GOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT PROGRAMME (2009-10) DETAILED PROJECT REPORT PROJECT NAME: IWMP - 3 - 2009-2010 KUSHAVATHI SUB WATERSHED TALUK:CHINTAMANI DISTRICT:CHICKKABALAPUR
Transcript
Page 1: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

GOVERNMENT OF KARNATAKA

WATERSHED DEVELOPMENT DEPARTMENT

INTEGRATED WATERSHED MANAGEMENT PROGRAMME

(2009-10)

DETAILED PROJECT REPORT

PROJECT NAME: IWMP - 3 - 2009-2010

KUSHAVATHI SUB WATERSHED

TALUK:CHINTAMANI DISTRICT:CHICKKABALAPUR

Page 2: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table of Content

Chapter Content Page

Executive Summary

1 Introduction and Background

2 General Description of Project Area

3 Baseline Survey

4 Institution Building and Project Management

5 Management/Action Plan

6 Capacity Building Plan

7 Phasing of Programme and Budgeting

8 Consolidation Exit Strategy

9 Expected Outcome

10 List of Maps

11 List of Abbreviations

Page 3: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

INDIA KARNATAKA

Page 4: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

CHICKABALLAPUR DIST CHINTAMANI TALUK

Page 5: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

CHINTAMANI IWMP – 3 SUB Watershed Map

Page 6: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Executive Summary

• Brief about area: The IWMP-3 project area of Chintamani taluk is 20 kms away Narth towards taluka head quarter. It comprises the geographical area of 5374.23 ha. Of 32 villages belonged to 5 Grama panchayats (GP) viz. Kencharlahalli, Eragmpalli, Raguttahalli. Kotagl & Yagamakote the project area. The SWS are named as Kushavathi SWS and they are divided into 10 micro w/s as fallows, 1.Kencharalahalli 2. Gollahalli 3.Yandahalli 4.Iragmpalli 5 Bramanarahalli 6.Seetharampura 7.Bairabanda 8.Naramakalahalli 9. Mindigal 10.Gundikere

The project area lies between longitude E 780 4’35” to E780 6’41” (W-E) and latitude N130 29’37” to N13033’50”(S-N) . The soils are shallow gravely sandy loams in uplands and deep red loamy soils in valley lands Land slope varies from 3 to 4%. Steep slopes are denuded for cultivation as such overland flow from heavy rains is lost along with fertile top soil. Ground nut occupies 75% of rain fed area. MFs and SFs constitute 77% and hold 63% of cropped area in the form of small holdings on steep slopes, landless (11%) families depend on seasonal farm labour for their livelihood. They find labour in their native till the end of kharif season and later move to nearby project areas other activities. Detailed planning for the selected area of 4050 ha. under IWMP-3 project with an outley of Rs 486 is worked out for taking up land treatments under soil and water conservation, horticulture, forestry and animal husbandry sectors.

• Institutional arrangements: All the 32 habituate villages are connected by main roads, and power supply .Educational institutions

up to higher secondary level, anganawadi facilities are available in all the villages. The primary health centre and veterinary services are at GP level and weekly markets at hobli level are accessible within a radius of 8-9 kms. The GPs are appraised of the implementation of IWMP- project in their area with peoples participation. Three Watershed Committees (WC) at GP level, 50 Self Help Groups (SHGs) and 30 User Groups (UGs) at village level have been formed to take-up various project activities.

• Salient Project activities: • Enhancing quality life among village community. • Ensuring institutional support for strengthening community organisation for data collection and preparation of action plans. • Inducing and strengthening both landless and poor landholders for income generation activities. • Reduction of soil and water erosion and fertility improvement for crop production. • Increasing household income of landholders through integrated farming and adoption of allied activities like, sheep/goat

poultry/rearing and vermi compost production etc. • Improving vegetative cover for fodder, fuel wood, and timber. • Improving ground water recharge.

Page 7: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

• Physical target and financial outlays: Area : private land 3980 ha. Community land and drainage course 70 ha. Total area 4050 ha. Total outlay Rs. 291.81 lakhs

Sl No Sectors Pri land

Com land

Drainage line sector

Total Phy Fin Phy Fin Phy Fin

1 Soil and water conservation No. - 15

162.85 cof 1000

0.59 Rmt – 15

0.25 163.69 Rmt. - 607237 Mtr - 58

2 Horticulture No. - 65961

57.60 -

- -

- 57.60 Rmt. - 117715 - -

3 Forestry No. - 158249

52.02 No. - 1180

2.83

No. - 9120

1.93 56.78 Ha - 11.95 Ha – 18.8 Ha – 5 Rmt. - 133213

4 Animal husbandry 10 gun - 604.7

13.74

- -

- - 13.74` 500m - 12.5 - -

Spm - 3820 - -

Total

286.21 3.42 2.18 291.81

Page 8: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Out of the total expenditure of treatments in private holdings, the SFs, MFs, SC and STs have to contribute 5% and others 10% either in cash or in kind.

Treatment area and details: Both arable (4050 ha.) and non arable (423.18 ha.) area will be treated with earthen field bunds of 0.45 section with WWs. Drainage line treatment includes MPTs, rubble checks and bolder checks. Horticultural species like mango, sapota, tamarind, Nerale grafts, cashew seedlings will be supplied to farmers to raise block plantation. Forestry seedlings - teak and silver oak will be provided for planting on bunds and field margins. Common lands and drainage lines will be covered by strip planting with species that supply fuel, fodder and timber. Another thrust program is capacity building of watershed community. PRA, EPA, baseline survey, awareness of WCs, SHGs , and UGs through trainings, meetings, exposure visits, pamphlets, folders and wall paintings will be conducted . The WS community will be made to learn about present problems , problem solving , formation of sanghas, importance of small savings , saving through sanghas, book keeping, utilizing saved money for I.G. activities as well as repairs and maintenance of developed resources in WS even after handing over and exit of WDT.

• Fact sheet about bench mark indicators and action plan a glance

• Reduction in seasonal migration from project area to other areas due to availability of labour in the project itself throughout the

season.

• Rise in ground water table.

• Increase in the crop yield through crop diversification and cropping intensity.

• Availability of good drinking water through out the year.

• Increase in the vegetative cover in the watershed area.

• Self employment of landless people in different income generating production systems and improvement in their livelihood.

• Increased availability of fodder, fuel wood and other raw materials to the rural community.

• Change of mono cropping to crop diversification as maize is the mono crop in the area.

• Increased crop yield due to conservation and adoption of dry land practices.

Page 9: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Executive Summary cum Checklist

Sl. No.

Item Details

1 Scheme IWMP-3

2 District CHICKABALLAPUR

3 Taluk CHINTAMANI

4 Project Name Kushavathi Sub Watershed

5 Sub-Watershed and Project code Kushavathi - 4C3D6N

6 Project Period 2009-10 TO 2013-14

9 Project location 18 Km away from Chintamani towards North

10 Area details

4473.29 Ha

Type of land

Total geographical area (Ha.)

Treatable area

Ha. % to geographic area

a. Private lands 3950.26 3900.00 72.57

b. Community lands 195.08 100.00 1.86

c. Reserve forest lands 0.00 0.00 -

d. Revenue lands 0.00 0.00 -

e. Others 327.95 50.00 0.93

T O T A L 4473.29 4050.00 75.36

Page 10: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Sl. No.

Item Details

7 Spread of the project area

a. Whether present sub-watersheds is in contiguous to the previous phase of the scheme?

Newly started first Phase IWMP-3 project area

Named as IWMP-3 (Chintamani Watershed project)

b. Does the Project follow the priority fixed in the perspective plan for watershed development in the district?

Yes

8 Site specific objectives of the project if any (other than general objectives)

1. To Increase the income level of BPL.

2. To Increase the Bio mass Production

3. To improve underground water table

4. To Increase the productivity of dry land crop

9 Name of the project implementing agency TWDO Chintamani

10 Name of the agency associated with the preparation/ implementation of the plan

WDD /WDT/NGO

11 Name of the persons and designations who are associated with the net/gross planning exercise of the project

1. Mr. B.C Devegowda Agriculture Officer

2. Mr. Srinivas Reddy Assistant Agriculture Officer

3. Mr. Ramaiah Agriculture assistant

4. Mr. Kempanna Assistant Horticulture officer

5. Mrs. Saritha RFO

Page 11: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Sl. No.

Item Details

12 Whether PRA was conducted at the time of preparing the net/gross plan and if yes, details

Yes / No Kencharlahalli, Raguttahalli Iragmpalli

The WC members and the village community assembled on the scheduled date and time to conduct PRA in the

villages of the Watershed area. PRA was conducted in all the villages of the 1 sub watersheds. The members of the

WCs, SHGs and UGs assembled a as per venue. An experienced person was asked to draw map of the village and in it

to mark the existing features like village site, road, cart track, foot path, water supply site, temple, school, nalas,

tanks, bore wells, forest area through their own discussion using coloured rangoli powder and small pebbles. The

maps so drawn on ground were compared with topo sheet maps to create awareness about community assets. The

existing natural resources - soil, water, forest, agricultural land and their degradation was explained .Crops grown,

yield level, family income, family size, other livelihood activities, educational status, health problems etc and their

connection with environment were discussed. The conservation measures proposed by them were marked on the

watershed plan drawn on the ground. Also they were asked to mark the sites of establishing plantations of

horticulture and forestry. The nala courses were marked with structure and vegetative measures.

A Venn diagram was prepared on the enlarged village map to show the facilities like school, hospital, anganwadi,

dairy, society, bank, market etc. The present main problems of the village community as a whole were discussed

.The issues raised were power supply, drinking water, approach road community hall ,repair of tank/temple /bore

well ,constructing gokatte /CD,PTand establishment of nursery.

The Watershed concept and its importance were then introduced and discussed. The participants were shown of the Watershed boundary, drainage courses, private lands and community lands, included in the Watershed. The required land treatments and their cost were explained. The government share available and the beneficiary contribution (either cash or kind) were made known to them. The beneficiary share is SF, MF, SC & ST and others. The collection of data for net plan from each family both landless and landholders, formation of SHGs, UGs and Watershed committee at GP level for all watershed development activities were also explained.

Page 12: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Sl. No.

Item Details

13 Sector wise budget allocation (Rs. in lakhs)

Activities 1 Year 2 Year 3 Year 4 Year 5th Year Total %

a. Soil and water conservation - 62.984 47.238 47.238 - 157.46

60 b. Agro Forestry - 23.328 17.496 17.496 - 58.32

c. Dry land Horticulture - 23.328 17.496 17.496 - 58.32

d. Live-stock Management - 7.036 5.277 5.277 - 17.59

G. Fisheries - - - - - - -

f. Production and micro enterprise - 13.60 10.20 10.22 - 34.02 7

e. Livelihood - 15.55 11.66 11.67 - 38.88 8

T O T A L - 145.82 109.37 109.37 - 364.50 75

Note: Where ever possible complete project within 4 years

14 Names of GPs associated with the project 1. Kencharlahalli 5. Kotagal

2. llyIragampalli 6. Bomishettihalli

3. Raguttahalli 7. Mittahalli

4. Yagavakote 8. M.Gollahalli

15 Whether the Grama Panchayats concerned have given approval for the activities included in action plan?

Yes

Kencharlahalli, Raguttahalli & Iragampalli

16 Who is responsible for community mobilization and training activities?

WDD / NGO

Page 13: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Sl. No.

Item Details

17 Is the treatment map of the sub-watershed appended to project document?

Yes

18 How is the social justice being addressed in this project? Enter community is being benefited

a. All SFs and MFs are covered by the project Yes

b. All SC and STs covered by the project Yes

c. Gender Equity is ensured Ensured

d. Project coverage by location Total area Treatable area

i. Upper reaches 1656.47 1456.47 35.96%

ii. Middle reaches 1897.19 1797.19 44.38%

iii. Lower reaches 919.63 796.34 19.66%

Total 4473.29 4050 100%

19 Method of implementation Entire sub watershed simultaneously

20 Are any specific items and locations identified for the purpose of impact studies?

Yes

Date:

Signature of the

District Watershed Development Officer,

Watershed Development Department,

………………… District.

Page 14: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

DETAILS OF BUDGET ALLOCATION FOR VARIOUS COMPONENTS

Sl No, Allocated Allocated Budget (Rs in Lakha) Percentage

I Management Cost

1 Administration cost 48.6 10%

2 Monitoring cost 4.86 1%

3 Evaluation cost 4.86 1%

Sub Total 58.32 12%

II Preparatory Phase

1 Entry point activities 19.44 4%

2 Capacity Building 24.3 5%

3 Preparation of DPR 4.86 1%

Sub Total 48.6 10%

III Watershed Work

1 Agriculture / Soil & water conservation 157.46 32.399%

2 Forestry 58.32 12%

3 Horticulture 58.32 12%

4 Animal Husbandry Activities 17.50 3.601%

Sub Total 291.60 60%

IV Livelihood activities 38.88 8%

V Production system and micro enterprises 34.02 7%

VI Consolidation Phase 14.58 3%

Sub Total 87.48 18%

Grand Total 486 100%

Page 15: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table-1: PROFILE OF THE PROJECT

NAME OF THE PROJECT With Code & W/S CODE NO:

(i) Name of the State KARNATAKA

(ii) Name of the District CHICKBALLAPUR

(iii) Name of the blocks Chintamani

(iv) Financial year of sanction 2009-2010

(v) Name of the Project with code

IWMP-3 Kushavathi Sub Watershed 4C3D6N

(v) No of micro watersheds covered in the project

Sl No Name of GP Micro watershed code Area Covered(ha)

10 Micro watershed

1 Kotagal Gollahalli 4C3D6N 1c 571.09

2 Kencharalahalli Kencharlahalli 4C3D6N 1d 538.69

3 Yandahally 4C3D6N 2c 567.84

4 IragampallI Naramakalahalli 4C3D6N 2a 468.39

5 Mindigl 4C3D6N 2b 266.79

6 Gundikere 4C3D6N 2d 384.39

7 Bairabanda 4C3D6N 2e 336.52

8 Iragmpalli 4C3D6N 2f 416.84

9 Raguttahalli Bramanarahalli 4C3D6N 2g 350.08

10 Seetarampura 4C3D6N 2h 572.55

Total 4473.29

Page 16: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

(vi) Project Duration From: 2009-10 2013-14

(vii) Names of Grama Panchyats included 1. Kencharlahalli 5.Kotagal

2. Iragampalli 6.Bhumshettyhalli

3.Raguttahalli 7.Mittahalli

4.Yagavakote 8.M.Gollahalli

(vii) Names & Census Code of Villages Covered

1. Kencharalahalli – 01816400

2. Gollahalli – 01831200

3. Bodanamari – 01831300

4. Kotagalu – 01831400

5. Upparlahalli – 01823900

6. Gudisalahalli – 01823800

7. Guttur – 01820700

8. Yandahalli – 01820600

9. Gowlahalli – 01820500

10. Mindigal – 01820800

11. Bathalahalli – 01822100

12. Vegalahalli – 01820400

13. Marabahalli – 1814500

14. Etigaddagollahalli – 01819100

15. Bramanarahalli – 01820300

16. Nallaguttalahalli – 01821100

17. Raguttahalli – 01820200

18. Seetarampura – 01821000

19. Bhupanahalli – 01820900

20. Iragampalli – 01821300

21. Guntapalli – 01821400

22. Chinnakurpalli – 01820200

23. Chandurapalli – 01821500

24. Junjanahalli – 01822200

25. Puligundalahalli – 01823500

26. Naramakalahalli – 01823400

27. Myakapothalahalli – 01822300

28. Kondavenkapalli – 01823300

Page 17: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

(viii) Four major reasons for Selection of Sub Watershed 1. To Control Erosion of soil & Water conservation

2. Increase the area under vegetation

3. To Increase the productivity and production

4. to reduce the poverty

(ix) Name Address &

Phone No.of the PIA (s)

Taluk Watershed Development Officer Chintamani

Phone No. 9901364725

(x) Date of approval of Watershed Development Plan by DPC

(xi) Area of the Project(ha) 4473.29

(xii) Area proposed to be treated (ha) 4050

(xiii) Project Cost (Rs. lakhs) 486.00

Page 18: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table -2: Details of the types of areas covered under the project (Area in ha)

1 2 3 4 5

Sl.No.

Area of the

project

Code Nos of MWS

Land Use type of proposed Area Ownership Pattern of the proposed area

Cultivated rain fed

area

Uncultivated waste land

Pvt. agri. land

Forest land

Community land

Others Total

Temporary fallow

Permanent fallow

1 4473.29 4C3D6N1c

4C3D6N1d

4C3D6N2a

4C3D6N2b

4C3D6N2c

4C3D6N2d

4C3D6N2e

4C3D6N2f

4C3D6N2g

4C3D6N2h

3900 - - 3900 - 100 50 4050

Page 19: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

OwnershIp Pattern of the Proposed

Area IWMP - 3 CHINTAMANI

97%

2%

1%1%

Pvt Agri Land

CommunityLand

Others

Page 20: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table -3: Details of the types of areas covered under the project (Area in ha)

1 2 3 4 5

S.

No.

Area of the

project

Name of micro

watershed and Code No. (as per

DoLR’s unique codification)

No. of beneficiaries covered Identified DPAP/ DDP Blocks

covered

MF SF LF Landless Total

DPAP DDP

No. of blocks

Area No. of blocks

Area

1 4473.29

4C3D6N1c

4C3D6N1d

4C3D6N2a

4C3D6N2b

4C3D6N2c

4C3D6N2d

4C3D6N2e

4C3D6N2f

4C3D6N2g

4C3D6N2h

106

64

80

55

80

46

91

60

76

108

150

106

150

77

150

81

92

118

108

127

34

87

93

60

93

22

45

69

37

40

52

50

33

51

33

29

18

29

13

93

362

327

290

331

356

178

246

253

234

368

- - - -

Total 544 1125 544 481 2905

Page 21: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table:4: Details of areas of micro-watersheds covered under the watersheds programme (ha) of DoLR in the

State (A) pre-IWMP, (B)under IWMP (C ) under other Ministries and (D) Total area (ha) covered under the

watershed programme of DoLR: State-wise :

1 2 3 4

Sl. No.

Total

micro

watersheds

in the

District

Micro-watersheds# covered so far Net

watersheds

to be

covered

Dept. of Land Resources Other

Ministries/ Depts.

Total

watersheds

covered

Pre-IWMP projects

IWMP projects

Any other watershed

project

No. Area (ha.)

No. Area (ha.)

No.

Area (ha.)

No. Area (ha.)

No. Area (ha.)

No. Area (ha.)

1 195 86997.00 64 31747 10 5123 26 13221 65 28310.61 60 20927.25

Total 195 86997.00 64 31747 10 5123 26 13221 65 28310.61 60 20927.25

Page 22: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 5: Demographic information: Total population, sex and caste distribution:

1 2 3 4 5

Sl. No.

Name of the

project with code

Name of Gramapan

chayat

Name of the Village/hamlet

Total Population

SC ST Others TOTAL

M F T M F T M F T M F T

1 Kushavathi Sub

Watershed 4C3D6N

Kotagal Kotagal 118 136 254 90 95 185 397 395 792 605 626 1231

Bodanamari 115 109 224 36 36 72 95 83 178 246 228 474

Kencharlahalli Kencharalhalli 194 189 383 8 6 14 469 461 930 671 656 1327

Gollahalli 67 64 131 19 21 40 138 122 260 224 207 431

Guttur 53 34 87 122 106 228 103 104 207 278 244 522

Gowllahalli 119 106 225 - - - 89 83 172 208 189 397

Yandahalli 46 53 99 - - - 105 102 207 151 155 306

Raguttahalli Etigoddagollahalli 63 54 117 46 43 89 93 87 180 202 184 386

Bramanarahalli 118 109 227 - - - 176 163 339 294 272 566

Nallagutalahalli 16 14 30 33 31 64 83 75 158 132 120 252

Vegalahalli 97 93 190 - - - - - - 97 93 190

Iragampalli Iragampalli 372 358 730 123 119 242 598 579 1177 1093 1056 2149

Seetharampura 269 254 523 - - - 32 33 65 301 287 588

Guntipalli 168 161 329 18 15 33 172 163 335 358 339 697

Page 23: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Ethamakalahalli 15 17 32 7 5 12 4 3 7 26 25 51

Junjanahalli 94 106 200 69 72 141 230 219 449 393 397 790

Myakapotahalahalli 46 44 90 18 19 37 107 99 206 171 162 333

Yagavakote Puligondanahalli 29 27 56 96 89 185 43 44 87 168 160 328

Naramakalahalli 96 87 183 10 8 18 68 60 128 174 155 329

Bhumishettihalli Upparlahalli 26 21 47 13 15 28 20 18 38 59 54 113

Gudisalahallh 18 19 37 10 10 20 0 0 0 28 29 57

B. Bathalahalli 44 35 79 14 15 29 53 48 101 111 101 212

Total for SWS 2183 2090 4273 732 705 1437 3075 2941 6016 5990 5739 11726

Data source: Baseline survey.

M=Male; F=Female; T=Total

Population density and literacy levels among the male and female and among Different social classes should also be mentioned.

Page 24: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

21832090

4273

732 705

1437

30752941

6016 59905736

11726

0

2000

4000

6000

8000

10000

12000

SC Population ST Population Others Population Total Population

Total Population Details for Kushavathi Sub Watershed Chintamani

Male

Female

Total

Page 25: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 6: Details of flood and drought in the project areas of the Project area during last 5 years

1 3 4 5 6 7

Sl. No. Name of

project

Particulars Villages Periodicity Not

affected Annual Any other

(please specify)

1 IWMP-3 Kuhavathi Sub W/S Flood No. of villages All villages - Not affected

Name(s) of villages All villages - Not affected

Drought No. of villages All villages - Once in a five years

Name(s) of villages All villages - Once in a five years

Data source:

From Column nos. 6 & 7, total no. of villages,

Page 26: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 7: Details of soil erosion in the project areas of the Block*:

1 2 3 4 5 6 7

Sl. No.

Name of

project Cause

Type of

erosion

Area affected

(ha)

Run off

(mm/ year)

Average soil loss

(Tonnes/ ha/ year)

1 IWMP-3 Kuhavathi Sub W/S

Water erosion

a Sheet 790 586 10 –Aug

b Rill 300 - -

c Gully 100 - -

Sub-Total 1190

Wind erosion - NA NA

Total for project 1190

Data source:

Page 27: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 8: Flora and fauna: Details on domesticated animals:

1 2 3 4 5

Sl. No.

SWS Code No./ Name

of the Project

Name of the

village

Types

Total Draught animals Cows Buffaloes Sheep Goat Pigs

Donkeys

Others

1 4C3D6N 1c Bodanamari 34 97 10 358 65 - - 250 814

4C3D6N 1c Upparalahalli 8 28 3 168 72 - - 39 318

4C3D6N 1c Kotagl 18 350 150 850 280 40 - 436 2124

4C3D6N 1c Gudisalahalli 6 129 32 210 15 5 - 156 553

4C3D6N 1c Gollahalli 30 96 20 280 4 - - 140 570

4C3D6N 1d Kencharlahalli 26 146 29 423 54 25 - 368 1071

4C3D6N 1d Guttur 28 111 21 509 15 - - 162 846

4C3D6N 2a Naramakalahalli 6 94 30 420 63 13 - 315 941

4C3D6N 2a Junjanahalli 24 148 35 590 98 26 - 420 1341

4C3D6N 2b Mindigal 34 138 19 615 92 16 - 398 1312

4C3D6N 2b B.Bathalahalli 8 96 16 256 39 19 - 210 644

4C3D6N 2c Yanadahalli 16 82 7 115 36 10 - 112 378

4C3D6N 2c Gowlahalli 20 118 5 233 19 12 - 135 542

4C3D6N 2c Vegalahalli 16 46 12 126 23 - - 168 391

4C3D6N 2d Makapothalahalli 6 94 30 420 63 13 - 315 941

Page 28: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

4C3D6N 2d Puligondanahalli 14 90 13 489 187 16 - 375 1184

4C3D6N 2e Guntipalli 28 134 24 298 63 5 - 315 867

4C3D6N 2e Ethamakalahalli 2 14 2 62 2 - - 23 105

4C3D6N 2f Iragampalli 81 294 75 712 93 45 - 510 1810

4C3D6N 2g Bramanarahalli 10 194 53 440 48 26 - 320 1091

4C3D6N 2g Etigaddagollahalli 22 115 26 185 36 6 - 212 602

4C3D6N 2g Nallaguttalahalli 14 60 9 112 - - - 56 251

4C3D6N 2h Seetharampura 34 125 28 283 52 10 - 215 747

4C3D6N 2h Bhupanahalli - 15 1 62 - - - 26 104

Total for SWS 485 2814 650 8216 1419 287 5676 19547

Data source:Distirct Statistical Office

Page 29: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 9: Details of infrastructure in the project areas in the sub watershed of Block Chintamani Dist Chickballapur

1 2 3 4

Sl.

No.

Name

of

project with SWS code

Parameters Status

1 IWMP – 3 Kushavathi Sub Watershed 4C3D6N

(i)

No. of villages connected to the main road

by an all-weather road

4

(ii) No. of villages provided

with electricity

32

(iii) No. of households without access

to drinking water

32

(iv) No. of educational institutions :

Primary(P)/ Secondary(S)/

Higher Secondary(HS)

/ vocational institution(VI)

(P)

32

(S)

4

(HS)

3

(VI)

-

(v) No. of villages with access to

Primary Health Centre

2

(vi) No. of villages with access to

Veterinary Dispensary

2

(vii) No. of villages with access to

Post Office

6

(viii) No. of villages with access to

Banks

3

Page 30: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Data source:

(ix) No. of villages with access to

Markets/ mandis

2

(x) No. of villages with access to

Agro-industries

-

(xi) Total quantity of surplus milk 6400 Ltr

(xii) No. of milk collection centres

(e.g. Union(U)/

Society(S)/

Private agency(PA)/

others (O))

(U)

23

(S)

6

(PA)

4

(O)

3

(xiii) No. of villages with access to

Anganwadi Centre

32

(xiv) Any other facilities with

no. of villages (please specify)

-

Page 31: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 10: Details of land holding pattern in the project areas in the sub watershed of Block Chintamani Dist Chickballapur

Data source:

1 2 3 4 5 6

S. No.

Name of

the project

Type of

Stakeholder

No. of househol

ds

No. of BPL

households

Land holding (ha)

Irrigated Rainfed Total

1

Kushavathi 4C3D6N

I. Large farmer

544 125 52 1419.61 1471.61

II. Small farmer 1125 1125 38 1874.26 1874.26

III. Marginal farmer

755 755 5.87 644.13 650

IV. Landless person

481 481 NA NA Na

Sub-Total 2905 2486 95.87 3900 3995.87

Page 32: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Land Holding

Big Farmer Small Farmer Marginal

FarmerLand Less

Family

0

200

400

600

800

1000

1200

Landholding Pattern in IWMP-3 Chintamani

Big Farmer

Small Farmer

Marginal Farmer

Land Less Family

Page 33: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 11: Details of Common Property Resources of the project areas in the sub watershed of Block Chintamani Dist Chickballapur

1 2 3 4 5

Sl. No.

Name of

project

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. per sons

Govt. (specify deptt.)

PRI

Any other (Pl.

Specify)

Pvt. persons

Govt. (specify deptt.)

PRI

Any other (Pl.

Specify)

IWMP-3 I. Wasteland/ degraded land

- - - - - - - -

II. Pastures 131.5 - - - 131.5 - - -

III. Orchards - 77.00 - - 77.00 - - -

IV. Village Woodlot

- - - - - - - -

V. Forest - - - - - - - -

VI. Village a)Ponds b)Tanks

- - - - - - - -

VII. Community Buildings

155.72 - - - - - - -

VIII. Weekly Markets

- - - - - - - -

IX. Permanent markets

- - - - - - - -

X. Temples/ Places of worship

- - - - - - - -

XI Others (Pl. specify)

- - - - - - - -

Total 287.22 77.00 208.05

Page 34: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 12: Details of the project implementing agency(s)

1 2

Sl.No. Particulars of PIA

1 Date of Selection of PIA 30/10/2011

2 Type of Organization # Line Department

3 Name of Organization WDD

4 Designation and Address AO TWDO Chintamani

5 Telephone 9901364725

6 Fax

7 E-mail

# Only letter assigned to each type, as given below, needs to be typed

A- Line dept., B- Autonomous organization,C- Govt.Institute, D- Research bodies, E- Zilla parishad, F- Intermediate Panchayat,G- Voluntary Organizations, H- Any Other

Page 35: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 13: Details Of Watershed Development Teams (WDTs) In The Project Area

1 2 3 4 5 6 7 8 9

Sl No.

Name of

PIA

Names of WDT

Members

M/F Age Qualification /

Experience

Description of professional

training

Role function

# #

Date of appointment

of WDT Member

1 TWDO B.C Devegowda AO M 54 B.Sc. Agri A to Z Software soil conservation training

B.C.D 2009-10

2 K.Srinivasareddy AAO M 50 PUC A to Z Software soil conservation training

A, B,C,D,E, F,G,H

2009-10

3 Ramaiah AAO M 45 B.Sc. A to Z Software soil conservation training

A, B,C,E, F,G,H

2009-10

3 P.M.Saritha RFO F 43 B.Sc. Forestry training A, B,C,D,E, F,G,H

2009-10

4 P.Kempanna AHO M 58 SSLC Horticulture training B,E,F,H 2009-10

5 Raghunath Sing M 52 SSLC Forestry Training A,B,H 2009-10

# # In column 8, only the letter assigned, as below, needs to be typed, except for “J” where the type may be specifically mentioned

A. PNP and PRA B. Planning

C. Maintenance of Accounts D. Signing of the cheques and making payments

E. Supervision of Construction activities F. Cost estimation

G. Verification & measurement H. Record of labour employed

I. Social audit J. Any other (please specify)

Page 36: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 14: Details of watershed committees (WC)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl no

Name

of

WC

Designation M/F SC ST SF MF LF Land

less

UG SHG GP Any other

Education

qualification

Function

(s)assigned # #

1

Sri V

en

kate

shw

ar

Ja

lana

ya

Sa

miti

Venkataramanappa President M Sc - SF - - - - - GP - 3rd

Std D

Srinivasa reddy treasurer M - - - - - - - - - Dept. SSLC A to H

K.N.Krishanareddy GP Member M - - - - LF - - - GP - BA A

G. Baskar G.P Member M - - SF - - - - - GP - BA A

G.V.Ashwathnaryana reddy UG Member M - - - - LF - UG - - - BA A

Jairamareddy UG Member M - - SF - - - UG - - - PUC A

Munishamigowda UG Member M - - SF - - - UG - - - 5TH

Std A

Srinath UG Member M - - - MF - - UG - - - 3rd

Std A

Srinivas UG Member M - - SF - - - UG - - - PUC A

Chinappa reddy UG Member M - - SF - - - UG - - - 7th Std A

Narasimhareddy UG Member M - - SF - - - UG - - - PUC A

Baiyamma SHG Member F - - - MF - - SHG - - 5th Std A

Ramadevi SHG Member F - ST - MF - - - SHG - - 8th Std A

Eshawarmma SHG Member F - ST - MF - - - SHG - - 3RD

Std A

Varalaxmi SHG Member F SC - - - - - - SHG - - SSLC A

Page 37: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 14: Details of watershed committees (WC)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl no

Name

of

WC

Designation M/F SC ST SF MF LF Land

less

UG SHG GP Any other

Education

qualification

Function

(s)assigned # #

1

Sri M

aru

thi Ja

lan

aya S

am

iti

Gopalkrishan President M - - - - - LL - - GP - SSLC D

Sarith treasurer F - - - - - - - - - Dept. Bsc Ho A to H

T.V. Srinivasreddy GP Member M - - - - LF - - - GP - PUC A

Rajanna G.P Member M - - SF - - - - - GP - PUC A

Venkatesh UG Member M SC - - MF - - UG - - - SSLC A

Ramanareddy UG Member M - - SF - - - UG - - - SSLC A

Ananda Reddy UG Member M - - - MF - - UG - - - 5th A

Raghunath UG Member M - - SF - - - UG - - - PUC A

Sriramareddy UG Member M - - SF - - - UG - - - 8th Std A

Yarappa UG Member M SC - - MF - - UG - - - - A

Ananda UG Member M - - - - LF - UG - - - BA A

Sudhakar UG Member M - - - MF - - UG - - - 8th Std A

Sharadamma SHG Member F - ST - MF - - - - SHG - 5th Std A

Laxmidevamma SHG Member F - ST - MF - - - - SHG - 8th STD A

Laxmi SHG Member F SC - - - - LL - - SHG - SSLC A

Page 38: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 14: Details of watershed committees (WC)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sl no

Name of WC

Designation M/F SC ST SF MF LF Land

less

UG SHG GP Any other

Education qualificatio

n

Function(s)assigned #

1

Sri

Chow

desh

wari

Jala

na

ya S

am

iti

Papamma President F SC - - - - LL - - GP - 3rd Std D

Srinivivas Reddy treasurer M - - - - - - - - - Dept. PUC A to H

Venkateshreddy GP Member M - - - - - LL - - GP - SSLC A

Ramakrishanppa G.P Member M SC - SF - - - - - GP - 4th Std A

Narasimhamurthy UG Member M - - SF - - - UG - - - SSLC A

Akkalappa UG Member M - ST SF - - - UG - - - SSLC A

Laxmanareddy UG Member M - - - MF LF - UG - - - 5th A

Manjunath UG Member M - - SF - - - UG - - - PUC A

Narayanaswamy UG Member M - - SF - - - UG - - - 5th Std A

Ramakrishanappa UG Member M - - SF - - - UG - - - 9th Std A

Krishanareddy UG Member M - - SF - - - UG - - - SSLC A

B.V.Radha SHG Member F - - - MF - - - SHG - - 8th Std A

Manjula SHG Member F - ST - MF - - - SHG - - 5th Std A

N.S.Manjula SHG Member F - ST - MF - - - SHG - - 8th STD A

Reddamma SHGMember F SC - - - - LL - SHG - - SSLC A

Page 39: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

WATER BUDGETING

1. Watershed information: a. Watershed area : 4473.29 b. Mean annual rainfall : 700.00 c. Run off inducing rainfall : 310.00 d. Runoff inducing rainy days : - e. Already constructed structures : CD – 22, Gokatte – 10 MI Tank - 3 f.

2. Run off

Q (Cu.Me) = Catchment Area (ha) X 10000 Run of Rain (mm) X10,000

4 X10000

Note: 25% of runoff is considered.

Table 15 A: Amount of water stored in different structures already existing

1 2 3 4

Sl. No. Details No. Storoage capacity in tmc

1 Check Dams 22 39.6

2 Nala bunds - -

3 Gokatte 10 1.2

4 MI Tank 3 430

Total 470.8

3. The quantity of water stored in proposed structures: a. Farm bunding – Volume of water stored = 104 b. Farm pond = c. RRS & CDs = 22 d.

Page 40: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 15 B: New structures proposed: 1 2 3 4

Sl. No. Details No. Storoage capacity in tmc

1 Field bunds 607237 RMT

1485.8

2 Farm ponds 1 83

3 CDs - -

4 Nala bunds - -

5 MI Tank - -

Total 607238 1568.8

Note: Structures should be planned to harvest 60% of the runoff.

Abstract:

A. Total quantity of water flow from watershed: B. Total quantity of water stored in existing structures C. Quantity of water available for additional storage at 60% of the total runoff: D. Remaining water flow out of watershed

Footnote: Procedure suggested in the technical manual could be followed.

Page 41: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

CHAPTER - 1

INTRODUCTION AND BACKGROUND

Page 42: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

• Project Background: The IWMP-3 project area of Chintamani Tq comprising 5 Grampanchayats and 32 villages and having a geographical area of 4473.29 ha. Which are further divided into 10 micro w/s as fallows,

• Kencharalahalli 2. Gollahalli 3.Yandahalli 4.Iragmpalli 5 Bramanarahalli 6.Seetharampura 7.Bairabanda

8.Naramakalahalli 9. Mindigal 10.Gundikereand one main Kushavathi Nala after traversing in the watershed leading to

Kandakur tank of Andrapradesh

• The project area is bound by a range of hillocks on eastern side and a low ridge in the north. The dividing line passing

through all these peak points on the hill range and the north ridge will be the watershed boundary.

• The livelihood of people depends on dry land agriculture. The rainfall of the area is 705.mm annually but most of it

nearly 50%-60% runoff escapes as muddy water into the Kushavathi Nala. Fertile soil loss, ground water depletion,

poor crop yield, deforestation, and biotic pressure on resources necessitate w/s programmes in the area.

Project Location: The project area lies between longitude E780 4’ 35” to 780 6’41” (W-E) and latitude N130 29’37” to

N130 33’ 50” ( S-N) the Kushavathi sub watersheds are contiguous and are about 20 kms towards north of Chintamani

to Chelur road passes in the middle of the project area.

All the habitat villages are connected by pucca road and by some kachcha road and tracts in the interior area.

Infrastructural facilities like rural electrification, educational up to high school level and anganwadi kendras are

provided in all the villages. Primary health centre and veterinary hospital at Kencharlahally, Raguttahally and

Iragampalli cater the needs of rural folk around 8-9 Kms radius. Weekly market at Iragmpalli & Kencharalahally meets

the business needs.

Page 43: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

No of micro watersheds with code total area and treatable area.

Sl no Micro w/s name Micro w/ms code Total area(ha) Treatable area(ha)

1. Gollahalli 4C3D6N 1c 571.09 530.44

2. Kencharlahalli 4C3D6N 1d 538.69 522.50

3. Yandahally 4C3D6N 2c 567.84 444.33

4. Naramakalahalli 4C3D6N 2a 468.39 435.20

5. Mindigl 4C3D6N 2b 266.79 244.33

6. Gundikere 4C3D6N 2d 384.39 350.00

7. Bairabanda 4C3D6N 2e 336.52 310.52

8. Iragmpalli 4C3D6N 2f 416.84 392.10

9. Bramanarahalli 4C3D6N 2g 350.08 310.08

10. Seetarampura 4C3D6N 2h 572.55 510.50

Total 4473.18 4050

Page 44: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Total area available for treatment is 4050 ha. Which includes private land of 3900 ha and common land 150 ha.

• Livelihood : Small and marginal land holders depend on rain fed crops , the landless people depend on labour available in farming

activities while some are engaged in sheep/goat/cattle raring .

• Need and Scope for Watershed Development: The foothills are deforested and cultivation of crops is progressing on steep slopes. Rills

and gullies are extending in all cultivated dry lands due to faulty cultivation and land not being used according to its capability. The

annual runoff producing rain of 290.32mm results in flash floods and most of the surface runoff carry fertile top soil into the river. The

time of concentration being (about 1.05hrs) very low, opportunity for infiltration is very less. Low organic matter content (<2%) further

aggravates moisture holding in the soil and most of it drains to low lands. The valley lands that are flat deposits of fine soils are also

suffering from water logging. The main cause for all these problems is steep sloppiness which needs to be broken into shorter ones for

conservation. Even the 10% irrigated area suffers from shortage of water in bore wells. Siltation of water bodies , fodder, food, fuel

shortage quality drinking water, livelihood of landless people are some more problems for which there is lot of scope for integrated

watershed development through involving w/s community to alleviate the problems.

• Weight age for selection of Watershed (as per DoLR’s instructions already issued)

1 11 111 1V V V1 V11 V111 1X X X1 X11 X111 Total

7.5 10 0 10 15 10 15 0 10 5 10 10 _ 102.5

• Watershed Information: The project area is composed of hillocks and valleys. Kushavathi SWS is in U Shep Land is sloping towards N-W.

The forest area is very meager and no valuable forest trees are found. There are one medium tank for irrigation. The soils are gravelly red

silt loams. Total area under rain fed crops is 3900 ha. And irrigated area is 95.87ha. Total human population is 11,726 with a population

density of 200/sqkm and animal population is 4391 with a density of 0.72/ha (birds are not included) which indicates heavy loss of animal

power.

• Status of previous watershed programmes & other development projects in the area: Very old 3 medium tanks , 4 minor tanks , 10

gokattas and a 8 CDs built by other departments in the area are completely silted up and are not in working state, and they need desilting.

Note: Ensure that information for MIS table supplied by DoLR is reflected in relevant • Project Background, Project Location number of micro watershed with code, Total area and treatable area, livelihood

Note: Ensure that information for MIS table supplied by DoLR is reflected in relevant parts of DPR

Page 45: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

CHAPTER - 2

GENERAL DESCRIPTION OF PROJECT AREA

Page 46: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Toposheet Map of IWMP – 3 Chintamani Taluk Kushavathi Sub Watershed

Page 47: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

• Location: longitude, latitude, state, District, Taluk, Block, Villages, Approach road, land mark (watershed location map), etc.

Location: Longitude E780 4’ 350E to 780 6’41 (W-E)

Latitude : N130 29’37” to N13033’50”(S-N)

State:Karnataka District : Chickkaballapur Taluk : Chintamani Block:IWMP-3 (Kushavathi Sub Watershed project)

Villages: 34 the habitat villages. 6 uninhabited villag.

Approach road: The project area has pucca roads.

Landmark (watershed location map): The project area is bound by lines of hillocks on north side south side Chintamani taluk area and remaining sides

are plain lands.

Area: under major land uses, irrigated and rainfed area, etc: In kharief the principal crop is Ground nut & red gram under 75-80% gross cropped area,

being grown as mono crops year after year . A few farmers use red gram to intercrop with Ragi and minar millets, Avare is the prominent intercrop in the

watershed area. In irrigated areas Mulbery vegetables grapes cultivation is predominant produced in small quantity for home consumption..

Page 48: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table-16: Area not available for treatment:

1 2 3 4 5 6

Sl. No.

Name of the project with code

Name of GP Name of the

village

Total geogra-phical area

Area not available for treatment (Ha)

Treatable area (Ha)

Thickly wooded

RF area

Canal irrigated

area

Large water bodies

(>40 ha)

Extensive private

orchards and groves (blocks of >40 ha)

Town ship area

Total

1 Kushavathi 4C3D6N Kotagal Bataradinne 8 4 - - - 1 5 1

2 Bodanamari 339.05 2 - - - 4 25.25 320

3 Kotagal 62 0 0 0 0 4 4 54

4 Kencharalahalli Kencharalahalli 337.35 25 0 0 10.35 10 120.35 330

5 Gollahalli 65.89 4 0 0 0 6 20.53 60

6 Gowdanahalli 8 2 - - - - 2 4

7 Yandahalli 210.81 - - - - 10 15.82 206

8 Golahally 165 .72 - - - 8 23.26 152.0

9 Marapanahalli 12 5 - - - - 5 5

10 Settinyakanahalli 6 3.96 - - - - 3.96 0.04

11 Guttur 198.56 5.56 - - - 8 13.56 182

12 Bhumishettihalli Gudisalahalli 26 0.5 - - - - 0.5 25

13 Uparalahalli 26 1 - - - - 1 22

14 B.Batalahalli 25 2 - - - - 2 20

15 Mittahalli Gonnenahalli 6.5 1.5 - - - - 1.5 3

Page 49: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

16 Yagavakota Kondavekapalli 6.2 2 - - - - 2 3

17 Puligodalahalli 8.5 2 - - - 3 5 60

18 Naramakalahalli 190.51 5 - - 25 5.51 65.51 180

19 Iragampalli Iragampalli 546 - - - - 10 40 536

20 Junjanahalli 374.21 7.12 - - - 5 32.12 360

21 Maykapotahalhalli 48.74 4.74 - - - 5 14.74 30

22 Chandurupalli 197.52 7.79 - - - 5 27.79 180

23 Guntipalli 49.28 0 - - - 4.28 4.28 82

24 Etamakalahalli 195 .43 25 69.43 5 139.43 120

25 Chinnakurupalli 59.59 8.56 - - 5 0 28.56 45

26 Mindigal 350 40 - - - 5.2 5.2 305

27 Seetharampura 158.42 5 - - - 5.72 10.72 132

28 Bhupanahalli 98.43 0 - - - - - 94.96

29 Ragutaahalli Raguttahalli 15.01 1.01 - - - - - 11

30 Etigaddagollahalli 160.21 20 - - 45 21.01 126.01 100

31 Bramanarahalli 175.05 5.68 - - - 10 35.68 143

32 Vegalahalli 162.14 17.37 - - - 10 67.37 118

33 Nallaguttalahalli 172.21 12.45 - - 10 10 62.45 160

34 M.Gollahalli M.Gollahalli 10 4 - - - - 4 6

Total 4473.29 4050

Page 50: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

• Physiography: The project area consists of undulating tracts with S-N running hillocks that occupy about 5-6% watershed area. The general slope in the

sub watershed is from west to East West , the land slopes in three directions i.e. W-E and N-E. The slope varies from 2% to 6% . The level difference

between ridge and valley is 2to 15m. The soil on well lands.

• Slope ranges from 2% to 6.0%.

• Order of SWS: 411C9A, 4C1C9C, 4C3D6F, 4C1C9B, 4C3F7B

• Nala : Major nalas have their origin in western hillocks. The nalas are dry for most of the period and carry only seasonal flow.

• Climate : The watershed area comes under southern Eastern Dry zone . Bright sunshine during summer, cloudiness during kharif and extreme cold during

rabi are of common occurrence. The climate shows extreme variations. Fast blowing winds prevail for about 3-4 months . Data on temperature, wind

velocity, and open PEM not being available, quantifiable climatic analysis could not be carried out but qualitative facts are mentioned.

Annual average rainfall is 700 and is received from both SW & NE monsoon .The uni model RF is is fairly well distributed enabling to take up croping in

both kharif and rabi season. Runoff producing rains of 320 mm received in 15days in a year are not much beneficial as they result in over land flow. Time of

concentration being as low as 1.05 hours, infiltration is also less, as such crops wither after 6-7 days of stoppage of rain. Soaking rains are found beneficial

to crops but high wind velocity coupled with high sunshine result in higher evapotranspiration losses also.

Drought occurance : Drought occurs in two years and repeats once in 4-5 years.

No of runoff producing rainy days: 320mm/Yr and is received in 15 days.

Page 51: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table 17: Climatic information: Monsoons, seasonal average rainfall (Table), mini/ max temperatures,

Drought/flood occurrence, no. of run off generating rainy days, etc.:

1 2 3 4 5 6 7 8 9 10 11

Month Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

Jan

Feb. 1 12.2

Mar 1 15.5 1 12.3 1 24.2 1 6 1 12.5 1 14.6 4 40.3 1 24.8 1 6

Apr 1 11.2 1 18.4 2 14.1 1 22 1 95.4 1 26 4 21.6 1 6 2 22.4 5 79.9

May 1 10 2 104 2 12.1 4 101.2 2 76.3 1 92.2 3 133.3 3 73.2 4 68.5 8 109

June 2 41.2 3 89 2 90.3 1 112.2 4 60.6 2 40 4 45 3 27.5 1 97.1 10 148.3

July 3 183.1 2 168.3 4 150.2 2 266.2 1 109.7 2 150 3 145.3 6 150.3 1 136.3 13 106.4

Aug 2 163 2 114.6 2 180.3 2 136.2 3 152.1 2 158.2 4 180.6 5 239.9 3 150.9 14 109.9

Sept 6 140.8 3 116.2 3 124.4 5 131.2 3 141 4 83.37 6 169.6 3 189.8 10 275.1 9 54

Oct 6 214.6 2 30.6 6 237.6 6 78 4 187.3 4 101.3 4 134.8 4 152.9 2 22.3 8 51.8

Nov 1 34.2 1 14.2 0 0 1 24.6 3 95 3 64.7 3 6.2 3 39 7 100.8 12 203.9

Dec. 0 0 0 0 0 0 0 0 0 0 1 84.1 4 66.7 1 24.2 1 10.1 6 18.5

Total 22 798.1 17 670.8 22 821.3 23 895.8 22 923.4 21 812.37 36 917.7 34 955.3 32 908.3 86 887.7

Note: 1=No. of rainy days; 2=Rainfall in mm : Data source: (Indicate whether it indicates any specific location data or average).

• Watershed characteristics: Shape index of watershed, Length of main stream, drainage density, average slope, watershed relief, perimeter of the watershed etc.

Page 52: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

10 Years Month wise Rainfall Pattern IWMP-3 Chintamani

0

200

400

600

800

1000

1200

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Dec

Nov

Oct

Sept

Aug

July

June

May

Apr

Mar

Feb

Jan

Page 53: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

10 Years Year wise Rainfall Pattern IWMP-3 Chintamani

798.1

670.8

821.3

895.8923.4

812.37

917.7955.3

908.3887.7

0

200

400

600

800

1000

1200

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Page 54: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Watershed characteristics:

1. Shape index of watershed: SWS is elongate and has banana leaf shape.

2. Length of main stream: 15 km.

3. Drainage density: = 2.00 Km /sqkm 4. Average slope : 4%

5 Drainage pattern: coarse drainage texture, angular pattern indicates good water conductivity. The soils are shallow

and coarse in texture in upper and middle reaches ,and are very fine deep texture in lower reaches . Soil erosion is mostly due to

detachment and transport by surface runoff and deposition of the same in water coarse having mild slope or erupt rock outs.

Page 55: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

CHAPTER - 3

BASELINE SURVEY

Page 56: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

• Socio-Economic conditions : Total population of the project is 4 of 11726 which male is 6016 and female is 5990. SC population is

4273(36.44%) ST 1437 (12.25%) Others 6016 (51.30%). Out of 2905 families MFs are 755 (25.98%) SF 1125 (38.72%), LFs 544 (18.72%) and LLs

481(16.55%). Main occupation of 84% families is agriculture and about 16% landless depend on farm labour. A very small no. of families are

engaged in sheep/goat raring and other petty business. Literacy level is 69% both male and female are equally educated.

• Soil and Land Use : Gravely sandy loams are found in 4-7% sloppy areas and red silt loams are predominant in 3to 5% slopes. Rain fed area is more (77%). Land use is not according to land capability. Steep slopes have been encroached for rain fed crop production where forest or dry land horticultural plantations would have been raised.

• Agriculture including area, productivity, cropping intensity, etc: More than 77% area of the w/s is under rain fed crops. Major crop is Ground Nut, tur & Ragi. Red gram crop taken up as sole crops in a small area. Mixed cropping is rare. Ragi is mixed with Avare sometimes. Productivity of cereals varies between 10-15qtls/ha. Kharif is the main cropping season. Cashew and Mango plantations are found on plains. Scrubs and bushes are found in common lands, valuable trees are of rare occurrence in the w/s area. Majority farmers apply chemical fertilizers.

• Horticulture : The main horticultural crop is Mango & Cashew.

• Livestock and Fisheries : Cross breeds dominate in the w/s area. A few farmers have improved breeds for milk production.

Landless marginal people have adopted sheep and goat raring.

• Forests and Grass land : No Reserve forest exist in the project area.

• Livelihood Status : Dairy, sheep and goat raring are some of the livelihood activities. Majority of the agriculture labourers have to wait for

their livelihood till the return of next kharif season.

• Hydrology and Water Resources : The terrain has meagre vegetative cover. Lot of runoff flows out of watershed area. There are only seven

tanks. Deep stuck bore wells are the only sources for the irrigated area which is less than 10%. Repeated cultural operations for annual

crops on sloppy lands subject them to erosion.

• PRA is conducted in all the habitat villages of the 4 SWS . Social Mobilization and Community Organization by Constitution of SHGs,UGs at village level and WC at GP

level are constituted and awareness created about their role and participation in all watershed development programmes

Page 57: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

CHAPTER - 4

INSTITUTION BUILDING AND PROJECT MANAGEMENT

Page 58: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

WATERSHED COMMITTEE:

Table-18 {Table :M(IS)8}:Details of Watershed Committees (WC) in the country: State-wise*

1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18

Sl. No.

Name of project

Name of WC Members Designation M/F SC ST SF MF LF Land-less

UG SHG GP Any

other

Educa-tional

qualifi-cation

Function/s assigned#

#

1 IWMP-3 Venkataramanappa President M Sc - SF - - - - - GP - 3rd

Std D

2

Sri V

enkate

shw

ara

Ja

na

naya

na S

am

ithi

Srinivasa reddy Treasurer M - - - - - - - - - Dept. SSLC A to H

3 K.N.Krishanareddy G.P Member M - - - - LF - - - GP - BA A

4 G. Baskar G.P Member M - - SF - - - - - GP - BA A

5 G.V.Ashwathnaryana reddy Member M - - - - LF - UG - - - BA A

6 Jairamareddy UG Member Member M - - SF - - - UG - - - PUC A

7 Munishamigowda UG Member Member M - - SF - - - UG - - - 5TH

Std A

8 Srinath UG Member Member M - - - MF - - UG - - - 3rd

Std A

9 Srinivas UG Member Member M - - SF - - - UG - - - PUC A

10 Chinappa reddy UG Member Member M - - SF - - - UG - - - 7th Std A

11 Narasimhareddy UG Member Member M - - SF - - - UG - - - PUC A

12 Baiyamma SHG Member Member F - - - MF - - SHG - - 5th Std A

13 Ramadevi SHG Member Member F - ST - MF - - - SHG - - 8th Std A

14 Eshawarmma SHG Member Member F - ST - MF - - - SHG - - 3RD

Std A

15 Varalaxmi SHG Member Member F SC

- - - - - - SHG - - SSLC A

Page 59: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table-18 {Table :M(IS)8}:Details of Watershed Committees (WC) in the country: State-wise*

1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18

Sl. No.

Name of project

Name of WC Members Designation M/F SC ST SF MF LF Land-less

UG SHG GP Any

other

Educa-tional

qualifi-cation

Function/s assigned#

#

1 IWMP-3 Gopalkrishan President President M - - - - - LL - - GP - SSLC D

2

Sri M

aru

thi Ja

lan

aya

Sam

iti

Sarith treasurer Tresurer F - - - - - - - - - Dept. Bsc Ho A to H

3 T.V. Srinivasreddy GPMember G.P.Member M - - - - LF - - - GP - PUC A

4 Rajanna G.P Member G.P.Member M - - SF - - - - - GP - PUC A

5 Venkatesh UG Member Member M SC - - MF - - UG - - - SSLC A

6 Ramanareddy UG Member Member M - - SF - - - UG - - - SSLC A

7 Ananda Reddy UG Member Member M - - - MF - - UG - - - 5th A

8 Raghunath UG Member Member M - - SF - - - UG - - - PUC A

9 Sriramareddy UG Member Member M - - SF - - - UG - - - 8th Std A

10 Yarappa UG Member Member M SC - - MF - - UG - - - - A

11 Ananda UG Member Member M - - - - LF - UG - - - BA A

12 Sudhakar UG Member Member M - - - MF - - UG - - - 8th Std A

13 Sharadamma SHG Member Member F - ST - MF - - - SHG - - 5th Std A

14 Laxmidevamma SHG Member Member F - ST - MF - - - SHG - - 8th

STD A

15 Laxmi SHG Member Member F SC - - - - LL - SHG - - SSLC A

Page 60: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

Table-18 {Table :M(IS)8}:Details of Watershed Committees (WC) in the country: State-wise*

1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18

Sl. No.

Name of project

Name of WC Members Designation M/F SC ST SF MF LF Land-less

UG SHG GP Any

other

Educa-tional

qualifi-cation

Function/s assigned#

#

1 IWMP-3 Papamma President President F SC - - - - LL - - GP - 3rd Std D

2

Sri C

ho

wd

esh

wari

Jala

na

ya

Sa

miti

Srinivivas Reddy treasurer Tresurer M - - - - - - - - - Dept. PUC A to H

3 Venkateshreddy GP Member G.P.Member M - - - - - LL - - GP - SSLC A

4 Ramakrishanppa G.P Member G.P.Member M SC - SF - - - - - GP - 4th Std A

5 Narasimhamurthy UG Member

Member M - - SF - - - UG - - - SSLC A

6 Akkalappa UG Member Member M - ST SF - - - UG - - - SSLC A

7 Laxmanareddy UG Member Member M - - - MF LF - UG - - - 5th A

8 Manjunath UG Member Member M - - SF - - - UG - - - PUC A

9 Narayanaswamy UG Member Member M - - SF - - - UG - - - 5th Std A

10 Ramakrishanappa UG Member

Member M - - SF - - - UG - - - 9th Std A

11 Krishanareddy UG Member Member M - - SF - - - UG - - - SSLC A

12 B.V.Radha SHG Member Member F - - - MF - - - SHG - - 8th Std A

13 Manjula SHG Member Member F - ST - MF - - - SHG - - 5th Std A

14 N.S.Manjula SHG Member Member F - ST - MF - - - SHG - - 8th

STD A

15 Reddamma SHGMember Member F SC - - - - LL - SHG - - SSLC A

Page 61: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

## In column 18 only the letter assigned, as below, needs to be typed, except for `J’, where the type may be specifically mentioned.

A. PNP and PRA B. Planning C. Maintenance of Accounts D. Signing of cheques and making payments E. Supervision of construction activities F. Cost Estimation G. Verification & Measurement H. Record of labour employed I. Social Audit J. Any other (please specify).

Page 62: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

SELF HELP GROUP:

Table-19 {Table :M(IS)9}:Details of Self Help Groups (SHGs) in the project area

1 2 3 4 5 6

Sl. No. Name of project

Total no. of registered SHGs No. of members No. of SC/ST in each

category No. of BPL in each category

With only Men

With only

Women

With both

Total Categories M F Total M F Total M F Total

(i) Landless - 350 350 - 264 264 - 350 350

(ii) SF - 126 126 - 70 70 - 25 25 (iii) MF - 417 417 - 145 145 - 385 385

(iv) LF - - - - - - - - -

1 IWMP-3 - 50 - 50 - 893 893 479 479 760 760

Total 50 - 50 - - 893 893 - 479 479 - 760 760

(M – Male, F – Female)

Page 63: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

USERS GROUP:

Table-20 {Table :M(IS)10}; Details of UGs in the project area

1 2 3 4 5 6

S. No. Names of

Project

Total no. of UGs No. of members No. of SC/ST in each category

No. of BPL in each category

Men Women Both Total Categories M F Total M F Total M F Total

(i)Landless - - - - - - - - - (ii) SF 310 - 310 37 - 37 328 - 328

(iii) MF 207 - 207 253 - 253 189 - 189

(iv) LF 83 - 83 - - - - - - 1 IWMP-3 30 - - 30 600 - 600 290 - 290 517 - 517

Total 30 - - 30 600 - 600 290 - 290 517 - 517

(M – Male, F – Female)

Focused Group Discussion: : Soil and moisture conservation water harvesting regeneration of vegetative cover, improved crop production technology, adoption of

allied income generating activities, formation of SHGs, small savings and maintenance of water shed created assets.

Page 64: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

About PIA:

Table-21 {Table :M(IS)7}:Details of Watershed Development Teams (WDTs) in the project areas of the country: State–wise*

1 2 3 4 5 6 7 8

S. No.

Name of project

Names of WDT members M/F# Age Qualification / Experience

Description of professional

training Role/ Function##

1 IWMP-3 B.C Devegowda AO M 54 B.Sc. Agri SCTC Training Overall responsibility in implements

the project

K.Srinivasareddy AAO M 50 PUC Watershed Training Implements the watershed Activities

P.M.Saritha RFO F 43 B.Sc. Foresters Training Implements the Forest Activities

P.Kempanna AHO M 58 SSLC Horticulture Training Implements the Agriculture Activities

Ramaiah M 40 B.Sc. SCTC Training Implements the Agriculture Activities

# M – Male, F - Female

# in column 10, only the letter, assigned as below, needs to be typed, except for `J’, where the type may be specifically mentioned. A. Participatory Net Planning (PNP) and Participatory Rural Approach (PRA), Training and Capacity Building B. Planning C. Maintenance of Accounts D. Signing of cheques and making payments E. Social audit F. Engineering surveys, drawings and cost estimations G. Physical verification & measurement H. Record of labour employed I. Livelihood opportunities for landless J. Post project operation, maintenance of assets K. Any other (please specify)

Page 65: GOVERNMENT OF KARNATAKA WATERSHED ...watershed.kar.nic.in/IWMP_DPR_BATCH1_files/Chintamani.pdfGOVERNMENT OF KARNATAKA WATERSHED DEVELOPMENT DEPARTMENT INTEGRATED WATERSHED MANAGEMENT

GRAMASABE

JATHA PROGRAMME


Recommended