Greater Houston Freight Committee June 18, 2019
Transcript
Page 1: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Greater Houston Freight Committee

June 18, 2019

Page 2: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Introduction/Welcome

▪ Established in 2016 by the Transportation Policy Council (TPC)

as recommended in the 2013 Regional Goods Movement Plan

as well as guidance from the FAST Act.

▪ Regularly engage and convene freight industry/goods

movement partners in the region to understand how best to

maintain an on-going conversation.

▪ Involve private sector freight generators, shippers, and other

logistics professionals.

▪ Meet periodically to share information, make

recommendations to the TPC, and assist/direct H-GAC staff in

freight planning tasks.

Page 3: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Introduction/Welcome

▪GHFC Structure

▪ TPC Nominating Chair recommended reappointment of

current co-chairs, Brian Fielkow and Ed Emmett, to be

confirmed at June 28th

TPC meeting

▪Meeting Frequency

▪ Priorities

Page 4: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

4

Committee Agenda Roundtable

▪ Houston Region Freight Rail Study

▪ Truck Parking Study

▪ TxDOT PEL Studies Updates

• IH-10: IH-69 to SH-99 (Phase 1 Complete)

• IH-45: BW 8 North to Loop 336 South (Phase

1 Complete)

• IH-69: Spur 527 to BW 8 South (Phase 1

Complete)

• SH-225 (Procurement Phase)

▪ North Houston Highway Improvement

Project

• Development of Freight Movement Advisory

Group

▪ 36A EIS Update

▪ Southeast Harris County Mobility Study

▪ Others?

Page 5: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Distracted Driving Roundtable Overview

Page 6: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A Project Update

Page 7: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A PROJECTGreater Houston Freight Committee Update

June 18, 2019

Page 8: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A Project - Background

▪ Houston-Galveston Area Council

– High level regional studies indicated a need

to route traffic (truck, hurricane evacuation,

etc.) around the urban core

– Identified in the 2040 Regional

Transportation Plan

– H-GAC committed funding for initial phase

of this study

▪ TxDOT – Houston District

– Conduct the study

– Study will follow the Federal environmental

process (NEPA)

Page 9: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A Project

▪ Roadway project

▪ Limits: I-69 southwest of Rosenberg

to SH 6 north of Hempstead

▪ Engineering and Environmental study

– Defines the Need and Purpose

– Develops alternative alignments

• Existing routes

• New location routes

– Refines alignments

• Based on:

» Public Involvement

» Engineering analysis

» Environmental constraints

– Selects Reasonable Alternatives

Rosenberg

Hempstead

Page 10: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Constraints:

❑ Existing Development

❑ Proposed Development

❑ Floodplains

❑ Wetlands / Water resources

❑ Katy Prairie & KPC lands

❑ Park and School properties

❑ Historic sites and properties

❑ EJ communities

❑ Other issues

36A Project – Constraints

Page 11: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Preliminary Engineering and Environmental Process

Page 12: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Preliminary Alternatives

Constraints:

❑ Existing Development

❑ Proposed Development

❑ Floodplains

❑ Wetlands / Water resources

❑ Katy Prairie & KPC lands

❑ Park and School properties

❑ Historic sites and properties

❑ EJ communities

❑ Other issues

Page 13: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Preliminary Alternatives – South of I-10 and North of I-10

Page 14: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Stakeholders:

▪ Elected Officials

▪ Public Officials

▪ Special Interest

Groups

▪ General Public

▪ Landowners

▪ Resource Agencies

.

Continuous Outreach:

❑ One-on-one Meetings

❑ Stakeholder Meetings

❑ On-site Visits

❑ Public Meetings

❑ Social Media

❑ Community Meetings

❑ Website and Phone

36A Project – Public Involvement

Page 15: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A Project – Public Involvement – Project Website

Page 16: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A Project – Public Involvement – Project Viewer Tool

Page 17: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

36A Project – Anticipated Timeline

2017 202220202018 2019 2021

Project Initiation & NOI

Public Scoping Meeting

Develop Alternatives

Public Meeting

Refine Alternatives

Recommended Alternative

Prepare Draft EIS

Public Hearing

Prepare Final EIS

Record of Decision

2023

Page 18: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

18

TxDOT Project Manager:

Cesar Martinez, TxDOT Houston District

[email protected] or 713-802-5279

Team Project Manager:

David Gornet, P.E., Jacobs/Gornet JV

[email protected] or 713-542-8524

For More Information:

Visit our website at www.txdot.gov or contact TxDOT-Houston District Public Information Office by

email at [email protected] or call 713-802-5076.

Project Contact Information

Page 19: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Thank You

Page 20: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Ports Area Mobility Study Update

Page 21: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Agenda

▪ Project Recap

• Objectives and

• Activities

▪ Project Deliverable Status

▪ Proposed Improvements

Page 22: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Study Objectives

▪ Identify freight and goods supply chains that are dependent

upon on the region’s port facilities

▪ Identify improvements to better facilitate port related freight

mobility:

• Infrastructure and facilities

• Multimodal improvements

• Operational strategies

• Policy-level changes

Page 23: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Study Activities

▪ Port profiles (complete)

▪ Rail Assessment (complete)

▪ Barge/Intracoastal Waterways Assessment

(complete)

▪Data gathering and analysis

• Trade and cargo flow (complete)

• Truck counts (complete)

• Truck driver surveys (complete)

• ATRI Truck GPS (complete)

[email protected]

Page 24: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Study Activities

[email protected]

▪ Supply Chain Analysis (complete)

• Transearch Dataset

• Datamyne and

• Third-party Interviews

▪ Improvements Identification (complete)

▪ Travel Demand Modeling (on-going)

▪ Benefit-Cost Assessment (on-going)

Page 25: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Project Deliverables

▪ Final Report consisting of Technical Memorandums:

• Port Profiles

• Rail

• Barge/Intracoastal Waterways

• Highways

• Supply Chain

• Commodity Flows

• Solutions and Strategies

Page 26: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Proposed Improvements

• Identified range of solutions and strategies that support

o Infrastructure and facilities

o Multimodal improvements

o Operational strategies

o Policy-level changes

• Strategies include

o Extended gate times at container terminals

o Terminal Gate Appointment System

o Inland Port

o Port centric warehousing etc.

Page 27: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Proposed Improvements

• Solutions include

o Freight Shuttle

oSelf discharge container on barge

oVirtual container yard

o I-69 bypass

o Independence Parkway Bridge

Page 28: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Freight Shuttle

▪ MOU signed with Port of Houston

▪ Third party system – similar to rail and

pipelines

• Using air rights above highways

• Private investment

• Local, regional, state, federal funding

▪ Assessed different options for PAMS:

• Shared User facility in Baytown

• Door-to-Door service (links container ports with

volume users – resin packaging plants, importers

Ikea, Walmart etc.)

Source: Freight Shuttle Systems

Page 29: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

▪ Intra-regional

• Feed Cedar Port

from Bayport and

Barbours Cut.

Container-on-Barge

Existing barge facility

Concentration of warehouses that export/import containersWalmart, Ikea, KatoenNatie (plastic resins)

[email protected]

Page 30: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Container-on-barge

▪ Currently once a week service to each container terminal

• Low frequency impacts container demurrage, acceptance time for exports, etc

▪ Significant benefits with Heavy weight containers.

▪ How can container on barge service attract more volume and increase frequency?

1. Operations.

• More reliable operations at the container terminal - Dedicated area/berth within terminals?

• Cheaper cargo handling methods? – Reach Stacker?

• Labor agreement to account for handling a barge rather than ocean going vessel

2. Soft sell

• Integrate within Shipping Line pricing structure

• Multi agency approach and business development to potential users

▪ Could it become a formal service offering at Houston?

[email protected]

Page 31: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Container moves1 x Import to Walmart1 x Export from Plantgistix4 truck trips • 2 carrying cargo• 2 empty• 59 truck miles

Existing Situation

Virtual Container Yard

Page 32: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Container moves1 x Import to WalmartEmpty container fromWalmart taken toPlantgistix

1 x Export from Plantgistix

3 truck trips • 2 carrying cargo• 1 empty• 36.5 truck miles

• 50% reduction of trips to the port terminal• 38% saving in truckmiles

“Street turn” Concept

Future Condition

[email protected]

Virtual Container Yard

Page 33: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

I -69 Bypass

• Relief route around Houston Urban

Core

• Connecting Wharton on the

southwest to Cleveland/Livingston

on the northeast

• Carrying traffic from Port of

Freeport, Port of Galveston, Port of

Houston to east, northeast and the

north

• Grand Parkway and Route 146 as

potential alignment

[email protected]

Page 34: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Independence Parkway Bridge

Page 35: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Port Truck Trip Calculator

▪ Forecast truck trips to

2045

• At Traffic Analysis

Zone (TAZ) level

• Based on 2016

Transearch

commodity data

• Used to inform

modelling

Page 36: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Port Truck Trip Calculator

Page 37: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Next Steps..

▪Cost – Benefit Analysis

▪ Finalize Technical Memorandums

Page 38: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Contracting for a Cleaner Region

H-GAC Clean Vehicles Program

Page 39: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Heavy Duty Diesel Replacements

▪ Clean Vehicles Program

• Class 8 trucks

• Alternative fuel fueling stations

▪ Regional Texas Emission Reduction Program

• Class 8 trucks

• Marine (ferries)

• Nonroad equipment

▪ Drayage Loan Program

• Class 8 trucks

▪ Other

• SEP funds – School buses

• EPA funds – Construction equipment, marine (tugs), forklifts

• Clean School Bus Program – School bus (emphasis on alt fuel)

Page 40: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Air Quality Initiatives Report

65 98 21 7 38 21

0 50 100 150 200 250NOx Reductions (in tons) = 250 or $5,000,000

2016 Annual NOx Reductions: Clean FleetsClean Vehicles Non-Drayage Projects Clean Vehicles Drayage Projects Clean School Bus Program

Non-Road Clean Vessels and Equipment Regional TERP Drayage Projects Regional TERP Local Government Projects

99 71 13 58 24 13 3

0 50 100 150 200 250

NOx Reductions (in tons) = 281 or $5,620,000

2017 Annual NOx Reductions: Clean FleetsClean Vehicles Non-Drayage Projects Clean Vehicles Drayage Projects Clean School Bus Program

Non-Road Clean Vessels and Equipment Regional TERP: Drayage Projects Regional TERP: Local Government Projects

115 87 19 62 28 7 6

0 50 100 150 200 250 300

NOx Reductions (in tons) = 324 or $6,480,000

2018 Annual NOx Reductions: Clean FleetsClean Vehicles Nondrayage Projects Clean Vehicles Drayage Projects Clean School Bus Program

Nonroad Clean Vessels and Equipment Regional TERP: Drayage Projects Regional TERP: Local Government Projects

Page 41: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Results (Drayage Loan Program and TERP)

36

59 50

41 41 46 36

26

3 9

67 80 74 80 77 75

10 10

42

90 98

90 100 96 91

11

50

101

218 232

242 251

242

202 192

0

50

100

150

200

250

300

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

YEAR

NOx Reduction (tons)

TERP

CMAQ

Drayage

HDDRP

Engines

▪ Drayage Loan Program

• Contracted with 67 owner / operators and 29 trucking companies.

• Issued $15,000,000 in grant funds and $11,500,000 in loan funds to replace 217 trucks.

• Contracted to obtain 1,050 tons of NOx emission reduction.

Page 42: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Lessons Learned

▪ 7 Year Monitoring Period:

• Too lengthy for owner operators

• Unpredictable market may require substantial grant returns

▪ GPS Monitoring:

• Original budget too weak for accuracy

• Limited Staff

▪ Communication:

• Bi-lingual (Spanish) a must

• Speed of circulation of main documents

• “Snail Mail” is no longer an assured means of communication

Page 43: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Clean Vehicles Program - Nutshell

▪ Replace Class 7 and 8 diesel powered trucks

▪Own and destroy the “donor” vehicle

• 1996 to 2005 works best

▪ Purchase new vehicle

▪H-GAC reimbursement “up to” 75%

Page 44: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Clean Vehicles Program - Improvements

▪Contract circulation via Agiloft

• Applicant MUST HAVE a working and active e-mail

• Quarterly reports and other communication through e-mail

▪Monitoring period is tiered to 3, 4, or 5 years

• Prevent repayment by extending to years 6 and 7

• Usage commitment based on average yearly usage from

odometer reading

▪GPS will mainly be used for troubled projects

▪Usage reporting via on-line website

Page 45: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Clean Vehicles Program - Further

▪Other eligible projects

• Non-Road equipment

• Infrastructure

▪ Emphasis on Alternative Fuels

• Funding cap increases from $20K to $40K per ton of NOx

reduction

• New truck waiver to “slightly used” repowered

Page 46: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

H-GAC Clean Vehicles Program

E-Mail:

[email protected]

713-993-2488

~or~

Visit the H-GAC website at:

H-gac.com

(Business ---> Clean Vehicles ---> Clean Vehicle Program)

Page 47: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Regional Goods Movement Plan

▪ Update to the 2013 Regional Goods

Movement Plan

▪ Regional Goods Movement Today

• Freight System in the MPO area

• Freight Significant Corridors and

Facilities

• Commodity Flow Patterns

• Key Industries

▪ Key Trends

• Employment/Population Growth

• International Trade

• Supply Chains

• Transportation Industry Trends

• Regulations and Policy

▪ Key Issues and Challenges

• Growth outpacing capacity

• Managing Existing Capacity

• Community & Environmental Issues

▪ Solutions and Recommendations

• Short Term

• Long Term

Page 48: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Legislative Update

▪ Impacts of State Bill 2223

• Effective 9/1/2019

▪Others?

Page 49: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Freight Activities from Committee

Committee members may briefly discuss current

and future freight transportation efforts

Page 50: Greater Houston Freight Committeeh-gac.com/freight-planning/greater-houston-freight... · 6/18/2019  · Greater Houston Freight Committee Update June 18, 2019. 36A Project - Background

Adjourn

Thank you!


Recommended