INFORMATION & CONTACT www.seattle.gov/transportation/greenlakepaving.htm Green Lake and Wallingford Paving & Multi-Modal Improvements Project Team (206) 693-4151 | [email protected] FACT SHEET GREEN LAKE AND WALLINGFORD PAVING & MULTI-MODAL IMPROVEMENTS Safer streets for people walking, biking, driving, and taking transit Spotlight: N 50th St Fall 2019 FACT SHEET PROJECT OVERVIEW On July 29 2019, we began construction in the Green Lake and Wallingford neighborhoods. Along N 50th St from Phinney Ave N to Roosevelt Way NE, we’ll be repaving and enhancing the existing bike lanes. We’ll also be adding curb ramps at many intersections along N 50th St for Americans with Disabilities Act (ADA) accessibility—that’s over 170 curb ramps! ROOSEVELT WAY NE FREMONT AVE N WOODLAND PARK AVE N N 45TH ST N 50TH ST N 52ND ST N 53RD ST N 54TH ST Woodland Park Zoo Woodland Park Meridian Playground University Playground AURORA AVE N STONE WAY N PHINNEY AVE N DAYTON AVE N WALLINGFORD AVE N DENSMORE AVE N ASHWORTH AVE N LATONA AVE NE Existing bike facilities On-street parking removal Paving area Rapid flashing beacons New/upgraded bike facilities N We’re repaving over a mile of N 50th St! Rectangular Rapid Flashing Beacons will be installed in 2022 under a separate contract at the Dayton Ave and Woodland Park Ave intersections to provide safety and visibility for people walking as they cross the street We’re improving safety for people biking by widening and striping bike lanes between Phinney Ave N and Stone Way N. Visit our website to learn more about improvements on other arterial streets. GREEN LAKE WAY N 5 GREEN LAKE WAY N (anticipated construction in 2022) WHAT WILL THE PROJECT LOOK LIKE? We’re making changes to lane layouts on N 50th St to enhance the existing bike lanes. Updates include: Wider bike lanes between Phinney Ave N and Stone Way N to improve comfort and safety for people biking Clearer striping of the bike lanes to better separate people driving and biking, as well asparked cars CONSTRUCTION SCHEDULE AND WHAT TO EXPECT We began construction on N 50th St at the end of July 2019. We’ll continue to share information about impacts through our regular construction updates via email. Our outreach team will also be available to help address concerns. Sign up for email updates on our webpage at www.seattle.gov/transportation/greenlakepaving.htm IMPROVEMENTS BASED ON WHAT WE HEARD
Transcript
Page 1: GREEN LAKE AND WALLINGFORD PAVING & MULTI ......On July 29 2019, we began construction in the Green Lake and Wallingford neighborhoods. Along N 50th St from Along N 50th St from Phinney

INFORMATION & CONTACT www.seattle.gov/transportation/greenlakepaving.htm Green Lake and Wallingford Paving & Multi-Modal Improvements Project Team (206) 693-4151 | [email protected]

FACT SHEET

GREEN LAKE AND WALLINGFORD PAVING & MULTI-MODAL IMPROVEMENTS Safer streets for people walking, biking, driving, and taking transit Spotlight: N 50th StFall 2019

FACT SHEET

PROJECT OVERVIEWOn July 29 2019, we began construction in the Green Lake and Wallingford neighborhoods. Along N 50th St from Phinney Ave N to Roosevelt Way NE, we’ll be repaving and enhancing the existing bike lanes. We’ll also be adding curb ramps at many intersections along N 50th St for Americans with Disabilities Act (ADA) accessibility—that’s over 170 curb ramps!

ROOS

EVEL

T W

AY N

E

FREM

ONT

AVE

N

WOO

DLAN

D PA

RK A

VE N

N 45TH ST

N 50TH ST

N 52ND ST

N 53RD ST

N 54TH ST

Woodland Park Zoo

WoodlandPark

MeridianPlayground

UniversityPlayground

AURO

RA A

VE N

STON

E W

AY N

E

PHIN

NEY

AVE

N

DAYT

ON A

VE N

WAL

LIN

GFOR

D AV

E N

DEN

SMOR

E AV

E N

ASH

WOR

TH A

VE N

LATO

NA

AVE

NE

Existing bike facilities On-street parking removal Paving area Rapid flashing beaconsNew/upgraded bike facilities

W GREENLAKE WA Y N

We’re repaving over a mile of N 50th St!

Rectangular Rapid Flashing Beacons will be installed in 2022 under a separate contract at the Dayton Ave and Woodland Park Ave intersections to provide safety and visibility for people walking as they cross the street

We’re improving safety for people biking by widening and striping bike lanes between Phinney Ave N and Stone Way N.

Visit our website to learn more about improvements on other arterial streets.

GREE

N L

AKE

WAY

N

5

GREEN LAKE WAY N

(anticipated construction in 2022)

WHAT WILL THE PROJECT LOOK LIKE?We’re making changes to lane layouts on N 50th St to enhance the existing bike lanes. Updates include:

• Wider bike lanes between Phinney Ave N and Stone Way N to improve comfort and safety for people biking

• Clearer striping of the bike lanes to better separate people driving and biking, as well asparked cars

CONSTRUCTION SCHEDULE AND WHAT TO EXPECTWe began construction on N 50th St at the end of July2019. We’ll continue to share information about impactsthrough our regular construction updates via email.Our outreach team will also be available to helpaddress concerns.

Sign up for email updates on our webpage at www.seattle.gov/transportation/greenlakepaving.htm

IMPROVEMENTS BASED ON WHAT WE HEARD

Page 2: GREEN LAKE AND WALLINGFORD PAVING & MULTI ......On July 29 2019, we began construction in the Green Lake and Wallingford neighborhoods. Along N 50th St from Along N 50th St from Phinney

N 50th St: GREEN LAKE AND WALLINGFORD PAVING & MULTI-MODAL IMPROVEMENTS

The City of Seattle is paving portions of N 40th St, N 50th St, N 80th St, and streets on the east side of Green Lake as soon as 2019. To request translation of these materials call (206) 693-4151.

La Ciudad de Seattle pavimentará porciones de las calles N 40th St, N 50th St, N 80th St, y calles en el lado este de Green Lake a más tardar para el 2019. Para solicitar la traducción de este material llame al (206) 693-4151.

西雅图市政府最快将于2019年铺设以下的部分路面:N 40th St, N 50th St, N 80th St,以及 Green Lake 东边的街道。請告訴我們如何透過修改 2019 年計劃鋪 設的路線(請參看地圖)來更好地滿足您的需求。如 需這些資料的譯文,或是在會議時需要口譯服務,請 致電 206-693-4151.

QUESTIONS AND ANSWERS

How will the enhanced bike lanes on N 50th St connect to existing bike lanes?We’re building a network of bicycle facilities inSeattle to help make biking a safe, affordable traveloption. These enhanced bike lanes will allow forsafer and more comfortable east-west travel throughWallingford by connecting to existing bike lanes onPhinney Ave N and Stone Way N.

Why aren’t you adding a protected bike lane on N 50th St?We considered adding a protected bike lane onN 50th St, but decided to widen the existing bikelanes instead. The roadway is not wide enough toaccommodate protected bike lanes. Widening the bikelanes allows us to increase safety while also retainingparking in the area.

Are you making design changes at the intersection of N 50th St, Stone Way N, and Green Lake Way N?We heard your concerns about improving thisintersection. We’re looking at ways within our scopeand budget to make improvements for people walkingand biking through this intersection. This work will beunder a separate contract and we will provide you withmore information as this work progresses through ouremail updates.

We’re also repaving and updating lane layouts on N 40th St, N 80th St, and streets on the east side of Green Lake in the Green Lake and Wallingford communities.

For details on these other segments, please visit our webpage.

New and upgraded curb ramps at many intersections along N 50th St.For cost savings and efficiency, the rapid flashing beacons at N50th St at Dayton Ave N and Woodland Park Ave N will be constructed and installed at a later day by SDOT crews. It is currently anticipated that they will be installed in 2022.

WHAT WE HEARD: We need wider bike lanes! I don’t feel safe when cars drive by me when I’m on my bike.

EXISTING

COMING 2019

MAY 2018

SEGMENT 6 PROPOSALN 50th St: Fremont Ave N to Phinney Ave N and Stone Way N to Whitman Ave N (looking west)

Sidewalk PlantingStrip

Shared Parking & Bike Lane

Travel Lane Travel Lane Bike Lane PlantingStrip

GravelPath

Sidewalk PlantingStrip

Bike Lane PlantingStrip

GravelPath

Parking Bike Lane Travel Lane Travel Lane

Major Changes:• Bike lanes widened and striped in both directions

NOTES: Cross sections are looking west. Street configurations at intersections may look different than cross sections shown.Sidewalk and planting strip widths vary along the corridor.

GREEN LAKE AND WALLINGFORD PAVING & MULTI-MODAL IMPROVEMENTS