+ All Categories
Home > Documents > Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate...

Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate...

Date post: 15-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
107
Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009 FY 2008 Region ADO State Worksite Service Level Grant Seq Number AIP Federal Funds Brief Description Of Work AL AAL AK Atka GA 005 21,647,363 Construct Apron [construct apron w/taxiway stub], Construct Snow Removal Equipment Building [Construct Snow Removal Equipment Building], Extend Runway [Extend/Rehab Runway] - 15/33, Rehabilitate Runway [Reconstruct Runway from 15/33 to 16/34] - 15/33 Bethel P 017 5,877,983 Construct Runway [Phase 3 (Paving Phase 2)] - Plan-1 Chicken GA 002 493,397 Acquire Land for Development [Acquire Land: Tract 1, Parcels B, C, D, D1, E, E1, and F], Acquire Snow Removal Equipment [Acquire Snow Removal Equipment Cold Bay CS 009 300,000 (Motor Grader)] Conduct Airport Master Plan Study Ekwok GA 003 1,640,647 Construct Snow Removal Equipment Building Elim CS 005 1,815,456 Rehabilitate Runway [rehabilitate runway, phase 2] - 01/19 Emmonak P 003 7,544,368 Rehabilitate Apron [rehabilitate apron] Fairbanks International P 034 17,393,366 Rehabilitate Runway [(Phase 2)] - 01L/19R 035 9,600,000 Rehabilitate Runway [(Phase 3)] - 01L/19R Goodnews GA 001 12,147,434 Construct Apron [construct apron (w/taxiway stub)], Construct Snow Removal Grayling GA 004 9,100,000 Equipment Building [SREB], Extend Runway [extend runway] - 05/23 Construct Apron [construct apron, phase 1], Construct Runway [Phase 1] - Plan-1 005 9,600,000 Construct Apron [construct apron phase 2], Construct Runway [Phase 2] - Plan-1 Juneau International P 049 10,506,094 Construct Apron [(Construct)], Construct Runway Safety Area [(Construction Kenai Municipal P 038 488,769 Phase 2)] - 08/26 Construct Sand and Chemical Storage Building [Construct Sand/Urea Bldg] King Salmon P 010 7,303,451 Construct Taxiway [Construct GA Tawiway], Extend Runway Safety Area [Phase 2] - 11/29, Rehabilitate Runway - 18/36 Kongiganak Merle K (Mudhole) Smith CS P 002 011 4,609,250 4,499,980 Construct Snow Removal Equipment Building [Construct SREB], Extend Runway [Extend/Widen RWY & RSA Phase 2] - 18/36 Rehabilitate Runway Lighting - 09/27 Merrill Field P 044 2,546,000 Rehabilitate Apron [Block 5 (phase 3), Charlie South] 045 304,000 Install Runways Incursion Caution Bars [Runway VPD barrier gate and warning Petersburg James A Johnson P 011 22,900,000 light upgrades, phase 1] Construct Runway Safety Area - 04/22, Rehabilitate Runway [mill and overlay] - Savoonga CS 004 12,500,000 04/22 Construct Taxiway, Expand Apron, Rehabilitate Access Road [Rehabilitate primary Shishmaref CS 006 350,000 access road], Rehabilitate Apron, Rehabilitate Runway - 05/23 Conduct Airport Master Plan Study [Phase 2] Selection Criteria Year: 2008 Page 1 of 107
Transcript
Page 1: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

AL AAL AK Atka GA 005 21,647,363 Construct Apron [construct apron w/taxiway stub], Construct Snow Removal Equipment Building [Construct Snow Removal Equipment Building], Extend Runway [Extend/Rehab Runway] - 15/33, Rehabilitate Runway [Reconstruct Runway from 15/33 to 16/34] - 15/33

Bethel P 017 5,877,983 Construct Runway [Phase 3 (Paving Phase 2)] - Plan-1

Chicken GA 002 493,397 Acquire Land for Development [Acquire Land: Tract 1, Parcels B, C, D, D1, E, E1, and F], Acquire Snow Removal Equipment [Acquire Snow Removal Equipment

Cold Bay CS 009 300,000(Motor Grader)] Conduct Airport Master Plan Study

Ekwok GA 003 1,640,647 Construct Snow Removal Equipment Building

Elim CS 005 1,815,456 Rehabilitate Runway [rehabilitate runway, phase 2] - 01/19

Emmonak P 003 7,544,368 Rehabilitate Apron [rehabilitate apron]

Fairbanks International P 034 17,393,366 Rehabilitate Runway [(Phase 2)] - 01L/19R

035 9,600,000 Rehabilitate Runway [(Phase 3)] - 01L/19R

Goodnews GA 001 12,147,434 Construct Apron [construct apron (w/taxiway stub)], Construct Snow Removal

Grayling GA 004 9,100,000Equipment Building [SREB], Extend Runway [extend runway] - 05/23 Construct Apron [construct apron, phase 1], Construct Runway [Phase 1] - Plan-1

005 9,600,000 Construct Apron [construct apron phase 2], Construct Runway [Phase 2] - Plan-1

Juneau International P 049 10,506,094 Construct Apron [(Construct)], Construct Runway Safety Area [(Construction

Kenai Municipal P 038 488,769Phase 2)] - 08/26 Construct Sand and Chemical Storage Building [Construct Sand/Urea Bldg]

King Salmon P 010 7,303,451 Construct Taxiway [Construct GA Tawiway], Extend Runway Safety Area [Phase 2] - 11/29, Rehabilitate Runway - 18/36

Kongiganak

Merle K (Mudhole) Smith

CS

P

002

011

4,609,250

4,499,980

Construct Snow Removal Equipment Building [Construct SREB], Extend Runway [Extend/Widen RWY & RSA Phase 2] - 18/36 Rehabilitate Runway Lighting - 09/27

Merrill Field P 044 2,546,000 Rehabilitate Apron [Block 5 (phase 3), Charlie South]

045 304,000 Install Runways Incursion Caution Bars [Runway VPD barrier gate and warning

Petersburg James A Johnson P 011 22,900,000light upgrades, phase 1] Construct Runway Safety Area - 04/22, Rehabilitate Runway [mill and overlay] -

Savoonga CS 004 12,500,00004/22 Construct Taxiway, Expand Apron, Rehabilitate Access Road [Rehabilitate primary

Shishmaref CS 006 350,000 access road], Rehabilitate Apron, Rehabilitate Runway - 05/23 Conduct Airport Master Plan Study [Phase 2]

Selection Criteria Year: 2008

Page 1 of 107

Page 2: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

AL AAL AK Sitka Rocky Gutierrez

Soldotna

State of Alaska

Ted Stevens Anchorage International

Unalakleet

Unalaska

Various Locations in Alaska

Report Date 02/19/2009

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

022P 200,000 Conduct Miscellaneous Study

023 1,000,000 Conduct Environmental Study [EIS]

024 432,250 Rehabilitate Terminal Building [Install air handling units and emergency engine generator]

008GA 190,000 Construct Apron [Construct Apron Phase 1 (Design)]

009 2,100,422 Update State System Plan Study

010 361,000 Conduct aeronautical survey for WAAS approach (Alakanuk; Minto)

101P 3,500,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [RSIP (phase 7), 75 homes (est.)]

102 8,436,000 Rehabilitate Taxiway [LOI no. 2-01 payment 5; Rehabilitate Taxiway Kilo]

103 2,494,098 Modify Terminal Building [Phase 2]

104 5,852,500 Rehabilitate Taxiway [Rehab. t/w G & E]

105 9,539,851 Security Enhancements [replace access controls]

106 1,526,000 Update Airport Master Plan Study [MP update phase 2]

107 1,000,000 Acquire Snow Removal Equipment [3 runway snow plows]

108 1,384,606 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF vehicle 4]

109 1,185,637 Rehabilitate Taxiway [Rehab. t/w G & E phase 2]

111 3,687,169 Rehabilitate Taxiway [Rehab. t/w G & E phase 3]

112 869,008 Modify Terminal Building [Phase 3]

004P 458,195 Acquire Snow Removal Equipment [Acquire SRE: Unalakleet Towed Broom]

013P 2,500,000 Conduct Environmental Study [(Phase 2 EIS)]

062 1,358,273 Acquire Snow Removal Equipment (Ketchikan International; Yakutat)

063 1,711,352 Acquire Snow Removal Equipment (Deadhorse; Merle K (Mudhole) Smith; Minto; Unalakleet; Valdez Pioneer Field)

064 399,000 Conduct aeronautical survey for WAAS approach (Nuiqsut; Wainwright)

065 3,953,917 Acquire Snow Removal Equipment (Bethel; Dillingham; Goodnews; Homer; Kodiak; Kongiganak; Manokotak (Proposed GA); Nightmute; Nunapitchuk; Tuntutuliak; Unalaska), Acquire Snow Removal Equipment (Bethel; Dillingham; Goodnews; Homer; Kodiak; Kongiganak; Manokotak (Proposed GA); Nightmute; Nunapitchuk; Tuntutuliak; Unalaska)

066 4,475,184 Rehabilitate Runway (Akhiok - 04/22; Ambler - 09/27; Bethel - 18/36; Birchwood ­01L/19R; Chignik - 02/20; Chignik Lake - 08/26; Coldfoot - 01/19; Fort Yukon - 04/22;

Selection Criteria Year: 2008

Page 2 of 107

Page 3: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

AL AAL AK

Wasilla

Wiley Post-Will Rogers Memorial

GA

P

066

014

011

1,409,818

3,000,000

Golovin - 02/20; Gustavus - 02/20; Haines - 08/26; Homer - 03/21; Igiugig - 05/23; Kaltag - 03/21; Karluk - 10/28; King Salmon - 11/29; Klawock - 02/20; Kodiak ­07/25; Kotlik - 02/20; Larsen Bay - 04/22; McGrath - 16/34; Merle K (Mudhole) Smith - 16/34; Naknek - 14/32; Nondalton - 02/20; Ouzinkie - 11/29; Port Graham - 12/30; Seward - 12/30; Sitka Rocky Gutierrez - 11/29; Skagway - 02/20; South Naknek Nr 2 - 04/22; St Paul Island - 18/36; Stebbins - 05/23; Talkeetna - 18/36; Tuluksak ­02/20; Yakutat - 11/29) Expand Snow Removal Equipment Building [expand SREB], Install Perimeter Fencing

Construct Runway Safety Area [Phase 3 construction] - 06/24, Rehabilitate Runway - 06/24

State Total: 48 Grants 226,191,838

ADO Total: 48 Grants 226,191,838

Region Total: 48 Grants 226,191,838

Report Total: 2457 Grants 3,471,166,652

CE ACE IA Albia Municipal

Algona Municipal

Ankeny Regional

Belle Plaine Municipal

Bloomfield Municipal

Boone Municipal

Centerville Municipal

Chariton Municipal

Cherokee County Regional

Clarion Municipal

Clinton Municipal

Council Bluffs Municipal

GA

GA

R

GA

GA

GA

GA

GA

GA

GA

GA

GA

005

005

006

014

004

003

010

004

006

006

004

005

012

013

014

144,079

103,550

81,700

401,102

161,500

50,055

403,916

78,052

57,000

288,213

78,990

34,340

417,147

133,046

473,628

Rehabilitate Runway [crack seal] - 13/31

Acquire Snow Removal Equipment

Install Runway Vertical/Visual Guidance System - 12/30

Rehabilitate Runway - 18/36

Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

Update Airport Master Plan Study

Construct Taxiway

Rehabilitate Runway - 16/34

Update Airport Master Plan Study

Acquire Land For Approaches

Install Miscellaneous NAVAIDS, Install Taxiway Lighting

Conduct Miscellaneous Study

Rehabilitate Runway [RPZ Land] - 14/32

Improve Runway Safety Area [Land] - 03/21

Rehabilitate Taxiway

Selection Criteria Year: 2008

Page 3 of 107

Page 4: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

CE ACE IA Creston Municipal

Decorah Municipal

Denison Municipal

Des Moines International

Estherville Municipal

Fairfield Municipal

Fort Dodge Regional

Fort Madison Municipal

Grinnell Regional

Guthrie County Regional

Hampton Municipal

Harlan Municipal

Humboldt Municipal

Independence Municipal

Iowa City Municipal

Jefferson Municipal

Keokuk Municipal

Lamoni Municipal

Le Mars Municipal

Maquoketa Municipal

Mason City Municipal

FY 2008

Service Grant Seq Level Number

GA 004

005

GA 004

GA 007

P 046

047

048

GA 006

GA 011

CS 024

GA 004

GA 006

GA 004

005

GA 004

GA 005

GA 004

GA 007

GA 015

016

GA 006

GA 015

GA 004

GA 005

006

GA 003

004

P 030

031

AIP Federal Funds

214,700

76,000

214,700

227,914

2,976,000

1,279,188

664,430

51,888

244,626

152,000

67,713

121,600

561,568

30,875

114,000

651,085

418,127

1,369,708

1,450,946

213,313

48,511

142,500

252,414

261,240

27,271

60,859

126,998

741,606

257,759

Report Date 02/19/2009

Brief Description Of Work

Install Miscellaneous NAVAIDS, Rehabilitate Taxiway

Update Airport Master Plan Study

Rehabilitate Runway - 11/29

Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building

Rehabilitate Taxiway

Construct Runway - Plan-1

Construct Runway [13R/31L (PH 6) Land - Croft Tract 2002-007 & Leonard Tract 2002-013] - Plan-1 Construct Building [t-hanger]

Acquire Snow Removal Equipment [Replace SRE]

Update Airport Master Plan Study

Remove Obstructions

Strengthen Runway - 13/31

Construct Building [Phase 2 - Construction], Remove Obstructions

Construct Building [Phase 3 - Add Pilots Lounge Bid Alternate]

Rehabilitate Runway - 17/35

Construct Taxiway [Phase 2]

Construct Access Road, Construct Terminal Building

Extend Runway - 17/35

Rehabilitate Runway [Rehab runway 7-25] - 07/25

Rehabilitate Runway [Add Bid Alternate] - 07/25

Extend Runway [EA] - 14/32

Update Airport Master Plan Study

Extend Taxiway [Construction]

Extend Runway [Runway Extention, Phase 3 (both ends)] - 18/36

Extend Runway [Reimburse runway extension and land, Phase 4] - 18/36

Conduct Environmental Study [EA]

Acquire Land for Development

Rehabilitate Apron

Rehabilitate Apron [Add Bid Alternate]

Selection Criteria Year: 2008

Page 4 of 107

Page 5: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE IA Muscatine Municipal GA 014 120,951 Acquire Snow Removal Equipment

Northeast Iowa Regional GA 007 287,850 Construct Taxiway

Orange City Municipal GA 004 147,630 Acquire Snow Removal Equipment

Osceola Municipal GA 007 158,270 Install Weather Reporting Equipment [Land]

008 178,673 Install Miscellaneous NAVAIDS [Beacon], Install Weather Reporting Equipment [AWOS Equip. & Installation]

Ottumwa Industrial GA 014 122,417 Rehabilitate Runway [Design] - 04/22

Pella Municipal GA 007 147,630 Acquire Snow Removal Equipment

Perry Municipal GA 002 140,951 Rehabilitate Runway - 14/32

003 33,193 Rehabilitate Runway [Runway remarking] - 14/32

Pocahontas Municipal GA 004 36,890 Rehabilitate Runway [Design] - 11/29

Red Oak Municipal GA 008 1,088,506 Construct Taxiway [Phase 2- Construction]

Sac City Municipal GA 005 62,578 Install Runway Vertical/Visual Guidance System - 14/32

Schenck Field GA 006 74,724 Update Airport Master Plan Study

007 79,986 Acquire Land for Development

Shenandoah Municipal GA 006 62,225 Install Runway Vertical/Visual Guidance System - 04/22

007 142,500 Acquire Snow Removal Equipment

Sioux Gateway/Col. Bud Day Field P 034 1,758,624 Rehabilitate Apron [Construction of North Ramp, Phase 1 Design in 2007]

036 656,003 Rehabilitate Apron [Complete ramp construction - Add Bid Alternate]

Southeast Iowa Regional CS 024 30,000 Acquire Aircraft Rescue & Fire Fighting Vehicle [Design]

025 85,500 Update Airport Master Plan Study

Spencer Municipal GA 018 103,883 Construct Taxiway

State of Iowa 012 124,212 Conduct aeronautical survey for WAAS approach

013 73,889 Conduct State System Plan Study

Storm Lake Municipal GA 004 148,428 Rehabilitate Parking Lot

The Eastern Iowa P 035 7,650,112 Rehabilitate Runway [LOI - Parallel Twy 3700'] - 09/27

036 915,578 Rehabilitate Runway [LOI - Rest of 4th Quarter Entitlement] - 09/27

Vinton Veterans Memorial Airpark GA 003 130,015 Rehabilitate Runway - 09/27

Waterloo Regional P 032 522,596 Rehabilitate Apron [Terminal PH 2]

033 218,595 Update Airport Master Plan Study

Selection Criteria Year: 2008

Page 5 of 107

Page 6: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE IA Webster City Municipal GA 008 124,771 Rehabilitate Parking Lot

Winterset-Madison County GA 005 182,452 Rehabilitate Apron [Construction]

State Total: 75 Grants 31,535,489

CE ACE KS Allen County GA 008 453,104 Rehabilitate Apron

Anthony Municipal GA 004 49,875 Rehabilitate Apron [Rehab Existing Apron - Design]

Atwood-Rawlins County City-County GA 007 200,566 Improve Access Road [Reconstruct access road]

Augusta Municipal GA 013 66,690 Update Airport Master Plan Study [ALP update to shift north threshold and correct

Blosser Municipal GA 005 117,135RPZ deficiency] Update Airport Master Plan Study

Chanute Martin Johnson GA 006 87,353 Update Airport Master Plan Study [Update MP/ALP]

Cheyenne County Municipal GA 005 95,000 Rehabilitate Runway [Ruway work - Design] - 13R/31L

006 26,600 Rehabilitate Runway [Acquire Land - portion of ultimate RPZ (easement)] - 13R/31L

Clay Center Municipal GA 008 671,531 Rehabilitate Runway [Resurface (overlay) Runway - Construction] - 17/35

Coffey County GA 003 150,000 Construct Taxiway [Design - Phase 1]

Coffeyville Municipal GA 012 42,322 Rehabilitate Taxiway [Design]

Colonel James Jabara R 015 113,524 Rehabilitate Runway [Remark Runway 36 Threshold per revised standard AC 150/5340-1J, Section 2, Paragraph 9,d.] - 18/36

016 707,000 Rehabilitate Runway Lighting - 18/36

Dodge City Regional CS 021 134,750 Expand Aircraft Rescue & Fire Fighting Building

Elkhart-Morton County GA 004 86,545 Update Airport Master Plan Study

Ellsworth Municipal GA 003 134,961 Rehabilitate Parking Lot [Rehab Parking Area], Remove Obstructions [Bury powerlines]

004 79,363 Conduct Environmental Study [Environmental Assessment for Airport Development]

Forbes Field P 023 1,010,204 Rehabilitate Apron [Terminal Apron]

024 374,778 Rehabilitate Apron [Terminal Apron - Phase 2]

Fort Scott Municipal GA 010 422,712 Expand Apron

Freeman Field GA 006 502,629 Rehabilitate Taxiway [Construct - Phase 2]

Garden City Regional P 025 623,226 Acquire Aircraft Rescue & Fire Fighting Vehicle

026 981,677 Construct Aircraft Rescue & Fire Fighting Building [Building for new 1500 gallon ARFF truck]

Selection Criteria Year: 2008

Page 6 of 107

Page 7: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

CE ACE KS 027 1,930,795 Rehabilitate Taxiway [1300' North & North End Connection - Phase 4 of Taxiway A project]

Gardner Municipal GA 004 201,400 Acquire Land For Approaches

Great Bend Municipal GA 017 199,974 Update Airport Master Plan Study

Hays Regional CS 017 23,372 Acquire Land For Approaches [Fee and Easement Acquisition of]

Hays Regional P 020 139,391 Construct Aircraft Rescue & Fire Fighting Building [Design]

021 169,928 Update Airport Master Plan Study

Hill City Municipal GA 008 20,282 Acquire Land For Approaches

Hugoton Municipal GA 005 148,692 Construct Taxiway [Design]

Hutchinson Municipal GA 017 258,400 Improve Runway Safety Area [Survey and Environmental Assessment - Phase 1] ­

020 8,63813/31 Rehabilitate Runway [Threshold markings] - 13/31

Independence Municipal

Kingman Airport - Clyde Cessna Field

GA

GA

016

010

1,263,338

308,676

Rehabilitate Taxiway [Phase 3 - Reconstruct connector taxiways perpendicular to thresholds] Construct Taxiway [Taxilane - Construction Phase 2]

Larned-Pawnee County GA 009 72,200 Update Airport Master Plan Study [Update ALP]

Liberal Mid-America Regional CS 015 600,170 Acquire Aircraft Rescue & Fire Fighting Vehicle

Lyons-Rice County Municipal GA 009 112,818 Rehabilitate Runway [Design] - 17R/35L

Manhattan Regional P 034 888,250 Acquire Miscellaneous Land [Acquire land for runway extension. Extension will

035 488,220correct RSA deficiency on 13 end] Improve Runway Safety Area [Design - Phase 1] - 03/21, Rehabilitate Runway

036 1,796,758[Design - Phase 1] - 13/31 Improve Runway Safety Area [Reimburseable Agreement for NAVAID relocation] -

Marysville Municipal GA 002 58,90003/21 Construct Taxiway [Design]

004 106,578 Acquire Land For Approaches [Runway 15-33 RPZ land - fee and easement]

Medicine Lodge GA 002 53,485 Conduct Environmental Study [EA for Airport]

Miami County GA 010 20,068 Construct Building [Design]

Moritz Memorial GA 005 59,954 Conduct Environmental Study [Environmental Assessment for development shown

New 003 479,869on new ALP] Construct Runway [Land acquisition reimbursement] - Plan-1

New Century Aircenter R 021 123,596 Rehabilitate Apron

Selection Criteria Year: 2008

Page 7 of 107

Page 8: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE KS Newton-City-County R 023 721,596 Construct Taxiway [Construction - Phase 2]

Oakley Municipal GA 007 2,340,810 Rehabilitate Runway [Project Construction] - 16/34

Oberlin Municipal GA 003 25,844 Remove Obstructions [Bury power lines in approaches]

004 56,430 Conduct Environmental Study

005 178,814 Acquire Land For Approaches

Osage City Municipal GA 005 100,597 Rehabilitate Runway - 17/35

Oswego Municipal GA 006 95,000 Acquire Land For Approaches [Land for 17 RPZ]

Philip Billard Municipal GA 013 531,611 Rehabilitate Taxiway [Taxiway Alppha, Bravo, & Delta]

Phillipsburg Municipal GA 007 142,039 Rehabilitate Runway [Slurry seal] - 13/31

Pratt Industrial GA 011 3,069,563 Rehabilitate Taxiway

012 104,091 Update Airport Master Plan Study

Salina Municipal CS 028 2,001,067 Rehabilitate Taxiway [Construction (Lights) - Phase 3], Rehabilitate Taxiway

029 1,328,523[Construction (Pavement and Shoulder Reconstruction) - Phase 2] Rehabilitate Taxiway [Construction - Continue to Charlie]

Scott City Municipal GA 009 2,455,743 Rehabilitate Runway [Rehabilitate failing runway pavement - Construction Phase 2] - 17/35

010 397,369 Rehabilitate Taxiway [Reconfigure access to separate from taxilane]

Shalz Field GA 008 51,533 Conduct Environmental Study

009 22,396 Rehabilitate Apron [Design - Phase 1]

Smith Center Municipal GA 005 280,022 Construct Runway [Engineering and Design] - 14/32

Stanton County Municipal GA 007 4,719,600 Construct Runway [Runway Construction] - 17/35

State of Kansas 006 357,511 Conduct State System Plan Study

007 17,089 Conduct State System Plan Study

008 184,825 Conduct aeronautical survey for WAAS approach

Strother Field GA 014 325,915 Improve Airport Drainage [Phase 2]

Syracuse-Hamilton County Municipal GA 006 384,583 Rehabilitate Apron

Tri-City GA 005 46,874 Rehabilitate Taxiway [Construction - Phase 2]

Tribune Municipal GA 003 150,000 Construct Taxiway [Phase 1 - Design]

Ulysses GA 010 97,371 Construct Taxiway [Lookback]

Wellington Municipal GA 008 70,200 Expand Apron [Expand Transient Parking Apron - DESIGN]

Selection Criteria Year: 2008

Page 8 of 107

Page 9: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

AIP FederalFunds

7,284,499

5,370,221

2,633,180

4,798,471

57,008,684

1,908,242

501,790

3,241,606

2,056,936

5,325,000

5,430,067

2,831,250

342,042

3,207,011

3,729,389

11,141,408

1,287,534

2,383,328

11,965,978

4,010,292

7,401,007

2,130,000

826,160

110,000

69,829,040

10,215

580,799

Report Date 02/19/2009

Brief Description Of Work

Construct Terminal Building [Phase 2 Final design/Construction mobilization]

Rehabilitate Apron [Phase 1 - Remove structure & reconstruct apron and glycol system] Construct Terminal Building [Phase 2a]

Rehabilitate Apron [Phase 2 - Reconstruct apron around new terminal]

Rehabilitate Apron

Update Airport Master Plan Study

Construct Terminal Building

Rehabilitate Apron

Rehabilitate Taxiway

Rehabilitate Apron, Rehabilitate Runway - 01L/19R

Rehabilitate Runway Lighting - 01L/19R

Rehabilitate Apron

Rehabilitate Runway - 12L/30R

Construct Runway [LOI Increase] - Plan-1

Construct Runway - Plan-1

Rehabilitate Taxiway

Rehabilitate Taxiway

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Construct Terminal Building [phase 5]

Construct Terminal Building [phase 6]

Construct Terminal Building

Conduct aeronautical survey for WAAS approach

Acquire Snow Removal Equipment

Construct Taxiway, Install Runway Vertical/Visual Guidance System - 15/33,

FAA - Office Of Airports Grants Awarded by FY

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

CE ACE KS Wichita Mid-Continent P 054

055

056

057

State Total: 80 Grants

CE ACE MO Columbia Regional

Joplin Regional

Kansas City International

Lambert-St Louis International

Missouri State Block Grant Program

Springfield-Branson National

State of Missouri

P

P

P

P

P

028

029

026

056

057

058

059

060

108

111

112

113

114

032

033

033

034

035

006

State Total: 19 Grants

CE ACE NE Ainsworth Municipal

Albion Municipal

GA

GA

006

007

Selection Criteria Year: 2008

Page 9 of 107

Page 10: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

CE ACE NE

Antelope County

Aurora Municipal - Al Potter Field

Brewster Field

Central Nebraska Regional

Crete Municipal

David City Municipal

Eppley Airfield

Evelyn Sharp Field

Garden County

Gordon Municipal

Hastings Municipal

Hebron Municipal

Imperial Municipal

Jim Kelly Field

Karl Stefan Memorial

Kearney Regional

Lincoln

Miller Field

FY 2008

Service Grant Seq Level Number

007

GA 003

GA 007

GA 007

CS 030

GA 007

GA 004

005

P 046

047

050

GA 005

006

GA 005

GA 005

GA 010

GA 005

GA 008

GA 009

GA 015

CS 019

P 037

038

039

GA 006

AIP FederalFunds

56,429

111,240

45,600

151,050

1,133,013

56,500

49,924

2,393,688

13,953,750

9,187,500

1,280,654

565,813

119,627

58,900

190,577

280,000

46,178

62,700

78,850

123,500

688,750

783,298

403,750

3,350,000

Report Date 02/19/2009

Brief Description Of Work

Remove Obstructions

Construct Taxiway

Construct Building

Acquire Easement For Approaches [Acquire 10.97 acres easement for RPZ for runway 36.] Acquire Snow Removal Equipment

Construct Taxiway, Install Perimeter Fencing, Rehabilitate Runway - 17/35, Remove Obstructions Extend Runway - 14/32, Rehabilitate Runway - 14/32, Rehabilitate Runway Lighting - 14/32 Acquire Land For Approaches

Rehabilitate Runway - 18/36

Rehabilitate Taxiway

Rehabilitate Runway - 14R/32L

Construct Taxiway, Extend Runway [Widen and extend Runway, construction] ­13/31, Install Runway Lighting - 13/31, Rehabilitate Apron Construct Taxiway, Extend Runway - 13/31, Install Runway Lighting - 13/31, Rehabilitate Apron Acquire Snow Removal Equipment

Conduct Airport Master Plan Study

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 14/32 Improve Airport Miscellaneous Improvements, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Runway Lighting ­12/30 Construct Building [Construct Terminal Building Phase II]

Update Airport Master Plan Study

Update Airport Master Plan Study

Update Airport Master Plan Study

Improve Airport Drainage

Security Enhancements

Install Apron Lighting

Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

Selection Criteria Year: 2008

Page 10 of 107

Page 11: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE NE North Platte Regional Airport Lee Bird Field

Pender Municipal

Plattsmouth Municipal

Rock County

Seward Municipal

State of Nebraska

The O'Neill Municipal-John L Baker Field

Wahoo Municipal

Wayne Municipal

Western Nebraska Regional/William B. Heilig Field York Municipal

CS

GA

GA

GA

GA

GA

GA

GA

P

GA

023

006

009

007

006

011

013

003

006

007

009

029

010

158,586

229,790

394,250

28,500

27,379

103,649

34,062

113,050

148,458

187,777

110,675

410,000

390,000

Rehabilitate Taxiway

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­15/33, Rehabilitate Runway Lighting - 15/33 Acquire Land for Development

Acquire Miscellaneous Land

Construct Access Road, Construct Parking Lot

Conduct aeronautical survey for WAAS approach

Conduct State System Plan Study

Construct Runway [Acquire land for cross wind runway 4-22] - 04/22

Construct Taxiway, Install Miscellaneous NAVAIDS

Construct Taxiway, Install Miscellaneous NAVAIDS

Acquire Snow Removal Equipment

Rehabilitate Airport Beacons, Rehabilitate Runway - 05/23

Construct Runway Safety Area - 17/35

State Total: 39 Grants 38,098,481

ADO Total: 213 Grants 196,471,694

Region Total: 261 Grants 196,471,694

Report Total: 2457 Grants 3,471,166,652

EA BEC WV Braxton County

Eastern WV Regional/Shepherd Field

Elkins-Randolph County-Jennings Randolph Field Fairmont Municipal-Frankman Field

Grant County

Greenbrier Valley

GA

R

GA

GA

GA

P

013

024

014

008

017

024

025

91,666

534,902

228,950

950,000

46,853

7,847,000

256,500

Install Runway Vertical/Visual Guidance System - 01/19

Conduct aeronautical survey for WAAS approach [RW 08 Approach], Install Airport Beacons, Rehabilitate Taxiway Acquire Land for Development

Rehabilitate Runway [construct] - 04/22

Update Airport Master Plan Study

Conduct aeronautical survey for WAAS approach [RW 22 Approach], Improve Runway Safety Area [Construction] - 04/22 Improve Terminal Building [Design]

Selection Criteria Year: 2008

Page 11 of 107

Page 12: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

EA BEC WV Kee Field

Logan County

Marshall County

Mason County

Mercer County

Morgantown Municipal-Walter L. Bill Hart Field

New (Replacement)

North Central West Virginia

Philippi/Barbour County Regional

Raleigh County Memorial

Summersville

Tri-State/Milton J. Ferguson Field

Upshur County Regional

Wheeling Ohio County

Yeager

ADO Total:

State Total:

EA HAR DE Delaware Airpark

New Castle

FY 2008

Service Level

Grant Seq Number

GA

GA

GA

GA

GA

012

008

016

017

015

020

CS

CS

029

001

002

031

GA

CS

GA

P

GA

GA

P

009

022

007

036

037

019

020

025

040

041

042

28 Grants

28 Grants

GA

CS

009

010

027

AIP Federal Funds

122,715

2,030,632

197,694

136,445

63,749

311,240

658,126

3,492,492

230,573

4,156,240

176,040

461,240

110,029

5,200,000

61,750

111,240

38,760

111,240

1,861,588

46,451

664,811

30,198,926

30,198,926

85,500

107,130

9,525,380

Report Date 02/19/2009

Brief Description Of Work

Install Apron Lighting, Update Airport Master Plan Study

Rehabilitate Runway [Construct] - 06/24

Remove Obstructions, Update Airport Master Plan Study

Remove Obstructions

Rehabilitate Runway [Design] - 07/25

Improve Terminal Building, Rehabilitate Runway Lighting - 05/23, Update AirportMaster Plan StudyAcquire Aircraft Rescue & Fire Fighting Vehicle

Construct New Airport [Acquire Land], Construct New Airport [Construction]

Construct New Airport [Acquire Land], Construct New Airport [Grading]

Conduct aeronautical survey for WAAS approach [RW 03 Approach], ImproveRunway Safety Area [NAVAIDS] - 03/21Acquire Land for Development, Improve Runway Safety Area - 08/26

Rehabilitate Apron, Remove Obstructions

Remove Obstructions [Mitigation Plan]

Improve Runway Safety Area [Construct (Navaids & Pavement)] - 12/30

Improve Terminal Building [Design]

Construct Building [T-hangar]

Construct Building [Portion of Box Hangar]

Rehabilitate Access Road

Rehabilitate Taxiway, Remove Obstructions [Design]

Acquire Friction Measuring Equipment

Extend Taxiway

Conduct Environmental Study [Archaeological Study, Ph IV]

Conduct Environmental Study [Archaeological Study, Phase V]

Improve Runway Safety Area [Construct] - 09/27, Rehabilitate Runway [Construct]- 09/27

Selection Criteria Year: 2008

Page 12 of 107

Page 13: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

EA HAR DE

State of Delaware

Sussex County

028

006

022

023

GA

599,640

166,250

120,636

30,400

State Total: 7 Grants 10,634,936

EA HAR NJ Atlantic City International 073P 1,896,828

Cape May County

Essex County

074

075

025

026

028

029

GA

R

144,400

475,000

666,613

68,875

80,781

426,500

Hammonton Municipal 014GA 151,035

Lakewood

Linden

009

010

012

GA

R

103,391

123,500

696,990

Millville Municipal 028GA 584,000

Morristown Municipal

029

038R

88,350

90,000

Ocean City Municipal

Princeton

Robert J. Miller Air Park

039

012

006

018

019

GA

R

GA

464,583

560,925

29,661

223,000

116,000

Report Date 02/19/2009

Brief Description Of Work

Remove Obstructions [Runway Ends]

Conduct State System Plan Study

Install Perimeter Fencing [design/construct]

Update Miscellaneous Study [Obstruction Survey]

Acquire Interactive Training System, Acquire Snow Removal Equipment [SnowThrower & Plow], Security Enhancements [Video Cameras]Environmental Mitigation [Phase V]

Update Airport Master Plan Study

Improve Airport Drainage, Remove Obstructions [Design and Permits]

Improve Airport Drainage [Phase III]

Update Airport Master Plan Study [ALP]

Rehabilitate Apron [Construct, Phase III], Remove Obstructions [Design & Permitting,Phase IV]Install Perimeter Fencing [Design and Construct], Rehabilitate Access Road [Designand permitting]Install Perimeter Fencing [Wetlands Mitigation, Phase III]

Improve Airport Drainage [Stormwater Management Plan]

Rehabilitate Apron [Aircraft Parking Apron (design/construct)], RehabilitateTaxiway [A, B, C & D (design/construct)]Construct Taxiway [T-hangar Taxiway (Design & Permitting)], Improve RunwaySafety Area [Design & Permitting] - 14/32, Rehabilitate Taxiway [Taxiway B & G(design/permitting)], Remove Obstructions [Design and Permits]Improve Airport Drainage [Study]

Conduct aeronautical survey for WAAS approach [Perform LPV survey forapproch to Runway 23 and Runway 5]Remove Obstructions [Design & Permitting]

Improve Airport Drainage [Construct, Phase II]

Acquire Snow Removal Equipment [Plow truck]

Expand Apron [Design], Remove Obstructions [Runway 6-24 (Design/permiting)]

Update Airport Master Plan Study [ALP Update]

Selection Criteria Year: 2008

Page 13 of 107

Page 14: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

EA HAR NJ Somerset

South Jersey Regional

Woodbine Municipal

006

007

016

017

R

R

GA

63,720

127,656

111,153

785,000

State Total: 23 Grants 8,077,961

EA HAR PA Allegheny County

Allentown Queen City Municipal

019

020

021

014

015

R

GA

259,240

1,269,006

155,462

111,240

320,000

Altoona-Blair County

016

034CS

1,562,459

574,240

Bradford Regional 034CS 346,643

Capital City 018R 58,476

019 423,761

Commonwealth of Pennsylvania

Delaware Valley Region

Dubois Regional

Erie International/Tom Ridge Field

020

006

007

009

030

047

CS

P

26,505

107,738

488,500

189,170

234,223

8,181,610

Franklin County Regional

048

008GA

214,942

610,036

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Apron [Transient Apron (design)]

Rehabilitate Taxiway [Hangar Area]

Expand Apron [Aircraft Apron (design/permitting)]

Rehabilitate Runway [Construct, Phase II] - 01/19

Rehabilitate Taxiway [Convert Runway 5/23 to Taxiway, Phase III]

Rehabilitate Taxiway [Convert Runway 5/23 to Taxiway, Phase IV]

Install Perimeter Fencing [Access Control, Phase V]

Rehabilitate Runway [Final Design] - 07/25

Construct Apron [Tie-Down Apron & Relocate Access Taxiway C (design)],Construct Taxiway [T-Hangar Taxilanes (Design)]Rehabilitate Runway [Construct] - 07/25

Acquire Land For Approaches [Land for Runway 3/21 (reimbursement), Phase III],Construct Taxiway [Hangar Taxilanes, Construct]Conduct Environmental Study [Wildlife Hazard Management Plan], Improve AirportDrainage [Phase II], Improve Runway Safety Area [Runway 14 end (wetlandspermitting & mitigation report), Ph IV] - 14/32, Install Airport Beacons [Replace],Install Runway Vertical/Visual Guidance System [GVGI, Phase II] - 05/23Rehabilitate Runway [Preliminary Design] - 08/26, Rehabilitate Runway Lighting[Including Airfield Lighting - Preliminary Design] - 08/26Improve Runway Safety Area [Land Acquisition-Mt Olivett Cemetery, Phase V] ­08/26Rehabilitate Access Road [Lighting - Design]

Conduct aeronautical survey for WAAS approach

Conduct State System Plan Study

Conduct Metropolitan System Plan Study [CASP XXVI]

Acquire Snow Removal Equipment [Vehicles with plows]

Acquire Land For Approaches [Runway 6/24, Phase II], Improve Runway SafetyArea [Phase II] - 06/24VALE Infrastructure [Three PCA's]

Construct Apron [Aircraft Parking Apron], Construct Taxiway [Connecting Taxiwayto Runway 6]

Selection Criteria Year: 2008

Page 14 of 107

Page 15: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

EA

Region

HAR PA

ADO State

Gettysburg Regional

Harrisburg International

Worksite

John Murtha Johnstown-Cambria County

Lancaster

Lehigh Valley International

Northeast Philadelphia

Pennsylvania State Block Grant Program

Philadelphia International

Report Date 02/19/2009

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

009 38,760 Rehabilitate Runway Lighting [Design] - 06/24, Rehabilitate Taxiway Lighting [Design]

005GA 62,225 Conduct Miscellaneous Study [Obstruction Study], Install Airport Beacons [Equipment Purchase]

049P 11,300,000 Construct Apron [Phase VII], Construct Taxiway [Phase VI], Install Runway Lighting [Phase V] - 13/31

050 2,288,712 Environmental Mitigation [Construct Wastewater Treatment Facility]

051 495,154 Construct Apron [Cargo Apron (Final Design), Phase II], Remove Obstructions [Demolish Crawford Station]

052 957,650 Environmental Mitigation [Wastewater Treatment Facility]

053 247,422 Install Taxiway Lighting [Taxiway "A" Hold Line Relocation, Phase II]

038P 769,819 Rehabilitate Runway - 05/23, Remove Obstructions [Runway 5 Protection Zone]

030CS 5,173,307 Improve Runway Safety Area [Runway 8 End] - 08/26

073P 6,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

074 2,111,749 Acquire Land for Development [Hanover/Allen/East Allen Townships-reimbursement]

075 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

076 880,751 Acquire Land for Development [Just Compensation- reimbursement]

077 260,566 Remove Obstructions [Runway 24 RPZ, Phase III]

014R 150,822 Rehabilitate Taxiway [Taxiways A & L (design)]

038 4,146,372 Non primary development projects in state block grant program

039 4,894,561 Non primary development projects in state block grant program

040 4,065,000 Non primary development projects in state block grant program

041 1,256,089 Non primary development projects in state block grant program

042 1,705,439 Non primary development projects in state block grant program

043 578,822 Non primary development projects in state block grant program

083P 3,484,301 VALE Infrastructure [Install PCA units], VALE Infrastructure [Rechargers for Electric Baggage Tractors], VALE Vehicle [Three Hybrid Vehicles]

084 6,950,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase V]

085 10,246,000 Rehabilitate Runway [Phase II] - 09R/27L

086 50,000 Conduct Noise Compatibility Plan Study [Ft. Mifflin Mitigation]

087 451,950 VALE Infrastructure [Fifteen Electric Vehicle Rechargers]

Selection Criteria Year: 2008

Page 15 of 107

Page 16: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

EA

Region

HAR PA

ADO State

Pittsburgh International

Worksite

Reading Regional/Carl A Spaatz Field

Rostraver

University Park

Wilkes-Barre/Scranton International

EA NYC

ADO Total:

State Total:

NJ

Williamsport Regional

Newark Liberty International

Teterboro

FY 2008

Service Grant Seq AIP Federal Level Number Funds

P 096 1,198,526

097 562,500

098 530,169

099 6,775,000

100 750,557

GA 044 2,395,669

045 32,425

R 013 60,747

P 042 372,404

043 1,248,309

044 188,522

P 045 1,323,072

046 2,269,422

047 641,250

048 1,214,639

P 033 756,353

034 240,350

61 Grants 106,258,636

91 Grants 124,971,533

P 116 2,328,300

118 3,010,963

119 1,614,809

120 1,996,011

P 038 33,301

039 258,394

040 95,000

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Runway [Preliminary Design] - 14/32, Rehabilitate Runway - 10L/28R

Improve Runway Safety Area [Design] - 14/32

Install Guidance Signs

Construct Deicing Containment Facility [Construction]

Rehabilitate Runway [Final Design] - 14/32

Improve Runway Safety Area [Runway 13 End] - 13/31

Install Guidance Signs

Construct Taxiway [General Aviation Taxiways (design)], Rehabilitate TaxiwayLighting [Parallel Taxiway Lighting (design)]Construct Taxiway, Install Weather Reporting Equipment [Wind Cones]

Construct Building [ATCT]

Conduct Environmental Study [Wildlife Hazard Study]

Acquire Snow Removal Equipment [Five pieces]

Improve Runway Safety Area [Runway 4 End, Phase V] - 04/22

Improve Runway Safety Area [Install EMAS Blocks] - 04/22

Acquire Snow Removal Equipment

Extend Taxiway [Parallel Taxiway B to Runway 27 End, Site Prep]

Extend Taxiway [Parallel Taxiway B to Runway 27 End]

Rehabilitate Taxiway

Rehabilitate Runway - 11/29

Security Enhancements

Rehabilitate Runway [Phase II R/W 11-29 rehabiliation] - 11/29

Conduct aeronautical survey for WAAS approach [Perform LPV Survey forRunway 24]Rehabilitate Taxiway [Phase I T/W 'A' Rehabilitation]

Safety Management System (SMS) Program [Conduct Safety Management (SMS)Pilot Study]

Selection Criteria Year: 2008

Page 16 of 107

Page 17: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite

State Total:

EA NYC NY Adirondack Regional

Akron

Albany International

Buffalo Airfield

Buffalo Niagara International

Buffalo-Lancaster

Buffalo-Lancaster Regional

Canandaigua

Cattaraugus County-Olean

Chautauqua County/Dunkirk

Corning-Painted Post

Service Level

Grant Seq Number

AIP Federal Funds

7 Grants 9,336,778

CS

R

043

044

045

014

71,256

707,211

35,832

787,974

P 095 694,590

096 414,386

097 1,244,905

098

099

456,738

667,926

100 939,813

R 019 1,004,876

P 065 4,656,000

066 1,146,952

R

067

017

500,000

40,241

018 913,851

R 019 214,651

R

GA

GA

GA

023

012

038

010

64,762

108,000

157,225

577,559

Brief Description Of Work

Rehabilitate Airport Beacons [Airport Rotating Beacon Replacement]

Rehabilitate Taxiway [Taxiways C (West), D & E Rehabilitation (Construction)]

Acquire Snow Removal Equipment [Acquire Snow Removal Equipment]

Acquire Land for Development [Land Commitment Credit], Construct Apron[Transient Apron-phase 1]Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF Equipment Replacement(3,000 gall. pumper)]Remove Obstructions [Runway 19 Approach Obstruction (Tree) Removal &Property Acquisition (Approx. 12 Parcels) - Phase II]Remove Obstructions [Runway 10 Approach Obstruction (Tree) Removals andProperty Acquisition]Remove Obstructions [Runway 28 Obstruction (Water Tank) Removal - Phase 2]

Remove Obstructions [Runway 19 Approach Structure Removal (Historic 1790House Relocation)]Acquire Aircraft Rescue & Fire Fighting Vehicle [Procure One Structural Pumper],Acquire Snow Removal Equipment [Procure One High Capacity Snow Blower]Acquire Land for Development [Land Commitment Credit], Rehabilitate Runway[Construction] - 06/24Noise Mitigation Measures for Residences within 65 - 69 DNL, Noise MitigationMeasures for Residences within 70 - 74 DNLNoise Mitigation Measures for Residences within 65 - 69 DNL [38 homes], NoiseMitigation Measures for Residences within 70 - 74 DNL [5 homes]Construct Deicing Containment Facility

Acquire Land for Development [EA Phase II (Permitting)], Conduct EnvironmentalStudy [Perform Environmental Assessment - Phase II (Wetland Permitting)]Acquire Land for Development [Land for Rwy. 26 RPZ extension], Extend Runway[Acquire RPZ land (Ecology and Environment/TOFA Appraisals)] - 08/26Acquire Land for Development [Design for Runway 8/26 Extension], ExtendRunway [Design] - 08/26Construct Apron [Design]

Update Airport Master Plan Study

Conduct Environmental Study

Construct Access Road, Expand Apron

Selection Criteria Year: 2008

Page 17 of 107

Page 18: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

EA NYC NY Cortland County-Chase Field GA 014 72,096 Install Runway Vertical/Visual Guidance System - 06/24, Remove Obstructions [Construction for on-airport obstruction removal]

Dutchess County GA 029 875,000 Rehabilitate Apron

030 26,600 Rehabilitate Apron [Design]

Elizabeth Field GA 015 78,035 Update Airport Master Plan Study [Alp Update]

Elmira/Corning Regional P 049 835,512 Improve Access Road [Construction]

050 169,035 Improve Access Road [Construction (Phase 2)]

Finger Lakes Regional GA 017 750,500 Improve Runway Safety Area - 01/19

Floyd Bennett Memorial GA 037 94,000 Conduct Miscellaneous Study [Perform Runway End Siting Surface Analyses for Runway 1, 19, 12 & 30]

038 61,750 Acquire Land For Approaches [Land Acquisition (Tra-Tom Parcel)]

039 35,150 Acquire Snow Removal Equipment [New Caterpillar 246C Skid Steer Loader with a 72" General Purpose Bucket and a 73" Snow Blower]

Fulton County GA 016 28,495 Install Miscellaneous NAVAIDS [Replace Rotating Beacon (Construction)]

Genesee County R 021 655,500 Expand Apron [Design], Improve Runway Safety Area [Construction] - 10/28,

022 48,450Remove Obstructions [Construction] Rehabilitate Apron [Design]

Greater Binghamton/Edwin A Link Field P 051 277,265 Install Runway Vertical/Visual Guidance System [Runway 16-34 PAPI Replacement] - 16/34

052 7,901,674 Rehabilitate Taxiway [Taxiway A Rehabilitation/Extension (Construction)]

054 585,993 Rehabilitate Taxiway [Taxiway "H" & "K" Rehabilitation]

Greater Rochester International P 061 3,822,534 Rehabilitate Runway - 10/28

062 1,524,147 VALE Infrastructure, VALE Vehicle

063 3,202,184 Rehabilitate Runway - 10/28

Griffiss Airfield GA 017 2,831,000 Rehabilitate Taxiway Lighting [Taxiway Edge Lighting,Marking & Signage

018 94,050Improvements (Construction)] Rehabilitate Building [Rehabilitate Aircraft Storage Hangar - Bldg. 782 (Design Only)]

019 4,525,371 Install Instrument Approach Aid [Navaids (ILS, MALSR) Construction (RWY 33)] ­15/33

Hamilton Municipal GA 015 112,500 Update Airport Master Plan Study [ALP Update]

016 104,500 Construct Taxiway [Design Partial Parallel Taxiway]

Hornell Municipal GA 017 103,217 Rehabilitate Apron

Selection Criteria Year: 2008

Page 18 of 107

Page 19: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

EA NYC NY Ithaca Tompkins Regional

John F Kennedy International

Joseph Y Resnick

Kingston-Ulster

La Guardia

Lake Placid

Le Roy

Long Island MacArthur

Lt Warren Eaton

Malone-Dufort

Massena International-Richards Field

Montauk

FY 2008

Service Grant Seq Level Number

P 048

049

P 154

155

156

157

159

160

161

GA 023

R 016

P 125

126

127

GA 029

030

R 018

019

P 075

GA 024

025

GA 020

CS 042

043

044

R 013

AIP Federal Funds

7,621,250

250,000

1,539,876

2,700,000

1,477,845

6,227,290

2,467,706

1,277,730

1,815,857

276,236

46,282

2,260,000

2,800,000

1,030,716

336,000

405,000

142,646

90,615

1,883,229

88,000

41,500

88,000

90,191

244,430

34,000

151,877

Report Date 02/19/2009

Brief Description Of Work

Improve Runway Safety Area [Extend Parallel Taxiway A between Taxiway E andRunway end 32] - 14/32Expand Apron [Demolish hangar to allow for apron expansion]

Noise Mitigation Measures for Public Buildings [Soundproofing of IS 180Q - PhaseV]Extend Taxiway

Rehabilitate Runway [Phase I] - 04L/22R

Rehabilitate Taxiway

Rehabilitate Taxiway [Rehabilitate T/W 'E' Phase II (4th Quarter)]

Update Metropolitan System Plan Study

Rehabilitate Taxiway [Rehabilitate T/W 'E' Phase III]

Construct Taxiway [Construct T- Hangar Taxilane]

Remove Obstructions [Obstructions Removal - Runway 33 End - Design Only]

Security Enhancements [Phase I]

Improve Access Road [Phase II]

Improve Access Road [Phase III GCP Rehabilitation (Flyover)]

Remove Obstructions [R/W 14-32 Obstruction Removal (On-Airport)]

Rehabilitate Runway [Runway Crack Repair] - 14/32

Acquire Land for Development [Design Runway end 28 extension], Extend Runway[Design*] - 10/28Acquire Land for Development [Land acquisition for Runway end 28 extension(Phase 2)], Extend Runway [Land Acquisition (Phase 2)] - 10/28Rehabilitate Runway [Rehabilitate Portions of R/W 6-24] - 06/24

Update Airport Master Plan Study

Construct Taxiway [Design]

Construct Taxiway [Parallel T/W "B" - Phase I (R/W 23 to R/W 14) - Design]

Conduct aeronautical survey for WAAS approach [Perform survey for proposedR/W 23 & 27 LPV approaches]Conduct Environmental Study [EA for Master Plan & Obstruction Projects]

Acquire Snow Removal Equipment [Acquire Snow Removal Equipment]

Install Instrument Approach Aid [Install PAPI on Runway 6 Construction Only] ­06/24

Selection Criteria Year: 2008

Page 19 of 107

Page 20: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Grant Seq Level Number

EA NYC NY 014

015

Niagara Falls International R 028

029

030

Ogdensburg International GA 031

032

Oswego County GA 030

031

032

Penn Yan GA 023

024

Piseco GA 017

018

Plattsburgh International GA 020

022

023

024

025

Potsdam Municipal/Damon Field/ GA 022

Randall R 022

Republic R 034

035

036

037

AIP Federal Funds

42,592

67,837

6,968,351

112,138

1,424,440

152,000

151,000

185,000

263,000

28,500

85,120

37,525

74,978

62,700

3,035,250

5,144,250

77,140

660,000

495,000

317,775

154,373

1,060,479

3,299,837

2,686,328

3,958,816

Report Date 02/19/2009

Brief Description Of Work

Install Instrument Approach Aid [Install PAPI for R/W 24 - Engineeri ng Design andPermitting Only] - 06/24Install Taxiway Lighting [Taxiway Edge Lights]

Construct Access Road [Construction], Construct Apron [Construction]

Install Guidance Signs

Construct Access Road [Construction-Ph. 2], Construct Apron [Construction-Ph. 2]

Expand Apron [Apron Expansion], Rehabilitate Apron [Demolish Terminal Buildingfor Apron Expansion]Install Runway Vertical/Visual Guidance System [Runway 9-27 PAPI Replacement(Design)] - 09/27, Rehabilitate Apron [Rehabilitate and Expand GA Apron (Design)]Rehabilitate Runway [Runway 15-33 Overlay (Design)] - 15/33

Remove Obstructions [EA for Off-Airport Obstruction Removal]

Remove Obstructions [Obstruction Study - Phase II]

Remove Obstructions [Obstruction study]

Rehabilitate Runway [Design] - 01/19

Install Miscellaneous NAVAIDS [Rehabilitate Segmented Circle/Wind Cone(Construction)]Update Airport Master Plan Study [Perform Airport Master Plan Update - Phase II]

Construct Building [Hangar Building (Design and Construction)], Construct Building[T-Hangars Phase II (Design & Construction)]Rehabilitate Runway [Rehabilitate Runway 17-35 (Construction) - Phase II] - 17/35

Remove Obstructions [Perform Runway 17 Obstruction Study]

Modify Building [Demolition of Former Alert Facility]

Modify Building [Demolition of Former FB-111 Shelters]

Rehabilitate Runway [Crack Repair & Seal RW's, TW's & Apron] - 06/24

Rehabilitate Runway [Runway Pavement Rejuvenation] - 08/26, RehabilitateTaxiway [Rejuvenate Taxiway "A" paralel to R/W 8-26]Improve Runway Safety Area [Construct EMAS-Design] - 14/32

Construct Taxiway [Relocate Taxiway "B" Construction Phase II]

Construct Taxiway [Relocate Taxiway "B" - Phase III]

Improve Runway Safety Area [Improve Runway Safety Area - Construction ­Phase I - Purchase of EMAS blocks for R/W 32 End] - 14/32

Selection Criteria Year: 2008

Page 20 of 107

Page 21: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

EA NYC NY Saratoga County

Schenectady County

Schroon Lake

Sidney Municipal

Sky Acres

Spadaro

State of New York

Stewart International

Sullivan County International

Syracuse Hancock International

Ticonderoga Municipal

Tri-Cities

Watertown International

FY 2008

Service Grant Seq Level Number

GA 024

R 040

041

042

GA 007

GA 013

R 017

R 009

010

011

008

P 061

062

GA 023

024

P 097

098

099

101

103

GA 015

016

GA 014

015

CS 027

AIP Federal Funds

73,150

125,912

512,299

328,842

66,500

327,735

187,264

27,437

109,424

85,619

707,750

1,277,566

1,246,851

253,365

582,920

341,637

715,326

736,250

142,500

6,303,250

159,384

69,175

94,972

36,837

213,180

Report Date 02/19/2009

Brief Description Of Work

Install Miscellaneous NAVAIDS [Airport Rotating Beacon Replacement], RemoveObstructions [Off-Airport-Phase I (Design Only)]Rehabilitate Airport Beacons [Airport Rotating Beacon Replacement], RehabilitateTaxiway Lighting [Taxiway "G" Edge Lights Replacement]Remove Obstructions [Obstruction Removal - Phase I (Removal and Easements)]

Improve Airport Drainage [Drainage Improvements (Construction)]

Improve Runway Safety Area [Obstruction Removal and Runway Safety AreaImprovements - Phase I: Permitting & Design] - 16/34Install Miscellaneous NAVAIDS, Light Obstructions

Improve Airport Drainage

Install Perimeter Fencing [West Side - Phase I - Engineering Design and Permitting]

Install Perimeter Fencing [East Side-Construction]

Update Airport Master Plan Study [ALP update]

Update State System Plan Study

Improve Airport Miscellaneous Improvements [Rehabilitate Airport WIP Circuitry]

Improve Airport Miscellaneous Improvements [Rehabilitate Airport WIP Circuitry]

Improve Runway Safety Area [Runway Safety Area Improvements - Design andLand Acquisition - Phase I] - 15/33Construct Apron [Construct Aircraft Parking Apron and Taxilane - Phase I]

Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF Vehicle Replacement]

Acquire Snow Removal Equipment [Acquire Snow Removal Equipment]

Rehabilitate Runway [Rehabilitate Runway Intersection (Design)] - Plan-1,Rehabilitate Taxiway [Rehabilitate Taxiway "M" South (Design Only)]Conduct aeronautical survey for WAAS approach [Perform Surveys for ProposedLPV Approaches to Runway 15 & 33]Rehabilitate Runway [Runway 15-33 Overlay] - 15/33

Install Miscellaneous NAVAIDS [Repairs to the Windsock, Segmented Circle andElectrical Vault]Rehabilitate Runway Lighting [Construction of Repairs to the Runway Lighting] ­02/20Conduct Environmental Study, Rehabilitate Taxiway [Design]

Rehabilitate Runway - 03/21, Rehabilitate Taxiway

Conduct Environmental Study [Prepare Environmental Assessment for 1 - 5 Year

Selection Criteria Year: 2008

Page 21 of 107

Page 22: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

FAA - Office Of Airports

Region ADO State Worksite

EA NYC NY

Wellsville Municipal Airport,Tarantine Field

Westchester County

ADO Total:

State Total:

Williamson-Sodus

EA WAS

State Total:

DC Washington Dulles International

EA WAS MD Baltimore/Washington International Thurgood Marshal Bay Bridge

Cambridge-Dorchester

Carroll County Regional/Jack B Poage Field

Crisfield Municipal

Easton/Newnam Field

Frederick Municipal

Greater Cumberland Regional

Grants Awarded by FY

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

GA

027

020 242,259

P

021

085

125,749

92,864

086

087

088

089

090

442,847

137,168

296,283

890,293

1,032,949

R 021 73,656

131 Grants 128,209,224

138 Grants 137,546,002

P 037 23,662,414

1 Grants 23,662,414

P 081 1,122,470

GA 018 228,553

GA

R

GA

023

024

006

566,302

438,750

363,164

GA

R

GA

033

032

015

294,238

378,935

160,550

Report Date 02/19/2009

Brief Description Of Work

Development]

Conduct Environmental Study, Remove Obstructions [On-airport obstructionremoval-construction]Remove Obstructions [On-airport obstruction removal-construction (Phase 2)]

Remove Obstructions [Obstructions Removal at the End of all Runways end ­Survey and Eng. Design]Acquire Snow Removal Equipment [Replace Runway Snow Sweeper]

Acquire Equipment [Replace Runway Deicing Vehicle]

Acquire Aircraft Deicing Equipment [Replacement]

Security Enhancements [Construction - Phase II]

VALE Vehicle [Purchase 25 electric vehicles and install 13 electric chargingstations]Remove Obstructions

Construct Runway [3/11] - Plan-1

Conduct Environmental Study [Conduct Environmental Assessment]

Acquire Snow Removal Equipment [Purchase Equipment], Extend Taxiway [DesignPier One Road Utility Relocation], Rehabilitate Runway [Seal Coat, RelocateThreshold, WAAS Approach - Design] - 11/29Extend Runway [Stormwater mitigation] - 16/34

Construct Runway [environmental assessment] - Plan-1

Extend Runway [Land Acquisition Services] - 14/32, Rehabilitate Runway [SealRunway 14/32 & Relocate Threshold] - 14/32Rehabilitate Apron [Design Only]

Conduct Environmental Study

Rehabilitate Runway [acquire land parcels 94 (shober), 68 (welch), 1 (ruckman),and 90 (welch)] - 05/23

Selection Criteria Year: 2008

Page 22 of 107

Page 23: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA WAS MD Hagerstown Regional-Richard A Henson Field CS 040 6,000,000 Construct Runway Safety Area [construction phase 6] - 09/27

Martin State R 013 444,963 Construct Taxiway [construct a portion of taxilane "k"]

014 155,037 Construct Taxiway [construct a portion of taxilane "k"]

Maryland R 008 27,282 Construct Runway [acquire land (easement) irvine parcel (20.587 acres)] - Plan-1

Montgomery County Airpark R 017 112,240 Remove Obstructions [acquire parcel 6 and 11 - consutlant services]

018 37,760 Remove Obstructions [acquire parcel 6 and 11 - consultant services]

019 209,000 Remove Obstructions [remove obstructions on-airport phase 2 (Design)]

New 003 156,161 Acquire Existing Airport [Land Acq. Services]

Ocean City Municipal GA 018 25,000 Update Airport Master Plan Study [Develop Preferred Alternative for EA]

Salisbury-Ocean City Wicomico Regional P 039 1,352,670 Improve Runway Safety Area [Construct RSA] - 05/23

040 878,386 Remove Obstructions [Construction - 23 end]

041 486,241 Remove Obstructions [Construction - 14 & 05 ends]

St. Mary's County Regional GA 015 387,656 Extend Runway [acquire land runway 11 approach - parcels 28, 29 and 31 ­professional services] - 11/29, Extend Runway [construct wetlands - phase 2] ­11/29, Extend Runway [reimburse land runway 11 approach - parcels 22 and 23] ­11/29

Tipton R 014 1,027,900 Rehabilitate Apron [construction], Remove Obstructions [existing runway]

State Total: 22 Grants 14,853,258

EA WAS VA Accomack County GA 012 161,500 Construct Building [Construct Building T-Hangar Site Preparation (Design) and Wetland Mitigation]

Blue Ridge GA 015 220,710 Expand Apron [Expand Apron, Conduct Environmental Assessment, Phase 2, Cultural Resources Study]

Charlottesville-Albemarle P 038 1,631,938 Rehabilitate Runway Lighting [Construction] - 03/21

039 172,384 Rehabilitate Taxiway Lighting [Rehabilitate Taxiway Light System (MITL)]

Chesapeake Regional GA 013 142,500 Remove Obstructions [Conduct Environmental Assessment]

Chesterfield County R 020 112,500 Update Airport Master Plan Study [Update Airport Master Plan Study]

021 38,760 Update Airport Master Plan Study [Phase 2]

Commonwealth of Virginia 005 326,000 Conduct Metropolitan System Plan Study

Culpeper Regional GA 018 272,650 Update Airport Master Plan Study

Dinwiddie County GA 017 100,000 Update Airport Master Plan Study [Airport Layout Plan Update]

Selection Criteria Year: 2008

Page 23 of 107

Page 24: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

EA WAS VA Farmville Regional GA 012 400,000 Construct Apron [Relocate AWOS, Rot. Beacon, & AFL Vault]

Franklin Municipal-John Beverly Rose GA 011 76,000 Acquire Land For Approaches [RPZ Land - R/W 27 - Environmental Assessment]

Front Royal-Warren County GA 012 81,700 Remove Obstructions [South Side-ROFA/Part77 (Environmental)]

Hampton Roads Executive R 008 115,995 Rehabilitate Runway [Obstruction Removal Phase 1 - EA] - 10/28

009 849,555 Rehabilitate Runway [Environmental Mitigation Ph 2] - 10/28

010 705,832 Construct Runway [Environmental Mitigation, Phase 3] - 10/28

Hanover County Municipal GA 019 180,000 Acquire Land For Approaches [RW 16 Approach (L. Johnson)], Conduct Environmental Study, Remove Obstructions [RW 34 Approach (Land Acquisition

Leesburg Executive R 033 149,625Services)] Conduct Environmental Study, Improve Runway Safety Area [Land Services for

Lonesome Pine GA 010 471,997RSA Property & Westside Properties] - 17/35 Conduct Environmental Study [Environmental Assessment]

Luray Caverns GA 009 310,881 Remove Obstructions [Land Acquisition (Parcel #26)]

010 15,950 Remove Obstructions [Land Acquisition (Parcels 6)]

Lynchburg Regional/Preston Glenn Field P 031 732,560 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire

Manassas Regional/Harry P. Davis Field R 028 209,950Fighting Building [(DESIGN)] Rehabilitate Taxiway [Delta Phase I (Design)]

029 144,685 Construct Service Road [Phase I Design]

Middle Peninsula Regional GA 006 1,909,500 Rehabilitate Runway [Phase 3, Construction] - 10/28

New Kent County GA 011 67,887 Remove Obstructions [(Planning/Env Coord)]

New River Valley GA 012 299,934 Rehabilitate Runway [Design] - 06/24

Newport News/Williamsburg International P 036 9,747,205 Expand Terminal Building [Concourse B - Phase 2 (FY-06, 07, & 08 Pass. Ent)]

037 5,312,947 Rehabilitate Runway [Phase 1] - 07/25

Norfolk International P 055 242,879 Acquire Land for Noise Compatibility outside 65 DNL [reimburse acquisition parcel 150 - garris]

Orange County GA 011 475,000 Remove Obstructions [Phase I (Land Services)]

Richmond International P 051 6,284,220 Rehabilitate Runway [Design/Construct] - 02/20

Roanoke Regional/Woodrum Field P 043 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase 7 (Sound Insulation)]

044 208,474 Rehabilitate Taxiway [Rehabilitate TW T and General Aviation Taxilane (Design)]

Shenandoah Valley Regional CS 029 109,343 Rehabilitate Apron [Rehabiliate Transient and Air Carrier Apron (Design)]

030 32,888 Rehabilitate Apron [Rehabiliate Transient and Air Carrier Apron (Design-

Selection Criteria Year: 2008

Page 24 of 107

Page 25: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA WAS VA

Stafford Regional

Suffolk Executive

Tangier Island

Tazewell County

Twin County

Virginia Highlands

Virginia Tech/Montgomery Executive

Warrenton-Fauquier

Winchester Regional

R

GA

GA

GA

GA

GA

GA

R

GA

030

019

013

014

004

013

010

027

028

015

016

013

023

1,804,551

114,745

259,775

2,465,250

66,500

144,875

237,500

2,389,408

416,053

36,948

133,000

527,250

Subconsultant Services)]

Construct Apron

Improve Airport Drainage [Design Only], Improve Runway Safety Area [Land Acquisition] - 04/22 Improve Runway Safety Area [Land Acquisition - Waverton] - 04/22

Rehabilitate Runway [Construction] - 02/20

Improve Airport Drainage [EA/Prelim. Design]

Extend Runway Safety Area [Design] - 01/19

Remove Obstructions [Easement Acquisition, RW 24 Approach]

Acquire Land For Approaches [RPZ Land Acquisition, Phase I (Wright Equipment)]

Conduct Environmental Study [Conduct Environmental Assessment (including drainage study)] Acquire Land For Approaches [Acquire Land, Runway 30 RPZ, Phase 1 (Structure Demolition, Design Only)] Acquire Easement For Approaches [(Land Services)]

Acquire Land For Approaches

State Total: 48 Grants 42,909,804

ADO Total: 71 Grants 81,425,476

Region Total: 589 Grants 374,141,937

Report Total: 2457 Grants 3,471,166,652

GL BIS ND Barnes County Municipal

Bismarck Municipal

Casselton Robert Miller Regional

Cavalier Municipal

Cooperstown Municipal

Crosby Municipal

GA

P

GA

GA

GA

GA

009

038

039

040

015

006

007

007

64,410

1,542,206

1,000,000

537,345

25,500

31,530

129,931

35,140

Install Airfield Guidance Signs, Rehabilitate Runway - 13/31

Rehabilitate Taxiway [Phase 1 - construction]

Rehabilitate Taxiway [Phase 2 Construction (reconstruct/realign)]

Rehabilitate Taxiway [Phase 3 utility relocation]

Improve Airport Drainage, Install Runway Vertical/Visual Guidance System - 13/31

Rehabilitate Runway - 16/34, Update Airport Master Plan Study

Improve Access Road, Improve Terminal Building, Rehabilitate Runway - 13/31

Acquire Land For Approaches, Rehabilitate Runway - 12/30

Selection Criteria Year: 2008

Page 25 of 107

Page 26: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL BIS ND Devils Lake Regional CS 025 3,031,614 Rehabilitate Runway - 13/31

026 622,815 Extend Runway - 13/31

Dickinson - Theodore Roosevelt Regional CS 021 345,032 Construct Parking Lot

Edgeley Municipal GA 007 39,059 Rehabilitate Runway - 14/32, Update Airport Master Plan Study

Ellendale Municipal GA 005 66,927 Construct Building, Rehabilitate Runway - 13/31

Glen Ullin Regional GA 008 95,000 Rehabilitate Runway - 11/29

Grand Forks International P 032 5,949,457 Construct Runway [Construct Runway] - Plan-1

033 92,748 Construct Runway [improve drainage] - Plan-1

Gwinner-Roger Melroe Field GA 007 264,825 Acquire Land For Approaches, Rehabilitate Runway - 16/34

Hamry Field GA 009 146,535 Construct Access Road, Construct Taxiway, Rehabilitate Runway - 12/30

Harry Stern GA 011 161,884 Improve Airport Drainage, Install Weather Reporting Equipment

Harvey Municipal GA 004 207,993 Construct Taxiway, Rehabilitate Runway - 11/29, Remove Obstructions

Hector International P 034 1,766,003 Expand Apron

Hillsboro Municipal GA 011 42,657 Acquire Snow Removal Equipment, Construct Building

Jamestown Regional GA 027 125,447 Conduct Airport Master Plan Study, Environmental Mitigation

Kenmare Municipal GA 008 77,247 Improve Access Road, Rehabilitate Apron, Rehabilitate Runway - 08/26

LaMoure Rott Municipal GA 004 90,074 Conduct Environmental Study

Lakota Municipal GA 006 35,107 Construct Building, Rehabilitate Runway - 15/33

Linton Municipal GA 008 37,310 Acquire Snow Removal Equipment, Rehabilitate Runway - 09/27, Update Airport Master Plan Study

Lisbon Municipal GA 005 108,488 Construct Building, Rehabilitate Runway - 14/32

006 46,512 Construct Building

Mandan Municipal GA 012 298,300 Acquire Land For Approaches, Install Miscellaneous NAVAIDS

Mercer County Regional GA 007 44,985 Construct Fuel Farm, Rehabilitate Runway - 14/32

Minot International P 036 213,297 Acquire Friction Measuring Equipment, Improve Terminal Building, Install Runway Incursion Caution Bars

Mohall Municipal GA 005 66,487 Rehabilitate Runway - 13/31

Mott Municipal GA 006 153,697 Extend Runway - 09/27, Rehabilitate Runway - 09/27, Remove Obstructions

New 001 232,468 Conduct Airport Master Plan Study

Northwood Municipal-Vince Field GA 009 361,240 Acquire Snow Removal Equipment, Construct Building

Selection Criteria Year: 2008

Page 26 of 107

Page 27: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL BIS ND 010 38,760 Construct Building

Park River - W C Skjerven Field GA 006 102,264 Construct Snow Removal Equipment Building, Install Runway Lighting - 03/21,

Parshall-Hankins GA 006 107,110Rehabilitate Runway - 12/30 Construct Access Road, Improve Access Road, Install Perimeter Fencing,

Pembina Municipal GA 005 67,006Rehabilitate Runway - 12/30 Rehabilitate Runway - 15/33

Robertson Field GA 006 27,163 Rehabilitate Runway - 14/32, Update Airport Master Plan Study

Rugby Municipal GA 008 205,900 Conduct Airport Master Plan Study, Rehabilitate Runway - 12/30

Sloulin Field International CS 027 282,668 Expand Access Road, Rehabilitate Taxiway

028 42,825 Construct Terminal Building

029 100,000 Safety Management System (SMS) Program

Standing Rock GA 004 113,216 Rehabilitate Apron

State of North Dakota 006 474,854 Update State System Plan Study

Various Locations in North Dakota 004 1,350,000 Install Weather Reporting Equipment (Barnes County Municipal; Beach; Cando Municipal; Mandan Municipal; Mercer County Regional; Rolla Municipal; Stanley

Washburn Municipal GA 008 110,386Municipal; Tioga Municipal; Walhalla Municipal) Conduct Environmental Study, Update Airport Master Plan Study

009 75,182 Conduct Environmental Study

Watford City Municipal GA 009 60,793 Rehabilitate Runway - 12/30, Update Airport Master Plan Study

State Total: 51 Grants 21,247,397

GL BIS SD Aberdeen Regional P 028 741,606 Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway - 13/31, Rehabilitate Taxiway [Taxiway D phase 2]

Black Hills-Clyde Ice Field GA 014 2,007,973 Extend Runway [Phase 3 construction] - 12/30

Brookings Regional GA 020 111,240 Conduct Environmental Study [Phase 2]

Chamberlain Municipal GA 004 50,635 Conduct Environmental Study

Chan Gurney Municipal GA 018 31,350 Rehabilitate Apron [Develop plans and specifications.]

019 630,829 Rehabilitate Apron

Clark County GA 005 281,200 Construct Taxiway [Construction]

Custer County GA 008 25,000 Construct Terminal Building [Phase 2 of GA terminal]

Faith Municipal GA 006 52,337 Conduct Environmental Study

Selection Criteria Year: 2008

Page 27 of 107

Page 28: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

GL BIS SD Faulkton Municipal GA 005 57,000 Acquire Land for Development [Environmental Assessment]

Flandreau Municipal GA 004 356,811 Expand Apron, Extend Taxiway

Harding County GA 004 1,134,335 Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate Taxiway

005 50,000 Conduct Airport Master Plan Study

Harold Davidson Field GA 006 2,099,422 Rehabilitate Runway - 12/30

Hot Springs Municipal GA 006 60,000 Improve Runway Safety Area [Design] - 01/19, Install Weather Reporting Equipment

Huron Regional GA 024 946,889[Design] Construct Snow Removal Equipment Building, Construct Taxiway

025 3,538,760 Rehabilitate Taxiway

Joe Foss Field P 037 5,823,264 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Taxiway, Rehabilitate

038 250,000Apron, Security Enhancements Rehabilitate Runway [design] - 15/33

039 4,017,620 Rehabilitate Runway [Construction phase 1] - 15/33

Madison Municipal GA 007 343,900 Acquire Land For Approaches [Conduct Environmental Assessment], Construct Taxiway [Conduct Environment Assessment], Install Weather Reporting Equipment

Martin Municipal GA 006 50,825[Install AWOS III], Update Airport Master Plan Study [Phase 2] Rehabilitate Runway [Design] - 14/32

Marv Skie-Lincoln County GA 008 100,700 Install Taxiway Lighting, Rehabilitate Parking Lot

Mitchell Municipal GA 022 330,000 Rehabilitate Taxiway

Mobridge Municipal GA 008 80,750 Acquire Land For Approaches [Environmental Assessment]

Murdo Municipal GA 006 25,000 Rehabilitate Apron [Design]

New 002 348,934 Construct New Airport [Develop Plans and Specification]

Parkston Municipal GA 005 31,653 Construct Taxiway [plans and specification], Expand Apron [Plans and

Philip GA 005 156,750specifications] Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS

Pierre Regional P 024 4,288,392[windcone, seg circle] Rehabilitate Taxiway [Construction Phase 2], Rehabilitate Taxiway

Pine Ridge GA 010 295,312 Install Miscellaneous NAVAIDS, Install Runway Lighting [Replace MIRL] - 12/30, Install Runway Vertical/Visual Guidance System [Install PAPI] - 12/30

Rapid City Regional P 035 1,677,252 Acquire Snow Removal Equipment [Blower], Acquire Snow Removal Equipment, Construct Aircraft Rescue & Fire Fighting Building [Design], Improve Access Road, Rehabilitate Apron, Rehabilitate Taxiway

Redfield Municipal GA 005 81,494 Conduct Environmental Study

Selection Criteria Year: 2008

Page 28 of 107

Page 29: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL BIS SD Sisseton Municipal

The Sigurd Anderson

Various Locations in South Dakota

GL CHI

ADO Total:

State Total:

IL

Wall Municipal

Watertown Regional

Wilder

Winner Regional

Abraham Lincoln Capital

Central IL Regional Airport at Bloomington-Normal

Chicago Midway International

Chicago O'Hare International

Chicago/Rockford International

FY 2008

Service Grant Seq AIP Federal Level Number Funds

GA 008 66,500

GA 004 223,250

012 354,312

013 480,400

GA 004 62,230

CS 020 37,126

GA 007 769,500

GA 009 111,240

41 Grants 32,181,791

92 Grants 53,429,188

P 046 1,895,250

047 741,606

048 440,561

P 049 906,470

050 674,762

P 075 2,214,674

076 771,649

P 094 26,500,000

095 18,000,000

096 2,913,107

097 300,000

098 320,000

P 050 1,728,410

Report Date 02/19/2009

Brief Description Of Work

Acquire Land For Approaches [Environmental Assessment]

Construct Taxiway

Acquire Snow Removal Equipment (Gregory Municipal, Flynn Field; Highmore Municipal; Onida Municipal) Rehabilitate Runway (Clark County - 13/31; Custer County - 08/26; Faith Municipal ­13/31; Gettysburg Municipal - 13/31; Hot Springs Municipal - 01/19; Marv Skie-Lincoln County - 16/34; Milbank Municipal - 13/31; Mission Sioux - 11/29; Philip ­12/30; Redfield Municipal - 13/31; Springfield Municipal - 15/33; Sturgis Municipal ­11/29; Wagner Municipal - 08/26) Extend Runway [EA] - 12/30

Expand Terminal Building [Develop Plans and Specifications]

Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate Taxiway

Extend Runway [Environmental Assessment] - 13/31

Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter Fencing, Modify Aircraft Rescue & Fire Fighting Building Rehabilitate Service Road, Widen Taxiway

Acquire Land For Approaches [Phase 1 (24.5 acres)], Conduct Airport Master Plan Study [Phase 1], Rehabilitate Apron [Design] Acquire Safety Equipment and/or Fencing

Acquire Aircraft Rescue & Fire Fighting Vehicle

Rehabilitate Runway - 04R/22L

Rehabilitate Runway [Phase 2 - Last quarter FY 2008] - 04R/22L

Construct Runway [Construct New Runway 9L/27R] - 09L/27R

Noise Mitigation Measures for Residences within 65 - 69 DNL

Noise Mitigation Measures for Public Buildings

Noise Mitigation Measures for Public Buildings

Conduct Miscellaneous Study

Construct Apron

Selection Criteria Year: 2008

Page 29 of 107

Page 30: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

GL

Region

CHI IL

ADO State

Decatur

Worksite

Greater Peoria Regional

Illinois State Block Grant Program

Quad City International

University of Illinois-Willard

Williamson County Regional

GL

State Total:

CHI IN Anderson Municipal-Darlington Field

Arens Field

Clark Regional

FY 2008

Service Level

Grant Seq Number

P

P

051

052

031

032

033

045

046

047

048

069

071

P

P

073

074

075

062

063

064

025

P 026

027

33 Grants

GA

GA

R

020

021

022

007

018

021

AIP Federal Funds

2,150,000

469,195

268,085

502,587

825,170

3,726,800

3,005,785

125,187

2,617,653

16,560,406

4,753,945

3,895,595

9,040,696

760,000

1,363,931

4,252,634

955,397

1,549,035

741,606

199,931

115,170,127

62,510

2,452,395

1,851,969

138,009

2,235,155

38,760

Report Date 02/19/2009

Brief Description Of Work

Extend Runway - 07/25

Acquire Snow Removal Equipment

Update Airport Master Plan Study

Acquire Snow Removal Equipment

Rehabilitate Taxiway

Construct Service Road, Install Perimeter Fencing

Rehabilitate Terminal Building [Phase 5]

Acquire Land For Approaches

Acquire Land For Approaches, Construct Terminal Building [Phase 5B]

Non primary development projects in state block grant program

Non primary development projects in state block grant program, Non primary development projects in state block grant program Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Expand Access Road

Rehabilitate Runway - 09/27

Rehabilitate Runway [Phase 2] - 09/27

Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master Plan Study Acquire Land For Approaches

Acquire Land For Approaches [Parcel 42], Construct Terminal Building [(Design) ­Phase II]

Install Perimeter Fencing

Construct Taxiway

Construct Taxiway [Last Phase]

Conduct Environmental Study, Remove Obstructions

Extend Runway [Phase 2 Design and Land Acquisition] - 18/36

Extend Runway [Phase 2a Design and Land Acquisition] - 18/36

Selection Criteria Year: 2008

Page 30 of 107

Page 31: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL CHI IN Columbus Municipal

Crawfordsville Municipal

Daviess County

De Kalb County

Delaware County - Johnson Field

Delphi Municipal

Elkhart Municipal

Evansville Regional

Fort Wayne International

Frankfort Municipal

Freeman Municipal

French Lick Municipal

Fulton County

Gary/Chicago International

Goshen Municipal

Greensburg-Decatur County

Greenwood Municipal

FY 2008

Service Grant Seq Level Number

GA 020

GA 006

007

GA 010

GA 015

016

GA 017

018

GA 009

GA 019

020

P 044

P 049

050

GA 010

011

012

GA 009

010

GA 007

008

GA 008

GA 022

GA 010

GA 003

004

GA 022

AIP Federal Funds

2,425,088

183,688

38,760

117,172

908,509

58,481

111,240

38,760

855,269

111,240

26,088

1,205,264

2,521,586

1,593,408

111,240

1,282,255

100,869

111,240

38,760

261,240

38,760

190,476

5,111,240

91,162

111,240

38,760

178,098

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Apron

Rehabilitate Apron, Rehabilitate Runway - 04/22

Rehabilitate Apron

Extend Taxiway [Extend Txy]

Install Perimeter Fencing, Install Weather Reporting Equipment

Install Perimeter Fencing, Install Weather Reporting Equipment

Install Airport Beacons, Update Airport Master Plan Study

Update Airport Master Plan Study

Rehabilitate Runway - 18/36

Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Environmental Study, Update Airport Master Plan Study Update Airport Master Plan Study [Phase 2]

Conduct Environmental Study, Conduct Miscellaneous Study, Improve Runway Safety Area - 04/22, Rehabilitate Taxiway Lighting, Update Airport Master Plan Study Install Guidance Signs, Rehabilitate Runway - 05/23, Security Enhancements

Security Enhancements

Rehabilitate Runway - 04/22, Rehabilitate Runway - 09/27

Rehabilitate Runway - 04/22, Rehabilitate Runway - 09/27

Construct Taxiway [Design (complete)]

Rehabilitate Taxiway [Reimburse Design of Taxiway A Rehab (Overlay) Phase 1]

Construct Terminal Building [Phase 2], Rehabilitate Taxiway [Reimburse Design of Taxiway A Rehab (Overlay) Phase 1a] Extend Taxiway, Remove Obstructions

Extend Taxiway [Taxiway Paving Design (Phase 2)]

Construct Snow Removal Equipment Building

Extend Runway - 12/30

Install Perimeter Fencing, Update Airport Master Plan Study

Acquire Existing Airport

Acquire Existing Airport

Rehabilitate Taxiway [Design for Ph1], Update Airport Master Plan Study

Selection Criteria Year: 2008

Page 31 of 107

Page 32: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL CHI IN Griffith-Merrillville R 008 167,200 Conduct Environmental Study, Construct Taxiway [Design]

Huntingburg GA 010 25,650 Rehabilitate Runway - 09/27

011 574,750 Rehabilitate Runway - 09/27

Huntington Municipal GA 008 111,240 Rehabilitate Taxiway [Design - Phase 1], Update Airport Master Plan Study

009 310,410 Rehabilitate Taxiway [Pave]

Indianapolis Executive R 014 111,240 Update Airport Master Plan Study

015 38,760 Update Airport Master Plan Study

Indianapolis International P 105 12,500,000 Construct Apron, Construct Service Road, Construct Taxiway, Improve Airport

106 1,842,637Drainage, Remove Obstructions [Relocate ATCT] Rehabilitate Runway - 05L/23R, Rehabilitate Taxiway

Jasper County GA 003 222,490 Install Runway Lighting [Phase 1] - 18/36, Install Taxiway Lighting

004 38,760 Install Runway Lighting [Phase 2] - 18/36

Kendallville Municipal GA 014 125,213 Improve Airport Drainage [design storm water improvements (Phase 1) and clear Parcel 18], Rehabilitate Taxiway

015 43,629 Improve Airport Drainage [stormwater design improvements (Phase 2)]

Kentland Municipal GA 004 71,250 Extend Runway [Design] - 09/27

Kokomo Municipal GA 015 80,000 Rehabilitate Apron

016 1,218,760 Extend Runway [Extend RW and TW and Relocate Road - Design (Phase 1)] ­05/23, Improve Runway Safety Area [Design - Phase 1] - 05/23, Rehabilitate Apron, Remove Obstructions

La Porte Municipal GA 014 81,700 Expand Apron [Design], Rehabilitate Apron [EA & Design]

Logansport/Cass County GA 013 111,240 Acquire Land For Approaches, Extend Runway [Reimburse Design (Phase 1)] ­09/27

014 38,760 Extend Runway - 09/27

Madison Municipal GA 012 397,740 Install Runway Vertical/Visual Guidance System [Phase 1 Construction] - 03/21

Marion Municipal GA 014 150,257 Update Airport Master Plan Study

015 52,354 Update Airport Master Plan Study

Mettel Field GA 012 2,234,846 Conduct Environmental Study, Construct Taxiway, Construct Taxiway

Michigan City Municipal GA 010 333,722 Construct Terminal Building

011 116,278 Construct Terminal Building [Phase 2]

012 250,000 Extend Runway [Supplemental Date Generation for Environmental Review] - 02/20

Selection Criteria Year: 2008

Page 32 of 107

Page 33: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL CHI IN New 002 39,944 Conduct Environmental Study

003 84,451 Conduct Environmental Study

New Castle-Henry County Municipal GA 006 1,539,000 Rehabilitate Runway - 09/27

North Vernon GA 009 111,240 Conduct Environmental Study [Environmental for Widlife Fence, and Apron and 5-23

010 38,760Overlay], Install Perimeter Fencing [PH1 Install 10' wildlife fencing Des] Install Perimeter Fencing [PH2 Install widlife & security fence design]

Paoli Municipal GA 007 108,865 Install Runway Vertical/Visual Guidance System - 02/20, Remove Obstructions

Perry County Municipal GA 005 452,200 Install Perimeter Fencing

Peru Municipal GA 009 195,472 Rehabilitate Apron

Plymouth Municipal GA 010 111,240 Acquire Land For Approaches [3.94 acres of parcel 11]

011 38,760 Acquire Land For Approaches [1.57 acres of Parcel 11]

Porter County Municipal GA 018 111,240 Rehabilitate Apron [EA/Design]

019 208,000 Rehabilitate Taxiway

Salem Municipal GA 009 99,013 Acquire Land for Development [Balance of Parcel 5], Rehabilitate Apron [Final

Shelbyville Municipal GA 018 125,160

reconstruction phase], Update Airport Master Plan Study [ALP Revision to match EA Justifcation] Rehabilitate Apron

019 38,760 Rehabilitate Apron

Smith Field GA 007 148,727 Update Airport Master Plan Study

008 51,822 Update Airport Master Plan Study

South Bend Regional P 036 2,422,900 Acquire Snow Removal Equipment, Construct Service Road, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 09L/27R, Rehabilitate Runway ­18/36, Rehabilitate Taxiway

037 220,400 Safety Management System (SMS) Program

State of Indiana 005 412,500 Conduct aeronautical survey for WAAS approach

Sullivan County GA 009 76,807 Construct Building

Terre Haute International-Hulman Field GA 033 431,378 Rehabilitate Runway - 05/23

034 4,041,384 Rehabilitate Runway - 05/23

Virgil I Grissom Municipal GA 006 102,600 Conduct Airport Master Plan Study, Install Perimeter Fencing

007 23,750 Install Perimeter Fencing

Warsaw Municipal GA 008 45,590 Conduct Environmental Study

Selection Criteria Year: 2008

Page 33 of 107

Page 34: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL CHI IN White County

State Total:

ADO Total:

GL DET MI Alpena County Regional

Bishop International

Capital City

Charlevoix Municipal

Cherry Capital

Chippewa County International

Delta County

Detroit Metropolitan Wayne County

Gerald R. Ford International

FY 2008

Service Grant Seq AIP Federal Level Number Funds

008GA 111,240

009 134,570

87 Grants 57,413,350

120 Grants 172,583,477

CS 013 746,225

P 044 2,576,029

045 903,719

P 042 9,392,885

043 611,799

P 010 404,130

P 034 1,197,000

P 022 912,576

023 305,792

024 890,000

P 029 112,575

030 50,350

P 085 18,281,315

086 1,000,000

087 3,800,000

088 2,207,046

089 604,659

090 1,607,960

P 040 3,619,500

Report Date 02/19/2009

Brief Description Of Work

Construct Terminal Building

Acquire Land for Development [Acquire land for development(reimbursement)], Construct Terminal Building

Improve Airport Drainage, Improve Utilities, Update Airport Master Plan Study

Acquire Land for Development, Construct Sand and Chemical Storage Building, Construct Taxiway, Expand Apron Acquire Land for Development

Acquire Land for Development, Conduct Airport Master Plan Study, Extend Runway - 10R/28L, Improve Runway Safety Area - 10R/28L Improve Terminal Building

Acquire Snow Removal Equipment, Acquire Snow Removal Equipment, Acquire Snow Removal Equipment, Rehabilitate Runway - 09/27, Remove Obstructions Acquire Snow Removal Equipment, Conduct Environmental Study, Construct Service Road, Extend Runway - 10/28, Remove Obstructions Rehabilitate Taxiway

Rehabilitate Runway Lighting [Rehabilitate Electrical Vault] - 16/34, Rehabilitate Runway Lighting [Rehabilitate Electrical Vault (Phase 2)] - 16/34, Rehabilitate Taxiway Rehabilitate Building [Rehabilitate Hangars #151 and #155 (Design)]

Acquire Easement For Approaches, Construct Snow Removal Equipment Building [Construction Phase-1] Remove Obstructions

Construct Apron, Construct Runway - 04L/22R, Environmental Mitigation

Rehabilitate Taxiway [Part 1]

Construct Deicing Containment Facility

Rehabilitate Runway [Design] - 09L/27R

Construct Apron, Construct Runway - 04L/22R, Environmental Mitigation

Rehabilitate Taxiway [Parts 2 and 3]

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Land For Approaches, Acquire Land for Development, Acquire Snow Removal Equipment

Selection Criteria Year: 2008

Page 34 of 107

Page 35: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

GL DET MI Houghton County Memorial 027

028

P 801,337

201,161

MBS International

Michigan State Block Grant Program

Muskegon County

Pellston Regional Airport of Emmet County

Sawyer International

037

038

055

056

057

058

059

060

061

029

029

025

026

P

P

P

P

1,530,925

1,143,723

15,376,749

4,010,000

4,395,941

1,987,000

3,556,505

1,400,000

3,151,240

2,816,935

416,575

743,011

4,697,500

Willow Run

027

031R

71,250

8,540,464

032 93,892

State Total: 37 Grants 104,157,768

GL DET OH Akron Fulton International

Akron-Canton Regional

015

047

GA

P

179,550

1,665,000

Alexander Salamon

048

049

007GA

10,203,000

944,028

152,266

Ashtabula County 009GA 111,240

Report Date 02/19/2009

Brief Description Of Work

Acquire Snow Removal Equipment [Design & Specs], Rehabilitate Access Road

Acquire Aircraft Rescue & Fire Fighting Vehicle [Design & Specs], Acquire Miscellaneous Land, Acquire Snow Removal Equipment [Acquire Front-End Loader] Construct Terminal Building

Construct Terminal Building [Phase 2 Design]

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Acquire Easement For Approaches, Improve Runway Safety Area - 14/32

Acquire Land for Development

Rehabilitate Runway - 01/19

Improve Building [Hangars 402 (Phase-2); 400 & 600 Series Hangars Improvements.] Improve Building [Hangar Improvements (Design FY09 MAP Projects)]

Improve Airport Miscellaneous Improvements, Improve Runway Safety Area ­05L/23R, Improve Runway Safety Area - 05R/23L Rehabilitate Runway - 05R/23L

Install Runway Vertical/Visual Guidance System - 07/25

Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Terminal Building [Construct Phase VI] Extend Runway - 05/23

Extend Runway - 05/23

Conduct Miscellaneous Study, Improve Airport Drainage, Install Weather Reporting Equipment, Remove Obstructions Rehabilitate Apron

Selection Criteria Year: 2008

Page 35 of 107

Page 36: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL DET OH

Bluffton

Bolton Field

Brown County

Butler County Regional

Cambridge Municipal

Carl R Keller Field

Carroll County-Tolson

Cincinnati Municipal Airport Lunken Field

Cincinnati West

Cleveland-Hopkins International

Clinton Field

Columbiana County

Cuyahoga County

FY 2008

Service Grant Seq Level Number

010

GA 010

R 019

GA 006

R 018

019

GA 007

008

GA 024

025

GA 006

R 020

GA 007

008

P 083

084

085

086

087

088

GA 005

GA 010

011

R 018

019

AIP Federal Funds

51,431

38,760

218,899

125,443

461,240

116,816

601,374

30,535

1,284,806

236,413

91,487

333,722

164,913

43,173

17,829,854

5,240,000

880,000

2,367,000

621,857

3,604,774

163,621

199,212

106,843

1,423,030

38,760

Report Date 02/19/2009

Brief Description Of Work

Improve Runway Safety Area - 08/26, Rehabilitate Apron, Rehabilitate Runway ­08/26Acquire Miscellaneous Land, Install Weather Reporting Equipment [Design]

Conduct Miscellaneous Study, Install Perimeter Fencing, Rehabilitate Taxiway

Construct Snow Removal Equipment Building, Expand Apron

Construct Taxiway

Construct Taxiway, Rehabilitate Apron

Improve Runway Safety Area - 04/22, Remove Obstructions

Install Runway Vertical/Visual Guidance System - 04/22, Install Weather ReportingEquipment, Rehabilitate Runway - 04/22Extend Taxiway, Rehabilitate Runway - 09/27

Extend Taxiway, Rehabilitate Runway - 09/27

Acquire Snow Removal Equipment, Rehabilitate Runway - 07/25, RemoveObstructionsConduct Miscellaneous Study, Install Miscellaneous NAVAIDS, Rehabilitate Apron,Rehabilitate Taxiway [Preliminary Design]Construct Taxiway [site preparation]

Construct Taxiway

Construct Runway - 06L/24R, Extend Runway - 06R/24L

Noise Mitigation Measures for Residences within 65 - 69 DNL, Noise MitigationMeasures for Residences within 70 - 74 DNLConduct Noise Compatibility Plan Study [Conduct Part 150 Study Update]

Construct Apron [Design], Construct Taxiway [Design], Rehabilitate Taxiway[Design]Construct Runway - 06L/24R

Improve Runway Safety Area - 10/28

Acquire Miscellaneous Land, Improve Airport Drainage, Rehabilitate Runway ­03/21, Rehabilitate TaxiwayConstruct Snow Removal Equipment Building

Construct Snow Removal Equipment Building

Conduct Airport Master Plan Study, Rehabilitate Taxiway, Rehabilitate Taxiway

Conduct Airport Master Plan Study

Selection Criteria Year: 2008

Page 36 of 107

Page 37: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

GL DET OH Darke County

Dayton-Wright Brothers

Delaware Municipal

Fairfield County

Fayette County

Fostoria Metropolitan

Fulton County

Galion Municipal

005

009

010

014

015

016

017

006

008

007

007

GA

R

GA

GA

GA

GA

GA

GA

71,250

111,240

20,391

325,690

38,704

229,337

77,759

13,395

308,579

290,151

604,408

Gallia-Meigs Regional

Geauga County

Greater Portsmouth Regional

007

008

011

012

011

012

GA

GA

GA

111,240

27,045

111,240

38,760

111,240

38,760

Greene County-Lewis A. Jackson Regional GA 012 285,911

Hardin County

Harrison County

Highland County

James A Rhodes

James M Cox Dayton International

013

GA 006

GA 007

008

GA 007

GA 007

P 064

065

066

067

068

38,760

40,375

123,677

38,760

226,060

80,852

4,000,000

2,000,000

3,272,762

475,000

1,260,116

Report Date 02/19/2009

Brief Description Of Work

Acquire Land For Approaches

Install Perimeter Fencing

Install Perimeter Fencing

Acquire Land For Approaches

Acquire Land For Approaches

Acquire Land for Development [Phase 1 - Approx. 1.2 acres], Construct Taxiway

Acquire Land for Development [Phase 2 - Approx. 1.1 acres]

Expand Apron

Extend Runway - 09/27

Extend Runway - 18/36, Remove Obstructions

Improve Airport Drainage, Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate Taxiway Install Weather Reporting Equipment, Update Airport Master Plan Study

Update Airport Master Plan Study

Improve Airport Drainage

Improve Airport Drainage

Install Perimeter Fencing

Install Perimeter Fencing, Rehabilitate Runway - 18/36

Remove Obstructions

Extend Taxiway, Install Taxiway Lighting

Construct Taxiway, Update Airport Master Plan Study

Improve Utilities, Rehabilitate Runway - 13/31

Improve Utilities, Rehabilitate Runway - 13/31

Rehabilitate Taxiway Lighting

Remove Obstructions

Improve Runway Safety Area - 06R/24L

Construct Service Road

Improve Airport Drainage, Rehabilitate Taxiway [Taxiways C and J]

Update Miscellaneous Study

Construct Service Road, Construct Taxiway, Rehabilitate Taxiway [Taxiway H]

Selection Criteria Year: 2008

Page 37 of 107

Page 38: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL DET OH Kelleys Island Land Field GA 007 90,579 Acquire Land For Approaches, Update Airport Master Plan Study

Knox County GA 012 1,330,000 Extend Runway - 10/28

Lakefield GA 011 854,104 Acquire Miscellaneous Land, Extend Runway - 08/26

Lebanon-Warren County GA 007 350,750 Acquire Land For Approaches, Remove Obstructions

008 38,760 Acquire Land For Approaches

Lima Allen County GA 010 27,500 Conduct aeronautical survey for WAAS approach

011 1,127,500 Extend Runway - 09/27, Rehabilitate Apron, Rehabilitate Taxiway

Madison County GA 012 45,315 Modify Access Road, Rehabilitate Runway - 09/27

Mansfield Lahm Regional GA 023 3,422,151 Rehabilitate Runway - 14/32

Marion Municipal GA 018 111,240 Acquire Land For Approaches, Remove Obstructions

Metcalf Field R 019 111,240 Update Airport Master Plan Study

020 38,760 Rehabilitate Runway [Design, Phase 1] - 14/32

Miami University GA 006 103,416 Conduct aeronautical survey for WAAS approach, Install Taxiway Lighting, Install Weather Reporting Equipment

Monroe County GA 008 24,795 Rehabilitate Apron, Rehabilitate Taxiway

Neil Armstrong GA 011 111,240 Construct Snow Removal Equipment Building, Construct Terminal Building, Remove Obstructions

Newark-Heath GA 020 111,240 Acquire Land For Approaches

021 38,760 Acquire Land For Approaches

Ohio State University R 024 344,750 Conduct Noise Compatibility Plan Study

025 38,760 Rehabilitate Runway - 09R/27L

026 5,600,000 Rehabilitate Runway - 09R/27L, Safety Management System (SMS) Program

Ohio University Snyder Field GA 013 449,764 Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS

014 231,704 Acquire Easement For Approaches, Acquire Land For Approaches

Perry County GA 006 118,909 Acquire Land for Development, Improve Runway Safety Area - 08/26

007 171,000 Acquire Land for Development, Rehabilitate Runway - 08/26

Pickaway County Memorial GA 009 50,174 Install Perimeter Fencing, Rehabilitate Runway - 01/19, Remove Obstructions

Pike County GA 006 38,613 Conduct Environmental Study, Improve Airport Drainage

Port Columbus International P 066 8,300,000 Construct Apron, Construct Taxiway, Extend Taxiway

067 57,893 Security Enhancements

Selection Criteria Year: 2008

Page 38 of 107

Page 39: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL DET OH

Portage County

Put-in-Bay

Putnam County

Richard Downing

Rickenbacker International

Ross County

Sidney Municipal

Springfield-Beckley Municipal

Toledo Express

Union County

Van Wert County

Vinton County

Wadsworth Municipal

Wayne County

Williams County

Wood County

Youngstown-Warren Regional

FY 2008

Service Grant Seq Level Number

068

069

GA 021

022

GA 014

015

GA 006

GA 014

CS 036

037

GA 011

GA 011

GA 018

P 065

066

067

068

GA 016

GA 010

011

GA 006

007

GA 010

011

GA 016

GA 005

GA 018

019

P 035

AIP FederalFunds

1,789,885

521,429

265,928

470,203

338,898

58,023

67,690

81,700

1,979,437

2,228,842

566,240

79,334

26,466

750,000

1,700,732

50,000

135,304

127,246

233,366

135,358

150,000

155,037

380,991

132,749

102,600

239,429

76,000

39,272

970,421

Report Date 02/19/2009

Brief Description Of Work

Expand Apron

Expand Apron

Acquire Land For Approaches

Acquire Land For Approaches

Acquire Land for Development [Root Parcels], Install Perimeter Fencing [phase 1]

Improve Airport Drainage, Install Perimeter Fencing

Remove Obstructions

Rehabilitate Runway - 04/22

Rehabilitate Runway - 05R/23L

Rehabilitate Runway - 05R/23L

Acquire Land for Development, Extend Taxiway, Remove Obstructions

Remove Obstructions

Rehabilitate Runway - 06/24, Rehabilitate Taxiway

Construct Access Road

Rehabilitate Taxiway

Update Airport Master Plan Study

Update Airport Master Plan Study

Construct Access Road, Install Perimeter Fencing, Rehabilitate Taxiway

Rehabilitate Runway - 09/27

Rehabilitate Runway [Phase-2] - 09/27

Improve Runway Safety Area - 09/27, Remove Obstructions

Improve Runway Safety Area - 09/27, Remove Obstructions

Acquire Land for Development

Acquire Land for Development

Remove Obstructions

Acquire Land For Approaches, Acquire Land for Development, Update Airport Master Plan Study Install Perimeter Fencing

Construct Terminal Building, Rehabilitate Runway - 18/36

Acquire Safety Equipment and/or Fencing, Improve Airport Drainage, Install

Selection Criteria Year: 2008

Page 39 of 107

Page 40: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

GL DET OH 035

036 246,687

State Total: 118 Grants 101,338,693

ADO Total: 155 Grants 205,496,461

GL MSP MN Aitkin Municipal-Steve Kurtz Field

Albert Lea Municipal

008

006

007

GA

GA

169,480

1,125,845

922,000

Austin Municipal

Baudette International

010

005

GA

GA

50,740

221,960

Bemidji Regional 018

019

P 1,241,606

257,125

Blue Earth Municipal

Brainerd Lakes Regional

006

007

029

GA

P

111,852

19,000

2,678,150

Cambridge Municipal

Chandler Field

Chisholm-Hibbing

Cook Municipal

Crystal

Detroit Lakes-Wething Field

030

007

008

024

002

004

005

006

GA

GA

P

GA

R

GA

1,032,026

133,970

193,872

1,792,248

182,266

250,170

87,167

340,515

Report Date 02/19/2009

Brief Description Of Work

Guidance Signs, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

Acquire Aircraft Deicing Equipment

Expand Apron, Improve Access Road [Pave east-west hangar access road]

Construct Runway - 16/34

Construct Runway [Plaza street relocation phase 2 (bridge over Bancroft Creek)] ­16/34 Update Airport Master Plan Study

Install Runway Lighting - 12/30, Install Runway Vertical/Visual Guidance System ­12/30 Construct Taxiway [Construct Taxiway connector], Improve Terminal Building

Construct Apron [Design/construct compass calibration pad.], Construct Taxiway [Design Taxiway C/F and adjoining apron segment], Update Airport Master Plan Study [Update airport layout plan] Acquire Snow Removal Equipment

Extend Runway [EA phase 2] - 16/34

Acquire Aircraft Deicing Equipment, Acquire Snow Removal Equipment [Broom Portion (Phase 2)], Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS [Supplemental Windcone], Rehabilitate Runway [Runway 5/23 Rehabilitate Phase 1 Design] - 05/23, Rehabilitate Taxiway [Design and construct shoulder paving Phase 2, design and rehabilitate parallel taxiway 5/23], Rehabilitate Terminal Building [Replace Terminal HVAC Control System] Rehabilitate Runway [Reconstruct Runway 5/23 - Phase 1] - 05/23

Install Miscellaneous NAVAIDS, Rehabilitate Access Road, Widen Taxiway

Rehabilitate Runway [Rehabilitate Airport Runways and] - 13/31

Extend Taxiway, Install Miscellaneous NAVAIDS, Rehabilitate Taxiway

Acquire Snow Removal Equipment, Conduct Airport Master Plan Study

Rehabilitate Runway - 14L/32R

Rehabilitate Runway - 14L/32R

Acquire Snow Removal Equipment [Tractor and Snowblower], Improve Terminal

Selection Criteria Year: 2008

Page 40 of 107

Page 41: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL MSP MN 006 Building

Dodge Center GA 004 69,905 Install Perimeter Fencing, Rehabilitate Runway Lighting - 16/34, Rehabilitate

Duluth International P 044 1,225,437Taxiway Construct Access Road, Construct Apron, Construct Taxiway, Install Airport Beacons

045 6,529,821 Construct Terminal Building, Improve Runway Safety Area - 09/27, Rehabilitate Runway - 03/21

Ely Municipal GA 009 61,465 Expand Apron [North Apron Expansion], Rehabilitate Runway [Crack Repair] ­12/30

Eveleth-Virginia Municipal GA 008 414,256 Conduct Airport Master Plan Study, Install Guidance Signs, Rehabilitate Apron

Fairmont Municipal GA 009 128,250 Install Perimeter Fencing, Rehabilitate Apron, Remove Obstructions

Falls International P 020 742,445 Construct Taxiway, Rehabilitate Parking Lot

Fergus Falls Municipal-Einar Mickelson Field GA 008 421,985 Construct Snow Removal Equipment Building [Construct SRE Building - Phase II]

Fillmore County GA 007 23,480 Improve Building

Flying Cloud R 008 583,740 Construct Service Road, Extend Runway - 10L/28R

009 38,760 Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System ­10L/28R

010 2,000,000 Extend Runway [Phase 1: Site Preparation (clearing, grubbing, excavation, grading, & fencing)] - 10R/28L

Fosston Municipal GA 004 407,478 Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building, Construct Taxiway [Environmental Assessment], Expand Apron [Expand Runway

Glenwood Municipal GA 004 1,267,34616 turnaround], Install Perimeter Fencing Conduct Airport Master Plan Study, Construct Access Road, Construct Parking Lot, Construct Taxiway, Rehabilitate Runway - 15/33, Rehabilitate Taxiway [Rehabilitate

Grand Marais/Cook County GA 009 244,198taxiways A & B, aprons A, B1, & B2], Remove Obstructions Conduct Environmental Study, Install Perimeter Fencing

Grand Rapids/Itasca County Airport-Gordon Newstrom Field

GA 014 1,321,432 Construct Runway [Runway 5/23] - Plan-1, Install Airfield Guidance Signs [Rwy 5/23], Install Runway Lighting [Medium Intensity Runway Lights] - Plan-1, Install

Hawley Municipal GA 005 42,655Runway Vertical/Visual Guidance System [PAPIs and REILs] - Plan-1 Construct Terminal Building [Construct terminal building (Phase II)]

Hector Municipal GA 004 130,509 Acquire Snow Removal Equipment, Construct Terminal Building

Hutchinson Municipal-Butler Field GA 008 80,940 Rehabilitate Runway - 15/33

Lac qui Parle County GA 005 236,435 Rehabilitate Apron

Lake Elmo R 006 220,895 Rehabilitate Apron, Rehabilitate Taxiway

Selection Criteria Year: 2008

Page 41 of 107

Page 42: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Level

GL MSP MN

Le Sueur Municipal GA

Litchfield Municipal GA

Little Falls/Morrison County-Lindbergh Field GA

Longville Municipal GA

Mahnomen County GA

Mankato Regional GA

Minneapolis-St Paul International/Wold- P Chamberlain

Minneapolis/St Paul Metropolitan Area

Montevideo-Chippewa County GA

Moose Lake Carlton County GA

Mora Municipal GA

Owatonna Degner Regional GA

Park Rapids Municipal-Konshok Field GA

Paynesville Municipal GA

Pine River Regional GA

Pipestone Municipal GA

Princeton Municipal GA

Quentin Aanenson Field GA

Redwood Falls Municipal GA

Richard B Helgeson GA

Rochester International P

Number

007

005

006

008

006

007

016

091

092

093

094

002

007

002

007

012

013

009

002

004

004

007

005

007

006

007

025

Funds

38,760

683,313

130,912

370,686

126,706

90,701

217,103

5,000,000

2,964,942

1,535,175

2,853,330

237,500

831,803

189,664

110,810

1,735,430

2,231,500

47,500

45,068

136,989

190,029

57,000

736,435

173,405

371,916

50,624

1,156,540

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Apron, Rehabilitate Taxiway

Rehabilitate Runway [Electrical] - 13/31, Rehabilitate Runway - 13/31

Construct Taxiway, Update Airport Master Plan Study

Expand Apron, Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway Construct Access Road [NE Building Area], Construct Taxiway [NE Building Area], Install Runway Vertical/Visual Guidance System - 13/31 Acquire Snow Removal Equipment [Truck and snowplow], Rehabilitate Runway ­17/35 Acquire Land For Approaches

Construct Runway - Plan-1

Rehabilitate Taxiway

Improve Runway Safety Area - 12R/30L

Rehabilitate Taxiway, Rehabilitate Taxiway

Update Metropolitan System Plan Study

Construct Taxiway

Acquire Snow Removal Equipment, Update Airport Master Plan Study

Acquire Snow Removal Equipment

Construct Runway - Plan-1

Construct Runway - Plan-1

Conduct Environmental Study [Pave and light Runway 18/36]

Construct Building [Phase 1 - 10 Unit T-Hangar]

Acquire Land for Development, Expand Apron, Extend Taxiway [North hangar area taxilane], Install Perimeter Fencing Acquire Snow Removal Equipment, Construct Fuel Farm

Acquire Land for Development

Construct Runway [grading] - Plan-1

Improve Airport Drainage, Update Airport Master Plan Study [Phase 1]

Construct Building [T-Hangar & Site Prep]

Construct Building [T-Hangar Construction Phase 2]

Acquire Snow Removal Equipment, Update Airport Master Plan Study

Selection Criteria Year: 2008

Page 42 of 107

Page 43: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL MSP MN 026 149,557 Rehabilitate Taxiway Lighting

Roseau Municipal/Rudy Billberg Field GA 006 99,573 Improve Airport Drainage

Rush City Regional GA 004 27,426 Construct Runway - Plan-1

Sauk Centre Municipal GA 002 106,483 Construct Building [Construct T-Hangar Phase 1]

Silver Bay Municipal GA 004 40,375 Construct Building [Phase 1 Design]

South St Paul Municipal-Richard E Fleming Field R 011 222,246 Rehabilitate Taxiway

Southwest Minnesota Regional Marshall/Ryan Field

GA 008 111,240 Extend Runway - 12/30

Springfield Municipal GA 006 46,189 Construct Taxiway [EA]

St Paul Downtown Holman Field R 018 7,611,240 Improve Runway Safety Area - 14/32, Rehabilitate Taxiway

019 38,760 Rehabilitate Taxiway

St. Cloud Regional P 020 1,866,606 Improve Terminal Building

Staples Municipal GA 004 104,544 Acquire Snow Removal Equipment [Tractor and blower]

State of Minnesota 005 262,149 Update State System Plan Study

Tower Municipal GA 004 174,221 Acquire Snow Removal Equipment, Conduct Miscellaneous Study [Conduct user study and recommend facilty development plan]

005 23,685 Remove Obstructions [Runway 26 approach, Runway 8/26 primary surface]

Wadena Municipal GA 004 56,240 Conduct Airport Master Plan Study [Condduct master plan study including ALP update]

Walker Municipal GA 003 37,335 Construct Taxiway

Warroad International Memorial GA 009 268,044 Rehabilitate Runway - 13/31

Willmar Municipal-John L Rice Field GA 009 31,920 Install Miscellaneous NAVAIDS

Windom Municipal GA 005 138,994 Acquire Snow Removal Equipment, Extend Runway [EA] - 17/35

Winona Municipal-Max Conrad Field GA 004 47,500 Remove Obstructions

Winsted Municipal GA 003 142,500 Conduct Airport Master Plan Study, Install Miscellaneous NAVAIDS

Worthington Municipal GA 009 178,810 Rehabilitate Runway [Design] - 17/35

State Total: 89 Grants 61,100,902

GL MSP WI Austin Straubel International P 037 40,150 Acquire Land For Approaches [Acquire Parcel No. 90a for approach protection]

Central Wisconsin P 037 391,400 Acquire Snow Removal Equipment

Chippewa Valley Regional P 028 3,711,252 Improve Terminal Building

Selection Criteria Year: 2008

Page 43 of 107

Page 44: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

GL MSP WI 029

Dane County Regional-Truax Field P 041

042

General Mitchell International P 053

054

Report Total:

Region Total:

ADO Total:

State Total:

La Crosse Municipal

Outagamie County Regional

Rhinelander-Oneida County

Wisconsin State Block Grant Program

P

P

P

19 Grants

108 Grants

1064 Grants

2457 Grants

031

032

032

033

034

026

031

032

033

034

035

NE ANE CT Bradley International P 046

Selection Criteria Year: 2008

AIP Federal Funds

526,950

9,195,201

5,600,062

2,653,470

5,000,000

3,230,000

360,968

1,677,986

559,329

700,000

741,606

12,681,653

3,460,000

4,900,000

4,000,000

3,843,786

63,273,813

124,374,715

555,883,841

3,471,166,652

5,000,000

Report Date 02/19/2009

Brief Description Of Work

Acquire Snow Removal Equipment [Snow Blade attachment], Improve Terminal Building [Phase 3 Civil Site Work Bldg East Side], Remove Obstructions [Runway 14 Tree Clearing], Runway Incursion Markings [Enhanced Taxiway Centerline Markings] Acquire Equipment, Expand Apron [Phase 1 - Relocate glycol ponds], Rehabilitate Taxiway Construct Taxiway [design], Expand Apron [Phase 2 - Expand apron], Install Runway Incursion Caution Bars, Rehabilitate Taxiway [design] Improve Airport Drainage, Install Perimeter Fencing, Install Runways Incursion Caution Bars, Rehabilitate Runway - 01R/19L, Rehabilitate Service Road, Rehabilitate Taxiway Construct Runway Safety Area - 01L/19R, Construct Runway Safety Area ­07R/25L Extend Runway - 18/36

Improve Terminal Building [design]

Construct Taxiway

Construct Taxiway

Install Perimeter Fencing

Install Apron Lighting, Rehabilitate Runway Lighting [Rehabilitate RWY 9/27 HIRLs;signage; electrical vault] - 09/27, Rehabilitate Taxiway Lighting Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Noise Mitigation Measures for Residences within 65 - 69 DNL

Page 44 of 107

Page 45: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NE ANE CT 047 11,055,140 Rehabilitate Runway [Phase II] - 06/24

Danbury Municipal R 027 440,639 Acquire Land For Approaches [Wooster School Easements and Greiner]

028 180,595 Improve Runway Safety Area - 08/26

029 1,256,375 Acquire Land For Approaches [greiner]

030 336,646 Remove Obstructions [for night operations]

Groton-New London GA 025 2,016,402 Rehabilitate Taxiway

Meriden Markham Municipal GA 010 734,965 Rehabilitate Apron [Phase II]

Tweed-New Haven P 033 10,348,492 Construct Runway Safety Area [Phase III] - 02/20

034 141,659 Construct Runway Safety Area [Phase II reimburseable agreement] - 02/20

State Total: 10 Grants 31,510,913

NE ANE MA Barnes Municipal GA 027 1,843,000 Rehabilitate Runway [PH I Safety Areas] - 15/33

028 3,486,500 Construct Apron

Barnstable Municipal-Boardman/Polando Field P 045 2,733,491 Acquire Land for Development [Blackburn]

Beverly Municipal R 027 152,475 Update Airport Master Plan Study

Chatham Municipal GA 018 65,455 Rehabilitate Runway [Ph II (Design Only)] - 06/24

General Edward Lawrence Logan International P 093 9,690,000 Construct Runway - Plan-1

094 19,724,330 Construct Taxiway [Phase I]

095 9,546,494 Construct Taxiway [Phase I-A]

Harriman-And-West GA 019 1,376,550 Construct Runway Safety Area - 11/29, Environmental Mitigation

Laurence G Hanscom Field P 026 2,862,654 Construct Runway Safety Area - 05/23

Lawrence Municipal R 027 210,197 Construct Runway Safety Area [Phase I - EA] - 05/23

Mansfield Municipal GA 020 204,250 Remove Obstructions

Marshfield Municipal - George Harlow Field GA 015 605,150 Conduct Environmental Study [Final]

Marthas Vineyard P 031 662,130 Rehabilitate Runway Lighting - 15/33

032 79,476 Remove Obstructions

033 73,664 Remove Obstructions [Phase II]

Nantucket Memorial P 045 4,802,502 Construct Terminal Building [Phases III]

046 1,670,557 Construct Terminal Building [Phase IV]

Selection Criteria Year: 2008

Page 45 of 107

Page 46: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NE ANE MA New Bedford Regional P 037 574,750 Rehabilitate Runway [Crack Repair and marking both runways] - 05/23

Orange Municipal GA 015 665,000 Acquire Easement For Approaches, Acquire Land For Approaches

Pittsfield Municipal GA 023 178,600 Extend Runway [(Phase III) Geotech Study] - 08/26

Provincetown Municipal P 023 501,600 Rehabilitate Apron [Terminal]

024 399,000 Conduct Environmental Study [Permitting]

Southbridge Municipal GA 016 111,583 Construct Building [Phase II]

017 38,417 Construct Building [III]

Turners Falls GA 013 152,000 Conduct Environmental Study

Westover ARB/Metropolitan GA 016 2,500,000 Acquire Land for Noise Compatibility within 75 DNL

Worcester Regional P 036 3,061,850 Construct Runway Safety Area [Phase I - (29) EMAS] - 11/29

037 3,534,000 Rehabilitate Runway [TZ & CL - 3000'] - 11/29

038 3,173,000 Construct Runway Safety Area [RWY 11 end EMAS blocks (no delivery)] - 11/29

State Total: 30 Grants 74,678,675

NE ANE ME Auburn/Lewiston Municipal R 017 106,780 Update Airport Master Plan Study [ALP Update]

Augusta State CS 018 47,500 Remove Obstructions, Update Miscellaneous Study [SPCC]

019 475,000 Acquire Aircraft Rescue & Fire Fighting Vehicle

Bangor International P 045 3,231,703 Acquire Friction Measuring Equipment, Acquire Handicap Passenger Lift Device,

046 1,047,999Acquire Snow Removal Equipment, Improve Terminal Building Improve Terminal Building [Phase II]

Caribou Municipal GA 012 227,973 Construct Taxiway

Central Maine Airport of Norridgewock GA 011 72,200 Remove Obstructions [Obstruction Analysis]

Dewitt Field,Old Town Municipal GA 006 758,100 Rehabilitate Taxiway [Taxiway Turnaround]

Dexter Regional GA 004 171,000 Remove Obstructions [design only]

Eastern Slopes Regional GA 013 234,650 Rehabilitate Runway [Crack Sealing] - 14/32

Greenville Municipal GA 011 209,000 Rehabilitate Taxiway

Hancock County-Bar Harbor P 025 442,130 Construct Runway Safety Area [Design] - 04/22, Runway Incursion Markings [Threshold Remarking and Enhanced Marking]

026 427,500 Acquire Aircraft Rescue & Fire Fighting Vehicle

Houlton International GA 011 223,250 Rehabilitate Runway [PH I - Design] - 05/23

Selection Criteria Year: 2008

Page 46 of 107

Page 47: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NE ANE ME Knox County Regional

Machias Valley

Millinocket Municipal

Northern Aroostook Regional

Northern Maine Regional Airport at Presque Isle

Oxford County Regional

Pittsfield Municipal

Portland International Jetport

Sanford Regional

State of Maine

Waterville Robert Lafleur

State Total:

NE ANE NH Lebanon Municipal

Manchester

Report Date 02/19/2009

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

024P 111,391 Acquire Snow Removal Equipment

025 118,750 Conduct Miscellaneous Study [Phase I, RSA study]

026 71,250 Conduct Miscellaneous Study [Terminal development study]

007GA 139,159 Rehabilitate Apron, Update Miscellaneous Study

010GA 331,209 Remove Obstructions [On Airport]

011 70,586 Remove Obstructions [Off airport analysis]

012GA 1,966,500 Rehabilitate Runway - 14/32

026P 6,180,029 Rehabilitate Runway [RSA] - 10/28, Rehabilitate Runway - 10/28

007GA 1,416,130 Light Obstructions, Rehabilitate Runway [Includes MIRLS and PAPI] - 15/33

009GA 91,200 Rehabilitate Apron [Phase I (Design)]

062P 1,667,488 Construct Apron [(South)]

063 1,033,760 Construct Apron [Terminal]

024R 271,700 Construct Taxiway [Phase II (Design)]

008 358,209 Conduct aeronautical survey for WAAS approach, Install Airfield Guidance Signs (Belfast Municipal), Update State System Plan Study

016GA 150,100 Update Airport Master Plan Study

29 Grants 21,652,246

035P 132,161 Acquire Equipment [ada ramp], Acquire Snow Removal Equipment [plow with sander], Runway Incursion Markings

036 229,900 Light Obstructions [design only critical obstructions]

037 107,826 Improve Airport Miscellaneous Improvements

038 193,743 Environmental Mitigation

069P 181,160 Construct Sand and Chemical Storage Building

070 687,045 Security Enhancements [Bollards and window treatments]

071 137,812 Conduct Miscellaneous Study [obstruction analysis]

072 980,585 Rehabilitate Apron [ASR]

073 4,782,247 Noise Mitigation Measures for Residences within 65 - 69 DNL

074 490,806 Construct Sand and Chemical Storage Building

075 389,577 Acquire Land For Approaches [RPZ]

Selection Criteria Year: 2008

Page 47 of 107

Page 48: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

FAA - Office Of Airports

Region ADO State Worksite

NE ANE NH New Hampshire State Block Grant Program

Portsmouth International at Pease

State Total:

NE ANE RI Newport State

North Central State

Theodore Francis Green State

NE

State

ANE

Total:

VT

Westerly State

Burlington International

Edward F Knapp State

Franklin County State

State of Vermont

Various Locations in Vermont

ADO Total:

State Total:

Selection Criteria Year: 2008

Grants Awarded by FY

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

P

001

002

003

038

039

1,991,776

2,033,927

585,502

5,411,778

453,150

16 Grants 18,788,995

GA

R

P

CS

016

019

083

084

085

017

182,326

226,075

3,934,471

5,000,000

417,748

121,465

6 Grants 9,882,085

P

GA

GA

069

070

071

072

009

006

005

006

005

3,239,798

2,261,000

784,130

640,300

341,471

448,108

324,638

237,285

155,476

9 Grants 8,432,206

100 Grants 164,945,120

Report Date 02/19/2009

Brief Description Of Work

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Construct Apron, Improve Terminal Building, Rehabilitate Terminal Building

Acquire Land For Approaches

Conduct Environmental Study

Update Airport Master Plan Study

Construct Taxiway ["M"]

Acquire Land for Noise Compatibility within 70 - 74 DNL

Conduct Environmental Study

Update Airport Master Plan Study

Construct Apron

Acquire Land for Noise Compatibility within 65 - 69 DNL

Construct Apron [Phase II]

Update Airport Master Plan Study

Rehabilitate Runway [Permits and Design] - 05/23

Construct Runway Safety Area - 01/19

Conduct aeronautical survey for WAAS approach, Update State System Plan Study

Update State System Plan Study

Rehabilitate Runway (Caledonia County - 02/20; Edward F Knapp State - 17/35; Franklin County State - 01/19; Hartness State (Springfield) - 11/29; Middlebury State - 01/19; Morrisville-Stowe State - 01/19; Newport State - 18/36; Rutland - Southern Vermont Regional - 01/19; William H. Morse State - 13/31)

Page 48 of 107

Page 49: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

Report Total:

Region Total: 1164 Grants

2457 Grants 3,471,166,652

164,945,120

NM DEN CO Aspen-Pitkin County/Sardy Field P 035 1,000,000 Improve Runway Safety Area - 15/33, Rehabilitate Runway - 15/33

036 356,054 Extend Runway [Environmental Phase II] - 15/33

037 472,484 Rehabilitate Runway [(Phase III)] - 15/33

Centennial R 035 1,500,000 Rehabilitate Taxiway

036 850,000 Expand Snow Removal Equipment Building

038 3,500,000 Rehabilitate Taxiway

Central Colorado Regional GA 011 222,481 Construct Terminal Building

City of Colorado Springs Municipal P 044 9,129,206 Rehabilitate Taxiway

Colorado Plains Regional GA 011 111,240 Rehabilitate Runway - 11/29

012 38,760 Rehabilitate Runway - 11/29

Cortez Municipal CS 024 111,240 Update Airport Master Plan Study

025 38,760 Update Airport Master Plan Study

Craig-Moffat GA 007 111,240 Construct Terminal Building

008 52,723 Construct Terminal Building

Denver International P 047 3,000,000 Rehabilitate Taxiway

048 1,917,752 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment

049 5,654,556 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment

050 7,500,000 Acquire Snow Removal Equipment

051 4,000,000 Expand Apron

Durango-La Plata County P 034 7,978,646 Construct Taxiway

Eagle County Regional P 041 9,415,431 Extend Runway - 07/25, Rehabilitate Runway - 07/25

042 6,993,172 Rehabilitate Runway - 07/25

043 3,000,000 Rehabilitate Runway - 07/25

Fort Collins-Loveland Municipal P 022 741,606 Acquire Snow Removal Equipment, Construct Taxiway

023 258,394 Install Perimeter Fencing

Fremont County GA 009 111,240 Construct Snow Removal Equipment Building

Front Range R 032 2,100,000 Rehabilitate Apron

Selection Criteria Year: 2008

Page 49 of 107

Page 50: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM DEN CO 033 129,072 Rehabilitate Taxiway

034 38,760 Rehabilitate Taxiway

Garfield County Regional GA 017 3,786,705 Improve Runway Safety Area - 08/26

Granby-Grand County GA 006 2,409,064 Improve Runway Safety Area [RSA improvements] - 09/27

Grand Junction Regional P 035 5,717,467 Rehabilitate Runway - 11/29

036 391,980 Update Airport Master Plan Study

Greeley-Weld County GA 019 261,240 Install Perimeter Fencing, Rehabilitate Runway - 09/27

020 38,760 Install Perimeter Fencing

Gunnison-Crested Butte Regional P 038 741,606 Rehabilitate Apron

040 258,394 Acquire Snow Removal Equipment, Rehabilitate Airport Beacons, Rehabilitate

Harriet Alexander Field GA 010 111,240Apron Acquire Snow Removal Equipment

011 60,910 Acquire Snow Removal Equipment

Holyoke GA 006 111,240 Update Airport Master Plan Study

Kit Carson County GA 009 111,240 Rehabilitate Apron

La Junta Municipal GA 007 136,047 Rehabilitate Runway - 08/26

Lamar Municipal GA 015 111,240 Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 18/36, Install Taxiway Lighting

016 38,760 Install Perimeter Fencing

Mc Elroy Airfield GA 007 111,240 Acquire Snow Removal Equipment

008 38,760 Acquire Snow Removal Equipment

Meadow Lake R 015 500,000 Acquire Land For Approaches [Parcels 1D and 6B]

016 126,360 Acquire Land For Approaches

Montrose Regional P 034 708,696 Acquire Aircraft Rescue & Fire Fighting Vehicle

035 119,000 Conduct Miscellaneous Study

Pueblo Memorial CS 027 485,330 Improve Runway Safety Area - 08R/26L, Rehabilitate Runway - 08L/26R

028 5,091,510 Construct Runway [Eniv. Assessment] - Plan-1, Rehabilitate Runway - 08L/26R

Rangely GA 008 491,046 Rehabilitate Runway Lighting - 06/24

Rocky Mountain Metropolitan R 043 4,150,000 Construct Taxiway

044 1,000,000 Construct Taxiway

Selection Criteria Year: 2008

Page 50 of 107

Page 51: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NM DEN CO Spanish Peaks Airfield

State of Colorado

Steamboat Springs/Bob Adams Field

Vance Brand

Yampa Valley

State Total:

NM DEN UT Beaver Municipal

Bryce Canyon

Cal Black Memorial

Cedar City Regional

Delta Municipal

Hanksville

Logan-Cache

Manti-Ephraim

Monticello Municipal Airport

Nephi Municipal

New

Ogden-Hinckley

Parowan

FY 2008

Service Grant Seq Level Number

GA 003

007

GA 017

018

GA 010

011

P 033

034

63 Grants

GA 009

CS 010

GA 011

012

CS 020

021

GA 008

009

GA 002

GA 019

020

GA 006

002

003

GA 011

012

009

R 031

GA 010

AIP Federal Funds

111,240

300,000

121,195

38,760

261,240

45,178

803,000

3,182,852

102,304,117

206,874

111,240

263,480

91,805

778,684

271,316

111,240

38,760

168,934

117,315

38,760

111,240

405,342

828,135

111,240

38,760

10,000,000

2,398,000

111,240

Report Date 02/19/2009

Brief Description Of Work

Update Airport Master Plan Study

Conduct aeronautical survey for WAAS approach, Update State System Plan Study

Acquire Snow Removal Equipment [(funds include $9,955 NPR FY07)]

Acquire Snow Removal Equipment

Improve Access Road [Improve embankment and barriers.]

Improve Access Road

Acquire Aircraft Rescue & Fire Fighting Vehicle

Rehabilitate Taxiway [design]

Install Perimeter Fencing

Rehabilitate Access Road

Conduct Environmental Study

Conduct Environmental Study

Construct Taxiway [Taxilanes], Rehabilitate Runway Lighting - 02/20

Construct Taxiway

Install Perimeter Fencing

Install Perimeter Fencing

Install Weather Reporting Equipment

Update Airport Master Plan Study

Update Airport Master Plan Study

Construct Taxiway

Construct New Airport [Design and Grading Phase 1]

Construct New Airport

Install Weather Reporting Equipment

Install Weather Reporting Equipment

Construct New Airport [Construction, Sch I]

Construct Taxiway

Conduct Airport Master Plan Study

Selection Criteria Year: 2008

Page 51 of 107

Page 52: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM DEN UT Provo Municipal GA 028 190,592 Install Apron Lighting

029 66,408 Install Apron Lighting

Richfield Municipal GA 009 1,400,000 Construct Runway - 01/19

Roosevelt Municipal GA 008 226,165 Improve Runway Safety Area - 07/25, Rehabilitate Apron

009 78,803 Improve Runway Safety Area - 07/25

Salt Lake City International P 087 3,132,868 Rehabilitate Taxiway

088 5,900,000 Rehabilitate Apron

089 399,650 Conduct Environmental Study

090 1,051,186 Rehabilitate Taxiway

Spanish Fork-Springville GA 016 1,689,471 Rehabilitate Runway - 12/30

State of Utah 008 410,000 Conduct State System Plan Study, Conduct aeronautical survey for WAAS approach

Vernal Regional GA 022 1,023,314 Acquire Miscellaneous Land

Wendover P 019 741,606 Construct Terminal Building

020 258,394 Construct Terminal Building

State Total: 33 Grants 32,770,822

NM DEN WY Cheyenne Regional/Jerry Olson Field P 039 1,073,675 Rehabilitate Runway [Construction] - 13/31

040 5,374,096 Rehabilitate Runway - 13/31

041 0 No projects assigned.

Converse County GA 018 222,480 Rehabilitate Apron

Dixon GA 009 111,240 Rehabilitate Runway - 06/24

Gillette-Campbell County P 030 954,266 Improve Airport Miscellaneous Improvements

031 175,000 Improve Terminal Building

Jackson Hole P 039 3,138,536 Rehabilitate Taxiway

Johnson County GA 013 1,075,320 Rehabilitate Runway [Construction] - 13/31

014 448,588 Rehabilitate Runway - 13/31

Lusk Municipal GA 008 171,076 Construct Building

009 38,760 Construct Building

Miley Memorial Field GA 009 111,240 Strengthen Apron

Selection Criteria Year: 2008

Page 52 of 107

Page 53: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM DEN WY Natrona County International P 044 150,000 Conduct Airport Master Plan Study

045 783,581 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Equipment

046 256,750 Acquire Handicap Passenger Lift Device, Security Enhancements

North Big Horn County GA 010 466,247 Rehabilitate Runway Lighting - 09/27

Phifer Airfield GA 005 111,240 Rehabilitate Apron

Pine Bluffs Municipal GA 008 226,050 Construct Fuel Farm

Ralph Wenz Field GA 015 111,240 Update Airport Master Plan Study

016 38,760 Update Airport Master Plan Study

Riverton Regional P 026 2,109,098 Rehabilitate Apron

027 516,789 Rehabilitate Apron

028 1,000,000 Construct Taxiway

Rock Springs-Sweetwater County P 023 88,350 Construct Building [design only]

Sheridan County P 033 280,000 Rehabilitate Aircraft Rescue & Fire Fighting Building, Rehabilitate Terminal Building

South Big Horn County GA 014 1,950,364 Improve Runway Safety Area - 15/33

State of Wyoming 005 54,105 Conduct aeronautical survey for WAAS approach

Worland Municipal CS 018 3,600,000 Construct Runway - 16/34

State Total: 29 Grants 24,636,851

ADO Total: 125 Grants 159,711,790

NM HLN MT Bert Mooney P 037 373,264 Conduct Environmental Study, Improve Airport Miscellaneous Improvements [Phase I - design], Install Guidance Signs

Billings Logan International P 034 1,869,268 Construct Taxiway, Improve Airport Drainage, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway

Colstrip GA 011 1,282,000 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­06/24, Rehabilitate Runway [Phase II - construction] - 06/24, Rehabilitate Runway Lighting - 06/24

012 285,000 Rehabilitate Apron, Rehabilitate Taxiway [A], Rehabilitate Taxiway [hangar access]

Conrad GA 004 173,000 Install Weather Reporting Equipment, Rehabilitate Runway - 06/24, Update Airport

Dawson Community GA 009 279,872Master Plan Study Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment

Ekalaka GA 006 197,512 Construct Snow Removal Equipment Building

Selection Criteria Year: 2008

Page 53 of 107

Page 54: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

NM HLN MT Ennis - Big Sky GA 010 2,290,423 Extend Runway [Phase 1 - construction] - 16/34, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Runway Lighting - 16/34, Rehabilitate Taxiway

011 405,114 Extend Runway [Phase II - construction] - 16/34

Eureka GA 008 212,325 Construct Snow Removal Equipment Building

Frank Wiley Field GA 010 2,377,400 Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30

011 95,608 Rehabilitate Taxiway

Glacier Park International P 035 735,905 Acquire Interactive Training System, Acquire Snow Removal Equipment, Rehabilitate Runway [Phase I - design] - 02/20

Great Falls International P 036 5,537,492 Rehabilitate Taxiway [Phase I - design and partial construction]

038 1,142,449 Rehabilitate Taxiway [Phase I - partial construction], Rehabilitate Taxiway Lighting [Phase I - partial construction]

Harlem GA 005 121,951 Install Miscellaneous NAVAIDS, Install Perimeter Fencing [Phase I - design], Rehabilitate Runway Lighting - 11/29

Helena Regional P 034 3,386,649 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Aircraft Rescue & Fire Fighting Building [Phase II]

035 561,946 Expand Snow Removal Equipment Building [Phase III]

L M Clayton GA 007 219,450 Conduct aeronautical survey for WAAS approach [Runway 11 and 29],

Laurel Municipal GA 013 166,250Rehabilitate Runway [Phase I - design] - 11/29 Conduct Environmental Study

Lewistown Municipal GA 011 97,375 Conduct aeronautical survey for WAAS approach [Runway 25]

Missoula International P 043 3,533,460 Construct Deicing Containment Facility [Phase II - partial construction]

045 830,000 Construct Deicing Containment Facility [Phase III - partial construction]

046 830,000 Rehabilitate Runway Lighting - 07/25

New 003 29,450 Update Airport Master Plan Study

004 1,973,125 Construct New Airport [Phase IV - construct a portion of grading, drainage, and

005 583,700pavement base course] Construct New Airport [Phase IV - construct remaining portion of grading, drainage, and pavement base course]

Ravalli County GA 009 98,500 Acquire Snow Removal Equipment

Ronan GA 009 297,350 Extend Taxiway

Scobey GA 005 245,514 Construct Fuel Farm

Sidney-Richland Municipal CS 016 168,781 Improve Terminal Building, Rehabilitate Runway - 01/19

State of Montana 007 124,094 Conduct State System Plan Study

Selection Criteria Year: 2008

Page 54 of 107

Page 55: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM HLN MT Terry GA 002 112,000 Install Miscellaneous NAVAIDS, Rehabilitate Runway - 08/26

Thompson Falls GA 005 212,800 Install Miscellaneous NAVAIDS, Install Weather Reporting Equipment, Rehabilitate

Three Forks GA 006 548,409Runway - 07/25, Update Airport Master Plan Study Install Perimeter Fencing

Turner GA 004 280,772 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­07/25, Rehabilitate Runway Lighting - 07/25

White Sulphur Springs GA 004 86,701 Conduct Environmental Study, Rehabilitate Runway [Phase I - Design] - 01/19

Wokal Field/Glasgow International GA 013 104,000 Rehabilitate Runway - 08/26

State Total: 38 Grants 31,868,909

ADO Total: 38 Grants 31,868,909

NM SEA ID Arco-Butte County

Bear Lake County

GA

GA

008

006

240,850

30,000

Install Miscellaneous NAVAIDS, Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting - 06/24 Improve Fuel Farm

Boise Air Terminal/Gowen Field P 049 3,692,478 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Runway - 10L/28R

050 994,796 Rehabilitate Apron

Boundary County GA 007 546,250 Rehabilitate Apron [Phase 3]

Buhl Municipal GA 005 111,240 Update Airport Master Plan Study

006 38,760 Update Airport Master Plan Study

Caldwell Industrial R 018 704,729 Construct Taxiway

Challis GA 004 774,925 Construct Taxiway, Expand Apron, Rehabilitate Apron

005 250,075 Construct Taxiway, Expand Apron, Rehabilitate Apron

Coeur d'Alene Air Terminal GA 028 558,000 Extend Taxiway, Install Perimeter Fencing, Rehabilitate Taxiway

Driggs-Reed Memorial GA 008 111,240 Rehabilitate Runway - 03/21

009 3,111,912 Rehabilitate Runway [Phase 3] - 03/21

Friedman Memorial P 033 741,606 Acquire Snow Removal Equipment, Improve Snow Removal Equipment Building

Gooding Municipal GA 004 71,250 Update Airport Master Plan Study

Idaho County GA 008 84,769 Construct Runway - 07/25

Idaho Falls Regional P 029 8,066,071 Rehabilitate Runway - 02/20, Runway Incursion Markings

030 633,961 Rehabilitate Runway - 02/20

Selection Criteria Year: 2008

Page 55 of 107

Page 56: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NM SEA ID Jerome County

Lemhi County

Lewiston-Nez Perce County

McCall Municipal

McCarley Field

Mountain Home Municipal

Nampa Municipal

New

Pocatello Regional

State Total:

Shoshone County

State of Idaho

NM SEA OR Albany Municipal

Astoria Regional

Baker City Municipal

Bend Municipal

Boardman

Brookings

FY 2008

Service Level

Grant Seq Number

GA

GA

P

GA

GA

GA

GA

P

GA

008

009

011

026

027

013

014

007

008

009

019

020

002

027

028

003

004

35 Grants

GA

GA

GA

GA

009

015

016

009

015

016

GA

GA

004

005

006

AIP Federal Funds

154,680

39,958

563,760

1,254,961

437,261

128,574

44,799

231,815

104,892

179,812

204,715

650,000

2,500,000

741,606

946,647

425,000

295,285

29,666,677

223,629

347,493

120,293

75,000

1,332,097

672,272

468,197

155,037

148,320

Report Date 02/19/2009

Brief Description Of Work

Install Perimeter Fencing

Install Perimeter Fencing

Construct Taxiway

Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Taxiway

Rehabilitate Apron, Rehabilitate Taxiway, Runway Incursion Markings

Conduct Environmental Study

Conduct Environmental Study

Rehabilitate Runway - 01/19, Rehabilitate Taxiway

Rehabilitate Taxiway

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate Taxiway

Update Airport Master Plan Study

Construct Taxiway

Construct New Airport [EIS Phase 2]

Expand Terminal Building [Phase 2], Rehabilitate Apron, Security Enhancements

Rehabilitate Apron

Install Airport Beacons, Install Miscellaneous NAVAIDS, Rehabilitate Runway ­07/25 Update State System Plan Study

Improve Airport Drainage, Install Perimeter Fencing

Construct Taxiway

Construct Taxiway

Update Airport Master Plan Study

Construct Runway - 16/34, Construct Taxiway

Construct Runway - 16/34, Install Runway Vertical/Visual Guidance System ­16/34 Construct Taxiway

Construct Taxiway

Construct Taxiway

Selection Criteria Year: 2008

Page 56 of 107

Page 57: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA OR 007 51,680 Construct Taxiway

Burns Municipal GA 006 344,623 Construct Apron

007 120,077 Construct Apron

Corvallis Municipal GA 013 334,379 Construct Apron, Install Perimeter Fencing

014 116,508 Construct Apron

Cottage Grove State GA 004 700,000 Improve Runway Safety Area - 15/33, Install Apron Lighting, Install Perimeter

Florence Municipal GA 009 82,960Fencing Update Airport Master Plan Study

Gold Beach Municipal GA 007 167,153 Install Perimeter Fencing, Install Weather Reporting Equipment

008 58,241 Install Weather Reporting Equipment

Grant County Regional/Ogilvie Field GA 004 348,236 Extend Runway - 17/35

005 228,335 Extend Runway - 09/27, Extend Runway - 17/35

Grants Pass GA 006 95,000 Update Airport Master Plan Study

Hobby Field GA 007 373,000 Improve Utilities

Illinois Valley GA 003 102,600 Install Perimeter Fencing, Update Airport Master Plan Study

Klamath Falls P 024 3,629,106 Environmental Mitigation [Phase 4]

025 3,258,394 Environmental Mitigation, Rehabilitate Runway [phase 2] - 14/32

La Grande/Union County GA 011 222,481 Rehabilitate Runway - 16/34

012 1,077,519 Rehabilitate Runway - 16/34, Rehabilitate Taxiway

Lebanon State GA 002 1,041,510 Improve Runway Safety Area - 16/34, Install Runway Vertical/Visual Guidance

Mahlon Sweet Field P 040 1,970,120System - 16/34, Rehabilitate Runway - 16/34, Rehabilitate Taxiway Expand Apron, Rehabilitate Apron

041 686,440 Expand Apron, Rehabilitate Apron

McMinnville Municipal GA 010 1,124,398 Construct Taxiway, Rehabilitate Runway - 17/35

011 1,658,146 Rehabilitate Runway - 17/35

McNary Field GA 012 324,238 Extend Taxiway, Install Airfield Guidance Signs

013 90,697 Extend Taxiway

Myrtle Creek Municipal GA 007 87,055 Update Airport Master Plan Study

Newport Municipal GA 016 85,000 Rehabilitate Runway - 16/34, Rehabilitate Taxiway

Portland International P 057 4,625,030 Rehabilitate Apron, Rehabilitate Taxiway

Selection Criteria Year: 2008

Page 57 of 107

Page 58: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA OR 058 1,557,632 Rehabilitate Taxiway

Portland-Hillsboro R 020 2,300,000 Construct Taxiway

Portland-Troutdale R 013 618,872 Construct Taxiway, Install Runway Vertical/Visual Guidance System - 07/25

014 3,216,278 Construct Taxiway, Install Runway Vertical/Visual Guidance System - 07/25

Prineville GA 006 226,240 Conduct aeronautical survey for WAAS approach [Runway ends 10 and 28], Extend Runway - 10/28, Rehabilitate Terminal Building

007 38,760 Extend Runway - 10/28

Roberts Field P 028 5,212,545 Expand Terminal Building [Phase 5 first year construction], Runway Incursion

029 958,274Markings Expand Terminal Building

030 3,000,000 Expand Terminal Building

Rogue Valley International - Medford P 031 2,313,258 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Terminal Building [Phase 5], Runway Incursion Markings

032 589,974 Construct Terminal Building

Roseburg Regional GA 015 94,626 Construct Apron

Scappoose Industrial Airpark GA 015 94,835 Remove Obstructions

Southwest Oregon Regional P 026 741,606 Construct Apron, Construct Terminal Building

027 5,707,504 Construct Taxiway

028 258,394 Construct Apron, Construct Terminal Building

State of Oregon 007 122,000 Update State System Plan Study

Various Locations in Oregon 022 292,083 Rehabilitate Runway (Condon State Pauling Field - 07/25; Ken Jernstedt Airfield ­07/25; Wasco State - 07/25), Rehabilitate Taxiway (Baker City Municipal; City-County; Columbia Gorge Regional/The Dalles Municipal; Joseph State)

State Total: 55 Grants 53,888,145

NM SEA WA Anacortes GA 016 1,024,289 Acquire Emergency Generator, Construct Access Road, Construct Apron, Install Perimeter Fencing, Rehabilitate Taxiway

Arlington Municipal GA 017 1,276,325 Construct Apron, Rehabilitate Taxiway, Strengthen Taxiway

018 207,257 Update Airport Master Plan Study

Auburn Municipal R 014 221,379 Construct Taxiway [phase 2]

015 2,458,464 Construct Taxiway, Rehabilitate Runway Lighting - 16/34

Bellingham International P 038 3,484,557 Construct Aircraft Rescue & Fire Fighting Building, Construct Taxiway, Runway

Selection Criteria Year: 2008

Page 58 of 107

Page 59: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA WA 038 Incursion Markings, Security Enhancements

039 1,232,000 Rehabilitate Apron

Boeing Field/King County International P 035 1,216,388 Rehabilitate Taxiway

036 1,500,000 Noise Mitigation Measures for Residences within 70 - 74 DNL

037 7,831,825 Rehabilitate Taxiway, Runway Incursion Markings

Bowerman GA 009 111,240 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Rehabilitate Runway

Bremerton National GA 020 416,718Lighting - 06/24 Rehabilitate Runway - 01/19

Cashmere-Dryden GA 001 515,074 Acquire Land For Approaches [phase 1 environmental parcel 2 (Town Brothers)], Rehabilitate Apron [phase 1], Rehabilitate Runway - 07/25, Rehabilitate Taxiway

002 126,825 Rehabilitate Apron

Chehalis-Centralia GA 009 181,385 Acquire Land For Approaches [Blaser parcel 3]

010 63,201 Acquire Land For Approaches

Cle Elum Municipal GA 003 1,558,180 Construct Runway - 07/25

Davenport GA 002 189,056 Install Perimeter Fencing, Modify Access Road

Deer Park GA 017 168,277 Update Airport Master Plan Study

Dorothy Scott GA 001 403,985 Construct Apron, Install Perimeter Fencing

Ed Carlson Memorial Field - South Lewis County

GA 003 513,356 Construct Apron, Rehabilitate Apron

Ephrata Municipal GA 010 238,414 Rehabilitate Runway - 02/20

011 2,930,644 Rehabilitate Runway - 02/20

Felts Field R 020 439,289 Install Airfield Guidance Signs

021 62,418 Install Airfield Guidance Signs [Install lighting circuit for south side RW 3L/21R]

Friday Harbor P 022 740,003 Acquire Land for Development

Grand Coulee Dam GA 002 99,750 Construct Taxiway, Improve Runway Safety Area - 03/21, Modify Access Road

Grove Field GA 002 393,430 Conduct Environmental Study

Kelso-Longview GA 013 190,000 Update Airport Master Plan Study

Lake Chelan GA 006 71,183 Install Weather Reporting Equipment

Ocean Shores Municipal GA 005 1,174,931 Construct Taxiway, Extend Runway - 15/33, Install Perimeter Fencing, Rehabilitate

Odessa Municipal GA 002 99,630 Runway - 15/33, Remove Obstructions Install Airfield Guidance Signs, Rehabilitate Runway - 02/20, Rehabilitate Taxiway

Selection Criteria Year: 2008

Page 59 of 107

Page 60: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NM SEA WA Olympia

Pangborn Memorial

Pierce County - Thun Field

Prosser

Pru Field

Pullman/Moscow Regional

Quillayute

Renton Municipal

Richland

Rosalia Municipal

Seattle-Tacoma International

Snohomish County (Paine Field)

Spokane International

FY 2008

Service Grant Seq Level Number

GA 015

016

P 028

GA 011

GA 010

GA 003

004

P 029

030

031

GA 005

R 018

019

GA 017

018

GA 003

P 109

110

111

112

113

114

R 043

044

P 038

039

AIP Federal Funds

3,711,240

1,549,194

639,504

603,975

88,104

365,356

32,595

600,000

920,698

1,283,272

249,867

73,102

3,969,555

75,621

2,068,289

600,218

24,281,078

2,635,208

7,414,647

1,950,145

1,392,364

375,000

3,111,240

3,087,951

4,419,703

2,514,903

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Runway [phase 3 construction] - 17/35, Runway Incursion Markings

Rehabilitate Runway - 17/35

Install Perimeter Fencing, Modify Terminal Building, Rehabilitate Access Road, Rehabilitate Taxiway Construct Taxiway, Install Runway Lighting - 16/34, Update Airport Master Plan Study Extend Runway - 07/25

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­01/19, Remove Obstructions Install Runway Vertical/Visual Guidance System - 01/19

Conduct Airport Master Plan Study

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Friction Measuring Equipment, Conduct Miscellaneous Study, Construct Apron, Runway Incursion Markings, Security Enhancements Construct Apron

Install Perimeter Fencing, Rehabilitate Runway [marking] - 04/22

Rehabilitate Runway - 15/33

Rehabilitate Runway - 15/33

Rehabilitate Runway [phase 1] - 01/19

Rehabilitate Runway - 01/19

Improve Runway Safety Area - 02/20, Install Airfield Guidance Signs, Install Apron Lighting, Rehabilitate Runway - 02/20, Rehabilitate Taxiway Construct Runway [Phase 13] - Plan-1

Noise Mitigation Measures for Residences within 65 - 69 DNL

Acquire Land for Noise Compatibility within 65 - 69 DNL

Noise Mitigation Measures for Public Buildings

Construct Runway [Phase 14] - Plan-1

Safety Management System (SMS) Program

Construct Aircraft Rescue & Fire Fighting Building

Construct Taxiway

Install Runway Incursion Caution Bars, Rehabilitate Taxiway

Install Runway Incursion Caution Bars, Rehabilitate Taxiway

Selection Criteria Year: 2008

Page 60 of 107

Page 61: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NM SEA WA Tri-Cities

Walla Walla Regional

Wilbur

William R Fairchild International

State Total:

ADO Total:

Region Total:

Report Total:

SO ATL GA Augusta Regional at Bush Field

Brunswick Golden Isles

Cherokee County

Clayton County - Tara Field

Cobb County-McCollum Field

Columbus Metropolitan

Daniel Field

Fulton County Airport-Brown Field

Gwinnett County - Briscoe Field

FY 2008

Service Level

Grant Seq Number

P 031

P 024

GA

P

004

025

026

63 Grants

153 Grants

1480 Grants

2457 Grants

P 031

P 026

027

GA 012

013

GA 016

R 025

P 031

GA 013

R 022

R 028

AIP Federal Funds

1,324,206

588,411

108,686

313,991

343,899

101,831,495

185,386,317

376,967,016

3,471,166,652

1,397,495

761,606

455,290

3,211,240

1,345,000

222,481

8,488,200

732,000

139,945

1,383,378

75,670

Report Date 02/19/2009

Brief Description Of Work

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Interactive Training System, Construct Taxiway, Runway Incursion Markings Install Runway Vertical/Visual Guidance System - 02/20, Rehabilitate Apron, Runway Incursion Markings Extend Runway - 02/20, Rehabilitate Runway - 02/20

Update Airport Master Plan Study

Rehabilitate Apron, Rehabilitate Taxiway

Expand Terminal Building [Construction - reimbursement], Install Guidance Signs

Improve Airport Drainage [Design], Install Airfield Guidance Signs, Rehabilitate Taxiway Lighting [Remove & Replace Taxiway Lighting], Runway Incursion Markings [Enhanced Taxiway Centerline Markings] Rehabilitate Taxiway Lighting [Phase 3: Various Airfield Electrical Work (Twy signs, wind cones, REILS, PAPI systems, AWOS, GA Apron Floodlighting)] Extend Runway [site prep phase II] - 04/22

Extend Runway [phase iii - extend runway/ taxiway 700' (pave/ light), includes runway overlay] - 04/22 Acquire Miscellaneous Land [TTF land acquisition (title search, appraisals, surveys)], Extend Runway [Env. Mitigation (phase II)] - 06/24 Rehabilitate Runway - 09/27, Widen Runway [includes relocation of localizer] ­09/27 Construct Aircraft Rescue & Fire Fighting Building [phase II of II reimbursement of FY 07 overrun], Install Miscellaneous NAVAIDS [Relocate Runway 6 Localizer to 1500 ft. from Threshold (Construction)], Rehabilitate Runway [Design] - 06/24 Rehabilitate Terminal Building [Design only]

Construct Taxiway [(culvert redesign/ env reeval)], Construct Taxiway [construct hold bay], Rehabilitate Taxiway [rehab Ty I and G] Conduct Environmental Study

Selection Criteria Year: 2008

Page 61 of 107

Page 62: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO ATL GA Hartsfield - Jackson Atlanta International

Lee Gilmer Memorial

Macon Downtown

Malcolm McKinnon

Middle Georgia Regional

Paulding County (New)

Peachtree City-Falcon Field

Richard B Russell

Savannah/Hilton Head International

Southwest Georgia Regional

State of Georgia

Toccoa - R G LeTourneau Field

Valdosta Regional

Various Locations in Georgia

FY 2008

Service Grant Seq Level Number

P 081

082

083

084

085

GA 014

GA 007

GA 015

P 024

005

006

007

GA 021

022

GA 014

P 044

045

046

P 028

029

003

GA 013

P 024

008

AIP Federal Funds

6,308,300

8,000,000

2,500,000

6,249,295

2,090,442

1,514,220

284,866

1,450,000

774,649

5,000,000

3,000,000

2,613,293

4,150,000

1,453,500

151,612

2,941,338

1,024,837

1,415,277

1,362,763

711,502

600,000

121,993

1,658,018

7,704,769

Report Date 02/19/2009

Brief Description Of Work

Construct Runway - Plan-1

Extend Runway - 10/28

Construct Taxiway [8R end around taxiway]

Rehabilitate Taxiway [Reconstruct Ty M (east end)]

Rehabilitate Taxiway [phase II]

Construct Taxiway [Parallel Taxiway Relocation - RW 11 to RW 22]

Rehabilitate Runway [Rehab Rwy Design] - 10/28, Rehabilitate Runway Lighting[Phase 2] - 10/28Rehabilitate Apron [Phase 2 - Terminal Apron Rehab Construction 1]

Acquire Equipment [Lighted Runway Closure Markers], Install Airfield GuidanceSigns, Rehabilitate Runway Lighting [Phase 2 - Rehab MIRL & MITL] - 13/31Construct New Airport [Rwy Construction Phase II (Rwy Paving & Marking Ph 1;Airfield Lighting & Visual NavAids Ph1)]Construct New Airport

Construct New Airport [Complete Parallel Taxiway Construction (Includes Lighting,Marking, and Visual NAVAIDS)]Construct Apron [Phase I - Design, mitigation, and site prep]

Acquire Land for Development [Area B land acq - Toybox reimbursement,Bearden/Vanechek acquisition]Acquire Equipment, Runway Incursion Markings

Construct Taxiway [G/A Twy Constr - Ph III (SW Quad FBO)], Expand TerminalBuilding [Expand Terminal Phase 5], Extend Taxiway [Phase 1: Taxiway "B"Extension]Extend Taxiway [Phase 2: Taxiway "B" Extension]

Rehabilitate Runway - 18/36

Rehabilitate Taxiway [Construct]

Rehabilitate Taxiway

Conduct State System Plan Study

Construct Taxiway [reimbursement for t-hangar taxiway]

Groove Runway - 17/35, Rehabilitate Taxiway [Rehab Txy]

Acquire Equipment (Barwick Lafayette), Acquire Land For Approaches (Blairsville),Acquire Land for Development (Franklin County), Construct Apron (Cochran; GilmerCounty; Thomson-McDuffie County), Construct Building (Souther Field; Thomaston-

Selection Criteria Year: 2008

Page 62 of 107

Page 63: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO ATL GA

Washington-Wilkes County GA

008

009

007

7,540,946

95,000

Upson County; Waycross-Ware County), Construct Taxiway (Cartersville; Crisp County-Cordele; Elbert County-Patz Field; Habersham County; Kaolin Field; Perry-Houston County; Thomasville Regional), Extend Runway (Greene County Regional ­06/24; Jackson County - 16/34; Metter Municipal - 10/28), Improve Airport Drainage (Decatur County Industrial Air Park), Improve Fuel Farm (Thomaston-Upson County), Install Perimeter Fencing (Early County; Statesboro-Bulloch County), Install Runway Lighting (Brantley County - 01/19), Rehabilitate Apron (Thomaston-Upson County), Rehabilitate Runway (Baxley Municipal - 08/26; Covington Municipal ­10/28; Harris County - 09/27), Rehabilitate Runway Lighting (Cartersville - 01/19; Douglas Municipal - 04/22; Polk County Airport- Cornelius Moore Field - 09/27) Acquire Miscellaneous Land (Clayton County - Tara Field), Conduct aeronautical survey for WAAS approach (Decatur County Industrial Air Park), Construct New Airport (St Marys), Construct Taxiway (Richard B Russell), Extend Runway (Greene County Regional - 06/24), Extend Taxiway (W H 'Bud' Barron), Install Airfield Guidance Signs (Newnan Coweta County), Rehabilitate Apron (Harris County), Rehabilitate Runway (Harris County - 09/27), Rehabilitate Taxiway Lighting (Richard B Russell), Remove Obstructions (Griffin-Spalding County) Construct Taxiway [west parallel taxiway - design only]

State Total: 37 Grants 88,928,925

SO ATL NC Albert J Ellis

Charlotte/Douglas International

P

P

028

057

170,468

22,369,458

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct aeronautical survey for WAAS approach, Rehabilitate Terminal Building [Phase 1 (Design)] Construct Runway [LOI Payment 2] - 18R/36L

Craven County Regional P 028

029

848,512

295,644

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Equipment, Acquire Equipment, Acquire Land for Development [Phase 1], Acquire Land for Development [Phase 2], Acquire Land for Development, Construct Taxiway, Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 04/22 Acquire Land for Development [Phase 1B]

Fayetteville Regional/Grannis Field P 033 2,010,589 Rehabilitate Runway Lighting [[ELECTRICAL VAULT]] - 04/22

034 6,812,956 Rehabilitate Runway [Phase II - Construction] - 04/22

Kinston Regional Jetport at Stallings Field P 025 741,606 Improve Terminal Building

026 258,394 Install Perimeter Fencing

North Carolina State Block Grant Program 033 22,301,499 Non primary development projects in state block grant program

034 17,128,445 Non primary development projects in state block grant program, Non primary

Selection Criteria Year: 2008

Page 63 of 107

Page 64: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite

SO ATL NC

Piedmont Triad International

Pitt-Greenville

Raleigh-Durham International

Wilmington International

State Total:

SO ATL SC Aiken Municipal

Allendale County

Anderson Regional

Barnwell Regional

Beaufort County

Charleston AFB/International

Charleston Executive

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

P

034

054 11,526,972

development projects in state block grant program, Non primary development projects in state block grant program Construct Runway [Construct Runway 5L-23R and associated taxiways; Construct connector taxiway "F"; Extend taxiway "K"; Acquire Land, Phase VII] ­Plan-1

P

055

029

6,470,000

383,347

Extend Taxiway [PHASE 1 OF CONSTRUCTION], Extend Taxiway [PHASE 2 CONSTRUCTION] Expand Terminal Building [PHASE 1 - STUDY], Improve Access Road [PHASE 1 ­DESIGN], Improve Runway Safety Area [PHASE 1 - FEASIBILITY STUDY] - 02/20, Install Instrument Approach Aid - 02/20, Rehabilitate Terminal Building, Remove Obstructions

030 575,340 Improve Access Road [PHASE 2 - CONSTRUCTION]

P

P

034

035

039

040

3,483,220

1,193,929

3,409,992

621,573

Install Guidance Signs, Rehabilitate Runway [PHASE 1] - 05R/23L, Rehabilitate Runway Lighting - 05R/23L, Rehabilitate Runway Lighting - 14/32, Rehabilitate Taxiway Lighting Rehabilitate Runway [PHASE 2 (BALANCE OF FY08 ENTITLEMENT FUNDS)] ­05R/23L Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway, Rehabilitate Terminal Building [Phase I - Design] Improve Terminal Building

18 Grants 100,601,944

GA 011 222,481 Install Perimeter Fencing [Phase I]

GA 012 111,240 Construct Terminal Building [Construction - Reimburse]

GA

GA

016

005

145,697

111,240

Rehabilitate Apron [PHASE 1 - DESIGN], Rehabilitate Taxiway [PHASE 1 - DESIGN], Runway Incursion Markings Construct Building [construct - phase 1]

GA

P

010

029

030

502,189

676,980

2,130,929

Install Runway Lighting [REILS - Design, Bid] - 07/25, Rehabilitate Airport Beacons [Rotating beacon, wind cone, segmented circle], Rehabilitate Runway [Overlay] ­07/25, Remove Obstructions [Tree removal - construction and mitigation] Improve Terminal Building [Jetbridge Replacement], Improve Terminal Building [Replace FIDS - Installation Reimbursement], Install Airfield Guidance Signs [Standardize signage], Rehabilitate Taxiway [Restripe Taxiway & Ramp] Improve Terminal Building [Jetbridge Replacement-Construction]

GA 012 3,201,845 Rehabilitate Runway [EA - Reimbursement] - 09/27, Rehabilitate Taxiway [Phase II ­

Selection Criteria Year: 2008

Page 64 of 107

Page 65: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO ATL SC 012 Construction]

013 208,864 Rehabilitate Runway [Glide Scope Reloc] - 09/27

Columbia Metropolitan P 034 9,844,033 Rehabilitate Runway [Phase II, Construction] - 05/23, Rehabilitate Runway Lighting ­05/23

Columbia Owens Downtown R 011 111,240 Conduct Airport Master Plan Study [Master Plan Update - Phase I]

012 877,132 Rehabilitate Taxiway [Reconstruct taxiway Rwy 31 end]

Conway-Horry County GA 015 294,442 Construct Fuel Farm [Construction], Improve Access Road [Construction]

Darlington County Jetport GA 008 183,577 Rehabilitate Airport Beacons [Replace Airport Bacon], Rehabilitate Runway

Donaldson Center GA 016 230,275

[Relocate Runway 34 Threshold] - 16/34, Update Airport Master Plan Study [Terminal Area Study] Extend Taxiway [Phase 1 - Design]

Florence Regional P 025 1,739,752 Improve Terminal Building [Phase II - Construction]

Georgetown County GA 010 2,041,550 Extend Runway [Construction] - 05/23

Grand Strand GA 014 104,500 Remove Obstructions [Obstruction Removal - Phase III]

Greenville Downtown GA 015 278,101 Acquire Land for Development [Phase 1 - Partial Reimbursement for 1.492 acres of

Greenville Spartanburg International P 040 2,969,733land.] Rehabilitate Runway [PHASE 1 - DESIGN] - 04/22, Rehabilitate Terminal Building

Greenwood County GA 010 147,192[PHASE 1] Improve Runway Safety Area [Rwy 9 RSA Improvements] - 09/27

Hilton Head P 028 879,563 Improve Airport Drainage [RSA Drainage Improvements - Design & Bid], Improve Terminal Building [Design], Install Guidance Signs [Enhanced Taxiway Centerline Marking], Rehabilitate Apron [Joint Replacement - survey, engineering, design & bid], Remove Obstructions [Obstruction removal on south end of runway ­

Lancaster County-Mc Whirter Field GA 011 170,552reimbursement], Update Miscellaneous Study [Update DBE Plan] Rehabilitate Runway [Design] - 06/24

Lee County-Butters Field GA 005 270,541 Construct Apron [Construct Apron and Connecting Taxiway]

Lexington County at Pelion GA 010 75,230 Rehabilitate Apron [Design, Bid]

Marlboro County Jetport - H.E. Avent Field GA 008 101,099 Acquire Land for Development, Conduct Miscellaneous Study [Terminal Area plan]

Mt Pleasant Regional-Faison Field GA 010 111,240 Construct Terminal Building [Reimbursement - Ph I]

Myrtle Beach International P 040

041

2,082,363

5,337,766

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle], Conduct Miscellaneous Study [Pavement Management Study], Improve Terminal Building Acquire Safety Equipment and/or Fencing [Security Fencing and Controls], Conduct Miscellaneous Study [Spill Prevention, Containment, and Counter-measure Plan],

Selection Criteria Year: 2008

Page 65 of 107

Page 66: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO ATL SC 041 Construct Building [ARFF Building - Design], Construct Service Road [ARFF Access and Drainage Improvements - Design], Construct Taxiway [Taxiway R - Design], Install Airfield Guidance Signs [Airfield Re-Designation and Signage], Rehabilitate Apron [Phase I], Rehabilitate Taxiway [Taxiway G - Design/Constr], Security

Newberry County GA 007 2,130,720Enhancements [Security System Replacement] Construct Runway [Construction: Paving, Marking, Lighting] - 4/22

Oconee County Regional GA 016 571,492 Extend Runway [Phase 2 - Runway Profile Modification (LOS) Design & STREAM

017 2,652,000MITIGATION] - 07/25 Extend Runway [Phase 3 - Runway Profile Modification (LOS) - Construction] -

Orangeburg Municipal GA 016 988,20207/25 Construct Apron [Construction]

Pickens County GA 015 379,468 Construct Parking Lot, Construct Terminal Building [PHASE 2 - CONSTRUCTION]

Rock Hill/York County/Bryant Field R 019 913,756 Construct Taxiway [PHASE 2 - CONST. (CORPORATE & T-HANGAR AREA)]

Saluda County GA 006 87,400 Construct Taxiway [Hangar Taxilane (design)]

Santee Cooper Regional GA 006 111,240 Construct Building [Construction - Phase II]

State of South Carolina 007 768,339 Install Perimeter Fencing, Rehabilitate Runway (Charleston Executive - 04/22), Remove Obstructions, Update State System Plan Study

Summerville GA 012 389,400 Acquire Land for Development [Phase I]

Sumter GA 012 111,240 Improve Runway Safety Area [Environmental Assessment & Wetland Mitigation] -

Williamsburg Regional GA 010 1,036,78205/23 Improve Runway Safety Area [Construction Phase 2] - 14/32

Woodward Field GA 016 111,240 Improve Runway Safety Area [Environmental Assessment & Survey and Appraisals] - 06/24

State Total: 42 Grants 45,412,625

ADO Total: 97 Grants 234,943,494

SO JAN AL Anniston Metropolitan GA 023 90,351 Rehabilitate Runway Lighting [Install regulators to prevent circuit overload.] - 05/23,

Ashland/Lineville GA 003 111,240Rehabilitate Taxiway [Rehabilitate taxiway marking to new Part 139 requirement] Install Perimeter Fencing

004 38,760 Install Perimeter Fencing

Atmore Municipal GA 005 81,849 Acquire Land For Approaches [Acquire parcels in Runway 18/36 protection zone,

Auburn-Opelika Robert G. Pitts GA 021 1,977,070 phase 1.] Construct Apron

Selection Criteria Year: 2008

Page 66 of 107

Page 67: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO JAN AL

Bay Minette Municipal

Bibb County

Birmingham International

Blackwell Field

Brewton Municipal

Camden Municipal

Carl Folsom

Centre-Piedmont-Cherokee County Regional

Craig Field

Dauphin Island

Dothan Regional

Folsom Field

Geneva Municipal

George Downer

Guntersville Municipal - Joe Starnes Field

FY 2008

Service Grant SeqLevel Number

022

GA 008

GA 005

P 067

068

069

070

071

072

073

GA 009

GA 005

GA 003

GA 005

GA 005

GA 007

GA 004

P 028

029

GA 016

GA 004

005

GA 005

GA 010

011

AIP FederalFunds

313,133

92,978

44,221

3,505,010

22,000,000

2,032,322

1,214,694

7,200,000

572,104

128,000

266,726

76,417

129,984

33,250

500,071

923,026

135,418

1,388,874

159,960

109,094

37,721

64,076

84,868

756,902

290,700

Report Date 02/19/2009

Brief Description Of Work

Construct Apron [Contruct Apron (Parking and terminal access road)], GrooveRunway - 18/36Construct Taxiway [Design of east portion of parallel taxiway]

Install Runway Vertical/Visual Guidance System - 10/28

Acquire Land for Development

Acquire Land for Noise Compatibility within 65 - 69 DNL

Environmental Mitigation

Acquire Land for Development

Acquire Land for Noise Compatibility within 65 - 69 DNL

Environmental Mitigation

Rehabilitate Taxiway [Taxiway Rehabilitation (1000 feet section repair)], SecurityEnhancementsRehabilitate Apron [Overlay main apron]

Construct Building [Design T-hangar unit (site, access, sturcture, mechanical andelectrical)], Construct Fuel Farm [Design fuel farm]Improve Runway Safety Area - 18/36

Rehabilitate Apron [Reconstruct apron (design only)]

Improve Airport Drainage [drainage needed to prevent premature pavement failure.]

Rehabilitate Apron

Acquire Land For Approaches [Acquire runway protection zone land, phase 1(one parcel).], Rehabilitate RunwayAcquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Taxiway [RehabilitateTaxiway A between connector taxiways F and K.]Rehabilitate Runway [Rehabilitate runway (design only)] - 14/32, Update AirportMaster Plan Study [Update Airport Layout Plan]Conduct aeronautical survey for WAAS approach, Rehabilitate Runway Lighting ­02/20Modify Access Road [Relocate access road (design only)], Rehabilitate Runway[Design runway rehabilitation] - 11/29Rehabilitate Runway [Rehabilitate runway 11/29 - base work.] - 11/29

Rehabilitate Apron

Construct Runway [Wetland Mitigation (Phase 1)] - Plan-1

Construct Runway [Wetland Mitigation (Phase 2)] - Plan-1

Selection Criteria Year: 2008

Page 67 of 107

Page 68: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO JAN AL H. L. (Sonny) Callahan GA 010 95,111 Construct Taxiway [Phase 2 of construct hangar access taxiways], Install Weather Reporting Equipment [Phase 2 of install AWOS]

011 80,167 Install Weather Reporting Equipment [Phase 3 of install AWOS]

Huntsville International-Carl T Jones Field P 054 2,651,512 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Interactive

055 1,182,956

Training System, Construct Sand and Chemical Storage Building, Expand Terminal Building, Install Runway Lighting - 18L/36R Acquire Land for Development

056 893,997 Expand Terminal Building

057 6,342,280 Rehabilitate Runway - 18L/36R

Isbell Field GA 014 223,602 Rehabilitate Taxiway

Jack Edwards GA 022 1,369,977 Install Airfield Guidance Signs [Install signs], Rehabilitate Apron [Overlay main

Lanett Municipal GA 005 141,651apron], Security Enhancements Rehabilitate Runway Lighting [Rehabilitatemedium intensity runway lights] - 08/26

006 30,906 Conduct Airport Master Plan Study

Lawrence County GA 007 37,759 Install Weather Reporting Equipment

MacCrenshaw Memorial GA 007 123,442 Rehabilitate Runway - 14/32

Madison County Executive/Tom Sharp Jr Field GA 019 611,239 Environmental Mitigation, Expand Apron, Rehabilitate Runway - 18/36, Rehabilitate

Marion County-Rankin Fite GA 007 232,275Taxiway Remove Obstructions

Merkel Field Sylacauga Municipal GA 013 80,965 Expand Apron [Expand general aviation apron (design only)], Rehabilitate Taxiway [design only]

Mobile Downtown GA 019 807,744 Improve Airport Drainage [Rehabilitate drainage], Rehabilitate Apron [Phase E1 of rehabilitate apron]

Mobile Regional P

020

041

71,964

1,721,226

Update Airport Master Plan Study [Layout plan update and environmental assessment (phase 1).] Rehabilitate Terminal Building [Phase 1 of construction for installation of sprinkler system in terminal building to meet fire code. Replace lobby lighting. Relocate emergency exit stairwell.]

042 2,341,822 Rehabilitate Taxiway [Construction of TW-A Rehab between TW-C and TW-A1.], Rehabilitate Taxiway [Rehab TW L]

043 599,719 Rehabilitate Terminal Building [Phase 2 of construction for installation of sprinkler system in terminal, replace lobby lighting and relocate emergency exit stairwell.]

Monroe County GA 005 28,738 Rehabilitate Runway Lighting - 03/21

Montgomery Regional (Dannelly Field) P 038 2,285,430 Rehabilitate Runway - 03/21

Selection Criteria Year: 2008

Page 68 of 107

Page 69: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO JAN AL Moton Field Municipal GA 011 198,100 Construct Terminal Building [Phase 1 (Site preparation and grading)]

North Pickens GA 003 32,689 Conduct aeronautical survey for WAAS approach, Construct Apron

Northeast Alabama Regional GA 008 327,010 Install Perimeter Fencing, Remove Obstructions

Northwest Alabama Regional CS 022 2,010,960 Rehabilitate Runway - 18/36

023 342,700 Acquire Aircraft Rescue & Fire Fighting Vehicle

Prattville - Grouby Field GA 011 1,150,828 Expand Apron

Pryor Field Regional GA 015 111,240 Construct Terminal Building

016 38,760 Construct Terminal Building

Roanoke Municipal GA 003 135,000 Acquire Land For Approaches

Robbins Field GA 005 748,600 Improve Runway Safety Area - 05/23, Install Miscellaneous NAVAIDS, Rehabilitate

Rountree Field GA 006 111,240Runway [Phased 2] - 05/23, Widen Taxiway Install Perimeter Fencing

007 39,631 Install Perimeter Fencing

Scottsboro Municipal-Word Field GA 011 437,698 Construct Taxiway, Rehabilitate Runway - 04/22

South Alabama Regional at Bill Benton Field GA 012 4,031,971 Extend Runway [Acquire land for extension (phase 2, approximately 82 acres)] ­11/29, Extend Runway [Close County Road 67.] - 11/29, Extend Runway [Grade,

St Clair County R 009 741,000drain and pave RW extension] - 11/29 Rehabilitate Runway - 02/20

State of Alabama 003 1,184,692 Conduct Miscellaneous Study, Construct Taxiway (Centre-Piedmont-Cherokee County Regional), Install Perimeter Fencing (St Elmo), Rehabilitate Taxiway Lighting (Bessemer), Remove Obstructions (St Elmo)

Talladega Municipal GA 015 831,868 Improve Runway Safety Area - 03/21, Install Perimeter Fencing, Remove Obstructions

016 224,925 Install Emergency Generator, Safety Management System (SMS) Program, Update Airport Master Plan Study

Tuscaloosa Regional GA 022 38,760 Update Miscellaneous Study

Vaiden Field GA 001 205,085 Install Runway Lighting - 16/34, Install Runway Vertical/Visual Guidance System ­

002 139,13116/34 Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Lighting

State Total: 73 Grants 79,395,189

SO JAN MS Belzoni Municipal GA 008 147,601 Construct Building [Hangar]

Selection Criteria Year: 2008

Page 69 of 107

Page 70: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO JAN MS Booneville/Baldwyn GA 009 23,750 Improve Fuel Farm

Brookhaven-Lincoln County GA 007 289,670 Construct Building [T-Hangars - Phase 1]

008 100,929 Construct Building [T-Hangars - Phase 2]

Bruce Campbell Field GA 016 189,681 Install Apron Lighting, Install Taxiway Lighting

C. A. Moore GA 008 67,536 Construct Terminal Building, Install Perimeter Fencing [Phase 1 - Design Only], Install Runway Vertical/Visual Guidance System [Phase 1 - Design Only] - 01/19

Calhoun County GA 006 175,800 Improve Fuel Farm

Clarke County GA 007 143,979 Extend Runway Safety Area [Construct phase 1 of extend safety area] - 16/34,

Cleveland Municipal GA 014 351,325Install Perimeter Fencing [Install perimeter fence (phase 2)] Extend Runway [Acquire Land for RW Extension Phase 2] - 17/35

Copiah County GA 006 71,250 Construct Runway [Environmental Assessment] - 17/35

Crosby Municipal GA 005 176,129 Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway [Seal and Mark RW] - 17/35, Rehabilitate Taxiway [Apply Seal

Dean Griffin Memorial GA 009 47,500Coat] Update Airport Master Plan Study [Update airport layout plan.]

Eupora GA 006 156,441 Install Perimeter Fencing

Fletcher Field GA 014 111,240 Acquire Land for Development [Acquire Land for Development -- Phase 1]

015 286,525 Acquire Land for Development [Acquire Land for Development - Phase 2]

G. V. Montgomery GA 004 32,728 Rehabilitate Runway [Conduct prelimninary condition and design alternatives

George M Bryan GA 013 713,087study.] - 16/34 Construct Heliport/Helipad, Improve Airport Drainage, Install Perimeter Fencing,

Golden Triangle Regional P 040 741,000Rehabilitate Runway - 18/36 Expand Terminal Building, Install Perimeter Fencing, Rehabilitate Runway - 18/36,

041 258,394Update Airport Master Plan Study Expand Terminal Building, Improve Terminal Building, Install Airfield Guidance Signs,

Greenwood-Leflore GA 012 266,878Update Airport Master Plan Study Extend Taxiway

Gulfport-Biloxi International P 063 5,000,000 Acquire Easement for Noise Compatibility within 65 - 69 DNL [Phase 4 of acquire easements], Noise Mitigation Measures for Residences within 65 - 69 DNL [Sound insulation Phase 3]

064 2,722,000 Construct Service Road [Phase 3A of construct service road.], Widen Taxiway [Phase 2 of widen and overlay taxiway C.]

065 2,135,534 Acquire Land For Approaches [Phase 1 of acquire runway protection zone land], Update Miscellaneous Study [Wild Life Hazard Management Plan.]

Selection Criteria Year: 2008

Page 70 of 107

Page 71: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO JAN MS 066 618,671 Conduct Miscellaneous Study [Conduct terminal apron study.], Rehabilitate Taxiway [Rehabilitate pavement joints for Taxiway A.], Security Enhancements [Acquire

067 3,800,000security vehicle] Extend Taxiway [Construct Taxiway J extension (phase 1)]

Hardy-Anders Field Natchez-Adams County GA 019 132,858 Expand Apron

Hattiesburg Bobby L Chain Municipal GA 015 112,480 Improve Airport Erosion Control

Hattiesburg-Laurel Regional P 029 536,282 Construct Access Road [Phase 4], Install Guidance Signs, Security Enhancements

Hesler-Noble Field GA 004 111,240 Extend Taxiway [Preliminary design for taxiway extension.], Install Weather

Hollandale Municipal GA 004 369,407Reporting Equipment Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Lighting - 08/26, Install Taxiway Lighting [MITWL], Widen Runway [Runway

Holly Springs-Marshall County GA 010 287,900Widening] - 08/26 Expand Apron, Rehabilitate Airport Beacons

Houston Municipal GA 008 14,250 Extend Runway - 03/21

Indianola Municipal GA 010 166,785 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Rehabilitate Runway [RW Markings] - 17/35, Rehabilitate Runway Lighting, Rehabilitate Taxiway [TW Markings], Rehabilitate Taxiway Lighting

Jackson-Evers International P 041 3,075,008 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Equipment, Conduct Miscellaneous Study, Improve Terminal Building, Security Enhancements, Update

James H Easom Field GA 006 63,172Airport Master Plan Study Construct Access Road [Access road and parking (design only)], Install Runway Vertical/Visual Guidance System [PAPI installation (design only)] - 13/31, Remove Obstructions

Key Field P 023 686,772 Construct Access Road, Construct Taxiway, Rehabilitate Apron

Kosciusko-Attala County GA 007 16,625 Improve Airport Drainage

Louisville Winston County GA 007 145,825 Acquire Land For Approaches

McComb/Pike County/John E Lewis Field GA 013 1,086,185 Construct Taxiway [Construct Partial Parallel TW]

014 831,931 Expand Apron [Construction of Apron (Phase 1)]

Monroe County GA 011 467,352 Rehabilitate Runway - 18/36

New Albany-Union County GA 010 125,182 Construct Taxiway, Install Airport Beacons

Okolona Municipal-Richard Stovall Field GA 009 162,973 Construct Fuel Farm

Olive Branch R 016 410,000 Improve Airport Drainage, Install Perimeter Fencing, Rehabilitate Apron

Paul Pittman Memorial GA 009 159,245 Construct Building [Construct Hangar 1-Phase 1]

Selection Criteria Year: 2008

Page 71 of 107

Page 72: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO JAN MS 010 27,430 Construct Building [Construct Hangar - Phase 2]

Philadelphia Municipal GA 008 98,087 Improve Airport Miscellaneous Improvements

Prentiss-Jefferson Davis County GA 005 277,204 Construct Building [Hangar]

Roscoe Turner GA 017 233,092 Improve Runway Safety Area - 18/36

Stennis International GA 023 263,266 Improve Airport Drainage

Tishomingo County GA 010 18,710 Install Perimeter Fencing, Rehabilitate Airport Beacons

Trent Lott International GA 023 17,105 Install Perimeter Fencing [Phase 1 of perimeter fence (design only)]

Tunica Municipal P 010 741,606 Acquire Equipment [Loading Ramp], Conduct aeronautical survey for WAAS

011 1,020,672approach, Construct Terminal Building [Phase 1 - Design Only] Expand Apron

Tupelo Regional P 030 5,485,723 Rehabilitate Runway - 18/36, Update Airport Master Plan Study, Widen Runway ­18/36

University-Oxford GA 021 3,850,911 Construct Taxiway, Install Taxiway Lighting

022 400,000 Acquire Aircraft Rescue & Fire Fighting Vehicle

Water Valley Municipal GA 005 215,813 Install Perimeter Fencing

Winona-Montgomery County GA 007 378,282 Construct Taxiway

Yazoo County GA 009 203,426 Expand Apron

State Total: 60 Grants 40,820,447

ADO Total: 133 Grants 120,215,636

SO MEM KY Addington Field GA 012 911,240 Construct Runway Safety Area - 05/23

Ashland Regional GA 009 96,786 Acquire Land for Development

Barkley Regional P 032 793,638 Acquire Equipment, Conduct Miscellaneous Study, Construct Terminal Building [Terminal Location Footprint Study], Expand Access Road, Install Airport Beacons,

033 270,798Security Enhancements [Replace three existing security gates.] Acquire Aircraft Rescue & Fire Fighting Safety Equipment [Breathing packs for ARFF (5 packs.) Existing packs no longer meet NIOSH Standars.], Acquire Emergency Generator, Install Airfield Guidance Signs, Rehabilitate Apron

Big Sandy Regional GA 010 233,824 Install Miscellaneous NAVAIDS, Rehabilitate Apron, Widen Taxiway

Blue Grass P 042 3,511,242 Construct Taxiway, Rehabilitate Taxiway

043 874,981 Construct Taxiway

Selection Criteria Year: 2008

Page 72 of 107

Page 73: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO MEM KY

Bowling Green-Warren County Regional

Bowman Field

Cincinnati/Northern Kentucky International

Cynthiana-Harrison County

Fulton

Gene Snyder

Georgetown Scott County - Marshall Field

Glasgow Municipal

Hancock Co-Ron Lewis Field

Henderson City-County

Hopkinsville-Christian County

Julian Carroll

Kyle-Oakley Field

Lake Cumberland Regional

Lebanon-Springfield

London-Corbin Airport-Magee Field

FY 2008

Service Grant SeqLevel Number

044

GA 020

R 018

P 059

060

061

062

063

064

GA 006

007

GA 005

GA 009

GA 013

014

GA 016

017

018

GA 007

GA 018

019

GA 014

GA 003

004

GA 017

018

GA 016

GA 007

GA 015

AIP Federal Funds

4,500,000

136,817

1,330,000

9,000,000

653,738

2,042,025

5,228,000

5,461,135

711,494

521,294

230,315

111,240

198,344

1,547,095

1,452,003

111,240

727,198

124,056

185,342

112,992

38,760

360,519

245,000

120,579

111,240

38,760

118,486

233,491

303,338

Report Date 02/19/2009

Brief Description Of Work

Construct Runway [Phase 1 of Relocatin of Runway 8-26 to Runway 9-27 which consists of Design and Phase I Construction.] - Plan-1 Acquire Aircraft Rescue & Fire Fighting Vehicle

Construct Taxiway

Construct Runway [FY 2008 Scheduled Payment]

Rehabilitate Apron [Concourse Apron/Taxilane REhab Ph 3]

Expand Terminal Building

Noise Mitigation Measures for Residences within 65 - 69 DNL

Noise Mitigation Measures for Residences within 65 - 69 DNL

Expand Terminal Building [Phase 1A - 4th Quarter Funding]

Construct Apron

Construct Apron

Extend Runway [Environmental Assessment - Phase 1] - 09/27

Install Weather Reporting Equipment, Rehabilitate Apron

Expand Apron

Expand Apron

Acquire Land for Development

Construct Apron

Construct Apron

Construct Fuel Farm

Improve Access Road, Remove obstructions to permit WAAS approach

Improve Access Road [Improve Access Road Phase 2]

Construct Building [Terminal Bldg]

Install Perimeter Fencing

Install Perimeter Fencing [Phase 2 4th Quarter Funding.]

Acquire Land For Approaches [Phase 1]

Acquire Land For Approaches [Phase 2]

Construct Fuel Farm

Install Runway Lighting - 11/29

Construct Building

Selection Criteria Year: 2008

Page 73 of 107

Page 74: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO MEM KY Louisville International-Standiford Field P 081 10,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

082 1,306,250 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Equipment, Rehabilitate

083 3,003,785Apron, Rehabilitate Runway Lighting - 17R/35L Construct Taxiway, Extend Taxiway [Extend Taxiway Echo, Phase I], Rehabilitate

Madison GA 010 90,000Runway Lighting - Plan-1 Construct Taxiway

Madisonville Municipal GA 016 105,975 Acquire Land For Approaches

017 3,216,284 Construct Taxiway [Phase 2 Construction]

Marion-Crittenden County GA 007 185,343 Construct Fuel Farm

Mayfield Graves County GA 009 45,154 Construct Building [Phase 1 - Design & EA]

Middlesboro-Bell County GA 010

011

111,240

38,760

Conduct Airport Master Plan Study, Improve Airport Drainage, Install Runway Distance-To-Go Signs - 10/28 Acquire Snow Removal Equipment, Improve Airport Drainage

Mount Sterling-Montgomery County GA 010 224,797 Acquire Land For Approaches

011 78,326 Acquire Land For Approaches

Muhlenberg County GA 005 1,256,172 Construct Taxiway [Partial parallel taxiway to RWY 23 end.]

006 38,760 Construct Terminal Building [Construct parking lot and drainage structures adjacent

Ohio County GA 007 82,916to new terminal construction.] Acquire Miscellaneous Land [Phase 1 Appraisal, review appraisal,boundary survey and environmental due diligence assessment.], Conduct aeronautical survey for WAAS approach, Update Airport Master Plan Study

Owensboro-Daviess County CS 036 38,760 Acquire Snow Removal Equipment

Pike County-Hatcher Field GA 009 67,749 Install Runway Lighting - 09/27

Princeton-Caldwell County GA 006 66,500 Conduct aeronautical survey for WAAS approach, Improve Airport Miscellaneous Improvements [405 Survey for GPS approaches]

Russellville-Logan County GA 009 219,240 Construct Apron

Samuels Field GA 011 111,240 Acquire Land for Development

012 38,760 Acquire Land for Development

Stanton GA 003 248,000 Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Runway

Stuart Powell Field GA 014 80,000Vertical/Visual Guidance System - 06/24 Acquire Land for Development, Rehabilitate Airport Beacons

Sturgis Municipal GA 008 40,148 Construct Building [Box hangar Design Phase 1]

Taylor County GA 012 111,359 Install Weather Reporting Equipment

Selection Criteria Year: 2008

Page 74 of 107

Page 75: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

SO MEM KY Tucker-Guthrie Memorial

Wayne County

Wendell H Ford

West Liberty

Williamsburg-Whitley County

007

008

005

012

004

010

011

GA

GA

GA

GA

GA

111,240

75,030

396,580

116,327

54,701

222,679

77,588

State Total: 68 Grants 64,506,673

SO MEM TN Lovell Field

McGhee Tyson

044

045

053

054

055

P

P

7,447,997

533,286

3,538,119

2,478,609

1,031,651

Memphis International 073

074

P 5,805,000

12,745,700

075 5,488,328

Nashville International

Tennessee State Block Grant Program

Tri-Cities Regional TN/VA

081

029

030

031

032

048

049

P

P

5,249,896

10,345,642

3,150,000

3,148,441

850,000

976,621

281,762

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Apron, Update Airport Master Plan Study

Rehabilitate Apron [Phase 2 Apron Rehabilitation]

Install Runway Lighting - 03/21

Expand Apron

Construct Runway Safety Area [Phase 1 Environmental Assessment] - 07/25

Construct Terminal Building

Construct Terminal Building

Construct Taxiway, Security Enhancements [Phase 2 Construction]

Security Enhancements [Phase 2 4th Quarter funding.]

Construct Aircraft Rescue & Fire Fighting Building

Construct Taxiway

Construct Aircraft Rescue & Fire Fighting Building [Final Phase, 4th Quarter entitlements.] Rehabilitate Runway [FY 2008 scheduled Payment]

Acquire Snow Removal Equipment [Snow Broom and Dump Trucks with Snow Plows], Construct Apron [Cargo Ramp Ph II], Construct Deicing Containment Facility [Design Phase 1], Construct Taxiway, Improve Airport Erosion Control [Design], Improve Terminal Building, Rehabilitate Apron, Rehabilitate Runway [Design] - 09/27, Rehabilitate Taxiway [Phase 2 Construction Reimbursement], Rehabilitate Taxiway [Rehab Taxiway Victor, East - Design] Construct Apron, Construct Taxiway [Taxiway Papa (Reimbursement)], Update Airport Master Plan Study Rehabilitate Taxiway, Security Enhancements

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Construct Taxiway [Phase 1, Access Road]

Acquire Land For Approaches, Apply Runway Friction Course - 05/23, Construct Taxiway [Environmental Assessment for TW R and Hamilton Road Relocation]

Selection Criteria Year: 2008

Page 75 of 107

Page 76: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

SO MEM TN 050

051

2,577,466

737,200

052

053

1,150,012

1,286,262

State Total: 19 Grants 68,821,992

ADO Total: 87 Grants 133,328,665

SO ORL FL Albert Whitted 017R 138,722

Bartow Municipal 022GA 79,325

Bob Sikes

Boca Raton

023

021

012

GA

R

42,036

2,229,552

1,558,000

Calhoun County

Cecil Field

001

011

012

GA

GA

444,963

275,050

2,267,337

Charlotte County

Craig Municipal

Daytona Beach International

Destin-Fort Walton Beach

022

023

024

019

052

053

054

015

GA

R

P

GA

2,507,364

111,240

376,104

84,881

1,590,756

549,675

554,260

162,384

Eglin AFB 021P 1,852,661

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Apron

Acquire Land For Approaches, Rehabilitate Runway [Phase 1] - 05/23, RehabilitateRunway - 05/23Security Enhancements, Security Enhancements

Rehabilitate Apron

Construct Apron [Northside Ramp - Phase 1 Design], Construct Taxiway [D, Phase1 Design], Install Runway Vertical/Visual Guidance System [Runway 7 End - Phase1 Design] - 06/24Improve Airport Drainage [Improve Airport Drainage - Design Phase], RehabilitateTaxiway [Rehabilitate Taxiway Delta - Design]Rehabilitate Runway [Rehab Runway 05/23 Markings] - 05/23

Rehabilitate Runway [Rehab Runway - Ph 2 Construction] - 17/35

Noise Mitigation Measures for Residences within 65 - 69 DNL [Residential SoundInstallation]Construct Runway [Paving and Marking Runway] - 17/35

Rehabilitate Terminal Building [Terminal Renovation to meet ADA requirements]

Extend Taxiway [Extend Taxiway D (Phase 1)], Rehabilitate Access Road [RehabAccess Road and Terminal Parking Lot], Rehabilitate Terminal Building [TerminalRenovation to meet ADA requirements]Rehabilitate Apron [Reconstruct Terminal Complex North Apron - Phase 1]

Extend Runway [Extend Runway 4 500 feet] - 04/22

Rehabilitate Apron [Reconstruct Terminal Complex North Apron - Phase 2]

Rehabilitate Taxiway Lighting [Rehabilitate Airfield Lighting]

Improve Terminal Building [Bond Repayment for Renovations]

Construct Service Road [Construct Perimeter Road - PH5 (Double Lane Canal)]

Improve Terminal Building [Bond Repayment for Renovations]

Install Runway Vertical/Visual Guidance System [Precision Approach PathIndicator] - 14/32Construct Apron [Construct Air Cargo Apron]

Selection Criteria Year: 2008

Page 76 of 107

Page 77: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO ORL FL Executive

Fort Lauderdale/Hollywood International

Gainesville Regional

Herlong

Hilliard Airpark

Jacksonville International

Kendall-Tamiami Executive

Key West International

Keystone Airpark

Kissimmee Gateway

Lake Wales Municipal

Lakeland Linder Regional

FY 2008

Service Grant Seq Level Number

R 025

P 056

057

058

P 024

025

026

027

R 012

GA 004

P 044

R 007

P 034

035

036

037

038

GA 018

R 030

031

GA 010

R 028

AIP Federal Funds

596,641

14,205,543

1,580,462

2,967,621

1,250,950

1,824,018

171,325

495,558

81,936

111,240

6,413,373

483,550

1,664,272

3,869,416

3,000,000

1,800,152

596,644

111,240

91,675

363,700

92,796

190,000

Report Date 02/19/2009

Brief Description Of Work

Improve Airport Drainage [Ph5 Stormwater Facility]

Construct Taxiway [High Speed TW Exits], Rehabilitate Taxiway [Rehab Taxiways(B east, Q, S, T5)]Rehabilitate Taxiway [Rehab Taxiway AB]

Rehabilitate Taxiway [Rehabilitate and Widen Taxiway B3 and AB]

Rehabilitate Terminal Building [Phase 2B - Terminal Renovations]

Rehabilitate Taxiway [Rehabilitate Taxiway B]

Conduct Noise Compatibility Plan Study

Rehabilitate Terminal Building [Phase 2C - Terminal Renovations]

Rehabilitate Runway - 07/25

Install Runway Lighting [Install Medium Intensity Runway Lights and ThresholdLights RWY 18/36] - 18/36, Rehabilitate Airport Beacons [Rehabilitate RotatingBeacon]Construct Apron [Construct Air Carrier Apron, Phase 4]

Extend Runway [Extend Runway 09R/27L - Design] - 09R/27L

Improve Terminal Building [Terminal Bond Repayment]

Improve Runway Safety Area - 09/27

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation ­Phase 6 Construction]Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation ­Noise Contour Update], Noise Mitigation Measures for Residences within 65 - 69DNL [Noise Mitigation - Phase 6B Construction], Noise Mitigation Measures forResidences within 65 - 69 DNL [Noise Mitigation - Phase 7 Design]Construct Terminal Building [Reimbursement for Terminal Building Construction],Environmental Mitigation [Wildlife Study Implementation]Rehabilitate Runway [Rehab Runway 04/22, plans and specs] - 04/22, RehabilitateRunway Lighting [Rehab Runway 04/22 Lights and electrical Vault] - 04/22,Rehabilitate Taxiway Lighting [Rehab Taxiway A Edge Lights]Widen Taxiway [Construct Run-Up Pad on Taxiway Bravo at Runway 24]

Conduct Noise Compatibility Plan Study [Noise Study - Part 150]

Rehabilitate Taxiway Lighting [Rehab all MITLs]

Conduct Airport Master Plan Study [Conduct Airport Master Plan and Airport LayoutPlan update.]

Selection Criteria Year: 2008

Page 77 of 107

Page 78: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO ORL FL Leesburg International GA 017 111,240 Extend Runway [Extend R/W 13/31 (Wetland Mitigation, Phase II)] - 13/31

018 968,872 Extend Runway [Wetland Mitigation for Runway 31 Extension] - 13/31

Marco Island GA 005 201,875 Construct Taxiway [Taxiway and Aircraft Apron South - Design, Permitting and Bidding]

Marianna Municipal GA 008 95,411 Rehabilitate Runway [Rehab Runway 18/36 Marking] - 18/36

Melbourne International P 031 1,699,550 Security Enhancements [Security Enhancements]

Miami International P 056 4,000,000 Construct Runway [Construct Runway 8/26 (now Runway 8L/26R)] - Plan-1

Naples Municipal P 026 2,741,606 Extend Taxiway [Taxiway B South (Phase 1 and Site work, Grading and Drainage

027 1,858,394for Phase 2)] Extend Taxiway [Taxiway B South]

New 002 28,246,414 Construct New Airport [Construct Airport - PH2 Construction]

New Smyrna Beach Municipal R 012 275,608 Conduct Noise Compatibility Plan Study [Conduct Part 150 Noise Study]

013 169,950 Rehabilitate Runway [Rehab Displaced Thresholds (635'x75')] - 07/25

North Palm Beach County General Aviation R 013 154,222 Rehabilitate Apron [Rehab apron], Rehabilitate Taxiway [Various Taxilanes]

Ocala International-Jim Taylor Field GA 020 3,522,180 Rehabilitate Runway [Rehab Runway 18-36 Design and Construction] - 18/36

021 55,800 Conduct Environmental Study [Environmental Assessment for new Air Traffic Control Tower]

Okeechobee County GA 016 824,496 Improve Runway Safety Area [Rehabilitate Runway 5 safety Area] - 05/23, Install Runway Vertical/Visual Guidance System [Install Vertical Guidance System for Runway 14/32] - 14/32, Rehabilitate Runway Lighting [Rehab Runway Lighting and PAPI] - 05/23

Orlando International P 099 2,000,000 Construct Taxiway [LOI 10 of 10]

100 4,260,855 Construct Runway [LOI 9 of 10] - 17L/35R

101 546,725 Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF Equipment]

102 5,435,487 Rehabilitate Taxiway [Rehab TW C Ph1 Construction]

103 1,449,108 Construct Runway [LOI 9B of 10] - 17L/35R

Orlando Sanford International P 054 2,906,854 Expand Apron [Expand East Terminal Ramp - Phase 3], Extend Runway [Prepare BCA for Runway 09L/27R extension from 9,600 feet to 11,000 feet] - 09L/27R, Extend Runway [Prepare EA for Runway 09L/27L extension] - 09L/27R, Install Taxiway Lighting [Install MITLs on Taxiways R and C (design)], Rehabilitate Runway [Overlay Runway 09L/27R (9,600' x 150')] - 09L/27R, Security Enhancements [Install Security Fencing (Part 1542: 2 Gates and Accesss control system)]

Selection Criteria Year: 2008

Page 78 of 107

Page 79: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

SO

Region

ORL FL

ADO State

Ormond Beach Municipal

Page Field

Palatka Municipal - Lt. Kay Larkin Field

Palm Beach County Glades

Palm Beach County Park

Palm Beach International

Pensacola Regional

Perry-Foley

Quincy Municipal

Sarasota/Bradenton International

Worksite

Sebastian Municipal

Sebring Regional

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

055

056

2,500,000

8,244,937

Acquire Land for Noise Compatibility within 65 - 69 DNL [Noise - Land Acquisition (Relocate 28 Homes) Phases 3 and 4] Rehabilitate Runway [Overlay and Remark Runway 09L/27R (Phase 1)] - 09L/27R

057 1,045,000 Extend Runway [Land Acquisition for Runway 09R/27L Extension] - 09L/27R

R

R

013

015

94,250

6,118,766

Install Miscellaneous NAVAIDS [rotating beacon], Rehabilitate Runway Lighting [MIRL] - 17/35, Rehabilitate Taxiway Lighting [East] Construct Apron [Construct GA Apron]

GA

GA

R

016

017

002

008

111,240

1,292,800

314,692

315,208

Update Airport Master Plan Study [Update Airport Master Plan and Airport Layout Plan] Improve Airport Drainage [Rehab Airfield Drainage], Install Weather Reporting Equipment [Install Automated Weather Observing System (AWOS)], Rehabilitate Taxiway [Rehab Taxiway B] Expand Apron [Expand/Reconfigure Apron], Rehabilitate Taxiway [Rehabilitate Taxilanes] Install Guidance Signs [Airfield Signage Imrpovements]

P 048 301,520 Install Guidance Signs [Airfield Signage Improvements]

P 034 2,195,805 Expand Apron [Expand Air Carrier Apron]

GA 006 234,712 Construct Taxiway [Construct taxilane to T-Hangar facility]

GA

007

004

68,115

264,897

Rehabilitate Runway [Remark Runways (ALL) - Design Phase] - 18/36, Rehabilitate Runway Lighting [Rehab Electrical Vault - Design Phase] - 18/36 Construct Taxiway [Construct taxilanes to public T-Hangars]

P

005

042

043

58,530

3,303,883

944,714

Conduct Airport Master Plan Study [Update Airport Master Plan and create master Stormwater Plan] Conduct Miscellaneous Study [Drainage master plan (Phase 2)], Construct Service Road [Construct service road (Phase 3)], Construct Taxiway [Construct Taxiway G], Rehabilitate Runway Lighting [Airfield lighting (Phase 2)] - 14/32, Rehabilitate Taxiway [Rehabilitate Taxiway A - Phase 1], Rehabilitate Terminal Building [Terminal Curb and Access - Design] Rehabilitate Taxiway [Rehabilitate Taxiway A (Phase 2)]

GA

GA

008

018

228,082

243,357

Construct Access Road [Consruct East Access Road - Design], Construct Taxiway [Construct Taxiway D - Design], Rehabilitate Apron [Rehab Apron and Taxilanes E and F - Design], Update Miscellaneous Study [Stormwater Master Plan Update] Rehabilitate Runway - 14/32, Rehabilitate Taxiway [Develop Plans and Specs for Rehab of Taxiway A-4]

Selection Criteria Year: 2008

Page 79 of 107

Page 80: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO ORL FL Southwest Florida International P 043 3,500,000 Construct Apron

044 1,406,364 Construct Apron [Apron - Midfield Terminal Phase VI], Construct Terminal Building

045 481,083[Construct New Terminal Building Phase V] Construct Apron [Reimbursement for Apron Construction], Construct Terminal

St Augustine R 022 111,240Building [Reimbursement for New Terminal Construction] Widen Taxiway [Widen Taxiway B and B-1 (Design Phase)]

023 703,000 Conduct Environmental Study [Environmental Assessment for Taxiway B and RSA]

St Lucie County International GA 029 5,258,780 Construct Runway [Construct New Runway 9L/27R - Phase 2] - Plan-1, Environmental Mitigation [Environmental Mitigation for Runway 09L/27R], Install

030 38,760Perimeter Fencing [Install Perimeter Fencing - Phase 4] Install Perimeter Fencing [Install Perimeter Fencing]

St Petersburg-Clearwater International P 033 1,550,586 Conduct Environmental Study [Conduct Airfield Drainage Study], Install Guidance Signs [Enhanced Taxiway Centerline Markings (Part 139)], Rehabilitate Aircraft Rescue & Fire Fighting Building, Rehabilitate Terminal Building [Rehab Terminal Phase II], Security Enhancements [Security Enhancements (Vehicle and Radios)]

Tampa International P 049 5,455,062 Construct Taxiway [Construct TW V from V-6 to Runway 18R (Phase 2, Construction)], Rehabilitate Taxiway [Relocate TW W from W-7 to Runway 18R

The Florida Keys Marathon GA 025 80,000(Phase 2, Construction)] Conduct Environmental Study [Preliminary Environmental Assessment], Rehabilitate Taxiway [Rehab Taxiway Markings]

Vero Beach Municipal GA 032 355,625 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Runway Incursion Caution Bars

Wauchula Municipal GA 009 270,164 Construct Apron [Phase 1, Initial]

Williston Municipal GA 009 109,863 Construct Apron [Construct Apron], Construct Taxiway [Construct Taxiway H]

Winter Haven's Gilbert GA 018 312,399 Rehabilitate Runway [Rehabilitate Runway 4/22 (Design)] - 04/22

019 93,661 Update Miscellaneous Study [Update Airport Layout Plan and Airport Property Map]

State Total: 94 Grants 165,918,164

SO ORL PR Antonio/Nery/Juarbe Pol GA 007 159,759 Construct Taxiway [construct taxilane to t-hangar facility]

Benjamin Rivera Noriega GA 011 128,440 Construct Taxiway [Construct taxiway to T-Hangar Development area.]

Fernando Luis Ribas Dominicci CS 005 275,182 Install Airfield Guidance Signs [Install airfield guidance signs - Design Phase], Install Perimeter Fencing [Install perimeter fencing - Design Phase], Rehabilitate Runway [Rehabilitate Runway 09/27 - Design Phase] - 09/27, Rehabilitate Service Road [Rehabilitate Service Road], Rehabilitate Taxiway [Rehabilitate Taxiway A and B

Selection Criteria Year: 2008

Page 80 of 107

Page 81: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Level Number Funds

SO ORL PR 005

Luis Munoz Marin International P 044 82,992

Mercedita P 016 386,193

New 001 1,732,307

002 13,210,686

003 1,903,927

Rafael Hernandez P 021 238,380

State Total: 9 Grants 18,117,866

SO ORL VI Cyril E King P 026 865,265

Henry E Rohlsen P 030 2,047,311

State Total: 2 Grants 2,912,576

ADO Total: 105 Grants 186,948,606

Region Total: 1902 Grants 675,436,401

Selection Criteria Year: 2008

Report Date 02/19/2009

Brief Description Of Work

and connectors - Design Phase]

Security Enhancements [Security Enhancements]

Improve Terminal Building [Passenger Loading Bridges (2) - Design Only], SecurityEnhancements [Security Enhancement]Conduct Environmental Study [Conduct Environmental Assessment], ConductMiscellaneous Study [Conduct Pavement Assessment and Prepare PavementMaintenance Plan], Improve Airport Miscellaneous Improvements [Runway,Taxiway and Apron Marking - Design Phase], Install Guidance Signs [Install AirfieldGuidance Signage - Design Only], Rehabilitate Runway Lighting [Rehab HighIntensity Runway Lights - Design Phase] - Plan-1, Rehabilitate Taxiway Lighting[Rehab Medium Intensity Taxiway Lights - Design Phase], Rehabilitate TerminalBuilding [Rehab Passenger Terminal Building]Improve Airport Miscellaneous Improvements [Runway, Taxiway and ApronMarking - Construction Phase], Install Guidance Signs [Install Airfield GuidanceSignage - Construction Phase], Rehabilitate Runway [Rehab Runway 07/25] - Plan­1, Rehabilitate Runway Lighting [Rehab High Intensity Runway Lights - ConstructionPhase] - Plan-1, Rehabilitate Taxiway Lighting [Rehab Medium Intensity TaxiwayLights - Construction Phase], Rehabilitate Terminal Building [Rehab PassengerTerminal Building - Construction Phase]Rehabilitate Terminal Building [Rehab Passenger Terminal Building - ConstructionPhase Continuation]Improve Terminal Building [install passenger laoding bridges - design only]

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF vehicle], AcquireAircraft Rescue & Fire Fighting Vehicle [Acquire quick response ARFF vehicle]Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire quick response ARFFvehicle], Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire two ARFFvehicles], Acquire Handicap Passenger Lift Device [Handicap passenger liftdevice], Conduct Miscellaneous Study [Conduct Airfield Pavement Evaluation andManagment Program]

Page 81 of 107

Page 82: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

Report Total: 2457 Grants 3,471,166,652

SW AROK AR Adams Field P 067 4,499,475 Extend Runway [Phase V, Extend Runway 18 Construction] - 18/36

068 2,338,425 Runway Incursion Markings [centerline lighting]

069 1,560,077 Extend Runway [Phase V-completion, Extend Runway 18 Construction] - 18/36

Arkansas International GA 002 107,777 Rehabilitate Runway Lighting [Design Only] - 18/36

Bearce GA 006 544,963 Widen Runway [Phase II - Construction] - 08/26

007 155,037 Widen Runway [Completion of Phase 2 Construction] - 08/26

Bentonville Municipal/Louise M Thaden Field GA 007 27,027 Conduct Environmental Study [Conduct environmental assessment for future airport development], Extend Runway [Design runway extension (345') for turnaround] ­

Billy Free Municipal GA 004 282,15118/36, Install Perimeter Fencing [Design perimeter fencing] Construct Taxiway [Phase 2-Construct Taxiway]

Blytheville Municipal GA 010 243,692 Rehabilitate Apron

Calico Rock-Izard County GA 005 125,021 Expand Apron

Carlisle Municipal GA 008 114,469 Install Perimeter Fencing

Carroll County GA 008 161,120 Acquire Land For Approaches

Clarksville Municipal GA 007 23,750 Construct Apron [Phase II of Apron Expansion (Design Only)]

Conway Replacement Airport 001 1,183,700 Construct New Airport [Land Acquisition Phase 1, ~113 Acres]

Corning Municipal GA 012 158,104 Install Weather Reporting Equipment

Danville Municipal GA 001 64,718 Conduct Airport Master Plan Study [Update Airport Layout Plan], Rehabilitate Runway [Phase 1, Design and DBE Plan - Clean and Seal Cracks, Sealcoat Runway and Remark Runway] - 11/29, Rehabilitate Taxiway [Phase 1, Design and DBE - Clean and Seal Cracks, Sealcoat Taxiways and Remark Taxiways]

Delta Regional Airport 003 635,075 Construct New Airport [Acquire Land - Phase B]

004 2,892,108 Construct New Airport [Construction Stage A: Construct Airfield Grading & Drainage - Phase 1; and Design Stage B: Prepare Plans & Specifications for Airfield Grading - Phase 2 and Utility Relocation - Phase 1]

Dexter B Florence Memorial Field GA 008 153,047 Acquire Land For Approaches [~15.9 Acres off Runway 22]

009 262,586 Conduct aeronautical survey for WAAS approach [Preliminary Obstruction Survey

Drake Field GA 036 121,920and ODALs Benefit], Remove Obstructions [Mitigate and Clear Trees, RW 22 RPZ] Improve Runway Safety Area [Conduct EA & prepare preliminary engineering

Fordyce Municipal GA 004 111,379 report] - 16/34 Rehabilitate Apron [Phase 1, East Side of Apron]

Selection Criteria Year: 2008

Page 82 of 107

Page 83: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW AROK AR

Frank Federer Memorial

Harrell Field

Heber Springs Municipal

Horseshoe Bend

Howard County

Jonesboro Municipal

Kirk Field

Marianna/Lee County-Steve Edwards Field

Marion County Regional

Marked Tree Municipal

Memorial Field

Mena Intermountain Municipal

Newport Municipal

Northwest Arkansas Regional

Ozark-Franklin County

Petit Jean Park

Rogers Municipal-Carter Field

GA

GA

GA

GA

GA

CS

GA

GA

GA

GA

CS

GA

GA

P

GA

GA

GA

005

004

009

010

007

001

003

004

015

006

003

005

006

015

014

006

029

030

002

001

002

025

20,862

135,050

358,251

124,825

92,530

366,526

296,533

132,914

611,240

152,389

242,913

152,362

402,468

669,750

172,000

74,349

654,089

3,360,955

266,105

444,963

79,214

3,286,240

Rehabilitate Apron [Phase 2-apron rehab]

Expand Apron [Phase 2]

Install Perimeter Fencing [Phase 1, Survey, Design and Plans and Specifications], Rehabilitate Apron Rehabilitate Apron [Partial Reconstruction]

Acquire Land For Approaches [Acquire Runway 23 RPZ (Phase 2 - Acquire Tracts 1, 2 and 10)] Conduct Airport Master Plan Study, Improve Runway Safety Area - 13/31

Extend Runway [Extend Runway 01 340'] - 01/19

Extend Runway - 01/19

Rehabilitate Taxiway [Rehab Taxiways associated with RW 5/23]

Construct Taxiway, Install Perimeter Fencing

Acquire Land For Approaches [Runway 18 RPZ - Acquire Parcels 1, 2, 3 and 4]

Construct Taxiway [Turnaround on RW 4 end], Rehabilitate Runway [Correct differential settlement] - 04/22 Extend Runway [Design-only] - 18/36, Rehabilitate Runway Lighting - 18/36

Rehabilitate Runway [Phase 2 - Construction, Narrow RW and Relocate Lights] ­13/31 Construct Taxiway [Phase 1 - Runway 17/35 West Parallel Taxiway Design (includes DBE Program and Goals)] Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate Runway Lighting - 18/36 Expand Aircraft Rescue & Fire Fighting Building

Construct Taxiway [Construct Taxiway A - Phase 2 (Reimbursable Agreement, NAVAIDS Engineering, Aeronautical Survey and Taxiway Joint Rehab)], Rehabilitate Apron Install Perimeter Fencing, Remove Obstructions

Install Miscellaneous NAVAIDS [Rehabilitate Windcone], Install Runway Lighting [MIRL] - 03/21, Install Taxiway Lighting [LED MITL system], Rehabilitate Runway [Remove Existing Markings and Remark Runway] - 03/21, Update Airport Master Plan Study [Airport Layout Drawing] Install Runway Lighting - 03/21, Install Runway Vertical/Visual Guidance System [Install PAPI's] - 03/21 Construct Taxiway [Construct parallel TWY A (Ph 3):demo & remove old TWY A,

Selection Criteria Year: 2008

Page 83 of 107

Page 84: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW AROK AR 025 construct mid section south of TWY C, regrade TWY safety area; design south segment of new TWY A; acquire & demo hangars @ south end (est $1,050,000.)

026 1,535,063(Total AIP request: $ 4,370,000)] Construct Taxiway [Construct Taxiway [Construct parallel TWY A (Ph 3a):demo &

Russellville Regional GA 008 658,840remove old TWY A, construct mid section south of TWY C,] Construct Taxiway [Phase 3 - Construct Northwest Segment]

Saline County Regional GA 003 540,822 Expand Apron, Install Taxiway Lighting

Searcy County GA 008 408,022 Construct Taxiway [Phase II - Construct II TW From Apron to RW 5]

009 142,166 Construct Taxiway [Construct parallel taxiway, Phase 2-Construction Stage 2

Searcy Municipal GA 017 511,240(Apron to Runway 5)] Expand Apron [Phase 3, west expansion]

Sharp County Regional GA 006 94,031 Construct Taxiway

Smith Field GA 009 366,413 Construct Apron [Phase 1 - Construct Apron Expansion]

South Arkansas Regional at Goodwin Field GA 014 60,325 Rehabilitate Taxiway [Phase 1, Survey, Design & DBE]

015 598,075 Rehabilitate Taxiway [Phase 2-Construction]

State of Arkansas 007 160,000 Conduct aeronautical survey for WAAS approach

Stuttgart Municipal GA 014 52,820 Rehabilitate Runway [Design-only] - 09/27

015 38,760 Rehabilitate Taxiway

Texarkana Regional-Webb Field P 027 2,495,270 Construct Aircraft Rescue & Fire Fighting Building [Phase 3-Start Construct ARFF

Waldron Municipal GA 004 94,485Facility] Environmental Mitigation [Construct Off-Airport Wetland], Install Perimeter Fencing

Walnut Ridge Regional GA 010 48,830[Complete Perimeter Fencing], Remove Obstructions [Remove Trees] Install Airfield Guidance Signs [Design-only]

Woodruff County GA 002 125,290 Rehabilitate Runway - 09/27

Z M Jack Stell Field GA 005 93,903 Rehabilitate Runway [Seal Cracks, Seal and Remark Runway] - 05/23

State Total: 62 Grants 35,886,504

SW AROK OK Ada Municipal GA 010 3,000,979 Rehabilitate Taxiway [Phase 2 - Rehab North & South Legs]

Altus/Quartz Mountain Regional GA 007 115,825 Install Runway Vertical/Visual Guidance System - 17/35

008 80,180 Install Taxiway Lighting

Alva Regional GA 006 118,750 Construct Runway [Phase 2 complete design] - 17/35

Antlers Municipal GA 003 214,387 Expand Apron

Selection Criteria Year: 2008

Page 84 of 107

Page 85: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SW AROK OK Ardmore Downtown Executive GA 008 58,815 Rehabilitate Apron [Middle Apron Full Depth Reconstruction (Design)]

Ardmore Municipal GA 011 239,095 Rehabilitate Runway Lighting - 13/31

Atoka Municipal GA 005 220,282 Install Perimeter Fencing - -, Update Airport Master Plan Study [Update ALP]

Blackwell-Tonkawa Municipal GA 007 233,700 Rehabilitate Runway - 17/35, Rehabilitate Taxiway, Remove Obstructions

Carnegie Municipal GA 001 132,000 Acquire Land For Approaches - -, Rehabilitate Runway [Phase 1 Formulation of Rehabilitate Rwy pavement.] - 17/35

Chandler Regional GA 008 276,000 Acquire Land For Approaches

Christman Airfield GA 004 123,090 Construct Apron, Rehabilitate Runway - 17/35

Claremore Regional GA 012 33,250 Conduct Airport Master Plan Study

Clinton Regional GA 007 44,650 Construct Taxiway [Phase 1 design]

Cushing Municipal GA 009 237,500 Construct Apron, Rehabilitate Taxiway - ­

David Jay Perry GA 005 273,377 Construct Taxiway [Construct Portion of T-hgr twy.]

006 93,148 Construct Taxiway [Complete construct T-hgr twy.]

Eaker Field GA 006 298,431 Construct Taxiway [Design-only (Note: OAC supplementing w/ $100K grant)],

Fairview Municipal GA 005 136,201Improve Runway Safety Area [Design-only] - 17/35 Construct Taxiway [Design south portion of parallel taxiway], Rehabilitate Apron [Design only.], Rehabilitate Apron [Design only.]

Gage GA 002 68,306 Install Miscellaneous NAVAIDS [Refurbish rotating beacon], Rehabilitate Runway [Complete design to rehab runway.] - 17/35

Grandfield Municipal GA 006 222,775 Install Taxiway Lighting, Rehabilitate Apron

Grove Municipal GA 012 211,263 Rehabilitate Apron [North Apron Crack Seal & Seal Coat], Rehabilitate Runway ­

Guthrie-Edmond Regional GA 010 740,74818/36, Update Airport Master Plan Study Acquire Land For Approaches [Acquire Portion of South RPZ: Wilkens{5 acres} .] ­-

Guymon Municipal GA 010 111,240 Construct Terminal Building [Construct terminal building phase 2]

011 38,760 Construct Terminal Building [Complete terminal building]

Halliburton Field GA 009 111,240 Construct Terminal Building [Phase 2]

Hominy Municipal GA 004 302,100 Improve Runway Safety Area - 17/35, Rehabilitate Apron

Jones Memorial GA 004 171,950 Rehabilitate Taxiway

Lindsay Municipal GA 004 189,192 Rehabilitate Apron

McAlester Regional GA 009 337,746 Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Taxiway

McCurtain County Regional GA 007 81,900 Construct Taxiway [Prepare Preliminary Engineering Report for Parallel TW

Selection Criteria Year: 2008

Page 85 of 107

Page 86: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SW AROK OK

Miami Municipal

Pauls Valley Municipal

Ponca City Regional

Prague Municipal

Richard Lloyd Jones Jr

Sayre Municipal

Seminole Municipal

Shawnee Regional

Skiatook Municipal

South Grand Lake Regional

Stan Stamper Municipal

State of Oklahoma

Stigler Regional

Stillwater Regional

Stroud Municipal

Thomas P Stafford

Tulsa International

Report Date 02/19/2009

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

007 Construction] - -, Improve Airport Drainage [design-only (1B)], Improve Runway Safety Area [Phase 2] - 02/20

012GA 236,550 Construct Taxiway [Base Bid Only]

013 106,400 Construct Taxiway [Additive Alternate #1]

007GA 75,515 Update Airport Master Plan Study

013GA 2,216,613 Construct Taxiway [Ph 2- north portion of taxiway] - ­

003GA 283,552 Extend Runway [Construct Rwy Extension] - 17/35

019R 47,244 Rehabilitate Service Road [Design-only], Rehabilitate Taxiway [Design-only]

020 105,475 Rehabilitate Service Road [Construction - Phase 1 (This grant is a proration of the entire construction bid. Sponsor executing abiolity to advancing entitlement construction in FY08 that will be reimbursed in FY09)]

003GA 69,939 Update Airport Master Plan Study

009GA 248,975 Rehabilitate Taxiway - -, Update Airport Master Plan Study

012GA 307,279 Rehabilitate Apron

004GA 332,500 Extend Runway - 17/35, Extend Taxiway

001GA 797,625 Acquire Existing Airport

008GA 300,000 Construct Apron, Construct Taxiway

008 369,715 Update State System Plan Study

005GA 392,090 Extend Runway - 17/35

006 55,100 Construct Taxiway [This is the second grant in FY2008. Demoplish old taxiway turnaround and construct new taxiway turnaround due to construction of runway extension.]

017GA 99,000 Construct Taxiway [Engineering Report]

005GA 210,900 Construct Taxiway

007GA 932,610 Expand Apron

063P 2,001,112 Rehabilitate Runway [Prepare Preliminary Engineering Report to Rehabilitate RW 18L/36R and Taxiway Juliet] - 18L/36R, Rehabilitate Runway [Rehabilitate RW 8/26 & TWs C & L] - 08/26

064 6,930,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation Phase 9]

065 1,400,329 Construct Taxiway [Construct North Area TW - Phase 1 (Base Bid only)]

066 144,576 Acquire Aircraft Rescue & Fire Fighting Safety Equipment [Acquire Snozzle]

Selection Criteria Year: 2008

Page 86 of 107

Page 87: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SW AROK OK

University of Oklahoma Westheimer

Vinita Municipal

ADO Total:

State Total:

Walters Municipal

Watonga Regional

Waynoka Municipal

Wiley Post

Will Rogers World

William R. Pogue Municipal

SW LANM LA Alexandria International

Baton Rouge Metropolitan, Ryan Field

FY 2008

Service Grant Seq AIP Federal Level Number Funds

067 2,250,000

068 1,696,680

020R 2,006,211

006GA 263,527

001GA 45,581

004GA 165,808

003GA 91,323

017R 2,011,240

055P 5,428,569

014GA 139,400

64 Grants 40,278,318

126 Grants 76,164,822

P 037 4,866,026

038 8,000,000

P 076 3,500,000

077 2,850,000

078 1,833,500

079 830,881

080 920,202

081 4,683,500

082 2,342,700

Report Date 02/19/2009

Brief Description Of Work

Remove Obstructions [Acquisition of Hangar Buildings in RW 8 RPZ]

Construct Taxiway [Construct North Area TW - Phase 2 (Add Alternates)]

Rehabilitate Apron, Rehabilitate Runway - 17/35

Acquire Easement For Approaches [Avigation Easement A & B in the RW 35Approach], Acquire Land For Approaches [Acquire Tract B 9.7 acres & Tract C 6.7acres], Extend Runway [Conduct EA] - 17/35Update Airport Master Plan Study [Update airport master plan]

Extend Taxiway [Engr/design only.], Rehabilitate Runway [Engr/design only.] ­17/35Widen Runway [Phase 1 design] - 17/35

Rehabilitate Taxiway [Part 2-North portion A.]

Acquire Aircraft Rescue & Fire Fighting Vehicle, Extend Taxiway, Extend Taxiway,Extend TaxiwayConduct aeronautical survey for WAAS approach, Install Perimeter Fencing

Rehabilitate Taxiway [Rehabillitate Taxiway E Phase III]

Noise Mitigation Measures for Residences within 70 - 74 DNL

Rehabilitate Runway [Rehabilitate Airfield Pavement: Rehabilitation of Runway13/31, Reconstruction of Taxiway B, Extend and Reconstruction of Taxiway L,Reconstruction of Taxiway A and associated SMGS lighting, reconstruction ofTaxiways E and G] - 13/31Noise Mitigation Measures for Residences within 70 - 74 DNL [Phase I noisemitigation]Improve Runway Safety Area [Land acquisition - Blount Road] - 04L/22R

Improve Runway Safety Area [Reimburse Professional Fees (in part) Plank Road] ­04L/22RImprove Runway Safety Area [Reimburse Professional Fees (in part) Plank Road &Rehabilitate Airfield Lighting] - 04L/22RImprove Runway Safety Area [Relocate Blount Rd- Construction] - 04L/22R

Rehabilitate Apron [Rehabilitate and Expand South Carrier Apron, Phase II (Designand construct)]

Selection Criteria Year: 2008

Page 87 of 107

Page 88: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW LANM LA 083 1,520,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [Phase II Noise Mitigation]

Beauregard Regional GA 013 942,117 Construct Taxiway

Chennault International GA 007 196,596 Rehabilitate Taxiway

David G Joyce GA 006 86,623 Remove Obstructions [Bury Powerline]

Esler Regional GA 023 1,347,965 Rehabilitate Runway Lighting [Replace Runway 8/26 Lighting, incl.PAPI 4, REILS,

George R Carr Memorial Air Field GA 014 1,184,000vault regulators, etc] - 08/26 Improve Runway Safety Area [Precast Piles, Drainage Structure, and Subsequent Earthen Cover (Need 2.5 M)] - 18/36

Harry P Williams Memorial GA 011 425,119 Improve Airport Drainage [Phase II]

Hart GA 008 554,850 Install Runway Lighting [Rehab RW Lighting, add REILS/PAPIs] - 12/30

Jena GA 003 119,700 Install Perimeter Fencing [Phase I]

Jennings GA 012 540,065 Rehabilitate Runway Lighting - 08/26

Jonesboro GA 004 42,750 Install Runway Lighting [P&S Prep] - 17/35

Jonesville GA 002 326,071 Install Perimeter Fencing

Kelly GA 011 963,850 Expand Apron, Extend Runway [Construction] - 18/36

Lake Charles Regional P 035 1,315,287 Construct Terminal Building [Construct Terminal Building Phase II], Rehabilitate

Lakefront R 022 338,268Runway Lighting [Install POFZ lighting and markings for runway 15] - 15/33 Update Airport Master Plan Study

Le Gros Memorial GA 007 88,875 Conduct Miscellaneous Study

Louis Armstrong New Orleans International P 079 1,821,713 Security Enhancements

081 750,000 Rehabilitate Apron [Finalize Design]

Louisiana Regional GA 010 77,928 Conduct aeronautical survey for WAAS approach, Update Airport Master Plan

Marksville Municipal GA 009 771,250Study Construct Taxiway [Phase II: Construction]

010 804,480 Construct Taxiway [Final phase]

Monroe Regional P 025 1,006,966 Construct Terminal Building [Environmental Reimbursement and Design]

Natchitoches Regional GA 015 335,307 Rehabilitate Apron [Near Fuel Pumps]

Shreveport Regional P 044 1,923,690 Construct Taxiway

045 3,000,000 Acquire Land for Noise Compatibility within 70 - 74 DNL

046 646,167 Rehabilitate Runway [Plans & Spec. Prep.] - 14/32, Rehabilitate Taxiway [Plans & Specs Prep]

Selection Criteria Year: 2008

Page 88 of 107

Page 89: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW LANM LA 047 414,374 Construct Taxiway

South Lafourche Leonard Miller Jr GA 010 4,611,240 Extend Runway [Phase IV of Construction - Remaining Parallel Taxiway Site Prep

Thibodaux Municipal GA 002 338,447and Partial Paving/Lighting] - 18/36 Improve Access Road

Vicksburg Tallulah Regional GA 009 3,303,629 Construct Taxiway

010 835,857 Construct Taxiway

State Total: 40 Grants 60,459,993

SW LANM NM Alamogordo-White Sands Regional GA 016 66,533 Conduct Miscellaneous Study

Albuquerque International Sunport P 033 9,441,340 Rehabilitate Apron [Moved from 2007 - AV], Runway Incursion Markings

Angel Fire GA 015 201,398 Acquire Land for Development, Acquire Snow Removal Equipment, Install Perimeter Fencing [Design-Only]

Artesia Municipal GA 010 235,219 Rehabilitate Access Road

Carrizozo Municipal GA 003 63,161 Update Airport Master Plan Study

Clovis Municipal GA 021 4,367,006 Conduct aeronautical survey for WAAS approach, Rehabilitate Runway - 04/22

023 637,200 Construct Taxiway

Deming Municipal GA 012 351,393 Acquire Land For Approaches

Dona Ana County at Santa Teresa GA 018 42,089 Construct Taxiway

Double Eagle II

Four Corners Regional

R

P

013

029

520,242

917,292

Extend Taxiway [desdign only], Install Perimeter Fencing, Rehabilitate Runway [design only] - 04/22 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Guidance Signs [Replace Airfield Guidance Sign panels], Rehabilitate Parking Lot [Design-Only Short Term Parking Lot], Rehabilitate Runway - 07/25, Rehabilitate Taxiway [Design Only],

Grant County GA 008 280,314Update Airport Master Plan Study Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­

Hatch Municipal GA 004 29,21008/26 Construct Access Road [design only]

Jicarilla Apache Nation GA 010 364,800 Rehabilitate Runway - 17/35

Las Vegas Municipal GA 011 169,005 Conduct Miscellaneous Study, Install Runway Vertical/Visual Guidance System ­

Lea County Regional GA 017 591,10902/20, Rehabilitate Runway [Remark Airfield] - 02/20 Rehabilitate Runway Lighting [transfer Jal and Lovington NP over] - 03/21

Lordsburg Municipal GA 008 104,478 Rehabilitate Runway - 12/30

Selection Criteria Year: 2008

Page 89 of 107

Page 90: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

FAA - Office Of Airports

Region ADO State Worksite

SW LANM NM

Los Alamos

Moriarty

Roswell International Air Center

San Juan Pueblo

Santa Fe Municipal

Sierra Blanca Regional

Socorro Municipal

Springer Municipal

State of New Mexico

Taos Regional

Truth Or Consequences Municipal

Tucumcari Municipal

Various Locations in New Mexico

ADO Total:

State Total:

SW TEX TX Abilene Regional

Austin-Bergstrom International

Grants Awarded by FY

FY 2008

Service Grant SeqLevel Number

GA

GA

CS

GA

CS

GA

GA

GA

GA

GA

GA

P

P

009

004

008

020

021

005

029

018

008

003

006

019

011

011

002

32 Grants

72 Grants

034

035

036

040

041

AIP FederalFunds

70,809

101,775

66,215

1,077,584

64,961

187,001

2,367,506

129,910

315,217

105,382

359,342

319,718

60,000

137,714

344,540

24,089,463

84,549,456

894,040

4,000,000

311,507

4,000,000

1,642,661

Report Date 02/19/2009

Brief Description Of Work

Conduct Airport Master Plan Study

Conduct aeronautical survey for WAAS approach, Improve Airport Drainage[Design-Only]Conduct Airport Master Plan Study, Rehabilitate Runway [Design Only] - 08/26

Acquire Aircraft Deicing Equipment, Expand Terminal Building

Improve Terminal Building [terminal fire alarm and supression system]

Rehabilitate Runway [Crack seal, seal coat, remark] - 16/34

Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Construct Taxiway[design only], Install Perimeter Fencing [replace entry control gates at terminal],Runway Incursion MarkingsImprove Access Road, Rehabilitate Taxiway [Taxiway A sealcoat]

Rehabilitate Runway - 01/19

Update State System Plan Study

Acquire Snow Removal Equipment

Conduct Airport Master Plan Study

Rehabilitate Apron, Rehabilitate Taxiway [Crack seal pavement]

Install Weather Reporting Equipment (Alamogordo-White Sands Regional; ArtesiaMunicipal; Grant County; Sierra Blanca Regional)

Improve Terminal Building [Improve Terminal Building], Rehabilitate Apron[Rehabilitate Air Carrier Ramp], Rehabilitate Taxiway [Rehabilitate Taxilane, Area B,Phase I (Design)]Rehabilitate Apron [Rehabilitate Air Carrier Ramp, Area C, Phase II (Construction)],Rehabilitate Apron [Rehabilitate Apron/Taxilane, Area A, Phase II (Construction)]Improve Terminal Building [Improve Terminal Building], Rehabilitate Runway Lighting[Rehabilitate Runway 17R/35L Lighting System, Phase I (Design)] - 17R/35LAcquire Land for Noise Compatibility within 65 - 69 DNL [Acquire Land]

Rehabilitate Runway Lighting [Rehabilitate Runway Lighting System/PavementAreas, Phase I] - 17L/35R

Selection Criteria Year: 2008

Page 90 of 107

Page 91: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq Level Number

SW TEX TX 042

043

044

045

046

047

Brownsville/South Padre Island International P 033

034

035

Corpus Christi International P 040

041

042

043

Dallas Love Field P 032

033

Dallas/Fort Worth International P 085

086

087

Del Rio International P 007

AIP Federal Funds

Brief Description Of Work

1,250,000 Rehabilitate Runway Lighting [Rehabilitate Runway 17R/35L Lighting System] ­17R/35L

1,250,000 Rehabilitate Runway Lighting [Rehabilitate Runway Lighting System, Phase I] ­17L/35R

1,461,071 Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire Land]

633,505 Construct Apron [Remain Overnight (RON) Apron, Phase I, (Design)]

1,538,929 Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire Land]

628,366 Rehabilitate Runway Lighting [Rehabilitate Runway Lighting System/Pavement Areas, Phase II] - 17L/35R

8,891,434 Rehabilitate Taxiway

632,500 Improve Airport Drainage [Install Permanent Pump], Install Airfield Guidance Signs, Install Apron Lighting [Replace Apron Lightstands damaged during hurricane Dolly], Install Perimeter Fencing [Remove and Replace 6,400 feet of Airport Perimeter Fencing (Damaged by Hurricane Dolly)]

1,995,000 Improve Airport Drainage [Expand Detention Pond, Install Engine Generator (Secondary Power Source), and Install a Third Pump]

2,234,346 Construct Building [Maintenance Equipment Building, Phase I (Design)], Construct Service Road [Perimeter Service Road, Phase I (Design)], Modify Aircraft Rescue & Fire Fighting Building [Modify Aircraft Rescue & Fighting Building, Phase I, (Design)], Rehabilitate Taxiway [Rehabilitate Taxiway]

2,500,000 Improve Airport Drainage [Improve Airport Drainage, Phase VI, (Construction)]

2,800,000 Rehabilitate Taxiway [Rehabilitate Taxiway Systems]

778,503 Construct Building [Maintenance Equipment Building, Phase II (Design)], Rehabilitate Taxiway [Rehabilitate Taxiway M, Phase I (Design)]

4,139,623 Acquire Interactive Training System, Conduct Miscellaneous Study, Improve Airport Drainage, Rehabilitate Taxiway

593,911 Improve Airport Drainage

2,552,000 Extend Runway [LOI Payment #9] - 17C/35C

6,906,034 Improve Terminal Building [Rehabilitate or Replace Board Owned Jetbridges 2008], Rehabilitate Runway [Pavement and Lighting Rehab] - 17L/35R, Rehabilitate Taxiway

2,279,293 Rehabilitate Runway - 17L/35R

741,606 Expand Terminal Building [Expand Terminal Building, Phase I (Design)], Improve Airport Miscellaneous Improvements [Install Security Fencing and Crash Gates, Phase II], Improve Service Road [Improve Perimeter Service Road, Phase II]

Selection Criteria Year: 2008

Page 91 of 107

Page 92: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SW TEX TX

East Texas Regional

Easterwood Field

El Paso International

Ellington Field

Fort Worth Alliance

George Bush Intercontinental/Houston

Houston-Galveston Area

Kickapoo Downtown

Laredo International

FY 2008

Service Grant Seq Level Number

008

P 028

029

030

P 026

P 024

025

R 021

R 034

035

036

037

P 065

066

067

068

069

070

072

073

074

075

001

GA 008

009

P 052

053

AIP Federal Funds

258,394

741,606

3,257,250

258,394

2,280,000

3,887,005

1,302,079

2,437,977

10,000,000

891,298

263,072

100,000

17,250,000

378,648

30,808

13,449,622

6,103,603

2,133,112

3,896,397

905,868

1,130,857

12,298,754

950,000

741,606

258,394

2,000,000

4,416,530

Report Date 02/19/2009

Brief Description Of Work

Expand Terminal Building [Expand Terminal Building,Phase II]

Construct Apron

Rehabilitate Taxiway [Reconstruct Twy M.]

Construct Apron

Extend Taxiway [Extend Taxiway H]

Rehabilitate Taxiway [Reconstruct Taxiway J.]

Rehabilitate Taxiway [Reconstruct Taxiway J and M.]

Rehabilitate Taxiway

Extend Runway [Extend Runway - Phase 4] - 16L/34R

Install Airfield Guidance Signs, Rehabilitate Airport Beacons, Rehabilitate Runway[Rehab RW 16R/34L Shouldersincluding replacement of guidance signs] - 16R/34LRehabilitate Runway - 16L/34R

Safety Management System (SMS) Program

Construct Runway - 08L/26R

Acquire Land for Noise Compatibility within 65 - 69 DNL

VALE Vehicle [VALE]

Rehabilitate Runway [Phase 2] - 09/27, Rehabilitate Runway - 09/27

Rehabilitate Terminal Building [South Apron]

VALE Infrastructure, VALE Infrastructure, VALE Infrastructure

Rehabilitate Terminal Building [South South Apron, Phase 2]

Construct Taxiway

Acquire Land for Noise Compatibility within 65 - 69 DNL

Rehabilitate Runway - 09/27

Conduct Metropolitan System Plan Study

Construct Taxiway, Install Perimeter Fencing, Install Taxiway Lighting

Install Taxiway Lighting

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation in 65DNL.]Acquire Land For Approaches, Rehabilitate Apron [Rehabilitate GA Apron (Phase4) engineering.], Rehabilitate Runway [Reconstruct runway.] - 14/32, SecurityEnhancements

Selection Criteria Year: 2008

Page 92 of 107

Page 93: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq Level Number

SW TEX TX 054

Lubbock Preston Smith International P 031

032

McAllen Miller International P 036

Midland International P 045

046

047

North Central Texas 003

Rick Husband Amarillo International P 033

Robert Gray AAF P 016

San Angelo Regional/Mathis Field P 026

027

028

San Antonio International P 056

057

058

Southeast Texas Regional P 025

State of Texas 005

Texas State Block Grant Program 046

AIP Federal Funds

Brief Description Of Work

390,964 Rehabilitate Runway [Rehabilitate Runway 17R/35L (Engineering Only).] - 17R/35L

2,685,934 Rehabilitate Runway [Engineering only to rehabilitate Runway 8/26 and shift both runway ends to the east to remove Runway 8/26 and Runway 17R/35L intersection.] - 08/26

380,300 Rehabilitate Runway [Engineering only to rehabilitate Runway 8/26 and shift both runway ends to the east to remove Runway 8/26 and Runway 17R/35L intersection.] - 08/26

75,000 Update Airport Master Plan Study [Airport Layout Plan Update]

2,525,571 Rehabilitate Runway [Rehabilitate Runway 16R/34L, Phase II (Construction)] ­16R/34L, Rehabilitate Runway [Rehabiltate Runway 10/28, Phase I (Design)] ­10/28, Rehabilitate Runway Lighting [Rehabilitate Runway/Taxiway Lighting Systems, Phase I (Design)] - 16L/34R

3,200,000 Rehabilitate Runway [Rehabilitate Runway 16R/34L, Phase III (Construction)] ­16R/34L

879,973 Rehabilitate Runway Lighting [Rehabilitate Runway/Taxiway Lighting System, Phase II (Construction)] - 16L/34R

875,000 Conduct Metropolitan System Plan Study

2,647,248 Improve Terminal Building [Improve Terminal Building]

1,440,566 Expand Terminal Building [Expand Terminal Building, Phase I (Design)], Improve Terminal Building, Runway Incursion Markings [Enhanced Taxiway Markings]

741,606 Rehabilitate Apron [Rehabilitate Apron, Area C, Phase II (Construction)], Rehabilitate Taxiway [Rehabilitate Taxiway B, Phase I (Design)], Remove Obstructions [Realignment of Electrical Power Poles, Phase I]

3,000,000 Rehabilitate Apron [Rehabilitate Apron, Area C, Phase III (Construction)]

258,394 Improve Terminal Building, Remove Obstructions [Realignment of Electrical Power Poles, Phase II]

5,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase 4]

4,379,320 Extend Runway - 03/21, Improve Airport Drainage [Improve Sky Place Drainage.], Rehabilitate Runway [Rehabilitate small portion of Runway 12R/30L (design only).] ­12R/30L, Rehabilitate Taxiway [Rehabilitate Taxiway R (design only).], Update Airport Master Plan Study

1,259,544 Extend Runway - 03/21

323,000 Acquire Aircraft Rescue & Fire Fighting Vehicle

500,000 Update State System Plan Study

34,477,055 Non primary development projects in state block grant program

Selection Criteria Year: 2008

Page 93 of 107

Page 94: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

SW TEX TX

Tyler Pounds Regional

Valley International

P

P

047

048

049

050

051

052

053

023

025

042

043

Report Total:

Region Total:

ADO Total:

State Total:

Waco Regional

William P Hobby

P

P

85 Grants

85 Grants

2185 Grants

2457 Grants

025

026

035

036

WP HNL AS Pago Pago International P 040

State Total: 1 Grants

WP HNL FM Federated States of Micronesia 001

Selection Criteria Year: 2008

AIP Federal Funds

160,000

5,000,000

9,718,525

3,000,000

800,000

1,000,000

300,000

2,852,706

279,684

1,497,320

755,000

1,467,294

266,675

4,823,575

10,779

243,246,636

243,246,636

403,960,914

3,471,166,652

9,241,606

9,241,606

4,000,000

Report Date 02/19/2009

Brief Description Of Work

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Construct Service Road, Improve Runway Safety Area [Design only and land acquisition.] - 04/22, Remove Obstructions Improve Runway Safety Area [Design only.] - 04/22

Conduct Miscellaneous Study, Rehabilitate Apron

Improve Airport Erosion Control [Reconstruct Drainge Headwall], Install Airport Beacons [Remove and Replace Beacon], Rehabilitate Aircraft Rescue & Fire Fighting Building [Replace roof, 6 overhead doors, paging system and ceiling (including lighting). Repair walls and floor.] Improve Runway Safety Area [Engineering design.] - 01/19, Improve Runway Safety Area [Engineering design.] - 14/32, Improve Terminal Building Improve Terminal Building

Acquire Land For Approaches, Security Enhancements

VALE Vehicle [VALE]

Construct Aircraft Rescue & Fire Fighting Training Facility, Construct Aircraft Rescue & Fire Fighting Training Facility

Conduct State System Plan Study

Page 94 of 107

Page 95: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

FAA - Office Of Airports

Region ADO State Worksite

WP HNL FM Pohnpei International

State Total:

WP HNL GU Guam International

State Total:

WP HNL HI Hilo International

Honolulu International

WP

WP

HNL

HNL

State Total:

State Total:

MH

MP

Kahului

Kona International at Keahole

Lanai

Lihue

Molokai

Marshall Islands International

Francisco C. Ada/Saipan International

Grants Awarded by FY

FY 2008

Service Level

Grant Seq Number

GA 011

2 Grants

P 059

060

061

062

064

5 Grants

P

P

P

P

P

P

P

028

029

030

031

092

093

094

044

029

011

038

014

12 Grants

GA 008

1 Grants

P 057

058

AIP FederalFunds

14,984,230

18,984,230

2,000,000

5,797,441

14,000,000

2,000,000

1,148,913

24,946,354

716,577

111,455

761,644

9,056,365

1,125,000

3,451,398

2,066,144

2,000,000

2,354,287

2,861,872

5,700,000

954,394

31,159,136

999,995

999,995

2,100,000

1,828,434

Report Date 02/19/2009

Brief Description Of Work

Rehabilitate Runway [Phase IV] - 09/27, Rehabilitate Runway [Phase V] - 09/27

Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase IV]

Construct Taxiway [Completion]

Extend Runway [Phase IV] - 06L/24R

Improve Airport Miscellaneous Improvements [MAP - Demolition of Naval HousingUnits - Ph. II]Improve Terminal Building [Seismic Zone 4 Upgrade - Ph. III]

Environmental Mitigation [Wastewater treatment]

Install Noise Monitoring System

Rehabilitate Taxiway [Twys B, G, L]

Construct Apron, Construct Taxiway

Conduct Environmental Study [EIS]

Security Enhancements [Access Control]

Rehabilitate Taxiway [Twy B]

Conduct Noise Compatibility Plan Study, Update Airport Master Plan Study

Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

Construct Apron [Phase II]

Improve Terminal Building [Replace A/C]

Improve Runway Safety Area [Improve Runway 23 Culvert, Phase II] - 05/23

Conduct Airport Master Plan Study

Acquire Emergency Generator

Rehabilitate Runway [Phase V] - 07/25

Selection Criteria Year: 2008

Page 95 of 107

Page 96: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

FAA - Office Of Airports

Region ADO State Worksite

WP HNL MP Rota International

Tinian International

State Total:

WP HNL PW Babelthuap/Koror

State Total:

ADO Total:

WP LAX AZ Avi Suquilla

Benson Municipal

Buckeye Municipal

Casa Grande Municipal

Cibecue

Cochise County

Colorado City Municipal

Coolidge Municipal

Cottonwood

Ernest A. Love Field

Falcon Field

Flagstaff Pulliam

Grand Canyon National Park

Grand Canyon West

Grants Awarded by FY

FY 2008

Service Level

Grant Seq Number

AIP Federal Funds

P

P

020

021

5,700,000

1,386,400

4 Grants 11,014,834

GA 011

012

850,000

3,000,000

2 Grants 3,850,000

27 Grants 100,196,155

GA 012 1,406,250

GA

GA

012

013

014

564,000

200,000

166,250

GA

GA

GA

GA

GA

GA

012

004

001

013

006

012

153,551

572,178

56,148

136,331

148,558

237,354

CS

R

P

026

027

017

032

25,000

180,000

535,000

1,581,410

P

P

033

021

008

1,359,175

6,142,756

5,930,656

Report Date 02/19/2009

Brief Description Of Work

Install Runway Lighting - 09/27, Install Runway Lighting - 09/27

Strengthen Taxiway [Phase IV]

Conduct Airport Master Plan Study

Construct Apron [Cargo - Phase I]

Acquire Equipment [Sweeper], Construct Runway [Phase IV] - 01/19, Install Taxiway Lighting Rehabilitate Apron [4,500 sq. ft.]

Conduct Environmental Study

Improve Airport Erosion Control, Install Perimeter Fencing, Rehabilitate Taxiway Lighting, Strengthen Apron Conduct Environmental Study

Construct New Airport

Rehabilitate Runway Lighting [Electrical Vault] - 03/21

Install Weather Reporting Equipment

Update Airport Master Plan Study

Install Airfield Guidance Signs [for Parallel Taxiway], Install Runway Lighting [MIRL] - 14/32, Install Runway Vertical/Visual Guidance System [Replace 20 year old PAPI] - 14/32 Security Enhancements

Conduct Environmental Study [for 40 Acre Land Acquisition]

Install Perimeter Fencing

Acquire Snow Removal Equipment, Extend Runway [Phase III] - 03/21, Improve Terminal Building Extend Runway - 03/21, Security Enhancements

Construct Aircraft Rescue & Fire Fighting Building [Phase III]

Construct Runway - 17/35, Construct Runway Safety Area - 17/35

Selection Criteria Year: 2008

Page 96 of 107

Page 97: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP LAX AZ 009 741,606 Construct Parking Lot, Remove Obstructions

010 196,993 Install Weather Reporting Equipment

Greenlee County GA 009 888,284 Construct Taxiway [Twy A]

H.A. Clark Memorial Field GA 021 1,141,964 Rehabilitate Taxiway [Phase II]

Kayenta GA 006 6,494,963 Strengthen Runway - 05/23

007 191,311 Install Weather Reporting Equipment

Kingman GA 020 70,240 Install Airfield Guidance Signs [design], Rehabilitate Runway [design] - 03/21

021 41,000 Conduct Environmental Study [Phase II of EA]

Lake Havasu City CS 020 35,685 Install Weather Reporting Equipment [AWOS]

Laughlin/Bullhead International P 031 3,479,488 Extend Taxiway, Rehabilitate Access Road, Rehabilitate Apron

033 151,668 Construct Access Road [design only, phase II], Improve Airport Miscellaneous Improvements [design only]

034 155,534 Conduct Environmental Study

Marana Regional R 016 111,240 Construct Building

Page Municipal P 021 458,961 Improve Airport Drainage [Design], Improve Airport Miscellaneous Improvements, Install Guidance Signs, Rehabilitate Runway - 15/33

Payson GA 015 309,700 Conduct Environmental Study [for 12 Acres Land Acquisition]

Phoenix Deer Valley R 024 1,093,316 Improve Runway Safety Area - 07R/25L

Phoenix Goodyear R 013 444,963 Rehabilitate Apron [North ramp]

014 794,533 Rehabilitate Apron [North ramp Phase II]

Phoenix Sky Harbor International P 064 8,259,059 Rehabilitate Taxiway [R between C and D Construction]

Phoenix-Mesa Gateway R 020 8,561,544 Construct Taxiway [Parallel Taxiway B, Phase V]

021 1,108,475 Rehabilitate Parking Lot [Phase II, MAP]

022 2,470,000 Improve Airport Drainage [Taxilane L drainage]

Ryan Field

Safford Regional

R

GA

018

017

285,919

111,240

Construct Service Road, Install Airfield Guidance Signs, Install Perimeter Fencing [Design] Rehabilitate Runway - 12/30

Sedona GA 019 87,320 Conduct Environmental Study

Show Low Regional CS 017 111,240 Acquire Easement For Approaches

018 100,000 Safety Management System (SMS) Program

Sierra Vista Municipal-Libby AAF GA 021 251,127 Install Runway Distance-To-Go Signs - 08/26

Selection Criteria Year: 2008

Page 97 of 107

Page 98: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP LAX AZ Taylor GA 016 141,727 Install Weather Reporting Equipment

Tucson International P 054 5,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

055 851,725 Conduct Miscellaneous Study, Conduct Noise Compatibility Plan Study [Update]

Winslow-Lindbergh Regional GA 015 268,850 Update Airport Master Plan Study

016 1,280,824 Install Taxiway Lighting, Rehabilitate Apron [South GA apron]

Yuma MCAS/Yuma International P 029 2,556,215 Acquire Equipment [Sweeper], Rehabilitate Taxiway

030 258,394 Construct Apron, Rehabilitate Taxiway [Taxiway F-3, Phase II]

State Total: 52 Grants 67,899,725

WP LAX CA Banning Municipal GA 007 150,000 Improve Airport Drainage [design]

Big Bear City GA 016 617,485 Construct Heliport/Helipad

Bob Hope P 045 3,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

046 3,858,237 Rehabilitate Taxiway [Taxilane A]

Borrego Valley GA 015 308,750 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate Taxiway

Brown Field Municipal R 013 2,388,072 Install Airfield Guidance Signs, Rehabilitate Runway Lighting [phase III] - 08L/26R, Rehabilitate Taxiway Lighting

Calexico International GA 012 2,351,651 Construct Access Road [Phase IV]

Camarillo R 026 150,000 Construct Apron, Rehabilitate Apron

Chemehuevi Valley GA 006 26,990 Update Airport Master Plan Study [ALP Update]

Eastern Sierra Regional GA 012 150,000 Install Emergency Generator [design only], Install Perimeter Fencing [design only],

Fullerton Municipal R 019 111,240Rehabilitate Taxiway [A, F & H (design only)] Construct Taxiway [taxilanes, Phase V]

Gillespie Field R 016 1,310,000 Rehabilitate Apron [Terminal Transient Apron]

Imperial County P 022 741,606 Rehabilitate Runway - 14/32

023 375,065 Install Guidance Signs

Independence GA 004 712,500 Rehabilitate Apron [Terminal Apron]

005 123,500 Rehabilitate Apron [Phase II]

Inyokern P 023 875,425 Acquire Equipment [Purchase Sweeper], Improve Terminal Building [Phase II], Install Perimeter Fencing, Rehabilitate Runway Lighting [Rehab Airfield Lighting, Phase II] ­

Jacqueline Cochran Regional GA 016 731,126 15/33 Rehabilitate Apron

Selection Criteria Year: 2008

Page 98 of 107

Page 99: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP LAX CA John Wayne Airport-Orange County P 038 5,549,507 Construct Apron, Improve Terminal Building [Replace 14 Loading Bridges, Phase I], Rehabilitate Runway - 01L/19R

Lone Pine GA 007 150,000 Construct Terminal Building [Design Only]

Long Beach /Daugherty Field/ P 030 7,697,409 Rehabilitate Taxiway [Twy K, Phase III]

031 1,826,147 Rehabilitate Taxiway [Twy K]

Los Angeles International P 046 12,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Inglewood]

047 5,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [El Segundo]

048 5,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [LA County]

049 9,212,489 Construct Taxiway [Center Twy, Phase II], Rehabilitate Taxiway [taxilane]

050 5,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [Lennox/Los Angeles

051 5,000,000County] Noise Mitigation Measures for Residences within 65 - 69 DNL [City of Inglewood]

052 5,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [City of El Segundo]

March ARB R 005 1,355,634 Construct Fuel Farm

McClellan-Palomar P 025 741,606 Construct Terminal Building [Phase II]

Meadows Field P 029 1,241,409 Construct Terminal Building [Phase IX], Improve Terminal Building [Phase II]

Mojave GA 020 951,739 Install Miscellaneous NAVAIDS

021 361,240 Conduct Environmental Study [conduct environmental assessment for rwy 08/26]

022 1,363,915 Construct Apron

Montgomery Field R 012 4,261,220 Rehabilitate Runway - 05/23, Rehabilitate Runway - 10L/28R

Ontario International P 030 3,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

Oxnard P 027 2,025,741 Acquire Equipment [Sweeper], Improve Airport Drainage, Rehabilitate Apron [East Side]

Palm Springs International P 043 6,857,787 Improve Terminal Building [Phase I], Rehabilitate Runway [including pavement condition index] - 13L/31R, Rehabilitate Taxiway [Twy E, including pavement

Redlands Municipal GA 009 244,963condition index] Rehabilitate Apron [Improve West Ramp]

San Bernardino International R 022 6,982,680 Rehabilitate Taxiway [Rehabilitate and relocate east end of Taxiway A (Phase II construction)]

San Diego International P 050 10,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL

051 874,000 Conduct Noise Compatibility Plan Study [Phase II]

052 1,811,420 Acquire Aircraft Rescue & Fire Fighting Vehicle [2 Ea., 3,000 Gallon]

Selection Criteria Year: 2008

Page 99 of 107

Page 100: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP LAX CA 053 5,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

054 20,209,569 Construct Taxiway, Rehabilitate Taxiway

Santa Barbara Municipal P 037 4,434,412 Environmental Mitigation [for Rwy 7/25]

038 7,222,850 Rehabilitate Apron [Rehab Terminal Apron], Rehabilitate Taxiway [Realign Taxiway

Shafter-Minter Field GA 014 538,076B] Construct Access Road, Construct Taxiway [taxilanes]

Southern California Logistics R 014 1,986,453 Install Perimeter Fencing, Security Enhancements

Van Nuys R 009 321,362 Rehabilitate Service Road [A], Rehabilitate Taxiway [taxilane]

Whiteman R 011 33,000 Update Airport Master Plan Study

012 1,558,000 Construct Apron

State Total: 53 Grants 162,794,275

ADO Total: 105 Grants 230,694,000

WP SFO CA Alturas Municipal GA 006 268,949 Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Runway [Slurry seal and remarking of airport pavements] - 03/21, Rehabilitate Taxiway

Arcata P 032 740,142 Construct Aircraft Rescue & Fire Fighting Building [Design], Improve Runway Safety Area [Design - Relocate Runway 32 Threshold by 200' & EMAS installation at Runway 14] - 14/32, Rehabilitate Runway Lighting [Design - Rehabilitate Runway

033 237,50014/32 Lighting System] - 14/32, Remove Obstructions [Remove obstruction] Conduct Environmental Study [Conduct NEPA documentation for RSA improvement]

Boonville GA 003 228,756 Construct Apron

Bryant Field GA 007 461,133 Acquire Land For Approaches [Acquire 2.1 acres of land to relocate road within Runway Safety Area], Construct Taxiway [(design)], Install Miscellaneous NAVAIDS [(Design)], Install Perimeter Fencing [Design], Modify Access Road

Buchanan Field R 017 150,000[Design], Rehabilitate Runway [(Design)] - 16/34, Rehabilitate Taxiway [(Design)] Acquire Equipment [Acquire Sweeper]

Byron R 012 1,444,963 Acquire Land for Development [Land Acquisition - 80 acres]

Castle GA 009 829,654 Install Perimeter Fencing, Install Taxiway Lighting [Install medium intensity taxiway

Charles M. Schulz - Sonoma County GA 032 1,336,740lighting] Acquire Land For Approaches, Rehabilitate Apron [Rehabilitate Apron Bravo/Taxiway (Design)]

033 921,500 Conduct Environmental Study [(Runway 14 and 19 extension, localizer relocation, Taxiway D realignment and terminal building )Phase III]

Selection Criteria Year: 2008

Page 100 of 107

Page 101: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO CA Chico Municipal P 028 3,211,641 Install Weather Reporting Equipment [Replace existing AWOS], Rehabilitate Apron [Rehabilitate Aircraft Parking Apron (approximately 150' X 1,100') - Phase 2 Construction and PCC Pavement CDF Apron (19,500 sq. ft.)], Rehabilitate Runway [Rehabilitate Runway 13L/31R (Including Crack Seal and Restriping)] - 13L/31R,

Chowchilla GA 005 40,000

Rehabilitate Taxiway [Rehabilitation of Taxiways (Including Crack Seal and Restriping)] Improve Airport Drainage

Columbia GA 013 111,240 Install Weather Reporting Equipment [Install Automated Weather Observing System]

Colusa County GA 011 75,000 Update Airport Master Plan Study [Update Airport Layout Plan]

Corning Municipal GA 005 300,000 Construct Taxiway [Taxiway realignment - Design], Expand Apron [Expand existing aircraft parking (approximatley 250'X800') - Design], Extend Runway [Relocate runway threhold by 900' - Design] - 16/34, Install Runway Lighting [Including signs and new electrical vault - Design], Install Runway Vertical/Visual Guidance System [Install PAPI, REIL, segmented circle and lighted wind cone - Design], Rehabilitate Runway [Design] - 16/34, Widen Runway [Widen existing Runway 16/34 to 60' -

Dinsmore GA 006 425,000Design] - 16/34 Rehabilitate Apron [aircraft parking apron], Rehabilitate Runway [Rehabilitate

Dunsmuir Municipal-Mott GA 010 304,000runway pavement] - 09/27 Extend Taxiway

Ells Field-Willits Municipal GA 004 133,000 Conduct Environmental Study [Prepare NEPA Documentation for runway safety area (stabilization)], Update Miscellaneous Study [Prepare and Update Exhibit "A" Property Map]

Fall River Mills GA 009 400,000 Construct Apron [Construction]

010 85,000 Update Airport Master Plan Study [Update airport layout plan and conduct FAA 405

011 38,760survey] Install Apron Lighting [Design], Install Miscellaneous NAVAIDS [Rehabilitate airport beacon], Install Runway Vertical/Visual Guidance System [Install Precision Approach Path Indicator (PAPI) and airport beacon - Design] - 02/20

Franklin Field GA 004 300,000 Conduct Airport Master Plan Study [Update Airport Master Plan]

Fresno Chandler Executive R 015 150,000 Construct Taxiway [Construct Taxiway H - Design]

Fresno Yosemite International P 053 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

054 2,699,290 Rehabilitate Service Road, Rehabilitate Taxiway, Security Enhancements [card

055 936,051access] Rehabilitate Taxiway [Design]

Garberville GA 005 234,000 Install Perimeter Fencing [Construction]

Selection Criteria Year: 2008

Page 101 of 107

Page 102: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO CA 006 88,943 Expand Apron [Expand aircraft parking apron including rehabilitate existing apron (approximately 130,000 SF) - Design], Rehabilitate Apron [Rehabilitate exisitng

Hayfork GA 007 211,240aircraft parking apron (approximately 225,000 SF) - Design] Conduct Environmental Study

Hayward Executive R 015 150,000 Update Airport Master Plan Study [Airport Layout Plan (ALP) Narrative]

Healdsburg Municipal GA 004 700,000 Improve Runway Safety Area [Improve Runway Safety Area 13/31(relocate

Hollister Municipal GA 011 127,926

threshold,lighting,markings,parallel rwy,RSA grading,obstruction removal, modify access road & decommission in-line twy)] - 13/31 Rehabilitate Runway - 13/31, Rehabilitate Taxiway [West Parallel Taxiway

Jack McNamara Field P 018 440,490(construction)] Conduct Environmental Study [Conduct NEPA Documentation for RW 11/29 & 07/25

Lake Tahoe GA 027 256,445RSA Improvements and sercurity fencing installation] Improve Runway Safety Area [Design] - 18/36

028 6,990,000 Improve Runway Safety Area [Reconstruction & Improve RSA, Phase II] - 18/36

Lampson Field GA 010 300,000 Improve Airport Drainage

Lincoln Regional/Karl Harder Field R 015 261,240 Conduct Environmental Study [Environmental Assessment West Side Development (approximately 300 acres)], Install Weather Reporting Equipment [Install Automated

Little River GA 005 1,592,421Weather Reporting Station] Rehabilitate Runway [rehabilitate runway and lighting] - 11/29, Rehabilitate Runway

Livermore Municipal R 019 783,000Lighting - 11/29 Rehabilitate Apron, Rehabilitate Taxiway

Lonnie Pool Field/Weaverville GA 008 30,000 Remove Obstructions

Madera Municipal GA 017 196,255 Expand Apron [Design]

018 1,068,382 Expand Apron

Mammoth Yosemite GA 018 1,790,000 Rehabilitate Runway [Construction Phase 2] - 09/27

019 1,238,760 Acquire Snow Removal Equipment [Acquire snow removal equipment]

Marina Municipal GA 007 333,722 Rehabilitate Apron [Phase I (approx. 80,000 SF)], Rehabilitate Taxiway [phase I]

Mefford Field GA 009 200,000 Construct Access Road [design], Install Weather Reporting Equipment [AWOS and

Merced Municipal/MacReady Field CS 015 830,592power connection] Acquire Equipment [Acquire Sweeper & Equipment], Acquire Safety Equipment and/or Fencing [ARFF Equipment], Improve Airport Drainage [Improve Airport Drainage (Phase III)], Rehabilitate Taxiway [Tarmax and Taxiway Crack Sealing]

016 138,760 Acquire Equipment [Acquire Sweeper (Phase II)], Acquire Safety Equipment and/or Fencing [ARFF Equipment], Rehabilitate Taxiway [Tarmax and Taxiway Crack

Selection Criteria Year: 2008

Page 102 of 107

Page 103: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

WP SFO CA

Mesa Del Rey

Metropolitan Oakland International

Modesto City County-Harry Sham Field

Monterey Peninsula

Napa County

Nervino

Nevada County Air Park

Norman Y. Mineta San Jose International

Nut Tree

Petaluma Municipal

Placerville

FY 2008

Service Grant Seq Level Number

016

GA 009

P 043

044

045

046

P 032

033

P 048

049

050

R 025

026

GA 006

GA 011

P 069

070

071

072

GA 012

013

014

015

R 018

GA 012

AIP Federal Funds

142,222

1,000,000

10,417,919

550,000

1,429,042

1,045,000

237,500

2,000,000

2,000,073

670,400

166,860

38,760

150,000

152,000

1,800,341

3,000,000

1,039,286

1,122,816

1,900,000

350,000

100,000

2,182,275

134,750

384,049

Report Date 02/19/2009

Brief Description Of Work

Sealing, phase II]

Install Perimeter Fencing, Install Runway Lighting [(Design)] - 11/29

Install Noise Monitoring System

Rehabilitate Taxiway

Improve Runway Safety Area [Wetlands mitigation for runways 9L/27R and 9R/27LRSA improvements] - 09L/27RRehabilitate Taxiway Lighting

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 1,500 gallon ARFF vehicleand equipment], Improve Runway Safety Area [Design] - 10R/28L, RehabilitateApron [Design Only]Update Airport Master Plan Study [Airport Layout Plan Narrative Report andTerminal Study]Noise Mitigation Measures for Residences within 65 - 69 DNL

Rehabilitate Apron, Rehabilitate Runway - 10R/28L, Rehabilitate Taxiway [Phase 2]

Improve Runway Safety Area [Phase I - Conduct Environmental Study] - 10R/28L

Rehabilitate Apron [Rehabilitate General Aviation Apron(Design)]

Rehabilitate Apron [Rehabilitate General Aviation Apron (Design, Phase II)]

Remove Obstructions [Remove Obstructions]

Improve Runway Safety Area [Final Design] - 07/25

Extend Runway [(LOI - Reimbursement) Rehabilitate and Extend Runways 12L/30Rand 12R/30L] - 12L/30RNoise Mitigation Measures for Residences within 65 - 69 DNL

Rehabilitate Apron [Six gates, design]

Rehabilitate Apron [Six gate, design]

Acquire Land for Development

Update Airport Master Plan Study [Update Airport Master Plan]

Expand Apron [South East Apron (approximately 225,000 SF) - Design]

Acquire Land For Approaches [Acquire approximately 27.1 acres of land forRunway 20 approach protection]Install Miscellaneous NAVAIDS [REIL], Install Perimeter Fencing, Update AirportMaster Plan Study [Update]Install Weather Reporting Equipment [Install AWOS], Rehabilitate Runway Lighting[Rehabilitate runway lighting at end 23, Phase II] - 05/23

Selection Criteria Year: 2008

Page 103 of 107

Page 104: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

WP

Region

SFO CA

ADO State

Red Bluff Municipal

Redding Municipal

Worksite

Reedley Municipal

Rogers Field

Rohnerville

Round Valley

Sacramento Executive

Sacramento International

Salinas Municipal

San Carlos

San Francisco International

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GA

P

GA

GA

GA

009

032

033

034

008

012

007

912,500

346,750

300,000

28,500

200,000

184,300

87,500

Construct Taxiway [Realign connector taxiway to Runway 15], Rehabilitate Runway [Rehabilitate runway pavement] - 15/33 Acquire Land For Approaches [Acquire land for approach protection (approximately 4 acres)] Construct Building [Construct FAR Part 139 Equipment Maintenace & Storage Building] Update Airport Master Plan Study [Update Airport Layout Plan (ALP) and ALP Narrative Report.] Install Perimeter Fencing, Install Weather Reporting Equipment [Install AWOS], Rehabilitate Taxiway [design] Conduct Miscellaneous Study [Pavement Maintenance Management Plans for Plumas County (Beckwourth, Chester, Quincy) airports.], Remove Obstructions [Remove Obstructions] Rehabilitate Runway Lighting [Phase II] - 11/29

GA

R

008

009

003

009

49,400

61,426

222,481

627,463

Construct Taxiway [Construct connector taxiway from expanded aircraft parking apron to parallel taxiway (apprximately 25' X 800') - Design], Expand Apron [Expand aircraft parking apron by approximately 75,000 SF - Design] Rehabilitate Runway Lighting [Phase III] - 11/29, Rehabilitate Taxiway Lighting [Phase III] Modify Service Road [reloate service road outside RSA for Runway 10], Rehabilitate Runway [Rehabilitate Runway, taxiway and MIRL] - 10/28 Install Runway Vertical/Visual Guidance System [Install REIL & PAPI] - 12/30

010 300,000 Update Airport Master Plan Study [Update Airport Master Plan]

P 042 565,000 Acquire Aircraft Rescue & Fire Fighting Vehicle

043 1,708,492 Install Perimeter Fencing, Rehabilitate Taxiway [Taxiways C2, C3 & D]

GA 015

016

745,332

150,000

Construct Taxiway [Construct taxilane, Phase 1 - construct], Install Perimeter Fencing [Upgrade airport gates and fencing, Phase 1 - construction], Modify Service Road, Rehabilitate Airport Beacons Update Airport Master Plan Study

R

P

012

040

833,721

16,013,539

Improve Airport Drainage, Improve Airport Erosion Control, Rehabilitate Taxiway [Reconstruct Taxiway - Phase 3], Remove Obstructions [Remove / relocate fuel farm (design)] Conduct Miscellaneous Study [Pavement Maintenance Program], Improve Airport Drainage [Airport Drainage Improvement], Improve Runway Safety Area [Runway 10L at Taxiway Z & Southfield Runway 01R/19L Safety Areas] - 10L/28R, Install Apron Lighting [Field Lighting Apron Improvement], Rehabilitate Apron

Selection Criteria Year: 2008

Page 104 of 107

Page 105: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

WP SFO CA 040 [Reconstruction, Phase II], Rehabilitate Runway - 01L/19R, Rehabilitate Runway Lighting [Underground Elcetrical Improvement Phase IV] - 01L/19R, Rehabilitate Taxiway [Rehabilitate Taxiway A & B (overlay and reconstruction)], Security Enhancements [Airport Security Fencing]

041 3,500,000 Rehabilitate Taxiway [Taxiway Reconstruction]

San Luis County Regional P 034 2,945,247 Construct Access Road [Construct Eastside Access Road]

035 1,903,694 Construct Access Road [Phase II Eastside Access Road]

Scott Valley GA 006 150,000 Construct Taxiway

Sequoia Field GA 002 1,444,963 Rehabilitate Runway [Runway rehabilitation] - 13/31

South County Airport of Santa Clara County R 008 400,000 Conduct Environmental Study

State of California 004 440,000 Conduct aeronautical survey for WAAS approach

Stockton Metropolitan P 025 741,606 Rehabilitate Apron [Fire Station]

026 298,394 Rehabilitate Apron [Phase 2]

Susanville Municipal GA 011 1,110,000 Rehabilitate Runway [Rehabilitate Runway 11/29 (approximately 75' by 4045')] ­11/29

Sutter County GA 005 300,000 Install Perimeter Fencing [Replace exisiting fence with chain-link fence including pedistrian and automatic gates]

Tracy Municipal GA 013 213,036 Construct Building

Truckee-Tahoe GA 020 980,000 Install Perimeter Fencing, Rehabilitate Runway [Seal and stripe runways, aprons,

Tulelake Municipal GA 006 392,996hangar rows] - 01/19 Conduct Environmental Study [Conduct environmental study], Conduct

Visalia Municipal CS 023 938,771Miscellaneous Study Construct Taxiway, Install Perimeter Fencing, Install Runway Distance-To-Go Signs

Westover Field Amador County GA 013 150,000- 12/30 Conduct Environmental Study [Environmental Assessement for Drainage/Retention Pond and Taxiway Construction]

Yolo County-Davis/Woodland/Winters GA 009 80,000 Rehabilitate Runway [Approximately 6,000' X 100' - Final Design] - 16/34, Rehabilitate Taxiway [Approximately 35 feet by 7,000 feet - Final Design]

State Total: 107 Grants 107,128,899

WP SFO NV Alamo Landing Field GA 003 30,000 Conduct Environmental Study [Phase II - Desert Tortoise Clearence Survey, Cultural Resource Survey]

Austin GA 011 574,750 Construct Service Road, Install Weather Reporting Equipment

Battle Mountain GA 018 160,000 Install Runway Distance-To-Go Signs - 12/30, Rehabilitate Runway Lighting - 12/30

Selection Criteria Year: 2008

Page 105 of 107

Page 106: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO NV Beatty GA 009 510,951 Expand Apron, Install Miscellaneous NAVAIDS [Segmented Circle with Lighted Windcone]

Boulder City Municipal P 012 741,606 Install Perimeter Fencing [(Approx. 13,000 lf)]

Carson R 015 2,850,000 Remove Obstructions [(Hill)]

016 332,500 Construct Taxiway [Parallel Twy D - Phase I], Install Weather Reporting Equipment [Phase I Design only], Rehabilitate Runway [Phase I Design Only] - 09/27,

Derby Field GA 010 410,000Rehabilitate Taxiway [Design Taxiway A - Phase I] Construct Taxiway [Apron Taxilane (approx. 550' X 25')], Rehabilitate Runway ­01/19

Elko Regional P 033 741,606 Rehabilitate Apron [Phase I]

034 213,750 Construct Aircraft Rescue & Fire Fighting Building [Phase II - Construct Enclosure

Ely /Yelland Field/ CS 013 111,240for ARFF Vehicle.] Install Airfield Guidance Signs [Istall 20 Signs required by FAR Part 139], Install

Fallon Municipal GA 009 78,002Runway Distance-To-Go Signs [Relocate RDR signs] - 18/36 Rehabilitate Apron

Goldfield GA 002 200,000 Update Airport Master Plan Study [Feasibility Study For A New Airport.]

Hawthorne Industrial GA 007 150,000 Update Airport Master Plan Study

Henderson Executive R 021 1,461,240 Construct Apron [North Apron]

022 860,668 Construct Apron

McCarran International P 064 21,724,333 Rehabilitate Runway [Phase II] - 07R/25L, Rehabilitate Runway [Phase III] - 07R/25L

065 3,500,000 Conduct Environmental Study [Conduct Environmental Study [new public airport,

067 1,705,941phase III]] Rehabilitate Runway - 07R/25L

Mesquite GA 010 217,481 Conduct Environmental Study [Phase V, for replacement of general aviation airport.]

011 503,355 Conduct Environmental Study [Final Phase, for replacement of general aviation

Minden-Tahoe GA 019 915,702airport.] Construct Apron, Improve Airport Drainage, Install Weather Reporting Equipment [AWOS], Rehabilitate Runway [Runway 30 run-up area] - 12/30, Rehabilitate

North Las Vegas P 025 100,000Taxiway [T-hangar taxilane rehabilitation] Safety Management System (SMS) Program

Reno/Stead R 026 908,900 Rehabilitate Taxiway

Reno/Tahoe International P 077 10,204,555 Improve Runway Safety Area [Runways 07/25 and 16L/34R] - 07/25, Rehabilitate

078 5,000,000 Apron [Rehab Term Apron Phase 10], Security Enhancements Noise Mitigation Measures for Residences within 65 - 69 DNL

Selection Criteria Year: 2008

Page 106 of 107

Page 107: Grants Awarded by FY · Brief Description Of Work Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Update Airport Master Plan Study Rehabilitate Runway - 11/29 Acquire Snow Removal

Grants Awarded by FY FAA - Office Of Airports Report Date 02/19/2009

FY 2008

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO NV 079 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

Silver Springs

State of Nevada

GA

080

010

006

1,286,185

600,000

362,000

Install Runway Lighting [Design] - 16L/34R, Rehabilitate Apron [Rehab Term Apron Phase 10.1] Install Miscellaneous NAVAIDS, Rehabilitate Runway [Slurry seal and stripe airport pavements] - 05/23 Conduct State System Plan Study

Winnemucca Municipal GA 013 314,547 Install Perimeter Fencing

Yerington Municipal GA 010

011

189,525

190,000

Acquire Land For Approaches [Land purchase -- 1.7 acres for safety and capacity], Install Miscellaneous NAVAIDS, Install Perimeter Fencing [Fencing for land acquired], Remove Obstructions [Remove Obstruction] Conduct Environmental Study [Environmental Study - hangar lots, runway offset, land purchases]

State Total: 33 Grants 59,148,837

ADO Total: 140 Grants 166,277,736

Region Total: 2457 Grants 497,167,891

Report Total: 2457 Grants 3,471,166,652

Selection Criteria Year: 2008

Page 107 of 107


Recommended