Grid Operational Efficiency Project HIFFI (WfM implementation)

Date post: 07-Jan-2016
Category:
Upload: monita
View: 27 times
Download: 0 times
Share this document with a friend
Description:
Grid Operational Efficiency Project HIFFI (WfM implementation). Kosice, May 2011 VSE a.s., Košice, Slovakia Marian Mester, head of Grid operation Juraj Sabol , head of IT and telco mamagement section. Company Profile energy utility company member of the RWE Group since 2003 - PowerPoint PPT Presentation
11
Frankfurt (Germany), 6-9 June 2011 Grid Operational Efficiency Project HIFFI (WfM implementation) Kosice, May 2011 VSE a.s., Košice, Slovakia Marian Mester, head of Grid operation Juraj Sabol , head of IT and telco mamagement section
Transcript
Page 1: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

Grid Operational Efficiency

Project HIFFI (WfM implementation)

Kosice, May 2011

VSE a.s., Košice, SlovakiaMarian Mester, head of Grid operation

Juraj Sabol , head of IT and telco mamagement section

Page 2: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

Company Profile energy utility company

member of the RWE Group since 2003

more than 605 000 points of delivery

mission = provide reliable and complex services which correspond to the needs of customers

sold more than 3,2 TWh in 2010

average number of employees = 1,575

Shareholders

National Property Fund: 51 % RWE: 49 %

Distribution area: 16 221 km2

HV Lines: 1 274 km

HV & MV substations: 56

MV Lines & Cables: 8 207 km

MV/LV Distribution stations: 4 974

LV Lines & Cables: 10 986 km

Page 3: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

3

Implementation of workforce management system with several aims (Part 1):

Efficiency / Productivity

Operational excellence / Reduction of operational costs / Cost transparency

Implementation of workflow-system for systematic, fully standardized and

asset condition oriented maintenance

Optimal allocation of human and production capacities

Optimal distribution of working orders related to priorities, geographical

location, optimal time reaction in case of outage / failure

Page 4: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

Implementation of workforce management system with several aims (Part 2):

Grid quality: improve SAIFI and SAIDI

Reduction of critical assets (asset in bad technical conditions) by condition and risk-

based maintenance

Asset operational safety

High quality and actual data of asset conditions support short and mid-term CAPEX /

OPEX planning

Reasonable allocation of financial means for asset renewal (CAPEX / OPEX)

Reduction of numbers of used IT systems (registers of asset conditions, planning of

maintenance activities, ...)

Standardization of IT landscape (unified integration platform)

Regulation / Grid Quality / Renewal of Grid Assets

Page 5: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

Long term preparation for WfM project

Grid Organization One grid unit (aprox 250 people) fully responsible for HV/LV :

- HV/LV grid maintenance- Power failure HV/LV repairs- Off take management- 24 x 7 emergency service

Solid IT background Implemented GIS containing detailed technical records of electricity distribution

devices (VHV, HV and LV devices) SAP as a source of grid economic data GIS fully integrated with SAP (GIS is master)

Page 6: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

6

Workforce management as tool for efficient grid services being implemented

2nd phase2011

1st phase2009 - 2010

3rd phase2012

Content

Pilot project finalization (in one region)

Target asset: distribution transformer stations (MV/LV)

Project roll-out to all regions

Target assets: MV-grid

Interconnection WfM system with SCADA

Project finalization Target assets: LV-

grid + Metering Full operation of

WfM system (all voltage levels)

Lessons learned / Expectation

Basic processes setting Mobile devices

experiences

Standardization of MV-maintenance activities

Higher data quality and actual data of MV-asset condition

Systematic and fully standardized asset condition maintenance

Reasonable allocation of financial means

Status 2008 Grid services operation without IT support, workforce coordination done by daily orders Necessity to optimize and increase efficiency has led to implementation of work force

management as of 2009

full

op

erat

ion

of

WfM

at a

ll vo

ltag

e le

vels

Page 7: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

7

Implementation of workforce management system as single system for grid operation and maintenance :

Despite complex IT implementation, go-live expected in 3Q 2011VSE as innovative first mover in CEE

IT platform - Primary systems

SAP- ISU

Outage managementSCADA

IBM MAXIMO

Off – takes management

Grid Maintenance

Grid operation and maintenance

WfM based on IBM Maximo

Real time operated

Real time integrated with other systems

Page 8: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

Workforce management system as a top decision support system for MV/LV based on other systems in VSE IT pool

8

Page 9: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

WfM is integrated with important IT systems in real time

9

implemented

planned

IBM

Maximo

Forms

server

Archive

server

HIFFI SYSTEM

GISSCADA

(OMS)GPS

SAP HRSAP PM

(ERP)

Attend.

system

SA

P-

PI

SA

P-

PI

Mobile clients

(tablets)

GSM networ

k

Page 10: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

HIFFI project - status quo (31.05.2011)

10

Project preparation: detail process analysis, definition of project goals, technical specification, tendering documentation etc.

Procurement process

Business Blueprint

Business Blueprint approval

1st phase: Pilot project implementation (Region Humenné)

2nd phase: Testing of system funcionality (MV-grid+DTs)

2nd phase: Roll-out (MV-grid+DTs)

2nd phase: full operation (MV grid+DTs)

3rd phase: Business Blueprint (LV-grid+Metering)

3rd phase: Implementation (LV-grid+Metering)

3rd phase: Testing (LV-grid+Metering)

3rd phase: Go Live (LV-grid+Metering)

2012

1Q 2Q 3Q 4Q4Q4Q

2010

1Q

2011

1Q 2Q 3Q 4QTime schedule of HIFFI project

1Q 2Q 3Q

2008 2009

4Q2Q1Q 2Q3Q 3Q

Page 11: Grid Operational Efficiency Project HIFFI  (WfM implementation)

Frankfurt (Germany), 6-9 June 2011

Project HIFFI – example of benefits

Regions / 4 x

Sub-Regions / 12x

Operational Service Points / 26 x

Regions / 1 x

Sub-Regions / 8 x

Operational Service Points / 24 x

Region „A“

Region „B“

Region „C“Region

„D“

The grid operation organization before HIFFI The organization having HIFFI