ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AJIYA
GREEN
INTEGRATED
BUILDING SOLUTION
AGiBS
ASEAN IRON & STEEL SUSTAINABILITY FORUM
BANGKOK
14/11 – 16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
INTRODUCTION
AJIYA Green Integrated Building Solution, AGIBS …
1. Provides Building components for affordable housing
2. Is Integration of several modular products/systems.
3. Green - uses sustainable lightweight steel materials.
4. Quality Controlled - manufactured in ISO certified factories.
5. Easy to install, no heavy machinery/equipment required.
6. Fast to construct , minimal debris, cleaner and safer site.
7. Manpower efficient - lesser workers.
8. Commercially competitive.
9. Proven – maiden project completed in 2013.
2
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS KEY ADVANTAGES
METAL FRAMING SYSTEM
For SPEEDY construction and
EARLY completion of superstructures!
3
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS KEY ADVANTAGES
CONCRETE/MORTAR WET WALL
• SOLID
• COOL
• LOW SOUND TRANSIMISSION
• WATER RESISTANCE
• ETC
4
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
5
LOAD BEARING TEST
Test specimen
Hydraulic jack
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
6
APPROVED BY AUTHORITIES
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Normal speech, hear easily
Loud speech, hear easily
Loud speech, can hear but not clear
Loud speech can hear faintly
Loud speech, must strained to hear
Loud speech can barely be heard
Loud speech cannot be heard
Very loud speech cannot be heard
Extremely loud speech cannot be heard
General application
Residential / Dwelling Unit
Hotel Room
Car Park
Cinema Wall/ Auditorium
RW
25
30
35
42
45
48
50
65
70
7
AGiBS
ACOUSTIC PERFORMANCE
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
8
THERMAL PERFORMANCE
Building Material R-value
# Material Thickness R-value
1 Face Brick 4” 0.44
2 Concrete Masonry Unit 4” 0.80
3 Concrete Masonry Unit 8” 1.11
4 Concrete Masonry Unit 12” 1.28
AGiBS
What are R-values?
In construction, the R-value is the measurement of a material's capacity to resist heat flow from one side to
the other. In simple terms, R-values measure the effectiveness of insulation and a higher number represents
more effective insulation.
https://www.archtoolbox.com/materials-systems/thermal-moisture-protection/rvalues.html
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS
a QUICK GLANCE
9
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
10
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
11
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
12
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
13
ASEAN IRON & STEEL SUSTAINABILITY FORUM, BANGKOK 14-16/11/2016
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS
STAGES OF CONSTRUCTION
14
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Ground slab preparation 15
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Fabrication of frame 16
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Erecting frames 17
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Fixing is easy, simple tools 18
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Pre-installed ducting, piping for M&E services and plumbing 19
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Installation of door and window frames 20
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
installation of RIBLATH mesh 21
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Light weight steel trusses 22
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Building structures ready for concreting 23
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Concreting in progress. 24
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Concreting completed, ready for plastering work. 25
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Plastering Works 26
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Cleaner and safer site - less debris and wastages. 27
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Roofing work 28
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS Project Reference
KLINIK DESA
KG. JAWA , SHAH ALAM, SELANGOR,
MALAYSIA
• Wall frames 3.0 days
• Truss 5.0 days
• Riblath Mesh 3.0 days
• Mortar Infill 5.0 days
• Roofing, plastering and skim coat 5.0 days
21.0 days
29
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Klinik Desa, Kg. Jawa, Selangor
30
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Klinik Desa, Kg. Jawa, Selangor
31
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Klinik Desa, Kg. Jawa, Selangor
32
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
33
AGIBS Project Reference
KUARTERS & KLINIK DESA
SG. SERAI, RAWANG, SELANGOR, MALAYSIA
• Wall frames 2.0 days
• Truss 4.0 days
• Riblath Mesh 2.0 days
• Mortar Infill 4.0 days
• Roofing, plastering and skim coat 5.0 days
17.0 days
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Kuarters & Klinik Desa Sg. Serai, Rawang
34
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Kuarters & Klinik Desa Sg. Serai, Rawang
35
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Kuarters & Klinik Desa Sg. Serai, Rawang
36
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
37
AGIBS Project Reference
LIGHT INDUSTRY FACTORIES (8m high)
PUCHONG, SELANGOR, MALAYSIA
• Frames Fabrication 1 + weeks
• Frames Installation 3 + weeks
• Concreting 2 + weeks
• Plastering and Skim Coat 3 + weeks
10 + weeks
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
38
Light Industry Factory, Puchong ( 8.0m high)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
39
Light Industry Factory, Puchong ( 8.0m high)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
40
Light Industry Factory, Puchong ( 8.0m high)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
41
Light Industry Factory, Puchong ( 8.0m high)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
42
AGIBS Project Reference
DOUBLE STOREY HYBRID (2ND Floor Only)
MUKIM KUALA NERUS
KUALA TERENGGANU, MALAYSIA
• Ground Floor – Conventional Method
• 2nd Floor – AGIBS system
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Double Storey Hybrid (2nd Floor Only) Kuala Terengganu
43
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Double Storey Hybrid (2nd Floor Only) Kuala Terengganu
44
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Double Storey Hybrid (2nd Floor Only) Kuala Terengganu
45
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS Staircase
Double Storey Hybrid (2nd Floor Only) Kuala Terengganu
46
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
47
AGIBS Project Reference
PRIMA MIX HOUSING DEVELOPMENT
SG. RAIA, SIMPANG PULAI
PERAK, MALAYSIA
• 376 units Mix Housing
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Ground floor
PR1MA Sg. Raia, Simpang Pulai, Perak
48
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
First floor
PR1MA Sg. Raia, Simpang Pulai, Perak
49
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA Sg. Raia, Simpang Pulai, Perak
50RIBLATH mesh installed
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA Sg. Raia, Simpang Pulai, Perak
51
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
52
PR1MA Sg. Raia, Simpang Pulai, Perak
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Staircase construction 53
PR1MA Sg. Raia, Simpang Pulai, Perak
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
54
AGIBS Project Reference
PRIMA MIX HOUSING DEVELOPMENT
TAPAH, PERAK, MALAYSIA
• 647 units mix housing
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA TAPAH, PERAK
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA TAPAH, PERAK
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA TAPAH, PERAK
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
58
PR1MA TAPAH, PERAK
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA TAPAH, PERAK
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
PR1MA TAPAH, PERAK
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
61
AGIBS Project Reference:
RUMAH MESRA RAKYAT
SG. BIDIN, KUCHING, SARAWAK, MALAYSIA
• 54 units single storey
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Rumah Mesra Rakyat, Sg. Bidin, Kuching, Sarawak
62
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Rumah Mesra Rakyat, Sg. Bidin, Kuching, Sarawak
63
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Rumah Mesra Rakyat, Sg. Bidin, Kuching, Sarawak
64
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
65
AGIBS Project Reference:
RUMAH MESRA RAKYAT (Mock Up )
KUALA MUDA, SG. PETANI, KEDAH
MALAYSIA
14/05/2016 – 03/06/2016 (20 days)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
66
Rumah Mesra Rakyat, Sg. Petani, Kedah (20 days)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
67
Rumah Mesra Rakyat, Sg. Petani, Kedah (20 days)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
68
Rumah Mesra Rakyat, Sg. Petani, Kedah (20 days)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
69
Rumah Mesra Rakyat, Sg. Petani, Kedah (20 days)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
70
Rumah Mesra Rakyat, Sg. Petani, Kedah (20 days)
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
Introducing
Total
Housing Solution …
AGIBS 8 SERIES
71
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
1st SERIES - LIGHT WEIGHT METAL WALL FRAMES
1. Metal
Wall Frames
AGIBS 8 SERIES 72
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
2nd SERIES - METAL DOOR & WINDOW FRAMES
2. Metal Door &
Window Frames
AGIBS 8 SERIES 73
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
3rd SERIES - LIGHT WEIGHT STEEL TRUSS
3. Steel Truss
AGIBS 8 SERIES 74
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
4th SERIES - METAL ROOFING & AWNINGS
4. Metal Roofing
& Awning
AGIBS 8 SERIES 75
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
5th SERIES - METAL STRUCTURAL FLOOR DECKING
5. M
eta
l
Str
uctu
ral
De
ck
ing
AGIBS 8 SERIES 76
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
6th SERIES - METAL CEILINGS
Me
tal
Ce
ilin
g
AGIBS 8 SERIES 77
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS 8 SERIES
7th SERIES – METAL LOUVRES & SUNSHADES
7. Metal
Louvre
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
8th SERIES – SAFETY GLASS & SASH
8. Safety Glass
& Sash
AGIBS 8 SERIES 79
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AGIBS 8 SERIES
1. Light Weight Metal Wall Frames (Wet Walls)
2. Metal Doors and Windows Frames
3. Metal Light Weight Roof Trusses
4. Metal Roofing & Awning
5. Metal Structural Floor Decking
6. Metal Ceilings
7. Metal Louvers and Sunshades
8. Safety Glass & Sash
80
AGiBSAJIYA GREEN INTEGRATED BUILDING SOLUTIONS
AJIYA
VISION 2040
To Provide Affordable, Sustainable
Building Solutions for the Community
81