+ All Categories
Home > Documents > Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of...

Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of...

Date post: 23-Apr-2018
Category:
Upload: duonghanh
View: 217 times
Download: 4 times
Share this document with a friend
13
~fHCflH Government of India $M~THi'.fIl am- ~ !ihilfllctl q''1I('1li Ministry of Electronics & Information Technology $M~THCR4 Hcf;(1'1, 6,m~:m CflTAlMCR4, ~~-110003 Electronics Niketan, 6, C G 0 Complex, New Delhi-ll0003 Website: www.meity.gov.in ~ No 3.(.1.13.)/20.Q8:£G- II (Vol-III) ~ Date 3.1::05.-;20l.7 . Minutes of Meeting Subject: Minutes of the Project Review and Steering Group (PRSG) Meeting on "Providing Broadband connectivity to 2500 CSCs in North East & difficult areas through NICSI" held on 19 th May, 2017 at 11:00 AM, under the Chairmanship of Joint Secretary & GC (eGov), MeitY. A PRSG Meeting was held under the Chairmanship of Joint Secretary & Group Coordinator (eGov), MeitY on 19 th May, 2017 at 11:00 AM at Conference Hall-4062, MeitY to review the status of the CSC - VSAT project being implemented by CSC -SPY for supply/installation of VSA T equipments and NICSI as an agency for setting up VSAT Hub & providing connectivity (Satellite Bandwidth) to VSA Ts at CSCs. 2. The copy of the Minutes of the Meeting is enclosed herewith for your kind information and necessary action. 3. The minutes are issued with the approval of the Chairman, PRSG and Group Coordinator (eGov), MeitY. (Pravin Chandekar) Director To, 1. Joint Secretary, Ministry of Rural Development (MoRD), New Delhi 2. Director General, National Informatics Centre, New Delhi 3. MD, National Informatics Centre Services Inc. (NICSI), New Delhi 4. CEO, CSC e-Governance Services India Ltd. (CSC -SPY), New Delhi 5. Deputy Director, IFD, MeitY, New Delhi Copy for kind information: 1. Secretary (IT), Department of Information Technology, Govt. of Arunachal Pradesh, Civil Secretariat, Itanagar - 791 111, Arunachal Pradesh 2. Principal Secretary (IT), Department of Information Technology, Govt. ofTripura, ITI Road, Indra Nagar, Agartala- 799 006, Tripura ~ Digital India "tJ Power To Empower t ELECTRONICS INDIA Billion Needs Million Chips
Transcript
Page 1: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

~fHCflHGovernment of India

$M~THi'.fIl am- ~ !ihilfllctl q''1I('1liMinistry of Electronics & Information Technology

$M~THCR4 Hcf;(1'1, 6,m~:mCflTAlMCR4,~~-110003Electronics Niketan, 6, C G 0 Complex, New Delhi-ll0003

Website: www.meity.gov.in

~No 3.(.1.13.)/20.Q8:£G- II (Vol-III)

~Date 3.1::05.-;20l.7 .

Minutes of Meeting

Subject: Minutes of the Project Review and Steering Group (PRSG) Meeting on"Providing Broadband connectivity to 2500 CSCs in North East & difficultareas through NICSI" held on 19th May, 2017 at 11:00 AM, under theChairmanship of Joint Secretary & GC (eGov), MeitY.

A PRSG Meeting was held under the Chairmanship of Joint Secretary & GroupCoordinator (eGov), MeitY on 19th May, 2017 at 11:00 AM at Conference Hall-4062, MeitY toreview the status of the CSC - VSAT project being implemented by CSC -SPY forsupply/installation of VSA T equipments and NICSI as an agency for setting up VSAT Hub &providing connectivity (Satellite Bandwidth) to VSA Ts at CSCs.

2. The copy of the Minutes of the Meeting is enclosed herewith for your kind informationand necessary action.

3. The minutes are issued with the approval of the Chairman, PRSG and Group Coordinator(eGov), MeitY.

(Pravin Chandekar)Director

To,1. Joint Secretary, Ministry of Rural Development (MoRD), New Delhi2. Director General, National Informatics Centre, New Delhi3. MD, National Informatics Centre Services Inc. (NICSI), New Delhi4. CEO, CSC e-Governance Services India Ltd. (CSC -SPY), New Delhi5. Deputy Director, IFD, MeitY, New Delhi

Copy for kind information:1. Secretary (IT), Department of Information Technology,

Govt. of Arunachal Pradesh, Civil Secretariat,Itanagar - 791 111, Arunachal Pradesh

2. Principal Secretary (IT), Department of InformationTechnology, Govt. ofTripura, ITI Road, Indra Nagar,Agartala- 799 006, Tripura

~ Digital India"tJ Power To Empower

t•ELECTRONICS INDIABillion Needs Million Chips

Page 2: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

3. Secretary, Department of S&T and Information Technology,Govt. of Manipur, North Block, Manipur Secretariat,Imphal - 795001, Manipur

4. Commissioner & Secretary (IT), Department ofInformationTechnology, Govt. ofMeghalaya, Ground Floor, NICBuilding, Secretariat Hall, Shillong, Meghalaya

5. Secretary (IT), Department of Information &Communication Technology, Govt. ofMizoram, OldSecretariat Building, Block "A", Top Floor, Aizawl- 796 001

6. Secretary (IT), Department of Information Technology,Govt. of Nagaland, New Secretariat (Thizama Road),Kohima- 797 001, Nagaland

7. Secretary (IT), Department of Information Technology,Govt. ofUttarakhand, Uttarakhand Secretariat,Subhas Road, Dehradun - 248001, Uttarakhand

8. Secretary, Department of Information Technology,Govt. of Jammu & Kashmir, 151 Floor, Room-III,Secretariat, Srinagar, Jammu & Kashmir

9. Additional Chief Secretary, Department of InformationTechnology, Govt. of Himachal Pradesh, IT Bhavan, Mehli,Shimla-13

10. Secretary (IT), Department oflnformation Technology,Govt. of Jharkhand, Jharkhand Mantralaya,Project Building, Dhurwa, Ranchi- 834 004

11. Commissioner & Secretary, LT. & Communication Deptt.Govt. of Rajasthan, IT Building,Yojana Bhawan,Tilak Marg, C-Scheme, Jaipur-302005, Rajasthan

12. Commissioner & Secretary, Information TechnologyDepartment, Goverrunent of Assam, Assam Sachivalaya,Block C, 3rd Floor, Dispur, Guwahati -781006, Assam

SO (SB), MeitY, New Delhi: For guard file.

Copy for information: Chairman (PRSG)/ Joint Secretary & GC (eGov), MeitY.

Page 2 of 13

Page 3: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

3(113)12008-EG-II (Vol-II) 31-05-2017

Minutes of Meeting

Subject: Minutes of the Project Review and Steering Group (PRSG) Meeting on"Providing Broadband connectivity to 2500 CSCs in North East & difficultareas through NICSI" held on 19th May, 2017 at 11:00 AM, under theChairmanship of Joint Secretary & GC (eGov), MeitY.

A PRSG Meeting was held under the Chairmanship of Joint Secretary & GroupCoordinator (eGov), MeitY on 19th May, 2017 at 11:00 AM at Conference Hall-4062, MeitY toreview the status of the CSC -VSAT project being implemented by CSC -Sl'V forsupplylinstallation of VSA T equipments and NICSI as an agency for setting up VSAT Hub &providing connectivity (Satellite Bandwidth) to VSATs at CSCs.

2. The list of participants is placed at Annexure A.

3. At the outset, the Chairman welcomed the participants and directed Program Division topresent the overall progress of the project till the project ending period up to March, 2017.Accordingly, the PRSG was apprised ofthe progress made in 12 States with regard to the physicaland financial progress made under the CSC-VSAT Project.

4. The following points were deliberated and discussed by the PRSG:

i) Physical progress:

Out of 2,488 nos. of ordered VSATs, WPC clearance obtained for 2,384 VSATs and a totalof 1,981 VSATs have been commissioned till date.The State-wise details can be seen at Annexure B. The progress timeline can be seen atAnnexure C.

ii) Financial progress:

o Outlay: Rs. 49.88 Cr. (A)• NICS 1- Rs. 40.56 Cr. (MeitY's contribution as GIA = Rs. 20.28 Cr. and State's

share as ACA = Rs. 20.28 Cr. as per Corrigendum Admin Approval dated05.11.2012)

• CSC SPV- Rs. 9.32 Cr. as GIA

o Total progressive release till date= Rs. 33.87 Cr. (B)o UC received till date= Rs. 29.92 Cr.o Total remaining Balance = Rs. 16.01 Cr., (A - B) among this,

• Bandwidth charges to NICSI= Rs. 15.32 Cr. (balance of the State's share as ACAas per Admin. Approval), and,

• Supply/Installation of VSATs to CSC-SPV= Rs. 0.69 Cr. (MeitY's contribution asGIA)

Details can be seen at Annexure D.

Page 3 of 13

Page 4: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

iii) Utilization of VSATs for CSCs:

Performance over the month: Regarding access of VSATs by CSC- VLEs, NICINICSIteam has informed that only 33% of the total installed VSATs were online in March, 2017(Considering those VSATs which have come online at least once during the period)

Day-wise performance: The day-wise analysis regarding access of the VSATs by CSC alsoindicates that only 223-438 VSATs were online per day (i.e. only 11-22%) during the monthof March, 2017, out of the total 1981 installed VSATs.

Details can be seen at Annexure E.

From such analysis, it was interpreted that the usage of VSATs is very low, the reason ofwhich may be the following:

There is a presence of alternate mode of connectivity, upon which VLEs are muchmore comfortable.Most of the CSCs are not functional throughout the month.

iv) Closure of the project:

It was also deliberated that the extended period of the entire CSC scheme under NeGP wasalready over in March, 2017. The VSAT project, being a part of that scheme, was approved to beimplemented by using the savings on the entire scheme after the finalization of lower bid valuesby the State implementing agencies (called SDAs) compared to nominal estimated values towardsthe revenue supports for the CSC- VLEs as viability gap funding under CSC scheme.Accordingly, the CSC -VSAT project was also validated till March, 2017 by following therecommendation in the 11th Empowered Committee Meeting on CSC Scheme held on 12.11.2013chaired by Secretary, MeitY. As per the recommendation in the PRSG meeting held on 9th

August, 2016, NICSI has already surrendered Satellite bandwidth after 31-March-2017 which ithad hired from ISRO for CSC -VSAT Project.

On the other hand, the ongoing CSC 2.0 project under Digital India is completely based on theservice/transaction oriented self-sustainable entrepreneurship model, wherein, the VLEs shallarrange for Capex and Opex for setting up and operation of CSCs. The existing CSCs havealready been migrated to the new pan India platform of CSC-Digital Seva under CSC 2.0.

Under such circumstances and in view of very low access/utilization of the VSATs, thePRSG recommended not to further extend the CSC-VSAT project after the expiry of itsvalidity period i.e. 31-March-2017.

v) Fund requirement by NICSI:

NICSI informed that around Rs. 10 Crores (out of ACA component-State's share) would berequired to settle the project expenditures incurred till 31 March 2017, which includes loan byNICSI of around Rs. 5.5 Cr, and, the expenditures incurred for FY 2016-17 of around Rs. 4.5 Cr.NICSI has also informed that the States of Tripura, l&K and lharkhand have not yet transferred toNICSI the ACA fund sanctioned by MeitY in FY 2014-15 under Centrally Sponsored Schemebudget, which is approx. Rs. 1.37 Cr. The CEO, lAP IT has informed that the transfer ofsanctioned amount of Rs. 88.15 lakhs to NICSI by the Govt. of lharkhand is in advanced stageand will be settled very soon.

Page 4 of 13

Page 5: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

In this regard, the Chairman has pointed out that a total balance amount of Rs. 15.32 Cr. is yet tobe released by the concerned State Governments from their own State's share as ACA component.In this context, the representative from the Govt. of Assam has informed that release of State'sshare (ACA) to NICSI for the balance amount of Rs. 2.93 Cr. is already under process as per thedecision at State level. The PRSG has requested all concerned State Governments for takingan early decision towards release of balance ACA fund to NICSI (bandwidth charges) fromtheir own States' share. NICSI has been advised to communicate with the concerned States forthe balance ACA funds.

vi) Transfer ofCSC-VSAT Hub:

NIC has informed that their own VSAT Hub which is presently being used exhaustively forvarious Govt. departments is quite old. To overcome this hurdle, NIC has requested MeitY to giveits consent to transfer CSC-VSAT Hub (which is in idle stage after ending of the project durationi.e. after 31-March-2017) from NICSI to NIC. The PRSG has recommended for takingappropriate action by NICSI for transfer of the CSC-VSAT Hub from NICSl to NIC, at noadditional financial implications.

vii) Supports to other organizations for smooth transition from CSC-VSAT hub:

NICSI has informed that the bandwidth of NICSI's CSC -VSAT hub was shared with MoRD &other Govt. organizations. To avoid any disruption in their VSAT service, NICINICSI wassuggested to extend full support & co-operation for smooth transition of VSAT hub / network toany other existing or new licensee /service provider based on the option to be selected by theorganizations concerned. In this context, NIC has informed that it has considered the requestsfrom many of the State Govt. departments and also from MoRD and providing connectivity fromits own VSAT Hub (beyond any project scope) for one more year, i.e. upto 31 March 2018 so asto allow these Govt. departments sufficient times to explore availing connectivity from alternatesources.

viii) Stock entry of the project inventories:

It was also elaborated that as the project duration is already over in March 2017, the concernedStates need to maintain stock register of the inventories under the project in coordination withCSC -Spy and work out various options for continuation of VSAT connectivity, if req uired,within the States' own budget. Further in this direction, the representatives of the States were alsosuggested that the required bandwidth can be opted either through- Other existing licensee/ Newcaptive VSA T Licensee, or, Shifting the existing VSATs to any other VSAT service provider'shub supporting the existing technology.

As CSC -SPY has already obtained the ISP license and monitoring & expansion of the CSCinitiatives is rested upon CSC -SPY, it was also advised to work out suitable self-sustainablebusiness model at their own Capex & Opex for providing connectivity to those CSCs which areactually being affected due to lack of connectivity.

Finally, it was advised that CSC -Sl'V being the implementing agency for supply, installation &commissioning shall coordinate with the States for stock entry works and submit Project ClosureReport. NICSI was also directed to submit the Project Closure Report on their own part ofimplementation, such as, setting up VSAT Hub & providing connectivity (Satellite Bandwidth) toVSATs.

Page 5 of 13

Page 6: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

8. After detailed discussions and deliberations, the PRSG has recommended the followingactions:

a) Necessary action to be expedited for stock entry of the project inventories andsubmission of the Project Closure Report at the earliest.

(Action by: NICSL CSC -SPVin coordination with concerned State Governments)

b) Settlement of pending transfer of the ACA funds to NICSI which were sanctioned byMeitY in FY 2014-15 and submission of final Utilization certificates along withaudited statement of accounts (Ref: Annexure-D).

(Action by: concerned State Governments)

c) Necessary action for release of balance ACA fund to NICSI (bandwidth charges) fromthe States' share (Ref: para-4 (v)).

(Action by: concerned State Governments)

d) Appropriate action for transfer of the CSC-VSAT Hub from NICSI to NIC, at noadditional financial implications. (Action by: NICSI & NIC)

e) To extend necessary supports to MoRD and other organizations for smooth transitionfrom NICSI's CSC -VSAT Hub to other suitable service provider's hub, aftersurrender of satellite bandwidth of CSC- VSAT. (Action by: NICINICSI)

Meeting ended with a vote of thanks to and from the Chair.

********************

Page 6 of 13

Page 7: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

Annexure A

List of Participants:

MeitY, GoI:1. Sh. Sanjiv Mittal, LA.S., Joint Secretary & GC (eGov), MeitY- Chairman2. Sh. Pravin Chandekar, Director, MeitY, New Delhi3. Sh. Notan Roy, Scientist-C, MeitY, GoI

State Governments:1. Sh. Dhannendra Singh, Addl. Secretary, Dept. ofIT, Govt. ofUttarakhand2. Sh. Sangeet Dubey, Dy. Resident Commissioner, Govt. of Arunachal Pradesh3. Sh. K.K. Sinha, CEO, JAPIT, Govt. of Jharkhand4. Smt. Shannila Gupta, ACP (Dy. Dir), DolT, Govt. of Rajasthan5. Sh. S.K. Bhuyan, AMTRON. Govt. of Assam6. Sh. Harinder Jaswal, Head-SeMT, Himachal Pradesh

NICINICSI:

1. Sh. Dayal Khandelwal, Technical Director, NIC, New Delhi2. Sh. Girish Chandra, GM, NICSI, New Delhi3. Sh. Gyan Ranjan Nanda, Principal System Analyst & Scientist-D, NIC, New Delhi4. Sh. Zail Singh, ProConsultant, NICSI

CSC-SPV:1. Smt. Soumi Banerjee, AVP, CSC -SPY2. Sh. Ankit Tyagi, Manager, CSC -Spy

Page 7 of13

Page 8: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

Annexure B

Physical Progress

Out of 2488 nos. of ordered CSC- VSATs. a total of 1981 CSC- VSATs have been commissionedtill 31-03-2017 and 654 CSC- VSA Ts came online at least once during the month.

Status of CSC VSATs in North East Region and other inaccessible areasas on 31-03-2017

SI. Ordered Regulatory Installed Not Installed Online* OfflineNo. State VSATs Cleared Sites VSATs VSATs VSATs VSATs(wpC/SACFA)

1 Arunachal 90 90 83 7 37 46Pradesh2 Assam 354 347 281 66 84 197., Himachal 361 341 251 90 101 150.)

Pradesh

4 Jammu & 37 37 28 9 9 19Kashmir5 Jbarkband 362 325 278 47 76 2026 Manipur 355 349 265 84 70 1957 Meghalaya 147 147 141 6 45 968 Mizoram 136 135 119 16 32 879 Nagaland 127 96 53 43 22 3110 Rajasthan 167 167 161 6 60 10111 Tripura 145 144 123 21 43 8012 Uttarakband 207 206 198 8 75 123

Total(CSC 2488 2384 1981 403 654 1327VSATs)MoRD(sharing the

13 bandwidth 477 357 326 142 71 255ofCSC-VSATHubGrand Total(CSC+ 2965 2741 2307 545 725 1582MoRD)

*Considering VSA Ts which have come online at least once during the period.

Page 8 of 13

Page 9: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

Annexure C

Progress timelines

} NICSI obtained VSAT License from DoT in September 2009, which is mandatory to provide VSATService.

} Initially, NICSI utilized the existing CIC VSAT Hub infrastructures and made the VSAT Hub ready toprovide VSAT connectivity to CSCs in March 2010.

} First lot of pilot VSATs were installed in December 2010.

} NICSI procured Latest technology VSAT Hub, Ku Band antenna & RF Chain and setup CSC VSATHub in Nov 2011.

} CSC SPY Placed order for first lot of 1597 VSATs on 24 May 2011.

'» NICSl Obtained WPC clearance (mandatory to install & operate VSAT) for first lot of 476 VSATs inNov 2011.

} CSC Spy deployed the first CSC VSAT on NICSI's VSAT Hub on 2111112011 at Mylliem Block,East Khasi Hills, Meghalaya (VSAT ID MGCH0018).

} 1000thVSAT got installed in June 2013 (HPCHOl77)

} 1500lh VSAT got installed in June 2014 (JHCH0131)

} Last CSC VSAT (1981 Ih) installed in Jan 2017 (HPCH0265)

} Total number ofCSC VSATs ordered : 2488

} Total Number ofWPC Cleared Sites : 2384

} Total number ofCSC VSATs deployed: 1981

} CSC VSAT Hub was used for providing connectivity to other Govt. Depts.

} NIC provided bandwidth to these State Govt. VSATs through CSC VSAT Hub.

} VSATs Procured & managed by State Govt. Depts. Either directly or through CSC SPY.

} A total of 1000 State Govt. VSATs were committed bandwidth.

} MeitY instructed to provide connectivity to 477 VSATs ofMoRD by sharing CSC VSAT Bandwidth.

} A total of326 MoRD VSATs were operational on CSC VSAT Hub as on 31 March 2017.

} _PSRG met on 91h August 2016 to review the status of the project and recommended that the projectduration would be ending in March 2017.

} Accordingly MeitY vide its letter dated 22.11.2016 informed all states to take necessary action andsubmit project closure report to MeitY.

} NICSI pointed out the difficulty in running the project due to project fund unavailability, mainly ACAfunds not being released by States and apprised on VSAT license fee issue.

Page 9 of13

Page 10: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

~ NICSI submitted that since project would be closed in March 2017, it would initiate the process forclosure of said project on 3 15t March 2017 by surrendering the VSAT License, Bandwidth etc.

~ PRSG in its meeting dated 9th August, 2016 also suggested various options for continuation of VSATconnectivity if required by CSC SPY, MoRD etc., post the closure of VSA T project by MeitY!NICS!.It was suggested that the said bandwidth can be opted either through- Other existing licensee/ Newcaptive VSAT Licensee, or, Shifting the existing VSATs to any other VSAT service provider's hubsupporting the existing technology.

~ NICSI has surrendered Satellite bandwidth which it had hired from ISRO for CSC VSAT Project.

~ NICSI has written to DoT for surrender ofVSAT License.

~ As on date NICSI holds no Satellite Bandwidth and all its VSAT services have been closed.

~ NICSI has received a total of Rs 25 Crores against sanctioned project outlay of Rs 40.56 Crore.

~ Since NIC's own VSAT Hub is quite old, NIC has requested MeitY to give its consent to transfer CSCVSAT Hub (which is in idle stage after ending of the project duration i.e. after 31-March-20 17) fromNICSI to NIC.

~ NICSI needs around Rs. 10 Crores (out of ACA component-State's share) to settle the projectexpenditures incurred till 31 March 2017.

~ Based on MeitY's decision, NIC intimated State Govt. Depts about the closure ofVSAT service.

~ In the PRSG meeting dated 9th August, 2016, NIC!NICSI was advised to extend full support & co-operation for smooth transition of VSAT network to the existing or new licensee/agency/serviceprovider based on the option to be selected by State Governments.

~ NIC received requests from many of these State Govt. departments and also from MoRD to continueproviding VSAT connectivity.

~ NIC considered the requests and providing connectivity from its own VSAT Hub (beyond any projectscope) for one more year, i.e. upto 31 March 2018 so as to allow these Govt. departments sufficienttimes to explore availing connectivity from alternate sources.

Page 10 of 13

Page 11: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

Annexure D

Financial Progress

o Outlay: Rs. 49.88 Cr.• NICSI- Rs. 40.56 Cr. (MeitY's contribution as GIA = Rs. 20.28 Cr. and State's share as

ACA = Rs. 20.28 Cr. as per Corrigendum Admin Approval dated 05.11.2012 )

• CSC SPV- Rs. 9.32 Cr. as GIA

o Progressive release till date (Rs. 33.87 Cr.) -• GIA progressive release to NICSI Rs. 20.28 Cr. (Released amount Rs. 19.32 Cr &

Interest earned Rs. 0.96 Cr)

• GIA progressive release to CSC SPY Rs. 8.63 Cr., (Released amount Rs. 9.32 Cr,Interest earned is Nil, Refunded amount Rs. 0.69 Cr)

• ACA release Rs. 4.96 Cr. in FY 2014-15 to l1-States for payment towards NICSIbandwidth charges (except Assam),

o Utilization Certificates (UC received Rs. 29.92 Cr.):• GIA: Rs. 28.91 Cr., Balance = NIL

o NICSI submitted UCs against GIA (Rs. 20.28 Cr.). Unspent balance is NIL.

o CSC SPY submitted UCs against GIA for Rs. 8.63 Cr. & refunded Rs. 0.69 Cr.(23.06.2016). Unspent balance is NIL.

• ACA: Rs. 1.0086 Cr., Balance=Rs. 3.95 Cr.

Arunachal Pradesh, Meghalaya, Mizoram submitted the UCs (Amount Rs. 100.86lakhs);

UCs awaited from 8 States (Amount Rs. 394.9282 lakhs- Tripura, HP, Manipur,Nagaland, Uttarakhand, J&K, Jharkhand & Rajasthan);

NICSI has informed that the following States have not yet transferred to NICSIthe ACA fund sanctioned by MeitY in FY 2014-15 under Centrally SponsoredScheme budget, which is approx. Rs. 1.37 Cr.

Tripura= Rs. 39.21 lakhs, J&K= Rs. 10 lakhs, Jharkhand= Rs. 88.15 lakhs

o Total remaining Balance =Rs. 16.01 Cr., among this,• For bandwidth charges to NICSI= Rs. 15.32 Cr. # (balance of the State's share as ACA as

per Admin. Approval), and,

• For Supply/Installation of VSATs to CSC-SPV= Rs. 0.69 Cr. (MeitY's contribution asGIA)

# Balance Bandwidth charges (ACA component)

S. State ACA Sanctioned bX UC Balance of ACANo. component DeitY to States submitted component (T-

(as per Plan) for release to by the Y)(T) NICSI in FY States

2014-15 -(V)1 Arunachal Pradesh 73 24.34 24.34 * 48.66

Page 11 of 13

Page 12: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

S . State ACA Sanctioned b~ UC Balance of ACANo. component DeitY to States submitted component (T-

(as per Plan) for release to by the Y)(T) NICSI in FY States

2014-15 (Y)2 Assam 293 0 0 2933 Tripura 120 39.21 0 80.794 Himachal Pradesh 299 50 0 2495 Meghalaya 122 39.75 39.75 82.256 Manipur 294 95.99 0 198.oI7 Mizoram 112 36.77 36.77 75.238 Nagaland 105 34.34 0 70.669 Uttarakhand 171 44.27227 0 126.7277310 l&K 31 10 0 2111 lharkhand 270 88.l5 0 181.8512 Rajasthan 138 32.96592 0 105.03408

Total 2028 495.7882 100.86 1532.212

* Original Signed copy of the UC is awaited from Arunachal Pradesh

Page 12 of 13

Page 13: Govt. ofJammu &Kashmir, 1 Shimla-13 - Ministry of ...meity.gov.in/writereaddata/files/MOM_PRSG_CSC-VSAT_19.05...review the status of the CSC -VSAT project being implemented by CSC

Annexure EUtilization of VSATs for CSCs

Observation-I:

Regarding access/utilization ofVSATs by CSC-VLEs, following have been recorded:

Month Installed VSA Ts Online VSATs*Online VSA Ts

(%)January, 2015 1,850 946 51%January, 2016 1,943 864 44%January, 2017 1,981 697 35%February, 2017 1,981 671 33.8%March, 2017 1,981 654 33%

*Considering VSATs which have come online at least once during the period.

Observation-2:

The day-wise analysis regarding access of the VSATs by CSC also indicates that only 223-438VSATs were online per day (i.e. only 11-22%) during the month of March, 2017, out of the total1981 installed VSATs.

Status of CSC VSATs in NER and other inaccessible areas as on 31-03-2017(Ref: vsats.nic.in)

S. State Total Regulatory Total Total Non *Online OfflineNo. V-SATs Cleared Commissioned Commissioned VSATs day- VSATs day-

Ordered Sites wise wise(WPC/ performance performanceSACFA) (min-max) (min-max)

I Arunachal 90 90 83 7 10-23 60-73Pradesh

2 Assam 354 347 281 66 31-48 233-250

3 Himachal 361 341 251 90 35-64 187-216Pradesh

4 Jammu & 37 37 28 9 1-7 21-27Kashmir

5 Jharkhand 362 325 278 47 28-54 224-250

6 Manipur 355 349 265 84 22-37 228-243

7 Megha1aya 147 147 141 6 11-36 105-130

8 Mizoram 136 135 119 16 16-25 94-1039 Naga1and 127 96 53 43 3-12 41-5010 Rajasthan 167 167 161 6 28-47 114-13311 Tripura 145 144 123 21 10-34 89-11312 Uttarakhand 207 206 198 8 28-51 147-170

Total 2488 2384 1981 403 223-438 1543-1758(projectpurpose/orCSCs)