Global Engineering ServicesAPA Product Development 1
GPDS - Basics
Global Engineering ServicesAPA Product Development
Global Product Development System - GPDS
2
GPDS IS THE GLOBAL CROSS FUNCTIONAL PROCESS TO DEVELOP AND DELIVER NEW VEHICLES EXCEEDING CUSTOMER EXPECTATIONS WHILE CONTINUOUSLY IMPROVING EFFICIENCY AND EFFECTIVENESS.
Global Engineering ServicesAPA Product Development
FPDS VS GPDS
3
GPDSFPDS
Global Engineering ServicesAPA Product Development
GPDS
4
• GPDS is based upon the Mazda Product Development System (MPDS).
• Each Ford Brand (FoE, JLR, Volvo, FNA and Mazda was benchmarked to select the basis for GPDS.
• MPDS was by far the fastest Product Development System and closest to Toyota in time to Market.
Global Engineering ServicesAPA Product Development
GPDS
5
• GPDS has taken 8 to 10 months out of Ford’s Product Development System (FPDS) time.
• However, GPDS is still 4 months slower than MPDS based upon our current capability.
Global Engineering ServicesAPA Product Development 6
Global Product Development System - GPDS
Global Engineering ServicesAPA Product Development
UN / UP
7
Global Engineering ServicesAPA Product Development
UNDERBODY
8
Body Chassis Electrical Climate/Cooling
Dash PanelFloorpanSide RailsF/R Bumper StructureSeat StructureIP StructureSteering Wheel StructureAir Bag Mounting and PackagingRestraint- Lower Anchorage
SuspensionBrakesSteeringTiresWheel StructureBody MountsFrame/Sub-Frame
EDS Under Body Wiring- PT & ChassisUnder Body Modules(Brakes, Restraints, etc)Power SupplyRestraint Electronics
Climate Control Compressor Underhood Lines, etc.Cooling Module
Global Engineering ServicesAPA Product Development
UPPERBODY
9
Body Body- Exterior
Body - Interior Chassis Electrical Climate
Body Side &
FendersClosuresRoofHood
BumperExterior OrnMirrorsLightingWiper/ WashWindshield
Door TrimIPSeatsRestraintsHeadlinerBolsterSteering Wheel StylingAir Bags
Wheel Styling
EDS Upper Body WiringSwitchesDriver info.Infotainment/ Multimedia
Climate Control Ducts/ Controls, etc.
Global Engineering ServicesAPA Product Development
GPDS – SCALEABILITY DEFINITION
10
Global Engineering ServicesAPA Product Development 11
GPDS – SCALEABILITY DEFINITION
Global Engineering ServicesAPA Product Development 12
GPDS – SCALEABILITY DEFINITION
Global Engineering ServicesAPA Product Development
GPDS - MILESTONE
13
Global Engineering ServicesAPA Product Development
GPDS Process
14
Global Engineering ServicesAPA Product Development
GPDS Milestone details
15
Global Engineering ServicesAPA Product Development
Commonly used Milestones
PS – PROGRAM START PA – PROGRAM APPROVAL
FDJ – FINAL DESIGN JUDGEMENT LR – LAUNCH READINESS
JOB 1 TT BUILD, PP BUILD
V0 – VERIFICATION 0 ( UNV0 – Underbody Verification 0
UPV0 – Upperbody Verification 0)
PEC – PRELIMINARY ENGINEERING CONFIRMATION
FEC – FINAL ENGINEERING COMPLETION
16
Global Engineering ServicesAPA Product Development
Mail Detail
17
The IMDS submission is an ongoing, progressive process, start from <UNV2> and end by <PEC>.
By <PEC>, all suppliers are required to meet the full compliance and this is not negotiatable.
This is clearly stated in the RSMS standard, and RSMS standard is in the SOW to every single supplier, which means you have already signed up to complete the IMDS by <PEC> with zero non-compliance. It is Ford Trustmark!
Global Engineering ServicesAPA Product Development
Mail Detail
18
If there is any banned substances identified in the data sheet, you are required to substitute the materials with zero non-compliance, and this is a part of the <PEC> deliverables, which mean you have to conduct the Engineering Changes accordingly.
This means a lot than a simple materials change, it may request re-DV, PV. Therefore, you could picture at the worst case, if you submit MDS only one time at the last minute before <PEC>, and based on the Ford approval, you found out there is a violation, then your part will not meet the <PEC> timing.
Global Engineering ServicesAPA Product Development 19
OTHER MAILS
MILESTONE EXPLAINATION
Global Engineering ServicesAPA Product Development 20
QUESTIONS