GQTS Changes Implemented 5/27/12
Revised 6/10/12
*Removed Launch Phase PRR deductions fromthe CT Bid list 6/10/12
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 2/9
2
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 3/9
3
(Continued changes 5/27/12)
5. Metrics Module – CT Bid list – Moved or merged GMPT Direct Ship Major
Disruption type PRR column with column Plant / UnAuth. No change in the -20
point Quality Ranking deduction during the current (6) six months
6. Metrics Module – CT Bid list – Removed the Quality Ranking ‘NR’ when the
supplier doesn’t have receipts in the last 12 months or PPM is blank. Revised
Performance Criteria or Quality Ranking note to If Quality Ranking is Blank or
RED, Sourcing requires SQ Leadership Approval
7. Metrics Module – CT Bid list – Added MMOG/LE (Materials ManagementOperation Guidelines, Logistics Evaluation) Ranking Red / Yellow / Green / NR =
not required Ratings based on supplier self assessment as rolled out at the GM
Supplier Business Meetings in 2012. Questions contact the MMOG/LE Team at
[email protected] (must provide the supplier mfg. duns) MMOG/LE assessment
available at AIAG.org
8. APQP Module / PPAP Sample Status - CCA (Customer Care & Aftersales)
Contracted Components will update automatically with the Final Assembly PPAP
status. This will only happen when we have a better PPAP status on the Final
Assembly than the Component (Example Component XYZ has not submitted
status while the Final Assembly part has Approved Status – the Component XYZ
will acquire an Approved Status)
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 4/9
4
Change 5/27/12
#1, 2
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 5/9
5
#1,2
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 6/9
6
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 7/9
7
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 8/9
8
Reference Only - Current CT Bid list before change adding (7) MMOG/LE Ranking, Move
Launch Phase PRR’s to Quality Performance, and Removed (4) Warranty PRR Type
Column from the Bid list. Moved (5) GMPT Direct Ship MD to Plant / Unauth column.
#5 #4
#7
8/13/2019 GQTS May 27 2012 Changes
http://slidepdf.com/reader/full/gqts-may-27-2012-changes 9/9
9
Widget Component - Part number 12345678 – PPAP Status – Not Submitted
Widget Assembly – Part number 98765432 – PPAP Status – Approved
With new change the following results:
Widget Component – Part number 12345678 - will acquire the better PPAP
Status of the Widget Assembly – PPAP Approved Status
APQP Module / PPAP Sample Status - CCA (Customer Care & Aftersales)
Contracted Components will update automatically with the Final Assembly
PPAP status. This will only happen when we have a better PPAP status on the
Final Assembly than the Component (Example Component XYZ has not
submitted status while the Final Assembly part has Approved Status – the
Component XYZ will acquire an Approved Status)
#8