Date post: | 16-Apr-2017 |
Category: |
Real Estate |
Upload: | ray-vince |
View: | 2,762 times |
Download: | 0 times |
Green Energy Worldwide Solutions Inc.
Presents Affordable Solutions
Affordable Solutions
=
Affordable Living
Green Energy Worldwide Solutions Inc.
Objective
1. Provide affordable housing solutions for poverty stricken areas, to make homes completely Energy Independent, and water dependent.
2. Seek and assist those in need of our program
Social Solutions, S.A.Type of Organization:
• Fabricators and designers of kits for homes • Kits are manufactured in our strategically
located plants
• Our product has been designed to meet requirements of social housing and emergency aid programs
Fiber CementExclusive advanced technology developed
and patented by Plycem®Consists of Portland cement, mineral fibers,
and other inorganic additivesLightweight material with manageability of
woodOf equal to or greater strength than
constructive cementSample:
Fiber Cement Cont.Structure passes general building codes
Standard Designs resist category 3 hurricane force winds
Optional Designs can withstand impacts up to category 5 hurricane force winds
Resistance against termites, fire, asbestos, and bacteria
Customer Benefits
Conscious of limited resources. Completely Energy Independent, and water dependent
Alleviates housing needs of areas of little or no resources
Social Impact
Quality EconomicEnergy Independent
Production Flexibility
Product AdvantagesVariety in panels adapt to different housing needsSimplicity and speed of constructionNo need for expensive equipment and man power
specialistEconomical construction and maintenanceQuick AssemblyCompletely Energy Independent, and water
dependent
Advantages Cont.
Designs are comfortable, functional, and allow for future expansions
Can use workers of little or no experienceCreates many job opportunitiesWe offer training and supervisionHigh quality products for a fraction of the
cost
Assembly Sequence and Times
•Build frame
•Installation of the pipes
•Installation of the barrier steam
•Installing the Mayan electro-welded
Day 1
Day 1
•Pouring of concrete •Leveling and finishing of floor plate •Showing rails basis
Day 2
Day 2
Installing rails basisInstalling rails basisFiber cement
Finish Concrete
Plate Concrete
Screws Anchoring Bolts
Anchoring
Riel Base
•Building of steel structure•Installation of walls•Installation of door(s) and window frames•Installation of the water network•Installation of interior walls
Days 3 & 4
Steel Structure
Armed Walls
Union Corners
Unions Walls
Union Walls (View Court)
Install Walls
Days 3 & 4
•Installation of power source•Mounting of steel girders•Installation of roof
Day 5
Day 5Support higher
Day 5
Day 5
Roof completely installed
Roof of Fiber cement
•Installation of interior walls•Installation of bathroom accessories
Day 6
Day 6
•Interior and exterior painting•Cleanup work
Day 7
Green Prefab Model A 505Sf.
Green Prefab Model B 753Sf.
Green Prefab External walls
Green Prefab Internal Living Area
Green Prefab Internal Kitchen Area
Green Prefab External doors
Final Notes
Our system of industrialized construction will be designed, manufactured, and supplied in full.
The shipment will be made in "container" closed or open, loose way or another depending on the port facilities.
The materials and equipment will be provided with new and relevant specifications and drawings.
The company sends qualified personnel to supervise and train in the development of the houses. Please free to contact us for more information.