+ All Categories
Home > Documents > Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure...

Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure...

Date post: 18-Jul-2018
Category:
Upload: buikhuong
View: 215 times
Download: 0 times
Share this document with a friend
10
+61 488 075 757 [email protected] executive director, operations lead specialist consultant Graham Bower-White PROD.PO.RES.GBW.140523 summary Graham has over 25 years relevant experience; and has worked on developments in Australasia, Europe and USA. He has been involved with major projects in design, development and operations phases in both onshore and offshore operating regimes. He has extensive knowledge of the application of Australian safety case regulations, and in the development of safety cases for major Australasian floating production storage and offload facilities, wellhead platforms, mobile offshore drilling units and onshore facilities. Graham is a talented and experienced facilitator, and has led numerous HAZID, HAZOP, risk assessment and risk & opportunity workshops. He has also presented technical papers around the world, including USA and France, and throughout Australia. He has worked with all major petroleum development companies and most of the supporting contractors over the course of the last 11 years. He has managed the in-house risk and safety teams for consultancies, engineering contractors and class societies. business role As Executive Director Operations, Graham works with our Executive Director Corporate in translating best practice organisational development and management into policies and procedures that specifically suit the the company’s consultancy focus. He is responsible for, and will usually be involved in, all stages in the sales process. He oversees initial client contact, proposal development and contract negotiations. This ensures that your required outcomes are accurately identified at the outset and that the project deliverables and service meet your specific needs. Graham’s role also involves a marketing focus, and he represents TSRhorizons Consulting at conferences and symposiums around the globe, presenting interesting and informative technical papers. An important part of his role as Executive Director Operations is to identify and recruit Consultants who fit our growth plans. Once they become part of our team, Graham is responsible for overseeing the quality of their deliverables and expanding their technical knowledge base. Well supported by our consulting team, Graham maintains full responsibility for maintaining our high standards of project management, execution and delivery; and client relationship management that will exceed your expectations. qualifications Graduate, Masters Program, Systems Engineering, Royal Canadian Air Force B.Sc. Marine Acoustics & Optics, University of NSW no. of years experience 25+ key competencies process safety engineering risk management concept safety evaluations HAZID & HAZOP facilitation hazard registers risk workshop facilitation major accident event analysis formal safety assessments bow-tie development ALARP demonstration safety critical elements performance standards qualitative risk assessment quantitative risk analysis safety cases & revisions safety case regulations regulatory compliance scope of validation validation plans HSE management plans simultaneous operations workshops & plans well operations management plans concept safety evaluations availability modelling reliability block diagram development failure modes effects & criticality analysis
Transcript
Page 1: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

+61 488 075 757 [email protected]

execut ive d irector, operat ions lead spec ial ist consul tant

Graham Bower-White

PROD.PO.RES.GBW.140523

summaryGraham has over 25 years relevant experience; and has worked on developments in Australasia, Europe and USA. He has been involved with major projects in design, development and operations phases in both onshore and offshore operating regimes. He has extensive knowledge of the application of Australian safety case regulations, and in the development of safety cases for major Australasian floating production storage and offload facilities, wellhead platforms, mobile offshore drilling units and onshore facilities. Graham is a talented and experienced facilitator, and has led numerous HAZID, HAZOP, risk assessment and risk & opportunity workshops. He has also presented technical papers around the world, including USA and France, and throughout Australia. He has worked with all major petroleum development companies and most of the supporting contractors over the course of the last 11 years. He has managed the in-house risk and safety teams for consultancies, engineering contractors and class societies.

business roleAs Executive Director Operations, Graham works with our Executive Director Corporate in translating best practice organisational development and management into policies and procedures that specifically suit the the company’s consultancy focus. He is responsible for, and will usually be involved in, all stages in the sales process. He oversees initial client contact, proposal development and contract negotiations. This ensures that your required outcomes are accurately identified at the outset and that the project deliverables and service meet your specific needs. Graham’s role also involves a marketing focus, and he represents TSRhorizons Consulting at conferences and symposiums around the globe, presenting interesting and informative technical papers. An important part of his role as Executive Director Operations is to identify and recruit Consultants who fit our growth plans. Once they become part of our team, Graham is responsible for overseeing the quality of their deliverables and expanding their technical knowledge base. Well supported by our consulting team, Graham maintains full responsibility for maintaining our high standards of project management, execution and delivery; and client relationship management that will exceed your expectations.

qualificationsGraduate, Masters Program, Systems Engineering, Royal Canadian Air ForceB.Sc. Marine Acoustics & Optics, University of NSW

no. of years experience25+

key competenciesprocess safety engineeringrisk managementconcept safety evaluationsHAZID & HAZOP facilitationhazard registersrisk workshop facilitationmajor accident event analysisformal safety assessmentsbow-tie developmentALARP demonstrationsafety critical elementsperformance standardsqualitative risk assessmentquantitative risk analysissafety cases & revisionssafety case regulationsregulatory compliancescope of validationvalidation plansHSE management planssimultaneous operations workshops & planswell operations management plansconcept safety evaluationsavailability modellingreliability block diagram developmentfailure modes effects & criticality analysis

Page 2: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p2

Graham Bower-White

oil & gas experience

key positions heldS2V Consulting/Xodus GroupManager, Technical Safety & Risk + Environmental Management & Approvals

Wood Group/Mustang EngineeringSafety and Risk Manager

Lloyd’s RegisterManager—Risk (WA)

Vanguard SolutionsBusiness Lead—Safety and Risk

Ball Solutions GroupWA Business Manager & Group Systems Safety Lead

Department of Defence: Defence Materiel OrganisationLead Engineer, +SAFE Update ProjectProject Manager, Fire Safety Study Guidelines Review & Implementation

Department of DefenceLead Presenter, System Safety Course for Aerospace EngineersSystems Engineer and Project Manager, KingAir Navigation Trainer ImplementationIndependent Safety Case Evaluator

Royal Australian Air ForceOfficerAfter successfully completing training at ADFA (UNSW) Graham remained in the RAAF until achieving the rank of Squadron Leader (senior officer), managing a major capital acquisition project valued at approximately USD19M.

clientsAllseasApacheAWEBaker HughesBHP BillitonBP KwinanaCentury ResourcesCloughCoogee ResourcesDSMEEnscoEOCPFluorHallin MarineIOS Offshore

InpexLinchPinMcDermottKongsberg NEMOKCGMOMVPTTEP AustralasiaProsafe Production ServicesSBM OffshoreSea Trucks GroupTanker Pacific Offshore TerminalsTransoceanShell Todd Oil ServicesVermilion Oil & Gas AustraliaWoodside

facilitiesFimiston PlantHarriet Alpha PlatformHarriet Bravo PlatformKapuni Production StationKarratha Gas PlantBP Kwinana Refinery

Rig 11 onshoreKing Bay Supply BaseKleenheat Gas PlantOtway Gas PlantPluto Gas PlantCS1 Metering Station

developmentsBalnavesBrowseCimattiDeen DayalGorgonHalyardIchthysJerukJulimarKashaganHarriet Joint Venture

MaariMontaraNorth RankinPersephoneSiakap North - PetaiSunriseVan GoghVaranus Island HubWandooWheatstoneWestern Flank Alpha

vesselsAudaciaChallis FPSOCrux FPSODB30E104 MODUE109 MODUGriffin Venture FPSOJabiru FPSOJascon 25Jascon 34

Lewek ChampionOKHA FPSONganhurra FPSONingaloo Vision FPSOOcean Legend MOPURaroa FPSOTog MorTui FPSOWindemerePioneer Express

Page 3: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p3

Graham Bower-White

workshop facilitation summary

client project/facility/vessel services provided

Audacia Pipeplay vessel MAE identification and scope of validation.

Tog Mor Pipelay vessel MAE identification and scope of validation.

Multiple facilities/developments HAZIDs for management of well integrity.

Multiple facilities/developments ENVIDs for environmental plans.

Balnaves Concept selection HAZID.

CSI Metering Station HAZID for maintenance campaign.

Halyard HAZID for: § Operations phase. § Construction/installation phase.

Harriet Alpha Platform HAZID for night operations.

Harriet Bravo Platform HAZID for drilling SIMOPS.

Ningaloo Vision FPSO HAZID for: § Repairs to DTM. § Replacement of DTM pull-in rope.

Ocean Legend MOPU HAZID for hydraulic cylinder removal during facility de-commissioning.

Van Gogh/Coniston/Novara HAZOP for gas re-injection well.HAZID for subsea installation.

Varanus Island Hub Condensate tank sludge removal HAZID.New fire & gas system design review.

Tui FPSO HAZID for: § Operations phase. § Construction/installation phase.

King Bay Supply Base HAZID and constructability review for mud plant de-commissioning and removal.

Welltest package HAZOP.

Kwinana Refinery Multiple HAZOPs, including: § GRU § AFPU § Jetties/Offsites § CDU1 § VDU2 § Alky Water Mitigation

Rig 11 Onshore Drill Rig HAZID for rig operation.

Maari HAZID for operations phase.HAZOP of WHP topsides.

Page 4: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p4

Graham Bower-White

workshop facilitation summary (contd)

client project/facility/vessel services provided

Challis FPSO HAZID for personnel transfers during campaign maintenance.

Montara WHP HAZID for hook-up and pre-commissioning.Development SIMOPS workshop for drilling campaign.Development HAZID for subsea installation and pipelay.WHP HAZID for:

§ Operations phase. § Construction/installation phase.

Development of: § 1.5 day HAZID Workshop Leader course. § 3-day HAZOP Workshop Leader course.

E104 MODU HAZID for operations phase.

E109 MODU HAZIDs for: § Operations phase. § Apache drilling campaign.

Lewek Champion HAZID for construction/installation phase.

Cimatti Project risk workshop.Options review workshop for methanol logistics study.

Karratha Gas Plant Risk workshop for: § 1GFH remediation. § LNG4 isolation project.

HAZID and constructability review for: § Service water header replacement. § Level gauge upgrade project. § MR Chiller project.

HAZOP for MR Chiller project.

King Bay Supply Base HAZID & constructability review for HV upgrade project.

Kleenheat Gas Plant HAZOP of dual-spec LPG project.

Nganhurra FPSO HAZID & constructability review for H2S scavenger project.

Pluto Design review for MR Chiller project.

Raroa FPSO HAZID, constructability review, design review and HAZOP for FPSO upgrades.

Woodside Browse Multiple HAZIDs and design review during FEED.

Windermere HAZID for operations phase.

Montara HAZIDs for construction/installation of subsea infrastructure.

Ichthys HAZIDs for URF and GEP covering design, installation, maintenance and operations phases.

Page 5: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p5

Graham Bower-White

workshop facilitation summary (contd)

client project/facility/vessel services provided

Fimiston Plant FMECA workshop.

Jabiru FPSO HAZID for field abandonment.Option review workshop for RTM recovery/abandonment.

Montara SIMOPS HAZID workshop for installation & commissioning.

DB30 HAZID for operations phase.

Ichthys Thirty percent design review workshop of riser support structure.

Raroa FPSO/Maari WHP Design review, HAZID and HAZOP for upgrades to H2S detection.

Montara HAZID for commissioning & operations phases for: § Wells & subsea infrastructure. § WHP & FPSO.

Ningaloo Vision FPSO HAZID for: § fuel gas system upgrade project. § design, construction/installation and operations phases.

Kikeh FPSO HAZID for topsides modifications to FPSO.

Jascon 25 HAZID for: § Compressed gas storage. § Heavy lift operations. § Pyrenees project operations. § West Atlas wreck removal project. § Module installation on Kikeh FPSO.

Kapuni Production Station HAZID for operations.

Montara FPSO Design HAZID.

new-build Arctic drillship Concept HAZID.

Wandoo HAZID for: § Changes to cyclone response. § Annual shutdown and maintenance campaign. § Floating hose change-out campaign. § GBS Shaft 4 confined space entry. § Wellbay extension project. § Drilling campaign. § Diving operations.

Browse HAZID during concept select.Multiple HAZID and design reviews during FEED.Subsea and riser HAZID post-FEED.HAZOP of central processing facility topsides.

Page 6: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p6

Graham Bower-White

workshop facilitation summary (contd) client project/facility/vessel services provided

Browse CPF HAZOP of platform topsides during FEED.

Karratha Gas Plant HAZID/constructability review of OCW project.HAZID/Constructability/ALARP for DOMGAS corrosion refurbishment.HAZID/Constructability/ALARP for LNG Train 1 corrosion refurbishment.HAZID for Jetty upgrades.

Nganhurra FPSO Risk assessment of ESD/BDV performance.

North Rankin Multiple HAZIDs for NRA bridge support structure.Multiple design/layout reviews for NRA bridge support structure FEED & detailed design.

Otway Gas Plant Multiple HAZIDs during design of inlet gas compression.Multiple design reviews for inlet compression project.HAZOP of inlet gas compression.

Persephone HAZID for installation/construction.

Sunrise Multiple HAZIDs during concept select phase.Multiple design/layout reviews during concept select phase.HAZOP of platform topsides during concept select phase.

Western Flank Alpha HAZID for WHP riser approach concepts.

Page 7: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p7

Graham Bower-White

key projects delivered

client facility/project services provided

Kashagan Procedure for demonstrating ALARP principles.Comprehensive review of hook-up and commissioning HSE execution plan.

AudaciaTog Mor

Scope of validation for pipeplay/construction vessels.Key deliverables included review of safety critical elements, methods for validation, performance standards, scope of validation, and validation plan.

Multiple facilities/developments Risk assessments and bow-tie development for Well Operations Management Plans.

All Facilities Spill risk assessment for all spill scenarios as input to OSCPs and EPs.

Environmental Department Development of complete risk assessment procedure/process for EP development, including new risk assessment workshop template.

Balnaves Safety support during concept select phase.

Halyard Pipeline Safety Case.Key deliverables included bow-ties, MAE analysis, operations and installation/construction safety case. Operations safety case.Key deliverables included operations PMP compliant with offshore and onshore pipeline regulations.

Harriet Alpha Safety case revision.Specific deliverables included qualitative risk assessment to cover extended night operations.

Harriet Bravo SIMOPS plan update.

Harriet JV Well operations management plan (WOMP) update.

Ningaloo Vision Safety case revision for repairs to FPSO.

Van Gogh Independent review of performance standards for field development.

Van Gogh/Coniston/Novara Risk assessments for conversion of gas lift well to gas re-injection.Risk assessments for subsea installation and tie-in.

Varanus Island Hub FEED and detailed design of new fire & gas system.Key deliverables included fire and gas system philosophy, selection and location of F&G detectors, fire detection coverage mapping, selection and location of active fire protection (monitors and deluge), fire pump sizing and firewater ring main sizing & design.

Tui Design construction and operations safety cases, including FPSO and subsea equipment in NZ waters.

Griffin Venture FPSO Review and update safety critical elements and associated operations performance standards.

Kwinana Refinery Close-out of outstanding HAZOP actions.

Rig 11 Safety case assistance and advice for onshore drilling rig.

Maari Joint technical leadership for formal safety assessment of WHP.Key deliverables included project management and planning, oversight of all studies, complete availability analysis of WHP, quality assurance and safety advice as required.

Page 8: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p8

Graham Bower-White

key projects delivered (contd)

client facility/project services provided

Gorgon Operations performance standards.

Wheatstone Safety support services to upstream development.

Challis FPSOJabiru FPSO

Safety advice on Jabiru and Challis including NOPSA liaison on safety case revisions.Key deliverables included update cyclone response procedure for Jabiru following NOPSA request and transport risk assessment for Challis during campaign maintenance.

Montara Safety case revision for WHP hook-up pre-commissioning.SIMOPS plan for jack-up drilling campaign.Advice on safety case revision requirements for change of construction vessel from Saipem Castoro Otto to Sea Trucks J25.Project management and specialist safety engineering for all safety-related aspects of WHP and subsea systems.Concept safety evaluation and HSE philosophy for FPSO, WHP and subsea tiebacks.

E104 Safety case, compliant with IADC and NOPSA requirements.Key deliverables included facility description, SMS, SIMOPs, FEA, NFHA, ESSA, ETRERA, bow-ties, ALARP, FSA and emergency response.Operations performance standards.

E109 Safety Case, compliant with IADC and NOPSA requirements.

Cimatti ALARP demonstration for methanol logistics study.

Karratha Gas Plant Project risk assessment and ALARP demonstration for 1GFH remediation project.Project risk assessment for LNG Train 4 isolation project.Review of DOMGAS PFP requirements.Risk assessments and ALARP demonstration for OCW rectification project.Full suite of formal safety assessments for DOMGAS EC refurbishment project.

Pluto Onshore MR Chiller Project Select Phase.Key deliverables included project risk review, design review and select phase report input.

Woodside Browse HSE Lead for bridging engineering phase post FEED for the central processing facility, responsible for all HSE matters for the project during this phase, including primary point of client contact.

Windermere Operations safety case.Key deliverables included MAE/bow-tie analysis, operations safety case and ongoing safety & risk support.

Pioneer Express Scope of validation for flexible pipelay/multi-purpose vessel and dive support vessel to be operated in Australian waters.Key deliverables included review of safety critical elements, methods for validation, performance standards, scope of validation for NOPSA acceptance, and validation plan.

Fimiston Plant Loss prevention engineering services for mineral processing plant.Key deliverables included failure and repair rate data analysis, reliability block diagram development, failure modes effects and criticality analysis, reliability and availability modelling, and critical path and critical system assessment.

Perth operations Advice and assistance with updating management system processes & procedures for compliance with Chevron CHESM requirements.

Maari Risk assessments and HSE advice for H2S upgrades to FPSO/WHP.

Page 9: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p9

Graham Bower-White

key projects delivered (contd)

client facility/project services provided

DB30 Principal engineer for production of vessel safety case for heavy lift barge.Key deliverables included hazard register, MAE/SCE definition, dropped object study, semi-quantitative risk assessment and safety critical element performance standards.

Crux Safety advice on Nexus Crux FPSO FEED studies.

Deen Dayal Reliability and safety engineering services for development.Key deliverables included availability modelling, HSE philosophies and flare radiation modelling for WHP and onshore gas plant.

Kikeh FPSO Risk assessment of installation/construction required for vessel upgrades.

Jabiru FPSO Safety case revision.

Montara Operations performance standards and safety case review.HSE co-ordination.

Ningaloo Vision FPSO Safety case revision for fuel gas system upgrade, including qualitative risk analysis.Safety support.Key deliverables included design construction and operations safety cases, specialist safety engineering advice and regulatory liaison.

Jeruk Concept definition studies.Specific deliverables included engineering guidelines, dispersion analyses, gas detection and safety philosophies and safety case execution philosophy.

Jascon 25 ESSA and vessel safety case updates for heavy lift barge.Safety case revision for compressed gas storage.Safety case revision and identification of scope of validation.Advice on responding to NOPSA clarification requests and attend NOPSA meetings.

Jascon 34 Update vessel safety case for heavy lift barge.

Kapuni Production Station Quantitative risk assessment for production station.Key deliverables included part counts, event tree analysis, leak frequency, fatality rates, individual risk assessment and risk contouring.

Montara Venture Lead engineer for Montara safety case development and responsibility for leading the team providing safety engineering project support.

Concept risk assessment of a new-build arctic drillship.

Wandoo Security plan and risk assessment procedures updates.MAE bow-tie workforce presentations.Emissions register calculation and reporting template.Hazard register redesign.Incident response plan update.Work management manual & PTW system update.Written schemes of examination update.ALARP demonstration for FRC removal.Contingency plans for unavailability of lifeboats and fire pumps.GBS Shaft 4 entry risk assessment.WNA EERA update, temporary work platform EERA and WNB ETRERA.

Page 10: Graham Bower-White · development and operations phases in both onshore and ... Kashagan Procedure for demonstrating ALARP principles. ... Graham Bower-White ...

PROD.PO.RES.GBW.140523 p10

Graham Bower-White

key projects delivered (contd)

client facility/project services provided

Wandoo (contd) Scope of validation for proposed wellbay extension on Wandoo B.Safety case revision to incorporate planned wellbay extension to Wandoo B including workshops and safety case impact assessment.Vermillion safety management system update.Facilities operations safety case review and update.Safety case update for changes to cyclone response procedure.Key deliverables included qualitative risk assessment, safety case revision and NOPSA presentation.SIMOPs bow-tie analysis.Security plan and risk assessment procedures updates.Ship impact risk assessment.HSE advisor for subsea infrastructure repairs project.HSE advisor for accommodation extension project.

Browse Formal safety assessment studies for Browse central process facility, a dual bridge-linked platform complex.Key deliverables included assumptions register, MAE identification, MAE/SCE matrix, FHA, NFHA, ETRERA, SECA and performance standards.

Karratha Gas Plant Risk assessment advice and ALARP demonstration during execution of OCW project.Risk assessment for upgrades to LNG loading jetty.

Nganhurra Independent risk assessment of emergency shutdown valve and blow-down valve performance.

North Rankin A Detailed design of bridge support structure for bridge-link.Key deliverables included design reviews, layout reviews, fire protection studies and QRA.

North Rankin B Concept definition and FEED of bridge support structure for bridge-link.Key deliverables included design reviews, layout reviews, fire protection studies and qualitative risk assessments.

OKHA Performance standard alignment, including operations performance standards for all safety critical elements.

Otway FEED for inlet compression project.Key deliverables included quantitative risk analysis, design reviews, project HSE management and operations safety case revision.Detailed design of inlet compression project.Key deliverables including safety & risk input into site selection, qualitative risk assessment of project, HSE management plan, assistance and input to WEL HSE documentation and review of long lead item tender responses.

Persephone Risk assessments of modifications to NRA/NRB and installation of subsea infrastructure for Persephone tie-in.

Sunrise Concept study.Manager responsible for all risk and safety engineering matters.Platform concept including day to day management of the safety & risk team, liaison with Woodside HSE representatives and provision of safety & risk advice to other project engineering disciplines.

Western Flank Alpha Safety support to WHP concept study.