+ All Categories
Home > Documents > Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009)...

Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009)...

Date post: 30-May-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
8
Greeley Avenue Traffic Calming: Hylan Boulevard to Fr. Capodanno Boulevard 2011 Midland Beach Civic Association – June 8, 2011 Commissioner Janette Sadik-Khan New York City Department of Transportation Office of Research, Implementation & Safety
Transcript
Page 1: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Greeley AvenueTraffic Calming: Hylan Boulevard to Fr. Capodanno Boulevard 2011Midland Beach Civic Association – June 8, 2011

Commissioner Janette Sadik-Khan New York City Department of TransportationOffice of Research, Implementation & Safety

Page 2: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Background

Originally calmed with channelized buffers in 2005

Existing speed boards installed in 2005

Page 3: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Existing Conditions Faded markings

• Wide street

• As many as 75% of vehicles• As many as 75% of vehicles traveling above the speed limit

Greeley Avenue & Olympia Blvd, looking west

Greeley Avenue & Grimsby Street, looking east

Page 4: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Need: Why Greeley Avenue?

• Connecting route between Hylan Blvd and Father Capodanno Blvd

• In vicinity of Priority School IS 2 and St. Margaret Mary School

• Request for traffic calming by Council Member Oddo and Midland Beach Civic Association

Ranks in 78th percentile for pedestrian crashes

Page 5: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Proposed Design

Page 6: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Proposal Details

Transition from buffer along parking lane to

painted center medianInstall 8-foot parking painted center median at Rudyard and Colonystripe

Page 7: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

Benefits of Proposal Calms traffic Calms traffic

Reduces cut through vehicles along residential corridor

Improves pedestrian safety near school crossing

Redesigns 0.81 miles of a high crash corridorg g

Proposed Configuration

Page 8: Greeley Ave Project Presentation - New YorkGREELEY AV: HYLAN BLVD - FR CAPODANNO BLVD (2005-2009) 10' Flush Median Parking Lane Moving Lane Moving Lane Parking Lane 50' PROPOSED 8'

ThankQuestions? ThankYou

Contact: Nichole Altmix at [email protected]


Recommended