BIOMASS
Expert working group on biomass Prepared by Veronika Valentar
EWG biomass2
Energy use in Slovenia
The importance of wood biomass in Slovenia:- Annual use of renewable energy sources in Slovenia- Annual use of energy in households(Source: stat.si)
Your logo
Annual use of renewable energy- general Gheotermie (TJ)
Solar thermie (TJ)Industial waste- not renewable (TJ)Komunal waste- renewable (TJ)Komunal waste- not renewable (TJ)Wood and wood biomass (TJ)Peat (TJ)Depot gas (TJ)
Heating oilNatural gasWood fuelsLiquid oil gasElectric powerCoalDistrict heatingSolar energyGheotermal energy
End use of energy in households 2012
EWG biomass3
-Keeps stores of fossil sources- CO2 neutral-Support stability of rural areas-Improves incomes from agriculture and forestry-Based on local supply-Providing job opportunities inlocal environment
Why biomass?
EWG biomass4
Biomass supply- forests in Slovenia
Your logo
-
EWG biomass5
- Non forest biomass- The worst quality wood from forests- Felling residues- Wooden residues (recycling)- Etc.
-Quantity:
Local biomass sources
EWG biomass6
- Firewood- Wood chips- Wood (and non wood) pellets- Wood briquets
Types of wood biomass fuels and production technologies
EWG biomass7
Organization of biomass supply chain
This is a symbolic picture- Add the chart of the most usual supply process
EWG biomass8
Biomass logistics
- Wood drying:
- Biomass trade center, storing of biomass
- Biomass logistics
EWG biomass9
- Individual heating system
Heating networks
Micro system heating network
District heating network
Mikro mreža
EWG biomass10
•Heating system= heating boiler (wood chips, supplied by automatic system + boiler room)•Investor is authorized for operation, service, maintenance and possible new investments•The contract lasts at least 15 years
Biomass heating contracting for public building
EWG biomass11
• Based on usual heating contracts for district heating systems
• Use of heating energy is measured regarding heating value of wood (measured by heating supplier)
• Use of heat is accounting based on actual energy consumption
• The system is insured together with the insurance for building
Heating contract
EWG biomass12
• Decision making process with municipality• Permissions of land owners/ public (impact
on environment)• Subscription fee?• Investment reimbursement (subvention)?• Building permissions
Administrative barriers
EWG biomass13
Technical questions
•Sanitary warm water in summer season•Basic requests regarding:
• Heating room• Boiler• Installations• Biomass supply (driveways)
EWG biomass14
•Investment costs: 600-700 €/kW installed power
•Heating boiler, supplying system: 200-300 €/kW installed power •Hot water system: 80-100 €/m’ route
• Variable costs:•Biomass (17- 21 €/sm3)•Power•Maintenance
Investment plan
EWG biomass15
•Incomes:•Subscription fee 160-250 €/kW installed power•Energy price (70- 90€/MWh)- 2500 working hours/a
Investment plan
EWG biomass16
Simple feasibility study
Determination of installed
power
Definition of investment
Identification of Variable
costs
Partners:Investors, suppliers,
SWOT analysis,
Identification of incomes: energy price
Contracting consortium
Informing, public
awareness rising
Project proposal
EWG biomass17
• Identification and promotion of project
• Working with different target groups: public,
• Excursions, best practices exchange
Public awareness rising
EWG biomass18
• Too late: other plan, heating system on gas, heating room is constructed•Not enough demand on heating•Project engineers are not flexible enough
ADVISE: NEVER GIVE UP!!!
Typical problems:
EWG biomass19
Questions?THANK YOU FOR YOUR ATTENTION!