+ All Categories
Home > Technology > Grandview District analysis + frameworks

Grandview District analysis + frameworks

Date post: 24-Jan-2015
Category:
Upload: wigley-and-associates
View: 1,047 times
Download: 0 times
Share this document with a friend
Description:
 
33
Grandview District Edina Minnesota Steering Committee Meeting 6 October 2011 Edina Minnesota history and culture of place Id dO ti Id dO ti Prep for Community Workshop #2 Prep for Community Workshop #2 Ideas and Options Ideas and Options Concept Plan
Transcript
Page 1: Grandview District analysis + frameworks

Grandview DistrictEdina MinnesotaSteering Committee Meeting 6 October 2011

Edina Minnesota

history and culture of place

Id d O tiId d O tiPrep for Community Workshop #2Prep for Community Workshop #2

Ideas and OptionsIdeas and Options

Concept Plan

Page 2: Grandview District analysis + frameworks

Principle 1 ‐ Leverage publicly‐owned parcels and civic presence to create a vibrant and connected district that serves as a catalyst for high quality, y g q yintegrated public and private development.

Principle 2 ‐ Enhance the District’s economic viability as a neighborhood center with regional connections, recognizing that meeting the needs of both businesses and residents will make the district a good place to do g pbusiness.

Principle 3 ‐ Turn perceived barriers into opportunities. Consider layering development over supporting infrastructure and taking advantage of the natural topography of the area. g y

Principle 4 ‐ Design for the present and the future by pursuing logical increments of change using key parcels as stepping‐stones to a more vibrant, walkable, functional, attractive, and life‐filled place.

Principle 5 ‐ Organize parking as an effective resource for the district by linking community parking to public and private destinations while also providing parking that is convenient for businesses and customers.

Principle 6 ‐ Improve movement within and access to the district for people of all ages by facilitating multiple modes of transportation, and preserve future transit opportunities provided by the rail corridor.

Principle 7 ‐ Create an identity and unique sense of place that incorporates natural spaces into a high quality and sustainable development reflecting Edina’s innovative development heritage.

Principles

Page 3: Grandview District analysis + frameworks

Group ReportsGroup Reports

Page 4: Grandview District analysis + frameworks

TransportationBi l Pl d t d 2007• Bicycle Plan adopted - 2007

• Transportation Commission – proposed Living Streets• Parking shortage for some usesParking shortage for some uses• City ramp acts as “informal” park ‘n ride lot• Area identified as park ‘n ride location in the 2030 p

Transportation Policy Plan – Met Council• CP rail – low frequency for limited # of users• Commuter rail cannot be planned for (Dan Patch rule)• Barriers and challenges for non-vehicular movement• School bus garage is available on condition (estimate is• School bus garage is available on condition (estimate is

$2-3 mil to replace – not including land)

Work Group Reports – September 21

Page 5: Grandview District analysis + frameworks

• Improve stormwater quality through reducing the impervious footprint of streets…

• Implement traffic calming th h th fmeasures through the use of

techniques best suited for site conditions…

• Improve biking and walking conditions along natural connector routes and collectorconnector routes and collector streets…

• Create boulevard tree standards that provide environmental benefits…

Living Streets

Page 6: Grandview District analysis + frameworks

Community Needs/Public RealmEdi id t k i l ti th th h l• Edina residents make social connections thru the school environment

• School auditoriums: SouthView, Valley View, High School , y , g(Edina Performing Arts Center)

• 70% of population does not have school age children• 33% of residents live alone• Underserved populations: empty nesters, teens, parents

w/young childrenw/young children• 2006 Parks & Rec Survey: support for walking/biking trails

(89%), indoor fitness/exercise (75%)• Facility Assessment – should be complete by November• Edinborough Facility – should be complete by November

Work Group Reports – September 21

Page 7: Grandview District analysis + frameworks

Land Use/Community Design17 t & 46 l• 17 property owners & 46 parcels

• Walgreens moving in old Jerrys Hardware – 2012• Jerrys updating new hardware location and storeJerrys updating new hardware location and store• History – Orchards and GrandView Heights Gates

Work Group Reports – September 21

Page 8: Grandview District analysis + frameworks

Finance & Real EstateAt l t t ffi l ki f /• At least two office users looking for more space/move

• Met Council has discussed park ‘n ride with OLG in the pastp

• Potential for residential development at OLG site• Past interest in developing the bus garage site• Potential for new residential project on W 49th Street• CIP identifies:

Art Center $196k– Art Center = $196k– Edinborough = $1.3mil– Braemar = $1.5 mil– Southdale/France/Promenade = $11 milSouthdale/France/Promenade $11 mil– Parks & Rec = $3.2 mil– Public Works = $32.9 mil– Utilities = $39.6 mil [$11.4 mil for stormwater pipe]

Work Group Reports – September 21

Page 9: Grandview District analysis + frameworks

City Departments PolicePolice

- Bike & pedestrian safety is biggest concern- Crime is not an issue- Dept has precinct at Southdale; operate bike unitsp p ; p

Parks & Rec- Braemar Study- Indoor athletic facility- Senior Center: how to better utilize

Public Works- County maintains Vernon; city maintains GrandView landscape

Lift t ti t Ed d A di- Lift station at Eden and Arcadia- Well at Sherwood Park will have to pipe to treatment site

CommunicationsNewsletter; daily & weekly outlets (Facebook & Twitter)- Newsletter; daily & weekly outlets (Facebook & Twitter)

Planning- Anticipating a zoning code update- Other areas of change include Southdale areaOther areas of change include Southdale area

Work Group Reports – September 21

Page 10: Grandview District analysis + frameworks

Businesses & Property OwnersWhat works:What works:

- Demographics and location/exposure- Customer loyalty- Good quality

What doesn’t work:- Parking lots and streetsg- Traffic, logistics of circulation and access

What would you add:Sidewalks on Vernon/pedestrian improvements- Sidewalks on Vernon/pedestrian improvements

- More/smaller restaurants- Green space- Buses on Eden rather than Vernon

Work Group Reports – September 21

Page 11: Grandview District analysis + frameworks

Q1 – Best thing/Worst thingS i & G d (11) A / i ti (13)Services & Goods (11) Access/navigation (13)Location (8) Walk/bike environment (9)Places (5) Unattractive (5)Places (5) Unattractive (5)

Q2 – Community CommonsGathering place (11) [outdoor (10)]Gathering place (11)…[outdoor (10)]Mixed use development (9)Public building (8)g ( )

Q3 – Success in 5 yrs/20 yrsBetter biking/walking (8) Transit/transportation (13)Community center (6) Gathering/community (9)Public realm improve. (5) Businesses/retail (5)

Public Meeting Q & A – September 21

Page 12: Grandview District analysis + frameworks

Base Maps/Graphic Analysis

Page 13: Grandview District analysis + frameworks

SketchUp over aerial

Page 14: Grandview District analysis + frameworks

SketchUp over aerial

Page 15: Grandview District analysis + frameworks

SketchUp Sections

Page 16: Grandview District analysis + frameworks

• Approx 340,000sf of office use

• Approx 150,000 sfof retail use

• Approx 1815 parking spaces

Parking – Preliminary #s

Page 17: Grandview District analysis + frameworks

Hard vs. Soft map

Page 18: Grandview District analysis + frameworks

Areas of Change/Potential Change

Page 19: Grandview District analysis + frameworks

Ideas for FrameworksIdeas for Frameworks

Page 20: Grandview District analysis + frameworks

Concept Plan

Small Area Guide Plan Illustrative . . . the green bridge1

Page 21: Grandview District analysis + frameworks

Concept Plan

Three Distinct Places . . . but connected2

Page 22: Grandview District analysis + frameworks

The Village Center . . . one signature gathering place at the heart3

Page 23: Grandview District analysis + frameworks

Emphasis on the Frame . . . pursue the ‘Living Streets’ approach4

Page 24: Grandview District analysis + frameworks

Emphasis on the Internal Streets . . . the connective tissue5

Page 25: Grandview District analysis + frameworks

New England / European Village . . . work with the topography 6

Page 26: Grandview District analysis + frameworks

Eden Avenue Main Street . . . creating a signature destination7

Page 27: Grandview District analysis + frameworks

Ideas for DetailsIdeas for Details

Page 28: Grandview District analysis + frameworks

Hwy 100 Before & After

Page 29: Grandview District analysis + frameworks

VernonVernon

Arcadia

Hwy 100

Eden

Arcadia

Hwy 100

50th

G

Intersections

Grange

Hwy 100

Page 30: Grandview District analysis + frameworks

Sidewalks

Page 31: Grandview District analysis + frameworks

Public Works Site

Page 32: Grandview District analysis + frameworks

Park N Ride – Maple Grove

Page 33: Grandview District analysis + frameworks

Park N Ride – Eden Prairie


Recommended