Greenways and Cycle Tracks 2013 Mid-Year Report Seattle City Council Transportation Committee May 31, 2013
Transcript
Page 1: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Greenways and Cycle Tracks 2013 Mid-Year Report

Seattle City Council Transportation Committee

May 31, 2013

Page 2: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Statement of Legislative Intent

2013 Adopted Budget included a Statement of Legislative Intent (SLI) prioritizing the following projects in the 2013-2014 Biennium:

• Ballard neighborhood greenway

• Delridge neighborhood greenway

• Downtown cycle track development

• West Seattle lower bridge trail access

• Design work on the following additional neighborhood greenways:

o Rainier Valley

o Central District

o Lake City

o University District

Page 3: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

What are Neighborhood Greenways?

• Family friendly routes

• Neighborhood networks that link community destinations such as parks, schools, libraries, and shopping areas

• Provide connections to regional trails such as the Burke-Gilman Trail

• Facilities that are parallel to higher volume arterials that allow bicyclists to make connections between neighborhoods on lower speed, lower volume streets

Page 4: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

• Low speeds (< 25 mph)

• Low volumes (< 1,000 vehicles per day)

• Gradual Inclines

• Destinations

• Community input

Route Selection

Page 5: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Define the Route

Page 6: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Improve Arterial Crossings

Traffic signals Crosswalk/crossbikes/ADA

Page 7: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Walk-Bike Priority and Traffic Calming

Page 8: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Why Invest in Neighborhood Greenways

• Increase walking and bicycling

• Improve transportation options

• Environmental benefits

• Safer streets for everyone

• Health benefits

• Equity

No Way, No How

Willing but Wary

Strong and

Fearless

Enthused and Confident

Page 9: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Neighborhood Greenways Outreach

Data Collection

• Speeds, volumes, collisions

•Community greenway or other planning efforts

Outreach Meeting #1

• Define greenways and describe tool box

• Discuss goals and objectives

• Hear local ideas and concerns

• Share traffic data and general route possibilities

Conceptual Design

• Identify route(s)

• Define improvements

Outreach Meeting #2

• Review goals and objectives

• Share conceptual routes and treatments

• Be open to input and change

• Describe next steps

Design and Build Greenway

• Design

• Construction

• Opening event

Evaluate and Adjust

• Stakeholder feedback

• Data

• Make changes if needed

Page 10: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Neighborhood Greenway Work Plan

2012 Completed Greenways: Wallingford 39th Avenue NE 2013 Greenway Construction: • Ballard • Delridge • Beacon Hill • Fremont Avenue N Planning Underway: • Delridge Loop • Ballard Box • Rainier Valley • Central District • Lake City • University District

Page 11: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Delridge Neighborhood Greenway

Page 12: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Delridge Neighborhood Greenway Project Elements Include: • Raised crosswalk at SW Andover St • New corners with curbs on the south side of SW Brandon St • ADA ramps, speed humps, crosswalks and crossbikes • Radar speed feedback and 20mph signs on SW Genesee •Sidewalk and pavement repair • Wayfinding signs and markings • 20 mph speed limit along the greenway; stop signs for intersecting non-arterial streets

Before

After

Page 13: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Ballard Neighborhood Greenway

Existing half-signal

Page 14: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Ballard Neighborhood Greenway

Before

After

Sidewalk Repair Widened sidewalk at Seaview

Page 15: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Additional Neighborhood Greenways

Planning underway for:

•Delridge Loop

•Ballard Box

•Rainier Valley

•Central District

•Lake City

•University District

Page 16: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Downtown Cycle Track

Next Steps: • Bicycle Master Plan adoption • 30% design for approximately 2 miles downtown

• Final design of an initial .25 miles for 2014 construction

Page 17: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

West Seattle Bridge Trail Access

• Site evaluation and data collection underway • Consultant selection starting • Goal is charrette in Summer 2013

Page 18: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013  · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions

Questions?