontr

act

aw

ard

ed

to M

/s E

ssar

Pro

jects

.

Th

e slo

w pro

gre

ss of

work

by H

EC

(in

sta

llatio

n

of

cra

nes

for

both

equip

ment

ere

ctio

n and subsequent

mate

ria

l handlin

g durin

g pro

duction)

&

HS

CL

(civ

il &

str

uctu

ral

work

) aff

ecte

d

the

pro

gre

ss

in

BR

M

&

UR

M.

Poor

perf

orm

ance of

M/s

E

PI

(OH

P

Part

-B and F

uel

& F

lux C

rushin

g &

S

cre

enin

g F

acili

tie

s)

consid

era

bly

in

th

e

are

a

of

desig

n-e

ngin

eerin

g,

manpow

er

& r

esourc

e d

eplo

ym

ent

&

co-o

rdin

atio

n

superv

isio

n

advers

ely

aff

ecte

d the w

ork

.

Page 16: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

8

(R

s.

In c

rore

) N

o

Nam

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

(b)

Du

rga

pu

r S

teel P

lan

t (D

SP

)

(i)

Expansio

n o

f D

SP

P

hasin

g o

ut

of

energ

y

inte

nsiv

e

units,

intr

oductio

n o

f energ

y

eff

icie

nt

technolo

gy,

reductio

n

of

sem

is

&

incre

ase of

hot

meta

l capacity

2875.0

0

--

--

564.0

0

Incre

ase

of

hot

meta

l capacity

from

2.0

9 to

2.4

5

Mtp

a

Energ

y

savin

g

as

well

as

eff

icie

ncy

in

pro

ductio

n

Dec’1

2

Mar’1

5

Fo

r M

SM

, th

e p

rogre

ss o

f civ

il w

ork

w

as

aff

ecte

d

due

to

incre

ase in

the s

cope of

work

fo

r pili

ng

by

aro

und

180%

, sin

ce

ME

CO

N

had

earlie

r consid

ere

d

pile

s

for

build

ing

str

uctu

res

only

and

the

pile

s

required

for

machin

e

foundatio

n

were

not

consid

ere

d.

Th

is als

o aff

ecte

d

the

str

uctu

ral

ere

ctio

n

work

. A

lso,

the w

ork

got

aff

ecte

d d

ue

to

poor

perf

orm

ance

of

civ

il contr

acto

r M

/s J

ain

Infr

a.

Fre

sh

ord

er

pla

ced on M

/s B

rid

ge &

R

oof

(B&

R)

in F

eb’1

3.

Fu

rther,

dela

y

in

supply

of

prio

rity

cra

nes b

y M

/s H

EC

is e

ffectin

g

ere

ctio

n o

f equip

ment.

Fo

r B

loom

cum

Round C

aste

r,

work

was a

ffecte

d d

ue t

o p

oor

perf

orm

ance o

f civ

il contr

acto

r M

/s Jain

In

fra.

Ris

k P

urc

hase

Notice

(RP

N)

issued

to

the

part

y.

Fre

sh

ord

er

pla

ced

on

M/s

B

rid

ge &

R

oof

in O

ct’1

2.

Als

o,

there

had been dela

y in

sta

rtin

g

Enablin

g

package

of

Div

ers

ion

of

gas

lines

and

underg

round c

able

s,

als

o t

hey

could

not

be done in

on

e go

and h

ad b

een

tem

pora

rily

done

to giv

e cle

ar

front

to th

e civ

il contr

acto

r fo

r com

ple

tin

g

the

civ

il w

ork

s o

f th

e a

rea o

f m

ain

package c

ontr

acto

r. A

lso,

poor

perf

orm

ance o

f M

/s M

ICC

O i

n

wate

r supply

package.

(ii)

Rebuild

ing o

f C

OB

-5

To

m

eet

the s

hort

fall

in

coke

dem

and

as

well

as

sta

bili

zin

g

coke

oven

gas

bala

nce

and

to

re

duce e

mis

sio

n le

vel

313.0

5

--

--

50.0

0

Impro

ved

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n n

orm

s

Will

ensure

susta

inable

opera

tio

n

of

the p

lant

Jun’1

5

Jun’1

5

--

Page 17: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

9

(Rs.

In c

rore

) N

o

Nam

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

015-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

(c)

Ro

urk

ela

Ste

el P

lan

t (R

SP

)

(i)

Rebuild

ing o

f C

OB

-3

To

m

eet

the

coke

requirem

ent

for

hot

meta

l pro

ductio

n

of

4.5

M

tpa

and

to

reduce

em

issio

n

levels

237.0

9

--

--

70.0

0

Impro

ve

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n n

orm

s o

f M

OE

F

Will

in

cre

ase

susta

inable

opera

tio

n

of

the p

lant

Jan’1

5

August’1

5

• Is

sues r

ela

ted t

o q

ualit

y o

f sili

ca b

ricks

• S

low

pro

gre

ss o

f re

fracto

ry

ere

ctio

n b

y B

EC

• D

ela

y

in

supply

of

oven

machin

es b

y B

EC

(ii)

Insta

llatio

n

of

heat

treatm

ent fa

cili

ties

To

m

eet

the

incre

asin

g

requirem

ent

of

quenched

&

tem

pere

d

pla

tes

for

Defe

nce

and

oth

er

secto

rs

of

str

ate

gic

im

port

ance

160.4

8

--

--

11.0

0

Additio

nal

pro

ductio

n

of

12000t

Valu

e

additio

n

of

the f

inis

hed

pro

duct.

Sep’ 14

Jun’1

5

Poor

perf

orm

ance

of

the

contr

acto

rs:

CA

N

Engg.

in

Desig

n

&

Engg.

Em

pire

Ind.

Eqpt.

&

R

elia

ble

H

igh-T

ech

in

equip

ment supply

.

(iii)

U

p-g

radatio

n o

f B

F-1

With

incre

ase

in

furn

ace

work

ing

volu

me,

BF

pro

ductivity

and

hot

meta

l pro

ductio

n

will

in

cre

ase.

Up

-gra

datio

n

will

als

o

reduce c

oke r

ate

.

779.4

1

--

--

200.0

0

April’1

6

April’1

6

-- -

-

(d)

Bo

karo

Ste

el P

lan

t (B

SL

)

(i)

Expansio

n o

f B

SL

Enhancin

g H

ot

meta

l pro

ductio

n

Intr

oductio

n o

f energ

y

eff

icie

nt

technolo

gy,

convers

ion

of

hig

her

quantities

of

Hot

Rolle

d coils

to

valu

e

added

Cold

R

olle

d

pro

ducts

w

ith

the

insta

llatio

n

of

additio

nal

Cold

R

olli

ng C

apacity.

6325.0

0

--

--

499.0

0

New

C

old

R

olli

ng

Mill

com

ple

x

of

1.2

M

TP

A

&

enhancin

g

Hotm

eta

l pro

ductio

n

from

4.5

9

to

5.7

7

MT

PA

Incre

ase in

th

e

availa

bili

ty

of

the

valu

e

added cold

R

olle

d

pro

ducts

Dec’ 11

May’1

5

All

majo

r fa

cili

ties

like

the

upgra

ded B

F N

o.2

, C

oke O

ven

batt

erie

s N

o.1

&2 and new

1.2

M

TP

A

Cold

R

olli

ng

Mill

have

been c

om

mis

sio

ned..

Main

reasons for

dela

y a

re :

• C

o-o

rdin

atio

n

pro

ble

ms

of

main

contr

acto

rs

with

consort

ium

part

ners

and

sub-c

ontr

acto

rs.

• D

ela

y

in

appro

val

of

dra

win

gs b

y t

he c

onsultant,

ME

CO

N

Com

mis

sio

nin

g o

f H

ot

Str

ip M

ill

is

rela

ted

to

availa

bili

ty

of

shutd

ow

n.

Page 18: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

10

(Rs.

In c

rore

) N

o

Nam

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

015-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

(ii)

Re-b

uild

ing o

f C

OB

-7

To

m

eet

the

coke

dem

and

&

CO

gas

short

age

and

to

com

ply

w

ith

late

st

sta

tuto

ry

em

issio

n

norm

s

245.6

7

--

--

98.0

0

Impro

ve

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n n

orm

s o

f M

OE

F

Will

ensure

susta

inable

pla

nt

opera

tio

n

May’1

6

May’1

6

• D

esig

n

engg.

and

civ

il &

str

uctu

ral

work

s

are

in

pro

gre

ss.

• S

upply

and

ere

ctio

n

of

Refr

acto

ry is in p

rogre

ss.

• F

abricatio

n

of

O

ven

Machin

es is in

pro

gre

ss

(e)

Raw

Ma

teri

als

Div

isio

n

(i)

Enhancem

ent

of

pro

ductio

n c

apacity o

f M

eghahatu

bu

-ru

Iron

O

re M

ine

A te

chnic

al

necessity

to

incre

ase

iron

ore

fo

r m

eetin

g

requirem

ent

after

SA

IL e

xpansio

n.

118.8

5

--

--

10.0

0

capacity

from

4.3

M

tpa t

o 6

.50 M

tpa

of

fin

ished p

roduct

Availa

bili

ty

of

contin

uous

supply

of

the

raw

m

ate

ria

ls

for

ste

el

pla

nts

Jun’1

2

Oct’1

5

Th

e w

ork

for

the m

ain

package i

s

sufferin

g

due

to

non

-paym

ent

by

M/s

T

ecpro

to

its sub

-contr

acto

rs.

Even

aft

er

contin

uous

follo

w

up

and r

evie

w a

t R

MD

and

Corp

ora

te

level,

the

pro

gre

ss

could

not

impro

ve.

SA

IL

is

support

ing

thro

ugh

direct

paym

ent

to

sub-

contr

acto

rs.

Jobs g

oin

g o

n s

low

ly

by in

fusio

n o

f cash f

low

by S

AIL

on

cost

recovery

basis

&

direct

paym

ent.

Ere

ctio

n o

f R

ecla

imer

is o

n h

old

as

pre

sence

of

M/s

E

lecon

Engin

eerin

g (

supplie

r of

Recla

imer)

is

re

quired

durin

g

ere

ctio

n

wh

o

have r

efu

sed f

or

the s

am

e d

ue t

o

com

merc

ial is

sues w

ith T

ecpro

.

(ii)

Enhancem

ent

of

pro

ductio

n c

apacity o

f

Bola

ni Ir

on O

re M

ine

A te

chnic

al

necessity

to

incre

ase

iron

ore

fo

r m

eetin

g

requirem

ent

after

SA

IL e

xpansio

n.

254.5

5

--

--

42.0

0

capacity

from

4.1

M

tpa

to

10

Mtp

a

of

fin

ished p

roduct

Capacity

from

4.1

M

tpa t

o 1

0

Mtp

a

fin

ished

pro

duct.

Nov’ 13

June’ 15

• In

term

itte

nt

clo

sure

of

Min

es

due

to

Environm

enta

l &

F

ore

st

cle

ara

nces a

nd L

ease

Rene

wal

has a

ffecte

d t

he s

ite

work

. (T

he m

ine w

as c

losed 5

tim

es,

tota

llin

g

294

days

durin

g

the

perio

d

Fe

b’1

2

to

May’1

4

on

account

of

these

issues)

• P

oor

perf

orm

ance

of

the

contr

acto

rs

(f)

Ch

an

dra

pu

r F

err

oall

oy P

lan

t

(i)

Insta

llatio

n

of

1x45

M

VA

subm

erg

ed arc

F

urn

ace

Additio

nal

pro

ductio

n

of

HC

Fe

Mn

&

HC

SiM

n

187.3

3

--

--

25.0

0

Additio

nal

pro

ductio

n

of

37500

t of

HC

Fe

Mn &

35000

t

of

HC

SiM

n

or

60,0

00t

of

HC

SiM

n

on

sta

ndalo

ne b

asis

.

O

ct’1

3

August ’1

5

Sta

rt o

f C

ivil

work

was a

ffecte

d d

ue

to

dela

y

in

environm

enta

l cle

ara

nce fro

m M

OE

F.

Fu

rther,

civ

il &

str

uctu

ral

work

wa

s

dela

yed

due

to

poo

r re

sourc

e

mobili

zatio

n

at

site

and

non

-paym

ent to

sub

-contr

acto

rs b

y

Page 19: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

11

(R

s. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

m

ain

contr

acto

r, M

/s T

ecpro

w

ho fa

iled to

adhere

to

any

of

its

com

mitm

ents

and

sto

pped

work

at

site.

RP

actio

n t

aken a

nd F

resh o

rder

pla

ced o

n M

/s H

SC

L.

2.

RA

SH

TR

IYA

IS

PA

T N

IGA

M L

TD

. (R

INL

)

(i)

Expansio

n t

o 6

.3

mtp

a L

iquid

Ste

el

To

in

cre

ase

the

pla

nt

capacity

12291.0

0

--

--

250.0

0

Enhancin

g

pro

ductio

n

of

liquid

ste

el

to 6.3

m

tpa of

liquid

ste

el

Enhancin

g

pro

ductio

n

of

liquid

ste

el

to

6.3

m

tpa

of

liquid

ste

el

Alm

ost

com

ple

ted

and

bala

nce

units

is

bein

g

work

ed o

ut.

Sta

ge

-1

unit

com

mis

sio

ned

and u

nder

sta

bili

zation e

xcept

Lim

e

Kiln

P

lant

where

schedule

fo

r K

ilin

1&

2

are

exp

ecte

d t

o b

e c

om

mis

sio

ned

by A

pr

& J

une 1

5.

Sta

ge-

2

unit

consis

ts

of

Specia

l B

ar

Mill

and

Str

uctu

ral

Mill

, E

arlie

r S

tage -

2

unit

was

pla

nned

to

be

com

mis

sio

ned

pro

gre

ssiv

ely

by D

ec’

14.

How

ever,

due t

o

dam

age

durin

g

recent

Cyclo

ne

HU

DH

UD

th

e

com

mis

sio

nin

g

schedule

got

aff

ecte

d a

nd a

re n

ow

pla

nned

to

be c

om

mis

sio

ned b

y

Mar’

15 &

Apr’1

5.

(ii)

CO

B-4

(P

h-I

I)

To

opera

te C

OB

-4

as

independent

Batt

ery

and

incre

ase

in

recovery

of

by-p

roduct

355.3

0

--

--

20.0

0

Incre

ase i

n r

ecovery

of

by p

roducts

In

cre

ase

in

recovery

of

by

pro

ducts

Dec’1

4.

By -

pro

duct

pla

nt

- T

he u

nit

was

com

mis

sio

ned

in

Dec’1

4.

Coal

handlin

g p

lant.

The

unit

is

likely

to

be

com

mis

sio

ned b

y J

une’ 15.

(iii)

C

oke

Oven

Batt

ery

No.

5

To

m

eet

the

coke

requirem

ents

and

gas

bala

nce

for

6.3

/7.3

mtp

a

sta

ge,

and

to

facili

tate

re

build

ing

of

CO

Bs

#

1,

2&

3

successiv

ely

.

28

58

.00

--

--

5

0.0

0

To

pro

duce

0.8

2

mtp

a o

f G

ross C

oke

Will

ensure

energ

y

eff

icie

ncy

29 m

onth

s fr

om

aw

ard

of m

ain

package.

Under

vario

us

sta

ge

of

tenderin

g/

fin

aliz

atio

n.

(iv)

Pow

er

Pla

nt

-II

To

me

et

the a

dditio

nal

pow

er

requirem

ent

by

utiliz

ing

the

lean

by

pro

duct

gases

whic

h

oth

erw

ise

would

be

flare

d to a

tmosphere

.

67

7.0

0

--

--

40.0

0

To

utiliz

e

the

lean

by-p

roduct

gases

whic

h

oth

erw

ise

would

be

fla

red

to

atm

osphere

. T

his

pro

ject

is conceiv

ed

with

the

sole

insert

ion

of

reducin

g G

reen

To

genera

te

120M

W

ele

ctr

icity

by

utiliz

ing t

he l

ean

by-p

roduct

gases

while

m

itig

atin

g

the

eff

ect

of

clim

ate

change.

May’1

5

Due

to

impact

of

Hudhu

d

reschedule

d to M

ay 2

015.

Page 20: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

12

(R

s.

In c

rore

) N

o

Nam

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

H

ouse G

as (

GH

G)

em

issio

ns in

to th

e

atm

osphere

w

hile

m

eetin

g t

he p

ow

er

requirem

ent

of

RIN

L t

o t

he e

xte

nt

of

120M

W t

here

by

mitig

atin

g

the

eff

ects

of

clim

ate

change.

(v)

Pulv

erised

Coal

Inje

ction

Inje

ction

syste

m

for

reduction

in

consum

ption

of

expensiv

e

BF

coke

with

less

expe

nsiv

e

pulv

erised c

oal

133.0

0

--

--

6.0

0

Incre

ase

d

pro

du

ctio

n

of

hot

meta

l.

To

reduce

cost

of

pro

duction

of

hot

meta

l

Incre

ase

d

pro

du

ctio

n

of

ho

t m

eta

l.

To

red

uce

of

co

st

of

pro

du

cti

on

ho

t m

eta

l.

Q 4

of 2014

-15

72

hrs

In

tegra

ted

tria

l fo

r

BF

-1

str

eam

com

ple

ted.

PC

I in

BF

-1

is

schedule

d

for

com

mis

sio

nin

g

in

the

last quart

er

of 2014

-15

(vi)

F

acili

ties fo

r Ir

on

Ore

Sto

rag

e

To

incre

ase

iron

sto

rage f

acili

ty.

450.0

0

--

--

25.0

0

Shall

incre

ase

Iron

ore

sto

rage

facili

ty t

o 3

0 d

ays

Shall

incre

ase

Iron

ore

sto

rage

facili

ty

to 3

0 d

ays

June’1

5

Under

vario

us

sta

ge

of

com

ple

tio

n.

(vii)

A

ugm

enta

tio

n

of

Wate

r S

tora

ge

Syste

m

Constr

uctio

n

of

additio

nal

sto

rage

reserv

oir w

ith c

apacity

of

16

Mqm

. T

o

meet

the w

ate

r re

quirem

ent

of

expansio

n .

220.0

0

--

--

5.0

0

To

incre

ase w

ate

r

sto

rage c

apacity

by 1

6 M

qm

To

in

cre

ase

wa

ter

sto

rag

e

ca

pa

city

--

Under

vario

us

sta

ge

of

tenderin

g.

(viii

) S

trength

enin

g

of

220

KV

syste

m

of

AP

TR

AN

SC

O

To

str

ength

en

AP

pow

er

grid

and in

tern

al

syste

m

at

VS

P

for

transm

issio

n of

pow

er

400 M

VA

86.3

4

--

--

18.0

0

To

str

ength

en A

P

pow

er

grid

for

transm

issio

n o

f

pow

er

of

400

MV

A

To

str

en

gth

en

AP

po

we

r g

rid

for

tra

nsm

issio

n

of

po

we

r.

--

Phase

-I

work

com

ple

ted.

Modalit

ies f

or

esta

blis

hm

ent

of

400/2

20

KV

substa

tio

n

are

under

fin

aliz

atio

n.

(ix)

Augm

enta

tio

n o

f 220K

V

pow

er

syste

m

for

receiv

ing

400M

VA

pow

er

Str

ength

enin

g

the

inte

rnal

syste

ms

of

VS

P

like

substa

tio

ns

etc

. to

enable

to

re

ceiv

e

400M

VA

pow

er

to

meet

the

exp

ansio

n n

eeds.

58.1

0

--

--

3.0

0

Str

ength

enin

g

the

inte

rnal syste

ms o

f V

SP

lik

e

substa

tio

ns e

tc.

to

enable

to

re

ceiv

e

400M

VA

pow

er

to

meet

the

exp

ansio

n n

eeds.

Str

en

gth

en

ing

th

e

inte

rna

l syste

ms

of

VS

P

--

Com

mis

sio

ned

on

August’

2014,

but

technic

al

issues

cro

pped

up

durin

g

com

mis

sio

nin

g.

Actio

ns a

re

initia

ted f

or

carr

yin

g o

ut

the

rectificatio

n w

ork

s.

(x)

BF

-1&

2

Cate

gory

R

epair

s

To

carr

y

out

the

Cate

gory

-I

capital

repairs &

enhance t

he

volu

me

to

3800

CuM

from

the e

xis

ting 3

20

0

CuM

capa

city.

1663.0

0

--

--

200.0

0

To

incre

ase

the

pro

duction b

y

0.5

Mt

from

2M

t to

2.5

Mt

of

Hot

Meta

l

To

in

cre

ase

the p

roductio

n

BF

-1 3

0th J

uly

’ 2014

BF

- 2 Q

4 o

f 2015

-16

Bla

st

furn

ace

-1

Com

mis

sio

ned o

n 3

0th

July

2014

and

is

regula

r

opera

tio

n

Bla

st

furn

ace

-2

Under

vario

us s

tages o

f pro

gre

ss.

Page 21: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

13

(R

s. In

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k

Fa

cto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

(xi)

3rd

C

onvert

er

and 4

th C

aste

r T

o c

on

ve

rt

additio

nal

Hot

meta

l genera

ted

(aft

er

cate

gory

1

repairs

of

the

exis

ting

2

Bla

st

Furn

aces)

into

ste

el

by

addin

g

a

3rd

convert

er

and 4

th c

aste

r.

974.7

6

--

--

200.0

0

To

incre

ase

the

pro

duction o

f ste

el

by 0

.97 M

t

To

in

cre

ase

the

pro

ductio

n

3rd

Convert

er:

Q 4

of '1

5-1

6

4th

C

aste

r:

Jul'1

6

Packages

under

vario

us

sta

ge

of

fin

aliz

atio

ns

/

work

(xii)

S

inte

r P

lant

pro

du

ctivity

enh

an

cem

ents

To

incre

ase th

e P

roduction

of

Sin

ter

to

support

th

e

incre

ase

in

the

volu

me

of

BF

. T

his

is

to

m

eet

the

pre

sent

pollu

tion

contr

ol

norm

s.

343.0

0

--

--

100.0

0

To

incre

ase

the

pro

duction

from

5.5

Mt

to 6

.8 M

t of

Sin

ter.

To

in

cre

ase

the

pro

ductio

n

Octo

ber’2

016

Packages

under

vario

us

sta

ge

of

fin

aliz

atio

ns / w

ork

(xiii

) S

MS

C

onvert

er

Revam

p

To

im

pro

ve th

e re

liabili

ty of

the

3

convert

ers

as

the

exis

tin

g

estim

ate

d

life

is

alm

ost

over.

Th

is i

s t

o m

eet

the p

resent

pollu

tio

n c

ontr

ol

norm

s.

404.1

6

--

--

120.0

0

Te

chnolo

gic

al

necessity

to

change

the

convert

ers

.

To

change

the

convert

ers

Q4 o

f 20

15

-16 f

or

the 1

st

Co

nvert

er

Packages

under

vario

us

sta

ge

of

fin

aliz

atio

ns / w

ork

(xiv

) A

cquis

itio

n

of

min

es

Develo

pm

ent

To

achie

ve

self-r

elia

nce

for

raw

m

ate

ria

l and

cost

reductio

n

500.0

0

--

--

20.0

0

RIN

L/V

SP

does

not

have

captive

sourc

e

for

cokin

g

coal

/ iron o

re a

nd

outla

y

inclu

ded

to

acquire m

ines

To

achie

ve

self-r

elia

nce

for

raw

m

ate

ria

l and

cost

reductio

n

Co

ntin

uo

us

RIN

L

is

makin

g

all

out

eff

ort

s

in

acquis

itio

n o

f m

ines

from

th

e

last

few

years

. R

INL

has

applie

d

for

29

iron

ore

min

ing l

eases i

n

vario

us

sta

ges

of

whic

h,

LO

I has b

een

receiv

ed

for

one

min

e,

from

G

ovt. of

Raja

sth

an,

over

an

are

a

of

945.8

5

Hecta

res.

Th

e

Phase-

I explo

ratio

n

of

Banera

B

lock by

M/s

M

EC

L

is

in

pro

gre

ss.

As

regard

s

allo

tment

of

Jahazpur

blo

ck

in

Bhilw

ara

, M

inis

try o

f

Min

es G

ovt. o

f In

dia

advis

ed

Govt.

of

Raja

sth

an to

Page 22: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

14

(R

s. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/ P

hysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k

Fa

cto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

exam

ine t

he c

ase a

nd

consid

er

notify

ing

it,

Govt.

of

Raja

sth

an

has r

equeste

d G

OI

in

favour

of

RIN

L

(xv)

Insta

llation

of

Addl.

Ste

am

T

urb

ine

Driven B

low

er

TB

-5 i

n T

PP

& B

H.

To i

nsta

ll T

B-5

as

sta

ndby

to

cate

r th

e

need

in

case T

B-1

,2,3

goes fo

r

modern

isation

and

als

o

can

be

used

as

sta

ndby

for

BF

-4 in futu

re.

280.5

2

--

--

90.0

0

To

Insta

ll T

B-5

to

cate

r th

e n

eed o

f cold

Bla

st

requirem

ent

of

BF

1

&

BF

2

in

case

exis

ting T

Bs a

re u

nder

modern

izatio

n

/

main

tenance

To

cate

r th

e

need

of

Cold

Bla

st

requirem

ent

of

BF

I a

nd B

F 2

Se

pte

mb

er,

20

16

T

he

main

package

has

sin

ce

been

ord

ere

d

and

schedule

d

for

com

ple

tio

n

by

Sept.

;

2016.

Engin

eerin

g h

as

com

menced.

Bala

nce

package

under

vario

us

sta

ges

of

tenderin

g.

(xvi)

A

MR

sche

me

s

To

m

ain

tain

g

oo

d health

of

pla

nt

Contin

uous

--

--

75.0

0

To

m

ain

tain

go

od

health

of

the

equip

ment

and

to

susta

in

curr

ent

level

of

pro

ductio

n

/

pro

ductivity

in

the

conte

xt

of

the ag

ein

g

of

the p

lant

To

main

tain

good h

ealth

of

pla

nt

Contin

uous

--

(xvii)

R

&D

schem

es

To

enhance

pro

ductivity

/

achie

ve

cost

reductio

n

/

develo

pm

ent

of

new

pro

ducts

Contin

uous

--

--

50.0

0

Develo

pm

ent

on

the

exis

tin

g

technolo

gy,

trouble

shootin

g

with

technolo

gic

al

solu

tio

ns

for

opera

tio

nal

activitie

s

thro

ugh

investig

ative

stu

die

s,

failu

re

analy

sis

and

critical exam

inatio

ns o

f

pro

cess p

ara

mete

rs t

o

reduce

cost/

enhance

pro

ductivity

To

enhance

pro

ductivity /

achie

ve c

ost

reeducatio

n /

develo

pm

ent of

new

pro

ducts

Contin

uous

--

(xviii

) F

org

ed W

heel

Pla

nt

To

set

up th

e fa

cili

ty fo

r

manufa

ctu

re

of

Fo

rged

wheels

at

Lalg

anj,

Rae

Bare

li, U

P

1177.0

0

--

--

60.0

T

o

pro

duce

100000

wheels

for

Railw

ays.

Hig

her

pro

ductio

n

36

month

fr

om

effective

date

of contr

act.

Work

s

for

Soil

investig

atio

n

is

com

ple

ted.

Exte

rnal

boundary

w

all

for

Pla

nt

are

a

is

alm

ost

com

ple

ted.

Under

vario

us

sta

ge

of

tenderin

g/f

inaliz

atio

n

Page 23: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

15

(R

s. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-P

lan

B

ud

ge

t

Pla

n

B

ud

ge

t

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

(xix

) A

xle

Pla

nt

To

set

up

the

facili

ty

for

manufa

ctu

re

of

Axle

s

and

oth

er

rela

ted

pro

ducts

at

New

Jalp

aig

uri,

W

est

Bengal

by

form

ing

a

100%

subsid

iary

of

RIN

L

for

the p

urp

ose.

391.0

0

--

--

5.0

0

Insta

ll suitable

capacity

of

Axle

and

oth

er

rela

ted

pro

du

cts

Ma

nufa

ctu

rin

g

unit

at

Ne

w

Jalp

aig

uri,

West

Bengal

by

form

ing a 10

0%

subsid

iary

of

RIN

L

for

the

purp

ose t

o m

eet

the

Railw

ay

assure

d

off

take

of

20,0

00 t

o 2

5000

num

bers

.

Insta

ll suitable

capacity

of

Axle

etc

.

--

Fin

al

Dra

ft

Land

Lease

&

Off-

take A

gre

em

ent

has been sent

to

Railw

ays

on

08

-01-2

014.

Fo

llow

ing o

n r

equest

of

Min

istr

y

of

Railw

ays

date

d

03.0

4.2

014

furt

her

pro

ject

report

w

as

sent

on 27.0

5.2

014 and dis

cussio

ns

were

held

there

aft

er.

Cle

ara

nce

is

aw

aited

from

R

ailw

ays

for

conclu

din

g

the

agre

em

ents

.

Te

nders

have

alread

y

bee

n

issued

for

majo

r te

chnolo

gic

al

package.

(xx)

Revam

pin

g

of

LM

MM

w

alk

ing

beam

furn

ace

Revam

pin

g

of

Fu

rnace

186.0

0

--

--

5.0

0

To

reduce

the

bre

ak-

dow

n/s

tabili

zatio

n

To

re

duce

bre

akdow

n

--

Te

nder

for

consulta

ncy i

s u

nder

pro

cess.

(xxi)

C

entr

al

Sto

rage

Yard

Ease

of

Handlin

g

& T

ransport

atio

n

270.0

0

--

--

5.0

0

Incre

ase c

apacity

at

a

centr

aliz

ed

sto

rage lo

cation

Incre

ase

capacity

--

Consultant

pre

pare

d altern

ative

Rail

Tra

ck

layouts

and

are

subm

itte

d to R

ailw

ays.

3.

NM

DC

Ltd

.

(i)

Baila

dila

D

eposit

11B

T

o

incre

ase

the

pro

ductio

n of

Iron

Ore

607.1

8

--

--

5.0

0

Capacity

of

7m

tpa

Availa

bili

ty

of

iron

ore

w

ill

incre

ase

Mar’1

5

Maois

t activitie

s in

D

ante

wada,

Basta

r re

gio

n

have

been

im

pedin

g/d

isru

ptin

g t

he p

rogre

ss

of constr

uctio

n a

ctivitie

s.

F

ire

incid

ent

caused

by

insurg

ents

on

16

th

Mar’

2014

dam

agin

g a

ppro

x.

200 M

le

ngth

of

Dow

nhill

conveyor

(Belt;

equip

ment

& s

tructu

res)

whic

h is

under

ere

ctio

n.

Contr

acto

rs a

nd a

llie

d la

bour

are

not

able

to w

ork

in

norm

al

way

due t

o the p

revaili

ng c

onditio

ns.

(ii)

K

um

ara

sw

am

y

Iron O

re P

roje

ct

To

in

cre

ase

the

pro

ductio

n of

iron

ore

898.5

5

--

--

65.0

0

Capacity

of

7m

tpa

Additio

nal

iron

ore

will

becom

e

availa

ble

to t

he

consum

er.

August’2

015

P

oor

Fin

ancia

l sta

tus

of

Dow

n

hill

conveyor

syste

m

Package

Contr

acto

r (M

/s E

lecon)

aff

ecte

d

the p

rogre

ss o

f w

ork

.

Page 24: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

16

(R

s. In

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

(iii)

P

elle

t P

lant

at

Donim

ala

i T

o

div

ers

ify

into

pelle

t pro

ductio

n

572.0

0

--

--

40.0

0

Capacity

of

1.2

mtp

a

Availa

bili

ty

of

pelle

t w

ill

incre

ase

June’ 2015

Fin

ancia

l constr

ain

ts

of

Beneficia

tion

Package C

ontr

acto

r re

sulted i

n d

ela

yed

supplie

s

&

poor

resourc

e

mo

bili

zatio

n,

whic

h h

as a

ffecte

d the p

rogre

ss o

f w

ork

(iv)

3

MT

PA

S

teel

Pla

nt at

Nagarn

ar

i)

Ensure

valu

e

additio

n

to

Iron

ore

m

ined in

C

G

Sta

te.

ii) D

evelo

pm

ent

of

Baste

r re

gio

n

inhabited

mostly

by t

rib

als

.

iii)

Part

ially

m

eet

the

gro

win

g

dem

and

for

ste

el

pro

ducts

, prim

arily

in

th

e

India

n m

ark

et.

iv)

Investm

ent

of

funds a

vaila

ble

for

busin

ess g

row

th.

15525.0

0

--

--

2450.0

0

Capacity

of

3

mtp

a

Ste

el

availa

bili

ty

will

in

cre

ase

to

cate

r th

e

needs

of

the

countr

y.

Decem

ber’ 2

016

Fo

rest

Cle

ara

nce

&

Rig

ht

of

Way

for

layin

g w

ate

r pip

e lin

es f

rom

riv

er

Sabri t

o

Ste

el P

lant site a

t N

agarn

ar

for

opera

tio

n

wate

r fo

r th

e s

teel pla

nt

4.

MO

IL L

imit

ed

(i)

Join

t ventu

re

for

Fe

rro M

anganese

/

sili

co

Manganese P

lant

with S

AIL

Th

e p

roje

ct

will

be

set

up a

t B

hila

i to

pro

duce

Fe

rro/S

ilico

Manganese

to

cate

r to

th

e

dem

and

of

Ste

el

Auth

ority

of

India

Lim

ited.

391.0

0

0.0

0

0.0

0

0.2

5

Th

e p

roje

ct

will

be

pro

ducin

g

Fe

rro

Manganese

31000 M

T and

S

ilico

Manganese

75000 M

T

Th

e pro

ject

will

be

pro

ducin

g

Fe

rro

Manganese

31000

MT

and

S

ilico

Manganese

75000 M

T

June’1

2

24

Month

s

aft

er

pla

cin

g

work

ord

er

for

furn

ace

and

auxili

arie

s

Th

e in

vestm

ents

have b

een d

ela

yed d

ue

to:-

(a

) Gett

ing

hig

her

offers

fo

r fu

rnace

package i

nitia

lly,

leadin

g t

o d

ecis

ion

to

reflo

at

the

tenders

fo

r both

th

e

pro

jects

. (b

) Change in

requirem

ent

of

ferr

o a

lloys

of

SA

IL a

s w

ell

as R

INL r

esultin

g i

n

pre

para

tion o

f fr

esh T

EF

Rs a

nd

(c) I

ncre

ase r

ate

s o

f pow

er

all

over

India

and

short

age

of

po

wer

in

And

hra

P

radesh n

ecessitatin

g r

evie

w o

f th

e

pro

jects

.

Possib

ilities o

f sourc

ing p

ow

er

(whic

h

is

ma

in

ingre

die

nt

for

pro

duction

of

ferr

o

allo

ys)

at

cheaper

rate

s

are

bein

g e

xplo

red to

go

ahead w

ith

th

e

imple

menta

tio

n o

f th

e p

roje

ct.

(ii)

Join

t V

entu

re

for

Fe

rro

Manganese/

Sili

co

Managanese

Pla

nt w

ith R

INL

Th

e p

roje

ct

will

be

set

up a

t B

obbili

to

pro

duce

Fe

rro/

Sili

co

Manganese

to

cate

r to

th

e

dem

and

of

Rashtr

iya

Ispat

Nig

am

Lim

ited

217.0

0

0.0

0

0.0

0

0.2

5

Th

e p

roje

ct

will

be

pro

ducin

g

Fe

rro

Manganese

20000 M

T and

S

ilico

Manganese

37500 M

T

Th

e pro

ject

will

be

pro

ducin

g

Fe

rro

Manganese

20000

MT

and

S

ilico

Manganese

37500 M

T

June’1

2

24

Month

s

aft

er

pla

cin

g

work

ord

er

for

furn

ace

and

auxili

arie

s

T

ota

l (A

)

70

62

3.9

9

0.0

0

0.0

0

78

63

.22

Page 25: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

17

(R

s. In

cro

re)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

Deli

vera

ble

s/ P

hysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

Orig

inal

Revis

ed

No

n-

Pla

n

Bu

dg

et

Pla

n

ud

ge

t

1

2

3

4(i)

4(ii)

5(i)

5(ii)

5(iii)

6

7

8

9

10

B.

Sch

em

e o

f M

inis

try o

f S

teel

1

Schem

e f

or

pro

motio

n o

f R

esearc

h &

Develo

pm

ent

in I

ron &

Ste

el secto

r

1(i)

(On

-go

ing

p

roje

cts

) 1.

Develo

pm

ent

of

innovative/

path

bre

akin

g

technolo

gie

s

for

utilis

atio

n

of

iron

ore

fin

es

and

non

-cokin

g c

oal.

2.

Impro

vem

ent

of

qualit

y

of

ste

el

pro

duced

thro

ugh

Inductio

n

Fu

rnace

route

. 3.

Beneficia

tio

n

of

raw

m

ate

ria

ls

like

iron o

re,

coal

etc

. and

agglo

mera

tio

n

(e.

g.

Pelle

tisatio

n).

48.0

0

32.8

7*

--

0.0

0

--

1)

Impro

vem

ent

in s

inte

r pro

ductivity t

hro

ugh d

eep

beneficia

tion

and

agglo

mera

tio

n

technolo

gie

s

for

ratio

nal

utiliz

atio

n

of

low

gra

de

iron o

res a

nd fin

es.

2)

Develo

pm

ent

of

Altern

ate

com

ple

menta

ry

Route

of

Iron/S

teel

makin

g w

ith r

efe

rence t

o

India

n

raw

m

ate

ria

l viz

lo

w

gra

de

iron

ore

and

non c

okin

g c

oal.

3)

Pro

ductio

n

of

low

P

hosphoru

s

Ste

el

usin

g

DR

I th

rough

Inductio

n

furn

ace

route

adoptin

g

innovative

flu

xes

and/o

r desig

n(r

efe

cto

ry)

changes.

4)

Sm

eltin

g re

ductio

n of

iron

ore

/fin

es

by

hydro

gen

pla

sm

a

and

elim

inatio

n

of

CO

2

em

issio

n.

5)

Beneficia

tio

n

of

Iron

Ore

slim

es fr

om

B

ars

ua

and o

ther

min

es in

India

. 6)

Develo

pm

ent

of

pilo

t scale

pelle

tizatio

n

technolo

gy

for

India

n

Goeth

itic

/hem

atitic

ore

w

ith

vary

ing

degre

e

of

fin

eness.

7)

CO

2

abate

ment

in

Iron

and

Ste

el

pro

ductio

n

by

pro

cess

optim

isatio

n.

8)

Pro

ductio

n

of

low

ash

(10%

ash)

coal

(cokin

g

non

cokin

g)

from

hig

h

ash

India

n

coals

in

clu

din

g

desulp

hurisatio

n

of

hig

h

sulp

hur

Nort

h E

ast coal.

Sam

e a

s in

c

ol. 6

--

Durin

g 11

th

Pla

n

(2007-1

2).

C

ontin

ued

in 1

2th F

ive

Y

ear

Pla

n

(2012-1

7)

1)

Th

e

Schem

e fo

r R

&D

w

as

intr

oduced

in

M

oS

in

the 1

1th

Fiv

e Y

ear

Pla

n

and

it

took

consid

era

ble

tim

e

to

get

appra

isal

and a

ppro

val

as

per

laid

dow

n p

rocedure

.

2)

Th

e E

FC

appro

ved th

e

schem

e in

N

ov 2008 an

d

Min

istr

y

of

Fin

ance

accord

ed

fin

al

cle

ara

nce

on

Jan

2009

with

a

rid

er

that

the

schem

e

be

opera

ted

with

eff

ect

from

2009-1

0.

3)

Min

istr

y

of

Ste

el

took

follo

w

up

actio

n

for

sele

ctio

n

of

R&

D

pro

jects

in

consultatio

n

with

the

sta

ke

hold

ers

, got

the

pro

jects

appro

ved b

y P

anel

of

Expert

s and 4 pro

jects

w

ere

appro

ved

in

Fe

b

2010.

Fo

ur

more

pro

jects

w

ere

appro

ved b

y P

AM

C in

N

ov 2

010.

4)

Because

of

the

dela

ys

on

the

appro

val

of

the

schem

e

and

subsequent

appro

val

of

the

indiv

idual

R&

D

pro

jects

, th

e

4

pro

jects

could

only

be

sta

rted

in

April

2010,

2

pro

jects

on Jan 2011 an

d

the

bala

nce

2

pro

jects

in

D

ec

2011.

Th

ere

fore

th

e

pro

jects

could

not

be

com

ple

ted i

n t

he 1

2th

Fiv

e

Year

Pla

n.

5)

so

far

5

pro

jects

have

been c

om

ple

ted a

nd 3

Page 26: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

18

(R

s. In

cro

re)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jec

tive

/ O

utc

om

e

Es

tim

ate

d/

Sa

nc

tio

ne

d C

os

t A

pp

rov

ed

ou

tla

y 2

01

5-1

6

Qu

an

tifi

ab

le

De

liv

era

ble

s/ P

hys

ica

l O

utc

om

es

Pro

jec

ted

O

utc

om

es

Pro

ces

se

s/

Tim

eli

nes

Re

ma

rks/

Ris

k F

ac

tors

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

ina

l A

ctu

al/N

ow

sch

ed

ule

d

Orig

inal

Revis

ed

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4(i)

4(ii)

5(i)

5(ii)

5(iii)

6

7

8

9

10

pro

jects

a

re

in

pro

gre

ss

wh

ich

a

re

like

ly

to

be

com

ple

ted

in

2

01

4-1

5

&

2015-1

6

6)

No

fu

rthe

r fu

nds

are

re

qu

ired

fo

r th

e

Ong

oin

g

Pro

jects

as i

ntim

ate

d b

y t

he

Pro

ject A

uth

orities.

1(ii)

(Ne

w

Co

mpo

ne

nt )

Deve

lopm

ent

of

the

tech

no

log

y fo

r C

old

R

olle

d

Gra

in

o

rie

nte

d

(C

RG

O)

ste

el sh

ee

ts a

nd

oth

er

va

lue

ad

de

d

inn

ovative

ste

el

pro

ducts

15

0.0

0

15

0.0

0

--

1.0

0

--

Deve

lopm

ent

of

the

tech

no

log

y

for

pro

ductio

n

of

CR

GO

S

teel

Sh

eets

a

nd

o

the

r va

lue

a

dd

ed

S

tee

l P

rod

ucts

.

Sa

me

as in c

ol.6

--

Du

rin

g 1

2th

P

lan.

ma

y

Co

ntinu

e in

13

th P

lan.

R&

D S

ch

em

e h

as a

men

de

d

with

th

e

du

e

ap

pro

va

l o

f S

FC

a

nd

HS

M

in

Nov.

20

14,

to

inclu

de

develo

pm

ent

of

tech

no

log

y

for

Co

ld

Ro

lled

G

rain

O

rie

nte

d

(CR

GO

) S

tee

l S

he

ets

a

nd

oth

er

va

lue

ad

de

d

inn

ovative

ste

el

pro

ducts

as a

n o

bje

ctive

of

the

sch

em

e.

In B

E 2

01

5-1

6

an

a

lloca

tio

n

of

Rs.

16

Cro

re

ha

s

be

en

pro

pose

d

for

the

C

RG

O

pro

ject,

as

pe

r th

e

req

uirem

en

t su

bm

itte

d b

y t

he

lea

d R

&D

A

ge

ncy N

ML J

am

sh

ed

pu

r.

1(iii)

N

ew

p

roje

cts

1.

Deve

lopm

ent

of

inn

ova

tive

/ p

ath

bre

akin

g

tech

no

log

ies f

or

utilis

ation

of

Ind

ian

iro

n

ore

fines

an

d n

on-c

okin

g c

oal.

2.

Imp

rovem

en

t of

qu

alit

y o

f ste

el

pro

duced

thro

ug

h

Ind

uction

Fu

rna

ce

ro

ute

. 3.

Be

neficia

tio

n

of

raw

ma

terials

lik

e iro

n o

re,

co

al

etc

. a

nd

ag

glo

me

ratio

n

(e.

g.

Pe

lletisa

tio

n).

4.

To

p

urs

ue

R&

D

on

a

ny

oth

er

su

bje

ct

of

na

tion

al

imp

ort

ance

co

nce

rnin

g

the

Ir

on

&

S

teel S

ecto

r

2.0

0

17

.13

#

--

14

.00

1)

Pro

ductio

n

of

low

P

ho

sp

ho

rus

ste

el

thro

ug

h

Indu

ction

Fu

rna

ce

ro

ute

usin

g

DR

I a

s

majo

r fe

rrug

inou

s

raw

m

ate

ria

l -

An

In

du

str

ial

Assessm

ent.

2)

Deve

lopm

ent

of

Au

tom

atio

n S

yste

m

for

Optim

um

C

oa

l B

len

din

g

at

Coa

l H

an

dlin

g P

lant

o C

oke

Oven

Ba

tte

ries

Sa

me

as in c

ol.6

D

urin

g

12

th

Pla

n.

Will

be

co

ntin

ue

d

in 1

3th P

lan

be

ing

a

co

ntin

uo

us

sch

em

e.

R&

D S

ch

em

e h

as a

men

de

d

with

th

e

du

e

ap

pro

va

l o

f S

FC

a

nd

HS

M

in

Nov.

20

14,

to

inclu

de

R

&D

o

n

an

y o

the

r su

bje

ct

of

na

tio

na

l im

po

rta

nce

co

nce

rnin

g

the

iro

n &

S

tee

l S

ecto

r, as a

n

obje

ctive

of

the

schem

e.

Fo

r th

e

ne

w

pro

jects

a

n

allo

ca

tio

n o

f R

s.

4 C

rore

is

pro

pose

d fo

r B

E 2

01

5-1

6.

T

OT

AL

(B

)

20

0.0

0

20

0.0

0$

15.0

0

* A

s n

o f

urt

he

r e

xp

en

ditu

re is r

eq

uir

ed

for

the

on

goin

g p

roje

cts

, it is p

rop

ose

d t

o r

ed

uce t

he

allo

ca

tion

fro

m R

s.

48

cro

re t

o R

s.

32

.87

cro

re in

12

th F

ive

Ye

ar

Pla

n.

# I

t is

pro

po

se

d to

in

cre

ase

th

e a

lloca

tio

n f

or

ne

w p

roje

cts

fro

m R

s.

2 c

rore

to

Rs.

17

.13

cro

re in

th

e 1

2th F

ive

Ye

ar

Pla

n.

$ T

he

ove

rall

allo

catio

n R

s.

200

cro

re f

or

the

R&

D S

ch

em

e r

em

ain

th

e s

am

e.

Page 27: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

O

utc

om

e B

udget

2015-1

6/C

hapte

r-II

/Ma

jor

Schem

es

19

(R

s. In

cro

re)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

ou

tla

y 2

015

-16

Q

uan

tifi

ab

le

Deli

vera

ble

s/

Ph

ysic

al

Ou

tco

mes

Pro

jecte

d

Ou

tco

mes

Pro

cesses/

Tim

elin

es

Rem

ark

s/

Ris

k F

acto

rs

Bu

dg

et

Su

pp

ort

I&

EB

R

Orig

inal

Actu

al/N

ow

schedule

d

No

n-

Pla

n

Bu

dg

et

Pla

n

Bu

dg

et

1

2

3

4

5(i)

5(ii)

5(iii)

6

7

8

9

10

C.

OT

HE

TR

SH

CE

ME

S/P

RO

GR

AM

ME

S

(i)

Rela

tin

g t

o P

SU

s

(

i)

Vario

us

AM

R

schem

es,

ongoin

g

and

ne

w

schem

es

costin

g

less

than

Rs.

50.0

0 c

rore

(ii)

Schem

es

with

sanctio

ned

cost

of

more

th

an

Rs.

50.0

0 c

rore

at

initia

l sta

ges

of

fin

aliz

atio

n

Fo

r re

gula

r m

ain

tenance

and

upkeep

of

pla

nt,

equip

ments

and

machin

ery

, cuttin

g

dow

n

of

pro

ductio

n

cost,

impro

vem

ent

in

the q

ualit

y o

f pro

ducts

, enhanced

pro

ductivity,

etc

.

--

--

5222.2

5

--

--

--

--

Th

ese s

chem

es a

re r

ela

ted

to

day

to

da

y

functio

nin

g

and

opera

tio

ns

of

the

PS

Us.

T

he

schem

es,

whic

h

are

yet

to

get

necessary

appro

vals

have

not

been inclu

ded.

T

OT

AL

(C

)

--

--

15.0

0

13070.4

7

G

RA

ND

TO

TA

L -

A +

B +

C

70823.9

9

0.0

0

15.0

0

13085.4

7

No

rma

l S

avin

g/s

urr

en

der

of

no

n u

tili

ze

d f

un

d in

pro

jec

ts/s

ch

em

es

ru

n u

nd

er

Go

ve

rnm

en

t B

ud

ge

tary

Su

pp

ort

S.

No

. R

&D

Pro

jec

t L

ea

d A

ge

nc

y

Am

ou

nt

Re

fun

de

d

(in

cro

re)

Ye

ar

of

Re

fun

d

Re

ma

rks

1.

Impro

vem

ent

in sin

ter

pro

ductivity th

rough deep b

eneficia

tio

n and

agglo

mera

tio

n t

echnolo

gie

s f

or

ratio

nal

utiliz

atio

n o

f lo

w g

rade i

ron

ore

s a

nd fin

es

CS

IR-N

ML J

am

shedpur

0.6

8

2014-1

5

Less

expenditure

again

st

the e

stim

ate

d c

ost

2

Altern

ate

com

ple

menta

ry R

oute

of

Iron/S

teel

makin

g w

ith r

efe

rence

to I

ndia

n r

aw

mate

ria

l viz

lo

w

gra

de iro

n o

re a

nd n

ow

cokin

g c

oal

CS

IR-N

ML J

am

shedpur

1.9

4

2014-1

5

Less

expenditure

again

st

the e

stim

ate

d c

ost

3

Pro

ductio

n of

low

P

hosphoru

s S

teel

usin

g D

RI

thro

ugh In

duction

furn

ace r

oute

adoptin

g i

nnovative f

luxes a

nd /

or

desig

n (

refr

acto

ry)

change

CS

IR-N

ML J

am

shedpur

0.1

2

2012-1

3

Less

expenditure

again

st

the e

stim

ate

d c

ost

4

Pro

ductio

n o

f lo

w a

sh (

10%

ash)

coal (c

okin

g n

on c

okin

g)

from

hig

h

ash In

dia

n coals

in

clu

din

g desulp

hurizatio

n of

hig

h sulp

hur

Nort

h

East coal

CS

IR-I

MM

T B

hubanesw

ar

3.2

9

2014-1

5

Tw

o

equip

ment

were

pro

cure

d

from

A

MP

RI

Bhopal fr

ee o

f cost

****

****

****

*

Page 28: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

20

CHAPTER - III

REFORM MEASURES AND POLICY INITIATIVES 1. LIBERALISATION OF THE INDIAN STEEL SECTOR

The Indian steel sector was the first core sector to be completely freed from the licensing regime and pricing and distribution controls. This was done primarily because of the inherent strengths and capabilities demonstrated by the Indian iron and steel industry. The economic reforms and the consequent liberalization of the iron and steel sector which started in the early 1990s resulted in substantial growth in the steel industry and a number of green field steel plants were set up in the private sector.

India ranked as the fourth largest producer of crude steel in the world after China,

Japan and the USA based on data released by the World Steel Association. Crude steel capacity expanded from 66.34 million tonnes per annum (MTPA) in 2008-09 to 101.02 MTPA in 2013-14. Indian crude steel production was 81.69 MT in 2013-14 as against 78.42 MT in 2012-13. India was also the third largest consumer of finished steel in the world, after China and USA in 2013 as per data released by the World Steel Association. The country has also been the largest sponge iron producer in the world since 2003. The steel sector contributed to nearly 2% GDP. India has turned into a net exporter of steel in 2013-14 for the first time since 2007-08. It directly provides employment to over 6 lakh people. The production for sale of total finished steel (alloy and non-alloy) during 2013-14 was 87.67 million tonnes, up by 7.3% over 2012-13 as per data released by Joint Plant Committee (JPC).

The important policy measures which have been taken over the years for the growth and development of the Indian iron and steel sector are as under:- (i) Pricing and distribution of steel were deregulated from January, 1992. At the same

time, it was ensured that priority continued to be accorded for meeting the requirements of small-scale industries.

(ii) The import regime for iron and steel has undergone major liberalization moving

gradually from a controlled import by way of import licensing, foreign exchange release, canalization and high import tariffs to total freeing of iron and steel imports from licensing, canalization and lowering of import duty levels. Export of iron and steel items has also been freely allowed.

(iii) Currently, the import duty on steel items is 7.5 per cent for flat steel (alloy and non-

alloy) and at 5 per cent for all other items. The import duty on raw materials differs and is at 2.5 per cent for melting scrap, 2.5 per cent for both coking coal, metcoke and between 2 to 5 per cent for other raw materials such as Zinc, Iron Ore and Ferro Alloys.

(iv) There is no export duty on any steel item. However, Government has imposed ad-valorem export duty of 30 per cent on all forms of iron ore and a 5 per cent export duty on iron ore pellets, in order to conserve the mineral for long term requirement

Page 29: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

21

of the domestic steel industry. The Government has also reduced basic customs duty from 7.5 per cent to 2.5 per cent on plant and machinery imported for setting up or substantial expansion of iron ore pellet plants or iron ore beneficiation plants.

(v) Excise duty for steel is currently at 12 per cent.

(vi) A roadmap for Research & Development and Technology for Indian Iron and Steel Industries has been released by the Ministry of Steel with the aim to highlight the gaps in R&D and Steel Technology and sensitize the steel industry to draw suitable action plan/strategy to invest on R&D and technology upgradation programme.

(vii) Inter Ministerial Group (IMG) meetings under the Chairmanship of Secretary (Steel) are being held regularly to sort out infrastructure constraints of steel industry and raw material issues. In addition, the Ministry is actively involved with the Project Monitoring Group (PMG) of the Cabinet Secretariat on fast tracking decision in respect of delayed steel projects.

(viii) A National Steel Consumers‟ Council to facilitate regular interaction of producers and consumers and redress problems faced by consumers relating to supply/availability/pricing of steel products and other related issues had been set up in the Ministry of Steel, under the Chairmanship of the Hon‟ble Steel Minister. The 24th meeting of Council was held on 3rd February 2014 in Lucknow.

(ix) Ministry of Steel in association with Steel Industry organizes the “Steel Pavilion” at the India International Trade Fair held at Pragati Maidan, New Delhi, every year where items of iron and steel and mining sector are showcased to highlight the versatility and benefits of steel use.

(x) The Government has issued the “Steel & Steel Products (Quality Control) Order” under the Bureau of Indian Standard Act 1986, to ensure that no manufacturer can manufacture, import, Store for sale or distribute steel and steel products which do not conform to the standards and which do not bear the standard mark (BIS or ISI mark).

(xi) Following the completion of the all-India study by Joint Plant Committee (JPC) as commissioned by the Ministry of Steel to obtain a full picture of the pattern of domestic rural steel consumption, a Monitoring Committee has been constituted by the Ministry of Steel, Government of India Under the chairmanship of Joint Secretary to Government of India and comprising of representatives from public sector steel plants, Ministry of Steel, JPC and INSDAG to monitor the implementation of the various recommendations of the rural study report.

(xii) Process of drafting of new National Steel Policy to replace the existing National Steel Policy 2005 has been initiated for development of steel industry for the focus on achieving the targetted production of 300 mtpa of steel by 2025.

Page 30: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

22

2. MAJOR INITIATIVES TAKEN BY THE MINISTRY OF STEEL

To achieve the objectives of the National Steel Policy (NSP) 2005, Ministry of Steel has taken the following major initiatives:-

(i) Mega Expansion Plans of SAIL, RINL & NMDC Ltd.

SAIL: Steel Authority of India Ltd has undertaken Modernization & Expansion of its integrated steel plants at Bhilai, Bokaro, Rourkela, Durgapur & Burnpur and special steel plant at Salem. In the current phase, the crude steel capacity is being enhanced from 12.8 Million tonne to 21.4 million tonne per annum. The indicative investment for current Phase is about Rs. 61,870 crore. Approximately Rs. 10,000 crore has been earmarked for modernization and expansion of SAIL Mines. The Expansion Plan of SAIL, besides capacity enhancement, adequately addresses the need of SAIL Plants towards eliminating technological obsolescence, energy savings, enriching product mix, pollution control, developing mines & collieries to meet higher requirement of key inputs, introduce customer centric processes and have matching infrastructure facilities in the Plant to support higher production volumes.

At Rourkela Steel Plant, all new facilities under the integrated process route of BF-BOF-Caster-Plate Mill are in operation and are operating at about 70% of the rated capacity. The installed crude steel capacity of the plant has increased from 1.9 Million tons per annum (Mtpa) to 4.2 Mtpa. At IISCO Steel Plant, all facilities under the integrated process route are in operation and are under stabilization and ramp-up. The installed crude steel capacity of the plant has increased from 0.50 Mtpa to 2.50 Mtpa. At Bokaro Steel Plant, all major facilities like the upgraded BF No. 2, Coke Oven batteries No. 1 & 2 and new 1.2 MTPA Cold Rolling Mill have been commissioned. At Bhilai Steel Plant, Ore Handling Plant Part-A, 2nd Sinter Machine in SP-3 and new Coke Oven Battery have been completed. At Durgapur Steel Plant, Rebuilding of Coke Oven Battery - 2 has been completed.

The balance facilities at Bhilai Steel Plant, Durgapur Steel Plant, and Bokaro Steel

Plant are under various stages of implementation. Efforts are being put in to complete the balance facilities under current phase of Modernization & Expansion progressively by 2015. RINL: RINL has undertaken major expansion plan to double its capacity to 6.3 Mtpa of Liquid Steel at an estimated cost of Rs. 12,291 crore. All major units of stage-I have been commissioned and are under regular operation. The balance unit under Stage-II i.e., Special Bar Mill and Structural Mill are planned for commissioning by March‟ 2015, and April, 2015 respectively. Modernization & Up-gradation: For enhancing the liquid steel capacity to 7.3 Mtpa, up-gradation & modernization of existing Blast Furnaces, Converters and installation of 3rd Converter, 4th Caster in SMS - 2 are taken up. Category-I Capital Repairs and upgradation of Blast Furnaces-I was completed with blowing in of the Furnace of 30th July, 2014. NMDC Ltd: NMDC plans to produce 34 MTPA iron ore production by 2014-15, 75 MTPA by 2018-19 and 100 MTPA by 2024-25. The company can produce about 78 MTPA from existing mines and it needs to procure more mines to enhance its production.

Page 31: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

23

NMDC is setting up a green filed integrated steel plant of 3 million tonne per annum capacity in Nagarnar, Chhattisgarh with an estimated cost of around Rs. 15,525 Crore.

NMDC is in the process of expanding its business through forward integration in both Greefilef and Brownfield projects by setting up (a) 1.2 mtpa Pellet Plant at Donimalai in Karnataka (b) 2 mtpa Pellet Plant at Nagarnar along with 10 mtpa Beneficiation Plant at Bailadila Complex interconnected by a Slurry Pipeline between Bacheli and Nagarnar in Chhatishgarh. (ii) Special Purpose Vehicle (SPV)

A Special Purpose Vehicle (SPV) called International Coal Ventures Ltd (ICVL) has been incorporated as a Joint Venture Company on 20.5.2009 with SAIL, CIL, RINL, NMDC and NTPC as its promoter companies with an objective to acquire Coal assets in overseas territories to meet the coal requirement of its promoter companies. ICVL has been granted powers and the autonomy to function as a Navratna company but without formal Navratna status. ICVL is actively scouting for coal properties in target countries such as Australia, Canada, Indonesia, Mozambique and USA. It is also carrying out due diligence of Coal Mines and assets in the other target countries. It has recently acquired a coal mine and coal assets in Mozambique from Rio Tinto having coal resources of 2.6 Billion Tonnes.

(iii) Mergers/Acquisitions and Strategic alliances/Joint Ventures To improve operational efficiency of steel units and to achieve synergy, a number of mergers/acquisitions/strategic alliance/Joint Ventures have either taken place or in various stages of negotiations. Details of which are as under:- (A) Mergers/Acquisitions Ministry of Steel has taken up with Ministry of Commerce / Government of India for

exploring possibility of acquiring majority stake in Neelachal Ispat Nigam Limited (NINL) in Jeypore, Odisha by SAIL. Such acquisition process will facilitate realization of full potential of NINL as a profitable integrated steel plant. It will help in enhancing SAIL‟s growth and market share, beside providing an access to a port based plant and captive iron ore deposits which could be gainfully utilized.

(B) Strategic alliances/Joint Ventures Revival of operation of SAIL SCL Kerala Ltd (SSKL), Kozhikode : The management

of erstwhile Steel Complex Limited, a BIFR referred company was taken over by SAIL after its release from BIFR, in 2010, and converted into a JV company namely “SAIL-SCL Kerala Limited” with SAIL and Government of Kerala having equal shareholding. The JV Company has initiated the process for installing 65000 tpa TMT rolling mill in the premises and erection of the mill is in progress.

SAIL is also in discussions with Industrial Development Corporation of Odisha Ltd.

(IDCOL) for exploring the possibility of acquisition / JV with its wholly owned subsidiaries IFCAL (IDCOL Ferro Chrome Alloys Ltd.) and IKIWL (IDCOL Kalinga

Page 32: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

24

Iron Works Ltd.). In pursuance to signing of MOU between the two companies, SAIL undertook valuation of assets, as well as prepared investment plan which would bring better utilization of land and resources of both the subsidiary companies of IDCOL. Based on detailed due-diligence visit, as well as series of discussions with IDCOL authorities, and approval by the SAIL Board, financial bid for acquisition of [100%] equity stake in IKIWL and [51%] equity stake in IFCAL was submitted in Aug‟2013. Negotiations are ongoing with Inter Departmental Core Group (IDCG) of Govt. of Odisha.

NMDC has signed an MoU with Indian Railways for doubling of the 150 km Jagdalpur-Kirandul section of the Kottavalsa-Kirnadul line of the East Coast Railways to augment the iron ore evacuation capacity.

NMDC has signed MoU with RINL to develop Slurry Pipe Line system from Nagarnar to Vizag and Pellet Plant at Vizag. This will be under Joint Venture.

RINL has a number of Strategic tie-ups for forward integration/ Business diversification. Various initiatives in this directions are as follows :

A Forged Wheel plant is being setup at Rae Bareli, up for production of wheels for High Speed Trains of Indian Railways

An Axle plant is being set-up for production of 50,000 axles per annum which is an import substitute item for Indian Railways

JV initiative with NMDC for laying 13 MTPA Iron ore Slurry pipe line from Nagarnar to Visakhapatnam and setting up of 6 MTPA pellet Plant at Visakhapatnam.

(iv) Corporate Social Responsibility

Corporate Social Responsibility (CSR) is a concept whereby organizations serve the interests of society by taking responsibility for the impact of their activities on customers, employees, shareholders, communities and the environment in all aspects of their operations. Harnessing of natural resources has a direct impact on the economy, environment and society at large. CSR is thus linked with the practice of Sustainable Development.

Department of Public Enterprises has issued new “Guidelines on Corporate Social Responsibility and Sustainability for Central Public Sector Enterprises” vide OM No. 15 (13)/2013-DPE (GM) Dated the 21st October, 2014.

Page 33: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

25

Various activities like constructions of schools, provisions of medical facilities, construction of roads drains, lighting of roads in villages, constructions of toilets in schools etc. are taken up by PSUs under this CSR activities.

BUDGET AND EXPENDITURE ON CSR BY STEEL PSUs

(Rs. in lakhs) PSU 2010-11 2011-12 2012-13 2013-14 2014-15

(upto Dec.14)

Budgeted Exp. Budgeted Exp. Budgeted Exp. Budgeted Exp. Budgeted Exp.

SAIL 9400.00 6895.26 6400.00 6125.00 4200.00 5329.00 4000.00 6206.00 7800.00 1287.00

RINL 1540.00 1173.00 1200.00 1062.22 750.00 1600.00 750.00 2031.00 1423.00 1129.00

NMDC 8156.00 6223.00 8013.00 8671.00 14530.00 10110.00 17105.00 13142.00 25018.69 6397.48*

MOIL 542.00 575.00 628.00 655.91 680.00 1056.00 863.00 1036.00 1419.00 330.00

KIOCL 100.00 59.36 230.00 119.00 283.00 79.00 93.00 227.00 110.00 8.84

MSTC 100.00 95.74 150.00 166.00 355.00 193.28 260.00 482.86 120.00 57.75@

FSNL 10.00 9.06 9.00 9.06 9.00 9.00 4.00 4.50 25.27 3.50

MECON 180.50 110.91 325.00 220.51 497.49 235.33 460.46 257.63 468.76 183.63

HSCL 25.00 2.87 0.00 7.51 0.00 24.02# 0.00 0.00 0.00 0.00

BGC 216.00 83.00 38.00 26.00 17.00 48.00 64.32 92.27 36.35 24.10

TOTAL 20269.50 15227.20 16993.00 17062.21 21321.49 18683.63 23599.78 23479.26 36421.07 9421.30

@ upto February 2015 * Nov. 2014 # spent from the carried over fund of last year.

(v) Rural Distribution Network of Steel SAIL has been expanding its‟ dealer network, with special focus on Rural Dealership Scheme, to widen reach of items of mass consumption. As on 1st January, 2015, SAIL‟s dealership network consists of 2877 dealers, including 1027 rural dealers. During April- December‟ 2014, 380 new dealers have been appointed out of which 207 are Rural dealers. SAIL Rural Dealership Scheme was introduced in 2011-12 with a view to expand it scope of business in rural areas at Block/Taluka level. Appointment of SAIL Dealers is a continuous process. Preference is accorded to applicants from SC, ST and OBC categories in appointment under SAIL Dealership Scheme, subject to their fulfilling eligibility criteria/ conditions, as prescribed for them. Dealership under SC/ST & OBC have been exempted from payment of security deposit while the dealers under general category are required to furnish a security deposit @ Rs. 500/-per tonne of agreed monthly off take. RINL makes efforts on continuous basis for promotion of steel usage through development and supplying of new products and improving Distribution Network for wider coverage.

RINL has a Distribution Network consisting of 5 Regional Offices, 23 Branch Offices, 22 Stockyards and 6 Consignment Sales Agents. RINL has appointed 115 Retailers for supplying steel products in urban, semi-urban and rural areas. With a view to popularizing usage of steel in rural areas, RINL/VSP introduced the Scheme of registration of District Level Dealers in Small Towns and Rural Dealers at Block and Panchayat Level locations. The process of registration of Rural Dealers is continuous

Page 34: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

26

and simple. Preference is given for the minorities and women entrepreneurs in the Rural Areas for the Rural Dealerships. Till the end of December 2014, RINL has 453 Rural Dealers spread across almost all the States and Union Territories in the country to supply steel products to the semi-urban and rural consumers. RINL has started Marketing Contact Offices at Ranchi, Raipur, Trichy, Allahabad, Panaji, Jammu, Siliguri and Vijayawada.

(vi) Encouraging Research & Development in Iron & Steel Sector Research & Development (R&D) in Iron & Steel sector is carried out mainly by the Steel Plants, Research Laboratories and Academic Institutions. Annually, about Rs. 300 crore is invested in R&D activities by the Iron & Steel and allied companies which is hardly 0.15% to 0.30% of the turnover. The R&D investment in Indian steel companies is roughly 1/10th of the investment made by leading steel companies abroad. There is a need for maximizing the use of indigenous raw materials, improvement in techno-economic parameters, reduction in energy consumption &CO2 emission and to develop new steel product. The focus of the Ministry‟s R&D promotion efforts, therefore, primarily cover the following areas: (a) Initiatives for accelerated adoption/assimilation of new technologies for Iron & Steel

making, specially technologies consistent with our domestic resource endowment.

(b) Developing domestic capabilities in innovative /path breaking technologies utilising iron ore fines and non coking coal.

(c) Beneficiation of raw materials like iron ore, coal etc. and agglomeration. (d) Improved quality of products through induction furnace route,

(e) Indigenous development of value added steel products like CRGO steel. In order to provide accelerated thrust on R&D, Ministry of Steel has published „A Roadmap for Research & Development and Technology for Indian Iron & Steel Industry‟ in Sept 2011 with an aim to sensitize the Indian steel industry to improve its technological face through R&D and technology intervention. Further, the Ministry is pursuing the following major initiatives for promoting R&D in Iron & Steel Sector.

(a) R&D with Steel Development Fund

Under this scheme, the Empowered Committee on R&D under the Chairmanship of Secretary (Steel) has so far approved 83 research projects costing Rs. 696.27 crore including SDF component of Rs. 389.63 crore of these 47 projects have been completed. Research results of several R&D projects have already been implemented by the steel plants, resulting in improvement in productivity, reduction in energy consumption and pollution etc.

(b) R&D with Plan Fund:

Under this Scheme, the Project Approval and Monitoring Committee under the Chairmanship of Secretary (Steel) has so far approved 10 R&D projects with a total cost of Rs. 138.10 crore with financial assistance of Rs. 95.66 crore from Plan Fund. So far 5

Page 35: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-III/Reform Measures & Policy Initiatives

27

projects have been completed wherein processes / technologies have been developed in laboratory/ pilot scale for beneficiation & agglomeration of iron ore & coal for the benefit of the iron & steel sector. Process has also been developed in laboratory scale for production of low Phosphorus steel in laboratory scale Induction Furnace, for which industrial trials are being carried out.

(c) Steel Research & Technology Mission of India.

To spearhead R&D in the Iron & Steel sector in the country. Ministry of Steel is facilitating setting up of an Industry led institutional mechanism, namely, the Steel Research & Technology Mission of India (SRTMI). SRTMI is proposed to be funded by Ministry of Steel and Indian Steel Industry. (vii) Mandatory Quality Control Order on Selected Steel Products

Ministry of Steel notified 16 steel products having direct bearing on human health &

safety, and which are critical to infrastructure through Steel & Steel Products (Quality Control) orders. Order fully enforces on all the 15 products categories with effect from 1st October, 2014 (one product has been omitted). This is expected to go a long way in making available quality steel to consumers for critical end use applications. The Order also empowers Public to take legal course against supply of sub standard steel products.

(viii) Gender Budgeting

For empowerment of women, a Gender Budget Cell has been set up in the Ministry as per directions of the Ministry of Finance and Ministry of Women & Child Development with the aim to initiate steps for implementation of gender budgeting concept in the Ministry.

3. NEW NATIONAL STEEL POLICY Steel industry is basically driven by changes in domestic and global market trends. This meant that most of the objectives and targets included in the National Steel Policy (NSP) 2005 needed to be reassessed/revaluated in the light of changing market conditions. Therefore, it has been decided to formulate a New National Steel Policy. The new policy, while retaining the core structure of National Steel Policy 2005, will aim for much broader policy formulation covering various aspects of steel sector in the country such as growth of steel demand in India, raw materials, resources and design, environment and facilitation of new steel projects. As precursor to the new policy documents Long Term Perspective of the Iron and Steel Sector has been prepared for finalization.

A High Level Committee on Manufacturing (HLCM) headed by the Prime Minister has set a target of 300 million tones Steel Production by 2025. This is a very ambitious target and with a view to achieve the same, SAIL and RINL are preparing plans for their second phase of modernization / expansion. Further, efforts are being made to facilitate setting up of large scale steel plants in the mineral rich states of Odisha, Jharkhand, Karnataka and Chhattisgarh. This would be done by having partnerships between SAIL, RINL and NMDC and State Government PSUs for setting up Special Purpose Vehicles (SPVs) which would be responsible for developing such projects.

*****

Page 36: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-IV/Review of Past Performance

28

CHAPTER – IV

REVIEW OF PAST PERFORMANCE OF SCHEMES OF 2013-14 & 2014-15

In the 11th Plan (2007-12), a new scheme named ‘Scheme for promotion of

Research & Development in Iron and Steel Sector’ was included with a budgetary

provision of Rs. 118.00 crore. The scheme was formally approved for implementation

on 23.1.2009. The scheme has been continued in the 12th Five Year Plan (2012-17)

with an allocation of Rs. 200 crore. Upto December, 2014, ten (10) R&D project

proposals have been approved.

The allocation of Rs. 200 crore for 12th FY Plan included Rs. 32.87 crore for the

ongoing projects, Rs. 150 crore for the ‘Development of Technology for Cold Rolled

Grain Oriented (CRGO) steel sheets and other value added innovative steel products’

(new component), and Rs. 17.13 crore for new projects to be pursued under the existing

objectives of the scheme. In BE 2014-15, Rs. 20.00 crore were allocated, which has

been reduced to Rs. 7.00 crore in RE 2014-15.

The PSUs under the administrative control of the Ministry formulate and

implement various schemes/ programmes related to their respective areas of operation.

The Plan schemes of the PSUs are components of their respective Annual Plans or

Five Year Plans or of both, depending on the nature of the scheme. Since each PSU

has several Plan schemes, most of which are related to the normal day to day

functioning and operations of the company, it was felt that inclusion of all schemes of

the PSUs in the Outcome Budget of Ministry of Steel would neither be practical nor

commensurate with the objectives of outcome budgeting. A view was, therefore, taken

that only major Plan and Non-Plan schemes with sanctioned/estimated cost of more

than Rs. 50.00 crore are included in the Outcome Budget of Ministry of Steel. Based on

this criterion, the actual achievements vis-à-vis the intended outcome in respect of the

45 of major Plan schemes included in Outcome Budget 2013-14 and 39 of the 2014-15

are given in the following tables. Achievements under the plan schemes of the Ministry

are also given in the table. It may be noted that since almost all the major schemes are

still under various stages of implementation, a more meaningful and realistic

assessment of the actual achievements is possible only upon completion of the

schemes.

Page 37: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

29

Revie

w o

f p

as

t p

erf

orm

an

ce

of

sc

hem

es

du

rin

g, 2

013

-14

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13

-M

ar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

A.

SC

HE

ME

S W

ITH

ES

TIM

AT

ED

/SA

NC

TIO

NE

D C

OS

T M

OR

E T

HA

N 5

0.0

0 C

RO

RE

1.

ST

EE

L A

UT

HO

RIT

Y O

F I

ND

IA L

TD

. (S

AIL

)

(a)

Bh

ilai S

teel P

lan

t (B

SP

)

(i)

Cold

R

epair

of

CO

B-9

T

o

m

eet

the

short

fall

in

coke

dem

and

as

well

as

sta

bili

zin

g c

oke o

ven

gas b

ala

nce a

nd

to

reduce

em

issio

n

level

359.7

8

(332.6

5)

137.0

0

65.6

2

Im

pro

ved

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n

norm

s

of

MO

EF

Jul’1

2/

Aug’1

4

Aug’1

4

59.9

9

102.3

9

Incre

ase

in

coke a

vaila

bili

ty

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(ii)

E

xpansio

n o

f B

SP

In

cre

ase

in

pro

ductio

n

of

hot

meta

l &

cru

de ste

el

thro

ugh

sta

te-o

f-th

e-

art

te

chnolo

gy;

Phasin

g

out

of

low

yie

ld

and

energ

y

inte

nsiv

e

units,

reductio

n

of

sem

is

by

enhancin

g

fin

ished

ste

el

pro

ductio

n;

Bro

adenin

g

and

valu

e

additio

n

in

pro

duct-

mix

fo

r hig

her

fle

xib

ility

and

pro

fita

bili

ty;

Meetin

g

requirem

ent

of

India

n R

ailw

ay.

18847.0

0

(17266.0

0)

5300.0

0

4460.0

0

Incre

ase

in

HM

capacity fr

om

4.0

8

mtp

a to 7

.5 m

tpa

Aug’1

0

pro

gre

ssiv

ely

/ M

ar’1

3

Mar’1

5

3958.0

1

12491.8

6

Ore

H

andlin

g

Pla

nt (O

HP

) A

T

his

pro

ject

has

been

revie

wed

in

2014-1

5.

(b)

Du

rga

pu

r S

teel

Pla

nt

(DS

P)

(i)

Expansio

n o

f D

SP

P

hasin

g

out

of

energ

y

inte

nsiv

e

units,

intr

oductio

n of

energ

y

eff

icie

nt

technolo

gy,

reductio

n o

f sem

is &

in

cre

ase o

f hot

meta

l capacity

3164.0

0

(2875.0

0)

775.0

0

675.0

0

Incre

ase o

f hot

meta

l capacity fro

m

2.0

9 t

o 2

.45 M

tpa

Aug’1

0

(Pro

gre

ssiv

el

y)/

Dec’1

2

Mar’1

5

631.4

2

2153.2

2

B

arr

el ty

pe

recla

imer

of

RM

HP

R

ebuild

ing o

f C

OB

-2

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(c)

Ro

urk

ela

Ste

el P

lan

t (R

SP

)

(i)

Coal

Dust

Inje

ctio

n

Syste

m

in B

F-

4

Te

chnic

al

necessity

for

reductio

n i

n c

oke

rate

and

impro

vem

ent

of

the

furn

ace p

roductivity.

70.7

1

(66.0

2)

10.2

5

5.0

0

Repla

cem

ent

of

coke

with

pulv

erized

coal

on

1:1

basis

. C

oal

inje

ctio

n

rate

in

B

last F

urn

ace a

t

Jan’0

7/

Oct’0

8

Jun’1

4

1.0

7

57.9

1

Susta

inabili

ty

pla

nt

opera

tio

n

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 38: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

30

Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

3-

Mar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

120 K

g/thm

.

(ii)

Expansio

n o

f R

SP

In

cre

ase

in

pro

ductio

n

of

hot

meta

l &

cru

de ste

el

thro

ugh

sta

te-o

f-th

e-

art

technolo

gy;

Impro

vem

ent

in

qualit

y

of

pro

ducts

; P

roductio

n

of

mo

re

valu

e-a

dded

pro

ducts

; Im

pro

vem

ent

in

energ

y

consum

ptio

n

&

environm

ent;

and

Reductio

n in

cost

of

pro

ductio

n

12922.0

0

(11812.0

0)

2050.0

0

2048.0 0

In

cre

ase i

n h

ot

meta

l capacity

from

2.0

0 M

tpa

to 4

.5 M

tpa

Aug’1

0

(Pro

gre

ssiv

ely

)/

Mar’1

3

Sep’1

4

1837.7

2

10870.1

7

Majo

r F

acili

ties

com

ple

ted :

S

inte

r P

lant-

3

O

re

Beddin

g

&

Ble

ndin

g

Pla

nt

C

oke

Oven

Batt

ery

C

om

ple

x

3rd

S

lab

Caste

r

B

last

furn

ace-5

and

its

associa

ted

facili

ties

Bla

st

Fu

rnace

of

4060

m3

volu

me

is

the

firs

t F

urn

ace

com

ple

ted

and

put

into

opera

tio

n under

ongoin

g

Modern

izatio

n

and

Exp

ansio

n

Pla

n o

f S

AIL

.

Th

is

pro

ject

has

been

revie

wed in

2014

-15.

(iii)

R

ebuild

ing o

f C

OB

-3

To

m

eet

the

coke

requirem

ent

for

hot

meta

l pro

ductio

n

of

4.5

M

tpa

and

to

reduce

em

issio

n

levels

258.5

3

(237.0

9)

4

5.0

0

47.6

5

Impro

ve

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n n

orm

s

of

MO

EF

Jun’2

01

2

Jan’1

5

29.0

5

31.9

3

Refe

cto

ry

ere

ctio

n

has

been

sta

rted

on 1

8.4

.14

Th

is

pro

ject

has

been

revie

wed in

2014

-15.

(iv)

Insta

llatio

n o

f heat

treatm

ent fa

cili

ties

To

m

eet

the

incre

asin

g

requirem

ent

of

quenched

&

tem

pere

d

pla

tes

for

Defe

nce

and

oth

er

secto

rs

of

str

ate

gic

im

port

ance

178.7

3

(160.4

8)

12.0

0

26.0

0

Additio

nal

pro

ductio

n

of

12000 t

onne

Oct’1

2/

Sep’1

4

Sep’1

4

18.5

2

18.8

6

Incre

ased

availa

bili

ty

of

valu

e

added

pro

ducts

Th

is

pro

ject

has

been

revie

wed in

2014

-15.

Page 39: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

31

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13 M

ar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(d)

Bo

karo

Ste

el P

lan

t (B

SL

)

(i)

Expansio

n o

f B

SL

Enhancin

g H

ot

meta

l pro

ductio

n

Intr

oductio

n

of

energ

y

eff

icie

nt

technolo

gy,

convers

ion o

f hig

her

quantities

of

Hot

Rolle

d c

oils

to v

alu

e

added

Cold

R

olle

d

pro

ducts

w

ith

the

insta

llatio

n

of

additio

nal

Cold

R

olli

ng C

apacity.

6951.0

0

(6325.0

0)

1200.0

0

1020.0

0

New

C

old

R

olli

ng

Mill

com

ple

x of

1.2

M

tpa &

enhancin

g

Hot

meta

l pro

ductio

n

from

4.5

9 M

tpa

to 5

.77 M

tpa

May’1

0(P

rogre

ssiv

ely

)/

Dec’1

1

Sep’1

4

1121.4

2

4591.3

4

Acid

re

genera

tio

n

pla

nt,

C

oil

Packagin

g L

ines,

Skin

P

ass

Mill

, C

om

pre

ssed

Air

sta

tio

n

have

been c

om

ple

ted.

Fo

r P

LT

CM

, in

tegra

ted

tria

l ru

n

taken

for

reductio

n

of

HR

P

ickle

d

coils

th

rough

Ta

ndem

C

old

M

ill

in

Jul’1

3.

Ele

ctr

oly

tic

Cle

anin

g

Lin

es

and

Bell

Annealin

g

Fu

rnace

have

als

o been m

ade

ready.

C

ast

House S

lag

Gra

nula

tio

n

Pla

nt

of

Cast

House

no.6

of

BF

-3 a

nd n

o.3

of

BF

-2 c

om

ple

ted

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(e)

IIS

CO

Ste

el P

lan

t

(i)

Expansio

n o

f IS

P

To

in

sta

ll a

new

str

eam

of

facili

ties t

o

pro

duce

2.7

MT

PA

hot

meta

l, 2.5

MT

PA

cru

de

ste

el

&

2.3

7

MT

PA

sale

able

ste

el

17960.5

9

(16408.0

0)

1750.0

0

1432.0

0

2.9

1

Mtp

a

hot

meta

l, 2

.5 M

tpa

cru

de

ste

el

&

2.3

7

Mtp

a

sale

able

ste

el.

Jun’0

8(P

rogre

ssiv

ely

)/

Dec’1

0

Sep’1

4

1307.3

2

15787.8

7

Majo

r F

acili

tie

s

com

ple

ted :

R

aw

M

ate

ria

l H

andlin

g

Com

ple

x

C

oke

Oven

Batt

ery

C

om

ple

x

alo

ng

with

CD

CP

&

B

y

pro

duct

pla

nt

S

inte

r P

lant

W

ire R

od M

ill

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 40: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

32

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

s

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

N

ew

B

last

Fu

rnace

&

Oxygen P

lant

are

ready.

F

irst

bill

et

was

cast

in

Bill

et

Caste

r N

o.1

.

(f)

R

aw

Ma

teri

als

Div

isio

n (

RM

D)

(i)

Enhancem

ent

of

loadin

g c

apacity o

f B

ola

ni

Iron

Ore

M

ine

Fo

r enhancin

g

loadin

g c

apacity a

nd

modific

atio

n

of

Railw

ay

line,

overh

ead

ele

ctr

ical

work

and s

ignalin

g &

te

lecom

munic

atio

n

for

full

rake lo

adin

g

124.8

8

(119.8

8)

15.0

0

20.5

0

--

Jun’0

8/D

ec’0

9

Sept’1

3

(Com

ple

ted)

1.9

6

99.3

0

Loadin

g

Conveyor

(LC

-3)

Com

ple

ted.

One lin

e c

om

ple

ted

(ii)

Enhancem

ent

of

pro

ductio

n

capacity

of

Meghahatu

buru

Ir

on O

re M

ine

A t

echnic

al necessity

to in

cre

ase iron ore

fo

r m

eetin

g

requirem

ent

after

SA

IL e

xpansio

n.

125.7

8

(118.8

5)

31.0

0

25.8

3

capacity

from

4.3

M

TP

A

to

6.5

0

MT

PA

of

fin

ished

pro

duct

Mar’1

0/J

un’1

2

Jun’1

4

7.8

5

65.3

7

Work

fo

r cru

shin

g

and

Loadin

g s

ectio

n

com

ple

ted

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(iii)

E

nhancem

ent

of

pro

ductio

n

capacity o

f B

ola

ni

Iron O

re M

ine

A t

echnic

al necessity

to in

cre

ase iron

ore

fo

r m

eetin

g

requirem

ent

after

SA

IL e

xpansio

n.

275.2

8

(254.5

5)

93.0

0

58.1

3

capacity

from

4.1

M

TP

A

to

10

MT

PA

of

fin

ished

pro

duct

Nov’1

1/

Nov’1

3

Jun’1

4

(7.5

Mtp

a)

Jun’1

5

(10 M

tpa)

59.5

5

104.1

6

--

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(g)

Ch

an

dra

pu

r F

err

oall

oy P

lan

t (C

FP

)

(i)

Insta

llatio

n o

f 1x45

M

VA

sub

-arc

F

urn

ace

Th

e

additio

nal

pro

ductio

n

of

HC

Fe

Mn &

HC

SiM

n

203.8

5

(187.3

3)

25.0

0

96.3

8

Th

e

additio

nal

pro

ductio

n o

f 37500

tonne

of

HC

Fe

Mn

&

35000

tonne

of

HC

SiM

n

or

60,0

00 t

onne

of

HC

SiM

n

on

sta

ndalo

ne

basis

.

Dec’1

1/

Oct’1

3

Bala

nce jo

bs

rete

ndere

d a

t risk &

cost

49.7

0

119.8

8

T

his

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 41: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

33

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

O

utl

ay 2

013

-14

Q

uan

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d O

utc

om

es

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

Co

l.7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr1

3-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

2.

RA

SH

TR

IYA

IS

PA

T N

IGA

M L

TD

. (R

INL

)

O

ng

oin

g S

ch

em

es

(i)

AM

R S

chem

es

To

main

tain

good

health o

f P

lant

100.0

0

100.0

0

To

m

eet

the

coke

requirem

ents

and g

as

bala

nce,

it is e

ssentia

l to

have a

re

pla

cem

ent

battery

to

main

tain

hot

meta

l &

liq

uid

ste

el

pro

ductio

n a

t curr

ent

levels

even

durin

g c

apital

repairs of

oth

er

thre

e

coke o

ven

batt

erie

s

Contin

uou

s

--

194.2

0

--

---

--

(ii)

R&

D S

chem

es

To

enhance

pro

ductivity / a

chie

ve

cost

reductio

n

/ D

evelo

pm

ent of new

pro

ducts

15.0

0

15.0

0

Develo

pm

ent

on

the

exis

tin

g

technolo

gy,

trouble

shootin

g w

ith

technolo

gic

al

solu

tio

ns for

opera

tio

nal

activitie

s

thro

ugh

investig

ative

stu

die

s,

failu

re

analy

sis

and c

ritical

exam

inatio

ns

of

pro

cess

para

mete

rs t

o re

duce

cost /

enhance p

roductivity

Contin

uou

s

--

50.2

7

--

Availa

bili

ty

of

new

pro

ducts

--

(iii)

C

oke O

ven

Batt

ery

No.4

P

hase

-II

To

opera

te C

OB

-4 a

s

independent

Batt

ery

. F

ull

utilis

atio

n of

gas

and enhancin

g bett

er

realis

atio

n

of

bypro

duct

by

pro

vid

ing

additio

nal bypro

duct

facili

ties

and

bala

nce

facili

ties

in c

oal handlin

g.

355.0

0

35.0

0

35.0

0

To

opera

te C

OB

-4 a

s

independent

Batt

ery

. In

cre

ase in

recovery

of

by

pro

ducts

Coal

Handlin

g

Sid

e:

June'0

8:

By

Pro

duct

Sid

e:

Sept'08.

June'1

4

to

Aug'1

4

pro

gre

ssiv

el

y

26.7

6

256.9

5

Pushin

g

em

issio

n

contr

ol

syste

m -

Unit

com

mis

sio

ned

on

30th

A

pr’1

4.

C

oal

handlin

g

Pla

nt

- E

rectio

n

of

Conveyor

no.

Y-2

5,

26 &

27 c

om

ple

ted.

Am

moniu

m S

ulp

hate

P

lant

- U

nit

part

ly

Com

mis

sio

ned

and

tota

l unit

com

mis

sio

nin

g

by

May’1

4.

Benzol

recovery

&

dis

tilla

tio

n

Pla

nt

- E

quip

ment ere

ctio

n

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 42: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

34

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/

Ris

k f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

in

clu

din

g

pip

ing

com

ple

ted.

Ere

ctio

n

of

Instr

um

enta

tion

work

s

are

under

advanced

sta

ge

of

com

ple

tio

n.

Th

e u

nit i

s l

ikely

to b

e

com

mis

sio

ned

from

June’1

4

to

Aug'1

4

pro

gre

ssiv

ely

.

(iv)

Expansio

n

to

6.3

M

tpa

Liq

uid

Ste

el

To

in

cre

ase

the

pla

nt capacity

12291.0

0

600.0

0

600.0

0

Incre

ase

pro

du

ctio

n.

En

han

cin

g

pro

du

ctio

n o

f

liq

uid

ste

el to

6.3

Mtp

a o

f L

iqu

id

Ste

el.

36

/48

mo

nth

s

in

phases

fro

m

28

-10

-

20

05

Sta

ge:-

I

Oct’

08

Sta

ge

-II

Oct’ 0

9

Sep’1

4

556.6

4

10792.6

6

Th

e

6.3

M

tpa

Expansio

n

Pro

ject

of

RIN

L

is

alm

ost

com

ple

ted

with

the

com

mis

sio

nin

g

of

all

majo

r units of

Sta

ge

-1

except

Lim

e K

iln P

lant.

Units C

om

mis

sio

ned:

Sin

ter

Pla

nt-

3

com

mis

sio

ned in

July

’13.

Convert

er-

2 in

S

teel M

elt S

hop

-2 c

om

mis

sio

ned

in O

ct’1

3.

Caste

r-3 in

Ste

el

Melt S

hop-2

com

mis

sio

ned in

N

ov’ 13.

1st Lin

e o

f W

RM

-2com

mis

sio

ned

in J

an’1

4

LF

-2 in

Ste

el

Melt S

hop-2

com

mis

sio

ned in

F

eb’1

4

Convert

er-

1 in

S

teel M

elt S

hop

-2 c

om

mis

sio

ned

in M

ar’1

4

2nd

Lin

e

of

WR

M-2

com

mis

sio

ned

in

Mar’1

4

Th

is p

roje

ct

has

been

revie

wed

in

2014-1

5.

(v)

Pulv

erised

Co

al

Inje

ction

S

yste

m

for

BF

-1 &

BF

-2

Inje

ction

syste

m

for

reduction

in

consum

ption

of

expensiv

e B

F

133.0

0

8.0

0

8.0

0

Incre

ase

d

pro

duction

of

hot

meta

l.

T

o

re

duce

cost

o

f

To

b

e

co

mm

iss

ion

ed

by.

Aug’1

4

3.5

7

101.0

4

All

me

chanic

al

work

com

ple

ted.

Expert

s fo

r N

2 c

om

pre

ssors

fro

m

Chin

a a

rriv

ed o

n

Th

is p

roje

ct

has

been

revie

wed

in

2014-1

5.

Page 43: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

35

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

O

utl

ay 2

01

3-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr1

3-

Mar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

coke

with

less

exp

en

siv

e

pulv

erized c

oa

l

pro

duction

of

hot

meta

l O

ct'

20

07

as

pe

r th

e B

OD

a

pp

rova

l

16/A

pr/

14

and

rectifie

d

one

com

pre

ssor

on

25/A

pr/

14.

Com

mis

sio

nin

g

exp

ert

s f

rom

Chin

a f

or

com

mencem

ent

of

testin

g

and

com

mis

sio

nin

g

activitie

s

arr

ived.

Inje

ctio

n o

n t

ria

l basis

is

pla

nned to

sta

rt in

A

ug’1

4.

(vi)

A

cquis

itio

n

of

iro

n o

re M

ine

&

cokin

g c

oal

min

e

To

achie

ve s

elf-

relli

ance f

or

raw

m

ate

ria

l and

cost

reductio

n

500.0

0

3.0

0

3.0

0

RIN

L/V

SP

does

not

have

captive

sourc

e

for

cokin

g c

oal/iron

ore

and

outla

y

inclu

ded

to

acquire

min

es

Contin

uous

--

0.0

0

0.2

8

LO

I date

d 3

1-0

5-2

013

has b

een r

eceiv

ed f

or

one m

ine fro

m G

ovt.

of

Raja

sth

an,

for

over

an

are

a

of

945.8

5

Hecta

res in

Bhilw

ara

D

istr

ict

of

Raja

sth

an

for

a

perio

d

of

30

years

. T

he

recom

mendatio

n

of

Govern

ment

of

Raja

sth

an

for

allo

tment of

anoth

er

iron o

re b

lock

of

about

4,8

66

hecta

res a

t Jahajp

ur,

B

hilw

ara

dis

t. is u

nder

consid

era

tio

n

of

Min

istr

y

of

Min

es.

Matt

er

is

bein

g p

urs

ued.

Th

is p

roje

ct

has b

een

revie

wed in

2014

-15.

(vii)

F

acili

ties

for

Iron

Ore

S

tora

ge

To

in

cre

ase

iron

sto

rage

facili

ty.

450.0

0

50.0

0

50.0

0

Shall

incre

ase

Iron o

re s

tora

ge

facili

ty

to

30

days

Sep’0

9

Dec’1

4

74.0

9

309.4

5

Unlo

adin

g

syste

m

by

HE

C

- A

lmost

all

mechanic

al

equip

ment

has

been r

eceiv

ed f

or

one

Wagon

Pusher

and

part

supplie

s for

anoth

er

Wagon

Pusher.

O

ther

packages

Majo

r supplie

s

and

civ

il w

ork

s c

om

ple

ted.

Equip

ment

ere

ctio

n i

s

in p

rogre

ss.

Th

is p

roje

ct

has b

een

revie

wed in

2014

-15.

Page 44: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

36

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

Co

l.7

Rem

ark

s/

Ris

k f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(viii

) S

trength

enin

g

of

220K

V

syste

m

of

AP

TR

AN

SC

O

To

str

ength

en

AP

pow

er

grid

for

transm

issio

n

of

pow

er

of

400 M

VA

86.3

4

5.0

0

5.0

0

It

enable

s

to

enhance

contr

acte

d

dem

and o

f 400

MV

A

for

RIN

L

on e

xpansio

n

Aug’0

9

--

0.3

1

63.3

3

Phase-I

w

ork

com

ple

ted.

Modalit

ies

for

esta

blis

hm

ent

of

400/2

20

KV

substa

tio

n

in

line

with

re

vis

ed

pro

posal

of

AP

T

ransco

are

under

fin

aliz

atio

n

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(ix)

BF

-1&

2C

ate

gory

R

epairs

To

carr

y o

ut th

e

Cate

gory

-I c

apital

repairs &

enhance

the v

olu

me to

3800 C

uM

fro

m t

he

exis

tin

g 3

200

CuM

capacity.

1663.0

0

406.0

0

406.0

0

To

incre

ase the

pro

ductio

n b

y

0.5

Mt

from

2M

t to

2.5

Mt of

Hot

Meta

l

BF

-1:

Nov'1

2

BF

-2:

July

'15

BF

-1:

May'1

4

BF

-2: July

'15

314.7

7

356.1

5

BF

-1:

Ere

ctio

n

in

advance

sta

ge

of

com

ple

tio

n a

nd

Com

mis

sio

nin

g

exp

ecte

d

by

end

of

May 2

014.

BF

-2:

Deta

il engin

eerin

g

is

in

pro

gre

ss

for

com

ple

tio

n

of

the

capital

repairs

as

per

schedule

by J

uly

’15.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(x)

Sin

ter

Pla

nt

pro

ductivity

enhancem

ents

To

in

cre

ase

the

Pro

ductio

n o

f S

inte

r to

support

th

e

incre

ase

in

the

volu

me o

f B

F. T

his

is

to m

eet th

e p

resent

pollu

tio

n

contr

ol

norm

s

343.0

0

2.0

0

2.0

0

To

in

cre

ase t

he

pro

ductio

n f

rom

5.5

Mt

to 6

.8 M

t of

Sin

ter

Sep’1

6

Sep’1

6

0.0

3

1.0

1

Ord

er

for

main

package

has

been

pla

ced

on

05.0

3.2

014

with

a

com

ple

tio

n

and

perio

d o

f 28 m

onth

s.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(xi)

S

MS

C

onvert

er

Revam

p

To

im

pro

ve

the

relia

bili

ty o

f th

e 3

convert

ers

as

the

exis

tin

g e

stim

ate

d

life

is

alm

ost

over.

T

his

is t

o m

eet

the

pre

sent

pollu

tio

n

contr

ol n

orm

s

404.1

6

25.0

0

25.0

0

Te

chnolo

gic

al

necessity t

o

change

the

Convert

ers

July

’15

May’1

6

2.0

5

2.0

5

Majo

r im

port

ed

supplie

s

have

been

ord

ere

d.

Majo

r In

dig

enous

supplie

s

have

been

ord

ere

d

and

S

upplie

s

com

menced.

Civ

il w

ork

s a

re u

nder

pro

gre

ss.

Gas d

uct ro

uting

for

secondary

em

issio

n

syste

m

fin

alis

ed a

nd

dra

win

gs a

ppro

ved.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 45: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

37

(R

s. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(xii)

3

rd C

onvert

er

an

d

4th C

aste

r T

o c

onvert

additio

nal

Hot

Meta

l genera

ted

(a

fter

cate

gory

1

repairs

of

the

exis

tin

g

2

Bla

st

Fu

rnaces )

in

to s

teel

by

addin

g

a

3rd

convert

er

and

4th

caste

r.

974.7

6

2.0

0

2.0

0

To

in

cre

ase t

he

pro

ductio

n

of

ste

el by 0

.97M

t

3rd

Convert

er:

July

’15

4th

Caste

r:

June’1

6

3rd

Convert

er:

July

’15 4

th

Caste

r:

June’1

6

0.0

0

0.1

4

3rd

C

onvert

er

- E

ngin

eerin

g

activitie

s a

re u

nder

pro

gre

ss.

4th

C

aste

r:

Ord

er

for

main

package

has

been

pla

ced

on

27.0

2.2

014.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(xiii

) 20.6

M

W

Waste

H

eat

Recovery

P

roje

ct

on S

inte

r S

traig

ht

line

Coole

r of

Sin

ter

M

achin

e 1

&2

To

G

enera

te

20.6

MW

pow

er

thro

ugh

waste

heat

recovery

syste

m

on

str

aig

ht-

line c

oole

r of

sin

ter

machin

es 1

&

2 under

Te

chnolo

gy

co-o

pera

tio

n

with

New

E

nerg

y

and

In

dustr

ial

Te

chnolo

gy

evelo

pm

ent

Org

anis

atio

n

(NE

DO

),

Japan

under

Gre

en

Aid

P

lan

96.0

0

10.0

0

10.0

0

To

genera

te

20.6

MW

E

lectr

icity

by

captu

rin

g

waste

heat

of

sin

ter

machin

es

and

without

burn

ing

any f

ossil

fuel.

Mar’1

2

Com

mis

sio

ned in

Mar'14.

20.2

3

87.4

1

Th

e

unit

com

mis

sio

ned

on

19

th M

arc

h’1

4

--

(xiv

) P

ow

er

Pla

nt-

II

To

utilis

e

the

lean

by-p

roduct

gases

whic

h

oth

erw

ise

would

be

fla

red

to

atm

osphere

. T

his

pro

ject

is conceiv

ed

with

the

sole

in

tentio

n o

f re

ducin

g

Gre

en

House

Gae

(GH

G)

em

issio

ns

into

th

e atm

osp

here

w

hile

m

eetin

g

the

pow

er

requir

em

ent

of

RIN

L

part

ially

; th

ere

by

mitig

atin

g

the e

ffects

of

clim

ate

change.

677.0

0

150.0

0

150.0

0

To

utilis

e

the

lean b

y-p

roduct

gases

whic

h

oth

erw

ise

would

be f

lare

d

to

atm

osphere

. T

his

pro

ject

is

conceiv

ed

with

the

sole

in

tentio

n

of

reducin

g G

reen

House

Gas

(GH

G)

em

issio

ns

into

th

e a

tmosphere

w

hile

m

eetin

g

the

pow

er

requirem

ent

of

RIN

L

part

ially

; th

ere

by

mitig

atin

g

the

eff

ects

of

clim

ate

Sep’1

3

Sep’1

4

213.4

7

296.2

9

Hydro

te

st

of

Boile

rs-1

&2

com

ple

ted.

Majo

r C

ivil

&

Str

uctu

ral

work

s

have

been

com

ple

ted

except

part

of

TG

build

ing

and

part

of

com

pre

ssor

build

ing

whic

h

are

under

pro

gre

ss.

Ere

ctio

n

of

TG

equip

ment

is

in

pro

gre

ss.

Th

e

unit

is

pla

nned

to

be

com

mis

sio

ned

by

Sept’1

4.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 46: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

38

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

change.

To

genera

te

120M

W

ele

ctr

icity

by

utilis

ing

the

lean b

ypro

duct

gases

while

m

itig

atin

g

the

effect

of

clim

ate

ch

ange

(xv)

Axle

Pla

nt

To

set

up t

he f

acili

ty

for

manufa

ctu

re

of

Axle

s

and

oth

er

rela

ted

pro

ducts

at

New

Jalp

aig

uri,

West

Bengal

by

form

ing

a

100%

subsid

iary

of

RIN

L

for

the p

urp

ose.

391.0

0

20.0

0

20.0

0

Insta

ll suitable

capacity

of

Axle

and oth

er

rela

ted

Pro

ducts

M

anufa

ctu

rin

g

unit a

t N

ew

Jalp

aig

uri,

West

Bengal

by

form

ing

a

100%

subsid

iary

of

RIN

L

for

the

purp

ose

to

meet th

e

Railw

ay

assure

d

off

take o

f 20,0

00

to

25000

num

bers

As

per

RIN

L:

30

month

s

As

per

Railw

ay:

24

month

s

Will

be

fin

aliz

ed

as

per

deliv

ery

schedul

e

of

supplie

r

--

0.1

1

0.2

2

M/s

ME

CO

N h

as b

een

appoin

ted

as

the

consultant.

Fin

al

Dra

ft L

and L

ease

&

Off-t

ake

Agre

em

ent

has b

een s

ent to

R

ailw

ays

on

08.0

1.2

014.

Cle

ara

nce

is

aw

aited

from

R

ailw

ays f

or

conclu

din

g

the

agre

em

ents

. T

enders

have

alr

eady

been is

sued fo

r m

ajo

r te

chnolo

gic

al

packages,

i.e.

Fo

rgin

g

line

&

Fu

rnaces

and

Machin

ing lin

e. T

he

off

ers

are

under

scru

tin

y.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(xvi)

In

sta

llatio

n o

f A

ddl. S

team

T

urb

ine D

riven

Blo

wer

TB

-5 in

TP

P &

BH

To

in

sta

ll T

B-5

as

sta

ndby t

o c

ate

r th

e

need

in

case

TB

-1,2

,3

goes

for

modern

isatio

n

and

als

o c

an b

e u

sed

as sta

ndby fo

r B

F-4

in

futu

re.

280.5

2

1.0

0

1.0

0

To

In

sta

ll T

B-5

to

cate

r th

e

need

of

cold

B

last

requirem

ent

of

BF

1

&

BF

2

in

case

exis

tin

g

TB

s

are

under

modern

isatio

n /

m

ain

tenance

27

month

s

from

aw

ard

of

contr

act

Aug’1

6

0.0

0

0.0

0

Ord

er

for

main

package

has

been

pla

ced

on

pla

ced

on

14.0

3.1

4

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

(xvii)

S

LT

M

To

U

tilis

e

the

additio

nal liq

uid

ste

el

of

1 M

T t

hat

will

be

pro

duced a

fter

revam

pin

g/u

pgra

dati

on

of

exis

tin

g

BF

s

and

Convert

ers

/Caste

rs.

2512.0

0

5.0

0

5.0

0

To

pro

duce

4,0

0,0

00

TP

A

of

Seam

less

Tu

bes

in

the

siz

e r

ange o

f 5

1/2

"

to

18"

OD

.

30

month

s

from

aw

ard

of

contr

act

2016-1

7

1.1

2

1.1

2

Te

nder

has s

ince b

een

cancelle

d

and

as

directe

d b

y B

oard

, and

actio

n i

s b

ein

g i

nitia

ted

to

conduct

a

fresh

mark

et surv

ey a

nd

Glo

bal

EO

I is

issued t

o

scout

for

pro

bable

JV

part

ner

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 47: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

39

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

3-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(xviii

) C

OB

-5

To

m

eet

the

coke

requirem

ents

and

gas

bala

nce

for

6.3

/7.3

MT

PA

sta

ge,

and

to

facili

tate

re

build

ing o

f C

OB

s #

1,2

& 3

successiv

ely

.

2858.0

0

2.0

0

2.0

0

To

pro

duce

0.8

2

mtp

a

of

Gro

ss C

oke.

42 M

onth

s

from

ord

er

pla

cem

ent

inclu

din

g

consultancy

2016-1

7

3.9

9

3.9

9

Te

nders

for

majo

r packages o

f C

OB

-5

i.e.

Batt

ery

P

roper,

Coke

Dry

Coolin

g P

lant,

Pow

er

genera

tio

n

unit

and

By-

Pro

duct pla

nt are

under

advanced

sta

ge

of

fin

aliz

atio

n.

Th

is

pro

ject

has

been r

evie

wed in

2014-1

5.

3.

KIO

CL

Ltd

.

(i)

Coke

Oven

Pla

nt

Settin

g u

p o

f a C

oke

Oven p

lant.

Th

is w

ill

impro

ve

availa

bili

ty

of

coke a

t a c

heaper

price.

452.0

0

10.0

0

--

--

--

--

--

--

KIO

CL

appro

ved

to

set

up

of

3.0

la

kh T

PA

capacity

Coke

Oven

Batt

ery

alo

ng w

ith

25M

W

Captive

Pow

er

Pla

nt

at

an

estim

ate

d

cost

of

Rs.

452.2

2 c

rore

s

with

a

pro

posed

investm

ent

pla

n o

f debt

equity

ratio

of

1:2

. T

he

Min

istr

y

of

Environm

ent

&

fore

st

gra

nte

d t

he

environm

enta

l cle

ara

nce

for

the

pro

ject

and

Karn

ata

ka

Sta

te

Pollu

tio

n

Contr

ol

Board

has

giv

en

the

consent

for

E

sta

blis

hm

ent

of

the p

roje

ct.

Matter

has

been

taken

up w

ith M

/s S

AIL

fo

r possib

le

join

t ventu

re

in

the

best

inte

rest

of

both

K

IOC

L

&

VIS

L unit of

SA

IL

at

Bhadra

vati,

The

matt

er

is

bein

g p

urs

ued.

Page 48: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

40

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

O

utl

ay 2

013

-14

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(ii)

Develo

pm

ent

of

perm

an

ent

railw

ay

sid

ing

at

Mang

alo

re

Sin

ce m

ajo

r port

ion

of

raw

mate

rial is

to

be t

ransport

ed t

hro

ra

il,

pro

posal

is

to

constr

uct

bulk

m

ate

rial

handlin

g

facili

ties fo

r re

ceip

t of

iron

ore

assig

nm

ent

to

KIO

CL f

or

its P

elle

t P

lant

and

Bla

st

Furn

ace U

nit

130.0

0

5.0

0

--

--

--

--

--

3.7

6

Deta

iled

Pro

ject

Report

fo

r th

e

pro

ject

has

be

en

pre

pare

d

by

M/s

K

onkan

Railw

ay

Corp

ora

tion

Ltd

. 56

acre

s

of

land

has

alr

ea

dy

be

en

acquir

ed.

Du

e

to

realig

nm

ent

of

track a

nd b

ecause

of

safe

ty r

easons,

additio

nal

lan

d

is

requir

ed.

Eff

ort

s

are

bein

g m

ad

e t

o

acquir

e

those

la

nds.

(iii)

C

onstr

uctio

n

of

Bulk

M

ate

ria

l H

andlin

g

facili

tie

s

for

receip

t of

iron

ore

by r

ail.

173.0

0

1.0

0

--

--

--

- --

(iv)

Develo

pm

ent

of

Chic

knayakanahlli

&

oth

er

min

es

At

pre

sent

the

Com

pany

does

not

have

captive

min

es

to

cate

r to

its

requirem

ent of ore

200.0

0

2.0

0

--

--

--

--

--

--

Th

e m

att

er

is b

ein

g

purs

ued w

ith S

tate

G

ovt.

to

is

sue

revis

ed

sketc

h

for

obta

inin

g

fore

st

and

oth

er

cle

ara

nces.

(v)

Develo

pm

ent

of

Rem

anadurg

M

ines

900.0

0

1.0

0

--

--

--

--

--

--

(vi)

D

uctile

S

pun P

ipe

Pla

nt

309.0

0

1.0

0

--

--

--

--

--

--

--

Settin

g up of

1.0

la

kh T

PA

capacity

DIS

P P

lant

at

an

estim

ate

d

cost

of

Rs.

308.6

12

cro

res

has

been

kept

in

abeyance.

(vii)

E

co-T

ow

n

develo

pm

ent

at

Kudre

mukh

100.0

0

1.0

0

--

--

--

--

--

--

T

he

pro

ject

has

been

kept

in

abeyance

Page 49: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

41

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

4.

NM

DC

Ltd

.

(i)

Baila

dila

Deposit

11B

T

o incre

ase

pro

ductio

n o

f iron

ore

607.1

8

60.0

0

40.0

0

Capacity

of

7m

tpa

Mar’1

2

Jan’1

5

20.4

9

369.5

7

Pro

ject

is

bein

g

execute

d

thro

ugh

seven

packages.

ME

CO

N

was

appoin

ted

as

EP

CM

C

onsultant.

All

packages

have

been o

rdere

d a

nd

work

s

are

in

pro

gre

ss.

Cru

shin

g

Pla

nt

Package.

T

rial

runs

taken

for

Secondary

C

rusher,

E

OT

C

rane

of

SC

H,

Scalp

ing

scre

en.

Apro

n

feeder

&

Tip

per

conveyor

is

als

o e

recte

d.

Civ

il str

uctu

ral

&

Ele

ctr

ical

ere

ctio

n

work

s in

pro

gre

ss

Dow

nhill

C

onveyor

Syste

m

Package:

Apro

n

feeders

, E

lectr

ic

hois

ts,

EO

T

Cra

ne

in

TH

-2

ere

cte

d,

Conveyor

1120 &

1116 tr

ial

runs

taken.

All

MC

C

Panels

are

charg

ed.

Conv.

1117

Belt

layin

g

and

join

ing

work

is

in

pro

gre

ss.

600

mtr

s

belt

laid

out

of

7000 m

trs.

Wate

r supply

lin

e

work

s

com

ple

ted.

Serv

ice

centr

e

civ

il &

str

uctu

ral

work

s

are

in

pro

gre

ss.

Th

is

pro

ject

has

been r

evie

wed i

n

2014-1

5.

Page 50: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

42

(R

s.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

O

utl

ay

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-m

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w A

nti

-cip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(ii)

Kum

ara

sw

am

y

Iron O

re P

roje

ct

To

incre

ase

pro

ductio

n o

f iron o

re

898.5

5

85.0

0

85.0

0

Capacity o

f 7

mtp

a

May’1

3

Jan’1

5

100.5

1

291.8

2

Pro

ject

is

bein

g

execute

d

in

six

packages.

M/s

Mecon

appoin

ted

as

EP

CM

consultant.

Th

e

work

has

been

aw

ard

ed f

or

Package

-1

(Cru

shin

g

and

sta

ckin

g

sectio

n),

P

ackage-2

(D

ow

nhill

conveyin

g

syste

m),

P

ackage-3

(E

lectr

ical

work

s)

and P

ackage 4

(T

ele

-com

munic

atio

n)

and

Package-5

(S

erv

ice

centr

e

facili

tie

s)

and

work

s a

re in

pro

gre

ss.

&

Package

6

(Appro

ach r

oad)

were

re

tendere

d

and

bid

s

fin

aliz

atio

n

is

in

pro

gre

ss.

Package-1

: C

ivil

work

s

com

ple

ted

for

Prim

ary

&

S

econdary

cru

shers

, D

um

per

pla

tform

, M

ine

off

ice

build

ing.

Oth

er

civ

il &

str

uctu

ral w

ork

s a

re in

pro

gre

ss.

Prim

ary

&

secondary

cru

sher

&

apro

n

feeder

ere

ctio

n

com

ple

ted.

Auxili

ary

equip

ment

ere

ctio

n i

n

pro

gre

ss.

Package-2

: D

esig

n &

E

ngin

eerin

g

is

in

advanced sta

ge.

Civ

il &

str

uctu

ral

work

s a

re

in

pro

gre

ss.

Civ

il,

Str

uctu

ral

fab

ricatio

n

& ere

ctio

n w

ork

s are

in

pro

gre

ss

for

Package 3

& 5

Th

is

pro

ject

has

been

revie

wed in

2014

-15.

Page 51: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

43

(

Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

Co

l.7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

3-

Mar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(iii)

P

elle

t P

lant

at

Donim

ala

i T

o d

ivers

ify

into

pelle

t pro

ductio

n

572.0

0

100.0

0

100.0

0

Capacity

of

1.2

mtp

a

Apr’1

3

Sep’1

4

111.3

5

379.6

2

M/s

M

.N.

Dastu

r appoin

ted as E

PC

M

consultant.

Th

e

pro

ject

is

bein

g

execute

d th

ough six

packages

(Pelle

etisatio

n,

Beneficia

tio

ns,

Site

levelin

g,

MR

SS

, B

oundary

w

all

&

mis

cella

neous

build

ings a

nd M

obile

equip

ments

).

All

packages h

ave b

een

ord

ere

d

and

woks

are

in

pro

gre

ss.

Pelle

t P

ackage:

Import

ed

Supplie

s

Com

ple

ted

&

Majo

r In

degeneous

supplie

s

receiv

ed.

Rem

ain

ing

supplie

s

are

in

pro

gre

ss.

Majo

r civ

il w

ork

s

com

ple

ted.

Str

uctu

ral

& E

rectio

n

work

s

are

in

P

rogre

ss.

Critical

equip

ment

like

Mix

er,

C

oole

r,

Balli

ng

Dis

cs,

Kin

, C

hain

, gra

te,

Scre

ens,

Fa

ns,

Com

pre

ssors

, vert

ical

roll

mill

s e

tc.

ere

ctio

n

com

ple

ted.

Oth

er

equip

ment

ere

ctio

n

under

pro

gre

ss.

Refr

acto

ry

ere

ctio

n

work

s

in

pro

gre

ss.

Beneficia

tio

n

Package:

Majo

r civ

il w

ork

s

com

ple

ted

Str

uctu

ral

& e

rectio

n

work

s

are

in

P

rogre

ss

Scre

ens,

Conveyor

accessories,

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 52: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

44

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

O

utl

ay

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-m

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w A

nti

-cip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

ve u

pto

M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

T

hic

kener

&

Hydro

cyclo

nes

receiv

ed

at

site.

Concentr

ate

th

ickener,

ball

mill

s,

Pre

ssure

fille

rs,

Magnetic

separa

tors

, dew

ate

rin

g

cyclo

nes,

EO

T

cra

ne

ere

ctio

n

com

ple

ted.

M

obile

equip

ment

i.e.

Fro

nt

end l

oadrs

ord

er

issued

and

sta

ggere

d

supplie

s

are

in

pro

gre

ss.

(iv)

3 M

TP

A S

teel

Pla

nt at

Nagarn

ar

i)

Ensure

valu

e

additio

n

to

Iron

ore

min

ed in

C

G

Sta

te.

ii)

Develo

pm

ent

of

Baste

r re

gio

n

inhabited

mostly

by

trib

als

. iii

) P

art

ially

meet

the

gro

win

g

dem

and

for

ste

el

pro

ducts

, prim

arily

in

th

e

India

n m

ark

et. i

v)

Investm

ent

of

funds

availa

ble

fo

r busin

ess

gro

wth

.

15525.0

0

1880.0

0

1990.0

0

Capacity o

f 3

mtp

a

Sep’1

4

Oct’1

6

2049.9

2

4230.4

4

1)

Th

e t

ota

l w

ork

of

the

Ste

el

Pla

nt

is

div

ided

into

09

Majo

r te

chnolo

gic

al

Packages,

27 A

uxili

ary

P

ackage,

16

Infr

astr

uctu

re

packages,

11 enablin

g

packages

and

5

Package

of

Private

R

ailw

ay S

idin

g f

or

ease

of

tenderin

g

and

executio

n.

All

the m

ajo

r T

echnolo

gic

al

package

are

a

ward

ed

and

the

work

is

pro

gre

ssin

g at

full

pace a

t site.

2.

Out

of

27

Nos

of

Auxili

ary

P

ackages

03

Packages a

re a

ward

ed

and

Civ

il,

Equip

ment

ere

ctio

n

work

is

pro

gre

ssin

g at

site fo

r P

ow

er

blo

win

g S

tatio

n,

one

of

the

Majo

r A

uxili

ary

P

ackage.

Te

nders

flo

ate

d fo

r 09

Aux.

Packages a

nd o

ut

of

whic

h 05 are

under

tender

evalu

atio

n.

Te

chnic

al

specific

atio

n

is

fin

aliz

ed

for

8

Auxili

ary

Packages a

nd

Th

is p

roje

ct

has

been

revie

we

d

in 2

014-1

5.

Page 53: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

45

(

Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s

/Ris

k f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

3-

Mar’

14

Cu

mu

lati

ve

up

to M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

fo

r bala

nce

auxili

ary

packages

Te

chnic

al

specific

atio

n

is

bein

g f

inaliz

ed.

3)

Out

of

16 N

os.

of

Infr

a p

ackages,

tender

enquiry

issued

for

02

packages and T

S

fin

aliz

ed

for

05

packages.

Th

e

technic

al

specific

atio

ns

for

bala

nce p

ackages

are

bein

g

fin

aliz

ed.

4)

Out

of

11 N

os.

of

Enablin

g

packages

08

packages

are

aw

ard

ed

out

of

whic

h

five

are

com

ple

ted.

Te

chnic

al

specific

atio

n is

fin

aliz

ed

for

01

package

and

for

bala

nce p

ackages

Te

chnic

al

specific

atio

ns

are

bein

g f

inaliz

ed.

5)

Te

nder

enquir

y

is

issued

for

one

of

the 0

5 R

ailw

ays

Sid

ing

Packages

and

Te

chnic

al

Specific

atio

n

is

bein

g f

inaliz

ed f

or

rem

ain

ing

3

packages.

One o

f th

e ra

ilway sid

ing

packages

i.e.

Road O

ver

Brid

ge

is to

be execute

d

by

NH

AI

on

deposit b

asis

.

Page 54: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

46

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

Co

l.7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13-

Mar’

14

Cu

mu

lati

-ve u

pto

M

ar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

5.

MO

IL L

td.

(i)

Join

t V

entu

re f

or

Fe

rro

Manganese/

Sili

co

Manganese

Pla

nt w

ith S

AIL

Th

e

pro

ject

will

be

set

up

at

Bhila

i to

pro

duce

Fe

rro/S

ilico

Manganese

to

cate

r to

th

e

dem

and of

SA

IL

of

India

Lim

ited

391.0

0

00.0

0

2.0

0

Th

e pro

ject

will

be

pro

ducin

g

Fe

rro

Manganese

31000

MT

and

S

ilico

Mn.

75000 M

T

June,

2012

Will

be

quantifie

d

aft

er

fin

aliz

atio

n

of

tender

for

furn

ace.

0.0

0

2.1

0

NA

T

he

investm

ent

have

not

been

mate

ria

lized

due

to

(a)

gett

ing

hig

her

off

er

for

furn

ace

package,

leadin

g

to

decis

ion

to

reflo

at

the t

enders

fo

r both

th

e

pro

jects

and

(b)

incre

ase

in

rate

s of

pow

er

all

over

India

and

short

age o

f pow

er

in

Andhra

P

radesh,

necessitatin

g

revie

w

of

the

pro

jects

to

re

locate

A

ndhara

P

roje

ct

in

Chatt

ishgarh

.

(ii)

Join

t V

entu

re f

or

Fe

rro

Manganese/

Sili

co

Manganese

Pla

nt w

ith R

INL

Th

e

pro

ject

will

be

set

up

at

Bobbili

to

pro

duce

Fe

rro/S

ilico

Manganese

to

cate

r to

th

e

dem

and

of

Rashtr

iya

Ispat

Nig

am

Lim

ited.

217.0

0

15.0

0

1.0

0

Th

e

pro

ject

will

be

pro

ducin

g

Fe

rro

Mn.

20000

MT

and

S

ilico

Mn.

37500 M

T

June,

20 1

2

Will

be

quantifie

d

aft

er

fin

aliz

atio

n

of

tender

for

furn

ace.

0.0

0

7.8

5

NA

Page 55: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

47

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

Ou

tla

y

2013-1

4

Qu

an

tifi

ab

le

Deli

vera

ble

s/ P

roje

cte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-

men

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

13

-M

ay’1

4

Cu

mu

lati

ve

up

to

Ma

y’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

B.

Sch

em

e o

f M

inis

try o

f S

teel

1.

Schem

e f

or

pro

motio

n o

f R

&D

in t

he I

ron &

Ste

el secto

r

1(i)

Ongoin

g p

roje

cts

S

chem

e

for

pro

motio

n o

f R

&D

in

the I

ron &

Ste

el

secto

r

Develo

pm

ent

of

innovative/p

ath

bre

akin

g t

echnolo

gie

s

for

utiliz

atio

n

of

iron

ore

fin

es

and

non

-cokin

g

coal.

Beneficia

tio

n

of

raw

m

ate

ria

ls

like

iron

ore

, coal

etc

.,

and

agglo

mera

tio

n.

Impro

vem

ent

in

qualit

y

of

ste

el

pro

duced

thro

ugh

inductio

n

furn

ace

route

.

48.0

0

12.0

0

8.0

0

1)

Impro

vem

ent

in s

inte

r pro

ductivity

thro

ugh

deep

beneficia

tio

n

and

agglo

mera

tio

n

technolo

gie

s fo

r ra

tio

nal

utiliz

atio

n

of

low

gra

de

iron

ore

s

and

fin

es.

2)

Develo

pm

ent

of

Altern

ate

com

ple

menta

ry R

oute

of

Iron/S

teel

makin

g

with

refe

rence to

In

dia

n ra

w

mate

ria

l viz

lo

w

gra

de

iron o

re a

nd n

on c

okin

g

coal.

3)

Pro

ductio

n

of

low

P

hosphoru

s

Ste

el

usin

g

DR

I th

rough

Inductio

n

furn

ace

route

adoptin

g

innovative

flu

xes

and/o

r desig

n

(refr

acto

ry)

changes.

4)

Sm

eltin

g

reductio

n

of

iron

ore

/fin

es

by

hydro

gen

pla

sm

a

and

elim

inatio

n

of

CO

2

em

issio

n.

5)

Beneficia

tio

n o

f Ir

on O

re

slim

es f

rom

Bars

ua a

nd

oth

er

min

es in

In

dia

. 6)

Develo

pm

ent

of

pilo

t scale

pelle

tizatio

n

technolo

gy

for

India

n

Goeth

itic

/hem

atite

ore

w

ith

vary

ing

degre

e

of

fin

eness.

7)

CO

2

abate

ment

in

Iron

and

Ste

el

pro

ductio

n

by

pro

cess optim

isatio

n.

8)

Pro

ductio

n

of

low

ash

(10%

ash)

coal

(cokin

g

non

cokin

g)

from

hig

h

ash

India

n

coals

in

clu

din

g

desulp

hurisatio

n of

hig

h

sulp

hur

Nort

h E

ast coal.

Durin

g

11

th

Pla

n

2007-1

2

Schem

e

Contin

ued

in t

he 1

2th

Pla

n 2

012-

17

8.0

0

32.0

0

8

R

&

D

pro

jects

w

ere

purs

ued u

nder

this

S

chem

e.

One

pro

ject

has

been

com

ple

ted

and

7

R&

D

Pro

jects

are

in

pro

gre

ss.

Th

is

pro

ject

has

been

revie

wed

in

2014-1

5.

Page 56: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

48

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

O

utl

ay 2

013

-14

Q

uan

tifi

ab

le D

elivera

ble

s/

Pro

jecte

d O

utc

om

es

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-m

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

-te

d

Fo

r A

pr’

13

-M

ar’

14

Cu

mu

lati

ve

up

to

Mar’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

1(ii)

(Ne

w

Com

ponent

under

the e

xis

tin

g

schem

e)

Develo

pm

ent

of

Te

chnolo

gy

for

Cold

R

olle

d

Gra

in

Orie

nte

d

(CR

GO

) S

teel

Sheets

and

oth

er

valu

e

added

in

novative

ste

el

pro

ducts

150.0

0

32.0

0

Nil

Develo

pm

ent

of

Te

chnolo

gy

for

Cold

R

olle

d

Gra

in

Orie

nte

d

(CR

GO

) S

teel

sheets

and o

ther

valu

e a

dded

in

novative s

teel pro

ducts

Durin

g

12

th P

lan

Durin

g

12

th

Pla

n.

May

Contin

ue

in

13

th P

lan.

Nil

Nil

In-p

rin

cip

al

appro

val

accord

ed

by

Pla

nnin

g

Com

mis

sio

n

17th

July

2013.

Th

is

pro

ject

has

been re

vie

wed in

2014-1

5.

1(iii)

(

New

P

roje

cts

under

exis

tin

g

Schem

e)

Develo

pm

ent

of

Innovative

Iron/S

teel

makin

g

Pro

cess/T

echnolo

gy

2.0

0

2.0

0

Nil

Develo

pm

ent

of

Innovative

Iron/S

teel

makin

g

Pro

cess/T

echnolo

gy

Durin

g

12

th P

lan

Durin

g 1

2th

Pla

n

Nil

Nil

Pro

posal

for

purs

uin

g

Phase-2

(I

ndustr

ial

Scale

) of

the

com

ple

ted

pro

ject

on

Pro

ductio

n

of

low

Phosphoru

s

Ste

el

usin

g D

RI

thro

ugh

Inductio

n

furn

ace

route

has

been

receiv

ed

from

C

SIR

, N

ML

Jam

shedpur.

Th

is

pro

ject

has

been re

vie

wed in

2014-1

5.

****

****

***

Page 57: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

49

Ac

tua

l a

ch

ieve

me

nt

vis

-à-v

is p

roje

cte

d o

utc

om

e/t

arg

ets

201

4-1

5

(

Rs.

in c

rore

) N

o

Nam

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec.’

14

Cu

mu

lati

ve

up

to

Dec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

A.

SC

HE

ME

S W

ITH

ES

TIM

AT

ED

/SA

NC

TIO

NE

D C

OS

T M

OR

E T

HA

N 5

0.0

0 C

RO

RE

1.

ST

EE

L A

UT

HO

RIT

Y O

F IN

DIA

LT

D. (S

AIL

)

(a)

Bh

ilai S

teel P

lan

t (B

SP

)

(i)

Cold

R

epair

of

CO

B-9

T

o

m

eet

the

short

fall

in

coke

dem

and

as

well

as

sta

bili

zin

g c

oke o

ven

gas b

ala

nce a

nd

to

reduce

em

issio

n

level

359.7

8

(332.6

5)

100.0

0

60.0

0

Im

pro

ved

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n n

orm

s

of

MO

EF

Aug’1

4

Jun’1

5

56.6

2

159.0

1

Dela

y

in

desig

n

engin

eerin

g

by

M/s

Mecon

• S

hort

age

of

refr

acto

ry

bricks

for

Batt

ery

P

roper

(ii)

E

xpansio

n o

f B

SP

In

cre

ase

in

pro

ductio

n

of

hot

meta

l &

cru

de ste

el

thro

ugh

sta

te-o

f-th

e-

art

te

chnolo

gy;

Phasin

g

out

of

low

yie

ld

and

energ

y

inte

nsiv

e

units,

reductio

n

of

sem

is

by

enhancin

g

fin

ished

ste

el

pro

ductio

n;

Bro

adenin

g

and

valu

e

additio

n

in

pro

duct-

mix

fo

r hig

her

fle

xib

ility

and

pro

fita

bili

ty;

Meetin

g

requirem

ent

of

India

n R

ailw

ay.

18847.0

0

(17266.0

0)

2960.0

0

1839.7

2

Incre

ase i

n H

M

capacity

from

4.0

8

mtp

a

to

7.5

mtp

a

Mar’1

3

Sept.’1

5 (

1

convert

er

two c

aste

r)

1343.2

41

13835.1

0

Majo

r F

acilit

ies

co

mp

lete

d

O

re H

andlin

g

Pla

nt

(OH

P)-

A

2nd

Sin

ter

Machin

e

in

SP

-III

1

st

Unit

of

Oxygen P

lant

(BO

O b

asis

)

F

irst

Pushin

g

done

for

CO

B-1

1

in

Sep’1

4

Th

e

SM

S-I

II

Package

got

aff

ecte

d

as

the

initia

l contr

act

for

civ

il w

ork

package

with

M/s

Ratn

a I

nfr

a h

ad t

o

be

term

inate

d

due

to

slo

w p

rogre

ss o

f w

ork

and

fresh

contr

act

aw

ard

ed t

o M

/s H

SC

L

in

Fe

b’1

1

at

risk

&

cost

of

M/s

R

atn

a

Infr

a.

Subsequently

contr

act

with

M/s

H

SC

L als

o had to

be

term

inate

d d

ue t

o p

oor

pro

gre

ss

&

ord

er

for

bala

nce

civ

il w

ork

s

has

been

pla

ced

on

M/s

Sim

ple

x a

t risk &

cost

of

M/s

HS

CL. T

he

equip

ment

ere

ction

package

als

o

had

to

be

re-t

endere

d

sin

ce

suffic

ient

ere

ctio

n

fronts

could

not

be

handed

over

within

contr

actu

al

com

ple

tio

n

perio

d.

Fre

sh c

ontr

act

aw

ard

ed t

o M

/s E

ssar

Pro

jects

.

Th

e s

low

pro

gre

ss o

f

Page 58: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

50

(Rs.

in c

rore

) N

o

Nam

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

4-

Dec.1

4

Cu

mu

lati

ve

up

to

Dec

’14

1

2

3

4

5

6

7

8

9

10

11

12

13

work

by H

EC

& H

SC

L

aff

ecte

d

the

pro

gre

ss

in

BR

M&

U

RM

. F

urt

her,

in

case

of

BR

M,

relu

cta

nce

of

technolo

gy s

upplie

r of

technolo

gy

supplie

r (M

/s

Danie

li)

to

sta

rt

equip

ment

ere

ctio

n in

spite

of

adequate

fr

onts

bein

g a

vaila

ble

. E

rectio

n

sta

rted

after

contin

uous

follo

w-u

p.

Als

o,

in c

ase o

f U

RM

, re

lucta

nce

of

technolo

gy

supplie

r (M

/s

SM

S

Meer)

to

contin

ue

equip

ment

ere

ctio

n i

n M

ill p

roper

in

spite

of

adequate

fr

onts

bein

g a

vaila

ble

. T

he e

rectio

n h

as b

een

resum

ed

in

April,

2014.

(Poor

perf

orm

ance

of

M/s

E

PI

(OH

P P

art

-B

and

Fu

el

&

Flu

x

Cru

shin

g &

Scre

enin

g

Fa

cili

ties)

consid

era

bly

in

th

e

are

a

of

desig

n-

engin

eerin

g,

manpow

er

& r

esourc

e

deplo

ym

ent

&

co

-ord

inatio

n

superv

isio

n

advers

ely

aff

ecte

d t

he

work

.

(iii)

U

p-g

radatio

n

of

Sto

ves f

or

BF

-4

To

achie

ve h

igher

HB

T to incre

ase

inje

ctio

n o

f auxili

ary

fu

el in

jectio

n,

reductio

n o

f coke

rate

75.9

5

(70.6

5)

10.0

0

20.0

0

To

achie

ve

1200

Oc H

BT

D

ec’1

4

Lin

ked t

o

shut

dow

n

15.2

2

15.2

2

.

(b)

Du

rga

pu

r S

teel P

lan

t (D

SP

)

(i)

Expansio

n o

f D

SP

P

hasin

g

out

of

energ

y

inte

nsiv

e

units,

intr

oductio

n o

f

3164.0

0

(2875.0

0)

588.0

0

414.7

0

Incre

ase o

f hot

meta

l capacity

from

2.0

9 t

o

Dec’1

2

Mar’1

5

302.1

5

2455.3

7

M

ajo

r F

acilit

ies

Fo

r M

SM

, th

e

pro

gre

ss o

f civ

il w

ork

Page 59: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

51

(Rs.

in c

rore

) N

o

Nam

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

4-

Dec.

14

Cu

mu

lati

ve

up

to

Dec

’14

1

2

3

4

5

6

7

8

9

10

11

12

13

energ

y

eff

icie

nt

technolo

gy,

reductio

n o

f sem

is &

in

cre

ase o

f hot

meta

l capacity

2.4

5 M

tpa

co

mp

lete

d

B

arr

el

type

recla

imer

of

RM

HP

R

ebuild

ing of

CO

B-2

N

ew

Ladle

F

urn

ace

Work

for

Blo

om

cum

R

ound

Caste

r com

ple

ted

in

Dec’1

4

and

Te

stin

g &

tr

ials

sta

rted

wa

s

affe

cte

d

du

e

to

incre

ase

in

th

e s

co

pe

of

wo

rk

for

pili

ng

b

y

pe

rfo

rma

nce

o

f civ

il co

ntr

acto

r M

/s

Ja

in

Infr

a.

Fre

sh

o

rder

pla

ce

d o

n M

/s B

rid

ge

&

Ro

of

(B&

R)

in

Fe

b’1

3.

Fu

rth

er,

de

lay i

n s

upp

ly

of

prio

rity

cra

ne

s b

y M

/s

HE

C

is

eff

ecting

ere

ction

of e

quip

me

nt.

Fo

r B

loom

cum

R

ou

nd

Ca

ste

r,

wo

rk

wa

s

affe

cte

d

du

e

to

po

or

pe

rfo

rma

nce

o

f civ

il co

ntr

acto

r M

/s

Ja

in

Infr

a.

Ris

k

Pu

rch

ase

No

tice

(R

PN

) is

su

ed to

th

e

part

y.

Fre

sh

o

rder

pla

ce

d o

n M

/s B

rid

ge

&

Ro

of

in

Oct’1

2.

Als

o,

the

re h

ad

bee

n d

ela

y i

n

sta

rtin

g

Ena

blin

g

pa

cka

ge

of

Div

ers

ion o

f th

e w

ork

.

Ris

k

Pu

rcha

se

N

otice

issu

ed

to

th

e c

on

tra

cto

r and

th

e

ba

lance

w

ork

w

as

rete

nde

red

in

M

arc

h’1

2

by

RS

P

on

be

ha

lf o

f S

ino

Ste

el.

Ho

we

ve

r,

du

e

to

hig

h

price

s

off

ere

d

by

on

ly

acce

pta

ble

b

idd

er

M/s

S

EP

C,

the

ord

ers

co

uld

n

ot

mate

ria

lize

. C

on

seq

ue

ntly,

M/s

Sin

o

Ste

el

wa

s

allo

we

d

to

take

up t

he

ba

lance

job

and

com

ple

te

the

pro

ject.

(ii)

Rebuild

ing

of

CO

B-5

T

o

m

eet

the

short

fall

in

coke

dem

and

as

well

as

sta

bili

zin

g c

oke o

ven

gas b

ala

nce a

nd

to

reduce

em

issio

n

level

339.3

5

(313.0

5)

125

102.3

9

Impro

ved

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n

norm

s

Jun’1

5

Jun’1

5

76.4

3

160.4

1

--

Page 60: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

52

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14 -

De

c.’1

4

Cu

mu

lati

ve

up

to

Dec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(c)

Bo

karo

Ste

el P

lan

t (B

SL

)

(i)

Expansio

n o

f B

SL

Enhancin

g H

ot

meta

l pro

ductio

n

Intr

oductio

n

of

energ

y

eff

icie

nt

technolo

gy,

convers

ion o

f hig

her

quantities

of

Hot

Rolle

d c

oils

to v

alu

e

added

Cold

R

olle

d

pro

ducts

w

ith

the

insta

llatio

n

of

additio

nal

Cold

R

olli

ng C

apacity.

6951.0

0

(6325.0

0)

642.0

0

533.8

6

New

C

old

R

olli

ng

Mill

com

ple

x of

1.2

M

tpa &

enhancin

g

Hot

meta

l pro

ductio

n

from

4.5

9 M

tpa

to 5

.77 M

tpa

Dec.’1

1

May’ 15

361.3

8

4952.7

2

Majo

r F

acili

tie

s

com

ple

ted

R

ebuild

ing

of

CO

B N

o. 1

& 2

U

p g

radatio

n o

f B

F N

o 2

U

nder

Ne

w

Cold

R

olli

ng

Mill

C

om

ple

x,

Rolli

ng

All

majo

r fa

cili

ties

like

the

upgra

ded

BF

N

o.

2,

Coke

Oven

batt

erie

s

No.

1&

2

and

new

1.2

M

TP

A C

old

R

olli

ng

Mill

have

bee

n

com

mis

sio

ned.

Main

re

asons

for

dela

y a

re

C

o-o

rdin

atio

n

pro

ble

ms o

f m

ain

contr

acto

rs

with

consort

ium

part

ners

and s

ub

-contr

acto

rs

D

ela

y

in

appro

val

of

dra

win

g

by

the

consultant,

ME

CO

N

com

mis

sio

nin

g of

Hot

Str

ip

Mill

is

re

late

d

to

availa

bili

ty

of

shutd

ow

n

gas

lines

and

underg

round

cable

s,

als

o th

ey

could

not

be

done

in

one

go

and

had

been

tem

pora

rily

done

to g

ive c

lear

front

to

the

civ

il contr

acto

r fo

r com

ple

tin

g

the

civ

il w

ork

s of

the

are

a

of

main

package

contr

acto

r.

Als

o,

poor

perf

orm

ance

of

M/s

MIC

CO

in

wate

r,

supply

package.

Page 61: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

53

(R

s. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

4-

Dec.’

14

Cu

mu

lati

ve

up

to

Dec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(ii)

Re-b

uild

ing

of

CO

B-7

T

o

meet

the

coke

dem

and

&

CO

gas

short

age

and

to

com

ply

w

ith

late

st

sta

tuto

ry

em

issio

n

norm

s.

265.5

0

(245.6

7)

--

48.0

0

Impro

ve

pro

ductio

n &

achie

ve la

test

pollu

tio

n n

orm

s

of

MO

EF

May’1

6

May’1

6

14.1

4

21.0

5

--

Desig

n

engg.

And

civ

il &

str

uctu

ral

work

s a

re i

n

pro

gre

ss

Supply

and

ere

ctio

n

of

Refr

acto

ry

is

in

pro

gre

ss.

(d.)

R

ou

rkela

Ste

el P

lan

t

(i)

Coal

Dust

Inje

ctio

n

Syste

m

in B

F-

4

Te

chnic

al

necessity

for

reductio

n i

n c

oke

rate

and

impro

vem

ent

of

the

furn

ace p

roductivity.

70.7

1

(66.0

2)

2.4

6

6.2

5

Repla

cem

ent

of coke w

ith

pulv

erized c

oal

on 1

:1 b

asis

. C

oal in

jectio

n

rate

in

Bla

st

Fu

rnace a

t 120

Kg/t

hm

.

Oct’0

8

Jan’1

5

0.3

6

58.2

7

All

jobs

inclu

din

g

inte

gra

ted

cold

tr

ials

com

ple

ted.

Hot

tria

ls

to

be

sta

rted

I A

ugust’1

4.

Cast

House

Sla

g

Gra

nual

atio

n

Pla

nt

of

Cast

House

No.

6

of

BF

-3 a

nd N

o.

3 o

f B

F-2

com

ple

ted.

Dela

y i

n d

esig

n

engin

eerin

g,

civ

il &

str

uctu

ral

work

s

and

supply

of

equip

ment

by

M/s

S

ino

Ste

el

Chin

a.

Com

merc

ial

dis

pute

s

betw

een

Sin

o

Ste

el

&

sub

agencie

s

aff

ecte

d

(iii)

In

sta

llatio

n o

f heat

treatm

ent fa

cili

ties

To

m

eet

the

incre

asin

g

requirem

ent

of

quenched

&

tem

pere

d p

late

s for

D

efe

nce

and

oth

er

secto

rs

of

str

ate

gic

im

port

ance

178.7

3

(160.4

8)

80.0

0

122.5

7

Additio

nal

pro

ductio

n

of

12000t

Sep’1

4

Jun’1

5

86.7

1

105.5

7

P

oor

perf

orm

ance

of

the c

ontr

acto

rs:

CA

N E

ngg.

in

Desig

n

&

Engg.

Em

pire

Ind.

Eqpt.

& R

elia

ble

H

igh-T

ech

in

equip

ment

supply

.

Fa

bricatio

n of

Oven

Machin

es

is

in

pro

gre

ss.

Page 62: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

54

(Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

s

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lati

ve

up

to

Dec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(iv)

Expansio

n o

f R

SP

In

cre

ase

in

pro

ductio

n

of

hot

meta

l &

cru

de ste

el

thro

ugh

sta

te-o

f-th

e-

art

technolo

gy;

Impro

vem

ent

in

qualit

y

of

pro

ducts

; P

roductio

n

of

mo

re

valu

e-a

dded

pro

ducts

; Im

pro

vem

ent

in

energ

y

consum

ptio

n

&

environm

ent;

and

Reductio

n in

cost

of

pro

ductio

n

12922.0

0

(11812.0

0)

1789.6

8

1600.0

0

Incre

ase

in

hot

meta

l capacity

from

2.0

0

Mtp

a

to

4.5

Mtp

a

Mar’1

3

Dec’1

4

811.6

3

11681.8

0

Opera

tin

g

at

about

70%

of

the

rate

d

capacity.

Th

e

insta

lled

cru

de

ste

el

capacity

of

the p

lant

has

incre

ased

from

1.9

mill

ion

tons p

er

annum

(M

tpa)

to

4.2

M

tpa.

All

new

fa

cili

ties

under

the

inte

gra

ted

pro

cess

route

of

BF

-BO

F-

Caste

r-P

late

M

ill

are

in

opera

tio

n

(v)

Rebuild

ing o

f C

OB

-3

To

m

eet

the

coke

requirem

ent

for

hot

meta

l pro

ductio

n

of

4.5

M

tpa

and

to

reduce

em

issio

n

levels

258.5

3

(237.0

9)

85.0

0

96.0

6

Impro

ve

pro

ductio

n

&

achie

ve

late

st

pollu

tio

n

norm

s

of

MO

EF

Jan’1

5

Aug’1

5

87.8

2

119.7

5

--

• Is

sues

rela

ted

to

qualit

y

of

sili

ca

bricks

• S

low

pro

gre

ss

of

refr

acto

ry

ere

ctio

n

by

BE

C

• D

ela

y

in

supply

of

oven

machin

es

by

BE

C

(e)

IIS

CO

Ste

el P

lan

t

(i)

Expansio

n o

f IS

P

To

in

sta

ll a

new

str

eam

of

facili

ties t

o

pro

duce

2.7

MT

PA

hot

meta

l, 2.5

MT

PA

cru

de

ste

el

&

2.3

7

MT

PA

sale

able

ste

el

17960.5

9

(16408.0

0)

1244.0

0

1178.9

4

2.9

1 M

tpa h

ot

meta

l,

2.5

M

tpa

cru

de

ste

el

&

2.3

7

Mtp

a sale

able

ste

el.

Dec.’1

0

Dec.’1

4

853.0

1

16640.8

8

Th

e

facili

ties

are

under

sta

bili

satio

n

and

ram

p-u

p.

Th

e

insta

lled

cru

de

ste

el

capacity

of

the

pla

nt

has

incre

ased

from

0.5

0

Mtp

a

to

2.5

0 M

tpa

All

facili

tie

s

under

the

inte

gra

ted

pro

cess

route

are

in

opera

tio

n

(f)

R

aw

Ma

teri

als

Div

isio

n

(i)

Enhancem

ent

of

pro

ductio

n

capacity

of

Meghahatu

bu

-ru

Iron O

re M

ine

A t

echnic

al necessity

to in

cre

ase iron ore

fo

r m

eetin

g

requirem

ent

after

SA

IL e

xpansio

n.

125.7

8

(118.8

5)

12.8

6

12.0

0

capacity

from

4.3

M

tpa

to

6.5

0

Mtp

a

of

fin

ished

pro

duct

Jun’1

2

Oct’1

5

10.6

8

76.0

5

C

rushin

g

Sectio

n

A

ugm

enta

tio

n

of

pow

er

supply

U

pgra

datio

n

Th

e

wo

rk

for

the

ma

in

packa

ge

is

suff

erin

g d

ue

to

no

n-

pa

ym

en

t b

y

M/s

T

ecp

ro

to

its

su

b-

co

ntr

acto

rs.

Eve

n

afte

r co

ntin

uo

us

Page 63: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

55

(Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

s

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lati

ve

up

to

Dec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

of

Loadin

g

Sectio

n

E

rectio

n

of

Wagon L

oader

T

hre

e

nos.

Cla

ssifie

rs

follo

w

up

a

nd

revie

w a

t R

MD

and

Co

rpo

rate

leve

l, t

he

pro

gre

ss

co

uld

n

ot

imp

rove

. S

AIL

is

su

ppo

rtin

g

thro

ugh

direct

pa

ym

ent

to

su

b-c

on

tra

cto

rs.

Jo

bs

go

ing

o

n

slo

wly

by in

fusio

n o

f cash

flo

w

by

SA

IL

on

cost

recove

ry b

asis

&

dire

ct p

aym

ent.

Ere

ction

of

Re

cla

imer

is

on

ho

ld a

s p

resen

ce

of

M/s

E

lecon

En

gin

ee

r (s

up

plie

r o

f R

ecla

imer)

is

re

qu

ired

d

uring

ere

ction

w

ho

h

ave

refu

sed

fo

r th

e

sam

e

du

e

to

com

me

rcia

l is

su

es

with

Te

cp

ro.

(ii)

Enhancem

ent

of

pro

ductio

n capacity

of

Bola

ni

Iron

Ore

M

ine

A t

echnic

al necessity

to in

cre

ase iron ore

fo

r m

eetin

g

requirem

ent

after

SA

IL e

xpansio

n.

275.2

8

(254.5

5)

52.7

1

20.0

0

capacity

from

4.1

Mtp

a t

o 1

0

Mtp

a

of

fin

ished

pro

duct

Nov’1

3

Jun’1

5

12.9

9

117.1

5

Modific

atio

n

of

Dum

pin

g

Pla

tform

, fo

ur

Cla

ssifie

rs,

Sta

cker

&

Bucket

wheel

Recla

imer

has

been c

om

ple

ted.

Inte

rmitte

nt

clo

sure

of

Min

es

due

to

Environm

enta

l &

F

ore

st

cle

ara

nces

and

Lease

Rene

wal

has

aff

ecte

d

the

site

work

. (T

he

min

e

was

clo

sed

5

tim

es,

tota

llin

g 2

94

days

durin

g

the

perio

d

Fe

b’1

2

to

May’1

4 o

n a

ccount

of

these issues)

• P

oor

perf

orm

ance

of

the

contr

acto

rs

Page 64: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

56

(

Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lati

ve

u

pto

D

ec’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

(g)

Ch

an

dra

pu

r F

err

o-a

llo

y P

lan

t

(i)

Insta

llatio

n o

f 1x45

M

VA

subm

erg

ed

arc

Fu

rnace

Th

e

additio

nal

pro

ductio

n

of

HC

Fe

Mn &

HC

SiM

n

203.8

5

(187.3

3)

23.0

0

45.0

0

Th

e

additio

nal

pro

ductio

n

of

37500

t of

HC

Fe

Mn

&

35000

t of

HC

SiM

n

or

60,0

00t

of

HC

SiM

n

on

sta

ndalo

ne

basis

.

Oct’1

3

Aug’1

5

24.0

2

143.9

0

S

tart

of

Civ

il w

ork

w

as

aff

ecte

d

due

to

dela

y

in

environm

enta

l cle

ara

nce

from

M

OE

F.

Fu

rther,

civ

il &

str

uctu

ral

work

w

as

dela

yed

du

e

to

poor

resourc

e

mobili

zatio

n

at

site

and

non

-paym

ent

to

sub

-contr

acto

rs

by

main

contr

acto

r,

M/s

T

ecpro

w

ho

faile

d t

o a

dhere

to

any

of

its

com

mitm

ents

and

sto

pped

work

at

site.

RP

actio

n

taken

and

Fre

sh

ord

er

pla

ced

on

M/s

HS

CL.

2.

RA

SH

TR

IYA

IS

PA

T N

IGA

M L

TD

. (R

INL

)

O

ng

oin

g S

ch

em

es

(i)

AM

R S

chem

es

To

m

ain

tain

good

health o

f P

lant

100.0

0

60.0

0

60.0

0

To

m

ain

tain

good

health

of

the

equip

ment

and

to

susta

in

curr

ent

level

of

pro

ductio

n

/ pro

ductivity

in

the

conte

xt

of

the a

gein

g o

f th

e

pla

nt

Continu

ou

s

--

14.3

8

--

--

--

(ii)

R&

D S

chem

es

To

enhance

pro

ductivity

/ achie

ve

cost

reductio

n/D

evelo

pm

ent

of

new

pro

ducts

--

15.0

0

15.0

0

Develo

pm

ent

on

the

exis

tin

g

technolo

gy,

trouble

shootin

g

with

technolo

gic

al

solu

tio

ns

for

opera

tio

nal

activitie

s t

hro

ugh

investig

ative

stu

die

s, fa

ilure

Contin

uo

us

--

20.3

2

--

--

--

Page 65: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

57

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/

Ris

k

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14

D

ec.’

14

Cu

mu

lati

ve

up

to D

ec.’14

1

2

3

4

5

6

7

8

9

10

11

12

13

analy

sis

and

critical

exam

inatio

n

of

pro

cess

para

mete

rs

to

reduce

cost/

enhance

pro

ductivity

(iii)

C

oke

Oven

Batt

ery

N

o.

4

Phase

-II

To

opera

te C

OB

-4 a

s

independent

Battery

and

incre

ase

in

recovery

of

by-

pro

duct.

355.3

0

38.0

0

30.0

0

To

opera

te

CO

B-

4

as

independent

Batt

ery

. In

cre

ase

in

recovery

of

by

pro

ducts

Oct’2

012

Dec.’2

014

11.1

0

268.0

5

Com

ple

te B

y P

roduct

Pla

nt

com

mis

sio

ned

in

Decem

ber’

2014.

Coal

Handlin

g

pla

nt.

Th

e u

nit is l

ikely

to b

e

com

mis

sio

ned

by

June 2

015.

(iv)

Expansio

n t

o 6

.3

Mtp

a L

iquid

Ste

el

To

in

cre

ase t

he p

lant

capacity

12291.0

0

400.0

0

470.0

0

Incre

ase

pro

ductio

n,

enhancin

g

pro

ductio

n

of

liquid

ste

el

to

6.3

M

tpa

of

Liq

uid

Ste

el.

36/4

8

month

s

in p

hase

from

28-

10-2

005

/June

2011

Marc

h’ 2015/

April’

2015

322.3

7

11115.0

3

Sta

ge-1

unite

com

mis

sio

ned

and

under

sta

bili

zatio

n

except

Lim

e K

ilin

Pla

n

whe

re

schedule

fo

r K

ilin

1

&

2

are

exp

ecte

d

to

be

com

mis

sio

ned

by

April

&

June

2015.

Earlie

r kili

n

1

was

lighte

d

up

in

Nov.

2014.

Due

to

bricks

dam

age

furt

her

com

mis

sio

nin

g

activity s

topped.

Sta

ge-

2 u

nit c

onsis

ts

of

Specia

l B

ar

Mill

and

Str

uctu

ral

Mill

. E

arlie

r sta

ge

- 2

unit

was

pla

nned

to

be

com

mis

sio

ned

pro

gre

ssiv

ely

by

Decem

ber,

2014.

How

ever,

due

to

dam

age d

urin

g r

ecent

cyclo

ne H

UD

HU

D t

he

com

mis

sio

nin

g

schedule

got

affecte

d

and a

re n

ow

pla

nned

to

be

com

mis

sio

ned

by

Marc

h’

2015

&

April’

2015

Page 66: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

58

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/

Ris

k f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14

D

ec.’

14

Cu

mu

lati

ve

up

to D

ec.’14

1

2

3

4

5

6

7

8

9

10

11

12

13

(v)

Pulv

erised

Co

al

Inje

ction

Syste

m

for

BF

-1 &

BF

-2

Inje

ction

syste

m

for

reduction

in

consum

ption

of

expensiv

e

BF

coke

w

ith

less

exp

en

siv

e

pulv

erized c

oa

l

133.0

0

15.0

0

15.0

0

Incre

ase

d

pro

duction

of

hot

meta

l.

To

re

duce

co

st

of

pro

duction

of

hot

meta

l

Se

p.’0

9

Q4 o

f

2014-1

5

1.1

7

102.2

1

72 h

rs I

nte

gra

ted

tria

l fo

r B

F-1

str

eam

com

ple

ted.

Th

e

PC

I in

B

F-1

w

ill

be

com

mis

sio

ned in

la

st

quart

er

of

2014-1

5

--

(vi)

A

cquis

itio

n of

iron

ore

Min

e &

cokin

g

coal m

ine

To

achie

ve

self-

relli

ance

for

raw

m

ate

ria

l and

cost

reductio

n

500.0

0

20.0

0

30.0

0

RIN

L/V

SP

does

not

have

captive

sourc

e

for

cokin

g c

oal/iron

ore

and

outla

y

inclu

ded

to

acquire

min

es

Continu

ous

--

0.0

0

0.2

8

RIN

L

makin

g

all

out

eff

ort

s

in

acquis

itio

n

of

min

es

from

th

e

last fe

w y

ears

. R

INL

has

applie

d

for

29

iron

ore

m

inin

g

leases i

n v

ario

us

sta

tes

of

whic

h,

LO

I has

been

receiv

ed fo

r one

m

ine,

from

Govt.

of

Raja

sth

an,

over

an

are

a

of

945.8

5 H

ecta

res.

Th

e

Phase

-I

explo

ratio

n

of

Banera

Blo

ck b

y

M/s

M

EC

L

is

in

pro

gre

ss.

As

regard

s

allo

tment

of

Jahazpur

blo

ck

in

Bhilw

ara

, M

inis

try o

f M

ines,

Govt.

of

India

advis

ed

Govt.

of

Raja

sth

an

to

exam

ine

the

case

and

consid

er

notify

ing

it.

Raja

sth

an

Govt.

has

requeste

d

GO

I in

fa

vour

of

RIN

L.

Page 67: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

59

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/

Ris

k

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14

D

ec.’

14

Cu

mu

lati

ve

up

to D

ec.’14

1

2

3

4

5

6

7

8

9

10

11

12

13

(vii)

F

acili

ties

for

Iron

Ore

Sto

rage

To

in

cre

ase

iron

sto

rage facili

ty.

450.0

0

40.0

0

34.0

0

Shall

incre

ase

Iron

ore

sto

rage

facili

ty

to 3

0 d

ays

May’1

2

June’1

5

33.1

8

342.6

3

Majo

r ere

ctio

n

of

Conveyor

&

alli

ed

equip

ment

and

sto

ck

yard

equip

ment

are

com

ple

ted.

Ele

ctr

ical

work

s a

nd c

ablin

g a

re

under

pro

gre

ss.

Sta

ckin

g

ste

am

com

mis

sio

nin

g

likely

to

sta

rt in

Fe

b’1

5.

The

unit i

s e

xpecte

d t

o b

e

com

mis

sio

ned

in

June’1

5.

(viii

) S

trength

enin

g

of

220K

V

syste

m

of

AP

TR

AN

SC

O

To

str

ength

en

AP

pow

er

grid

for

transm

issio

n

of

pow

er

of

400 M

VA

86.3

4

5.0

0

5.0

0

It

enable

s

to

enhance

contr

acte

d

dem

and o

f 400

MV

A

for

RIN

L

on e

xpansio

n

Sept’1

2

Phase-

I w

ork

com

ple

ted

0.0

0

63.3

3

Phase-I

w

ork

com

ple

ted.

Modalit

ies

for

esta

blis

hm

ent

of

400/2

20

KV

substa

tio

n in

lin

e w

ith

revis

ed

pro

posal

of

AP

Tra

nsco a

re u

nder

fin

aliz

atio

n

--

(ix)

Augm

enta

tio

n

of

220 K

V s

yste

m o

f A

PT

RA

NS

CO

Str

ength

enin

g

the

inte

rnal

syste

ms

of

VS

P lik

e s

ubsta

tio

ns

etc

. to

enable

to

re

ceiv

e

400M

VA

pow

er

to

meet

the

exp

ansio

ns n

eeds.

58.1

0

15.0

0

15.0

0

To

augm

ent

to

receiv

e

400

MV

A

pow

er

at

VS

P

Aug’1

1

Schedule

I

bein

g r

e-

work

ed

9.2

5

43.7

6

Com

mis

sio

ned

on

Aug’1

4

but

technic

al

issues

cro

pped

up

durin

g com

mis

sio

nin

g

. actio

ns are

in

itia

ted

for

carr

yin

g

out

the

ratificatio

n

work

s.

Recom

mendatio

ns

from

th

e

orig

inal

equip

ment

manufa

ctu

re a

waited.

(x)

BF

-1&

2C

ate

gory

R

epairs

To

carr

y

out

the

Cate

gory

-I c

apital

repairs

&

enhance

the v

olu

me to

3800

CuM

fr

om

th

e

exis

tin

g 3

200

CuM

capacity.

1663.0

0

350.0

0

200.0

0

To

incre

ase the

pro

ductio

n b

y

0.5

Mt

from

2M

t to

2.5

Mt of

Hot

Meta

l

BF

-1:

Nov'1

2

BF

-2:

July

'15

BF

-1: July

'14

BF

-2: O

tr 4

of

20'1

5

197.7

3

553.8

8

Bla

st

Fu

rnace-I

C

om

mis

sio

ned

on

30

th J

uly

, 2014 a

nd i

s

under

regula

r opera

tio

n

Bla

st

Fu

rnace-I

I O

rder

for

main

package h

as

been

pla

ced

and

Desig

n &

Engin

eerin

g

is

under

pro

gre

ss.

Th

e

furn

ace

is

pla

nned

to

be

taken

for

shut

dow

n

in

4th

Quart

er

of

2015

-16

--

Page 68: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

60

(Rs. In

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

Co

l.7

Rem

ark

s/

Ris

k f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec.’

14

Cu

mu

lati

ve

up

to D

ec.’14

1

2

3

4

5

6

7

8

9

10

11

12

13

(xi)

S

inte

r P

lant

pro

ductivity

enhancem

ents

To

in

cre

ase

the

Pro

ductio

n o

f S

inte

r to

support

th

e

incre

ase

in

the

volu

me o

f B

F.

Th

is is

to m

eet th

e p

resent

pollu

tio

n

contr

ol

norm

s

343.0

0

25.0

0

1.0

0

To

in

cre

ase t

he

pro

ductio

n f

rom

5.5

Mt

to 6

.8 M

t of

Sin

ter

Oct’1

6

Oct’1

6

2.5

1

3.5

2

Agre

em

ent

has b

een

conclu

ded

on

23.0

6.2

014

for

revam

p

of

both

th

e

Sin

ter

Machin

e

pro

gre

ssiv

ely

by

Oct’1

6.

Engin

eerin

g

is u

nder

pro

gre

ss.

--

(xii)

S

MS

C

onvert

er

Revam

p

To

im

pro

ve

the

relia

bili

ty o

f th

e 3

convert

ers

as

the

exis

tin

g e

stim

ate

d

life

is

alm

ost

over.

T

his

is t

o m

eet

the

pre

sent

pollu

tio

n

contr

ol norm

s

404.1

6

25.0

0

140.0

0

Techn

olo

gic

al

necessity t

o

cha

nge

the

Convert

ers

July

’15

Q.

4 o

f 2015

-16 f

or

Convert

or-

I

100.9

5

103.0

0

Majo

r im

port

ed

supplie

s

have

been

ord

ere

d.

Majo

r In

dig

enous

supplie

s

have

been

ord

ere

d

and

Supplie

s

com

menced.

Civ

il w

ork

s a

re u

nder

pro

gre

ss.

Th

e

1st

Convert

er

revam

pin

g

is

pla

nned

to

com

mence

in

4th

quart

er

of

2015-1

6

alo

ng w

ith B

F-2

Cat-

1 C

apital re

pair.

--

(xiii

) 3

rd

Convert

er

and 4

th C

aste

r T

o c

onvert

additio

nal

Hot

Meta

l genera

ted

(aft

er

cate

gory

1

repairs

of

the

exis

tin

g

2

Bla

st

Fu

rnaces )

in

to s

teel

by

addin

g

a

3rd

convert

er

and

4th

caste

r.

974.7

6

150.0

0

100.0

0

To

in

cre

ase t

he

pro

ductio

n

of

ste

el by 0

.97M

t

3rd

Convert

er:

July

’15

4th

Caste

r:

Jul’1

6

3rd C

onvert

er

Q4 o

f 2015-

16

4

th C

aste

r:

Jul’1

6

25.0

1

25.1

5

3rd

C

onvert

er

- T

he

main

package

has

already

been

ord

ere

d a

nd b

ala

nce

rela

ted package are

under

fin

aliz

atio

n.

Deta

iled E

ngin

eerin

g

is

under

pro

gre

ss

and

equip

ment

supplie

s

have

com

menced.

Th

e

unit

is

expecte

d

for

com

ple

tio

n

by

4th

Quart

er

of

2015

-16.

4th

Caste

r:

Agre

em

ent

has b

een

conclu

ded

on

02.0

6.2

01

for

insta

llatio

n o

f C

aste

r by

July

’16.

Engin

eerin

g

in

pro

gre

ss.

--

Page 69: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

61

(R

s. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lati

ve

up

to

Dec’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

(xiv

) P

ow

er

Pla

nt-

II

T

o

meet

the

additio

nal

pow

er

requirem

ent

by

utiliz

e

the

lean

by

pro

duct

gasses

whic

h

oth

erw

ise

would

be

fla

red

to

atm

osphere

.

677.0

0

100.0

0

220.0

0

To

utilis

e

the

lean b

y-p

roduct

gases

whic

h

oth

erw

ise

would

be f

lare

d

to

atm

osphere

. T

his

pro

ject

is

conceiv

ed

with

the

sole

in

tentio

n

of

reducin

g G

reen

House

Gas

(GH

G)

em

issio

ns

into

th

e a

tmosphere

w

hile

m

eetin

g

the

pow

er

requirem

ent

of

RIN

L to

th

e

exte

nt

of

120

MW

th

ere

by

mitig

atin

g

the

eff

ects

of

clim

ate

change.

Sep’1

3

May’1

5

181.3

3

477.6

2

Due t

o t

he r

ecent

Hudhud

Cyclo

ne,

the U

nit is lik

ely

to

be

com

mis

sio

ned

by M

ay’2

015.

--

(xv)

Axle

Pla

nt

To s

et

up

th

e f

acili

ty f

or

manufa

ctu

re

of

Axle

s

and

oth

er

rela

ted

pro

ducts

at

Ne

w

Jalp

aig

uri,

West

Beng

al.

513.0

0

5.0

0

5.0

0

Insta

ll suitable

capacity

of

Axle

and

oth

er

rela

ted

Pro

ducts

M

anufa

ctu

rin

g

unit a

t N

ew

Jalp

aig

uri,

West B

engal.

40

month

s

aft

er

agre

em

ent

with

Railw

ays.

--

0.0

0

0.2

2

Fin

al

Dra

ft

Land

Lease &

Off-

take

Agre

em

ent

has

been

sent

to

Railw

ays

on

08.0

1.2

014,

Cle

ara

nce

is

aw

aited

from

R

ailw

ays

for

conclu

din

g

the

agre

em

ent,

Bala

nce

package

are

in

vario

us

sta

ge o

f w

ork

.

(xvi)

F

org

ed

Wheel

Pla

nt

To

set

up t

he f

acili

ty

for

manufa

ctu

re

of

Fo

rged

wheels

at

Lalg

anj,

Rae

Bare

li U

p.

1177.0

0

70.0

0

70.0

0

To

pro

duce

100000 w

heels

fo

r R

ailw

ays

36

month

s

from

eff

ective

date

of

contr

act

--

6.1

9

6.1

9

Work

fo

r S

oil

Investig

ation

is

com

ple

ted.

Exte

rnal

boundary

w

all

for

the P

lant

ara

is

alm

ost

com

ple

ted.

Work

is

under

pro

gre

ss.

Te

nderin

g

in

pro

cess.

Page 70: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

62

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

4-

Dec’1

4

Cu

mu

lati

ve

up

to

Dec

’14

1

2

3

4

5

6

7

8

9

10

11

12

13

(xvii)

In

sta

llatio

n o

f A

ddl. S

team

T

urb

ine D

riven

Blo

wer

TB

-5 in

TP

P &

BH

To

in

sta

ll T

B-5

as

sta

ndby t

o c

ate

r th

e

need

in

case

TB

-1,2

,3

goes

for

modern

isatio

n

and

als

o c

an b

e u

sed

as sta

ndby fo

r B

F-4

in

futu

re.

280.5

2

50.0

0

25.0

0

To

Insta

ll T

B-5

to

cate

r th

e

need

of

cold

B

last

requirem

ent

of

BF

1 &

BF

2 i

n

case

exis

tin

g

TB

s a

re u

nder

modern

isatio

n

/ main

tenance

Sep’1

6

Sep’1

6

0.0

0

0.0

0

Th

e m

ain

package

has

sin

ce

been

ord

ere

d

and

schedule

d

for

com

petitio

n

by

Sept.

16.

Engin

eerin

g

has

com

menced.

Bala

nce

package

under

vario

us

sta

ge o

f te

nderin

g.

(xviii

) S

LT

M

To

U

tilis

e

the

additio

nal liq

uid

ste

el

of

1 M

T t

hat

will

be

pro

duced a

fter

revam

pin

g/u

pgra

dati

on

of

exis

tin

g

BF

s

and

Convert

ers

/Caste

rs.

2512.0

0

10.0

0

1.0

0

To

pro

duce

4,0

0,0

00

TP

A

of

Seam

less

Tu

bes

in

the

siz

e

range

of

5 1/2

"

to 18"

OD

.

--

--

0.0

0

1.1

2

Under

pro

cess.

--

(xix

) C

OB

-5

To

m

eet

the

coke

requirem

ents

and

gas

bala

nce

for

6.3

/7.3

MT

PA

sta

ge.

2858.0

0

25.0

0

25.0

0

To

pro

duce

0.8

2

mtp

a

of

Gro

ss C

oke.

29

month

s

from

aw

ard

of

main

package

--

19.5

8

23.5

7

Under

vario

us

sta

ge

of

tenderin

g

and f

inaliz

atio

n

--

4.

NM

DC

Ltd

.

(i)

Baila

dila

D

eposit 1

1B

T

o incre

ase

pro

ductio

n o

f iron

ore

607.1

8

15.0

0

15.0

0

Capacity

of

7m

tpa

Mar’1

2

Mar’1

5

11.4

4

381.0

2

Pro

ject

is

bein

g

execute

d

thro

ugh

seven

packages.

ME

CO

N

was

appoin

ted

as

EP

CM

C

onsultant.

All

packages

have

been

ord

ere

d

and

w

ork

s

are

in

pro

gre

ss.

Th

e m

ajo

r package

deta

ils

are

as

under:

P

rim

ary

&

S

econdary

cru

sher

are

a:

Most

of

civ

il,

str

uctu

ral

&

mechanic

al

ere

ctio

n

work

s

com

ple

ted.

Ele

ctr

ical

and

fin

ishin

g w

ork

s are

in

pro

gre

ss.

M/s

.

Maois

t activitie

s in

D

ante

wada,

Basta

r re

gio

n

have

been

im

pedin

g/d

isru

ptin

g th

e pro

gre

ss of

constr

uctio

n

activitie

s.

Fire

incid

ent

caused

by

insurg

ents

on 1

6th

Mar’1

4

dam

agin

g

appro

x

200

M

length

of

Dow

nhill

conveyor

(Belt.,

equip

ment

&

str

uctu

res)

whic

h

is u

nder

ere

ctio

n.

Contr

acto

rs

and

alli

ed la

bour

are

not

able

to w

ork

in

norm

al w

ay d

ue t

o

Page 71: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

63

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-m

en

ts w

.r.t

p

roje

cte

d O

utc

om

es in

C

ol.

7

Rem

ark

s/R

isk f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lat

ive u

pto

D

ec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

U

ralm

ash,

Moscow

, exp

ert

s a

waited f

or

fin

al

checkin

g of

the ere

cte

d

cru

shers

and

for

pro

ceedin

g

with

inte

gra

ted

tria

ls

and

com

mis

sio

nin

g.

Dow

nhill

C

onveyor

Syste

m.

All

mechanic

al

equip

ment

ere

cte

d e

xcept

conveyor

belt fo

r a le

ngth

of

500

m

out

of

7000

m.

ele

ctr

ical, c

ablin

g

and fin

ishin

g w

ork

s are

in

pro

gre

ss.

Wate

r supply

work

s c

om

ple

ted.

T

ransm

issio

n l

ine w

ork

s

are

in

pro

gre

ss.

the

pre

vaili

ng.

(ii)

Kum

ara

sw

am

y I

ron

Ore

Pro

ject

To

incre

ase

pro

ductio

n o

f iron o

re

898.5

5

80.0

0

80.0

0

Capacity

of

7

mtp

a

May’1

3

August’1

5

59.8

7

351.6

8

Pro

ject

is

bein

g

execute

d

in

six

packages.

M

EC

ON

appoin

ted

as

EP

CM

consultant

Work

aw

ard

ed

for

all

packages

except

package

IV

- T

ele

C

om

munic

atio

n S

yste

m.

Th

e

majo

r package

deta

ils a

re a

s u

nder:

C

rushin

g

syste

m

package:

All

equip

me

nt

inclu

din

g

prim

ary

&

secondary

cru

shers

ere

cte

d E

lectr

ical

work

s

als

o

alm

ost

com

ple

ted.

Fin

ishin

g

work

s

are

in

pro

gre

ss.

Dow

nhill

C

onveyor

Syste

m P

ackage.

Civ

il &

str

uctu

ral

work

s

alm

ost

com

ple

te.

Ere

ctio

n

of

fabricate

d

str

uctu

res

is

in pro

gre

ss.

Ere

ctio

n of

mechanic

al

equip

ment

to b

e taken u

p.

Serv

ice

centr

e

&

wate

r supply

civ

il and

str

uctu

ral

work

s

are

in

pro

gre

ss.

Poor

Fin

ancia

l sta

tus

of

Package

Contr

acto

r (M

/s

Ele

con)

of

Package -

2

aff

ecte

d

the

pro

gre

ss

of

work

s.

Page 72: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

64

(

Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

4-

De

c’1

4

Cu

mu

lati

ve

up

to

De

c’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

T

ele

com

munic

atio

ns

Syste

m

package

rete

ndere

d

and

bid

evalu

atio

n

is

in

pro

gre

ss.

(iii)

P

elle

t P

lant

at

Donim

ala

i T

o d

ivers

ify

into

pelle

t pro

ductio

n

572.0

0

60.0

0

60.0

0

Capacity

of

1.2

mtp

a

Apr’1

3

June’ 2015

37.5

9

417.2

1

M/s

M

.N.

Dastu

r appoin

ted

as

EP

CM

consultant. T

he p

roje

ct

is

bein

g

execute

d

though

six

packages

(Pelle

etisatio

n,

Beneficia

tio

ns,

Site

levelin

g,

MR

SS

, B

oundary

w

all

&

mis

cella

neous

build

ings

and

Mobile

equip

ments

).

T

he

majo

r package

deta

ils

are

as u

nder.

P

elle

tisatio

n P

ackage :

E

rectio

n o

f m

echanic

al

equip

ment

&

sub

-syste

ms

com

ple

ted.

Tria

ls r

uns o

f in

div

idual

equip

ment

, re

fracto

ry

and f

inis

hin

g w

ork

s a

re

in p

rogre

ss.

Beneficia

tio

n

Package

majo

r civ

il w

ork

s

com

ple

ted.

Str

uctu

ral

fabricatio

n

&

Ere

ctio

n

work

s are

in

pro

gre

ss.

Concentr

ate

th

ickener,

B

all

mill

s,

Pre

ssure

F

ilters

. W

him

s &

Lim

s,

Dew

ate

rin

g

cyclo

ne

&

EO

T

Cra

nes

ere

ctio

n

com

ple

ted.

Bala

nce

equip

ment

supplie

s

&

ere

ctio

n in p

rogre

ss.

Main

tr

ansfo

rmers

&

G

IS s

ubsta

tio

n e

rectio

n

com

ple

ted.

inte

rfacin

g

work

s in

pro

gre

ss.

Mobile

E

quip

ment

package

supplie

s

com

ple

ted.

Fin

ancia

l constr

ain

ts

of

Beneficia

tio

n

Package

Contr

acto

r re

sulted

in

dela

yed

supplie

s &

poor

resourc

e

mobili

zatio

n,

whic

h

has

aff

ectin

g

the

pro

gre

ss

of

work

s

Page 73: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

65

(R

s.

in c

rore

)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

O

utl

ay

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-m

en

ts w

.r.t

p

roje

cte

d O

utc

om

es

in C

ol.

7

Rem

ark

s/R

isk

facto

rs

BE

R

E

Ori

gin

al

No

w A

nti

-cip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lati

ve

up

to

Dec.’

14

1

2

3

4

5

6

7

8

9

10

11

12

13

(iv)

3 M

TP

A S

teel

Pla

nt at

Nagarn

ar

i)

Ensure

valu

e

additio

n

to

Iron

ore

min

ed in

C

G

Sta

te.

ii)

Develo

pm

ent

of

Baste

r re

gio

n

inhabited

mostly

by

trib

als

. iii

) P

art

ially

meet

the

gro

win

g

dem

and

for

ste

el

pro

ducts

, prim

arily

in

the

India

n m

ark

et. i

v)

Investm

ent

of

funds

availa

ble

fo

r busin

ess

gro

wth

.

15525.0

0

2280.0

0

2280.0

0

Capacity o

f 3

mtp

a

May’

2015

Decem

ber’

2016

1

633.2

6

5864.0

0

1)

Th

e

tota

l w

ork

of

the

ste

el

Pla

nt

is

div

ided in

to 09 M

ajo

r te

chnolo

gic

al

Packages,

26

Auxili

ary

Package.

15

infr

astr

uctu

re

packages,

11

enablin

g p

ackage a

nd

5 package of

Private

R

ailw

ays

Sid

ing

for

ease o

f te

nderin

g a

nd

executio

n

All

the

majo

r T

echnolo

gic

al

packages

are

aw

ard

ed a

nd t

he w

ork

is

pro

gre

ssin

g

at

full

pace a

t site.

2)

Out

of

26

Nos

of

Auxili

ary

P

ackage 07

Packages

are

aw

ard

ed

and

C

ivil,

E

quip

ment

ere

ctio

n

work

in

pro

gre

ssin

g a

t site f

or

Pow

er

Blo

win

g

Sta

tio

n,

one

of

the

majo

r A

uxili

ary

package.

Te

nders

are

flo

ate

d

for

10

Aux.

Package o

ut

of

whic

h

05

are

unde

r te

nder

evalu

atio

n.

Rem

ain

ing

09 p

ackages a

re in

3)o

ut

of

15

Nos

of

Infr

a package,

tender

enquire i

ssued f

or

05

package o

ut

of

whic

h

04 nos are

in

te

nder

evalu

atio

n,

Rem

ain

ing

11 n

os o

f package a

re

in

diffe

rent

sta

ge

of

tender

docum

ent

fin

aliz

atio

n.

Fo

rest

Cle

ara

nce &

R

ight

of

Way

for

layin

g

wate

r pip

e

lines

from

river

Sabri t

o S

teel

Pla

nt

site a

t N

agarn

ar

for

opera

tio

n w

ate

r fo

r th

e s

teel pla

nt

Page 74: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

66

(

Rs. in

cro

re)

No

N

am

e o

f P

SU

s

an

d S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

C

os

t

Ap

pro

ved

Ou

tla

y

2014-1

5

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d T

imeli

ne

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts w

.r.t

p

roje

cte

d

Ou

tco

mes in

Co

l.7

Rem

ark

s

/Ris

k f

acto

rs

BE

R

E

Ori

gin

al

No

w

An

ticip

ate

d

Fo

r

Ap

r’ 1

4-

Dec’1

4

Cu

mu

lati

ve

up

to D

ec’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

4)

Out

of

11 N

os.

of

Enablin

g

packages

08

packages

are

aw

ard

ed

out

of

whic

h

five

are

com

ple

ted.

T

ender

for

01 n

o o

f package

is

issued

and

is

under

tender

evalu

atio

n.

Rem

ain

ing 0

2 n

os o

f packages

are

in

diffe

rent

sta

ges

of

tender

docum

ent

finaliz

atio

n.

5)

Te

nder

enquiry is

issued

for

Tw

o

packages out

of

the

05

Railw

ays

Sid

ing

Package.

One o

f th

e

Railw

ays

sid

ing

packages

i.e.

Road

Over

Brid

ge i

s t

o b

e

execute

d

by

NH

AI

on

deposit

basis

R

em

ain

ing

02

packages

are

in

diffe

rent

sta

ges

of

tender

docum

ent

fin

aliz

atio

n.

Page 75: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

67

(R

s.

in c

rore

)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/ S

an

cti

on

ed

C

os

t A

pp

rov

ed

O

utl

ay 2

014

-15

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d O

utc

om

es

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ieve-

men

ts

w.r

.t

pro

jecte

d

Ou

tco

me

s i

n C

ol.7

Rem

ark

s/R

isk f

acto

rs

Ori

gin

al

Revis

ed

B

E

RE

O

rig

ina

l N

ow

A

nti

cip

ate

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

l-ati

ve

up

to

Dec’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

14

B.

Sch

em

e o

f M

inis

try o

f S

teel

1.

Schem

e f

or

pro

motio

n o

f R

&D

in the I

ron &

Ste

el secto

r

1(i)

Schem

e f

or

pro

motio

n

of

Researc

h

&

Develo

pm

ent

in I

ron &

S

teel

secto

r

(On

-go

ing

p

roje

cts

) 1

. D

evelo

pm

ent

of

innovative/

path

bre

akin

g

technolo

gie

s

for

utilis

atio

n

of

iron

ore

fin

es

and

non

-cokin

g c

oal.

2.

Impro

vem

ent

of

qualit

y

of

ste

el

pro

duced

thro

ugh

Inductio

n

Fu

rnace

route

. 3.

Beneficia

tio

n

of

raw

m

ate

ria

ls

like

iron o

re,

coal

etc

. and

agglo

mera

tio

n

(e.

g.

Pelle

tisatio

n).

48.0

0

32.8

7*

6.0

0

0.0

0

1)

Imp

rovem

ent

in

sin

ter

pro

ductivity

thro

ugh

d

ee

p

ben

eficia

tio

n

an

d

agglo

mera

tio

n

tech

nolo

gie

s

for

ration

al

utiliz

ation o

f lo

w g

rade iro

n

ore

s

and

fin

es.

2)

Develo

pm

ent

of

Altern

ate

com

ple

me

nta

ry

Route

o

f Ir

on/S

teel

makin

g

with

refe

rence

to

India

n

raw

m

ate

rial

viz

lo

w g

rade i

ron

ore

a

nd n

on cokin

g coal.

3)

Pro

du

ctio

n

of

low

P

hosp

ho

rus

Ste

el

usin

g

DR

I th

roug

h

Inductio

n

furn

ace

route

a

dop

tin

g

innovative

flu

xe

s

and

/or

desig

n

(refr

acto

ry)

cha

nge

s.

4)

Sm

eltin

g

red

uction of

iro

n o

re/f

ine

s

by

hyd

roge

n

pla

sm

a

an

d

elim

inatio

n

of

CO

2

em

issio

n.

5)

Ben

eficia

tio

n

of

Iron

O

re

slim

es

from

B

ars

ua a

nd o

the

r m

ines i

n

India

. 6)

Develo

pm

ent

of

pilo

t scale

pelle

tiza

tio

n

tech

nolo

gy

for

India

n

Goeth

itic

/hem

atite

ore

with

vary

ing

degre

e

of

fine

ness.

7)

CO

2

aba

tem

en

t in

Ir

on

an

d

Ste

el

pro

du

ctio

n

by

pro

cess

optim

isa

tio

n.

8)

Pro

ductio

n

of

low

ash

(10%

ash

) co

al

(cokin

g

non c

okin

g)

from

hig

h a

sh

India

n

coals

in

clu

din

g

desulp

hurisatio

n

of

hig

h

sulp

hur

No

rth E

ast

coal.

Durin

g

11

th

Pla

n

2007-1

2

Schem

e

Contin

ued in

th

e 1

2th P

lan

2012-1

7

bein

g a

contin

uous

schem

e.

0.0

0

32.8

7

8

R&

D

pro

jects

w

ere

purs

ued

under

this

S

chem

e.

So

far

5

Pro

jects

have b

een

com

ple

ted

and

3

pro

jects

are

in

pro

gre

ss.

1)

The

Schem

e

for

R&

D

was in

trod

uce

d in

M

oS

in

th

e

11th

F

ive

Yea

r P

lan

and

it

took

co

nsid

era

ble

tim

e to

g

et

ap

pra

isal

an

d

app

roval

as p

er

laid

do

wn

pro

ced

ure

. 2)

The E

FC

app

roved t

he

schem

e in

N

ov 20

08 an

d

Min

istr

y

of

Fin

ance

acco

rded

fin

al

cle

ara

nce

on Jan 20

09 w

ith a ri

de

r th

at

the

schem

e

be

ope

rate

d

with

eff

ect

from

200

9-1

0.

3)

Min

istr

y

of

Ste

el

took

follo

w

up

actio

n

for

sele

ction

of

R&

D pro

jects

in

con

sultatio

n

with

the

sta

ke

hold

ers

got

the

pro

jects

ap

pro

ve

d

by

Panel

of

Exp

ert

s

and

4

pro

jects

were

app

roved i

n

Fe

b

20

10

. F

ou

r m

ore

pro

jects

we

re a

pp

roved b

y

PA

MC

in N

ov 2

010.

4)

Becau

se o

f th

e d

ela

ys

on

the

app

roval

of

the

schem

e

an

d

subsequ

en

t app

roval

of

the

indiv

idu

al

R&

D

pro

jects

, th

e

4

pro

jects

could

o

nly

b

e

sta

rted

in

Ap

ril

20

10,

2

pro

jects

on J

an 2

011 an

d

the

bala

nce

2

pro

jects

in

D

ec

2011

. T

he

refo

re

the

pro

jects

co

uld

not

be

com

ple

ted i

n t

he 1

1th

Fiv

e

Ye

ar

Pla

n.

5)

Th

e o

ng

oin

g 8

pro

jects

have

bee

n

co

ntin

ue

d

in

the

12th

F

ive

Yea

r P

lan

. A

s

per

the

ori

gin

al

sche

dule

, th

ese

pro

jects

are

lik

ely

to b

e c

om

ple

ted

in

20

12-1

3,

20

13-1

4,

201

4-1

5 &

20

15

-16.

Page 76: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outc

om

e B

udget

201

5-1

6/C

hapte

r-IV

/Revie

w o

f P

ast P

erf

orm

ance

68

(Rs.

in c

rore

)

No

N

am

e o

f P

SU

s a

nd

S

ch

em

e/

Pro

gra

mm

e

Ob

jecti

ve/

Ou

tco

me

Esti

mate

d/

San

cti

on

ed

Co

st

Ap

pro

ved

O

utl

ay 2

014

-15

Qu

an

tifi

ab

le

Deli

vera

ble

s/

Pro

jecte

d

Ou

tco

mes

Pro

jecte

d t

imelin

e

Ac

tua

l E

xp

en

dit

ure

A

ch

ievem

en

ts

w.r

.t p

roje

cte

d

Ou

tco

mes in

C

ol.

7

Rem

ark

s/R

isk f

acto

rs

Ori

gin

al

Revis

ed

B

E

RE

O

rig

ina

l N

ow

A

nti

cip

ate

-te

d

Fo

r A

pr’

14-

Dec’1

4

Cu

mu

lati

ve u

pto

D

ec’1

4

1

2

3

4

5

6

7

8

9

10

11

12

13

14

1(ii)

(Ne

w

Com

ponent )

Develo

pm

ent

of

the

technolo

gy

for

Cold

R

olle

d

Gra

in

Orie

nte

d

(CR

GO

) ste

el

sheets

and

oth

er

valu

e

add

ed

in

novative

ste

el

pro

ducts

.

150.0

0

150.0

0

12.0

0

0.5

0

Develo

pm

ent

of

the

technolo

gy

for

pro

ductio

n o

f C

RG

O

Ste

el

Sheets

and

oth

er

valu

e

add

ed

S

teel P

roducts

.

Durin

g

12

th P

lan

Durin

g

12

th

Pla

n.

Will

C

ontin

ue

in

13

th

Pla

n,

bein

g

a

contin

uous

schem

e.

0.2

5

0.2

5

DP

R o

f th

e C

RG

O

pro

ject

with

MO

S

fundin

g o

f R

s.

50

Lakh

has

been

appro

ved

by

HS

M.

1st

insta

llment

of

Rs.

25 la

kh has been

rele

ased

to

NM

L

Jam

shedpur.

P

lacem

ent

of

ord

er

for

the

pre

para

tion o

f th

e

DP

R

is

expecte

d

in

Jan

2015.

Bala

nce

Rs.

25

Lakh

expecte

d

to

be

rele

ased

in

Marc

h 2

015.

Th

e

R&

D

Schem

e

has

am

ended w

ith

the

due

appro

val

of

SF

C

and

HS

M

in

Nov.

2014,

to

inclu

de

develo

pm

ent

of

technolo

gy

for

Cold

R

olle

d

Gra

in

Orie

nte

d

(CR

GO

) S

teel

Ste

ets

and

oth

er

valu

e

added

innovative

ste

el

pro

ducts

as

an

obje

ctive

of

the s

chem

e.

1(iii)

N

ew

pro

jects

1.

Develo

pm

ent

of

innovative/

path

bre

akin

g

tech

nolo

gie

s f

or

utilis

atio

n

of

iro

n o

re f

ines a

nd n

on

-cokin

g c

oal.

2.

Imp

rovem

ent

of

qualit

y o

f ste

el

pro

duce

d

thro

ug

h

Ind

uctio

n

Fu

rna

ce r

oute

. 3.

Beneficia

tion

of

raw

mate

rials

lik

e iro

n o

re,

coal

etc

. an

d

agglo

mera

tio

n

(e.

g.

Pelle

tisatio

n).

4.

To pu

rsue

R&

D

on

an

y

oth

er

su

bje

ct

of

national

imp

ort

ance

concern

ing

th

e

Iro

n

&

Ste

el S

ecto

r

2.0

0

17.1

3#

2.0

0

6.5

0

1)

Pro

ductio

n

of

low

P

hosphoru

s

ste

el

thro

ugh

Inductio

n

Fu

rnace

route

usin

g

DR

I as

majo

r fe

rrugin

ous

raw

m

ate

ria

l -

An

Industr

ial

Assessm

ent.

2)

Develo

pm

ent

of

Auto

ma

tio

n

Syste

m

for

Optim

um

C

oal

Ble

ndin

g

at

Coal

Handlin

g

Pla

nt

o

Coke

Oven

Batt

eries

Durin

g

12

th P

lan.

Will

C

ontin

ue

in

13

th

Pla

n,

bein

g

a

contin

uo

us

schem

e.

Durin

g

12

th

Pla

n.

Will

C

ontin

ue

in

13

th

Pla

n,

bein

g

a

contin

uous

schem

e.

1.4

8

1.4

8

2

New

R

&D

P

roje

cts

have

been a

ppro

ve

d b

y

the

PA

MC

in

its

meetin

g

held

on

17

th F

eb.

2014 &

8

th

Decem

ber

2014.

Th

e

pro

jects

are

in

pro

gre

ss

Th

e

R&

D

Schem

e

has

am

ended w

ith

the

du

appro

val

of

SF

C

and

HS

M

in

Nov.

2014,

to

inclu

de

R&

D

on

any

oth

er

subje

ct

of

natio

nal

import

ance

concern

ing

the

iron

&

Ste

el

Secto

r,

as

an

obje

ctive

of

the s

chem

e.

* A

s n

o f

urt

he

r e

xp

en

ditu

re is r

equir

ed f

or

the o

ngoin

g p

roje

cts

, it is p

rop

ose

d t

o r

edu

ce t

he

allo

cation f

rom

Rs. 4

8 c

rore

to

Rs.

32.8

7 c

rore

in 1

2th F

ive Y

ear

Pla

n.

# It is

pro

pose

d t

o in

cre

ase

th

e a

lloca

tion f

or

ne

w p

roje

cts

fro

m R

s.

2 c

rore

to R

s. 1

7.1

3 c

rore

in

th

e 1

2th F

ive Y

ear

Pla

n.

$ T

he

overa

ll allo

cation R

s. 2

00 c

rore

for

the

R&

D S

ch

em

e r

em

ain

th

e s

am

e.

**

****

****

Page 77: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

69

CHAPTER - V

FINANCIAL REVIEW

For the year 2015-2016, Demand No. 95 will be presented to the Parliament on behalf of the Ministry of Steel during the Budget Session. The Demand includes provisions for Plan/Non-Plan expenditure for the Ministry and Plan expenditure of the Public Sector Undertakings (PSUs) under its administrative control. 1. TOTAL REQUIREMENT OF FUNDS FOR 2015-16

The total financial requirements covered in Demand No. 95 for BE 2015-16, are summarized in the following Table:-

(Rs. in crore)

Demand No. 95 for

2015-2016

BE 2015-16

Plan Non-Plan Total

REVENUE SECTION 15.00 73.13 88.13

CAPITAL SECTION 0.00 0.00 0.00

Total (Gross) 15.00 73.13# 88.13

# Includes provision of Rs. 5.18 crore for accounting adjustments relating to waiver of guarantee fee for HSCL.

2. ACTUAL EXPENDITURE: 2012-13 TO 2014-15 (UPTO DEC’14)

The actual Plan and Non-Plan expenditure (Gross) under the Ministry’s grant during the preceding three years vis-à-vis the BE and RE for the respective years, are summarized in the table

below:

(Rs. in crore) Year BE RE Actual Expenditure

Non-Plan Plan Total Non-Plan Plan Total Non-Plan Plan Total

2014-15 72.92 20.00 92.92 71.10 7.00 78.10 53.92 1.73 55.65*

2013-14 72.97 46.00 118.97 70.46 8.00 78.46 70.02 8.00 78.02

2012-13 75.89 46.00 121.89 220.58 26.49 247.07 218.40 24.90 243.30

*Upto Dec’2014

Page 78: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

70

3. NON-PLAN EXPENDITURE 3.1 The Non-Plan provision of Ministry of Steel, including Secretariat proper, PAO (Steel), Development Commissioner for Iron & Steel (DCI&S), Kolkata and the PSUs under this Ministry, in 2014-15 (BE & RE) and requirement of fund in 2015-16 (BE) are given in the following table :-

(Rs. in crore) No. Major Head & Item of Expenditure BE

2014-15

RE 2014-15

% age increase/

decrease in RE over BE

2014-15

BE 2015-16

% age increase/ decrease

over BE 2014-15

I. MH – 3451

1. Secretariat - Economic Services 23.26 21.37 -8.12% 23.35 0.39%

II. MH – 2852

2. Development Commissioner for Iron & Steel,

Kolkata

0.14 0.19 35.71% 0.23 -76.66%

3. Awards to Distinguished Metallurgists. 0.23 0.25 8.70% 0.26 13.04%

4. Interest Subsidy :

(i) Subsidy to Hindustan Steelworks Construction

Ltd. (HSCL) for payment of interest on loans

raised from Banks for implementation of VRS

44.11 44.11 0.00% 44.11 0.00%

5. Waiver of guarantee fee (Non-cash

transaction) :

(i) HSCL – Waiver of guarantee fee in respect of

Govt. guarantee for cash credit (CC) limit,

bank guarantee (BG) and VRS loans

5.18 5.18 0.00% 5.18 0.00%

Less – Receipts netted [5(i) to (ii)]# -5.18 -5.18 0.00% -5.18 0.00%

Total : Non- Plan Expenditure(Net of

receipts)

67.74 65.92 -2.68% 67.95 0.31%

Total : Non- Plan Expenditure(Gross) 72.92 71.10 -2.50% 73.13 0.29%

3.2 As against Non-Plan provision of Rs. 72.92 crore in BE 2014-15, a provision of Rs. 73.13 crore has been kept in BE 2015-16. 4. PLAN EXPENDITURE 4.1 The Gross Budgetary Support for plan outlay in BE 2015-16 is Rs. 15.00 crore for the scheme for `Promotion of R&D in iron & steel sector` to cover the following: (i) Rs. 1.00 crore for the new component for Development of Technology for Cold Rolled Grain

Oriented (CRGO) Steel Sheets and other value added innovative steel products.

(ii) Rs. 14.00 crore for new projects under existing objectives of the R&D scheme.

4.2 The total Plan budgetary support of Rs. 20.00 crore in BE 2014-15 was reduced to Rs. 7.00 crore in RE 2014-15. A total Plan budgetary support of Rs. 15.00 crore has been provided in BE 2015-16 for the aforesaid R&D scheme. The break-up of Plan provision during 2014-15 & 2015-16 are given in the following table:

Page 79: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

71

Plan Expenditure

(Rs. in crore) No Name of

Scheme 2014-15

(BE) 2014-15

(RE) 2015-16

(BE) %age

increase/decrease over BE 2014-15

in BE 2015-16

1. Scheme of the Ministry: Promotion of R&D in iron & steel sector

1(i) On-going R&D projects 6.00 0.00 0.00 -100%

1(ii) Development of Technology for Cold Rolled

Grain Oriented (CRGO) Steel Sheets and

other value added innovative steel products

(new component)

12.00 0.50 1.00 -0.92%

1(iii) New project under the existing scheme 2.00 6.50 14.00 600%

Total 20.00 7.00 15.00 -25%

5. BRIEF ON R&D SCHEME 5.1 Based on the recommendation of the Working Group on Steel Industry for 11th Plan (2007-12), a new scheme i.e. ‘Scheme for Promotion of R&D in Iron and Steel Sector was included in the 11th Five Year Plan with an outlay of Rs. 118.00 crore. The objective of the scheme is to promote and accelerate R&D activities in development of innovative/path breaking technologies utilizing Indian iron ore fines and non-coking coal, improvement of quality of steel produced through induction furnace route and beneficiation of raw materials like iron ore, coal etc. and agglomeration (e.g. pelletization). The scheme was approved on 23.1.2009 for implementation from FY 2009-10 (w.e.f. 1.4.2009). 5.2 The scheme was continued in the 12th Five Year Plan with an allocation of Rs. 200.00 crore. In 12th Five Year Plan the scheme was amended to include the following additional objectives:-

(i) To pursue development of CRGO and other value added innovative steel products. (ii) To pursue any other projects of National importance for the iron and steel sector.

5.3. The year wise Plan fund allocation and the amount released under the scheme is given below:

(Rs. in crore)

Period B.E RE Actual

2010-11 35.00 29.00 27.05

2011-12 39.00 29.00 9.63

2012-13 46.00 26.49 24.89

2013-14 46.00 8.00 8.00

2014-15 20.00 7.00 1.73*

*Upto Dec’14

Page 80: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

72

6. ANNUAL PLAN OUTLAY FOR 2015-16 (BE)

6.1 Based on the discussion held in the Ministry of Finance and intimated to them within the overall context of the 12th Five Year Plan (2012-2017), the following Plan outlay for 2015-16 (BE) for Ministry of Steel are as under:

(Rs. in crore)

Actual 2013-14

BE 2014-15

RE 2014-15

BE 2015-16

a) Gross Budgetary Support EAP component of GBS

8.00 0.00

20.00 0.00

7.00 0.00

15.00 0.00

b) Internal & Extra Budgetary Resources (I&EBR)

14025.49 15373.22 13265.28 13070.47

Total 14033.49 15393.22 13272.28 13085.47

6.2 Plan outlay of Public Sector Undertakings (PSU’s):- (Rs. in crore)

No. Name of the PSU/ Organisation BE 2014-15 RE 2014-15 BE 2015-16

IEBR B.S. Outlay IEBR B.S. Outlay IEBR B.S. Outlay

A. Central Sector Scheme

1 SAIL 9000.00 0.00 9000.00 7800.00 0.00 7800.00 7500.00 0.00 7500.00

2 RINL# 1724.17 0.00 1724.17 1722.24 0.00 1722.24* 1801.00 0.00 1801.00**

3 HSCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 MECON Ltd. 5.00 0.00 5.00 5.00 0.00 5.00 5.00 0.00 5.00

5 MSTC Ltd. 45.00 0.00 45.00 5.00 0.00 5.00 10.00 0.00 10.00

6 FSNL$ 12.00 0.00 12.00 12.00 0.00 12.00 12.00 0.00 12.00

7 NMDC Ltd. 4345.00 0.00 4345.00 3555.00 0.00 3555.00 3588.00 0.00 3588.00

8 KIOCL Ltd. 50.00 0.00 50.00 13.00 0.00 13.00 27.00 0.00 27.00

9 MOIL Ltd. 192.05 0.00 192.05 153.04 0.00 153.04 127.47 0.00 127.47

10 Scheme for promotion of R&D in Iron & Steel sector

10(i) On-going R&D Projects 0.00 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00

10(ii) Development of Technology for Cold Rolled Grain Oriented (CRGO) Steel Sheets and other value added innovative steel products (new component)

0.00 12.00 12.00 0.00 0.50 0.50 0.00 1.00 1.00

10(iii) Development of innovative iron/steel making process/ technology (new project under the existing scheme)

0.00 2.00 2.00 0.00 6.50 6.50 0.00 14.00 14.00

TOTAL - A 15373.22 20.00 15393.22 13265.28 7.00 13272.28 13070.47 15.00 13085.47

B. Centrally Sponsored Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL - B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GRAND TOTAL – A + B 15373.22 20.00 15393.22 13265.28 7.00 13272.28 13070.47 15.00 13085.47

#OMDC Ltd. and BSLC Ltd. were constituents of erstwhile Bird Group of Companies, which have become subsidiary PSUs of RINL and their figures have been clubbed with RINL. (*RE 2014-15: RINL – 1535.00 + OMDC – 187.24 = 1722.24) & (**BE 2015-16: RINL – 1402.00 + OMDC – 399.00 = 1801.00).

$ FSNL is a subsidiary of MSTC Ltd

6.3 The total Plan outlay of the Ministry of Steel for BE 2015-16 is Rs. 13085.47crore which will be

financed through approved gross budgetary support of Rs. 15.00 crore and IEBR of Rs. 13070.47 crore. Out of the budgetary support of Rs. 15.00 crore for the R&D scheme, provision of Rs. 1.00 crore has been made for Development of Technology for Cold Rolled Grain Oriented (CRGO) Steel Sheets and other value added innovative steel products. Provision of Rs. 14.00 crore has been made for new projects.

Page 81: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

73

6.4 Brief description of the PSU-wise outlays provided in BE 2015-2016 for various schemes of the PSUs are given below:-

(i) Out of the total outlay of Rs.13070.47crore in Annual Plan 2015-16 (BE), an amount of Rs.

7500.00 crore has been provided for Steel Authority of India Limited (SAIL), for various

ongoing and new schemes/ projects and research work.

(ii) Outlay of Rs. 1801.00 crore has been provided for Rashtriya Ispat Nigam Ltd. Major portion

is earmarked for expansion of RINL’s production capacity. Balance outlay is for AMR

schemes. RINL’s outlay includes the outlays of two subsidiary PSUs viz., OMDC Ltd. and

BSLC Ltd., which were constituents of erstwhile Bird Group of Companies.

(iii) Outlay of Rs. 3588.00 crore, has been provided for NMDC Ltd. for 3 MTPA Steel Plant at

Nagarnar in Chhattisgarh. Balance outlay is for AMR/Township and R&D scheme.

(iv) Outlay of Rs. 27.00 crore has been provided for KIOCL Ltd., for AMR schemes and for

Development of Ananthapuramu Mine and setting up of pelletisation and beneficiation plant at

Ananthapuramu. Remaining outlay is for various ongoing scheme and R&D/feasibility studies.

(v) Outlay of Rs. 127.47 crore has been provided for MOIL Ltd. for investment in joint venture for

Ferro Manganese/ Silico Manganese Plant with RINL and SAIL and AMR schemes, township,

R&D/feasibility studies etc.

(vi) Outlay of Rs. 5.00 crore has been provided for MECON Ltd. for expansion, modification &

augmentation of office space/guest house at various locations.

(vii) Outlay of Rs. 10.00 crore, to be met out of I&EBR of the company has been provided for

MSTC Ltd. for setting up of Shredding Plant.

(viii) Outlay of Rs. 12.00 crore has been provided for Ferro Scrap Nigam Ltd., for AMR schemes.

Page 82: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

74

7. YEARWISE ANALYSIS OF GROSS BUDGETARY SUPPORT (GBS) OUTLAY IN 12TH FIVE YEAR PLAN

7.1 The Scheme-wise break up of GBS of Rs. 200.00 crore approved for 12th Plan (2012-17) are given in the table below:-

Scheme of the Ministry : Promotion of R&D in the Iron & Steel sector (Rs. in crore)

No. Name of Scheme 12th

Plan (2012-17)

2012-13 2013-14 2014-15 2015-16

BE RE BE RE BE RE

BE

1(i) Ongoing projects 32.87 44.00 26.49 12.00 8.00 6.00 0.00 0.00

1(ii) Development of Technology

for Cold Rolled Grain Oriented

(CRGO) Steel sheets and

other value added innovative

steel products (new

component)

150.00 0.00 0.00 32.00 0.00 12.00 0.50 1.00

1(iii) Development of innovative

Iron/Steel making

Process/Technology (new

projects under existing

scheme)

17.13 0.00 0.00 2.00 0.00 2.00 6.50 14.00

TOTAL 200.00 46.00* 26.49 46.00 8.00 20.00 7.00 15.00

* Rs. 2.00 crore was kept as token provision for two additional schemes which were dropped in RE stage due to less overall allocation by Planning Commission.

7.2 In BE 2014-15, there was an allocation of RS 20.00 crore which was reduced to Rs. 7.00 crore at RE stage. Total Plan Gross Budgetary support of Rs. 15.00 crore has been allocated in BE 2015-16.

Page 83: GOVERNMENT OF INDIA OUTCOME BUDGET · Research & Development in Iron & Steel Sector 1 2-5 5 II. OUTCOME BUDGET (2015-16) - MAJOR SCHEMES 6-19 1. Normal Saving/surrender of non utilized

Outcome Budget 2015-16/Chapter-V/Financial Review

75

8. PLAN OUTLAY AND ACTUAL EXPENDITURE DURING 2014-15

Plan outlay and actual expenditure during 2014-15 (upto December, 2014) For the financial year 2014-15, the Planning Commission approved an outlay of Rs. 15393.22 crore (Rs. 15373.22 crore as IEBR and Rs. 20.00 crore as GBS). The source-wise details of approved outlay for 2014-15 (BE) and actual expenditure upto December, 2014 are given in the table below:-

(Rs. In crore) No. Name of the PSUs 2014-15 (BE) 2014-15 (RE) 2014-15

Actual expenditure (upto Dec. 2014)

I&EBR B.S. Total I&EBR B.S. Total I&EBR B.S. Total

A Central Sector Scheme

1. SAIL 9000.00 0.00 9000.00 7800.00 0.00 7800.00 5133.00 0.00 5133.00

2. RINL^ 1724.17 0.00 1724.17 1722.24 0.00 1722.24 989.06 0.00 989.06

3. HSCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4. MECON Ltd. 5.00 0.00 5.00 5.00 0.00 5.00 3.74 0.00 3.74

5. MSTC Ltd. 45.00 0.00 45.00 5.00 0.00 5.00 0.00 0.00 0.00

6. FSNL 12.00 0.00 12.00 12.00 0.00 12.00 6.00 0.00 6.00

7. NMDC Ltd. 4345.00 0.00 4345.00 3555.00 0.00 3555.00 2224.80 0.00 2224.80

8. KIOCL Ltd. 50.00 0.00 50.00 13.00 0.00 13.00 7.94 0.00 7.94

9. MOIL Ltd. 192.05 0.00 192.05 153.04 0.00 153.04 73.45 0.00 73.45

B Centrally Sponsored Scheme

10 Scheme for promotion of R&D in Iron & Steel sector

10(i) on-going R&D projects 0.00 6.00 6.00 0.00 0.00 0.00 -- 0.00 0.00

10(ii) Development of Technology for Cold Rolled Grain Oriented (CRGO) Steel sheets and other value added innovative steel products (new component)

-- 12.00 12.00 0.00 0.50 0.50 -- 0.25 0.25

10(iii) Development of innovative Iron/Steel making Process/Technology (new projects under existing scheme)

-- 2.00 2.00 0.00 6.50 6.50 -- 1.48 1.48

Grand Total (A+B) 15373.22 20.00 15393.22 13265.28 7.00 13272.28 8437.99 1.73 8439.72

^OMDC Ltd. and BSLC Ltd. were constituents of erstwhile Bird Group of Companies, which have become subsidiary PSUs of RINL and their figures have been clubbed with RINL.

9. STATUS OF OUTSTANDING UTILISATION CERTIFICATES

As on 31.12.2014, no utilization certificate is pending.

*****


Recommended