ATL 2018 © WWW.UKATA.ORG.UK | [email protected] | 01246 824 437 1 GRAHAM O’MAHONY BSc (HONS) IOSH WEBINAR NOVEMBER 2018
Transcript
Page 1: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

1

GRAHAM O’MAHONYBSc (HONS)

IOSH WEBINARNOVEMBER 2018

Page 2: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

2

Managing Asbestos

Introduction

Presented by Graham O’Mahony BSc (HONS)

Started as a plumbing and heating engineer

Moved to a Building Surveyor for a LA

Progressed to Asbestos Surveyor in the late 1990’s

Responsible for Managing Asbestos

Started in the private sector as Consultant

Over 20 years working in the asbestos industry

Current Chair of the Association

Page 3: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

3

Managing Asbestos

Page 4: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

4

Managing Asbestos – Part Two

Before considering the different work types, we need

to firstly define work with asbestos.

‘Work with asbestos’ includes:

• work which removes, repairs or disturbs asbestos;

• work which is ancillary to such work (ancillary

work);

• supervising the work referred to in the two bullet

points above (supervisory work).

Page 5: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

5

Managing Asbestos – Part Two

There are two distinct work types undertaken with

asbestos, these are best known as:

• Licensable Work

• Non-Licensable Work (Inc Notifiable Non-

Licensable Work)

Page 6: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

6

Managing Asbestos – Part Two

Licensable work

That is work:

• where worker exposure to asbestos is not sporadic

and of low intensity or

• where the risk assessment cannot clearly

demonstrate that the control limit (0.1 f/cm3

airborne fibres averaged over a four-hour period)

will not be exceeded; or

Page 7: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

7

Managing Asbestos – Part Two

Licensable work

• on asbestos coating (surface coatings which

contain asbestos for fire protection, heat insulation

or sound insulation but not including textured

decorative coatings); or

• on asbestos insulation or AIB where the risk

assessment demonstrates that the work is not

sporadic and of low intensity, the control limit will

be exceeded and it is not short duration work.

Page 8: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

8

Managing Asbestos – Part Two

Page 9: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

1. Sprayed Coating

2. Insulation / Lagging

3. A.I.B.

a) 1 hr / 7 days

b) 2 phr / 7 days

Notify the works (HSE or

LA) (ASB5)

14 days Statutory Period

2 year EMAS Medical

(Certificate)

40yr or up to the age of

80 exposure records

Non-Licensable Works

Asbestos Cement

Textured Coating

Gaskets

W/C Cistern

Floor Tiles

Bitumens

Resins

Textiles

Non-Licensable

Works

No Notification

No Medical

No Record Keeping

No HSE

Non-Licensable Works

Degraded or

Degrading…..????

NNLW

Notification to the

HSE (ASBNNLW1)

Before work starts

40 yr + record keeping

3 year GP Medical (1st

May 15)

0.1 f/cm3 = Control Limit

>0.1 f/cm3 = Licensable

works

WHAT WORKS ARE LICENSABLE AND NON-LICENSABLE WORKS….?

Licensable Works

9

Page 10: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

10

Managing Asbestos – Part Two

Materials in which the asbestos fibres are firmly

linked in a matrix

• asbestos cement;

• textured decorative coatings (artex);

• bitumen products;

• roofing felts;

• thermo plastic/vinyl floor tiles

• linoleum flooring

• composite products/ toilet cisterns etc

Page 11: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

11

Managing Asbestos – Part Two

With the introduction of the CAR 2012, two further

definitions have been given to determine if NNLW

applies.

Maintenance Work – this is defined as drilling holes

or painting ACM’s, it also includes the removal of

ACM’s where the removal work is ancillary to the

main task.

Removal – this is defined as refurbishment or

demolition works where the ACM’s have to be

removed.

Page 12: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

12

Managing Asbestos – Part Two

Regulation 10: Training of Employees

There are three main types of information, instruction

and training.

These are:

(a) Asbestos awareness training.

(b) Training for non-licensable asbestos work.

(c) Training for licensable work with asbestos.

Page 13: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

13

Managing Asbestos – Part Two

For those undertaking NLW,

the guidance generally to

follow is HSG 210.

There are two main sections:

EM – Equipment and Method

A Sheets – Various tasks

Page 14: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

14

Managing Asbestos – Part Two

For licensable works

being undertaken the

guidance document is

HSG 247

Page 15: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

15

Managing Asbestos – Part Two

There are four practices that require a licence issued

by the HSE:

• Asbestos Removal, where regulation 3 (2) cannot

be satisfied

• The construction of a Scaffold where access is

required to remove licensable asbestos materials,

where it is foreseeable that asbestos will be

disturbed (Reg 3(2).

• Supervisory Licence holder

• A company maintaining NPUs and Vac’s

Page 16: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

16

Managing Asbestos – Part Two

Regulation 9: Notification of work

If a contractor undertakes licensable work they have

to notify the appropriate enforcing authority with

details of the proposed work.

This gives the enforcing Authority the opportunity to

assess the proposals for carrying out work with the

asbestos containing materials and to inspect the site

either before or during the work.

Page 17: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

17

Managing Asbestos – Part Two

They will normally be required to notify the relevant

enforcing authority office 14 days before any work

begins, but the enforcing authority may allow a

shorter period, e.g. in an emergency where there is a

serious risk to the health and safety of any person.

This shorter period is known as a ‘waiver’ or

dispensation.

*The waiver.....it has become increasingly more

difficult to successfully request a waiver, the waiver

must include a formal request from the client as well

as the contractor.

Page 18: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

18

Managing Asbestos – Part Two

Notification Form

ASB 5

Page 19: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

19

Managing Asbestos – Part Two

Notification Form

ASB 5

Page 20: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

20

Managing Asbestos – Part Two

Actual start date ofset up on site

Expected finish dateof work

Waiver required?

Duration of work (noof days)

Job start and finishtimes

Night working Weekend working

Significant cessation /pause

About the work

ACM Type

Work to beundertaken

General condition ofthe asbestos material

Main type of asbestos

Details of the type ofwork to beundertaken, generalcondition and maintype of asbestos

Size of job (area orvolume)

Minimum number ofpersons employedper shift

Maximum number ofpersons employedper shift

Control measures and risks

Control measuresused to reduceexposure

How the work will besupervised andmonitored

Non-asbestos risks

Details of non-asbestos risks

Special premises

Enforcing authority

The enforcing authority is - HSE

Notifier contact details and declaration

Declaration I declare that an ACoP compliant plan of work has been prepared

Notifier name Notifier position

Notification Form

ASB 5

Page 21: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

21

Managing Asbestos – Part Two

Actual start date ofset up on site

Expected finish dateof work

Waiver required?

Duration of work (noof days)

Job start and finishtimes

Night working Weekend working

Significant cessation /pause

About the work

ACM Type

Work to beundertaken

General condition ofthe asbestos material

Main type of asbestos

Details of the type ofwork to beundertaken, generalcondition and maintype of asbestos

Size of job (area orvolume)

Minimum number ofpersons employedper shift

Maximum number ofpersons employedper shift

Control measures and risks

Control measuresused to reduceexposure

How the work will besupervised andmonitored

Non-asbestos risks

Details of non-asbestos risks

Special premises

Enforcing authority

The enforcing authority is - HSE

Notifier contact details and declaration

Declaration I declare that an ACoP compliant plan of work has been prepared

Notifier name Notifier position

Notification Form

ASB 5

Page 22: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

22

Managing Asbestos – Part Two

Actual start date ofset up on site

Expected finish dateof work

Waiver required?

Duration of work (noof days)

Job start and finishtimes

Night working Weekend working

Significant cessation /pause

About the work

ACM Type

Work to beundertaken

General condition ofthe asbestos material

Main type of asbestos

Details of the type ofwork to beundertaken, generalcondition and maintype of asbestos

Size of job (area orvolume)

Minimum number ofpersons employedper shift

Maximum number ofpersons employedper shift

Control measures and risks

Control measuresused to reduceexposure

How the work will besupervised andmonitored

Non-asbestos risks

Details of non-asbestos risks

Special premises

Enforcing authority

The enforcing authority is - HSE

Notifier contact details and declaration

Declaration I declare that an ACoP compliant plan of work has been prepared

Notifier name Notifier position

Notification Form

ASB 5

Page 23: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

23

Managing Asbestos – Part Two

Selection of contractor/sub-

contractor & Laboratory

In the first instance, it is

necessary for the client to

confirm that the potential

contractor or sub-contractor

holds current and valid Health

& Safety Executive (HSE)

asbestos licence, and note the

conditions that apply.

Page 24: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

24

Managing Asbestos – Part Two

Selection of contractor/sub-contractor/laboratory

The client should make enquiries to establish whether

the contractor/sub-contractor has had any

prohibitions or improvement notices for breaches of

health and safety regulations within the last three

years.

This information can be sourced by visiting the HSE

Notices Web Page

http://www.hse.gov.uk/notices/

Page 25: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

25

Managing Asbestos – Part Two

Selection of contractor/sub-contractor/laboratory

Typical list of qualifying documentation before

appointment of contractors:

• Employers liability certificates

• Current valid licence

• Up to date worker training records (12 month max)

• Management training records

• Health & Safety Policy document

• Company Risk Assessments

• Asbestos standard operating procedures

• Medical records for employees

• Face fit certificates for all RPE

• References from previous works (if available)

Page 26: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

26

Managing Asbestos – Part Two

What to expect prior to work commencing;

• Pre-site meeting

• Pre-site setup visit to assess the site

• Pre-clean (where identified debris or contamination)

• Installation on site of the DCU

• Installation on site of waste storage (where applicable)

• Issue of the notification pack including POW (at the same

time as the HSE receive their copy of the ASB5)

• An agreement of the scope of the clearance, handover and

designation of transit routes.

• Agreement of any site specific emergency procedures.

Page 27: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

27

Managing Asbestos – Part Two

Plan of Work (POW)

In accordance with CAR 2012, Regulation 6 & 7, the

contractor will be required to assess and produce a

suitable and sufficient POW (aka Method Statement).

This MUST be prepared before the work is notified to

the Enforcing Authority

This needs to be job and site specific.

Page 28: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

28

Managing Asbestos – Part Two

The plan of work must include the following

information:

• the nature and probable duration of the work;

• the number of people involved in the work;

• the address and location where the work is to be carried out;

• the methods to be used to prevent or reduce exposure to asbestos,

eg prevention and control measures, arrangements for keeping

premises and plant clean and arrangements for the handling and

disposal of asbestos waste;

• the type of equipment, including PPE and RPE, used for:

– protecting and decontaminating those carrying out the work;

– protecting other people present at or near the worksite.

Page 29: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

29

Managing Asbestos – Part Two

Safe Working Methods (Control Measures)

There are a number of methods which can be used

when removing asbestos, all of which should ensure

that fibre release is minimised.

Methods available:

• Wrap and cut

• Spray wetting

• Shadow vacuuming

• Wet injection

Page 30: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

30

Managing Asbestos – Part Two

Page 31: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

31

Managing Asbestos – Part Two

Enclosures

HSE Guidance note for enclosure construction

provided for work with asbestos – HSG 247.

Enclosures may either make use of the fabric of the

building or may be self supporting built around the

work area.

The enclosure should be constructed with the view to

avoid the spread of asbestos from the work area.

Page 32: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

32

Managing Asbestos – Part Two

Page 33: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

33

Managing Asbestos – Part Two

Page 34: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

34

Managing Asbestos – Part Two

Page 35: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

35

Managing Asbestos – Part Two

The Role of the Analyst

After asbestos removal works have

been carried out, the enclosure

should be tested in accordance with

HSG 248 (The Analysts Guide), CAR

2012, L143

CAR states that the independent

laboratory carrying out the clearance

test should conform to ISO 17025

It is recommended that the Client

appoints the Analyst

Page 36: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

36

Managing Asbestos – Part Two

Types of air sampling

• Background Monitoring (BM)– before the

work begins

• Leakage Monitoring (LM) – during work,

outside

• Personal Monitoring (PM)– inside while

carrying out the work

• Clearance Test (CT) – after removal

works, pre de-tenting

• Reassurance Monitoring (RM) – after

enclosure removed

Page 37: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

37

Managing Asbestos – Part Two

Certificate of Reoccupation (CORO)

There are four stages to the site

certification for reoccupation procedure:

• Stage 1: Preliminary check of site condition

and job completeness;

• Stage 2: A thorough visual inspection inside

the enclosure/work area;

• Stage 3: Air monitoring;

• Stage 4: Final assessment post-

enclosure/work area dismantling.

Page 38: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 39: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 40: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 41: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 42: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 43: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 44: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 45: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 46: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 47: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

Page 48: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

48

Managing Asbestos – Part one

UKATA Training Available

Asbestos Training

For Project Managers

For the Site Project Mangers who are

appointing Licensed and Non-Licensed

Contractors undertaking asbestos

removal and remediation work.

To provide the delegate with the

theoretical and practical skills to

undertake the management of asbestos

contractors.

1 ½ day duration

Duty to Manage

Appointed Person

For the Appointed Person

For the Duty Holder

To provide the delegate with the

theoretical and practical skills to

undertake the management of asbestos

containing materials within the

buildings that they are responsible for

as defines in CAR 2012.

3 day duration

Page 49: GRAHAM O’MAHONY - IOSH · 2019-03-13 · ACM’s where the removal work is ancillary to the main task. Removal ...

ATL 2018 ©WWW.UKATA.ORG.UK | [email protected] | 01246 824 437

49

Managing Asbestos – Part two

Thank you for your time.

Any EASY questions……

Graham O’Mahony

[email protected]

01763 787 150

0755 488 6080