Form3160-3 FORM APPROVED (August 2007) OMBNo. 1004-0137 Expires July31, 2010 UNITED STATES DEPARTMENT OF THE INTERIOR 5. Lease SerialNo. BUREAUOF LAND MANAGEMENT UTU-74389 6. If Indian,Alloteeor TribeName APPLICATION FOR PERMIT TO DRILL OR REENTER NA O O 2 If Unitor CAAgæement,NameandNo. la. Type of work: / DRILL REENTER West Point 8. Lease NameandWellNo. Ib. Type of Well: Oil well O GasWell Other SingleZone MultipleZone West Point Federal 3-31-8-16 2. Nameof Operator Newfield Production Company 9. API We.11No. 3a. Address Route #3 Box 3630, Myton UT 84052 3b. PhoneNo. (include area code) 10.Fieldand Pool,or Exploratory (435) 646-3721 Monument Butte 4. Locationof Well(Reportlocationclearly and in acontance with anyState requirements.*) 11.Sec.,T.R. M. or Blk.andSurveyor Area Atsurface NEINW 500'FNL1931'FWL gQ.ÔOgØÔ Sec.31,T8SRí6E At proposed prod. zone 4) So (ey | n' 14. Distanceinmilesanddirectionfrom nearest town or post oEce* 12.Countyor Parish 13. State Approximately 10.3 miles southwest of Myton, UT Duchesne UT 15. Distancefrom proposed* 16. No.of acresin lease 17. SpacingUnitdedicatedto this well locationtonearest propertyor leaseline, ft Approx. 500' f/lse, 500' flunit 541.00 (Also to nearestdrig. unit line, if any) 40 Acres 18. Distancefromproposed location* 19.ProposedDepth 20. BLM/BIA BondNo. on file pl ed for o tdhis linas'Ompleted' Approx. 1374' 6,435' WYB000493 21. Elevations(Showwhether DF,KDB,RT, 4 etc.) 22. Approximate date workwill start* 23. Estimatedduration 5765' GL (7) days from SPUD to rig release 24. Attachments The following,completedinaccordance with the requirements of OnshoreOilandGas OrderNo.I, must be attachedto thisform: 1. Wellplat certified by a registered surveyor. 4. Bondto cover the operationsunlesscovered by an existing bondon file (see 2. A DrillingPlan. Item20 above). 3. A Surface Use Plan (if the location is on National Forest System Lands, the 5. Operatorcertification SUPO must be filed with theappropriateForestServiceOffice). 6. Suchother sitespecificinformationand/or plans as may be required by the BLM. 25. Signature / Name (Printed/Typed) Date // Mandie Crozier Title Regulatory S I t Ap ved i t Name (PrinteÑTyped) Date Tit QRADEETG HfLL M ENVIRONMENTAL MANAGER Applicationapprovaldoesnot warrantor certify thattheapplicant holdslegalorequitable titletothose rights inthesubjectleasewhich wouldentitletheapplicantto conduct operationsthereon. Conditions of approval, if any, are attached. Title 18U.S.C.Section1001 and Title43 U.S.C.Section1212, make it a crime for any personknowinglyand willfully tomake to any department or agency ofthe United Statesany false,fictitiousor fraudulent statements or representations as to any matterwithinitsjurisdiction. (Continued on page 2) *(Instructions on page 2) Federaf Approvatof tirls RECEIVED ActIon Is Necessary DN OF i, GAS & g¡gg
Transcript
Page 1: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Form3160-3 FORM APPROVED(August2007) OMBNo.1004-0137

ExpiresJuly31, 2010UNITED STATES

DEPARTMENT OF THE INTERIOR 5. LeaseSerialNo.

BUREAUOF LAND MANAGEMENTUTU-74389

6. If Indian,Alloteeor TribeNameAPPLICATION FOR PERMIT TO DRILL OR REENTER NA

O O 2 If Unitor CAAgæement,NameandNo.la. Typeof work: / DRILL REENTER West Point

8. Lease NameandWellNo.Ib. Typeof Well: Oilwell O GasWell Other SingleZone MultipleZone West Point Federal 3-31-8-16

2. Nameof Operator Newfield Production Company 9. API We.11No.

3a. Address Route #3 Box 3630, Myton UT 84052 3b. PhoneNo.(include area code) 10.FieldandPool,or Exploratory(435) 646-3721 Monument Butte

4. Locationof Well(Reportlocationclearly and in acontance with anyStaterequirements.*) 11.Sec.,T.R. M. or Blk.andSurveyor Area

Atsurface NEINW 500'FNL1931'FWL gQ.ÔOgØÔ Sec.31,T8SRí6E

At proposedprod.zone 4) So (ey | n'14. Distanceinmilesanddirectionfromnearest townor postoEce* 12.Countyor Parish 13.State

Approximately 10.3 miles southwest of Myton, UT Duchesne UT

15. Distancefromproposed* 16. No.of acresin lease 17. SpacingUnitdedicatedto thiswelllocationtonearestpropertyor leaseline, ft Approx. 500' f/lse, 500' flunit 541.00(Also tonearestdrig.unit line, if any) 40 Acres

18. Distancefromproposedlocation* 19.ProposedDepth 20. BLM/BIA BondNo.on file

pl ed for otdhislinas'Ompleted'Approx. 1374' 6,435' WYB000493

21. Elevations(Showwhether DF,KDB,RT,4 etc.) 22. Approximatedateworkwill start* 23. Estimatedduration5765' GL (7) days from SPUD to rig release

24. AttachmentsThe following,completedinaccordancewith the requirements of OnshoreOilandGasOrderNo.I, mustbeattachedto thisform:

1. Wellplat certified by a registered surveyor. 4. Bondto cover the operationsunlesscoveredby an existing bondon file (see2. A DrillingPlan. Item20above).3. A Surface Use Plan (if the location is on National Forest SystemLands, the 5. Operatorcertification

SUPO must be filedwiththeappropriateForest ServiceOffice). 6. Suchother sitespecificinformationand/orplansas may be required by theBLM.

25. Signature / Name (Printed/Typed) Date// Mandie Crozier

TitleRegulatory S I t

Ap ved i t Name (PrinteÑTyped) Date

Tit QRADEETG HfLL MENVIRONMENTALMANAGER

Applicationapprovaldoesnot warrantor certify thattheapplicantholdslegalorequitabletitletothoserights inthesubjectleasewhichwouldentitletheapplicanttoconduct operationsthereon.Conditionsof approval,if any,are attached.

Title 18U.S.C.Section1001and Title43 U.S.C.Section1212,make it a crime for any personknowinglyand willfully tomake to any departmentor agency oftheUnitedStatesany false,fictitiousor fraudulent statements or representations as to any matterwithinitsjurisdiction.

(Continued on page 2) *(Instructions on page 2)

Federaf Approvatof tirlsRECEIVED

ActIon Is Necessary

DNOF i, GAS&g¡gg

Page 2: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

TBS, Ri6 E, S. L.B. ocM. ximo PRMŒTIONCOMPMYS89 58'E - 77.57 (G.L.O.)

WELL LOCATION, WEST POINT 3-31-8-16,S89°58'17"E- 2480.03' (Meas.) SB9°50'JS"E

- 2642.19' (Meas.)i \ LOCATED AS SHOWN 1N THE NE 1/4 NW

Brass Cap Stone 191o 1/4 OF SECTION 31, T8S, R16E, S.L.B.&M.Brass CapDUCHESNE COUNTY, UTAH.1931

Lot 1 I i

BAR SCALE

Lot2 N1910Brass Cop

oELL LOCATIOH:EST PO/HT J- J1-8-16

tot J ELEV UNGRADED GROUND = 5764.5' THIS IS TO CERTIFY THA WASPREPARED FROM FIELD RVEYSMADE BY ME OR UN O THAT

. THE SAME ARE TRU RRECT T TH T OFMY KNOWLEDGE AN I .No.189377

S. ACY W.REGI D LALot 4 REGi RA N o.STAT OF1910 1910 1910 g ggBr¤ss Cap Brass Cop Brass Cap

SB9°54'JO"E.- 248ZO9' (Me¤s.) SB9°57'E G.L.O. (Basis of Bearings)'

TRI STATELANDSURVEYING& CONSULTINGS89°57E 77.68 (G.L.O.) 26J9.J2' (Measured) 180 NORTH VERNALAVE. - VERNAL, UTAH 84078(435) 781-2501

IWESTPO/HT J-J1-8-16 DATE SURVEYEDSECTION CORNERS LOCATED (surfaceLocation) NAD BJ 11-03-08 SURVEYEDBY: C.M.LA T/TUDE =

40° 04' 49.17" DATE DRAWN:BASIS OF ELEV; LONG/7UDE=

110° 09' 50.87" 11-11-08 DRAWN BY: F.T.M.

U.S.G.S. 7-1/2 min QUAD (MYTON SW) REV1SED:SCALE: 1" =

Page 3: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O ONEWFIELD PRODUCTION COMPANY

WEST POINT FEDERAL 3-31-8-16NE/NW SECTION 31, TSS, R16E

DUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

DRILLING PROGRAM

1. GEOLOGIC SURFACE FORMATION:

Uinta formation of Upper Eocene Age

2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:

Uinta 0' - 1725'Green River 1725'Wasatch 6435'Base of Moderately Saline Ground Water @5250'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:

Green River Formation 1725' -6435' - Oil

4. PROPOSED CASING PROGRAM

Please refer to the Monument Butte Field Standard Operation Procedure (SOP).

5. MINIMUM SPECIFICATIONS FOR PRESSURE CONTROL:

Please refer to the Monument Butte Field SOP. See Exhibit "C".

6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:

Please refer to the Monument Butte Field SOP.

7. AUXILIARY SAFETY EOUIPMENT TO BE USED:

Please refer to the Monument Butte Field SOP.

8. TESTING, LOGGING AND CORING PROGRAMS:

Please refer to the Monument Butte Field SOP.

9. ANTICIPATED ABNORMAL PRESSURE OR TEMPERATURE:

The anticipated maximum bottom hole pressure is 1800 psi. It is not anticipated that abnormaltemperatures will be encountered.

10. ANTICIPATED STARTING DATE AND DURATIONOF THE OPERATIONS:

Please refer to the Monument Butte Field

Page 4: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O ONEWFIELD PRODUCTION COMPANY

WEST POINT FEDERAL 3-31-8-16NE/NW SECTION 31, TSS, R16E

DUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI-POINT SURFACE USE & OPERATIONS PLAN

1. EXISTING ROADS

See attached Topographic Map "A"

To reach Newfield Production Company well location site West Point Federal 3-31-8-16 located inthe NE 1/4 NW 1/4 Section 31, T8S, R16E, Duchesne County, Utah:

Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed southwesterly - 7.0 miles ± to it's junctionwith thebeginning of the proposed access road to the southwest; proceed southwesterly along the proposedaccess road - 1.7 miles ±; turn and proceed in a northwesterly direction - 900' ± to the proposedwell location.

2. PLANNED ACCESS ROAD

See Topographic Map "B" for the location of the proposed access road.

3. LOCATION OF EXISTING WELLS

Refer to Exhibit "B".

4. LOCATION OF EXISTING AND/OR PROPOSED FACILITIES

All permanent surface equipment will be painted Carlsbad Canyon.Please refer to the Monument Butte Field Standard Operating Procedure (SOP).

S. LOCATION AND TYPE OF WATER SUPPLY

Newfield Production will transport water by truck for drilling purposes from the following watersources:

Johnson Water DistrictWater Right : 43-7478

Neil Moon PondWater Right: 43-11787

Maurice Harvey PondWater Right: 47-1358

Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).

Please refer to the Monument Butte Field SOP. See Exhibit "A".

6. SOURCE OF CONSTRUCTION MATERIALS

Page 5: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O OPlease refer to the Monument Butte Field SOP.

7. METHODS FOR HANDLING WASTE DISPOSAL

Please refer to the Monument Butte Field SOP.

8. ANCILLARY FACILITIES

Please refer to the Monument Butte Field SOP.

9. WELL SITE LAYOUT

See attached Location Layout Diagram.

10. PLANS FOR RESTORATION OF SURFACE

Please refer to the Monument Butte Field SOP.

11. SURFACE OWNERSHIP - Bureau Of Land Management (Proposed location and access roadsleading to).

12. OTHER ADDITIONAL INFORMATION

The Archaeological Resource Survey and Paleontological Resource Survey for this area areattached. MOAC Report #08-302, 1/20/09. Paleontological Resource Survey prepared by, WadeE. Miller, l1/29/08. See attached report cover pages, Exhibit "D".

Newfield Production Company requests a 1490' ROW in Lease UTU-69061, a 3480' ROW inLease UTU-69060, a 1090' ROW in Lease UTU-77339, a 2020' ROW in Lease UTU-81000 and1770' of disturbed area be granted in Lease UTU-74389 to allow for construction of the plannedaccess road. Refer to Topographic Map "B". A permanent width of 30' and a running surfaceof 18' is proposed for the planned access road. The construction phase of the planned access roadwill last approximately (5) days. The planned access road will be an 18' crown road (9' either sideof the centerline) with drainage ditches along either side of the proposed road whether it is deemednecessary in order to handle any run-off from normal meteorological conditions that are prevalentto this area. The maximum grade will be less than 8%. There will be no culverts required alongthis access road. There will be barrow ditches and turnouts as needed along this road. There areno fences encountered along this proposed road. There will be no new gates or cattle guardsrequired. All construction material for this access road will be borrowed material accumulatedduring construction of the access road.

Newfield Production Company requests 900' of disturbed area be granted in Lease UTU-74389 toallow for construction of the proposed surface gas lines. It is proposed that the disturbed area willtemporarily be 50' wide to allow for construction of a 10" or smaller gas gathering line, and a 3"poly fuel gas line, with a permanent width of 30' upon completion of the proposed gas lines. Theconstruction phase of the proposed gas lines will last approximately (5) days. Both lines will tie into the existing pipeline infrastructure. Refer to Topographic Map "C." For a ROW plan ofdevelopment, please refer to the Monument Butte Field SOP.

Newfield Production Company requests 900' of disturbed area be granted in Lease UTU-74389 toallow for construction of the proposed water lines. It is proposed that the disturbed area willtemporarily be 50' wide to allow for construction of a buried 3" steel water injection line and aburied 3" poly water return line, with a permanent width of 30' upon completion of the proposedwater return line. The construction phase of the proposed water lines will last approximately (5)days. Refer to Topographic Map "C." For a ROW plan of development, please refer to theMonument Butte Field SOP. In the event that the proposed well is converted to a water injectionwell, a separate injection permit will be applied for through the proper agencies.

Page 6: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O OWater DisposalImmediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class II wells to enhance Newfield's secondary recoveryproject.

Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SR19E), State of Utah approved surface disposal facilities, or Federally approved surface disposalfacilities.

Threatened, Endangered, And Other Sensitive SpeciesMountain Plover: If new construction or surface disturbing activities are scheduled to occurbetween May 15 and June 15, detailed surveys of the area within 0.5 mile of the proposed locationand within 300 feet of proposed access routes must be conducted to detect the presence of mountainplovers. All surveys must be conducted in accordance with the survey protocols outlined in the mostrecent USFWS Survey Protocol. Surveys must be completed prior to initiatingnew construction orsurface disturbing activities. No new construction or surface disturbing activities will be allowedbetween May 15 and June 15within a 0.5 mile radius of any documentedmountain plover nest site.

Reserve Pit LinerA 16 mil liner with felt is required. Please refer to the Monument Butte Field SOP.

Location and Reserve Pit ReclamationPlease refer to the Monument Butte Field SOP.

The followingseed mixture will be used on the topsoil stockpile, to the recontoured surface of thereserve pit, and for final reclamation: (All poundages are in pure live seed)

Squirrell Tail Elymus Elymoides 6 lbs/acreSiberian Wheatgrass Agropyron Fragile 2 lbs/acreGardner Saltbush Atriplex Gardneri 1 lbs/acreShadscale Atriplex Confertifolia I Ibs/acreFourwing Saltbush Atriplex Canescens 1 lbs/acreScarlet Globemallow Sphaeralcea Conccinea 0.20 lbs/acreForage Kochia Kochia Prostrata 0.20 lbs/acre

Details of the On-Site InspectionThe proposed West Point Federal 3-31-8-16 was on-sited on 11/25/08. The following werepresent; Tim Eaton (Newfield Production ), and James Herford (Bureau of Land Management).Weather conditions were clear and ground cover was 100% open.

LESSEE'S OR OPERATORS REPRESENTATIVE AND CERTIFICATION

Representative

Name: Dave AllredAddress: Route #3 Box 3630

Myton, UT 84052Telephone: (435) 646-3721

Certification

Please be advised that NEWFIELD PRODUCTION COMPANY is considered to be theoperator of well #3-31-8-16 NE/NW Section 31, Township 8S, Range 16E: Lease UTU-74389Duchesne County, Utah: and is responsible under the terms and conditions of the lease for the

Page 7: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O Ooperations conducted upon the leased lands. Bond coverage is provided by, Federal Bond#WYB000493.

I hereby certify that the proposed drill site and access route have been inspected, and Iam familiar with the conditions which currently exist; that the statements made in this plan are trueand correct to the best of my knowledge; and that the work associated with the operationsproposed here will be performed by Newfield Production Company and its contractors andsubcontractors in conformity with this plan and the terms and conditions under which it isapproved. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a falsestatement.

Date Mandie Crozier'

ORegulatory SpecialistNewfield Production Company

Page 8: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

9NEWFIELD PRODUCTION COMPANY

SectioWEST POINTR 6E35Sn.B6.&M.

RROPOSED ACCESSROAD (Max 6X Groo'e)

6

5 STA. 3+ 0

sToc Pit

C/4. 9

Top of2' Berrn Arounor Ei// Cut S/opePortion of Locotion

•Ô 120' C/2.5 C/5JC -

STA. 1+70

C/J.7 nase err

WELL HEAD:UNGRADED = 5764.5' Note:E/N. GRADE = 5762.0' E/ore p/t is to

be /ocated amín/mum of 80'MEXCER

L from we// heco'

Toe of STA. 0+00 •

Ei// S/op e

F/S. FERENCE POINTS220' SOUTHWEST = 5752.5270' SOUTHWEST = 5755.9'170' NORTHWEST= 5754.6'220' NORTHWEST = 5754.2'

SURVEYED BY: C.M. DATE SURVEYED: 11-03-08 i State '362 '"'-26°'

DRAWN BY: F.T.M. DATE DRAWN: 11-11-08 La,nd Surveyri,ng, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH

Page 9: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

9NEWFIELD PRODUCTION COMPANY

CROSS SECTIONSWEST POINT 3- 31- 8-16

1" = 50' SM. J+00

TTT-I l i

1" = 50' SM. 2+30

EX/ST/NGF/N/SHED GRADEGRADE

so' SM. 1+70

1" = 50' SM. 0+00 ESTIMATEDEÁRTHWORKQUANTITIES(No Shrink or swell adjustments have been used)

(Expressed in Cubic Yards)

ITEM CUT FILL 6" TOPSOIL EXCESS

NOTE: PAD 2,740 2,740 ToPsoil is 0not includedUNLESS OTHERWISE PIT 640 0 in Pad cut 640NOTED ALL CUT/FILL

SLOPES ARE AT 1.5:1 TOTALS 3,380 2,740 1,060 640

SURVEYED BY: C.M. DATE SURVEYED: 11-03-08 ri State s'> '"'-26 'DRAWNBY: F.T.M. DATE DRAWN: 11-11-08 La,nd Surveying, Inc.SCALE: 1" = 50' REVlSED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH

Page 10: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

U)

OU

)O

¯DC

r< co

TRA

lLER

SFU

EL

PAR

TDSO

GH

OU

OSU E

WA

TER

TAN

KLi

ght

Plan

t17

0'1]

O'

..C

ATW

ALK

RIG

BA

SEI

Fuel

Line

PlPE

TUB

--

MU

DPU

MP

DA

TAM

UD

TAN

KM

UD

PUM

PT

H10

---

----

70--

-

YF

iso'

50'

Wat

erLi

ne_

j

80

to'

wis

ese

vcit

Page 11: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

field Production Com yProposed Site Facility Diagram

West Point Federal 3-31-8-16

NE/NW Sec. 31, TSS, R16E

Duchesne County, Utah

UTU-74389

Well Head 55 GallonsMethonol

Pumping Unit 150 Gallons LegendChemical Drums

Emulsion Line ····

Load Rack -----------

Water Line - -·-·-·---

55 GallonsMotor Oil Heater Gas Sales - · - · - --

Treater Oil Line

Gas Sales Meter

1IIWater Tank 6 -

200 bbl I Production Phase:I 1) Valves 1, 3, and 4 sealed closed

2) Valves 2, 5, and 6 sealed open

!2

Sales Phase:4 Production Tank 3 - - 4 - - - - - - - - - _

Load Rack

1) Valves 1, 2, 4, 5, and 6 sealed closed400 bbl 1 .

2) Valve 3 open

5Draining Phase:

2 1) Valves 1 and 6 open

Production Tank4 3 --j-

400 bbl

Diked

Page 12: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

0M n

Br e and6e rt

III I

L .

SAL6

- --

L

I

r posed LocationL

est Point 31-8-16

I

res

Legend ---

'.. Existing RoadAMSew Proposed Access

(435) 781-2501180 North Vamal Ave. Vemat Utah 8407ß

West Point 3-31-8-16 '. ,, ,,, . -. - . - . -

SEC. 31, T8S, R16E, S.L.B.&M. "A"ti

Page 13: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

eI

I130'

820'±1,490'

2070'y

100470

890°

630'2320'

320

220'

/ e2e Wsoo 2400'

Proposed LocationWest Point 3-31-8-16

I

Legend

Existing RoadAN'S y & - Proposed Access

435) 781-2501r m No Vemd Ave Vamal, Utah B4078

West Point 3-31-8-16- ••• • -• - ¯

SEC. 31, T8S, R16E, S.L.B.&M. •·-

Page 14: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

DHll Hole

1

I lil

i

28

Tie In at Existing. Gas Pipellne

1900= r2900' le in at Ex1sting

WaterilneIProposed LocationWest Polnt 3-31-8-16

93

5732

Legend

Roads

agr, Proposed Gas Line

(435) 781-2501 -----m m- Proposed Water Line

180 North Vernal Ave Vernal. Ulah 64078

West Point 3-31-8-16 , , , - - - - - - - -

SEC. 31, TSS, R16E, S.L.B.&M. •·-

-

Page 15: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Burface Spud

to il sa y a e to li la r i e a 9 I la 1Driing

I • Walling on Complelion• Producing 011Well

-L - 4 6 -

.

* Producing Gas Well

16 14 13 15 17 16 15 14 11 la 17 li 0 17 in Th 14/ WaterinjectionWel

T4 -R3W I T4S R1ETDem

rilyAbandoned -Plugged & Abandoned

22 N N 99 2a 21 22 2e u a aSWhaernSource

Well

a rf _ _ g, . Water Disposal Well

2a .

c.¾ ab. Injection Stenons

e 27 18 26r rSe

23 7 28 28Od-

r .,-. e -

16S-Rl

TBS 6E .

as.L .1 i .5

S

+ a a. <. .:. * +

S-R1 iCS-R16 E,, a g a" "A s a s 9S-R 7 E A & M27

2 30 2n 26 27 25 30 N 22 28 25 3¾ 29

34 36 ,14 3B 30 37 12 33 M 36 31 32 sa 34 ,15 N 37

0-MV NEWFIELD--

310E -

10 11 10 11 il 7 11 12 7 5 10 11 10

15 14

Page 16: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

0i 1Ju3ËO1109

( 1-73089 I IT I 1-77339

I 3 I 19 1 9 19 1 10 1 JO JO

i 13 3O SO 4 19 ) L 29

I TU-65965, ,, , . g O O

N 1% 5 At 10 7 IO E 3U I 9 « •r pg g gg

I

UTLJ T't.49trTU 150 gL T1 69t?6i98/1 E , •

8 Ja 4 4 1 in> 2 BO k-I10 133 16AO I 1$9 I 19 a19

est P elÌs D ga II4 46 I J %A 1 16 .4 h i ...... I l i 4 l a 11 ) 13

Proposed Location . WWest Point 3-31-8-16 '

-21836

e • • .* LA 12 11 IJ 3)

I

31 ' 32

ML-2 835 g g e , e e17 46 ti 56 46 9 bd 17 11 ti 31 la pi 9 li ¿p p> ts 1;

3Jl

UTU 149950

14 )) 14 ha 15 by %i 1) ¾6 14 ad 14 L6 44 1 t 3[ 4 a M al i 3

I I6974-4

ee se og e

B ele g es.s31 I Mi 6 114(, i ITAG I

1 6 U 0342 I 7>t

e o e

U TU-3Legend

-SÑ¢Ñ Locationsed'.5°aoughy fr One-MiteRadius

't (435) 781-2501illO North Vamal Ave verrial,Ulah 84078

West Point 3-31-8-16 - ...

SEC. 31, TSS, R16E, S.L.B.&M. - Exhibit "B"9 #t

Page 17: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

2-M SYSTEMBlowout Prevention Equipment Systems

I

r'

I

/

EXHlBIT

Page 18: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

OCULTURAL RESOURCE INVENTORYOFNEWFIELD EXPLORATION'S SIX BLOCKPARCELS(T8S, R16E, SECTIONS 19, 27, 28, 29, 30, AND 31)

DUCHESNE COUNTY, UTAH

By:

Nicole Shelnut

Prepared For:

Bureau of Land ManagementVernal Field Office

Prepared Under Contract With:

NewfieldExploration CompanyRt. 3 Box 3630

Myton, UT 84052

Prepared By:

Montgomery Archaeological Consultants, Inc.P.O. Box 219

Moab, Utah 84532

MOAC Report No. 08-302

January 20, 2009

United States Department of Interior (FLPMA)Permit No. 08-UT-60122

State of Utah Antiquities Project (Survey)Permit No.

Page 19: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

NEWFIELD EXPLORATION COMPANY

PALEONTOLOGICAL SURVEY OF PROPOSEDPRODUCTION DEVELOPMENT AREAS,

AND PROPOSED PIPELINE ROUTESDUCHESNE COUNTY, UTAH

Area SurveysSection 30, T 8 S, R 16 E [except NW 1/4, NW 1/4 & SE 1/4/ SE 1/4);

Section 31, T 8 S, R 16E [except NE 14/ SE 1/4; SW 1/4, SE 1/4,SW 1/4;SW 1/4, SE 1/4; SE 1/4/ SE 1/4 and NE 1/4, NE 1/4].

Proposed Water Injection Pipeline Surveys22-32-8-16, 33-32-8-16, 6-36-8-16, 13-32-8-16, 34-33B-8-16, 2-2-9-16, 16-2-9-16,

14-3-9-16, 23-16-9-17, and 4-22-9-17

Water and Gas Pipeline Survey7-33-8-16 to I 1-28-8-16

REPORT OF SURVEY

Prepared for:

Newfield Exploration Company

Prepared by:

Wade E. MillerConsulting Paleontologist

November 29,

Page 20: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 02/02/2009 API NO. ASSIGNED: 43-013-34199

WELL NAME: W POINT FED 3-31-8-16

OPERATOR: NEWFIELD PRODUCTION ( N2695 ) PHONE NUMBER: 435-646-3721

CONTACT: MANDIE CROZIER

PROPOSED LOCATION: INSPECT LOCATN BY: / /

NENW 31 080S 160E .

Tech Review Initials DateSURFACE: 0500 FNL 1931 FWL

BOTTOM: 0500 FNL 1931 FWL Engineering

COUNTY: DUCHESNE GeologyLATITUDE: 40.08040 LONGITUDE: -110.1634

UTM SURF EASTINGS:571330 NORTHINGS: 4436806 Surface

FIELD NAME: MONUMENT BUTTE ( 105 )

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU-74389 PROPOSED FORMATION: GRRV

SURFACE OWNER: 1 - Federal COALBED METHANE WELL? NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

/* Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit: WEST POINT (GRRV)

(No.WYB000493 )Potash (Y/N) R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

'Water Permit

____

R649-3-3. Exception(No.43-7478 /^

Drilling UnitµÁ RDCC Review (Y/N)Board Cause No: cQgy L

GAF F

DaSu

f Agreement (Y/N)Date

Ah Intent to Commingle (Y/N) R649-3-11. Directional Drill

COMMENTS: LJ

STIPULATIONS: Lp,14 2/60

Page 21: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O OII

4301334189FED4E3 4-

08-16 4 API Number: 4301334199FEDERAL5-30-8-16 4301334188

4301334186 4301334175FEDERAL6-30-8-16

FEDERAL8-30-8-16 FEDERAL5-29-8-16 Well Name: W POINT FED 3-31-8-16+

Township 08.0 S Range 16.0 E Section 31

Meridian: SLBMOperator: NEWFIELD PRODUCTION COMPANY

Map Prepared:

4301334183 4301334184 43013319514301334172 Map Produced by Diana Mason

FEDERAL 11-30-8-16 FEDERAL 10-30-8-16 LLS DRAW 9-30 FEDERAL 12-29-8-16

4301334182 Units wellsQuery Events

FEDERAL 12-30-8-16 4301334185 sTATus

25 30 FEDERAL 9-30-8-16 29 ACTlVE<all other values>

EXPLORATORyGIS_STAT_TYPE

GASSTORAGE<Null>

NFPPOIL APD

NF SECONDARY DRL

Pi O1L Gi

PP GAS

43013324514301334180 FEDERAL 16-30-8-16

PPGEOTiiERML

FEDERAL 14-30-8-16 4301334179 PPOIL X LA

FEDERAL 15-30-8-16 SECONDARY NEW

4301334181 4301334171

FEDERAL 13-30-8-16 FEDERAL 13-29-8-16 TERMINATED OPS

4301332450 FieldS PA

FEDERAL13-29-8-16 STATUS PGWACTIVE

POWCOMBlNED

RETSections

SGW

SOW

TA

43013342014301334199 4301334200 W POINT FED 1-31,8-16

W POINTFED 3-31-8-16 W POINT FED2-31-8-164301332452

4301334198 WESÏPOÏNTÉED 1-31-8-1(W POINT FED 4-31-8-16

4301332222WELI S DRAW4-32-8-10

e

CacheBox Elder Rict Location Map

Ä301Š34í94Davs

r

Sum

4301332114 4301332116 W POINT FED 8-31-8 16 4301332218 att Lak

4301330934 WESTŸOlÑT 5-31-8-16 4301332115 WEST PÓlNÍ7-31-8-16 WELLSDRAW 5-Š2-8-14 Tooelesatcl

WELLSDRAW ST 7-36 § 43b1334197 WEST P01NT 6-31 a-16 4301334195 UtahDuchesne

UintahW POINTFED 5-31-8-16 X ‡W POINT FED 7-31-8-f6

36 31 32' Juab Carbon

MillardSanpete

Emery Grand

Sevier

Beaver Piute Wayne

E$T41 1-8 16 WIONF 2

1--16Y

WEST4PN 0 1-8-16 VEST

0013N3T-31 8 16

4 1331112

tron Garfieldan Juan

X 4301332120WÉSTPOIÑT -31-8-36

ATE 13-3 Washington Kane

A304334146W DRAWSTN 32-8 i

4301331039 1,100 550 0 1,100 Feet

STATE14632

Page 22: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

(2/9/2009) Diana Mason - WestPoint.d Page i

United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State OfficeP.O.Box45155

Salt Lake City, Utah 84145-0155

INREPLYREFERTO:3160{UT-922)

Februa 6,2009

Memonandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2009 Plan of Development West Point Unit, DuchesneCounty, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas and Mining, and MickeyCoulthard, Utah State Office, Bureau of Land Management, the followingwells areplanned for calendar year 2009 within the West Point Unit, Duchesne County, Utah.

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-013-34194 W Point Fed 08-31-8-16 Sec 31 TO8S R16E 1911 FNL 0796 FEL43-013-34195 W Point Fed 07-31-8-16 Sec 31 TO8S R16E 2084 FNL 1925 FEL43-013-34196 W Point Fed 06-31-8-16 Sec 31 TOSS R16E 1906 FNL 1779 FWL43-013-34197 W Point Fed 05-31-8-16 Sec 31 TOSS R16E 1981 FNL 0582 FWL43-013-34198 W Point Fed 04-31-8-16 Sec 31 TOSS R16E 0736 FNL 0458 FWL43-013-34199 W Point Fed 03-31-8-16 Sec 31 TOBS R16E 0500 FNL 1931 FWL43-013-34200 W Point Fed 02-31-8-16 Sec 31 TO8S R16E 0524 FNL 1999 FEL43-013-34201 W Point Fed 01-31-8-16 Sec 31 TO8S R16E 0464 FNL 0692 FEL43-013-34202 W Point Fed 13-31-8-16 Sec 31 TO8S R16E 0644 FSL 0682 FWL43-013-34203 W Point Fed 12-31-8-16 Sec 31 TOSS R16E 1890 FSL 0755 FWL43-013-34204 W Point Fed 11-31-8-16 Sec 31 TO8S R16E 2063 FSL 1843 FWL43-013-34205 W Point Fed 10-31-8-16 Sec 31 TO8S R16E 1920 FSL 1793 FEL

This office has no objection to permitting the wells at this time.

Is/MichaelL.Coulthard

bcc: File-VVestPointUnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid

Page 23: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O OState of UtahDEPARTMENT OF NATURAL RESOURCES

MICHAELR. STYLER

JON M. HUNTSMAN, JR. Executive Director

Govemor Division of Oil, Gas and MiningGARY R. HERBERT JOHN R. BAZALieutenant Govemor Division Director

February 10, 2009

Newfield Production CompanyRt. #3, Box 3630Myton, UT 84052

Re: West Point Federal 3-31-8-16 Well, 500'FNL, 1931' FWL, NE_NW, Sec. 31, T. 8 South,R. 16 East, Duchesne County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 et seq., UtahAdministrative Code R649-3-1 et seq., and the attached Conditions of Approval, approval to drillthe referenced well is granted.

This approval shall expire one year from the above date unless substantial and continuousoperation is underway, or a request for extension is made prior to the expiration date. The APIidentification number assigned to this well is 43-013-34199.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Duchesne County AssessorBureau of Land Management, Vernal Office

UTAH

DNR

1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone (801) 538-5340 •facsimile (801) 359-3940 • TTY (801) 538-7458 • www.ogm.utah.gov 011., GAS &

Page 24: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

O OOperator: Newfield Production CompanyWell Name & Number West Point Federal 3-31-8-16

API Number: 43-013-34199Lease: UTU-74389

Location: NE NW Sec.1 T. 8 South R. 16 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division with 24 hours of spudding the well.

• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dustin Doucet at (801) 538-5281 office (801) 733-0983 home

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to

Page 25: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Form3160-3 FORM APPROVED(August2007) OMBNo.1004-0137

ExpiresJuly31, 2010UNITED STATES

DEPARTMENT OF THE INTERIOR 5. LeaseSerialNo.BUREAU OF LAND MANAGEMENT

UTU-74389

6. If Indian,Alloteeor TribeNameAPPLICATION FOR PERMIT TO DRILL OR REENTER NA

la. Typeof work: DRILL REENTER F m mN

8. Lease NameandWellNo.Ib. Typeof Well: OilWell O Gas Well Other SingleZone MultipleZone West Point Federal 3-31-8-16

2. Nameof Operator Newfield Production Company 9. API WellNo.

3a. Address Route #3 Box 3630, Myton UT 84052 3b. PhoneNo.(include area code) 10.FieldandPool,orExploratory '(435) 646-3721 Monument Butte

4. Locationof Well (Report locationclearly and in aconiance with ariy State requirements.*) 11.Sec.,T. R.M. or Blk.andSurveyor Area

At surface NE/NW 500' FNL 1931' FWL Sec. 31, T8S R16E

At proposedprod.zone

14. Distancein miles and directionfrom nearest town or postoffice* 12.Countyor Parish 13. StateApproximately 10.3 miles southwest of Myton, UT Duchesne UT

15. Distancefromproposed* 16. No.of acresin lease 17 SpacingUnitdedicatedto thiswelllocationtonearestpropertyor leaseline,ft. Approx. 500' f/lse, 500' f/unit 541.00(Alsotonearest drig.unit line,if any) 40 Acres

18. Distancefromproposedlocation* 19. ProposedDepth 20 BLM/BIABondNo. onfiletagn rest well, d llinas,completed' Approx. 1374' 6,435' WYBOOO493

21. Elevations(Showwhether DF,KDB,RT,GL,etc.) 21 Approximatedateworkwill start* 23. Estimatedduration5765' GL fÀ (7) days from SPUD to rig release

24. AttachmentsThefollowing,completed in accordancewith the requirements of OnshoreOiland GasOrderNo.1,must be attachedto this form:

1. Wellplatcertifiedby a registered surveyor. 4. Bondto cover the operationsunlesscoveredby an existing bondon file (see2. A DrillingPlan. Item20above).3. A SurfaceUse Plan (if the location is on National Forest SystemLands, the 5. Operatorcertification

SUPO must be filedwith the appropriate Forest ServiceOffice). 6. Suchother site specific informationand/or plansas may be requiredby theBLM.

25. Sig NMame(ePrinte yrped) Date

TitleRegulatory Specialist

Approvedby (S nature) Name (Printed/Typed) Date

Title Ands&Minera

RMeagrs

of ice VERNALFIELDOFFICEApplicationa doesnot warrantorcertifythattheapplicantholdslegalorequitabletitletothoserights inthesubjectleasewhichwouldentitletheapplicanttocConndductope nsrov

,

fnany,are attached. CONDITIONSOFAPPROVALATTACHED

Title 18U.S.C.Section1001andTitle43 U.S.C.Section1212,make it a crime foranypersonknowinglyand willfully to make to any departmentor agencyofthe UnitedStatesanyfalse,fictitiousor fraudulent statementsor representations as to any matterwithin itsjurisdiction.

(Continued on page 2) *(Instructions on page 2)

NOTICEOFAPPROVAL RECEIVED NOS 1HMFE30 2 203 * DEC2 1 2009

AFMSS#18¼SURADIV.0FOlL,GAS&

Page 26: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

UNITED STATES DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT

VERNAL FIELD OFFICE170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TO DRILL

Company: Newfield Production Company Location: NENW, Sec. 31, T8S, R16EWell No: West Point Federal 3-31-8-16 Lease No: UTU-74389API No: 43-013-34199 Agreement: Greater Monument Butte (GR)

Unit

OFFICE NUMBER: (435) 781-4400

OFFICE FAX NUMBER: (435) 781-34 RECEIVEDDEC2 1 2009

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YO OF0lL,GAS&MININGFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance is made with the applicablelaws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill including Surface andDownhole Conditions of Approval. The operator is considered fully responsible for the actions of his subcontractors.A copy of the approved APD must be on location during construction, drilling, and completion operations. Thispermit is approved for a two (2) year period, or until lease expiration, whichever occurs first. An additionalextension, up to two (2) years, may be applied for by sundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Environmental Scientist) access roads.

Location Completion - Prior to movingon the drilling rig.(Notify Environmental Scientist)

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify Petroleum Engineer)

I

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and(Notify Supv. Petroleum Tech.) cementing all casing strings to: ut vn opreport blm.qov.

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Supv. Petroleum Tech.)

First Production Notice - Within Five (5) business days after new well begins or(Notify Petroleum Engineer) production resumes after well has been off production for

more than ninety (90)

Page 27: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

RECEIVEDDEC21 2009

Well:West Point Federaœ3 868

DIV.0FOlL,GAS&MINING 12/10/2009

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

• AIInew and replacement internal combustion gas field engines of less than or equal to 300 design-rated horsepower must not emit more than 2 gms of NOx per horsepower-hour. This requirementdoes not apply to gas field engines of less than or equal to 40 design-rated horsepower.

• AIIand replacement internal combustion gas field engines of greater than 300 design ratedhorsepower must not emit more than 1.0 gms of NOx per horsepower-hour.

• Ifthere is an active Gilsonite mining operation within 2 miles of the well location, operator shallnotify the Gilsonite operator at least 48 hours prior to any blasting during construction.

• If paleontological materials are uncovered during construction, the operator is to immediately stopwork and contact the Authorized Officer (AO). A determination will be made by the AO as to whatmitigation may be necessary for the discovered paleontologic material before construction cancontinue.

• Construction and drilling is not allowed from May 1 - June 15 to minimize impacts during Mountainplover nesting.

• If it is anticipated that construction or drilling willoccur during any of the given timingrestrictions, aBLMor qualified biologist shall be notifiedso surveys can be conducted. Depending upon theresults of the surveys, permission to proceed may or may not be recommended or granted by theBLM biologist.

• Water for drilling the subject wells will come from the Johnson Water District (Water Right 43-10136), Neil Moon Pond (Water Right 43-11787), or Newfield Collector Well (Water Right 41-3530).Water will be hauled by a licensed trucking company. Water wells will not be drilled on lease.

Reclamation

Interim Reclamation:

• Interim reclamation of the surface environment shall take place after drilling and completion and thewell is placed into production. At a minimum,thiswill include the stabilization of the soil surfaceduring construction, recontouring of the unused pad area, and the reserve pit to the originalcontourto the extent possible, and the re-spreading of the top soil after recontouring takes place, up to therig anchor points and any area not needed for production. Buried pipelines will be recontoured, thesalvaged topsoilredistributed and reseeded. The outside borrow of the access road will have thetop soil salvaged and re-spread and reseeded. The area will be reseeded using appropriateseeding methods, which includes, but is not limited to, the drill seeding method (see below). Anyadjustments, due to site specific production concerns, to the reclamation COAs in this documentcan be submitted on Sundry form 3160-5.

• The reclamation objective is to establish a desired self-perpetuating diverse plant community.Theobjective is to attain 75% basal cover based on similar undisturbed adjacent native vegetativecommunity, and comprisedof desired species and/or seeded species within5 years of initialreclamation action. However if after three (3) growing seasons there is less than 30% of the basalcover based on similar undisturbed native vegetative community, then the Authorized Officer mayrequire additional seeding

Page 28: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

RECEIVED Page 3 of 8Well: West Point Federal 3-31-8-16

DEC21 2009 12/10/2009

DIV.OFOIL,GAS&MINING• Topsoil will be segregated from the subsoil (withoutmixing them),stockpiled separately from other

soil materials, and maintained for future use in rehabilitating the locations.

• Topsoil piles stored beyond one growing season will be stabilized and seeded to prevent erosion.

• Topsoil storage areas will be identified with appropriate signage, so it is easily identifiable wheretopsoilis on location.

• Noxious and invasive weeds will be inventoried and monitored. Noxious and invasive weeds will becontrolled through integrated weed management including chemical, mechanical, and biologicalcontrol methods. An approved Pesticide Use Proposal (PUP) is required for all herbicideapplications.

• All trash and waste materials not needed for production will be removed immediately.

• Earth work for interim and final reclamation must be completed within6 months following wellcompletion or well plugging (weather permitting).

• Salvaged topsoilwill be re-distributed evenly, and to pre-disturbance depths, over the surfaces tobe revegetated.

• The soil surface will be prepared to provide a seedbed for re-establishment of desirable vegetation.Site preparation may include gouging, scarifying, dozer track-walking,mulching, hydro mulching,contour furrowing, water terracing, fertilizing, disking, soil additives or other approved methods.The seedbed preparations will be determined to accomplish the reclamation objectives above.

• The seeding contractor will provide all seed tags to the appropriate SMA prior to seeding efforts.

• Seeding will occur after August 15 and prior to winter freezing of the soil.

• Drillseeding will be used except in areas where topography or substrate composition (rock)precludes tNe use of the drill. Ifdrill seeding is not possible, broadcast seeding will beimplemented. Ifthe broadcast method is used (such as on slopes of 40 percent or greater), theseed rates established for drill seeding will be doubled and seed will be immediately covered toprevent seed desiccation or predation by birds or rodents. The seeds can be covered in severalways including spreading and crimpingstraw over the seeded area, raking the area by hand, ordragging a chain or chain-linked fence over the seeded area.

• Any altered drainages or water courses will be stabilized throughrip rap, berming, seeding, matting,or other approve methods, and will be reconstructed to have the characteristics and features ofnearby functional drainages. Any disturbance to "dashed line" drainages as depicted on USGS1:24,000 topographicmaps will be coordinated with the corps of engineers prior to disturbance.

Final Reclamation:

• Final Reclamation will be similar to interim reclamation except, all disturbance associated with thewell location, access road and pipeline will be reclaimed. The seed mix may include more shrubsand native species. The visual composition willbe reestablished to blend with the naturalsurroundings throughrecontouring and

Page 29: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Page 4 of 8Well: West Point Federal 3-31-8-16

12/10/2009

• After pipeline installation is complete, all disturbed areas will be reseeded. The seed mixtures to beused will be similar to the vegetation of the surrounding areas and may consist of grasses, forbs, orshrubs. A recommended seed mixture is provided in the table below.

Monitoring:

• The initial monitoring report will include but is not limited to: when the recontouring and seedingwas completed. The seed applied, the amounts,and the depth of application. Seedbedpreparation such as disking , mulching, etc. Seed application such as drilling or broadcast seeding.Are there any soil amendments, fertilizers, watering, etc. The amounts of noxious and invasiveweeds. Are any fencing requirements needed.

• Prior to any surface disturbance, vegetative monitoring locations and reference sites will beidentified by the operator and approved by the BLMAuthorized Officer.

• Vegetation monitoring protocol will be developed by the operator and approved by the BLMAuthorized Officer prior to implementation of revegetation techniquesand will be designed tomonitor % basal vegetative cover.

• Reclamation areas will be inspected annually and monitored to document location and extent ofareas with successful revegetation. Monitoring willcontinue untilthe site is considered a successby the authorized officerand the objectives established in the Green River District Guidelines. Areclamation report will be submitted electronicallyto the Authorized Officer by March 31 of eachyear.

• On Federal lands, the reclamation objective will be a vegetation communitythat within5 years iscomprised of desired and/or seeded species, where the basal vegetative cover is 75 percent of asimilar undisturbed adjacent native vegetation community. Ifafter 3 years basal cover is less than30 percent, then additional seeding and reclamation efforts may be required.

Seed mix Interim and Final Reclamation):Common name Latin name Ibslacre Recommended

seed plantingdepth

Squirreltail grass Elymus elymoides 3.0 ¼ - ½"Siberian Agropyron fragile 1.0 ½"wheatgrassShadscale saltbush Atriplex confertifolia 0.50 ½"Four-wing saltbush Atriplex canescens 0.50 ½"Gardner's saltbush Atriplex gardneri 0.50 ½"Scarlet Sphaeralcea 0.10 ½ -- ¼"globemallow coccinea

• All pounds are pure live seed.• All seed and mulch will be certifiedweed free.• Rates are set for drill seeding; double rate if broadcasting.• Reseeding may be required if initial seeding is not successful.

RECEIVEDDEC2 1 2US

DIV.0FOIL,GAS&

Page 30: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Page 5 of 8Well: West Point Federal 3-31-8-16

12/10/2009

DOWNHOLE PROGRAMCONDITIONS OF APPROVAL (COAs)

SITE SPECIFIC DOWNHOLE COAs:

• Newfield Production Co. shall adhere to all referenced requirements in the SOP (version: June 24,2008) ) along with all Oil and Gas rules and requirements listed in the Code of Federal Regulationsand all Federal Onshore Oil and Gas Orders.

AII provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictly adheredto. The following items are emphasized:

DRILLINGICOMPLETIONIPRODUCING OPERATING STANDARDS

• The spud date and timeshall be reported orally to Vernal Field Office within 24 hours of spudding.

• Notify Vernal Field Office Supervisory Petroleum Enqineerinq Technician at least 24 hours inadvance of casinq cementing operations and BOPE & casinq pressure tests.

• AIIrequirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable for airdrilling of surface hole.

• Blowout prevention equipment (BOPE) shall remain in use until the well is completed orabandoned. Closing unit controls shall remain unobstructed and readily accessible at all times.Choke manifolds shall be located outside of the rig substructure.

• All BOPE components shall be inspected daily and those inspections shall be recorded in the dailydrilling report. Components shall be operated and tested as required by Onshore Oil & Gas OrderNo. 2 to insure good mechanical working order. All BOPE pressure tests shall be performed by atest pump with a chart recorder and NOT by the rig pumps. Test shall be reported in the driller'slog.

• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out from underthe surface casing and weekly thereafteras specified in Onshore Oil & Gas Order No. 2.

• Casing pressure tests are required before drilling out from under all casing strings set andcemented in place i RECEIVED

• No aggressivelfresh hard-banded drill pipe shall be used within casing DEC2 1 2009· Cement baskets shall not be run on surface casing· DIV.0F0lL,GAS&MINING• The operator must report all shows of water or water-bearing sands to the BLM. Ifflowing water is

encountered it must be sampled, analyzed, and a copy of the analyses submitted to the BLMVernalField Office.

• The operator must report encounters of all non oil&gas mineral resources (such as Gilsonite, tarsands, oilshale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well namelnumber, well location, date and depth (from KBor GL) of encounter, vertical footage of the encounter and, the name of the person making thereport (along with a telephonenumber) should the BLM need to obtain additional

Page 31: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Page 6 of 8Well: West Point Federal 3-31-8-16

12/10/2009

• A complete set of angular deviation and directional surveys of a directional wellwill be submitted tothe Vernal BLMoffice engineer within 30 days of the completion of the well.

• While activelydrilling, chronologic drilling progress reports shall be filed directly with the BLM,Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.

• A cement bond log (CBL) will be run from the production casing shoe to the top of cement and shallbe utilized to determine the bond quality for the production casing. Submit a field copy of the CBLto this office.

• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement for submittalof paper logs to the BLM.

• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operation musthave prior approval from the BLMVernal Field Office.

RECEIVEDDEC2 1 2009

DIV.0FOlL,GAS&

Page 32: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Page 7 of 8Well: West Point Federal 3-31-8-16

12/10/2009

OPERATING REQUIREMENT REMINDERS:

• AIIwells, whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, lease serialnumber, well number, and surveyed description of the well.

• In accordance with 43 CFR 3162.4-3, thiswell shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in which operationscommence and continue each month until the well is physically plugged and abandoned. Thisreport shall be filed in duplicate, directly with the Minerals Management Service, P.O. Box 17110,Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

• Should the well be successfully completed for production, the BLMVernal Field office must benotifiedwhen it is placed in a producing status. Such notification will be by written communicationand must be received in this office by not later than the fifth business day following the date onwhich the well is placed on production. The notificationshall provide, as a minimum, the followinginformational items:

' RECEIVEDo Operator name, address, and telephone number. i

o Well name and number. DEC21 2009

o Well location (¼¼,Sec., Twn, Rng, and P.M.). DIV.0FOlL,GAS&MINING

o Date well was placed in a producing status (date of first production for which royalty will bepaid).

o The nature of the well's production, (i.e., crude oil,or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).

o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.

o Unit agreement and/or participatingarea name and number, if applicable.

o Communitization agreement number, if applicable.

• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLMVernal Field Office.

• AIIundesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A will bereported to the BLM,Vernal Field Office. Major events, as defined in NTL3A, shall be reportedverbally within 24 hours, followed by a written report within 15 days. "Other than Major Events" willbe reported in writing within 15 days. "Minor Events" will be reported on the Monthly Report ofOperations and Production.

• Whether the well is completed as a dry hole or as a producer, "Well Completion and RecompletionReport and Log" (BLM Form 3160-4) shall be submitted not later than 30 days after completion ofthe well or after completion of operations being performed, in accordance with 43 CFR 3162.4-1.Two copies of all logs run, core descriptions, and all other surveys or data obtained and compiledduring the drilling, workover, and/or completion operations, shall be filed on BLM Form

Page 33: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Page 8 of 8Well: West Point Federal 3-31-8-16

12/10/2009

Submit with the well completion report a geologic report including, at a minimum,formation tops,and a summary and conclusions. Also include deviation surveys, sample descriptions, strip logs,core data, drill stem test data, and results of production tests if performed. Samples (cuttings, fluid,and/or gas) shall be submitted only when requested by the BLM,Vernal Field Office.

• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall have priorwritten approval from the BLMVernal Field Office.

• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLMVernal Field OfficePetroleum Engineers will be provided with a date and timefor the initial meter calibration and allfuture meter proving schedules. A copy of the meter calibration reports shall be submitted to theBLMVernal Field Office. AIImeasurement facilities will conform to the API standards for liquidhydrocarbons and the AGA standards for natural gas measurement. All measurement points shallbe identified as the point of sale or allocation for royalty purposes.

• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submitted tothe BLMVernal Field Office within 30 days of installation or first production, whichever occurs first.All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall be adhered to. Allproduct lines entering and leaving hydrocarbon storage tanks will be effectively sealed inaccordance with Onshore Oil & Gas Order No. 3.

• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing of asuitable plan and need prior approval of the BLMVernal Field Office. Emergency approval may beobtained orally, but such approval does not waive the written report requirement.

• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without prior approvalof the BLMVernal Field Office. Ifoperations are to be suspended for more than 30 days, priorapproval of the BLMVernal Field Office shall be obtained and notificationgiven before resumptionof operations.

• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of water producedfrom thiswell for a period of 90 days from the date of initial production. A permanent disposalmethod must be approved by this officeand in operation prior to the end of this 90-day period. Inorder to meet this deadline, an application for the proposed permanent disposal method shall besubmitted along with any necessary water analyses, as soon as possible, but no later than 45 daysafter the date of first production. Any method of disposal which has not been approved prior to theend of the authorized 90-day period will be considered as an Incident of Noncompliance and willbegrounds for issuing a shut-in order until an acceptable manner for disposing of said water isprovided and approved by this office.

• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notifiedat least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended or abandoned,all pits must be fenced immediately until they are backfilled. The "Subsequent Report ofAbandonment" (Form BLM3160-5) must be submitted within 30 days after the actual plugging ofthe well bore, showing location of plugs, amount of cement in each, and amount of casing left inhole, and the current status of the surface restoration. RECEIVED

y DEC? 1 2003DIV.OFOiL,GAS&

Page 34: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

API Well No: 43013341990000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-74389

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)

1. TYPE OF WELL Oil Well

8. WELL NAME and NUMBER: W POINT FED 3-31-8-16

2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY

9. API NUMBER: 43013341990000

3. ADDRESS OF OPERATOR: Rt 3 Box 3630 , Myton, UT, 84052

9. FIELD and POOL or WILDCAT: MONUMENT BUTTE

4. LOCATION OF WELL FOOTAGES AT SURFACE: 0500 FNL 1931 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NENW Section: 31 Township: 08.0S Range: 16.0E Meridian: S

COUNTY: DUCHESNE

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

2/8/2010

SUBSEQUENT REPORTDate of Work Completion:

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Newfield requests to extend the permit to drill this well for one year.

NAME (PLEASE PRINT) Mandie Crozier

TITLE Regulatory Tech

SIGNATURE N/A

DATE 2/8/2010

PHONE NUMBER:435 646-4825 Ext

PHONE NUMBER435 646-4825

February 08, 2010

February 16, 2010

iPI Well No: 43013341990000

FORM 9STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCESDIVISION OF OIL, GAS, AND MINING 5.LEAS7E4DE9SIGNATION AND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals. GMBU (GRRV)

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well W POINT FED 3-31-8-16

2.NAMEOFOPERATOR: 9.APINUMBER:NEVVFIELDPRODUCTION COMPANY 43013341990000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext MONUMENT BUTTE

4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE

0500 FNL 1931 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr: NENW Section: 31 Township: 08.05 Range: 16.0E Meridian: S UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

/ NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

2/8/2010CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

O SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Newfield requests to extend the permit to drill this well for one year.Approved by theUtah Division of

Oil, Gas and Mining

Date: February 16, 2010

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech

SIGNATURE DATEN/A 2/8/2010

RECEIVED February 08,

Page 35: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

The Utah Division of Oil, Gas, and Mining

- State of Utah- Department of Natural Resources

Electronic Permitting System - Sundry Notices

Request for Permit Extension Validation Well Number 43013341990000

API: 43013341990000Well Name: W POINT FED 3-31-8-16

Location: 0500 FNL 1931 FWL QTR NENW SEC 31 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY

Date Original Permit Issued: 2/10/2009

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.

If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? Yes No

Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? Yes No

Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? Yes No

Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? Yes No

Has the approved source of water for drilling changed? Yes No

Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? Yes No

Is bonding still in place, which covers this proposed well? Yes No

Signature: Mandie Crozier Date: 2/8/2010

Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY

February 08, 2010

February 16, 2010

UTAH

[gg The Utah Division of Oil, Gas, and Mining- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices

OTI GAS & MINTNG

Request for Permit Extension Validation Well Number 43013341990000

API: 43013341990000Well Name: W POINT FED 3-31-8-16

Location: 0500 FNL 1931 FWL QTR NENW SEC 31 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY

Date Original Permit Issued: 2/10/2009

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.

• If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? I Yes I ) No

• Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? I i Yes i i No

• Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well?

_

I Yes i i No

•Have there been any changes to_the access route including ownership, or rightof- way, which couldaffect the proposed location? I:_ I Yes I:BI No

• Has the approved source of water for drilling changed? I Yes I:¾) No

• Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? I i Yes i No

Approved by the•Is bonding still in place, which covers this proposed well? I i Yes .

I No Utah Division ofOil, Gas and Mining

Signature: Mandie Crozier Date: 2/8/2010Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY Date: February 16, 2010

By:

RECEIVED February 08,

Page 36: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

BLM- Vernal Field Office - Notification Form

Operator Newfield Exploration Rig Name/# Ross #21Submitted By Mitch Benson Phone Number (435) 823-5885Name/Numer WEST POINT FEDERAL3-31-8-16Qtr/QrtNE/NW Section & Township 8_S Range 16ELease Serial Number UTU-74389API Number 43-013-34199

Spud Notice - Spud is the initial spudding of the well, not drillingout below a casing string.

Date/Time 11/9/2010 8:00:00 AM

Casinq - Please report time casing run starts, not cementingtimes.

X Surface CasingIntermediateProduction CasingLinerOther

Date/Time 11/9/2010 2:00:00 PM

Page 37: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

STATEOF UTAH OPERATOR: NEWFIELD PRODUCTION COMPANY OPERATORACCT.No. N2695DMSION OFOIL,GASANDMINING ADDRESS: RT.3 BOX3630ENTITYACTION FORM -FORM 6 MYTON, UT 84052

ACTION CURRENT NEW APINUMBER WELLNAME WELLl.OCATION SPUD EFFECTIVECODE ENTITY NO. ENTITYNO. QQ SC TP NO ) COUNTY DATE DATEv' WEST POINT FEDERAL

B 99999 17400 4301334199 3-31-8-16 NENW 31 SS 16E DUCHESNE 11/9/2010 // O /OWEU.1 COMMEN13:

76/61/ACTION CURRENT NEW API NUMBER WELLNAME WELL LOCAT10N SPUD EFFECTIVECODE E 00

4301334179 FEDERAL 15-30-8-16

SWœSE

30 8 16 DUC ESNE 11/ 010 | | /O

AcTioN cuRRENT NEW API NUMBER WELL NAME WELLLOCATION SPUD EFPECTIVECODE ENTITYNO. ENTITYNO, / QQ 50 IP RU COUNTY DATE

B 99999 17400 4301334234 STATE 1-36-8-15 NENE 38 8S 15E DUCHESNE 11/5/2010 // //) t)

ACTTON CURRENT NEW APINUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECDDE ENTITY NO. ENTITY NO. QQ ( SC | TP RG COUNTY DATE DATE

A 99999 | Ñ 4301350309 UTE TRIBAL11-22-4-2 NESW 22 4S 2W DUCHESNE 11/5/2010 // /L) /L)

ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECODE ENTITYNO. ENTITY NO. QQ SC TP RG COUNTY DATE DKTE

/ MONBUTTE NE FEDERAL já /1£^B 99999 17400 4301350194 K-25-8-16 NWSW 88 ..48E° DUCHESNE 11/2/2010 // /O//O

WELL 5 COMMENTS:

ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCAT10W SPUD EFFECTIVECODE ENTITYND ENTlfYNO. ' QQ 80 TP i RG COUNTY DATE DATE

GREATER MONBUTTEB 99999 17400 4301350278 Q-34-8-16 SESW 34 SS 16E DUCHESNE 11/3/2010 | D O

WELL5COMM

ACTION CODES (Sooinstrucilonson back offoun)A - I newentityfor newwell(singlewellonly)8 - *wall to existingentity(groupor unitwell) Jentri ParkC-fromoneoxistagentitytoano-•- RECEIVEDD - wellfromone oxlstingentitytoa newontityE- ther(explalnincommontssocion) Production C1 rk 11/09/10NOV09 2010

NOTE IJso COMMENT sectionto explain whyeach Action Code was selected.

DIV,0F0lL,GAS&

Page 38: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

FORM 3160-5 UNITED STATES FORM APPROVED( 2007) DEPARTMENT OF THE INTERIOR

BUREAUOF LANDMANAGEMENT 5. Lease SerialNo.SUNDRY NOTICES AND REPORTS ON WELLS USA UTU-74389

Do not use this form for proposals to drill or to re-enter anabandoned well. Use Form 3160-3 (APD) for such proposals. 6. If Indian, Allottee or TribeName.

SUBMIT IN TRIPLICATE - Other Instructions on page 2 7. If Unit or CA/Agreement, Name and/or

GMPUl. Type of Well

Oil Well O Gas Well O Other 8. Well Nameand No.2. Name of Operator WESTPOINT FEDERAL 3-31-8-16

NEWFIELD PRODUCTIONCOMPANY 9. API Woll No.3a. Address Route 3 Box 3630 3b. Phone (include are code) 4301334199Myton, UT 84052 | 435646 377] 10 Field and Pool, or Exploratorv Area

4. Location of Well (Footage, Sec., T., R., M, or SurveyDescription) GREATERMB UNITl 1. County or Parish, State

NENW Section3lT8SR16EDUCHESNE, UT

12. CHECK APPROPRIATE BOX(ES) TO INIDICATE NATURE OF NOTICE, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Acidize Q Deepen Q Production (Start/Resume) Q Water Shut-OffNotice of Intent

Alter Casing Q FractureTreat Q Reclamation Q Well IntegritySubsequentReport CasingRepair Q New Construction Q Recomplete Other

ChangePlans O Plug & Abandon Q Temporarily Abandon Spud NoticeFinal Abandonment Convertto Injector Q Plug Back Q Water Disposal

13. Describe Proposed or CompletedOperation:(Clearlystate all pertinent details, includingestimated starting date of any proposed work and approximate duration thereof. If theproposal is to deepen directionally or recomplete horizontally,give subsurface locationsand measured and true vertical depths of all pertinent markers and zones. Attach theBond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filed within 30 days followingcompletionofthe involved operations. Ifthe operation results in a multiple completion orrecompletion in a new interval, a Form 3160-4 shall be filed once testing has been completed.Final Abandonment Notices shallbe filed only after all requirements, includingreclamation, have been completed, and the operator has determinedthat the site is ready for finalinspection.)

On 11/9/10 MIRU Ross #29. Spud well @8:00 AM. Drill 315' of 12 1/4" hole with air mist. TIH Wl7 Jt's 8 5/8" J-55 24# casing.Set @314.96' KB. On 11/21/10 cement with 160 sks of class "G" w/ 2% CaCL2 + 1/4# per sk Cello Flake mixed @ 15.8 ppgwith 1.17 cf/sk yield. Returned 5 bbls cement to pit. WOC.

RECEIVEDDEC07 2010

I hereby certify that the foregoingis true and Titlecorrect (Printed/ Typ d)

Sign eDaDrillin20Foreman

THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approvedby Title DateConditionsof approval, if any, are attached. Approvalofthis notice does not warrant orcertify that the applicant holds legal or equitable title to those rights in the subjectlease Officewhich would entitle the applicant to conduct oÿerations thereon.Title 18 U.S.C.Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowinglyand willfully to make to any department or agency of the UnitedStates anv false fictitious and finudulent statementsor renresentationsas to anv matter within its jurisdiction(Instructions on page

Page 39: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

NEWFIELD PRODUCTION COMPANY - CASING & CEMENT REPORT

8 5/8" CASING SET AT 314.96

LAST CASING 14 SET AT 6 OPERATOR Newfield Exploration CompanyDATUM 12 WELL W POINT 3-31-8-16

DATUMTO CUT OFF CASING 12 FIELD/PROSPECT Monument ButteDATUMTO BRADENHEAD FLANGE 12 CONTRACTOR & RIG # Ross Rig #29TD DRILLER 315 LOGGERHOLE SIZE 12 1/4"

LOG OF CASING STRING:PIECES OD ITEM - MAKE - DESCRIPTION WT / FT GRD THREAD CONDT LENGTH

1 Wellhead A 0.957 8 5/8" ST&C Casing (44.10' shoe joint) 24 J-55 STC A 303.111 Guide Shoe A 0.9

CASINGINVENTORY BAL. FEET JTS TOTAL LENGTH OF STRING 304.96TOTAL LENGTH OF STRING 304.96 7 LESS CUT OFF PIECE 2LESS NON CSG. ITEMS 1.85 PLUS DATUMTO T/CUT OFF CSG 12PLUS FULL JTS. LEFT OUT 0 CASING SET DEPTH 314.96

TOTAL 303.11 7 -

TOTAL CSG. DEL. (WlO THRDS) 303.11 7 · COMPARETIMING

BEGIN RUN CSG. Spud 8:00 AM 11/9/2010 GOOD CIRC THRU JOB YesCSG. IN HOLE 2:00 PM 11/9/2010 Bbls CMT CIRC TO SURFACE 5BEGIN CIRC 10:12 AM 11/21/2010 RECIPROCATED PIPl NoBEGIN PUMP CMT 10:22 AM 11/21/2010BEGIN DSPL. CMT 10:32 AM 11/21/2010 BUMPED PLUG TO 430

PLUGDOWN 10:42 AM

Page 40: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

CEMENT USED CEMENT COMPANY- BJ ServicesSTAGE # SX CEMENT TYPE & ADDITIVES

1 160 Class"G"+ 2%CaCl2+0.25#lsk CelloFlakeat 15.8ppgw/1.17yield.

CENTRALIZER & SCRATCHER PLACEMENT SHOW MAKE& SPACINGMiddle of first, topof second, and thirdfor a totalof three.

COMPANY REPRESENTATIVE Mitch Benson DATE

Page 41: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

Form 3160-4(August 2007)

UNITED STATESFORM APPROVED

O DEPARTMENT OF THE INTERIOR OMB NO. 1004-0137BUREAU OF LAND MANAGEMENT Expires: July 31, 2010

WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease Serial No.UTU-74389

la. Type of Well Oil Well GasWell Dry O Other 6. If Indian, Allottee or Tribe Nameb. Type of Completion: New Well WorkOver Deepen O Plug Back Diff. Resvr.,

Other: 7ÓMU or CA Agreement Name and No.

2. Name of Operator 8. Lease Name and Well No.NEWFIELD EXPLORATION COMPANY WEST POINT FEDERAL 3-31-8-163. Address 3a. Phone No. (include area code) 9. AFI Well No.

1401 17TH ST. SUITE 1000 DENVER, CO 80202 (435)646-3721 43-013-341994. Location of Well (Report location clearly and in accordance with Federal requirements)* 10. Field and Pool or Exploratory

GREATER MB UNITAt surface 500' FNL & 1931' FWL (NE/NW) SEC. 31, T8S, R16E 11. Sec., T., R., M., on Block and

Surveyor AreaSEC.31, TSS, R16E

At topprod. interval reported below 12. County or Parish 13. State

At totaldepth 6475' DUCHESNE UT

14. Date Spudded 15. Date T.D. Reached 16. Date Completed 12/18/2010 17. Elevations (DF, RKB, RT, GL)*11/09/2010 11/30/2010 D & A Ready to Prod. 5765' GL 5777' KB

18. Total Depth: MD 6475' 19. Plug Back T.D.: MD 6405' 20. Depth Bridge Plug Set: MDTVD TVD TVD

2 I. Type Electric& Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? No O Yes (Submit analysis)

DUALIND GRD, SP, COMP. DENSITY,COMP. NEUTRON,GR,CALIPER, CMT BOND Was DST run? No O Yes (Submit report)Directional Survey? No Yes (Submitcopy)

23. Casing and Liner Record (Report all strings set in well)

Hole Size Size/Grade Wt. (#/ft) Top (MD) Bottom (MD) Stage Cemhenter N of S & Slur Vol CementTop* Amount Pulled

12-1/4" 8-5/8" J-55 24# 0 315' 160 CLASS G7-7/8" 5-1/2" J-55 15.5# 0 6451' 300 PRIMLITE 42'

399 50/50 POZ

24. Tubing tecordSize Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD)

2-7/8" EOT@6266' TA @ $167'25. Producing intervals 26. Perforation Record

Formation Top Bottom Perforated Interval Size No. Holes Perf StatusA) Green River 4209' 6201' 4209-6201' .36" 93B)

C)

D)

27. Acid, Fracture,Treatment, Cement Squeeze, etc.Depth Interval Amount and Type of Material

4209-6201' Frac w/ 120020#'s 20/40 sand in 907 bbis of Lightning 17 fluid in 4 stages

28. Production - Interval ADate First fest Date Hours Test Oil Gas Water OilGravity 3as Production MethodProduced fested Production BBL MCF BBL Corr.API Gravity 2-1/2" x 1-1/2" x 16' x 20' RHACPump

12/20/10 01/02/11 24 10 3.53 25Choke Ibg. Press. Osg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio PRODUCING

SI

28a. Production - Interval BDate First Test Date Hours Test Oil Gas Water OilGravity Gas Production MethodProduced fested Pr on BBL MCF BBL Corr.API Gravhy ggcENEDChoke Tbg. Press. Osg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize VIwg. Press. Rate BBL MCF BBL Ratio

*(Seeinstructions and spaces for additional data on page 2) !,

Page 42: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

28b. Production - Interval CDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity

Choke Tbg.Press.Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio

SI

28c. Production - Interval DDate First Test Date Hours Test Oil Gas Water Oil Gravity Oas Production MethodProduced Tested Production BBL MCF BBL Corr.API 3ravity

Choke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize F1wg. Press. Rate BBL MCF BBL Ratio

SI

29. Dispositionof Gas (Solid,usedforfuel,vented, etc.)

USED FOR FUEL

30. Summary of Porous Žones (Include Aquifers): 31. Formation (Log)Markers.

Showall important zones of porosity and contents thereof: Cored intervals and all drill-stem tests' GEOLOGICAL MARKERSincluding depth interval tested, cushion used, timetool open, flowing and shut-in pressures andrecoveries.

TopFormation Top Bottom Descriptions, Contents,etc. Name

Meas. Depth

GREEN RIVER 4209' 6201' GARDEN GULCH MRK 3916'GARDENGULCH1 4141'

GARDEN GULCH 2 4260'POINT 3 4530'

X MRKR 4797'Y MRKR 4833'

DOUGALS CREEK MRK 4951°

BI CARBONATE MRK 5195'

B LIMESTON MRK 5317'CASTLE PEAK 5841'

BASALCARBONATE 6277'WASATCH 6402'

32. Additional remarks (include plugging proceture):

33. Indicate which items have been attached by placing a check in the appropriate boxes:

O Electrical/Mechanical Logs (1 full set req'd.) Geologic Report DST Report Directional Survey

O Sundry Notice for plugging and cement verification O Core Analysis Other DrillingDaily Activity

34. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records (see attached instructions)*

Name ease Lucy havez au to TD ee Administrative Assistant

Title 18 U.S.C. Section 1001 and Title 43 U.S.C.Section1212, make it a crime for any person knowingly and willfully to make to any department or agency of the UnitedStatesanyfalse, fictitious or fraudulent statements or representations as to any matter within itsjurisdiction.

(Continued on page 3) (Fonn 3160-4, page

Page 43: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

' Summary Rig Activity Page 1 of 2

Daily Activity Report

Format For SuncIry

W POINT 3-31-8-169/1/2010 To 1/30/2011

W POINT 3-31-8-16 Waiting on CementDate: 11/18/2010Ross #29 at 315. Days Since Spud - On 11/9/10 Ross Rig #29 spud Federal 3-31-8-16, drilled315' of 12 1/4" hole, and ran 7 jts 8 5/8" - casing (guide shoe, shoe jt, baffle plate, 6 jts) set@ 314.96' KB. On 11/21/10 BJ Services cemented - Returned 5 bbis to pit. - 8 5/8" casing w/160 sks Class "G" + 2% CaCl2 + 0.25#/sk Cello Flake at 15.8 ppg w/ 1.17 yield.Daily Cost: $0Cumulative Cost: $32,611

W POINT 3-31-8-16 Rigging downDate: 11/26/2010NDSI #3 at 315. O Days Since Spud - RD on State 1-36-8-15 to move to Federal 3-31-8-16Daily Cost: $0Cumulative Cost: $39,561

W POINT 3-31-8-16 Drill 7 7/8" hole with fresh waterDate: 11/27/2010NDSI #3 at 1213. 1 Days Since Spud - Kelly up/Work on frozen air lines - PU BHA with PayZone Dir. Tools/Tag cmt @ 305' - De ice Stand pipe & repair collar clamp - to 1500 psi for 30min /AII OK - all Equipment - On 11/26/10 Jones Trucking moved riig # 3 from State 1-36-8-15 to West Point Federal 3-31-8-16/Set - Drill 7 7/8" hole from 305' to 484'/WOB 15/RPM65/GPM 380/ROP 90FPH/Survey @ 326' 2.72 Dir. 261.25 - Work on pump - Drill 7 7/8" holefrom 484' to 929'/WOB 18/RPM 65/GPM 380/ROP 148FPH - Install Rotating head rubber &Drive bushings - Drill 7 7/8" hole from 929' to 1213'/WOB 18/RPM 65/GPM 380/ROP 114FPH -

RU Quicktest & test kelly,safety valve, pipe & blind rams & choke to 2000 psi for 10 min/TestCsgDaily Cost: $0Cumulative Cost: $94,035

W POINT 3-31-8-16 Drill 7 7/8" hole with fresh waterDate: 11/28/2010NDSI #3 at 3209. 2 Days Since Spud - Drill 7 7/8" hole from 2662' to 3209'/WOB 18/RPM65/GPM 380/ROP 109FPH - work on charge pump - Drill 7 7/8" hole from 2140' to 2662'/WOB18/RPM 65/GPM 380/ROP 109FPH - work on charge pump - Drill 7 7/8" hole from 1591' to2410'/WOB 18/RPM 65/GPM 380/ROP 109FPH - Work on pump - Drill 7 7/8" hole from 1213'to 1591'/WOB 18/RPM 65/GPM 380/ROP 148FPH - Rig serviceDaily Cost: $0Cumulative Cost: $109,890

W POINT 3-31-8-16 Drill 7 7/8" hole with fresh waterDate: 11/29/2010NDSI #3 at 4774. 3 Days Since Spud - Rig service - Drill 7 7/8" hole from 3209' to3639'/WOB 18/RPM 65/GPM 380/ROP 71FPH - Drill 7 7/8" hole from 3639' to 4774'/WOB18/RPM 65/GPM 380/ROP71FPHDaily Cost: $0Cumulative Cost: $126,745

http://www.inewfld.com/denver/SumActRpt.asp?RC=l59742&API=4301334199&MinDa...

Page 44: gQ.Ô OgØÔ n' linas'Ompleted' - Utah · o o newfield production company west point federal 3-31-8-16 ne/nw section 31, tss, r16e duchesne county, utah onshore order no. 1 drilling

' Summary Rig Activity Page 2 of 2

W POINT 3-31-8-16 Lay Down Drill Pipe/BHADate: 11/30/2010NDSI #3 at 6475. 4 Days Since Spud - Pump 300 sks PLII+3%KCL+5#CSE+5#KOL+.5SMS+FP+SF. Mixed at 11 ppg and 3.53 yield. Then 400sks -

50:50:2+3%KCL+.5%EC-1+.25#CF+,05#SF+.3SMS+FP-6L. Mi×ed at 14.4 ppg 1.24 yield.Returned - 22 bbis to reserve pit. Bump plug at 2050 psi. - Nipple down and set slips w/108,000# tension. - Clean mud tanks and release rig at 10:30 PM 11/30/2010. - Circulate andrig up BJ hard lines - R/U and run 148 jts of 5 1/2" 15.50# 355 casing set at 6451'/KB - Test 51/2" pipe rams to 2000 psi for ten min - R/U PSI and log. Tripple combo suite TD to 4750'30/min. 4550 to surface 60'/min - Finish pipe lay down - Continue to lay down DP and BHA -

Wait on brine. Pump 200 bbis of 10# brine water - Lay down pipe to 4000'. Check flow. Wellflowing at 5 gal/min. Pump 200 bb\s of 10# brine water - Circulate - Drill 7 7/8" hole from5624' to 6475'/WOB 18/RPM 65/GPM 380/ROP 113.5FPH - Rig service. Function test BOP andcrown-o-matic - Drill 7 7/8" hole from 4774' to 5624'/WOB 18/RPM 65/GPM 380/ROP 89.4FPH- Clean mud tanks and release rig at 10:30 PM 11/30/2010. - Nipple down and set slips w/108,000# tension. - 22 bb\s to reserve pit. Bump plug at 2050 psi. - 50:50:2+3%KCL+.5%EC-1+.25#CF+,05#SF+.3SMS+FP-6L. Mixed at 14.4 ppg 1.24 yield. Returned - Pump 300 sksPLII+3%KCL+5#CSE+5#KOL+.5SMS+FP+SF. Mixed at 11 ppg and 3.53 yield. Then 400sks -

Circulate and rig up BJ hard lines - R/U and run 148 jts of 5 1/2" 15.50# J55 casing set at6451'/KB - Test 5 1/2" pipe rams to 2000 psi for ten min - R/U PSI and log. Tripple combosuite TD to 4750' 30/min. 4550 to surface 60'/min - Finish pipe lay down - Continue to laydown DP and BHA - Wait on brine. Pump 200 bb\s of 10# brine water - Lay down pipe to4000'. Check flow. Well flowing at 5 gal/min. Pump 200 bbls of 10# brine water - Circulate -

Drill 7 7/8" hole from 5624' to 6475'/WOB 18/RPM 65/GPM 380/ROP 113.5FPH - Drill 7 7/8"hole from 4774' to 5624'/WOB 18/RPM 65/GPM 380/ROP 89.4FPH - Rig service. Function testBOP and crown-o-matic FinalizedDaily Cost: $0Cumulative Cost: $182,972

Pertinent Files: Go to File List

http://www.inewfld.com/denver/SumActRpt.asp?RC=159742&API=4301334199&MinDa...