Name of faculty:- Parveen Beniwal ( Theory& Practical ) Discipline:Civil Engineering Semester: 4 th Subject: Structural mechanics Lesson Plan Duration: 15 weeks (from Jan-2019 to Apr-2019) Work Load: Lectures-3 Practicals-2 WEEK THEORY PRACTICAL LECTURE DAY TOPIC PRACTI CAL DAY TOPIC 1 1 To introduction about the subject 1 st Determination of yield stress, ultimate stress, percentage elongation and plot the stress strain diagram and compute the value of young's modulus on mild steel 2 Properties of materials 3 Classification of material, elastic, Plastic, Ductile, Brittle materials Introduction about tensile, compressive, impact, fatigue, torsion test 2 1 Revision of ch. 1 st . 1 st Determination of yield stress, ultimate stress, percentage elongation and plot the stress strain diagram and compute the value of young's modulus on mild steel 2 Concept of stress, normal and shear stresses Concept of strain and deformation, longitudinal and strain. 3 Poisson ratio and volumetric stress Hook law, moduli of elasticity and rigidity, bulk 3 1 modulus of elasticity,relation between the elastic constant. 1 st Testing of HYSD Steel 2 Stresses and strains in bars subjected to tension and compression. 3 Stress-strain diagram for mild steel and HYSD steel, mechanical properties, factor of safety. Temperature stresses and strains 4 1 Extension of uniform bar under its own weight, stress produced in compound bars (two or tPeriodsee) due to axial load. 1 st Determination of Young's modulus of elasticity for steel wire with searl's apparatus 2 Revision of ch. 1st. & Concept of a beam and supports (Hinges, Roller and Fixed) 3 types of beams: simply supported, cantilever, propped, over hang, cantilever and continuous beams (only concept). 5 1 Types of loads (dead load, live load, snow load, wind load seismic load as per IS Codes etc) - 1 st Determination of Young's modulus of elasticity for steel wire with searl's apparatus 2 types of loading (point, uniformly distributed and uniformly varying loads) Concept of bending moment and shear force, sign conventions 3 Mr Ashish GOVERNMENT POLYTECHNIC SANGHI
Transcript
Page 1: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

Lesson Plan Name of faculty:- Parveen Beniwal ( Theory& Practical ) Discipline:Civil Engineering Semester: 4th Subject: Structural mechanics Lesson Plan Duration: 15 weeks (from Jan-2019 to Apr-2019) Work Load: Lectures-3 Practicals-2

WEEK

THEORY PRACTICAL

LECTURE DAY

TOPIC PRACTI

CAL DAY

TOPIC

1

1 To introduction about the subject

1st

Determination of yield stress, ultimate stress, percentage elongation and plot the stress strain diagram and compute the value of young's modulus on mild steel

2 Properties of materials

3

Classification of material, elastic, Plastic, Ductile, Brittle materials Introduction about tensile, compressive, impact, fatigue, torsion test

2

1 Revision of ch. 1st.

1st

Determination of yield stress, ultimate stress, percentage elongation and plot the stress strain diagram and compute the value of young's modulus on mild steel

2

Concept of stress, normal and shear stresses Concept of strain and deformation, longitudinal and strain.

3

Poisson ratio and volumetric stress Hook law, moduli of elasticity and rigidity, bulk

3

1 modulus of elasticity,relation between the elastic constant.

1st Testing of HYSD Steel

2 Stresses and strains in bars subjected to tension and compression.

3

Stress-strain diagram for mild steel and HYSD steel, mechanical properties, factor of safety. Temperature stresses and strains

4

1 Extension of uniform bar under its own weight, stress produced in compound bars (two or tPeriodsee) due to axial load.

1st Determination of Young's modulus of elasticity for steel wire with searl's apparatus

2

Revision of ch. 1st. & Concept of a beam and supports (Hinges, Roller and Fixed)

3 types of beams: simply supported, cantilever, propped, over hang, cantilever and continuous beams (only concept).

5

1

Types of loads (dead load, live load, snow load, wind load seismic load as per IS Codes etc)

- 1st

Determination of Young's modulus of elasticity for steel

wire with searl's apparatus

2 types of loading (point, uniformly distributed and uniformly varying loads)

Concept of bending moment and shear force, sign conventions 3

Mr Ashish

GOVERNMENT POLYTECHNIC SANGHI

Page 2: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

6

1 Bending Moment and shear force diagrams for cantilever

1st

Determination of modulus of rupture of a concrete beam

2

simply supported and overhanging beams

subjected to concentrated, uniformly

distributed.

3 Relationship between load, shear force and bending moment, point of maximum bending moment, and point of contraflexure.

1st Determination of modulus of rupture of a concrete beam

7

1 Revision of ch. 3rd and assignment.

2 Concept of moment of inertia and second moment of area and radius of gyration, theorems of parallel

3 perpendicular axis, second moment of area of common geometrical sections: rectangle, triangle, circle

8

1 Second moment of area for L, T and I sections, section modulus.

1st

Determination of maximum deflection and young's modulus of elasticity in simply supported beam with load at middle third point

2

Bending Stresses in Beams Concept of pure/simple bending

3 Assumptions made in the theory of simple bending, derivation

9

1 application of bending equation to circular cross-section, I section, T&L sections only

1st

Determination of maximum deflection and young's modulus of elasticity in simply supported beam with load at middle third point

2 Moment of resistance Calculations of bending stresses in simply supported beam

3

Revision of ch 4th and 5th Class test of ch 5th

10

1 Sessional test 2nd

1st Verification of forces in a

framed structure

2 Explanation of sessional

3

Copy and assignment check

11

1

Shear Stresses in Beams Concept of shear stresses in beams

1st Verification of forces in a

framed structure 2

shear stress distribution in rectangular, circular I, T, L sections for S.S. beams and Portland

3 Revision of covered syllabus

Page 3: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

12

1 Slope and Deflection:

1st

Repeat any experiment and copy check

2 Determination of slope and deflection using Moment Area Theorem for simply supported beam for pointed load

3 Determination of slope and deflection using Moment Area Theorem for simply supported beam for UDL load

13

1 Theory of columns 1st Determination of Young's

modulus of elasticity for steel wire with searl's apparatus

2 Problem solving using Eulers and Rankine Formula

3 Analysis of Trusses

14

1 Concept of a perfect, redundant and deficient frames

1st

Determination of maximum deflection and young's modulus of elasticity in simply supported beam with load at middle third point

2 Assumptions and analysis of trusses by: a) Method of joints

3

Assumptions and analysis of trusses by: a) Method of Section Revision and doubt clear from complete syllabus

15

1 Revision and doubts from first three units

1st

Determination of yield stress, ultimate stress, percentage

elongation and plot the stress strain diagram and compute the

value of young's modulus on mild

steel -

2

Revision and doubts from fourth to sixth units

Revision and doubts from remaining units 3

Page 4: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

GOVERNMENT POLYTECHNIC MEHAM

Name of faculty :- Mr. Mohd Shad Discipline :- Civil. Engg. Semester :-4th Subject :- Concrete Technology lesson plan duration :-15 weeks Work Load per week(in hours):- Lectures-3,Practicals-2

WEEK THEORY PRACTICAL

1st week

1st

day

Unit 1 : Introduction –Definition of concrete ,uses of concrete in comparison to other building materials

1st day

To determine the physical properties of cement as per IS codes

2nd day

Unit 2: Cement, physical properties of cement, different type of cement as per IS codes

3rd day

Classification of aggregates according to size and shape

Characteristics of aggregates, particle size and shape ,surface texture, specific gravity, bulk density, water absorption, surface moisture, bulking of sand,Deletrious materials

2nd week

1st day

Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates, fineness modulus, interpretation of grading charts

Water quality requirements as per IS 456-2000

1st

day To determine flakiness and elongation index of coarse aggregate

2nd day

Unit 3: Hydration of cement ,principles of water cement ratio, duff Abrams water cement ratio law,limitation of water cement ratio law and its effects on strength of concrete

3rd day

Workability, factors affecting workability, Measurement of workability ,slump test ,compacting factor test

3rd week

1st day

Properties of concrete in plastic state ,workability,segregation,bleeding and harshness

1st day

To determine silt in fine aggregate

2nd day

Properties of concrete in hardened state-,Strenght,Durability,Impermeability,Dimenisional changes

Ajay

GOVERNMENT POLYTECHNIC SANGHI

Page 5: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

5th week

1st day

Special Concretes-Cold weather concreting, under water

concreting, hot weather concreting

-Ready mix concrete, Fiber reinforced concrete, Polymer

concrete, Fly ash concrete, Silica fume concrete

1st day

Determination of bulk density and voids of aggregates

2nd

day

Storing of cement-Storing of cement in warehouse,

storing of cement at site, Effect of storage on strength of

concrete, Determination of warehouse capacity of

storage of cement

3rd

day

Batching –Batching of cement, Batching of aggregate by

volume using gauge box ,measurement of water

6th week

1st day

Mixing –Hand mixing, Machine mixing-types of mixers

,capacities of mixers, choosing appropriate size of

mixers, operations of mixers ,maintenance and care of

machines

1st day

To determine surface

moisture in fine aggregate by

displacement method

2nd

day

Transportation of concrete using wheel barrows, transit

mixers,chutes,belt,conveyors,pumps,tower crane, and

hoists

3rd

day

Placement of concrete-checking of form work ,shuttering

and precautions to be taken during placement

3rd day

Objective of mix design ,introduction to various grades as per IS 456-2000,Proportioning of nominal mix design as per IS 456-2000

4th week

1st day

Adjustment on site for bulking of fine aggregates ,water absorption of aggregate ,workability

1st

day Determination of specific gravity and water absorption of aggregates

2nd day

Difference between nominal and controlled concrete

Introduction to IS -10262-2009-Code for controlled mix design

3rd day

Introduction to admixture for improving performance of concrete

Page 6: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

7th week

1st day

Compaction-Hand compaction ,machine

compaction,types of vibrators,internal screed vibrators

and form vibrators

1st

day

Determination of particle size

distribution of fine ,coarse and

all in aggregates by sieve

analysis method 2nd

day

Selections of suitable vibrators for different situations

3rd

day

Finishing concrete slabs-screeding,floating and toweling

8th week

1st day

Curing-Objective of curing, method of curing like

ponding,membrane curing ,chemical curing

1st

day

To determine necessary

adjustment for bulking of fine

aggregate 2nd

day

Types of tools used and their geometry.

3rdday Durations for curing and removal of form work

9th

week

1st day

Jointing-Location of construction joints, treatment of

construction joints, expansion joints in building-their

importance and location

1st

day

To determine workability by

slump test

2nd

day

Defects in concrete

3rdday Identification and methods of repairs

10th

week

1st day

Importance of non –destructive tests 1st

day

Compaction factor test for

workability

2nd

day

Methods of non-destructive tests

3rdday Fields visit to relevant things of construction

11th

week

1st day

Doubt will be taken of unit 1 and revision of unit 1 1st

day

Non destructive test on

concrete by –Rebound

hammer test

-Ultrasonic pulse velocity test

2nd

day

Doubt will be taken of unit 2 and revision of unit 2

3rdday Doubt will be taken of unit 3 and revision of unit 3

12th 1st day

Doubt will be taken of unit 4 and revision of unit 4 1st Tests for compressive strength

of concrete cubes for different

Page 7: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

week 2nd

day

Doubt will be taken of unit 5 and revision of unit 5 day grades

3rdday Doubt will be taken of unit 5 and revision of unit 5

13th

week

1st day

Doubt will be taken of unit 6 and revision of unit 6 1st

day

Practice in Lab

2nd

day

Doubt will be taken of unit 7 and revision of unit 7

3rdday Doubt will be taken of unit 8 and revision of unit 8

14th

week

1st day

Doubt will be taken of unit 9 and revision of unit 9 1st

day

Practice in Lab

2nd

day

Doubt will be taken of unit 9 and revision of unit 9

3rdday Doubt will be taken of unit 10 and revision of unit 10

15th

week

1st day

Revision 1st

day

Viva-Voice

2nd

day

Revision

3rdday Discuss on problems

Page 8: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

Govt. Polytechnic Education Society Meham (Rohtak) Civil Engineering Department

Lesson Plan

Name of the Faculty Mr. ASHOK KUMAR (VTF. In Civil Engg.)

Discipline Civil Engineering

Semester 4th

Subject Irrigation Engineering

Lesson Plan Duration From JAN 2019 to APR 2019 ( 15 Weeks)

Work Load (Theory/Practical) per week Theory – 03 / Practical - 00

week Day Theory

1

1st

day 1. Introduction: Definition of irrigation

2nd

day 1.2 Necessity of irrigation 1.3 History of development of irrigation in India

3rd

day 1.4 Major, medium and minor irrigation projects

2

1st

day 2. Water Requirement of Crops

2.1 Principal crops in India and their water requirements 2.2 Crop seasons – Kharif and Rabi

2nd

day 2.3 Soil water, soil crop and crop water relationships, Duty, Delta and Base Period, their relationship

3rd

day 2.4 Gross commanded area (GCA), culturable commanded area (CCA), Intensity of Irrigation, Irrigable area

3

1st

day 3 Hydrological Cycle Catchment Area and Run-off Rainfall , definition rain-gauges – automatic and non-automatic,

2nd

day methods of estimating average rainfall (Arithmatic system); catchment area runoff

3rd

day factors affecting runoff, hydrograph, basic concept of unit hydrograph.

4

1stday 4. Methods of Irrigation Flow irrigation - its advantages and limitations

2ndday Lift Irrigation – Tubewell, submersible and well irrigation advantages and disadvantages

3rdday 4.1Sprinkler irrigation conditions favourable and essential requirements for sprinkler irrigation, sprinkler system – classification and component parts

GOVERNMENT POLYTECHNIC SANGHI

Mr. Prateek Malik

Page 9: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

5

1st

day Drip irrigation, suitability of drip irrigation, layout, component parts, advantages

2nd

day 5. Canals 5.1 Classification, apurtenancs of a canal and their functions, sketches of different canal cross-sections

3rd

day 5.2 Various types of canal lining - their related advantages and disadvantages, sketches of different lined canal x-sections

6

1st

day 5.3 Breaches and their control

2nd

day 5.4 Maintenance of lined and unlined canals

3rd

day Unit test will be conduct

7

1st

day 6. Tube Well Irrigation 6.1 Introduction, occurrence of ground water, location and command, advantages and disadvantages, comparison with canal irrigation

2nd

day 6.2Tube wells, explanation of terms: water table, radius of influence, depression head, cone of depression, confined and unconfined aquifers. Yield of a well and methods of determining yield of well

3rd

day 6.3 Types of tube wells and their choice-cavity, strainer and slotted type;

8

1st

day 6.4 Method of boring, installation of well assembly, development of well, pump selection and installation and maintenance

2nd

day 6.5 Water Harvesting Techniques: Need and requirement of various methods, Run-off from roof top and ground surface, construction of recharge pits and recharge wells and their maintenance.

3rd

day Revision of unit 6

9

1st

day 7. Dams 7.1 Classification of dams; earth dams - types, causes of failure; cross-section of zoned earth dam, method of construction,

2nd

day gravity dams – types, cross-sections of a dam, method of construction 7.2 Concept of small and micro dams

3rd

day 7.3 Concept of spillways and energy dissipators

Page 10: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

10

1st

day 8. Canal Head Works and Regulatory Works

2nd

day Definition, object, general layout, functions of different parts of head works. Difference between weir and barrage

3rd

day Unit test will be given

11

1st

day 9. Cross Drainage Works 9.1 Functions and necessity of the following types:

2nd

day aqueduct, super passage, level crossing, inlet and outlet

3rd

day 9.2 Sketches of the above cross drainage works

12

1st

day 10. Definitions of following Hydraulic Structures with Sketches

10.1 Falls

2nd

day Cross and head regulators

10.1 Outlets 10.2 Canal Escapes

3rd

day Doubt will be taken

13

1st

day 11. River Training Works Methods of river training

2nd

day guide banks, retired (levees) embankments, groynes and spurs, pitched island, cut-off

3rd

day Rivison of unit 11

Page 11: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

14

1st

day 12. Water Logging and Drainage and Ground Water Re-charge

2nd

day Unit test will be conduct

3rd

day Definition of water logging – its causes and effects, detection, preventio and remedies

15

1st

day Surface and sub-surface drains and their layout

2nd

day

12.3 Concept and various techniques used for ground water re-charge

3rd

day Study of previous year questions paper

Page 12: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

GOVERNMENT POLYTECHNIC EDUCATION SOCIETY MEHAM

Name of Faculty :- Sandeep ,VF in Civil Engg. Discipline :- CIVIL ENGG. Semester :-4TH Subject :- PUBLIC HEALTH ENGINEERING Lesson plan duration :-15 weeks Work Load per week(in hours):- Lectures-3,Practicals-2

WEEK THEORY PRACTICAL

1st week

1ST day Necessity and brief description of water supply system Water requirement

1st day

To determine turbidity of water sample

2nd day Rate of demand and variation in rate of demand

3rd day Per capita consumption for domestic, industrial, public and fire fighting uses as per BIS standards

2nd week

1st day Population Forecasting 1st

day To determine dissolved oxygen of given sample

2nd day Meaning of pure water and methods of analysis of water

3rd day Physical, Chemical and bacteriological tests and their significance

3rd week

1st day Standard of potable water as per Indian Standard, Maintenance of purity of water (small scale and large scale quantity)

1st day

To determine pH value of water

2nd day Sedimentation - purpose, types of sedimentation tanks Coagulation floculation

3rd day usual coagulation and their feeding Filtration - significance Types of filters, their suitability

4th week

1st day Necessity of disinfection of water, forms of chlorination , break point chlorine, residual chlorine, application of chlorine

1st

day To perform jar test for coagulation

2nd day Flow diagram of different treatment units functions of Areation fountain ,mixer

GOVERNMENT POLYTECHNIC SANGHI

Mr Prateek Malik

Page 13: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

5th week 1st day

Different types of pipes - cast iron, PVC, steel, asbestos cement, concrete and lead pipes.

1st day

To determine BOD of given sample

2nd

day

Their suitability and uses, types of joints in different types of pipes

3rd

day

Appurtenances: Sluice, air, reflux valves, relief valves, scour valves

6th week

1st day

Bib cocks, stop cocks, fire hydrants, water meters their working and uses Distribution site: Requirement of distribution, minimum head and rate

1st day

To determine residual chlorine in water

2nd

day

Methods of layout of distribution pipes Systems of water supply - Intermittent and continuous service

3rd

day

Reservoirs - types, necessity and accessories Wastage of water - preventive measures

7th week 1st day

Maintenance of distribution system, Leakage detection Setting out alignment of pipes

1st

day

To determine conductivity of water and total dissolved solids

2nd

day

Excavation for laying of pipes and precautions to be taken in laying pipe in black cotton soil

3rd

day

Handling, lowering beginning and jointing of pipes Testing of pipe lines

8th week 1st day

Back filling Use of boring rods Connections to water main (practical aspect only)

1st

day

To study the installation of following: a) Water meter b) Connection of water supply of building with main c) Pipe valves and bends d) Water supply and sanitary fittings

2nd

day

Water supply fixtures and installations and terminology related to plumbing

3rd

day

Purpose of sanitation Necessity of systematic collection and disposal of waste Definition of terms in sanitary engineering

9th week 1st day

Collection and conveyance of sewage Conservancy and water carriage systems, their advantages and Disadvantages

1st

day

To study and demonstrate the joining/threading of GI Pipes, CI Pipes, SW pipes, D.I. pipes and PVC pipes

2nd

day

Surface drains (only sketches) : various types, suitability

3rdday Types of sewage: Domestic, industrial, storm water and its seasonal variation

3rd day floculator, clarrifier, slow and rapid sand filters ,chlorination chamber

Page 14: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

10thweek 1st day

Types of sewerage systems, materials for sewers, their sizes and joints

1st day

To demonstrate the laying of SW pipes for sewers

2nd

day

Appurtenance: Location, function and construction features Manholes,drop manholes

3rdday tank hole, catch basin, inverted siphon, flushing tanks

11th

week

1st day

Grease and oil traps, storm regulators, ventilating shafts Setting out/alignment of sewers

1st

day

Study of water purifying process by visiting a field lab

2nd

day

Excavations, checking the gradient with boning rods

3rdday Preparation of bedding, handling and jointing testing and back filling of sewers/pipes Construction of surface mains and different sections required

12thweek 1st day

Properties of sewage and IS standards for analysis of sewage

1st

day

To test house drainage

2nd

day

Physical, chemical and bacteriological parameters

3rdday Disposal by dilution Nuisance due to disposal

13th

week

1st day

Self purification of stream Disposal by land treatment

1st

day

FIELD visit to water treatment

plant

2nd

day

Meaning and principle of primary and secondary treatment

3rdday Activated sludge process their flow diagrams

14th

week

1st day

Introduction and uses of screens, grit chambers, detritus tanks,

1st

day

FIELD visit to sewage

treatment plant

2nd

day

Skimming tanks, plain sedimentation tanks, primary clarifiers, secondary clarifiers

3rdday filters, control beds, intermittent sand filters, trickling filters, sludge treatment and disposal.

15th week 1st day

oxidation ponds Aims of building drainage and its requirements

Water supply and sanitary fittings

Page 15: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

2nd

day

Different sanitary fittings and installations Traps, seals

1st

day

3rdday causes of breaking seals Previous years papers will be discussed

Page 16: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

Govt. Polytechnic Education Society Meham (Rohtak) Civil Engineering Department

Lesson Plan

Name of the Faculty Mr. ASHOK KUMAR ( VTF In Civil Engg.)

Discipline Civil Engineering

Semester 4th

Subject Reinforced Concrete Design

Lesson Plan Duration From JAN 2019 to APR 2019 (15 weeks)

Work Load (Theory/Practical) per week Theory – 03 / Practical – 00

week Day Theory

1

1st

day 1. Introduction

2nd

day 1.1 Concept of Reinforced Cement Concrete (RCC)

3rd

day 1.2 Reinforcement Materials: Suitability of steel as reinforcing material

2

1st

day Properties of mild steel and HYSD steel

2nd

day 1.3. Loading on structures as per IS: 875

3rd

day 2. Introduction to following methods of RCC design

3

1st

day 2.1 Working stress method

2nd

day 2.2 Limit state method

3rd

day 3. Shear and Development Length

4

1stday 3.1 Shear as per IS:456-2000 by working stress method

2ndday i) Shear strength of concrete without shear reinforcement

3rdday ii) Maximum shear stress iii) Shear reinforcement

GOVERNMENT POLYTECHNIC SANGHI

Mr Ashish

Page 17: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

5

1st

day 4. Singly Reinforced Beam (Working stress method)

2nd

day 4.1 Basic assumptions and stress strain curve, neutral axis

3rd

day Under reinforcement and over reinforced beams,

6

1st

day Under reinforcement and over reinforced beams,

2nd

day Moment of resistance for singly reinforced beam.

3rd

day 4.2 Design of singly reinforced beam including sketches showing reinforcement details.

7

1st

day 5. Concept of Limit State Method 5.1 Definitions and assumptions made in limit state of collapse (flexure)

2nd

day 5.2 Partial factor of safety for materials

3rd

day 5.3 Partial factor of safetyfor loads 5.4 Design loads

8

1st

day 5.5 Stres block, parameters

2nd

day 6. Singly Reinforced beam Theory and design

3rd

day singly reinforced beam by Limit State Method

9

1st

day 7. Doubly Reinforced beam Theory and design

2nd

day simply supported doubly reinforced rectangular beam Limit State Method

3rd

day 8. Behaviour of T beam inverted T beam;isolated T beam L’ beams (No Numericals)

Page 18: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

10

1st

day 9. One Way Slab Theory and design of simply supported

2nd

day one way slab including sketches showing reinforcement details

3rd

day (plan and section) by Limit State Method

11

1st

day 10. Two Way Slab

2nd

day Theory and design of two-way simply supported slab with corners free to lift

3rd

day provisions for torsional reinforcement by Limit State

12

1st

day 11. Axially Loaded Column

2nd

day 11.1 Definition and classification of columns

3rd

day 11.2. Effective length of column

13

1st

day

11.3. Specifications for longitudinal and lateral reinforcement

2nd

day 11.3. Specifications for longitudinal and lateral reinforcement

3rd

day 11.4. Design of axially loaded square By Limit State Method

Page 19: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

14

1st

day rectangular and circular short columns

2nd

day including sketching of reinforcement

3rd

day 12. Prestressed Concrete 12.1. Concept of pre-stressed concrete

15

1st

day 12.2. Methods of pre-stressing : pre-tensioning, post tensioning

2nd

day

post tensioning, disadvantages of prestressing

3rd

day 12.4. Losses in pre-stress

Page 20: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

GOVERNMENT POLYTECHNIC MEHAM

LESSON PLAN

Name of the Faculty: MR. Mohd Shad, VF in Civil Engg.

Discipline: CIVIL ENGG.

Semester: 4th

Subject : SURVEYING-II

Lesson Plan Duration: 15 weeks (From January, 2019 to April, 2019)

**Work Load (Lecture/ Practical) perweek (in hours): Lectures-02, Practicals-05 per week

Week Theory Practical

1st Week

1st Day

Introduction to surveying 1st day & 2nd day

Contouring- 1. Preparing a contour plan by radial line method by the use of a Tangent Clinometer/Tachometer

2nd Day

Concept of contours, purpose of contouring,

2nd Week

1st Day

Contour interval and horizontal equivalent, factors effecting contour interval, characteristics of contours

1st day & 2nd day

2. Preparing a contour plan by method of squares

2nd Day

methods of contouring: Direct and indirect

3rd Week

1st Day

Use of stadia measurements in contour survey, interpolation of contours

1st day & 2nd day

3. Preparing a contour plan of a Road/Railway track/Canal by taking cross sections.

2nd Day

Revision and doubts

4th week

1st Day

Test 1st day & 2nd day

Theodolite: 4. Taking out the Theodilite, mounting on the tripod and placing it back in the box

2nd day

Use of contour map, Drawing cross section from a contour map; marking alignment of a road

5th week

1st Day

Railway and a canal on a contour map, computation of earth work and reservoir capacity from a contour map

1st day & 2nd day

5. Study of a transit vernier theodolite; temporary adjustments of theodolite

2nd Day

Working of a transit vernier theodolite, axes of a theodolite and their relation; temporary adjustments of a transit theodolite

GOVERNMENT POLYTECHNIC SANGHI

Mr Ajay

Page 21: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

6th Week

1st Day

concept of transiting, swinging, face left, face right and changing face; measurement of horizontal and vertical angles

1st day & 2nd day

6. Reading the vernier and working out the least count, measurement of horizontal angles by repetition and reiteration methods

2nd Day

Prolonging a line (forward and backward) measurement of bearing of a line; traversing by included angles and deflection angle method

7th week

1st day

Revision and doubts 1st day & 2nd day

7. Measurement of vertical angles and use of tachometric tables

2nd day

Test

8th week

1st day

traversing by stadia measurement, theodolite triangulation, plotting a traverse

1st day & 2nd day

8. Measurement of

magnetic bearing of a line 2nd day

concept of coordinate and solution of omitted measurements (oneside affected)

9th week

1st day

Errors in theodolite survey and precautions taken to minimize them; limits of precision in theodolite traversing

1st day & 2nd day

9. Running a closed traverse with a theodolite (at least five sides) and its plotting 2nd

day Height of objects – accessible and non-accessible bases

10th week

1st day

Revision and doubts 1st day & 2nd day

10. Height of objects with and without accessible bases

2nd day

Test

11th week

1st day

Tachometry, Instruments to be used in tachometry, methods of tachometry, stadia system of tachometry

1st day & 2nd day

Curves:- 11. Setting out of a simple circular curve with given data by the following methods a) Offsets from the chords produced b) One theodolite method

2nd day

general principles of stadia tachometry, examples of stadia tachometry and Numerical problems.

12th week

1st day

Simple Circular Curve:- Need and definition of a simple circular curve; Elements of simple circular curve - Degree of the curve, radius of the curve, tangent length, point of intersection (Apex point), tangent point, length of curve

1st day & 2nd day

Minor instruments: 12. Demonstration and use of minor instruments like Ceylon Ghat Tracer, Tangent Clinometer, Pantagraph, Abney level etc.

2nd day

long chord deflection angle, Apex distance and Mid-ordinate. Setting out of simple circular curve:- a) By linear measurements only: - Offsets from the tangent - Successive bisection of arcs - Offsets from the chord produced b) By tangential angles using a theodolite

13th week

1st day

Transition Curve:-

Need (centrifugal force and super elevation) and definition of transition curve; requirements of transition curve

1st day &

13.Use of planimeter for computing areas

Page 22: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

2nd day

length of transition curve for roads; by cubic parabola; calculation of offsets for a transition curve; setting out of a transition curve by tangential offsets only

2nd day

14th week

1st day

Vertical curve:- Setting out of a vertical curve

Introduction to the use of Modern Surveying equipment and techniques such as: a) EDM or Distomat b) Planimeter

1st day & 2nd day

14. Demonstration of digital instruments through field visits to Survey of India and other government agencies.

2nd day

c) Total station

d) Introduction to remote sensing, GIS and GPS 6 Minor Instruments:-

6.1. Introduction and use of minor instruments like Ceylon Ghat Tracer, Clinometer, Pantagraph, Abney Level etc.

15th week

1st day

Revision and doubts 1st day & 2nd day

15. Total Station

2nd day

Revision and doubts

Page 23: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

GOVERNMENT POLYTECHNIC EDUCATION SOCIETY MEHAM

Name of faculty :- SANDEEP Discipline :- CIVIL ENGG. Semester :-4TH Subject :- PULIC HEALTH AND IRRIGATION ENGINEERING DRAWING Lesson plan duration :-15 weeks(JAN 2019 TO APRIL 2019) Practical-5

WEEK PRACTICAL

1st week

1st day

Cross section of standard types of open drains (circular, v shaped and -shaped) with their foundations

2nd day

Cross section of earthen ware and RCC sewer pipes

2nd week

1st day

Detailed section of floor trap and gully trap

2nd day

Detailed plan and section of a manhole

3rd week

1st day

Detailed plan and cross sections of a domestic septic tank with soak pit for 10 and 50 users

2nd day

4th week

1st day

Cross-section through the external wall of lavatories at ground and first floor showing the one and two pipe system and the connections of the lavatory to inspection chamber

2nd day

Plan of a bathroom showing positions of lavatory, bath tub, wash-basin, taps and showers

Mr Ashish

GOVERNMENT POLYTECHNIC SANGHI

Page 24: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

5thweek 1st day

Draw sectional elevation of a two storeyed building showing details of one pipe and two pipes systems with sanitation system

2nd day

6th week

1st day

Practice of reading water supply and sanitary engineering working drawings (PWD/urban Development agencies) including hot water and cold water supply

2nd day

7th week

1st day

Detailed Layout Plan of Sewage Treatment Plant for a residential area

2nd day

8th week

1st day

Typical cross section of an unlined and lined channel in cutting, partly cutting and partly filling and fully in filling with given design data.

2nd day

Page 25: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

9th

week

1st day

Layout plan of a canal head works

2nd day

10th

week

1st day

Draw the typical L-section of a weir

2nd day

11th

week

1st day

The X-section of an Earthen Dam i) Homogeneous ii) Zoned type iii) Diaphragm type

2nd day

12th

week

1st day

Cross section of a tube well

2nd day

Page 26: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

13th

week

1st day

Layout and cross section of rain water harvesting system.

2nd day

14th

week

1st day

Cross sections of masonry sewers (circular and egg shaped)

2nd day

Detailed plan and section of an inspection chamber

15th

week

1st day

L-section of a channel for given data

2nd day

Effluent Treatment Plant for an industrial unit

Page 27: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

Lesson Plan

Name of the Faculty: Sh. Ravinder Garg

Discipline: Civil

Semester: 6th

Subject: Railway, Bridges and Tunnels.

Lesson Plan: 15 week (from January, 2018 to April, 2018)

Work load (lecture/ Practical) per week (in hours): LTP5

Week Theory Practical

Lecture day Topic (Including

assignment / test)

Practical Day Topic

1st 1st Introduction to Indian

railways, factors

influencing the railway

route.

2nd Factors influencing the

railway route.

3rd Brief description of

railway survey.

4th

Classification of

permanent way

describing its

component parts.

5th Rail gauge, types and

price in India.

2nd 1st Type of rails, rail

fastenings.

CMRA GOVT POLYTECHNIC , SANGHI

Mr Prateek Malik

Page 28: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

2nd Fish plates and bearing

plates.

3rd Functions of sleepers,

Type of sleepers.

4th Requirement of ideal

material for sleepers.

5th Functions of ballast,

Types of ballast.

3rd 1st Requirement of ideal

material for ballast.

2nd Introductions of

crossings and

signaling.

3rd Different types of

crossing and signaling

4th Latest electronic and

operated devices.

5th

Maintenance of track

and necessity.

4th 1st Inspection of soil.

2nd Track and fixtures,

maintenance.

3rd Boxing of ballast

maintenance gauges

and tools.

4th Earthwork and

drainage

5th Features of rail roads

1st Bed level and width of

formation.

5th 2nd Side slopes and drains

methods of

constructions.

Page 29: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

3rd Requirement of

drainage system.

4th PART 2

BRIDGES

INTRODUCTION

5th

Function and

components parts of

bridges.

6th 1st Difference between

bridges and culverts

2nd Classification of bridges,

structural elements and

suitability

3rd According to life permanent and

temporary

4th According to deck, through and

semi through

5th According timber, masonry,

steel, RCC, pre-stressed

7th 1st According to structural form.

1. Grade separator ROB and

RUB.

2nd 2.Beam type-RCC, T beam

,Steel girder, plate girder, box

girder

3rd 3. Balance cantilever truss

bridges.

4th 4.Arch type, open spandrel and

filled spandrel

5th 5.Suspension types

Page 30: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

8th 1st 6. According to the position of

HFL.

2nd IRC classification.

3rd Introduction of bridge

foundation.

4th Open foundation and pile

foundation.

5th Well Foundation

9th 1st Peers abutments and wing wall

introduction.

2nd Piers- definition, parts, types.

3rd Abutments- types definition

parts.

4td Wing walls definition type parts.

5th Launching of equipment bridges.

10th 1st Bridge bearings, purpose of

bridge bearings

2nd Types of bridge bearings

Fixed plate, rocker and roller.

3rd Maintenance of bridges

4th Inspection of steel and

equipment bridges

5th Routine maintenance

11th 1st PART 3 TUNNELS

INTRODUCTION

2nd DEFINATION AND

NECESSITY

3rd Typical section of tunnel for NH

Page 31: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

4th Typical section for single and

double broad gauge railway

TRACK

5th Ventilation- necessity of

ventilation

12th 1st Different method of ventilation.

2nd Ventilation by blowing.

3rd Ventilation by exhausting.

4th Ventilation by combination of

blowing and exhausting.

5th Drainage method of drinking

water in tunnel.

13th 1st Lighting of tunnel.

2nd Necessity of lighting in tunnel.

3rd Method of lighting in tunnel.

Page 32: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

NAME OF THE FACULTY: Sh. Ravinder Garg, Sr. Lecturer in Civil Engineering.

Discipline:Civil.

Semester: 6th

Subject: Quantity Surveying and Valuation.

Lesson Plan Duration 15th Weeks (From January 2018 to April 2018)

**Workload (Lecturer/Practical) per week (in hours)

Week Theory Practical

Lecture day Topic Practical day Topic

1st 1st Introduction toquantity surveying and its importance. Duties of quantity survey.

2nd Plinth Area estimate Cubic rate estimate.

3rd Estimate per unit base

4th Definition, Stage of preparation and details of measurement and calculation of quantity and abstracts.

5th Units of measurements for various items of work as per BIS 1200

2nd Ist Rules for measurement different methods of taking out

Mr ASHISH

Page 33: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

quantities of estimation.

2nd Central line method.

3rd Long wall and short wall methods

4th Preparation of detailed estimate for small residential building with a flat roof.

5th Preparation of detailed estimate for small residential building with a pitched roof building.

3rd Ist Estimation of two rooms with WC Bath kitchen Veranda.

2nd Earth work for unlined channel.

3rd WBM and premix carpeting.

4th Single span RCC slab culvert

5th Earth work for plain and hills road.

4th Ist RCC work in beams slab, columns and lintel and foundations.

2nd User’s septic tank-10 users and 50 users.

3rd Calculation of material for Cement mortar in different proportion

4th Calculation of material for Cement concrete in different proportion.

Page 34: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

5th Brick /stone masonry in cement mortar.

5th 1st Plastering in different proportion

2nd Pointing in different proportion

3rd White washing in different proportion

4h Painting in different proportion

5th RCC work in slab

6th 1st Beams in different proportion

2nd ANALYSIS OF RATES INTRODUCTION

3rd Steps involving in analysis of rates

4th Requirement of material

5th Labor , sundries rate analysis

7th 1st Contractors profit and overheads

2nd Analysis for finishing items

3rd Rates of material and labor as given

4th 1- Earthwork in excavation in soil

5th 2-Earthwork in filling

8th 1st 3-RCC in roof, slabs, lintel and column

2nd Brick masonry in cement mortar

3rd Cement plaster

4th Whitewashing

5th Painting

9th 1st Stone masonry in cement mortar

2nd Running and maintenance cost of equipments

Page 35: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

3rd CONTRACTORSHIP INTODUCTION

4th Meaning of contract

5th Qualities of a good contractor

10th 1st Qualifications of a good contractor

2nd Essentials of a contract

3rd Types of contract

4th Advantages and disadvantages of a contract

5th Suitability and system of payments

11th 1st Single and two cover bids

2nd Tender, tender form and documents

3rd Tender notice

4th Submission of tender

5th Deposit earnest money and security money

12th 1st Retention money and maintenance period

2nd Classification and types of contracting firms

3rd Preparation of tender documents based on CSR

4th Introduction of schedule of rates

5th Calculation of cost based on CSR

13th 1st Detailed specification of different types of buildings works

2nd 1-from excavation in foundation

3rd 2-superstructure

4th 3-finishing operations

5th Exercise on

Page 36: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

preparing tender documents based on the following

14th 1st 1-earthwork 2- construction of small house bases on small drawing

2nd 3-RCC works 4- pointing, painting, plastering and flooring

3rd 5-white-washing 6-distempering and painting

4th 7-wood work including polishing

5th 8-sanitry and water supply works

15th 1st 9-false ceiling, aluminum partitioning, 10-tile flooring including base course

2nd 11-construction of WBM and concrete roads

3rd Exercise on preparation of comparative statements for items rate contract

4th VALUATION Purpose, principal, definition of different terms like depreciation, scrape and salvage value, market value etc.

5th Methods of valuation Replacement cost method Rental return method.

Page 37: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

NAME OF THE FACULTY: Shri Ravinder Garg, Sr. Lecturer in Civil Engineering.

Discipline:Civil.

Semester: 6th

Subject: Construction management and accounts

Lesson Plan Duration 15th Weeks (From January 2018 to April 2018)

**Workload (Lecturer/Practical) per week (in hours) LTP 5

Week Theory Practical

Lecture day Topic Practical day Topic

1st 1st Introduction of construction management significance.

2nd Main objectives of construction management

3rd Function of con-struction management( planning, organization

4th Staffing directing, controlling and coordinating.

5th Classification of construction into light heavy and industrial construction.

2nd Ist Stages of construction from

Mr AJAY

CMRA GOVT POLYTECHNIC , SANGHI

Page 38: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

conception to completion.

2nd Construction planning, stages of construction (pre tender stage and contract stage).

3rd Scheduling construction works by bar chart.

4th Definition of activity, identification, preparation of bar chart.

5th Preparation of bar chart for simple construction works

3rd 1st Preparation of schedules for labor , materials and machinery

2nd Limitations of bar chart

3rd SCHEDULING BY NETWORK ANALYSIS Introduction

4th Analysis of PERT

5th Analysis of CPM

4th 1st Difference between PERT and CPM

2nd ORGANIZATION INTRODUCTION

3rd Types of organizations

4th Line, line and staff, functional and their characteristics.

5th SITE ORGANISATION INTRODUCTION

5th 1st Principal of

Page 39: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

storing and stacking materials at site.

2nd Location of equipments

3rd Preparation of actual job layout for a building

4th Organizing labor at site

5th CONSTRUCTION LABOUR INRTRODUCTION

6th 1st METHODS OF RECORDING PROCESS

2nd Labor welfare act 1936(as amended)

3rd Payment of wages act 1936(as amended)

4th Minimum wages act 1948(as amended)

5th CONTOL OF PROCESS INTRODUCTION

7th 1st METHOD OF RECORDING PROCESS

2nd Analysis of process

3rd Taking corrective actions keeping head office informed

4th Cost time optimization for simple jobs (direct and indirect costs)

5th Variation with time and cost optimization

8th 1st IMSPECTION AND QUALITY CONTROL

Page 40: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

INTRODUCTION

2nd Need for inspection and quality control for the following 1-earthwork 2-masonry

3rd 3-RCC 4-sanitary and water supply services

4th ACCIDENTS AND SAFETY IN CONSTRUCTIONS INTRODUCTION

5th Accidents – causes and remedied

9th 1st Safety measure for 1-Excavation work 2-Drilling and blasting

2nd 3-Hot bituminous work

3rd 4- Scaffolding , ladders , formworks

4th 5-Demolition

5th Safety campaign and safety devices

10th 1st PUBLIC WORKS DEPARTMENT INTRODUCTION

2nd TECHNICAL SANCTION, administrative approval

3rd Allotment of funds, Re appropriation Of fund bills

4th Contractor ledger, Measurement book

5th Running and final account bills

Page 41: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

11th 1st Preparation of BOQ

2nd Completion certificate and report , hand receipt

3rd Aquittance roll, muster labor

4th Casual labor rolls duties, and responsibility of different cadres.

5th Budget stores, account of stock

12th 1st PW advances T&P

2nd VERIFICATION, survey report

3rd Road metal material charged direct to works

4th Account, expenditure and revenue report

5th Remittance and deposit head

13th 1st Definition of cash

2nd Cash book

3rd Precaution in custody of cashbook

4th Imprest account

5th Temporary advance

14th 1st Treasury challan

2nd Preparation of final bill

3rd Precautions taken during final bill

4th Account register

5th How to prepare account register

15th 1st Stock register

2nd How to preparation stock register

Page 42: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

NAME OF THE FACULTY: Shri Ravinder Garg, Sr. Lecturer in Civil Engineering.

Discipline: Civil.

Semester: 6th

Subject: ENVIRONMENTAL ENGINEERING.

Lesson Plan Duration 15th Weeks (From January 2018 to April 2018)

**Workload (Lecturer/Practical) per week (in hours) LTP 3

Week Theory Practical

Lecture day Topic Practical day Topic

1st 1st STUDY OF importance of environmental engineering. Importance of clean environment, control of environmental pollution.

2nd Control with respect to air, land, and water. Conservation of natural resources, environmental education and awareness, sustainable development.

3rd Environment and ecology – Introduction

2nd 1st Definition, understanding of environment, ecology concept.

2nd Eco system and type of eco system

3rd Energy flow and in eco system. Food chain,

3rd Ist Ecological

Mr PRATEEK MALIK

Page 43: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

pyramid consortium and ecological balance.

2nd WATER POLLUTION INTRODUCTION

3rd Causes of pollution in surface and underground water

4th Ist Eutrophication of lakes and its preventive measure

2nd BIS standards for water quality

3rd AIR POLLUTION INTRODUCTION

5th Ist Definition and principal air pollutants

2nd Atmospheric parameters influencing air pollution

3rd Types of air pollutants and their sources

6th 1st Effect of pollution on human beings, plants and animals

2nd Automobile pollution, BIS ambient air quality standard

3rd Measures to combat air pollution

7th 1st NOISE POLLUTION INTRODUCTION-

2nd Definition and units of measurement of noise

3rd Sources and

Page 44: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

effects of noise pollution, effect and control

8th 1st EFFECT IF MINING BLASTING AND DEFORESTATION INTRODUCTION-

2nd ILL effects of mining , blasting on human and wild life

3rd Ill effect of deforestation on human being and wild life.

9th 1st LAND USE INTRODUCTION

2nd Effect of land use on environmental quality

3rd Land use and natural disasters

10th 1st Land slide and soil degradation problems. Soil erosion

2nd Water logging problems and preventive measures

3rd Soil pollution and remedies

11th 1st ENVIRONMENTAL IMPACT ASSESMENT INTRODUCTION-

2nd DEFINATION AND REQUIREMENTS

3rd ENVIRONMENTAL IMPACT ASSESMENT program

12th 1st Flour chart of ENVIRONMENTAL IMPACT ASSESMENT Methodology

2nd Importance of EIA

3rd Need of

Page 45: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

ENVIRONMENTAL IMPACT ASSESMENT

13th 1st LEGISLATION TP CONROL ENVIRONMENTAL POLLUTION INTRODUCTION

2nd Indian legislative acts for water, land and air to control pollution

3rd Provision , control and implementation of the acts

14th 1st GLOBAL ISSUES OF ENVIRONMENTAL ENGINEERING INTRODUCTION--

2nd Global warming , ozone depletion, acid rain , oil pollution , hazard and their control

3rd Concept of clean technology

15th 1st Role of non renewable sources of energy in environmental pollution

2nd Conservation of energy resources like coal , oil etc.

3rd Alternative fuels like bio-diesel etc.

Page 46: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

NAME OF THE FACULTY: Shri.RavinderGarg, Sr. Lecturer in Civil Engineering.

Discipline: Civil.

Semester: 6th

Subject: Employability Skills-2.

Lesson Plan Duration 15th Weeks (From January 2018 to April 2018)

**Workload (Lecturer/Practical) per week (in hours) LTP 3

Week Theory Practical

Lecture day Topic Practical day Topic

1st 1st MOCK INTERVIEW PRACTICE --- Practice good nonverbal communication

2nd Dress for the job or company

2nd 1st Better listener and don’t talk too much

2nd Use appropriate language and don’t be too familiar.

3rd 1st Always look for the question behind the question

2nd PREPARING FOR MEETING PRACTICE—

4th 1st Identify your objective

2nd Professional impression for your coworkers and clients

5th 1st Be on time always

2nd Prepare an

Mr VIKASH SANGWAN

Page 47: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

agenda for the meeting

6th 1st GROUP DISCUSSION PRACTICE-

2nd Train students to be good listener

7th 1st Develop the patience to listen

2nd Revolve around the objective of learning, sharing and understanding.

8th 1st Relax during the interview due to anxiety and nervousness.

2nd SEMINAR PRESENTATION PREPARATION-

9th 1st MOTIVATE WELL, use diagrams, bring out economical and social benefits

2nd Speak loudly and don’t mumble

10th 1st Keep to tome (practice several times)

2nd Don’t assume the questioner know more than you

11th 1st MAKING A PRESENTATION--- 1-ELEMENTS OF A GOOD PRESENTATION

2nd Types and importance of visual aids

12th 1st Confident during presentation

2nd 2-STRUCTURE AND TOOLS OF PRESENTATION

13th 1st Having good ,engaging and effective

2nd Manipulate

Page 48: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

videos, images and audio clips

14th 1st 3-PAPER READING

2nd PRACTICE , speak during reading, don’t hesitate

15th 1st POWER POINT PRESENTATION

2nd How to create PPT

Page 49: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

Government Polytechnic Meham Lesson Plan

Name of the Faculty : Mohd Shad

Discipline : Civil Engg. Semester : 6th Subject : Earthquake Resistant Building Construction Lesson Plan Duration : 15 weeks ( from January, 2019 to April, 2019) **Work load (Lecture / Practical) per week(in hours): Lectures-03, Practicals -Nil

Week Theory Practical Lecture

day Topic

(Including assignment / test) Practical

Day

Topic

1st 1st Chapter 1. Elements of Engineering Seismology Seismic waves

N/A N/A

2nd Earthquake size (magnitude and intensity), Epicentre, Seismograph

N/A N/A

3rd Seismic waves, earthquake size (magnitude and intensity)

N/A N/A

2nd 4th Epicentre, Seismograph N/A N/A

5th Classification of earthquakes, Seismic zoning map of India

N/A N/A

6th Static and DynamicLoading, Fundamental period.

N/A N/A

3rd 7th Revision N/A N/A

8th Chapter 2.Seismic Behaviour of Traditionally- Built Constructions of India

N/A N/A

9th Performance of building during earthquakes

N/A N/A

4th 10th Mode of failure N/A N/A 11th Out-of-plane failure, in-plane failure,

Diaphragm failure N/A N/A

12th Connection failure, Non-structural components failure

N/A N/A

5th 13th Revision Assignment No.1 1 Classification of earthquakes, Seismic

zoning map of India 2 Epicentre, Seismograph

N/A N/A

14th Sessional Test No.1 N/A N/A 15th Chapter 3.Special construction method

Special construction method and tips N/A N/A

6th 16th Precautions to be observed while planning

N/A N/A

17th Designing of earthquake resistant building

N/A N/A

18th Construction of earthquake resistant building

N/A N/A

7th 19th Revision N/A N/A 20th Chapter 4. IS Codes

Introduction N/A N/A

21st IS Codes: 4326 N/A N/A 8th 22nd IS: 13828 N/A N/A

23rd IS: 1893(Part 1) N/A N/A

24th IS: 154326 N/A N/A

9th 25th IS: 13920 N/A N/A

GOVERNMENT POLYTECHNIC SANGHI

Mr. PRATEEK MALIK

Page 50: GOVERNMENT POLYTECHNIC SANGHI Lesson Plan Name of faculty:- Parveen Beniwal ( Theory ... · 2019-01-14 · Grading of aggregates ,coarse aggregates, fine aggregates, all in aggregates,

Week Theory Practical Lecture

day Topic

(Including assignment / test) Practical

Day

Topic

26th Revision Assignment No.2 1 IS Codes: 4326, IS: 13828 2 IS: 1893(Part 1), IS: 154326, IS: 13920 3 Special construction method and tips

N/A N/A

27th Sessional Test No.2 N/A N/A 10th 28th Chapter 5. Seismic Provision of

Strengthening Seismic Provision of Retrofitting

N/A N/A

29th Brick and RCC Structures N/A N/A

30th Seismic Provision of RCC Structures N/A N/A

11th 31st Revision N/A N/A

32nd Chapter 6: Provision of reinforcement detailing Reinforcement detailing in masonry

N/A N/A

33rd Reinforcement detailing in RC constructions

N/A N/A

12th 34th Detailing in masonry N/A N/A

35th RC constructions N/A N/A

36th Chapter 7. Disaster Management Disaster rescue, psychology of rescue

N/A N/A

13th 37th Rescue workers N/A N/A 38th Rescue plan, rescue by steps N/A N/A 39th Rescue equipment N/A N/A

14th 40th Safety in rescue operations N/A N/A 41st Debris clearance N/A N/A 42nd Casuality management. N/A N/A

15th 43rd Revision Assignment No.3 1 Reinforcement detailing in masonry 2 Rescue equipment, Safety in rescue operations 3 Debris clearance

N/A N/A

44th Revision N/A N/A 45th Sessional Test No.3 N/A N/A


Recommended