ANNEXURE -1 LOSS OF PUNCTUALITY OF MAIL/EXPRESS TRAINS (OHE & GRID)
Sl. No.
Date No. of Trains
Train No.
Detn. (Minute)
Section affected (with
inspection schedule)
Brief details of incidence Cause of Failure Responsibility Remedial Action taken to prevent
recurrence.
1. 19.03.12 01 18622 148 STL-JAJ Both stay and bracket insulators (JSI
10/93 & JSI 5/93) at loc. no. 351/17
were flashed and parted. Pantogrph of
Loco. No. 22415 of Train no. 53049
UP was entangled with hanging
cantilever assembly and broken.
There is no evident cause of flashing of
insulators. However, flashing of insulators
may have occurred due to early morning
dew and missing of structure bond at loc.
no. 351/17. Structure bond at the location
was missing due to change of rails by Engg
dept.
-- Availability of
structure bond will be
ensured.
ANNEXURE -1A
TRD INCIDENTS REPORTED FROM DIVISIONAL TRAFFIC CONTROL TO HEADQUARTER EMERGENCY CONTROL
Sl. No.
Date No. of Trains
Train No.
Detn. (Minute)
Section affected (with inspection
schedule)
Brief details of incidence Cause of Failure
Responsibility Remedial Action taken to prevent
recurrence. 1. 14.03.12 Nil -- -- -- Circuit breaker no. CB-127 at
SNQ/TSS was tripped at 03:10:36
hrs. Supply restored at 03:11:05 hrs.
Transient tripping. No abnormality found. -- --
2. 19.03.12 01 18622 148 STL-JAJ Both stay and bracket insulators (JSI
10/93 & JSI 5/93) at loc. no. 351/17
were flashed and parted. Pantogrph
of Loco. No. 22415 of Train no.
53049 UP was entangled with
hanging cantilever assembly and
broken.
There is no evident cause of flashing of
insulators. However, flashing of insulators
may have occurred due to early morning
dew and missing of structure bond at loc.
no. 351/17. Structure bond at the location
was missing due to change of rails by Engg
dept.
-- Availability of structure
bond will be ensured.
GRID SUPPLY FAILURE ANNEXURE -II
Sl. No.
Date Name of GSS/TSS
Supply Athority
From (hh:mm:ss)
To (hh:mm:ss)
Duration in
minutes Cause of failure
Detention of trains due to delay in feed extension
Cause of
delay Action taken
1. 16.03.12 JMT
BDME
JSEB
JSEB
08:02:00
08:02:00
08:08:00
08:09:00
06:00
07:00
Tripped from Mython Hydel end through
distance protection zone-3. -- -- --
2. 30.03.12 KMME
DVC 09:38:00
09:56:00
10:02:00
11:35:00
09:45:00
09:59:00
10:25:00
11:39:00
07:00
03:00
23:00
04:00
Line No. 16 & 17 both frequently tripped at
KMME/GSS at 132 kV side.
-- -- --
2
ANNEXURE -IIA TRIPPING DATA RELAY WISE ( NO. OF TRIPPINGS)
Auto reclosure action No. of trippings in the month TSS / GSS
Feeder CB No.
Tripping Target
Tripping during the month
Trip & close Lock out DPR OCR WPC Delta-I Panto flashover
CB-01 -- 10 10 -- 08 08 -- -- Not required. OYR/FP*
CB-02 -- 18 12 06 14 17 -- 01 Not required.
CB-03A -- 32 23 09 25 29 -- 01 Not required. KMME/FP
CB-04 -- 01 01 -- 01 01 -- -- Not required
CB-121 -- 07 07 -- 06 06 -- 04 Not required. JMT/TSS
CB-123 -- 03 03 -- 03 03 -- 02 Not required.
CB-125 -- -- -- -- -- -- -- -- Not required SNQ/TSS
CB-127 -- 13 09 04 08 07 -- 01 Not required.
TIF 0012 REV 2 PART-II LOG SHEET FOR FAILURES OF SS WIRE ROPE ANNEXURE –II B
FAILURE DUE TO Sl. No.
Section Location Make Month & Year of
Manufacturer
Specification to which
procured & P.O. number
Date of installation
of wire rope
Type of ATD Winch/ Pulley
Block/3- pulley/3- pulley
(modified)
Date of last maintenance
Date of
failure
Failure on OHE side/CW
side
Rope snapped
Corrosion/ pitting
marks on rope
Bird caging
loosening of wires
Deformation of wire rope
Date of application of lubricant
“BALMEROL ROPE LUBE-
1000” NIL
TIF 0012 REV 2 PART-III LOG SHEET FOR FAILURES OF SS WIRE ROPE DUE TO FAILURE OF ATD ONLY ANNEXURE –II C
FAILURE DUE TO Sl No.
Section Location Make Month & Year of
Manufacturer
Specification to which
procured & P.O.
number
Date of installation
of wire rope
Type of ATD Winch/ Pulley Block/3- pulley/3- pulley
(modified)
Date of last maintenance
Date of
failure
Failure on OHE side/CW
side
Seizure of bearing (if failure due to seizure of bearing mention bearing
No.)
Deformation of pulley groove
Alignment/ gazing of
side walls of pulley/drum
Overriding of wire rope
Date of application of
lubricant “BALMEROL ROPE LUBE-
1000” NIL
TIF-0014 PART-IV FAILURE REPORTING FORMAT OF THE TRANSFORMER (21.6/30.24 MVA OR 21.6 MVA) ANNEXURE –II D
Sl. No.
Division TSS Location
Make Voltage rating
MVA rating 21.6 or 21.6/30
MVA
Year of manufacture
Year of commissioning
Date of failure
Date and type of last maintenance
Details of failure/ defect including condition i.e. on load or off load
Action taken by Railways
Remarks including details of past failure if any
NIL
3
TIF–0015 Pt-IV FAILURE REPORTING FORMAT FOR THE SHUNT CAPACITOR BANK ANNEXURE –II/E
Division TSS/FP Make Date of commissioning
Date of failure
Details of failure Probable reasons of the
failure
Action taken by Railway
Corrective and preventive action suggested by the
Railway
Remarks including details of past failures if any
NIL
TIF-0016 Pt-III PROFORMA FOR STATISTICS OF A.C. CIRCUIT BREAKERS ANNEXURE –II/ F
Sl. No.
Division/ Post/ CB
No.
Make Rated Voltage &
Type
Sl. No. & Year of
Manufacture
Date/ Year of Commissioning
Date of failure
No. of operation before failure/
Defect
Details of Failure/ Defect & location on
installation
Action taken by Rly to rectify the
defect
Remarks
NIL
TIF-0016 Pt-IV PROFORMA FOR STATISTICS OF A.C. INTERRUPTORS ANNEXURE –II/G
Sl. No.
Division/ Post/ BM
No.
Make Rated Voltage & Type
Sl. No. & Year of Manufacture
Date/ Year of Commissioning
Date of failure
No. of operation before failure/
Defect
Details of Failure/ Defect & location on
installation
Action taken by Rly to rectify the defect
Remarks
NIL TIF-0018 PART-I FORMAT FOR INSULATOR FAILURE INFORMATION ANNEXURE –II/ H
Zonal Railways
Division Depot Section Location No.
Type of location (whether straight
line, inside curve, outside
curve, out of run, BWA
location, feeder location or any other to
be specified)
Distance of
location from
Anticreep & ATD
Location of
insulator (In Non-polluted zone or Polluted zone)
Type of insulator (Mention whether Stay Arm/ Bracket Tube/ 9-Tonne/
Sectioning Insulator
Creepage distance/ (850 mm/
1050 mm)
Make of the
Insulator
Month. & Year of
Manufacture
Year of commissioning/
Erection (whether New/
Released insulator)
Date of last maintenance
Date of failure
Weather condition/
clear/ foggy
/stormy/ rainy
Nature of failure
(Flashed, Flashed and Broken, Core broken viz. Mechanical
Breakage into two parts or more, Cap
slipping, Cap broken, any
other abnormality
found)
Apparent cause of failure [(i) SS wire rope/ Contact wire/
Catenary wire broken, (ii) Electrocution of Monkey/ Bird/ Snake etc. (iii) Short circuit due to dropping of stray wire/ foreign object, (iv) Panto
entanglement, (v) tree falling, (vi) Brake
block hitting the mast, (vii) Pollutant
deposition, (viii) any other reason (To be
specified)
Whether any
silicon greases was
applied on the
insulator
Stay 1050 mm
JSI
10/93
1998
27.08.11 19.03.12 Foggy Flashed and
broken
Suspected dew No E.Rly ASN JSME STL-
GHN
351/17 Inside
curve ACC-310
Mtrs.
BWA-244 Mtrs.
Non
polluted
zone Bracket 1050 mm JSI 05/93 New -- 19.03.12 Foggy Flashed and
broken
Suspected dew No
TIF-0019 REVISION PART-II CONTACT WIRE FAILURE ANNEXURE –II/ I
Particulars of failure Sl. No.
Div Type of failure Date Section Location CC/ Jointed contact wire
Year of Manufactu
re
Make Type of OHE conventional/ Tramway/ unregulated
At OOR/ IR of OHE
Insulated overlap/or uninsulated overlap
Approximate distance From
support
ATD free to move (Y/N)
Whether jumper location (Y/N)
Pollution area (Y/N)
Action taken Reason of failure
Nil
4
TIF-0024 PART-II FORMAT FOR FAILURE OF TOWER WAGONS ANNEXURE –II/ J
Date of last POH done on equipments Type of wagon
Division Tower wagon no
Make Engine Transmission
System Traction motor/ rectifier/ batteries
Generator/ Alternator
Last POH done on TW/ due date of POH
Recommended Maintenance
schedule followed before or not, with date
Date of failure and probable
reason of failure
Remedial action taken by Rlys on failure
Details of past failures, if any
Nil
ANNEXURE –III THEFT/ATTEMPTED THEFT
SL No. Date Section Location Theft Item Quantity Gross amount Net amount Joint note details Nil
CORPORATE MASTER ACTION PLAN A. MAINTENANCE ORIENTED WORK ANNEXURE –IV/I
Sl. No.
Item Unit Total Qty. as on 1st April of the current
financial year
Target for current financial
year
Prop. Target up
to the current month
Completed during
the Current month
Completed during the current financial
year
Short fall w.r.t. prop.
Target
Balance Cause of shortfall
Action taken for completion
of the balance work
1 2 3 4 5 6 7 8 9 10 11 12 1 AOH of OHE-AC TKM 1335 1335 1335 45.271 513.59 (-) 821.410 821.41 -- --
2 AOH of OHE-DC TKM -- -- -- -- -- -- -- -- --
3 Section Insulator (checking) No. 691 536 536 21 259 (-) 277 432 -- --
4 Section Insulator (cleaning) No. 691 536 536 21 259 (-) 277 432 -- --
5 PTFE (Checking & Cleaning) (AF) No. 28 28 28 1 27 (-) 1 01 -- --
6 PTFE (Checking & Cleaning) (BB) No. -- -- -- -- -- -- -- -- --
7 Retenesioning of FTA No. 316 162 162 2 9 (-) 307 307 -- --
8 POH of Regulating Equipment No. 2273 440 440 67 379 (-) 61 1894 -- --
9 AOH of Interrupter. No. 144 134 134 8 141 (+) 03 -- -- --
10 Adjustment of Cross over/Turn out No. 917 772 772 36 434 (-) 483 483 -- --
11 AOH of Isolator No. 415 331 331 19 209 (-) 122 206 -- --
12 AOH of Auxiliary Transformer No. 305 275 275 21 260 (-) 15 45 -- --
13 POH of switching stations. No. 18 18 18 -- 08 (-) 10 10 -- --
i) Stay No. -- All 24 225 -- -- -- --
ii) Bracket No. -- All 38 430 -- -- -- --
14 Replacement of all
broken/flashed over/
atena insulator. iii) 9-Tonne No. -- All
--
42 349 -- -- -- --
15 Application of Balmerol rope lube on SS wire rope No. 2273 1980 1980 181 1278 (-) 702 995
16 Replacement of catenary ending clamp during alternate POH. No. 4835 500 500 15 149 (-) 351 4686 -- --
17 Replacement of contact ending clamp during alternate POH. No. 3573 500 500 09 66 (-) 434 3507 -- --
5
1 2 3 4 5 6 7 8 9 10 11 12 18 POH of vacuum interrupter. No. 18 18 18 -- 02 (-) 16 16 -- --
19 POH of engine of 8-wheeler tower wagon. No. 03 03 03 -- 01 (-) 02 02 -- --
20 Checking of PG clamp of ‘G’ jumper. No. 15104 All All 1346 8015 -- 7089 -- --
21 Removal of failure prone insulator as per RDSO’s guideline. No. Nil All All -- -- -- -- -- --
22 Replacement of catenary make ‘C’ jumper by standard
jumper.
No. 134 134 134 21 184 (+) 50 -- -- --
23 Improvement of steady clearance. No. 1949 All All 28 334 -- 1615 -- --
i) Stay No. -- 740 9115 -- --
ii) Bracket No. -- 746 9419 -- --
24
Cleaning of insulators.
iii) 9-Tonne No. --
48874
144 1556 --
--
--
25 Earthing & bonding of OHE structure. No. 7246 All All 202 1558 -- 5688 -- --
26 Continuity of buried rail. No. 04 04 04 -- 04 -- -- -- --
27 Examination of Silica gel of power Transformer and CB/BM. No. 240 240 240 33 248 (+) 08 -- -- --
28 POH of Traction Transformer. No. -- 03 03 -- -- (-) 03 -- -- --
29 Tree trimming. No. All All All 399 2624 -- -- -- --
30 Visual inspection of SS wire rope during patrolling. No. 2273 All All 1969 21788 -- -- -- --
i) Catenary No. 3715 15 150 3565 -- 31 POH of ending clamps as per SMI No.
TI/MI/0034 (Rev-0). ii) Contact No. 3965 All
04 76 --
3889 --
32 Provision of double PG clamp on sectioning jumpers/’G’
jumpers.
No. 108 108 108 -- 27 (-) 81 81 -- --
33 Bird deterent gel to be provided from 1st Week of February
onward every year.
No. -- All All -- -- -- -- -- --
34 Live line checking by Tower Wagon. Km 830 830 830 16 942 -- -- -- --
35 Checking of anticreep wire. No. 692 692 692 27 282 (-) 410 410 -- --
36 Measurement of Equivalent salt deposit density(ESDD) -- -- -- -- -- -- -- -- -- --
37 Replacement of insulators by composite insulators in stone
pelting zone and for ESDD>0.3 No. 4516 3500 3500 -- 251 (-) 3249
4265 -- --
38 To check healthiness of the lightning arrester in lightening
prone area. 138 138 138 04 102 (-) 36 36
-- --
39 Joint checking of pantograph by TRD & TRS staff. No. All All All 158 1738 -- -- -- --
40 Tree branch trimming No. All All All 5848 30433 -- -- -- --
41 Cutting of trees with Engineering department. No. 465 465 465 142 439 (-) 26 26 -- --
42 Checking of RRA clamp to avoid necking & parting of contact
wire. No. 2235 2235 2235 43 646 (-) 1589
1589 -- --
43 Free movement of cantilever. No. 21592 21592 21592 585 9006 (-) 12586 12586 -- --
44 Checking of PG clamps, splices by thermo vision camera. No. 8550 8550 8550 -- 5666 (-) 2884 2884 -- --
45 Checking of all the along/vertical feeders opposite to
TSS/SP/SSP gantries. No. 90 90 90 10 135 (+) 45
-- -- --
6
B. WORK TO BE DONE WITH MAINTENANCE WORK-ONE TIME PROGRAMME
1 2 3 4 5 6 7 8 9 10 11 12 1 Replacement of worn out contact wire Km 12 10 10 -- 2.870 (-) 07.13 9.13 -- --
2 Replacement of week and over-aged Catenary wire. Km 10 10 10 -- 1.720 (-) 08.28 8.28 -- --
3 Replacement of conventional type steady arm by BFB steady
arm.
No. 3933 2000 2000 31 295 (-) 1705 3638 -- --
4 Anti theft jumpers at anti-creep point. No. 2681 500 500 05 114 (-) 386 2567 -- --
5 Replacement of pin insulator. No. 100 100 100 -- -- (-) 100 100 -- --
6 Mapping of OHE by Oliver G Plus for OHE spark detection. TKM 285 All All -- 156 -- 129 -- --
7 Adjustment of OHE parameters recorded by NETRA Car. No. 181 All All 06 138 -- -- -- --
8 Identification of 9-ton insulators having core dia of 72 mm
and appropriate action.
No. All All All -- 4942 --
-- -- --
9 Replacement of G-jumpers/cross feeders of 105 sq. mm with
150 sq. mm size in heavy loading locations.
No. All All -- -- -- --
-- -- --
C. WORKS TO BE DONE THROUGH SANCTIONED WORKS PRIORITY-1 (Required Power Block)
1 2 3 4 5 6 7 8 9 10 11 12
1 Providing guide tubes for counter weight movement. No. 156 80 80 03 46 (-) 34 110 -- --
2 Provision of insulated catenary under FOBs/ROBs. No. 29 11 11 -- 05 (-) 06 24 -- --
3 Replacement of earthing grides at TSSs/FPs. No. 03 03 03 -- -- (-) 03 03 -- --
4 Removal of all return conductors. Km. Nil 02 02 -- -- (-) 02 -- -- --
< 2.135 M No. 215 -- 12 -- -- --
2.136 - <2.16 M No. 129 -- 09 -- -- --
2.16 – 2.210 M No. 631 -- 26 -- -- --
2.211 – 2.36 M No. 1817
300 --
-- 52
--
-- -- --
2.37 – 2.50 M No. 1729 -- -- -- 01 -- -- -- --
5
Improvement of tight
implanted masts.
Total No. 4512 -- -- -- 100 -- -- -- --
6 Replacement of over aged isolators. No. 32 32 32 01 02 (-) 30 30 -- --
7 Replacement of over aged Lightning Arrestor. No. -- -- -- -- 13 -- -- -- --
8 Replacement of over aged PT. No. -- -- -- -- -- -- -- -- --
9 Replacement of Guy Rod Anchor by Dwarf Mast No. 20 -- -- -- 01 -- 19 -- --
10 Replacement of Alluminium cross feeder by Copper cross
feeder. No. 33 33 33 -- 01 (-) 32 32
-- --
11 Upgradation of Cap Bank. No. 03 03 03 -- 01 (-) 02 02 -- --
12 Conversion of fixed tensioning arrangement to auto tensioning
arrangement by providing balance weight anchor in
conventional AC OHE at different locatins.
No. 21 -- -- -- -- -- 21
-- --
13 Replacement of soldered type jumper connection to lugs at old
isolator bus connector by new copper bus bar terminal and
connector compression.
No. 64 64 64 -- -- (-) 64 64 -- --
7
1 2 3 4 5 6 7 8 9 10 11 12
14 Replacement of defaced Number Plates for location, isolators
and BM/CB etc.
No. 642 All All 202 1338 -- -- -- --
15 Anticorrosive painting of masts/portals -- -- -- -- -- -- -- -- -- --
16 Provision of PTFE neutral section replacing section insulator
type neutral section.
No. -- -- -- -- -- -- --
17 Replacement of turnbuckle type stay arm by conventional type
Stay arm.
No. 1424 1421 1421 -- 08 (-) 1413 1416
18 Replacements of earth wire in double track-circuited section. Km 4.00 2.00 2.00 -- 0.440 (-) 1.56 3.56
19 Provision of 250 gms capacity Silica Gel Breathers on 10 KVA
Aux. Transformers.
No. Nil All All -- 42 -- --
20 Replacement of OHE mast at platform with implantation less
than 4.75 m.
No. 63 63 63 -- -- (-) 63 63
21 Provision of drop bracket assembly as per drg No.
ETI/OHE/P/2360 along with steady arm as per Drg. No.
ETI/OHE/P/2390.
No. 3527 2000 2000 08 191 (-) 1809 3336
22 Provision of PTFE Neutral section. No. Nil -- -- -- -- -- --
23 Removal of all (279) OHE structure of implantation less than
2.135 Mtrs as on ASN division.
No. 215 215 215 -- 12 (-) 185 203
24 Shifting of metering point from grid sub-station to traction
sub-station.
No. 02 02 02 -- -- (-) 02 02
25 100 KVA Transformer to be replaced with 10 KVA at Traction
sub-station.
No. 02 02 02 -- 02 -- --
26 Provision of bird & monkey scare measures at portals &
designated locations. No. All -- -- -- 164 --
--
27 Replacement of rusted cantilever assembly No. 7985 1000 1000 05 190 (-) 810 7795
28 Replacement of overhead 11 KV crossing by under ground
cable. No. 27 27 27 -- -- (-) 27 27
D. WROKS TO BE DONE THROUGH SANCTIONED WORKS PRIORITY-I
(Required No Power Block) 1 2 3 4 5 6 7 8 9 10 11 12
1 Replacement / renovation of earth pits & provision of earthing
pits at all girder bridges.
No. 47 20 20 -- 35 (+) 15 12
2 Replacement of over aged batteries. Set 72 72 72 -- 02 (-) 70 70
3 Provision of spare battery charger. No. 05 05 05 -- 01 (-) 04 04
4 Painting of Balance weight and regulating equipment. No. 2273 1656 1656 -- 698 (-) 958 1575
5 Upgradation of sectioning Board. No. -- -- -- -- 04 -- --
6 Joint inspection of power line crossing over electrified track. No. 96 81 81 09 85 (+) 04 11
7 Provision of standard height gauge as per RDSOs Drawing. No. All 246 246 02 03 (-) 243 --
Single Masts No. All 6548 -- -- -- 6548 -- -- 8 Raising of foundation level and remuffing for
the masts where rail level has been increased
substantially in HWH-BWN-KAN section. Portals Masts No.
All 1076 -- -- -- 1076 -- --
8
1 2 3 4 5 6 7 8 9 10 11 12
9 Provision of stranded galvanized wire bond in place of M.S.
Flat bond in theft prone areas.
No. 3032 All All 146 478 -- 2554 -- --
10 Provision of screens to 1.83 M height on all FOBs to cover
gaps wherever existing between two lines. No. 15 15 15 -- -- (-) 15
15 -- --
E. WORKS TO BE DONE THROUGH SANCTIONED WORKS-PRIORITY-II
1 2 3 4 5 6 7 8 9 10 11 12
1 Removal of all abandoned OHE structures from along the
track.
No. 38 -- -- -- 23 -- 15 -- --
2 Implantation of masts with Ats as per prescribed dimension. Mast 86 86 86 -- -- (-) 86 86 -- --
3 Replacement of heavy duty section insulator by standard AC
(light duty) Section Insulator in HWH-BWN main line section. -- -- -- -- -- -- --
-- -- --
F. SPECIAL WORK
1 2 3 4 5 6 7 8 9 10 11 12
1 Replacement of 16 Nos, 3 track cantilever masts at Srirampore
in HWH division.
No. -- -- -- -- -- -- -- -- --
2 Removal of abandoned concrete portals at SHE-TAK section. -- -- -- -- -- -- -- -- -- --
3 Removal of cross span wire. -- 03 -- -- -- -- -- -- -- --
G. DEVELOPMENT ORIENTED WORK.
1 2 3 4 5 6 7 8 9 10 11 12
1 Organizing safety seminar by Depot In-Charge. Depot 108 108 108 05 81 (-) 27 27 -- --
a) At CKP No. 13 02 06 07 -- -- i) Supervisor
b) At THK No. 33 -- --
-- 10 --
23 -- --
ii) Group-C At CKP No. 82 -- -- 02 33 -- 49 -- --
2 Training to staff.
iii) Group-D At CKP No. 22 -- -- -- 12 -- 10 -- --
3 Time drill once in a month. Depot 84 84 84 03 31 (-) 53 53 -- --
FORMAT FOR MONITORING THE STATUS OF TIGHT IMPLANTATION Annexure-IV/III
PRESENT POSITION PROGRESS
Implantation
measured(Mtrs)
New
Implantation
Sl
No.
Depot Section Loc.No. Line
Forward Reverse
SED Value(Mtrs) Type of
mast
Date/Month of
replacement
Front Reverse
Type of
mast
Nil
9
ANNEXURE –IV/II
CORPORATE RELIABILITY ACTION PLAN FOR TRD ASSETS TO IMPROVE PUNCTUALITY
Sl. No. Item Unit Total Qty. as on 1st
April of the current financial year
Target for current
financial year
Prop. Target up to the current
month
Completed during the Current month
completed during the current
financial year
Short fall w.r.t. prop.
Target
Balance Cause of shortfall
Action taken for completion of the balance work
1. Replacement of worn out contact wire Km 12 10 10 -- 2.870 (-) 07.13 9.130 -- --
2. AOH of OHE-DC TKM N.A. -- -- -- -- -- -- -- --
3. AOH of OHE-AC TKM 1335 1335 1335 45.271 513.59 (-) 821.410 821.41 -- --
4. Section Insulator (checking) No. 691 536 536 21 259 (-) 277 432 -- --
5. Section Insulator (cleaning) No. 691 536 536 21 259 (-) 277 432 -- --
6. PTFE (Checking & Cleaning) (AF) No. 28 28 28 1 27 (-) 1 01 -- --
7. PTFE (Checking & Cleaning) (BB) No. N.A. -- -- -- -- -- -- -- --
8. Retenesioning of FTA No. 316 162 162 2 9 (-) 153 307 -- --
9. POH of Regulating Equipment No. 2273 440 440 67 379 (-) 61 1894 -- --
10. AOH of Interrupter. No. 144 134 134 8 141 (+) 07 -- -- --
11. Adjustment of Cross over/Turn out No. 917 772 772 36 434 (-) 338 483 -- --
12. AOH of Isolator No. 415 331 331 19 209 (-) 122 206 -- --
13. AOH of Auxiliary Transformer No. 305 275 275 21 260 (-) 15 45 -- --
14. Provision of Hex. Tie Rod on ATD. No. 90 -- -- -- -- -- -- -- --
10
ANNEXURE – IV/A AOH OF OHE
Progress in Nos. Progress in ETKM Sl. No.
Item Multiplying Factor
Total on line
Yearly target
During the month
Cumulative up to
current month
Prop. Target
(-) Short fall / (+) Excess
During the month
Cumulative up to
current month
Prop. Target
(-) Short fall (+) Excess
1 AOH of OHE-DC (TKM)
1.4 NIL -- -- -- -- -- -- -- -- --
2 AOH of OHE-AC (TKM)
1 1335 1335 45.271 513.59 1335.000 (-) 821.410 45.271 513.590 1335.000 (-) 821.410
3 Section Insulator (checking) [No.] 0.22 691 536 21 259 536 (-) 277 4.620 56.980 117.920 (-)60.940
4 Section Insulator (cleaning) [No.] 0.16 691 536 21 259 536 (-) 277 3.360 41.440 85.760 (-)44.320
5 (i)
PTFE (Cleaning) (Arthur Flury) 0.38 28 28 1 27 28 (-) 1 0.380 10.260 10.640 (-)0.380
5 (ii)
PTFE (Cleaning) (Belfour Beaty) 0.38 NIL -- -- -- -- -- -- -- -- --
6 Retenesioning of FTA [ No.]
0.67 316 162 2 9 162 (-) 307 1.340 6.030 108.540 (-) 102.510
7 POH of Regulating Equipment [No.] 0.33 2273 440 67 379 440 (-) 61 22.110 125.070 145.200 (-) 20.130
8 AOH of Interrupter [No.] 0.16 144 134 8 141 134 (+) 03 1.280 22.560 21.440 (+) 1.120
9 Adjustment of Cross over/ turnout [No.] 0.33 917 772 36 434 772 (-) 483 11.880 143.220 254.760 (-) 111.540
10 AOH of Isolator [No.] 0.22 415 331 19 209 331 (-) 122 4.180 45.980 72.820 (-) 26.840
11 AOH of Auxiliary Transformer [No.] 0.16 305 275 21 260 275 (-) 15 3.360 41.600 44.000 (-) 2.400
12 POH of Cantilever [No.] 0.66 24441 150 1 121 150 (-) 29 0.660 79.860 99.000 (-) 19.140
13 “G” jumper 0.3 860 860 25 303 860 (-) 557 7.500 90.900 258.000 (-)167.100
TOTAL 105.941 1177.490 2553.080 (-) 1375.590
11
ANNEXURE – IV/A/I
PROFORMA FOR MONITORING THE PROGRESS OF AOH OF OHE
ETKM (AOH) Sl.
No.
Division
Depot
RKM
TKM Annual Target
Prop. Target
Achievement during the month
Cumulative Progress
Shortfall (-) Excess (+)
1 Panagarh 60 278 419 419 36.672 237.061 (-) 181.939
2 Andal
31 423 760 760 10.402 122.726 (-) 637.274
3 Asansol 30 161 333 333 14.242 119.038 (-) 213.962
4 Barakar
39 122 183 183 07.297 136.288 (-) 46.712
5 Jamtara 44 126 190 190 10.821 151.213 (-) 38.787
6 Madhupur 37 112 148 148 09.825 142.359 (-) 05.641
7 Jasidih
58 113 154 154 12.993 159.941 (+) 05.941
8
ASANSOL
Total 299 1335 2187 2187 102.252 1068.626 (-) 1118.374
12
ANNEXURE-IV/B
CLEANING OF PTFE NEUTRAL SECTION
Sl No.
Name of FP/SP
Location
Line
Last date of checking/ Cleaning
Remarks
146/2B DN Line-2 24.08.2011 Provided on 07.06.2009 (Arthur Flurry)
146/2C DN Line-1 04.04.2010 Provided on 11.06.2009 (Arthur Flurry)
146/1B UP Line-2 23.08.2011 Provided on 20.12.2009 (Arthur Flurry)
1.
MNAE/SP
145/27 UP Line-1 23.08.2011 Provided on 24.12.2009 (Arthur Flurry)
177/19 UP Line-1 14.06.2011 Replaced by Arthur flurry type on 21.03.2009
177/19A UP Line- 2 06.05.2011 Replaced by Arthur flurry type on 22.03.2009
178/6 DN Line-1 14.06.2011 Replaced by Arthur flurry type on 15.02.2005 2. OYR/FP
178/4A1 DN Line- 2 13.06.2011 Replaced by Arthur flurry type on 23.03.2009
203/332 UP Line-1 21.02.2012 Provided on 31.12.2003 (Arthur Flurry)
203/33A UP Line-2 12.02.2012 Provided on 29.12.2003 (Arthur Flurry)
203/34 1 DN Line-1 09.09.2010 Provided on 17.01.2004 (Arthur Flurry) 3. KPK/SP
203/34A2 DN Line-2 04.03.2012 Provided on 18.01.2004 (Arthur Flurry)
232/13 UP/GC 03.05.2011 Replaced by Arthur flurry type on 02.12.03 4. KMME/FP
232/18 DN/GC 25.06.2011 Replaced by Arthur flurry type on 17.04.2007
244/11 UP/GC 08.04.2010 Replaced by Arthur flurry type on 07.04.2007 5. KAO/SP
245/6 DN/GC 11.03.2011 Replaced by Arthur flurry type on 09.04.2007
235/41 UP/ML 28.12.2011 Provided on 10.09.2004 (Arthur Flurry) 6. CRJ/SP
235/42 DN/ML 11.05.2011 Provided on 11.10.2004 (Arthur Flurry)
250/09 UP/ML 24.11.2010 Replaced by Arthur flurry type on 05.04.2007 7. JMT/TSS
250/20 DN/ML 08.12.2011 Replaced by Arthur flurry type on 10.7.2004
281/25 UP/ML 14.12.2011 Provided on 10.03.2004 (Arthur Flurry) 8. JRW/SP
281/26 DN/ML 03.04.2010 Provided on 25.11.2004 (Arthur Flurry)
313/5 UP/ML 24.04.2011 Replaced by Arthur flurry type on 12.04.2007 9. SNQ/TSS
313/6 DN/ML 24.04.2011 Replaced by Arthur flurry type on 11.04.2007
335/23 UP/ML 14.09.2011 Provided on 19.12.2003 (Arthur Flurry) 10. LHB/SP
335/24 DN/ML 09.08.2011 Provided on 22.12.2003 (Arthur Flurry)
260/1 UP/GC 14.07.2011 Provided on 22.07.2007 (Arthur Flurry) 11. PKA/FP
260/2 DN/GC 17.07.2011 Provided on 25.07.2007 (Arthur Flurry)
13
REPLACEMENT OF 9 TON INSULATOR BY TESTED 9 TON INSULATOR ANNEXURE –IV/D
LOCATION SECTION MAKE OF INSULATOR REPLACED BATCH OF INSULATOR REPLACED REPLACED BY – MAKE REPLACED BY- BATCH 186/21 UDL/RRI-UDL/WC -- -- Deccan 01/11
194/13A RNG-NMC -- -- MCPL 11/07
194/13-16 RNG-NMC -- -- M-India 05/05
194/26-24 RNG-NMC -- -- M-India 11/07
318/12 JSME-SNQ M-India 10/94 AESPL 10/09
293/37 MDP-MUW M-India 06/94 Deccan 2010
273/1 VDS-JRW M-India 06/94 AESPL 2010
274/7 VDS-JRW JSI 03/94 GTSL 2007
276/21 VDS-JRW JSI 05/94 GTSL 2007
277/33 VDS-JRW M-India 10/94 GTSL 2007
280/25 VDS-JRW M-India 03/94 GTSL 08/09
280/33 VDS-JRW JSI 04/94 GTSL 10/07
271/29 VDS-JRW M-India 10/94 GTSL 2007
272/3 VDS-JRW M-India 03/94 GTSL 2007
276/15 VDS-JRW M-India 06/94 GTSL 12/07
227/16A BRR-ULT W.Ger 11/58 MCPL 2011
236/18A MMU Yard NGK 1978 MCPL 2011
MMU/61 Pandra Siding M-India 11/06 Deccan 2008
227/18 BRR-ULT M-India 12/88 Deccan 04/11
154/20A PAN-MNAE M-India 06/05 Deccan 08/08
169/31 RBH-DGR CGEC 1963 Deccan 08/09
140/5A-3 PAJ-MNAE M-India 04/80 GTSL 08/09
144/2 PAJ-MNAE M-India 04/07 GTSL 01/11
169/48A RBH-DGR M-India 08/03 GTSL 01/11
169/16A RBH-DGR M-India 04/07 MCPL 2008
145/18 MNAE-PAN M-India 03/08 MCPL 01/11
153/39 MNAE-PAN M-India 05/05 MCPL 04/09
153/33A MNAE-PAN NGK 1982 Deccan 08/08
171/14 DCOP-RBH CGEC 1961 MCPL 04/09
162/39 PAN-RBH WG 1982 Deccan 01/11
162/23 PAN-RBH CGEC 1964 GTSL 01/11
162/40 PAN-RBH M-India 04/88 Deccan 08/08
162/55 PAN-RBH M-India 12/08 Deccan 08/08
170/55A PAN-RBH M-India 12/08 Deccan 08/08
128/12A PAN-RBH M-India 04/07 Deccan 08/08
209/13 ASN-KPK M-India -- MCPL 08/09
221/18E STN Yd. M-India 07/03 MCPL 08/09
221/12G STN Yd. M-India -- MCPL 08/09
207/27A ASN-KPK JSI -- MCPL 08/09
MEMU/1027 UP/Yd.-2/ASN JSI -- MCPL 08/09
MEMU/1011 UP/Yd.-2/ASN W.Ger 1982 MCPL 04/09
14
LOCATION SECTION MAKE OF INSULATOR REPLACED BATCH OF INSULATOR REPLACED REPLACED BY – MAKE REPLACED BY- BATCH 336/3 JSI 04/96 Deccan 2010
330/23 JSI 03/96 Deccan 04/11
337/17 JSI 03/96 Deccan 04/11
363/15 JSI 04/96 AESPL 2010
348/28 JSI 03/96 Deccan 04/11
350/37 M-India 04/95 AESPL 2010
352/10 M-India 10/94 AESPL 2010
ANNEXURE -IV/E REPLACEMENT OF FAILURE PRONE INSULATOR
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION MAKE BATCH MAKE BATCH
NIL
REPLACEMENT OF BROKEN/FLASHED OVER INSULATOR ANNEXURE -IV/F
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) MAKE BATCH MAKE BATCH
1 169/48A DCOP-RBH 9-Ton Insulator -- -- GTSL 01/11
2 169/12A DCOP-RBH 9-Ton Insulator -- -- MCPL 2008
3 227/16A BRR-ULT 9-Ton Insulator -- -- MCPL 2011
4 153/39A MNAE-PAJ 9-Ton Insulator -- -- MCPL 04/09
5 153/33A MNAE-PAJ 9-Ton Insulator -- -- Deccan 08/08
6 145/18A MNAE-PAJ 9-Ton Insulator -- -- MCPL 01/11
7 145/12 MNAE-PAJ 9-Ton Insulator -- -- Deccan 10/10
8 171/14A PAJ-MNAE 9-Ton Insulator -- -- MCPL 04/09
9 221/18E DCOP-RBH 9-Ton Insulator -- -- MCPL 08/09
10 207/24A DCOP-RBH 9-Ton Insulator -- -- MCPL 08/09
11 162/39 DGR-RBH 9-Ton Insulator -- -- MCPL 01/11
12 MEMU/1022 ASN 9-Ton Insulator -- -- MCPL 08/09
13 MEMU/1011 ASN 9-Ton Insulator -- -- MCPL 04/09
14 162/40 RBH-PAN 9-Ton Insulator -- -- Deccan 01/08
15 276/21 VDS-JRW 9-Ton Insulator -- -- GTSL 04/07
16 350/ STL-JAJ 9-Ton Insulator -- -- AESPL 2010
17 348/28 STL-JAJ 9-Ton Insulator -- -- Deccan 04/11
18 293/27 MDP-MUW 9-Ton Insulator -- -- Deccan 2010
19 273/7 VDS-JRW 9-Ton Insulator -- -- AESPL 2010
20 273/1 VDS-JRW 9-Ton Insulator -- -- Deccan 2010
21 330/23 STL-JAJ 9-Ton Insulator -- -- Deccan 04/11
22 227/25 STL-JAJ 9-Ton Insulator -- -- Deccan 04/11
23 CLW/10 CLW Sdg. 9-Ton Insulator -- -- Deccan 07/10
15
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) Make Batch Make Batch
24 CLW/13 CLW Sdg. 9-Ton Insulator -- -- Deccan 07/10
25 227/10 KAO-CAM 9-Ton Insulator -- -- Deccan 04/11
26 PMC/16A Kottadih Sdg 9-Ton Insulator -- -- Deccan 08/09
27 PMC/17A Kottadih Sdg. 9-Ton Insulator -- -- Deccan 08/09
28 203/17A RNG-KPK 9-Ton Insulator -- -- MCPL 01/11
29 128/12A GLI-KAN 9-Ton Insulator -- -- Deccan 08/08
30 MMU/61 MMU 9-Ton Insulator -- -- Deccan 2008
31 170/55A DGR-RBH 9-Ton Insulator -- -- Deccan 08/08
32 236/8A MMU-KAO 9-Ton Insulator -- -- MCPL 2011
33 162/39 RBH-PAN 9-Ton Insulator -- -- GTSL 05/09
34 271/24 JRW-MDP 9-Ton Insulator -- -- GTSL 11/07
35 272/3 JRW-MDP 9-Ton Insulator -- -- GTSL 11/07
36 352/10 JAJ-STL 9-Ton Insulator -- -- AESPL 04/11
37 280/25 VDS-JRW 9-Ton Insulator -- -- GIL 08/09
38 280/33 VDS-JRW 9-Ton Insulator -- -- GIL 10/07
39 238/8 KAO-MMU 9-Ton Insulator -- -- Deccan 03/08
40 145/9 MNAE-PAJ 9-Ton Insulator -- -- GTSL 11/07
41 142/15A PAN-MNAE 9-Ton Insulator -- -- MCPL 01/11
42 356/23 LHB-STL 9-Ton Insulator -- -- Deccan 04/11
1 138/22 MNAE-PAJ Bracket Insulator -- -- MCPL 2010
2 138/8 MNAE-PAJ Bracket Insulator -- -- Deccan 2010
3 138/22 MNAE-PAJ Bracket Insulator -- -- Deccan 2010
4 121/2 GLI-KAN Bracket Insulator -- -- MCPL 10/10
5 121/14 GLI-KAN Bracket Insulator -- -- DEccan 10/10
6 121/18 GLI-KAN Bracket Insulator -- --- MCPL 07/10
7 121/22 GLI-KAN Bracket Insulator -- -- Deccan 10/10
8 230/28 GLI-KAN Bracket Insulator -- --- Deccan 2009
9 MEMU/1016A ASN Bracket Insulator -- -- Deccan 07/09
10 225/40 STN-SLS Bracket Insulator -- -- Deccan 07/10
11 363/8 LHB-STL Bracket Insulator -- -- AESPL 01/11
12 362/2 LHB-STL Bracket Insulator -- -- AESPL 01/11
13 296/28 MDP-MUW Bracket Insulator -- -- GTSL 08/08
14 297/8 MDP-MUW Bracket Insulator -- -- Deccan 07/10
15 239/5 CRJ-JMT Bracket Insulator -- -- Deccan 07/10
16 286/25 JRW-MDP Bracket Insulator -- -- Deccan 07/10
17 264/1 KEE-VDS Bracket Insulator -- -- Deccan 09/10
18 262/28 KEE-VDS Bracket Insulator -- -- Deccan 07/10
19 319/10 SNQ-MUW Bracket Insulator -- -- Deccan 07/10
16
Insulator replaced New insulator provided Sl No.
LOCATION
SECTION
Type of insulator (9-T, BKT, Stay) Make Batch Make Batch
20 319/14 SNQ-MUW Bracket Insulator -- -- Deccan 07/10
21 293/38 MDP-MUW Bracket Insulator -- -- Deccan 2010
22 264/12 KEE-VDS Bracket Insulator -- -- AESPL 2011
23 212/10 MDP-MUW Bracket Insulator -- -- Deccan 10/10
24 212/12 MDP-MUW Bracket Insulator -- -- Deccan 10/10
25 124/25 GLI-KAN Bracket Insulator Deccan 10/10
26 122/18 GLI-KAN Bracket Insulator -- -- MCPL 07/11
27 122/26 GLI-KAN Bracket Insulator -- --- MCPL 2010
28 PMC/16 Kottadih Sdg. Bracket Insulator -- -- M-India 01/10
29 PMC/21 Kottadih Sdg Bracket Insulator -- -- Asiatic 01/10
30 167/18 OYR-DCOP Bracket Insulator -- -- Deccan 11/10
31 161/46 RBH-PAN Bracket Insulator -- -- Deccan 07/10
32 PMC/12 Kottadih Sdg. Bracket Insulator -- -- M-India 10/10
33 PMC/13 Kottadih Sdg. Bracket Insulator -- -- M-India 11/10
34 PMC/14 Kottadih Sdg. Bracket Insulator -- -- M-India 11/10
35 226/7 SLS-STN Bracket Insulator -- -- AESPL 01/11
36 195/12 KPK-RNG Bracket Insulator -- -- Deccan 08/10
37 209/23G KPK-ASN Bracket Insulator -- -- MCPL 2009
38 336/25 LHB-STL Bracket Insulator -- -- AESPL 2010
1 138/12 MNAE-PAJ Stay Insulator -- -- AESPL 2010
2 138/28 MNAE-PAJ Stay Insulator -- -- MCPL 2010
3 121/14 GLI-KAN Stay Insulator -- -- BHEL 11/08
4 120/68 GLI-KAN Stay Insulator -- -- MCPL 10/10
5 126/18 GLI-KAN Stay Insulator -- -- BHEL 11/08
6 363/8 LHB-STL Stay Insulator -- -- AESPL 01/11
7 261/21 KEE-VDS Stay Insulator -- -- Deccan 2009
8 261/17 KEE-VDS Stay Insulator -- -- Deccan 2009
9 261/19 KEE-VDS Stay Insulator -- -- Deccan 2009
10 296/28 MDP-MUW Stay Insulator -- -- Deccan 08/10
11 297/8 MDP-MUW Stay Insulator GTSL 05/08
12 239/8 CRJ-JMT Stay Insulator AESPL 06/10
13 286/25 JRW-MDP Stay Insulator -- -- GTSL 05/08
14 294/3 JRW-MDP Stay Insulator -- -- GTSL 05/08
15 291/18 MDP-MUW Stay Insulator -- -- AESPL 2010
16 292/12 MDP-MUW Stay Insulator -- -- AESPL 2010
17 122/20 GLI-KAN Stay Insulator -- -- MCPL 2010
18 PMC/16 Kottadih Sdg. Stay Insulator -- -- Asiatic 01/10
19 PMC/21 Kottadih Sdg. Stay Insulator -- -- Asiatic 01/10
20 227/25 SLS-STN Stay Insulator -- -- GIL 2011
21 213/8 ASN-BCQ Stay Insulator -- -- MCPL 2009
22 209/25G KPK-ASN Stay Insulator -- -- MCPL 2009
23 209/28G KPK-ASN Stay Insulator -- -- MCPL 2009
24 209/29G KPK-ASN Stay Insulator -- -- MCPL 2009
17
SURVEY OF INSULATOR DURING AOH ANNEXURE -IV/G
9-Ton Stay Bracket Others
Numbers Numbers Numbers Numbers
AOH done in no. of
locations
Make Batch Porc. Compo
Make Batch Porc. Compo
Make Batch Porc. Compo
Type
Make Batch Porc. Compo
CGEC 1963 09 BHEL 2008 06 CGEC 1963 12 JSI 02/91 01
CGEC 1960 01 BHEL 1986 14 CGEC 1959 14 JSI 12/94 01
CGEC 1964 08 Deccan 2009 08 CGEC 1960 12
IEC 09/03 02 Deccan 2007 11 CGEC 1964 04
IEC 09/02 01 CGEC 1963 23 Deccan 11/10 03
Deccan 2020 04 CGEC 1959 01 Deccan 10/10 10
JSI 04/94 01 CGEC 1964 09 Deccan 2007 04
JSI 03/89 01 GTSL 2008 01 Deccan 2010 05
JSI 03/94 03 GTSL 2009 09 GIL 2009 01
M-India 06/04 02 GTSL 2010 08 GIL 2007 01
M-India 0288 01 GTSL 05/08 03 Deccan 2008 02
M-India 2003 06 GIL 2008 02 IEC 12/05 08
M-India 06/94 03 JSI 02/94 07 AESPL 01/11 01
M-India 05/94 04 JSI 01/94 01 GIL 2008 03
M-india 10/94 02 JSI 08/93 02 GIL 2009 07
GTSL 2008 01 JSI 10/93 31 GIL 2010 01
MCPL 2011 01 JSI 06/92 01 IEC 06/99 01
MCPL 2009 01 JSI 01/93 02 GTSL 2009 08
MCPL 08/09 07 JSI 06/94 16 GTSL 2007 01
MCPL 2007 01 JSI 05/94 19 GTSL 2008
GTSL 2009 04 JSI 04/94 32 JSI 03/92 09
GTSL 01/07 01 JSI 09/93 12 JSI 10/93 03
WSI 02/88 04 JSI 03/95 02 JSI 02/93 05
JSI 03/94 54 JSI 03/93 10
JSI 10/94 01 JSI 09/93 01
JSI 03/93 02 JSI 03/94 12
M-india 06/03 01 JSI 05/92 06
M-India 03/08 27 JSI 03/95 03
NGK 1980 06 JSI 04/94 22
IEC 10/08 01 JSI 05/94 48
MCPL 10/10 18 JSI 06/94 10
M--India 11/08 05 JSI 12/93 01
M--India 01/08 10 JSI 02/95 01
Core
M-India 09/07 04 JSI 02/94 04
M-India 08/04 01 JSI 11/89 08
M-India 04/06 12 MCPL 2010 15
491Nos.
M-India 02/06 04 MCPL 2009 04
18
9-Ton Stay Bracket Others
Number Number Number Number Make Batch Porc. Compo
Make Batch Porc. Compo
Make Batch Porc. Comp.
Type Make Batch
Porc. Compo AESPL 2010 03 M-india 07/03 01 M-India 03/03 01 M-india 02/06 03
NGK 1978 05 M-india 02/00 04 N 1959 20 M-india 03/08 0601 M-India 10/09 01 M-india 04/07 05 M-India 06/06 01 SEP 1964 12
WSI 12/88 01 Portugal 1979 04 NGK 1988 01 Portugal 1978 01 M-India 01/07 12 M-India 08/03 02 M-India 05/05 01 BHEL 12/86 06
M-India 01/00 01 OKT 1963 33 M-India 12/99 02 Portugal 1989 07 MCPL 2009 01 SEP 1963 30 Portugal 1979 04 AESPL 2009 03
M-India 03/07 17 WSI 10/88 01 M-India 06/00 06 JSI 06/09 01 M-India 02/07 02 M-India 11/01 01 M-India 06/07 13 AESPL 2010 02
M-India 02/08 15 Portugal 1980 02 M-India 09/05 06 BHEL 2008 03 M-India 04/08 01 M-India 2003 02 M-India 05/00 02 M-India 05/03 01
M-India 08/08 03 M-India 02/07 14 M-India 01/00 01 M-India 05/00 02
M-India 01/99 02 M-India 11/04 04 M-India 02/08 11 MCPL 10/10 MCPL 2007
MCPL 09/07 01 M-India 09/06 04 M-India 04/08 03 M-India 2007 02
M-India 03/07 08
19
ATTENTION TO DEFECTS/DEFICIENCIES RECORDED BY NETRA CAR ANNEXURE -V
Category ‘A’ Stg>450 mm Category ‘B’ Stg <450mm and >350 mm Category ‘C’ Stg <350mm >300 mm Sl No. Section Total TKM run Total
location (as on 01.11.11)
Location attended during the month
Cumul attended
Balance Total location (as on
01.04.11)
Location attended during the month
Cumul attended
Balance Total location (as on
01.04.11)
Location attended during
the month
Cumul attended
Balance
01 KAN-ASN 92 -- -- -- -- 03 -- 01 02 20 -- 07 13
02 ASN-JAJ 154 01 -- 01 -- 17 01 17 -- 29 01 22 07
03 JAJ-ASN 154 -- -- -- -- 24 -- 23 01 16 -- 13 03
04 ASN-KAN 92 -- -- -- -- 34 03 31 03 10 01 03 07
05 ASN-DHN 60 -- -- -- -- 10 -- 10 -- 17 -- 10 07
Total 01 -- 01 -- 88 04 82 06 92 02 55 37
TESTING DETAILS OF FEEDER PROTECTION RELAY ANNEXURE -VI
Type of Relay
Name of FP/TSS/GSS
CB No.
Date of Last testing
2010-11-12
Testing done during
current month
Testing done during current Financial Year
Balance
Cause of Non Testing
Action taken for testing
CB-01 -- -- -- -- OYR/FP
CB-02 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.06.11
CB-03 -- -- -- -- KMME/FP
CB-04 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.02.11
CB- 121 20.03.12 20.03.12 20.03.12 -- -- -- JMT/TSS
CB- 123 20.03.12 20.03.12 20.03.12 -- -- -- CB- 125 29.03.12 29.03.12 29.03.12 -- -- --
Composite Feeder Protection
Module
(Compensating of DPR, OCR,
WPC, PTF and Auto Reclose
Relay)
SNQ/TSS CB- 127 29.03.12 29.03.12 29.03.12 -- -- -- CB-01 -- -- -- --
OYR/FP CB-02 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.06.11
CB-03 -- -- -- -- KMME/FP
CB-04 -- -- -- --
Feeder circuit breakers with protective
relays were commissioned on 18.02.11 CB- 121 20.03.12 20.03.12 20.03.12 -- -- --
JMT/TSS CB- 123 20.03.12 20.03.12 20.03.12 -- -- --
CB- 125 29.03.12 29.03.12 29.03.12 -- -- --
Delta – I Relay
SNQ/TSS CB- 127 29.03.12 29.03.12 29.03.12 -- -- --
Panto Flashover Relay Not required
20
Annexure -VII
MAINTENANCE PROGRESS OF OTHER OHE ITEMS
AVAILABILITY OF POWER BLOCK ANNEXURE -VIII
Power Block Granted
OHE Maintenance/ Construction Depot
Power Block Demanded For Maintenance Work
Schedule ETKM done as per Annexure-IVA
Power Block Granted for other than Maintenance Work
Total Power Block Granted
Panagarh 117.00 hrs (maint) + 13.00 hrs. (Spl) 61 hrs 15 mts. 36.672 30 hrs 30 mts. 91 hrs 45 mts.
Andal 84.00 hrs (maint) + 23.00 hrs. ( Spl) 18 hrs 45 mts. 10.402 17 hrs 45 mts. 36 hrs 30 mts.
Asansol 92.00 hrs (Maint) + 41.00 hrs. (Spl) 26 hrs 45 mts. 14.242 21 hrs 35 mts. 48 hrs 20 mts.
Barakar 105.00 hrs.(maint) + 18.00 hrs. (Spl) 15 hrs 15 mts. 07.297 14 hrs 35 mts. 29 hrs 50 mts.
Jamtara 100.00 hrs. (maint) + 23.00 hrs. (Spl) 23 hrs 00 mts. 10.821 21 hrs 15 mts. 44 hrs 15 mts.
Madhupur 104.00 hrs (maint) + 17.00 hrs. (Spl) 17 hrs 45 mts. 09.825 23 hrs 45 mts. 41 hrs 30 mts.
Jasidih 109.00 hrs (maint) + 09.00 hrs. (Spl) 21 hrs 05 mts. 12.993 13 hrs 55 mts. 35 hrs 00 mts.
Construction 00.00 hrs (maint) + 54.00 hrs. (Spl) 00 hrs 00 mts -- 20 hrs 50 mts. 20 hrs 50 mts.
Total 691.00 hrs (maint) + 161.00 hrs. (Spl) 183 hrs 50 mts 102.252 164 hrs 10 mts. 348 hrs 00 mts.
Sl No Item Done during the month Cumulative during 2011-12
1. No. of turnouts (M/L) 04 121
2. No. of turnouts (Y/L) 23 152
3. No. of trees cut (Engg.) 142 439
4. No. of trees trimmed 399 2624
5. No. of tree branch trimmed 5848 30433
6. No. of kites / kite threads removed 13 167
7. No. of bird nest removed 16 2118
8. No. of Flashed / Broken insulator replaced. 104 2222
(i) Checked 4087 41778 9. No. of muffs of OHE structure
(ii) Repaired -- 35
10. No. of Winch type ATD replaced by pulley type ATD. -- --
11. No. of special drive for joint panto checking by TRD and RSO/ RS staff. 24 MEMU + 44 Loco (158 Nos. Pantos) 236 MEMU + 356 Loco (1738 Nos. Pantos)
(i) Stay Insulator 703 8735
(ii) Bracket Insulator 709 8995
12 Identification of Insulators for various Makes &
Batches.
(iii) 9-Tonne Insulator 114 1573
13. Replacement of damaged droppers. 111 1244
14. Replacement of corroded cantilever assembly. 05 190
21
INTEGRATED BLOCK ANNEXURE VIII/A
Integrated Power Block Sl. No.
Date
Section Demanded (Mts) Granted (Mts)
% Granted
Work done
Attended by
Nil
INSPECTION DONE BY OFFICERS / SUPERVISORS ANNEXURE IX
Sr.DEE/TRD/ASN AEE/TRD/MDP AEE/TRD/ASN AEE/TRD/UDL SR. SUPERVISORS Sl No.
Item Quota Actual Quota Actual Quota Actual Quota Actual Quota Actual
1.1 OHE depots 01 01 04 04 04 03 04 02 04 --
1.2 Tower Wagon inspections 01 -- 03 02 03 -- 03 02 04 58
1.3 Push trolley/motor trolley inspections 01 -- 02 -- 02 -- 02 -- 04 --
1.4 Inspections by Loco Cab 01 02+02* 02 02+01* 02 02+03* 02 03+03* 02 18
1.5 Station inspection/Level X-ing gates 01 02 02 04 02 02 02 02 04 30
1.6 Ambush checks of working gangs/TPC Once in
2 month 02 01 02 01 01 01 02 02 20
1.7 Current collection test Once in
6 month 02 Once in
2 month -- Once in
2 month -- Once in
2 month -- Once in
2 month 02
1.8 PSI depots 01 -- 04 -- 04 -- 04 -- -- --
1.9 Traction Sub-Station 01 -- 02 01 02 -- 02 -- 04 03
1.11 Switching Stations 01 01 03 04 03 01 03 02 04 06
1.12 Grid Sub-Station 2 in a
year
-- 02 -- 02 -- 02 -- 01 05
1.13 Remote Control centre Once in
6 month -- Once in
2 month -- Once in
2 month -- Once in
2 month -- 01 --
1.14 Office inspection 01 -- 01 -- 01 -- 01 01 01 --
2.00 Foot Pattrolling (in Km) -- -- -- -- -- -- -- 04 -- 466
* denotes Night footplate inspection.
INSPECTION CARRIED OUT BY DIVISIONAL OFFICERS DURING THE MONTH ANNEXURE –IX/1
No of inspections during the month
No of inspections during the year Sl No.
Division
Due Done Prop. Due up to the month Done up to the month Arrear
Remarks
1 Asansol 48 61 576 542 34
FAILURE OF REMOTE CONTROL SYSTEM /SCADA ANNEXURE –X/A
Date & time of failure Date & time of Rectification Sl No
Switching Post Date Time ( hrs.) Date Time (hrs.)
Duration in minutes.
Type of failure
Responsibility
1 MUW/SSP 29.03.12 11:51 30.03.12 10:30 1419 Modem cord not working. RC
22
FAILURE OF COMMUNICATION ANNEXURE –X /B
Date & time of failure Date & time of Rectification Sl No
Switching Post
Date Time (hrs.) Date Time (hrs.)
Duration in minutes.
Type of failure Responsibility
1 SLS/SSP 13.03.12 23:37 14.03.12 03:22 225 No RX tone due to communication wire cut on
isolation transformer of S&T department. S & T
2 STL/SSP 21.03.12 16:23 21.03.12 20:59 276 Communication failure S & T
GRID WISE ENERGY CONSUMPTION ( MONTH : March’12 ) ANNEXURE –XIA
Name of GSS/TSS
Contract Demand (MVA)
Recorded Maximum demand (MVA)
Energy consumption (KWH)
Status of Capacitor Bank
Power Factor
Remarks
DTPS/GSS 25.00 24.875 7490000 OK 0.903 -- KMME/GSS 20.50 19.250 6081000 OK 0.940 --
JMT/TSS 12.00 12.250 2316240 OK 0.969 --
SNQ/TSS 14.00 13.792 2391328 OK 0.950 --
TOTAL ENERGY CONSUMPTION VIS-À-VIS GTKM ANNEXURE- XIB
Energy Consumption (KWH) Month 2010-11 2011-2012
Excess (+) Saving (-)
Variation (%)
Variation in GTKM (11-12 over 10-11) in( %)
March’12 18249050 18278568 29518 0.161 --
PENALTIES PAID TO SUPPLY AUTHORITY ANNEXURE –XII
Penalty Paid Name of GSS/TSS
Low Power factor
Exceeding Contract
Demand Minimum Guaranteed
Energy
Cause
Action taken
Nil
23
STAFF POSITION AND VACANCY ANNEXURE –XIII/A A. SUPERVISOR
Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 1. Sr. Section Engg. 9300-34800/- 4600/- 33 30 03
2. Junior Engg. Gr.-I 9300-34800/- 4200/- 27 25 02
3. Junior Engg./Drg. 9300-34800/- 4200/- 01 01 --
TOTAL 61 56 05
B. TECHNICIAN
Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 8. MCM/Sr.Tech(TW Driver) 9300-34800/- 4200/- 01 01 Nil
9. TW Driver-I 5200-20200/- 2800/- 22 18 04
10. TW Driver-II 5200-20200/- 2400/- 00 03 (+) 01
12. MT Driver-I 5200-20200/- 2800/- 02 00 02
13. MT Driver-II 5200-20200/- 2400/- 02 02 --
14. MT Driver-III 5200-20200/- 1900/- 02 04 (+) 02
15. Sr.Tech 9300-34800/- 4200/- 22 17 05
16. Tech-I 5200-20200/- 2800/- 113 115 (+) 02
17. Tech-II 5200-20200/- 2400/- 66 67 (+) 01
18. Tech-III 5200-20200/- 1900/- 59 34 25
Crane Driver-III 5200-20200/- 1900/- 01(wc) -- 01
TOTAL 289+01(wc) 261 33
C. GROUP-‘D’
Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 32. Helper-I 5200-20200/- 1800/- 99 53 46
34. Helper-II 5200-20200/- 1800/- 12 45 (+) 33
35. Substitute 5200-20200/- 1800/- -- 00 (+) 01
36. Chowkidar 5200-20200/- 1800/- 18 13 05
37. Hd. T/Man -- -- -- -- --
38. T/Man -- -- -- -- --
37. Sr. MCP -- -- -- -- --
38. MCP -- -- -- -- --
39. Sweeper -- -- -- --
TOTAL 129 111 17
24
D. MINISTRIAL & DRAWING
+Sl No Category Pay Band (`) Grade Pay (`) Sanctioned On Roll Vacancy Remarks 40. Ministerial -- -- 22 21 01
41. Draftsman -- -- -- -- Nil
42. Steno -- -- 01 01 Nil
43. Gr. ‘D’ Staff (Office) -- -- 03 03 Nil
TOTAL 26 25 01
SUMMARY OF STAFF POSITION AND VACANCY
Sl No Category Sanctioned Strength Man on Roll Vacancy 1 A 61 56 05
2 B 289+01(wc) 261 33
3 C 129 111 17
4 D 26 25 01
TOTAL 505+01 (wc) 453 56
STAFF TRAINING DURING 2010-11 ANNEXURE –XIII/B
Traction Distribution Course Categories Total No. of staff
Completed during the month
Total completed
Remarks
Supervisor -- -- 01 --
Artisan -- -- 04 -- Initial
Unskilled -- -- 12 --
Supervisor 54 02 03 -- Refresher
Artisan 228 02 25 --
Supervisor 54 -- 02 --
Artisan 228 -- 02 -- Special
T/W Driver -- -- 01 --
AICTC, Chakradharpur,
South Eastern Railway
Total 312 04 29 --
Supervisor 54 -- 08 --
Artisan -- -- -- -- CETI, Thakurli,
Central Railway Total 54 -- 08 --
Tower Wagon Driver (promotional) -- -- 02 -- ZRTI, Bhuli,
Eastern Railway Tower Wagon Driver (refresher) 20 -- 01 --
Disester management -- --
25
Annexure –XI FINANCIAL MANAGEMENT (ALLOTMENT AND EXPENDITURE AGAINST VARIOUS DEMANDS)
DEMAND 7-100 ( Fig. In `̀̀̀ Thousand)
Particulars Primary Units Revised Grant (2011-12) Proportionate grant up to January’12 Expenditure incurred up to January’12 Salary 01 7696 6413 10148
DA 02 3749 3124 5757
PLB 03 315 315 490
HRA 04 731 609 1088
CCA 05 -- -- --
Interim Relief 06 -- -- --
Conveyance Allowance 07 469 391 663
KM-Allowance 10 -- -- --
OT 11 81 68 47
NDA 12 105 88 152
Other Allowance 13 83 69 73
Fees & Honourium 14 -- -- --
Transfer Allowance 15 55 46 126
TA 16 472 393 406
Leave encashment 20 42 35 26
Children education 25 -- -- --
Office expences 18-24 1126 938 876
TOTAL 14924 12489 19852 DEMAND 7-400 ( Fig. In `̀̀̀ Thousand)
Particulars Primary Units Revised grant (2011-12) Proportionate grant up to January’12 Expenditure incurred up to January’12
Salary 01 54013 45011 41375
DA 02 25005 20838 24018
PLB 03 3060 3060 3253
HRA 04 3796 3163 3266
CCA 05 -- -- --
Interim Relief 06 -- -- --
Conveyance Allowance 07 4470 3725 3827
KM- Allowance 10 1379 1149 1105
OT 11 2473 2061 1072
NDA 12 1835 1529 1578
Other Allowance 13 1078 898 701
Fees & honourium 14 -- -- --
Transfer Allowance 15 220 183 104
TA 16 4603 3836 2808
Leave encashment 20 177 148 98
Office expences 18-24 -- -- --
Children education 25 -- -- --
26
Particulars Primary Units Revised grant (2011-12) Proportionate grant up to January’12 Expenditure incurred up to January’12 Stock material 27 22418 18682 21941
Non stock material 28 6893 5744 2849
Contractual payment 32 10165 8471 3729
Transfer Dr./Cr. 33 2724 2270 8528
Sale Tax 38 -- -- --
TOTAL 144309 120767 120252 --
DEMAND No. – 10 (Fig. In `̀̀̀ Thousand)
Primary Units Revised grant (2011-12) Proportionate grant up January’12 Expenditure incurred up to January’12 32 995000 829167 818619
DEMAND 08E611 (Fig. In `̀̀̀ Thousand)
Particulars Primary Units Revised grant (2011-12) Proportionate grant up to January’12 Expenditure incurred up to January’12 Salary 01 2281 190 984
DA 02 1311 1093 541
PLB 03 192 192 --
HRA 04 170 142 70
CCA 05 -- -- --
Conveyance Allowance 07 30 25 14
OT 11 10 08 --
NDA 12 40 33 --
Other Allowance 13 42 35 25
Transfer Allowance 15 -- -- --
TA 16 50 42 21
Leave encashment 20 50 42 --
Children education 25 -- -- --
Total 4176 3512 1654
DEMAND 03-700 ( Fig. In `̀̀̀ Thousand)
Particulars Primary Units Revised grant ( 2011-12) Proportionate grant up to January’12 Expenditure incurred up to January’12 Salary 01 10039 8366 2841
DA 02 5967 4973 1575
PLB 03 130 130 123
HRA 04 853 711 231
CCA 05 -- -- --
Conveyance Allowance 07 784 633 182
OT 11 -- -- --
NDA 12 -- -- --
Other Allowance 13 86 72 15
14 43 36 --
27
Particulars Primary Units Revised grant ( 2011-12) Proportionate grant up to January’12 Expenditure incurred up to January’12 Transfer Allowance 15 97 81 --
TA 16 240 200 79
Leave encashment 20 79 100 --
Children education 25 -- -- --
Office Contigency 18-24 120 66 --
Total 18438 15387 5046
Annexure –XV/1
PROGRESS OF COMPLETION REPORT OF SANCTIONED PINK BOOK WORKS
Pink Book / 11-12
PH-16 PH-17 PH-29 PH-36 PH-42 PH-52 PH-53 PH-64 Total No. of works
Work-in-progress -- -- -- 05 -- -- -- -- 05
New Works (10-11) -- -- -- -- -- -- -- -- --
WORKS COMPLETED
Month Sl.No. Description of work P.B. ref. Works ref. (Plan Head)
March’11 -- -- -- --
Annexure –XV/I1
PROGRESS OF COMPLETION REPORT OF SANCTIONED LAW BOOK WORKS
Law Book / 11-12 PH-16 PH-17 PH-29 PH-36 PH-42 PH-52 PH-53 PH-64 Total No. of works Work-in-progress 01 -- -- 17 -- -- -- -- 18
New Works (11-12) 01 -- -- 02 -- -- -- -- 03
WORKS COMPLETED
Month Sl.No. Description of work L.B. ref. Works ref. (Plan Head) March’11 -- -- -- --
28
ANNEXURE –XV/A
Progress of Sanction Works above 1 Cr. (Under Pink Book & LAW Book Pt..-I) (Figures in `̀̀̀ 1000/-)
Sl. No
Yr. O
f Sa
nction
Item
No. of
curren
t yr
. Name of works
Current Cost / Allocation
Exp. Upto last financial
Yr. 2010-11
Outlay for
current Fin. Yr.
Exp. Upto current month
(2011-12)
Fund required during current Fin. Yr.
Fund required in next Fin. Yr.
Plan App.
( Y/N
)
Date of Sanctionin
g of detailed estimate T
ender
open
ing
date
LOA date
Tar
get da
te %
Fin. Prog
% Phy. Prog.
Progress of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 07-08 PB No.
507 of
11-12
Khana – Pradhankhunta – Replacement of corroded
Cantilever Assemblies. Phase-
III. (1750 Nos)
35021
DRF 31332 1000 0 900 0 NA -- 24.08.07 10.01.08 Completed 89 % 100 % All materials received &
1750 Nos. cantilever
assemblies replaced. Work
physically completed.
2 09-10 PB No. 516 of
11-12
PH-36
Replacement of mast at critical implantation (Phase-VI). (300
Nos) LOA No.
TRD/WC/T/2009-10/13 dt.
30.06.10.
82253
DRF
1548 10000 7609 13500 60000 NA 15.09.09 22.01.10 -- 31.07.12 11.13
%
100 %
LOA issued on 30.06.10.
Foundation work under
progress & 47 Nos
foundations already
completed. 14 nos masts
already removed.
3 10-11 PB No.
528 of
11-12 PH-36
KAN-PKA- Replacement of
cntilever assemblies
(Phase-IV) (2000 Nos.)
37043
DRF
0 5000 0 5000 20000 -- 09.11.10 29.04.11 20.09.11 19.08.12 0 -- Estimate sanctioned on
09.11.10. P.O for store items
is under finance vetting.
LOA issued on 20.09.11.
4 10-11 PB No.
529 of
11-12 PH-36
Replacement of catenery wire
(40 km) 19656
DRF
0 5000 38 12000 656 -- 09.11.10 -- -- -- 0.19 -- Estimate sanctioned on
09.11.10. Requsitions for
store items return from HQ
for revetting of additional
amount.
5 06-07 LB No. 996 of
11-12
PH-36
Replacement of Mast at critical implantation PH-IV
(117 Nos)
21961
DRF (LOA
cost:
19044)
17028 100 3308 3038 0 -- -- 27.07.06 04.07.07 Completed 92.60
%
100 % 117 Nos. critically
implanted masts already
removed. Work physically
completed.
6 07-08 PB No.
508 of
11-12
PH-36
Replacement of Mast at critical
Implantation.
Phase –V (118 Nos.).
25342
DRF
20298 2995 1856 2400 0 -- -- 24.08.07 06.03.08 31.12.11 87.76 % 95 % All material received. 113
nos critically implanted
masts also removed.
7 09-10 LB No.
993 of
11-12
PH-36
Replacement of leaning portals
in KAN-UDL section of ASN
Division (29 Nos).
18350
DRF
623 200 2078 2110 11727 -- 04.09.09 22.01.10 30.06.10 31.07.12 14.71
%
5% LOA issued against M/s
Master Engineering Concern,
Asansol.
8 08-09 LB No. 992 of
11-12
PH-36
Replacement of old and
overaged failure prone
catenary wire in industrially
polluted area. (Reqn. No.
351050179 dt. 30.07.08)
(20 Km).
12912
DRF
10785 838 691 500 1600 0 08.07.08 16.10.08 28.01.09 Completed 60 % 100 % Material received. 19.934
Kms catenery wire
replaced. Work physically
completed.
29
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 9 08-09 LB No.
1008 of
11-12
PH-36
Replacement of failure prone –
underground cable between
Durgapur Thermal Power
Station & Waria/FP.
(Reqn. No. 351050225 dt.
13.11.08 for 1850 Mtrs HT
cable)
9221
DRF
9162 58 15 0 15 0 0 25.03.09 18.12.09 Completed 40% 100% 1843 Mtrs HT cable received
from M/s Hindusthan Vidyut
Products Ltd, New Delhi on
12.01.10.
Work physically completed.
ANNEXURE –XV/B Progress of Sanction Works below 1 Cr. (Under LAW Book Pt.-II) (Figures in ` ` ` ` 1000/-)
Sl
No
Item
No. of
Current
Yr.
Name of works Qty Year
Sanc.
Current cost/
Allocation
Exp
upto
lastFin.
Yr.
2010-11
Outlay
for
current
Fin.
Yr.
Exp up to
current
month
(2011-12)
Fund
required
during
current
Fin. Yr
Fund
required
during
nextFin
Yr
Target
date
%
Fin.
Prog
%
phy.
Prog
Progress of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 LB No.
995 of
11-12
PH-36
Replacement of Steel
Anticreep by copper
Catenary wire (2006-07).
(Requisition no. 351050117
dtd.30.06.06)
8.5 km 06-07 1801
DRF 47 1454 0 10 0 -- 2.60% 25 % i) Total 15 Nos. damaged steel
anticreep wire replaced.
ii) Letter sent to HQ(CEE) for
dropping the requisition vide
no. ACT/S/5/127 dt. 17.01.12. 2 LB No.
994 of
11-12
PH-36
Provision of 2nd CB with
associated equipments at
SNQ/TSS and provision of
DP isolator at JSME/SSP
-- 06-07 3374
DF3
2980 394 0 800 0 Completed 88.38 % 100 % Work physically completed.
3 LB No.
1001 of
11-12
PH-36
Raising of muffing of OHE
structures in KAN-PKA
Section .
1800 Nos 07-08 1725
DF3
643 1038 0 1 0 -- 37.27 % 35 % 567 Nos. muffing have been
completed. Work short closed.
4 LB No.
1007 of
11-12
PH-36
Provision of new SP at
Sitarampur
01 No 08-09 3319
DF3
1238 150 472 550 1431 -- 51.52% 25% All material received.
5 LB No.
1009 of
11-12
PH-36
Provision of circuit
breakers at Kumardhubi &
Waria feeding posts to
enhance the reliability of
power supply
-- 08-09 7092
DRF
4366 1706 05 2000 0 Completed 61.63% 100 % Work physically completed.
6 LB No.
1010 of
11-12
PH-36
ASN Divn-Shifting of mast
below 4.75mtrs at Platform
area in ASN division.
30 Nos 09-10 6041
DRF
28 200 685 700 4013 31.07.12 11.80 % 5 % LOA issued on 30.06.10 .
Foundation work in progress. 03
nos. mast and 04 nos. dwarf
mast completed.
7 LB No.
1011 of
11-12
PH-36
ASN Divn-Replacement of
failure prone underground
cable between DTPS-
OYR/FP in phase-II Reqn
No. 351050030 dt. 03.11.09.
1850
Mtrs
09-10 9925
DRF
22 200 0 10 1208 -- 0.22 % 5 % i) LOA issued on 20.05.10.
ii) The case is being
retendered for the 3rd time.
30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 8 LB No.
1013
PH-36
ASN Divn-Replacement of
existing old SCADA system
of STN-JAJ section by new at
Remote Control Centre at
Asansol
14 Nos 09-10 9875
DRF
8133 200 322 420 0 Completed 85.62 % 100 % Tender opened on 17.12.09.
LOA issued on 31.03.10. All
materials received &
commissioned at site. Work
physically completed.
9 LB No.
1014
PH-36
Replacement of broken
insulators by composite
insulators in polluted/
vandalism prone areas.
Stay
(500)
Bkt (2000)
09-10 5432
DRF
46 200 3659 4000 386 Completed 68.20 % 100% 500 nos. stay insulators received
on 10.06.11 & 2000 nos bracket
insulator received on 21.06.11.
work physically completed.
10 LB No.
1006 of
11-12
PH-36
Renovation of Burried Rail
and earth pit of TSS/FP at
JMT, SNQ.OYR & KMME.
-- 09-10 3535
DF3
1039 164 1312 1850 0 Completed 66.50% 100 % LOA issued on 20.08.09.
Work physically completed..
1st on A/c bill passed.
11 LB No.
1012 of
11-12
PH-36
ASN Divn-Supply of drop
out fuse unit complete set
with solid core pedestal
insulators (Rating-25 KV)
90 Nos 09-10 3508
DF3
2485 100 0 200 923 -- 70.83% 25% Tender opened on 27.11.09.
LOA issued on 17.03.10. All
materials received. 12 Nos D.O
fuse assembly also erected.
12 LB No.
23
PH-16
STN-Provision of OHE on
pre-weighment line No.2 to
yard lines with full wiring
of yard line No.11
-- 09-10 5105
DF3
1466 750 1280 1750 0 Completed 53.79 % 100 % . LOA issued on 07.04.10. Work
physically completed.
13 LB No.
1016 of
11-12
POH of Traction Transformer
at JMT/TSS. (PH-36)
02 Nos 10-11 7860
DF3 0 100 0 10 7760 -- 0 0% Estimate vetted by Sr.DFM/ASN
and sanction is under process.
14 LB No.
1017
Restoration of damage
/deficient traction
bonds(PH-36)
-- 10-11 8858
DRF
0 100 351 360 1858 -- 03.91
%
0% Estimate sanctioned on 07.12.10
& TR done on 28.12.11.
15 LB No.
1019
PH-36
Conversion of cross type
OHE to Overlap type OHE
for running at 140 Kmph in
ASN Divn.
-- 10-11 9802
DF-3
0 100 0 100 8302 -- 0 -- Revised estimate vetted. Tender
open on 20.01.12. Briefing note
sent to A/Cs for vetting. Minutes
under process.
16 LB No.
132 of
11-12
PH-36
Provision of full OHE of line
no. 8, 9, 11 at receiving yard
at Andal
-- 10-11 9743
DF-3
0 2000 0 10 9243 -- 0 -- Tender opened on 25.10.11.
Under TCM. After negotiation on
17.01.12 the case under TCM.
LOA issued on 08.02.12.
17 LB No.
1058 of
11-12
PH-36
Augmentation of capacitor
bank at OYR/FP (Ph-II).
-- 4500
DF3
0 1150 0 10 1140 Detailed estimate has been
sanctioned on 30.01.12. Tender
will open on 27.03.12. Briefing
note sent to A/Cs on 30.03.12.
PROGRESS OF M&P ANNEXURE –XV/C (Figures in ` 1000/-) Sl.
No Description of works Qty Year
Sanction/
Item No.
Unit Book Item
No of
11-12
Alloc. Sanction
cost
Expn.
Upto last
financial
year
OA/
Curren
t year
Expn.
During curren
financial year
Fund required
during current
Fin. Yr
Fund
required
during next
Fin Yr
Present status
01 On line leakage current monitor
for Lightning Arrester.
(Reqn No. 351050180)
01 08-09
(LS)
No. LB 1836 DF3 1428 694 3 0 3 0 P.O No. 08.08.6359.1.41370 dt.
18.06.09 against M/s SCOPE
T&M Pvt. Ltd., Mumbai. Material
has been received.
31
PROGRESS OF RSP
ANNEXURE –XV/D (Figures in ` 1000/-)
MONTHLY AND CUMULATIVE EXPENDITURE UNDER VARIOUS PLAN HEADS FOR THE YEAR 2011-12 Annexure –XV/E (Figures in thousand of `̀̀̀ )
PH-16 PH-29 PH-36 PH-41 PH-42 PH-52 PH-53 PH-64 Total
Budget allotment for 2010-11 Actual expenditure
2750 -- 32448 1636 -- -- -- -- 52324
For 0 -- -- -- -- -- -- -- -- April ’11 Upto 0 -- -- -- -- -- -- -- --
For 0 -- 0 0 -- -- -- -- 0 May’11 Upto 0 -- 0 0 -- -- -- -- 0
For 0 -- 0 0 -- -- -- -- 0 June’11 Upto 293 -- 337 0 -- -- -- -- 630
For 101 -- 5960 0 -- -- -- -- 6061 July’11 Upto 394 -- 6297 0 -- -- -- -- 6691
For 0 -- 2028 0 -- -- -- -- 2028 August’11 Upto 394 -- 8325 0 -- -- -- -- 8719
For 0 -- 157 0 -- -- -- -- 157 September’11 Upto 394 -- 8482 0 -- -- -- -- 8876
For 0 -- 346 0 -- -- -- -- 346 October’11 Upto 394 -- 8828 0 -- -- -- -- 9222
For 1386 -- 0 0 -- -- -- -- 1386 November’11 Upto 1780 -- 8828 0 -- -- -- -- 10608
For 250 -- 9435 0 -- -- -- -- 9685 December’11 Upto 644 -- 18263 0 -- -- -- -- 18907
For 183 -- 0 0 -- -- -- -- 183 January’12 Upto 827 -- 18263 0 -- -- -- -- 19090
For 453 -- 2566 -- -- -- -- -- 3019 February’12 Upto 1280 -- 20829 -- -- -- -- -- 22109
For 0 -- 1298 -- -- -- -- -- 1298 March’12 (Pre final) Upto 1280 -- 22127 -- -- -- -- -- 23407
Sl.
No
Description of works Qty Year
Sanction/
Item No.
Unit Book Item
No of
Current
Yr.
Alloc. Sanction
cost
Expn.
Upto last
financial
year
OA/
Current
year
Expn.
During
curren
financial
year
Fund required
during current
Fin. Yr
Fund
required
during next
Fin Yr
Present status
01 Supply, erection, testing and
commissioning of Diesel Hydraulic
Rail Crane on suitable Railway
Wagon.
10-11 No. LB 1707 -- 4922 0 01 0 1 4921 Estimate is under
preparation.
32
STORE PURCHASE ITEMS AGAINST SANCTIONED ESTIMATE ANNEXURE –XVI
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
1 Electrification of extension
of shunting neck (250 M) at UDL UP Yard and UDL
Yard modification.
29 TRD/ASN/05-06 &
22/TRD/ ASN/ 05-06.
Copper catenary wire
(65 sq. mm) Size-19/2.1 mm.
m 2400 4,64,568/- 351050089
dt. 03.03.06.
15.06.6264
P.O has already been issued.
2 Electrification of LPG siding at DGR & ASN
Division-TTR-27 set.
52/TRD/ASN/05-06 25/REV/TRD/ASN/
05-06
Copper catenery wire (65 Sq.mm) Size-19/2.1 mm.
km 2.3 4,45050/- 3510500103 dt. 23.03.06
15.06.6383
P.O No. 16.10.6030.1.41695 dt. 09.11.10. Material has not yet been received.
3 Electrification of FSD
siding at DGR. & Replace ment of Girder of Bridge
no. 509 in M/L section of
ASN Division.
51/TRD/ASN/05-06
& 40/TRD/ASN/05-06.
Cadmium copper catenery wire (65
sq. mm) size-19/2.1 mm.
km. 2.3 4,45,211/- 351050108
dt. 25.05.06
15.06.6382
club with reqn. No. 351050103
dt. 23.03.06.
P.O. has been issued. P.O. No.
16.10.6030.1.41695 dt.09.11.10. Material has not yet been received.
70/2nd Rev/TRD/C/
ASN/05-06
Galvanised TTC/ Portal/Rolled/
Febricated Mast.
MT. 19 15,02,874/- 351050002
dt. 04.03.10
15.06.6433 P.O.No. 16.11.6038.1.4116 dt. 05.03.12 issued
to M/s Modern Technomech & P.O No.
16.11.6038.1.41117 dt. 05.03.12 issed to M/s Mehrotra Engg. Works.
4 Raising of Rail level
platform at DGR, RNG,
JSME, CRJ, MDP & Extension of platform at
PAN, MNAE, RNG &
OYR. 71/2nd Rev/ TRD/C/
ASN/05-06
Galvanised steel traction Mast MT 08 351050010
dt. 26.06.10
P.O. No. 16.10.60.36.246325 dtd. 22.12.10.
Some quantity of materials have already been
received on 20.12.11, balance materials have not yet been supplied by the firm
5 i) ASN Divn. –
Replacement of steel
anticreep by Cu atenary
wire.
ii) Electrification of DD
line and shunting neck
with top wiring at RNG.
iii) Electrification of
Chunch colliery siding at
KMME, Damaguria
siding at JMT & SCOB
siding at Hirapur.
16, 17, 18/
TRD/ASN/06-
07,
38/TRD/C/05-06
& 32/TRD/ASN/
06-07 (Clubbed)
Cadmium copper catenary
wire
(65 Sq.mm).
km 13.8 26,13,195/- 351050117
dt.
30.06.06.
15.06.6411
Letter sent to HQ(CEE) for dropping the
requisition vide no. ACT/S/5/127 dt.
17.01.12.
6 STN-Provision of top
wiring at HWH end of
L/No. 22 to 24 at UDL
top wire of L/No. 7 at
KLK end at DN Dep.
Yard.
28/TRD/ASN/06
-07.
25 KV AC Copper cadmium
catenary wire 19/2.10 mm.
km 0.9 174213/- 351050133
dt.
22.09.06.
15.07.6157 P.O. has been issued. P.O. No.
16.10.6030.1.41695 dt.09.11.10. Material
has not yet been received.
7 Electrification of
Departure Line No. 3
in UP Departure yard
at UDL setion.
54/TRD/ASN/
05-06. (Clubbed)
Galvanized TTC structure
complete with 8 mtrs. Boom
with fastner.
MT. 5.5 306141/- 351050159
dt.
11.12.07.
16.09.6024
Main case No.
16.08.0163
P.O.No. 16.11.6038.1.4116 dt. 05.03.12 issued
to M/s Modern Technomech & P.O No.
16.11.6038.1.41117 dt. 05.03.12 issued to M/s
Mehrotra Engg. Works.
8 Replacement of old and
overaged failure prone
catenery wire in
industrial polluted area
20KM
12/TRD/ASN/08-
09
Hard drawn round copper wire
(5mm) dia small dropper wire
confirming to IS-282,1982
Make: RDSO / CORE/Appvd
source.
Kg 3000 1143000/- 351050186
dt. 11.08.08
16.08.6098
Main case
No.
16.10.1017
Fresh tender under process.
33
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
9 Replacement of old and
overaged failure prone
catenery wire in
industrial polluted area
20KM
12/TRD/ASN/08-09 Contact wire splice (tooth
type) complete confirming to
RDSO Spn No.
ETI/OHE/P/1080 of 1081-1
Mod-C.
Nos. 400 435868 /- 351050204
dt. 14.08.08
16.08.6110
Main case
no.
16.08.0077
P.O has been issued against M/s Eastern
Works/KKK. P.O No.
16.08.6095.1.41774 dt. 13.12.10.
Material has not yet been received.
10 Replacememt of failure
prone under ground cable
between DTPS-OYR/FP
36/TRD/ASN/09-10 Single Core 800/1000 Sq.
mm. Copper conductor,
XLPE insulated.
Km 1850 86,95,000 /- 351050030
dt.03.11.09.
08.10.6021 Tender will be opened on 15.05.12.
11 i)Replacement of leaning
Portals at KAN-UDL
section in Asansol
Division.
ii) Shiftting of mast
below 4.75 M at
Platfrom.
iii) Replacement of mast
at critical implantation.
16/TRD/ ASN/09-10,
38/TRD/ ASN/09-10
& 37/TRD/ ASN/09-10
25 KV Composite 9 –
Tonne insulator.
Nos. 280 9,66,000 /- 351050021
dt.08.10.09
16.10.6014
Clubbing
T.C NO.
16.09.0177
P.O No. 16.11.6003.1.41570 dt.
12.01.12 issued against M/s Bhel (210
nos.) & P.O No. 16.11.6003.1.41569 dt.
12.01.12 issued against M/s Asiatic (70
nos.).
12 Hard drawn dropper
contact wire
m 1900 7,12,500/- 351050026
dt.03.11.09 16.10.6022
Main case
no.
16.09.0114
After getting fund of 12-13, P.O will be
released.
13
Provision/on pre-
weighment line No. 2
yard lines with full
wiring of yard line No. 2.
41/TRD/ ASN/09-
10
Copper catenery wire m 380 99,560/- 351050027
dt.03.11.09 16.10.6020 P.O is under A/Cs vetting.
14 Galvanised rolled /
fabricated traction mast/
Gantry mast
MT 139.5 7,60,046/- 351050031
dt.03.11.09
16.10.6041 P.O no. 16.10.60.36.243325 dt.
22.12.10. Some quantity of materials
have been received on 20.12.11,
balalnce materials have not yet been
supplied by the firm.
15
Provision/on pre-
weighment line No. 2
yard lines with full
wiring of yard line No. 2.
38/TRD/ ASN/09-10
& 37/TRD/ ASN/09-10
Galvanised TTC’s /Portal
Structure complete with
fasterners.
MT 5 3,30,455 351050022
dt.03.11.09
16.10.6042
Main case
No.
16.10.0160
P.O. No. 16.11.6038.1.4116 dt. 05.03.12 issued
to M/s Modern Technomech & P.O No.
16.11.6038.1.41117 dt. 05.03.12 issued to M/s
Mehrotra Engg. Works.
16 Hard drawn grooved copper
contact wire 107 sq, mm m 400 1,50,000/- 351050032
dt. 19.11.09
15.09.6063 P.O is under A/Cs vetting.
17 Galvanised rolled /
fabricated traction mast/
Gantry mast
MT 3 1,98,273/- 351050034
dt. 19.11.09
16.10.6043 P.O. No. 16.11.6038.1.4116 dt. 05.03.12 issued
to M/s Modern Technomech & P.O No.
16.11.6038.1.41117 dt. 05.03.12 issued to M/s
Mehrotra Engg. Works.
18
PAN –Provision of OHE
on 3rd Loop with direct
reception facilities on UP
direction.
52/TRD/ ASN/
09-10
Catenery wire 65 sq. mm. M 400 1,04,800/- 351050038
dt. 19.11.09
16.10.6023 P.O is under A/Cs vetting.
34
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
19 Hard drawn grooved copper
contact wire of 107 sq. mm.
m 750 2,78,250/- 351050001
dt: 04.03.10
In vice of
351050007
dt: 29.06.09
16.10.6057
Main Case
No.
16.10.0115
After local A/Cs vetting the case has
been sent to CEE/KKK on 24.05.10.
P.O will be released on 30% option
basis after issue of main P.O. Main
P.O is under A/Cs vetting. After
current year fund certification the case
sent to HQ on 24.02.12.
20
Romoval of diamond
crossing by 1 in 12 points
and crossing man east cabin
at Asansol.
39/TRD/ ASN/
08-09
Copper catenary wire of 65
sq. mm
m 750 1,64,490/- 351050004
dt: 04.03.10
In vice of 351050008
dt: 29.06.09
16.10.6083 P.O. No. 16.11.6043.1.41073 dt.
12.02.12 issued aginst M/s Chandra
Metals.
21 Madhupur- development of
direct dispatch line for
goods traffic.
74/TRD/ ASN/
09-10
Hard drawn grooved copper
contact wire of 107 sq. mm.
m 300 1,12,500/- 351050002
dt: 12.04.10
16.10.0115 After getting fund of 12-13, P.O will
be released..
22 Galvanized rolled fabricated
traction mast/gantry mast
MT 18 11,89,638/- 351050004
dt: 12.04.10
16.10.6030 P.O no. 16.10.60.36.243325 dt. 12.12.10.
Some quantity of materials have been
received on 20.12.11, balalnce materials
have not yet been supplied by the firm.
23
Extension of platform to
accommodate 16 coach
trains with foot over bridge
at 06 station i.e: KEE,
KBQ, SNQ, JRW, Rajla
halt and Telwa.
67/TRD/ ASN/
09-10
Galvanized TTC/Portal
structure complete set.
MT 15 9,91,365/- 351050003
dt: 13.09.10
16.09.6036 P.O. No. 16.11.6038.1.4116 dt. 05.03.12
issued to M/s Modern Technomech & P.O
No. 16.11.6038.1.41117 dt. 05.03.12 issued
to M/s Mehrotra Engg. Works.
24 25 Kv uninsulated copper
cadmium atenary wire
19/2.10 mm 65 sq. mm
MT 23.89 1,15,16,318/ 351050011
dt: 28.09.10
16.10.6072 P.O is under A/Cs vetting.
25 Stranded annealed copper
jumper wire(105 sq. mm)
19/1.016 mm
kg 1500 4,83,660/- 351050012
dt: 28.09.10
16.10.6074 Tender has been opened. TR done on
28.11.11. TCM under JAG level TC
.
26 Stranded annealed copper
jumper wire(50 sq. mm)
19/1.80 mm
kg 1000 4,99,000/- 351050013
dt: 28.09.10
16.10.6075 Retender opened on 30.12.11. TCM
under finalization. Main TC No.
16.9.0113 under JAG level TC.
27 Hard drawn copper wire
(5mm dia) small dropper
wire
kg 5000 20,40,000/- 351050014
dt: 28.09.10
16.10.6088 Fresh tender under process.
28 Contact wire parallel clamp
(large) assembly with all
fasteners.
Nos. 3000 10,07,400/- 351050021
dt: 28.09.10
16.10.6071 The case sent to HQ on 17.01.12
after current year fund certification.
P.O is under A/Cs vetting.
29
Replacement of
catenary wire 40 Km
24/TRD/ASN/
10-11
Contact wire dropper
clip(107)
Nos. 16000 4,89,600/- 351050024
dt: 28.09.10
16.10.6087 Sent to HQ on 13.01.12 after current
year fund certification & local A/Cs
vetting. P.O is under A/Cs vetting.
35
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
30 Catenery wire dropper clip
(107)
Nos. 10000 4,57,000/- 351050025
dt: 28.09.10
16.10.6088 After current year fund certification &
local A/Cs vetting for additional
amount, the case has been sent to HQ
on 29.03.12.
31 Catenery ending clamp (65) Nos. 1000 4,50,450/- 351050028
dt: 28.09.10
16.10.6076 P.O is under A/cs vetting.
32 Suspension clamp complete
with all accessories.
Nos. 1000 3,18,200/- 351050030
dt: 28.09.10
16.10.6077 P.O is under A/Cs vetting.
33 Contact wire splice (tooth
type)
Nos. 600 11,88,468/- 351050031
dt: 28.09.10
16.10.6070 P.O has been issued against M/s
Kumar Fastener. P.O No.
16.10.6070.1.41393 dt. 05.09.11
34 Insulated catenary wire
(19/2.10 mm) 65 sq. mm
m 500 5,35,000/0 351050033
dt: 28.09.10
16.10.6086 The case is under TCM.
35
Replacement of
catenary wire 40 Km
24/TRD/ASN/
10-11
Stay insulator (composite) Nos. 500 6,72,600/- 351050034
dt: 28.09.10
16.11.6001 The case was put up to CEE on
02.04.12 for finalisation.
36 Post Insulator Nos. 200 7,80,000/- 351050037
dt.28.09.10
16.10.6078 P.O. is under A/Cs vetting from
29.02.12.
37
Replacement of catenary
wire 40 Km
24/TRD/ASN/
10-11
Bracket insulator
(composite)
Nos. 500 7,08,000/- 351050035
dt: 28.09.10
16.11.6002 The case is under TCM.
38 Composite Stay insulator Nos. 2500 33,60,000 /- 351050038
dt: 28.09.10
16.11.6001 The case was put upto CEE on
02.04.12 for finalisation.
39
Replacement of cantilever
assembly at KAN-PKA
section (Ph- iv)
01/TRD/ASN/
10-11
Composite bracket insulator Nos. 2500 33,40,000 /- 351050039
dt: 28.09.10
has
cancelled &
clubbed with
reqn. No.
351050035
dt. 28.09.10
16.11.6002 P.O is under A/Cs vetting. From
29.02.12.
36
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
40 Replacement of overaged
lighting arrester at various
switching station at OYR-
STN section
44/TRD/ASN/
10-11
42 kv 10 KVA lighting
arrester with surge monitor
& insulating base as per RDSO Spn No.
ETI/PSI/71/Rev-1 (1/87) with
A & C slip no. 5/9/2005.
Nos. 27 6,79,050 /- 351050040
dt: 09.12.10
16.11.6004 P.O no. 16.11.6004.1.41437 dt.
10.10.11.
41 Replacement of over aged
25 kv /240 volts. 10 KVA
AT with associated
assembly at various station
& level crossing
43/TRD/ASN/
10-11
25 kv/240 volts 10 KVA AT
with associated assembly
Nos. 11 8,14,000 /- 351050041
dt: 09.12.10
16.11.6014 Tender will be opened on 03.04.12..
42 Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends.(each 2.50 Mtrs long).
Nos. 1260 14,70,420 /- 351050042
dt: 22.12.10
16.11.6008 TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
43 Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends (each 2.50 mtrs. Long)
Nos. 1270 15,67,180 /- 351050043
dt: 22.12.10
16.11.6009 TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
44
Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends (each 2.75 mtrs. Long)
Nos. 500 6,51,000 /- 351050044
dt: 22.12.10
16.11.6005 TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
45 Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends (each 3.00 mtrs. Long)
Nos. 1100 15,07,000 /- 351050045
dt: 22.12.10
16.11.6011 TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
46 Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends (each 3.50 mtrs. Long)
Nos. 760 11,45,320 /- 351050046
dt: 22.12.10
16.11.6010
TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
47 Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends (each 5.25 mtrs. Long)
Nos. 200 3,96,800 /- 351050047
dt: 22.12.10
16.10.6006 TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
48
Restoration of damaged
Traction bond
50/TRD/ASN/
10-11
Galvanised steel fleexible
wire bond for traction with
lug duly crimped on both
ends (each 7.00 mtrs. Long)
Nos. 200 4,92,200 /- 351050048
dt: 22.12.10
16.10.6007 TR done on 28.12.11. Final TCM was
signed by Dy.CEE/TRD/HQ on
02.04.12.
49 Hard drawn grooved copper
contact wire(107sq.mm)
MT 1.153 4,50,000/- 351050053
dt: 07.01.11
16.11.6019 After getting fund of 12-13 P.O will
be released. 50
Stabling line for MEMU
rake at Asansol.
28/TRD/ASN/09-10
Contact wire of 65 sq. mm
dia.
MT 0.776 3,40,600/- 351050052
dt: 07.01.11
16.11.6020 P.O. No. 16.11.6047.1.41073 dt.
12.02.12 issued against M/s Chandra
Metals.
37
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
51 Replacement of 1100Volt, 40
Ah battery charger by
110Volt, 200Ah battery
chargerfor improvement of
DC backup supply of
reliability of train operation
reliability of
56TRD/ASN/10-11 Battery charger suitable for
110V D.c 200Ah lead acid
battery.
Nos 04 8,43,600/- 351050056
dt: 28.01.11
16.11.6021 P.O. No. 16.11.6021.1.41491 dated
04.11.11. Material has already been
deposited by the firm to LCD/Belur.
52 Hard drawn grooved copper
contact wire(107 sq.mm)
MT 2.306 9,36,000/- 351050054
dt: 28.01.11
16.11.6022 P.O. No. 16.11.6047.1.41073 dt.
12.02.12 issued against M/s Chandra
Metals.
53
Development of Railway
yard facilities under ISP’s
expansion plan at Hirapur.
31TRD/ASN/10-11
Catenery wire 65 sq. mm MT 1.552 8,75,867/- 351050055
dt: 07.01.11
16.11.6023 P.O. No. 16.11.6047.1.41073 dt.
12.02.12 issued against M/s Chandra
Metals.
54 Coversion of cross type
OHE to overlap type OHE
for running at 140 Kmph in
ASN division of KAN-
PKA section.
61/TRD/ASN/10-11 Galvanised TTC /portal
structure complete with
fastners.
MT 23 13,30,889/- 351050062
dt: 24.03.11
16.11.6038
Main case
no.
16.10.0160
P.O. No. 16.11.6038.1.4116 dt. 05.03.12
issued to M/s Modern Technomech & P.O
No. 16.11.6038.1.41117 dt. 05.03.12 issued
to M/s Mehrotra Engg. Works.
55 Galvaninesd rolled
fabricated Traction
mast/gantry mast.
MT 13 7,52,242/- 351050063
dt: 24.03.11
-- P.O. No. 16.11.6038.1.4116 dt. 05.03.12
issued to M/s Modern Technomech & P.O No. 16.11.6038.1.41117 dt. 05.03.12 issued
to M/s Mehrotra Engg. Works. 56 Hard drawn grooved copper
contact wire of 107 sq, mm
MT 1.441 5,85,000/- 351050074
dt: 24.03.11
16.11.6042 After getting current year fund, P.O
will be released.
57 Catenery wire of 65 sq. mm. MT 0.895 4,74,000/- 351050075
dt: 24.03.11
16.11.6041 P.O issued against M/s M/s Chandra
Metals.
58 Large span wire 130 sq. mm
of 37/2.10 mm cadmium
copper.
Mtrs 1000 6,46,000/- 351050076
dt: 24.03.11
16.11.6040 P.O no. 16.11.6040.1.41003 dt.
12.01.12..
59 Composite Stay Insulator Nos. 80 1,15,360/- 351050066
dt. 24.03.11
-- Requisition sent to HQ on 24.02.12.
60
Coversion of cross type
OHE to overlap type
OHE for running at 140
Kmph in ASN division
of KAN-PKA section.
61/TRD/ASN/
10-11
Composite Bracket Insulator Os. 80 1,15,360/- 351050067
dt. 24.03.11
-- Requisition sent to HQ on 24.02.12.
38
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
61 Provision of additional
retro-reflective number
plate for guidance of
running staff in STN-JAJ
section.
57/TRD/ASN/11-12 Retro-reflective structure
number plate.
Nos. 950 4,87,350/- 351050099
dt: 28.09.11
16.11.6085 P.O issued against M/s Ramkrishna
Enterprise.
62 Galvanised TTC/Portal
structure
MT 02 1,00,870/- 351050002
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
63 Composite Stay Insulator Nos. 06 8652/- 351050005
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
64 Composite Bracket Insulator Nos. 05 7210/- 351050006
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
65 Composite 9-ton Insulator Nos. 04 5768/- 351050007
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
66 Large span wire 130 sq. mm
copper37/2.10 mm cadmium
copper.
Mtrs. 160 1,03,360/- 351050012
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
67 Large jumper wire(105 sq.
mm) copper(19/7/1.016)
Kgs. 20 13,600/- 351050011
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
68
Proposed siding work of
Bengal Wagon Industries
Pvt. Ltd. Within Kulti Yard.
65/TRD/ASN/10-11
Galvanized TTC/Portal
structure.
MT 1.25 63,044/- 351050001
dt. 16.05.11
-- Requisition sent to HQ on 24.02.12.
69 Andal-Durgapur-
Strengthenning of of sub-
structure and foundation
including following drop
curtain wall for 2.5 ton axle
load.
310/PB/10-11
Sub estt:
32/TRD/ASN/10-11
Hard drawn grooved copper
contact wire(107 sq. mm)
MT 0.192 78,000/- 351050051
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
70 Provision of AT at
Sitarampur G.C panel.
111(S&T)/10-11
Sub estt:
42/TRD/ASN/10-11
Galvanised rolled/fabricated
traction mast.
MT 1.5 75,663/- 351050036
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
71 Galvanised rolled/fabricated
traction mast/gantry mast.
MT 01 50,435/- 351050061
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
72
Andaal Station-Extension
FOB(6’-0”) from branch
line PF to Railway coloney
over yard lines.
(151.2253Km)
01/TRD/ASN/11-12
Galvanized TTC/Portal
structure.
MT 1.25 63,044/- 351050060
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
73 Galvanized TTC/portal
structure complete with
fastener.
MT 05 2,52,175/- 351050018
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
74 Hard drawn grooved copper
contact wire(107 sq. mm).
MT 0.720 2,92,500/- 351050028
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
75 Galvanized rolled/fabricated
traction mast/gantry mast.
MT 14 7,06,090/- 351050019
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
76
Conversion of down loop
into common loop at
Chittaranjan.
49/TRD/ASN/10-11
Catenery wire 65 sq. mm. MT 0.447 2,37,000/- 351050029
dt. 25.07.11
-- Requisition sent to HQ on 24.02.12.
39
Sl No
Name of sanctioned work
Estimate No. Description of Material Unit Quantity
Total cost (in `̀̀̀)
Requisition No & date
COS Case No.
Remarks
76 For removal of speed
restriction of 15 Kmph at
Km 201/24A-22A on DN
line-2 betwenn NMC-KPK
section on A route of ASN
divn.
64/TRD/ASN/10-11 Galvanised rooled/
fabricated traction/gantry
mast.
MT 0.5 25,217/- 351050054
dt. 25.07.11
--- Requisition sent to HQ on 23.03.12.
CRITICAL STORE ITEMS ANNEXURE –XVII
Sl. No.
Description Unit Qty. Approximate Cost (in `̀̀̀)
Requisition No. & date
C.O.S case No.
Remarks
1 Battery charger including associated for 110 volt, 200AH 0-30
Amp. Trickle mode function.
No. 03 1,31,040/- 361100339
dt. 22.08.06.
16.07.6042 P.O has been issued.
2 Overhauling kit for pole column/TSS4-720002-RI for 25 KV
SF-6 interrupter type EDF-SKI-1.
Set. 21 113720/- 361100306
dt.25.07.06
16.08.6009 P.O. No. 16.08.6009.1.41747 dt. 17.11.09 against M/s
Bhandari Enterprises, Kolkata.
3 Vacuum bottle suitable for 25 KV vacuum circuit breaker of
Alind Make type-VSE-5/20, part No.4 Rating 1600 Amps.
No. 01 173361/- 361100379
dt.15.12.06
16.07.6031 P.O issued (P.O no. 16.07.6031.1.41499) against M/s
Alluminium Industries Ltd., Kolkata.
40
ANNEXURE –XVII A
POSITION OF P.I. STOCK ITEM OF AC OHE COMPONENTS /FITTINGS RECEIVED FOR TRD/ASN
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
1 46-13-0019 SS bolt with nuts, L/nuts
Size 10x35/30 mm.
No. 1000 1000 1000
2 46-13-0100 SS bolt with nuts, L/nuts
Size 10x65/30 mm No.
1000
1000
1000
3 46-13-0202 SS bolt with nuts, L/nuts
Size 12x45/30 mm
No. 100
100
100
4 46-13-0251 SS bolt with nuts, L/nuts
Size 12x55/30 mm old
& atenary (item modified
size 12x60/30 mm)
No. 100 100 100
5 46-13-0305 SS bolt with nuts +L/nuts size
12x75x30mm
No. -- 200 01 0.05 200
6 46-13-0408 GS bolt with nuts, L/nuts
Size 16x50/38 mm.
No. 4000 4000 4000
7 46-13-0500 GS bolt with nuts + L/nuts size
16x65x38mm.
No. 200 200 200
8 46-13-0550 GS bolt with nuts + L/nuts size
16x75x38 mm.
No. 125 125 125
9 46-13-0603 GS bolt with nuts + L/nuts
size16x260x100 mm.
No. 200 200 200
10 46-13-0652 GS bolt with nuts + L/nuts
Size 16x360/100 mm
No. -- -- -- -- -- -- -- -- --
11 46-13-0706 GS bolt with nuts +L nuts
Size 20x65/46 mm.
Nos. 200 200 200
12 46-13-0809 GS bolt with nuts +L nuts
Size 20x85/46mm.
No. 75 75 75
13 46-13-0858 GS bolt with nuts + L nuts
Size 20x260/100mm
No. 50 50 50
14 46-13-0901 GS bolt with nuts + L nuts
Size 20x360/100mm
No. 50 50 50
15 46-13-0950 GS bolt with nuts + L nuts
size 24x85/55mm (old and
atenary item) modified
24x70/54mm
ETI/C/007
3, MOD-
“A” &
RDSO
Specn No-
ETI/OHE/
18(4/84)
with latest
rev. ETI/OHE/
P/150
No. 50 50 50
41
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
16 46-13-1309 SS Hex head stud bolt size
12x50/50mm
No. 25 25 25
17 46-13-2454 SS ‘U’ Bolt size 10 mm dia
1153 (s)
No. 20 20 20 10 50
18 46-13-2508 SS “U” bolt – 10 mm dia
1162 (s)
No. 500 500 500
19 46-13-2557 SS “U” bolt – 10 mm dia
1173 (s)
No. 100 100 100
20 46-13-2650 SS ‘U- Bolt – 10 mm dia
6034 (s)
ETI/C/0073,
MOD-“A” &
RDSO
Specn No-
ETI/OHE/18
(4/84) with
latest rev. ETI/OHE/
P/150
No. 500 500 500
21 46-19-0053 Anti wind Clamp for
Circular tube.
RE/33/P/
2500
No. -- 100 100
22 46-19-0077 Standard Anti wind Clamp
with ID No 2251-1, 2502 &
2503.
ETI/OHE/P/2550-
1/2 MOD-L
No. 1000 1000 1000
23 46-19-0107 18 mm bus Terminal
Multiple Bolt.
ETI/OHE/P/
6310-1MOD-A
No. -- 20 20
24 46-19-0156 18 mm bus Tee Joint. ETI/OHE/
P/6330-1
MOD-C
No. -- 20 20
25 46-19-0302 Contact wire PG clamp
(large)
ETI/OHE/
P/1030-2
MOD-D
No. 1000 1000 1000
26 46-19-0351 Contact wire PG clamp
(small)
ETI/OHE/P/ 1040-2
MOD-E No. 500 500 500
27 46-19-0405 Contact wire Dropper Clip RE/33/P/1180
MOD-F with ID
Nos. 1182 MOD-C
No. 1000
1000
1000 1000 100
28 46-19-0454 Catenary Dropper Clip ETI/OHE/
P/1192 MOD-C
No. 500
500
500
29 46-19-0508 Contact wire swivel clip ETI/OHE/
P/1220 MOD-E
with ID No.-1222
MOD-C
Set 300
300
300
30 46-19-0752 Double suspension clamp (65
x 65)
RE/33/P/1170-
MOD-K with 1D
Nos. 1172 MOD-
C & 1174 MOD-B
Set 10
10
10
42
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
31 46-19-0934 Contact wire ending
clamp (107 wedge type) ETI/OHE/
P/1110-2MOD-D
No. 300
300
300
32 46-19-0958 Ending clamp atenary
(65)
ETI/OHE/
P/1120 MOD-B No. 300
300
300
33 46-19-1033 Ending clamp steel wire
(90)
ETI/OHE/
P/1360 MOD-B No. 10
10
10 10 100
34 46-19-1057 Feeder Ending Clamp ETI/OHE/
P/1130
No. 25
25
25
35 46-19-1100 Earth Pipe Clamp ET/10 ref Drg No.
RE/33/P/7022
No. 20
20 20
36 46-19-1252 Earth Wire strain Clamp. ETI/OHE/
P/7050 MOD-D
No. 05
05
05
37 46-19-1409 Knuckle Tube Clamp &
Jaw.
ETI/OHE/
P/1216 MOD-D
No. 10
10
10
38 46-19-1458 Large span wire ending
clamp (130)
ETI/OHE/
P/1140 MOD-B Set 20
20
20
39 46-19-1653 Dropper clip (38mm) ETI/OHE/
P/2274-1 MOD-D No. 250
250
250
40 46-19-1859 Backing angle RE/33/
P/3076 ID
No-3076-1.
No. 10 10 10
41 46-19-1872 Backing angle RE/33/
P/3076 ID
No-3076-2.
No. 20 20 20
42 46-19-1896 Backing angle RE/33/
P/3076 ID
No-3076-3.
No. 10 10 10
43 46-19-1914 Backing angle RE/33/
P/3076 ID
No-3076-4.
No. 10 10 10
44 46-19-1926 Backing angle RE/33/
P/3076 ID
No-3076-5.
No. -- 10 10
45 46-19-2050 Parallel Clamp
(Modified)
ETI/OHE/
P/1050-3
Set 100 100 100
46 46-19-2207 Parallel clamp double
contact wire
ETI/OHE/
P/6170 MOD-C
No. -- 200 200
47 46-19-2256 Raised register Arm
clamp.
ETI/OHE/
P/1370-1 MOD-E
Pair 10 10 10
43
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
48 46-19-2359 Dropper clip (34mm) ETI/OHE/
P/2461-1 MOD-F
No. 200 200 200
49 46-19-2402 Dropper clip (25mm) ETI/OHE/
P/2471-1 MOD-E No. 20 20 20
50 46-19-2505 Suspension (65mm) ETI/OHE/
P/1160 MOD-J Set 50 50 50
51 46-19-2554 Suspension clevis (18mm) ETI/OHE/
P/1270-1 MOD-F
No. 10 10 10 10 100
52 46-19-2657 25mm steady arm Clamp. ETI/OHE/
P/2490-2 MOD-E Set 200 200 200
53 46-19-2955 18 mm single Clevis. ETI/OHE/
P/5040 MOD-B
No. -- 10 10
54 46-19-3406 ‘U’ clamp (50/50) ETI/OHE/
P/1320 MOD-B
No. 50 50 50
55 46-19-4289 Large Suspension Clamp
with all accessories
(20mm)
ETI/OHE/
P/1580 MOD-F .ID
No-1581,1582,1580
(Ref:10,11)
No. -- 10 10
56 46-19-4400 Post Insulator jumper
Clamp
ETI/OHE/
P/6094 MOD-B Nos. 50 50 50 50 100
57 46-23-0014 Contact wire splice
(Tooth type).
ETI/OHE/
P/1080-1 MOD-B
& 1081-1 MOD-C
Set 75 75 75 50 66.67
58 46-23-0051 Catenary splice (65) ETI/OHE/
P/1090 No. 1000 1000 1000
59 46-23-0154 Double contact wire
splice.
RE/33/
P/1280MOD-C -- -- 20 20
60 46-23-0506 Mast fitting for hook
insulator.
TI/DRG/OHE
TGEF/RDSO/00005/04
/0,ID No3021-1
No. 50 50 50
61 46-23-0555 Mast bracket fitting assly
(150)
ETI/OHE/
P/3070-1D MOD-H No. 25 25 25
62 46-23-0579 Mast bracket fitting assly
(200)
ETI/OHE/
P/3070-2 MOD- D No. 25 25 25
63 46-23-0658 Mast anchor fitting
welded
ETI/OHE/
P/3231 MOD-C No. 25 25 25
64 46-23-0750 Mast guy rod fitting
welded.
ETI/OHE/
P/3232- MOD-C No. 10 10 10
65 46-23-0956 Multiple cantilever cross
arm assly. RE/33/
P/3120 MOD-H No. 05 05 05
44
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
66 46-23-1158 Counter weight guide tube
assly. ETI/OHE/
P/0560- MOD-C
with ID No-5067
& 2053-1
No. 100 100 100
67 46-27-0024 SS stud bolt with L/nuts
/ size 10x3530mm ETI/OHE/
P/2404- MOD-C No. 300 300 300
68 46-29-0450 Tube cap 25mm ETI/OHE/
P/2423-1 MOD-A No. 400 400 400
69 46-29-0503 Tube cap 40mm ETI/OHE/
P/2104-1 MOD-A No. 50 50 50
70 46-29-0655 Tubuler stay sleeve ETI/DRG/OHE/FIGF
E/RDSO/00004/03/
0 & RDSO Spec.No
ETI/OHE/49/
(09/09) with A&C
No. 50 50 50
71 46-35-1309 Washer flat G.S for 16
mm dia bolt. ETI/C/0075
No. 200 200 200
72 46-50-0017 Anchor bolt (1.6 mtrs)
long ETI/OHE/
P/6001-1 MOD-D No. 50 50 50
73 46-50-0108 Anchor double strap assly. ETI/OHE/
P/6030 MOD-C Set 50 50 50
74 46-50-0200 Guy rod double strap
assly. ETI/OHE/
P/6220 Set 15 15 15
75 46-51-0308 Counter weight assembly complete (ID No.
5091,5092 & 5093)
ETI/OHE/
P/5901 MOD-B Set -- 05 05
76 46-52-0703 SS wire rope for pully
block type RE.
RDSO’s specn No. TI/SPC/OHE/WR/10
60 No. 50 50 50
77 46-52-0752 SS wire rope for winch
block type RE.
No. -- -- --
78 46-53-0101 Earth contact assembly
for 25KV SP Isolator-
1600Amps
RDSO’s Specn No.
ETI/OHE/16(1/94) No. 10 10 10
79 46-53-0204 Earth pipe 3100 mm.
long. ETI/OHE/
P/7021 MOD-A No. 100 -- -- 100 100
45
Year of 09110 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
80 46-53-0307 Single pole isolator 25
KV, 1250 amp. ETI/OHE/16(01/94)
Rev-2(March-04) No. 04 04 04
81 46-54-0039 Guy rod stirrup. ETI/OHE/
P/5002 MOD-B No. 10 10 10
82 46-54-0155 Equalising plate. No. 05 05 05
83 46-54-0209 Compensating plate.
ETI/OHE/
P/5191 MOD-B No. 05 05 05
84 46-54-0404 Raised register Arm
adjuster 25mm. ETI/OHE/
P/2432 MOD-E No. 05 05 05
85 46-54-0556 Tubular stay adjuster ETI/OHE/
P/2402 MOD-A No. 10 10 10
86 46-55-0010 Large jumper wire (105 sq
mm) (19/7/1.016) ETI/OHE/3
(2/94) rev-1 Kg 300 300 300
87 46-55-0100 Stranded annealed copper
jumper wire (50 sq.mm)
(19/1.80mm)
ETI/OHE/3/
(2/94) rev-1 Kg 1000 1000 1000
88 46-55-0306 Contact wire
(107 Sq.mm) ETI/OHE/76/(06/97)
with A & AC Slip 1&3 m 3500 3500 3500
89 46-55-0409 Catenary wire
(65 sq.mm) ETI/OHE/50/(06/97)
with A&C slip No. 1 m 3000 3000 3000
90 46-55-0604 Large dropper wire (7mm
dia) IS-282/1982 Kg 100 100 100
91 46-55-0800 Small dropper wire (5mm IS-282/1982 Kg 400 400 400
92 46-56-0014 Ball eye I.D No. 6068 ETI/OHE/P/6068
Mod-B -- -- -- -- -- -- -- --
93 46-56-0105 Bent steady Arm, swivel
ID. No 2352
ETI/OHE/P/2352
Mod-A No.
25 25 -- -- 25
94 46-56-0208 Double eyes distance rod
(20mm x 1m) ETI/OHE/P/5183
Mod-C No.
100 100 100
95 46-56-0403 Eye rod for balance
weight ETI/OHE/P/5094-
5095Mod-F No.
30 30 30
96 46-56-0609 Normal bent steady arm
eye piece ETI/OHE/P/2522
Mod-B No.
05 05 05
97 46-56-0907 Register Arm eye piece TI/DRG/OHE/
RDSO/FTGFE/
0002/00/0 & RDSO’s
specn No.
ETI/OHE/94/ (09/95)
with A&C-1
No.
100 100 100
98 46-56-1201 BFB steady arm eye piece.
ID. No. 2541 ETI/OHE/P/2541
Mod-E
No. 200 -- -- 200 200
46
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
99 46-56-1304 BFB steady arm
swivel. ID. No. 2542
ETI/OHE/P/2542
Mod-C
No.
500 500 500
100 46-56-1456 BFB steady arm
(32*31x3mm)
(0.72mtr long)
ETI/OHE/P/2540Mo
d-B ID NO 2544-1
No.
250 250 250
101 46-56-1500 BFB steady arm
(32*31x3mm)
(0.92mtr long)
ETI/OHE/P/2540
Mod-B ID NO 2544-2
No.
500 500 500
102 46-57-0019 BFB steady arm
(40x30mm)
ID. No. 2521
ETI/OHE/P/2520
MOD-B ID No 2544-2
RDSO’s Spec No –
ETI/OHE/9/74 or
latest.
No.
25 25 25
103 46-57-0100 Large Bracket tube
(40/49)
ETI/OHE/P/2081
MOD-E& RDSO
Spec No –
ETI/OHE/11/5/89 or
latest.
M
150 150 150
104 46-57-0305 Stay Tube RE/33/P/2401
MOD-C & RDSO
Spec No
ETI/OHE/11
(5/89) or latest.
M
200 -- -- 200 200
105 46-57-0500 Standard Bracket Tube
(30/38 mm)
ETI/OHE/P/2041
MOD-D & RDSOSpec
No –ETI/ OHE /
11/5/89or latest.
No.
-- -- -- 50 -- -- 50
106 46-58-0130 Large Register Arm
hook
ETI/OHE/P/2160-1 &
MOD-E
Set 100 100 100
107 46-58-0700 Standard Register Arm
hook
ETI/OHE/P/2150-1 &
MOD-E
No. 100 100 -- -- 100
108 46-58-0402 Normal bent Steady
Arm Hook ID. No.
2523
ETI/OHE/P/2523 &
MOD-B
No.
-- -- -- 20 -- -- 20
47
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
109 46-58-0694 Steady Arm hook (BFB
Forged)
ID. No. 2391-1
ETI/DRG/OHE/FTG
EE/RDSO/OOOO3/
00/0 & RDSO Spec
No –ETI/OHE/49
(9/95)WITH A&C-
1 (3/97).
No.
750 -- -- 750 750
110 46-59-0055 Bracket insulator
assembly ETI/OHE/P/6030 No.
250 250 -- -- 250
111 46-59-0109 Large suspension bracket ETI/OHE/P/2130
MOD-B
No. 30 30 30
112 46-59-0158 Standard Catenary
suspension bracket Complete
ID. No. 2110
ETI/OHE/P/2110
MOD-B
No. -- -- -- -- -- -- --
113 46-59-0201 Bracket Insulator assembly
(Polluted zone) ETI/OHE/15/(9/91)
with Slip No1 to 6.
No. 100 -- -- 100 100
114 46-61-0753 Section insulator assembly
without insulator (RI 6100) ETI/OHE/27 (08/84)
rev-1 (Oct-92) No.
-- -- -- 10 10
115 46-61-0806 Section Insulator (RI 6100)
(850 mm CD) CORE ETI/OHE/15 (09/91)
with A&C-1to 6
No. 10 -- -- 10 10
116 46-61-0984 Porcelain stay arm insulator
(polluted zone) No.
100 -- -- 100 25 25 100
117 46-61-1010 Porcelain 9 Ton insulator
(polluted zone) (RI-6020-2)
1050mm CD
No. 100 -- -- 100 -- -- 100
118 46-61-1022 Operating insulator for 25KV
Isolator (RI-6260) No.
-- -- -- 10 10
119 46-61-1034 Post insulator for 25KV
isolator and bus bar (RI-
6090)
No. 25 25 25
120 46-61-0303 Porcelain 9 Ton
insulator(RI-6020) (850 mm
CD)
300 -- -- 300 300
121 46-61-0704 Porcelain Stay Arm
Insulator. (RI-6000) 850
mm CD
ETI/OHE/15
(09/91) with
A&C-1to 6
200 200 200
122 46-62-0011 Register arm extension
frame ETI/OHE/P/2110
05 -- -- 05 -- -- 05
123 46-62-0102 Stay arm/bracket chair RDSO’s Drg No
ETI/OHE/P/3050
Mod-B 05 -- -- 05 01 20 05
48
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
124 46-63-0016 9.5Mtrs long drilled and
galvanized RSJ masts (WB-
022) 52 Kg./Mtr (203 x152
mm) as per IS: 808 IS:2062
gr. A. SK driiled scheduled.
ETI/OHE/g/00144
sheet-3 Rev-C type
of mast-F & Spec
No. ETI/OHE/13
(1/84) & A&C-1 to 3.
No.
-- -- -- 05 -- -- 05
125 46-63-0107 9.5Mtrs long drilled and
galvanized BFB masts
ETI/OHE/g/00144
sheet-3 Rev-C type
of mast-F & Spec
No. ETI/OHE/13
(1/84) & A&C-1 to 3.
No.
10 10 -- -- 10
126 46-63-0156 Galvanised standard Traction
masts (fabricated with batten
plate) 9.5 Mtrs long,
B-200.
No. -- 05 -- -- 05
127 46-63-0259 Galvanised standard
Traction masts (fabricated
with batten plate) 9.5 Mtrs
long, B-175.
No. -- -- -- 05 -- -- 05
128 46-63-0302 Galvanised standard Traction
masts (fabricated with batten
plate) 9.5 Mtrs long, B-150.
ETI/C/0071/MOD-E
& RDSO’s specn
No.
ETI/OHE/13(04/84
0 A&C 1 to 3
No. -- -- -- 05 -- -- 05
129 46-64-0014 Guy Rod (25mm dia) 9.3
Mtrs long ID No. 5004
RDSO’s specn No.
ETI/OHE/P/5004/5/
6-1 MOD-G
No. -- -- -- 10 -- -- 10
130 46-90-0366 Discharge/ Earthing rod
complete with all accessories
for OHE (preferably fibre
glass type)
ETI/OHE/51/
(09/87) Rev-1
(Oct’92)
No. 50 50 50
40 80
131 46-98-7812 SS bolt with nuts, L/nuts
size 10/40/26mm ETI/C/0073
MOD-A No. 500 500 500
132 46-98-7824 Adjuster 9 tonne (Eye and
Clevis type) ETI/OHE/P/
5021-1 No. 500 500 500
50 100
133 46-99-0057 Bond (Transverse) with 40x6
mm of MS flat 4 Mtr length
complete with fastner
ETI/OHE/G/
0525 MOD-A No. 500 500 500
134 46-99-0069 40x6 mm of M.S. flat
structure bond 2.5 m length
complete with fastner
ETI/OHE/P/7000
MOD-E
No. 500 500 500 500 100
135 46-99-0094 Silicon composite 9
Tonne insulator
(Standard)
No. 200 200 200
136 46-99-0100 Silicon Composite 9
Tonne Insulator (polluted
Zone)
TI/SPC/OHE/
INSCOM/1070 No. 300 300 300
49
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
137 46-99-0112 25 KV Silicon composite
stay arm insulator
(Polluted Zone)
TI/SPC/OHE/
INSCOM/1070
No. 200 200 200
138 46-99-0124 25 KV Silicon Composite
bracket tube Insulator
(Polluted Zone)
No. 200 200 200
139 46-99-0136 Regulating equipment 3
pully type 3:1 ratio
(Modified)
TI/SPC/SSWR/
1061
No. 25 25 25
140 46-99-0150 SS wire rope for 3 pulley
RE (3:1 ratio)
TI/SPC/SSWR/
1060 No. 30 30 30
141 46-99-0161 SS wire Rope for
modified 3 pully R.E. TI/SPC/OHE/WR/
1060 No. 50 50 50
142 46-99-0173 Silicon composite bracket
insulator (Stranded).
TI/SPC/OHE/
INSCOM/1070 No. 500 500 500
143 46-99-0185 Public caution board retro
reflective type.
RE/33/P/7551 No. 100 100 100
144 46-99-0197 Staff caution board retro
reflective type
RE/33/P/7531
Mod-B
No. 200 200 200
145 46-99-0203 25KV danger board retro
reflective type
ETI/OHE/P/7531
MOD-B
No. 100 100 100
146 46-99-0215 Silicon composite stay
arm insulator (stranded)
TI/SPC/OHE/INS
COM/1070
No. 500 500 500
147 46-99-7213 Angular contact ball
bearing double row
As per ID No
SKF 3205
No. -- -- --
148 46-99-0318 Drop bracket PUI suit
33.7mm register arm tube
Drg
No.ETI/OHE/P/
2360(Mode I)
Pl No. 2361
No.
-- 1200 1200
149 85-99-7328 Bearing SKF 8305 RSI or
MBC 6305LLU
SKF 6305 2RSI
or MBC 6305
LLU
No.
-- 600 600
150 46-99-0537 Counter weight eye rod
(1.55 Mtr long) for 3
pulley
ETI/OHE/P/
5090-5 (Mod-A
ID 5099)
No.
-- 25 25
151 46-99-0549 Guy rod 25mm length
5.35 mtrs for dwarf mast
ETI/OHE/G/
01402 ref-3
No. -- 50 50
152 46-99-0550 Anchor bolt 0.85 mtr long
dia 20 mm
ETI/OHE/G/
01402 ref-5 No.
-- -- -- 40 40
50
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L No
Description of Store
RDSO’s Drawing No
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
Yearly P.I Quota
Qty. Recd.
% Recd.
153 46-99-0562 Attachment for dwarf
mast
ETI/OHE/G/
01402 ref-6
No. -- -- -- 50 50
154 46-99-0460 PTFE type neutral section
(phase break)
TI/SPC/OHE/SN
S/0000
No. -- -- 05 05
155 46-99-0860 Tension insulator rod 2500
of neutral section GF 25
spare part(one set
consisting of 4pieces
OEMID No. 659.500.013
TI/SPC/OHE/SN
S/0000
Set -- -- -- 05 -- -- 05
156 46-99-0872 Cleaning paste for
insulator rods (for PTFE
short neutral section
assembly phase break)
TI/SPC/OHE/SN
S/0000 OEM’s ID
No. 655.188.000
No.
-- -- -- 15 15 100 15
157 46-99-0884 Set of right sidd to SI
655.167.666 (one set
consisting of 04 pieces)
TI/SPC/OHE/SN
S/0000 OEM’s ID
No. 659.500.127
Set
-- -- -- 10 -- -- 10
158 46-99-0896 Set of left sidd to SI
655.167.666 (one set
consisting of 04 pieces)
TI/SPC/OHE/SN
S/0000 OEM’s ID
No. 659.500.126
Set
-- -- -- 10 -- -- 10
ANNEXURE-XVII/B EAC QUOTA FOR 2009-10 FOR PSI ITEM & ADDITIONAL FOR OHE ITEMS FOR 2009-10 IN ASANSOL DIVISION
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/ Specn. No.
Unit
Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd
.
Yearly P.I
Quota
Qty. Recd.
% Recd
. 1 46-99-0320 25KV/240V single phase oil filled
Auxiliary Transformer/10 KVA.
ETI/PSI/15 (03/2003) or
latest
No. 45 -- -- 45 45
2 46-99-0331 25 KV single pole Vacuum Circuit
Breaker
TI/SPC/PSI/ CB/00000
with A& C slip No:04 or
latest
No. 02 -- -- 02 -- -- 02
3 46-99-0343 25 KV single pole Vacuum Inturreptor ETI/PSI/67(9/97) with
A & C slip: 1 or latest
No. 09 -- -- 09 09
4 46-99-0355 25 KV potential transformer type-I TI/SPC/PSI/PTS/0992
(Aug.)
No. 10 10
10
5 46-99-0367 25 KV Potential transformer type-II TI/SPC/PSI/ PTS/0992
(Aug.05 or latest)
No. 04 -- -- 04 04
6 46-99-0379 25 KV single phase oil cooled current
transformer ratio 1500-750/5A Class-
P.S.
ETI/PSI/90(06/95) with
A & C slip 1,2,3,4 or
latest
No. 04 -- -- 04 04
51
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/ Specn. No.
Unit Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd
Yearly P.I
Quota
Qty. Recd.
% Recd
7 46-99-0380 Vacuum bottle for 25KV Circuit
Breaker type VSE-5/20 make-BHEL
TI/SPC/PSI/ CB/0000 with
A & C slip 1 to 4 or latest No.
02 -- -- 02 02 02 100
8 46-99-0392 Vacuum bottle for 25 V iterruptor type
VSE 5/8
ETI/PSI/167(9/97) with
A & C slip :1 No.
20 -- -- 20 20
9 46-99-0409 Drop out fuse switch assembly (W/O
insulator)
ETI/PSI/4 (1/66) Rev:1
April 87 No.
50 -- -- 50 50
10 46-99-0410 Battery Lead Acid 40 AH-LM Set 03 -- -- 03 03
11 46-99-0422 Battery Lead Acid 200 AH-LM
RDSO/PE/SPEC/TL/
0040-2003 (Rev-0) Set 03 -- -- 03 03
12 46-99-0434 Battery charger Lead Acid
40 AH-LM
ETI/PSI/1 (6/81) No. 03 -- -- 03 03
13 46-99-0446 Battery charger Lead Acid
200 AH-LM
ETI/PSI/24 (6/81) No. 02 -- -- 02 02
14 46-99-0471 18 mm Copper Bus Bar RE/30/OHE/5 (11/60)
18-613-2000
M 12 -- -- 12 -- -- 12
15 46-99-0483 36 mm Tubular Al Bus Bar GR GIE
to IS:5082-1998
IS: 2673-2002 M 36 -- -- 36 -- -- 36
16 46-99-0495 36mm Al Tubular connector
1 36mm Al Bus TEE Connector
ID No.6501 Mod B. & 6492 Mod C
a) 36/20mm all terminal connector
ID No. 6482, 6592 & 6531
GR 91E to IS 5082-1998
2673-2002
No.
No.
No.
10
10
10
-- -- 10
10
10
-- -- 10
10
10
17 46-99-0501 Copper Cable 2x2.5 Sq mm (LT for
PT)
IS: 1554 PT-1 1998 M 200 -- -- 200 -- -- 200
18 46-99-0513 Copper Cable 2x4 Sq mm (LT for
CT)
IS: 1554 PT-1 1998 M 200 -- -- 200 -- -- 200
19 46-99-0525 Copper Cable 7x2.5 Sq mm
(LT for Interruptor/CB)
IS: 1554 PT-1 1998 M 45 -- -- 200 -- -- 200
20 46-99-0574 Fuse carrier fibre tube for DO fuse
25KV outer dia 32mm length 53mm
ETI/PSI/032 No. 02 -- -- 50 50
21 42-99-1171 Fuse wire element for (DO fuse) AT 1
Amp
ETI/PSI/14(1/06) No. 09 -- -- 900 900
22 46-99-0598 End fitting for DO fuse 25 KV
Dia 32mm
ETI/PSI/14(1/86) No. 10 -- -- 50 50
23 46-99-0616 Swivel with hook for DO fuse 25 KV
dia-32mm
ETI/PSI/14(1/86) No. 04 -- -- 50 50
52
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/Specn. No.
Unit Yearly
P.I Quota Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
24 46-99-0630 Jaw with terminal connector for DO fuse 25
KV dia-32mm
ETI/PSI/14(1/86) No. 04
30 -- -- 30
25 46-99-0653 Horn link for DO fuse 25 KV dia 32mm. ETI/PSI/14(i/86) No. 02 50 50
26 46-99-0689 36/15 mm Al Bus to centenary tap
connector
ETI/OHE/P/6660 Mod-B No. 20
-- -- 20 20
27 46-99-0677 36 mm Al Bus to PAD terminal connector
for 25 KV isolator
ETI/OHE/P/6480 Mod –C No. 50
-- -- 20 20
28 46-99-0690 PAD to Al conductor terminal connector ETI/OHE/P/6830-01 Mod C No. 03 -- -- 20 20
29 46-99-0458 Operating Rod (Pole) ETI/PSI/14 (1/86) No. 03 -- -- 10 -- -- 10
30 46-99-0586 Fuse carrier fibre tube for DO fuse 25 KV
outer dia 32mm length 53mm.
-- No. 03
-- -- -- -- -- --
31 46-99-0604 End fitting for DO fuse 25 KV dia-25mm -- No. 02 -- -- -- -- -- --
32 46-99-0628 Swivel with hook for DO fuse 25KV dia-
25mm
-- No. 12 -- -- -- -- -- --
33 46-99-0641 Jaw with terminal connector for DO fuse
25KV dia 25mm
-- No. 36 -- -- -- -- -- --
34 46-99-0665 Horn link or DO fuse 25KV dia-25mm. -- No. 10
-- -- -- -- -- --
35 46-99-0707 Micro processor based for feeder protection TI/SPC/PSI/PROTECT/507
0 (05/07) No. 200 -- -- 02 02
36 46-99-0719 Delta-I type fault selective relay for 25 KV
single phase traction system
TI/SPC/PSI/PROTECT/198
2 No. 200 -- -- 02 02
37 46-99-0720 HT capacitor cell 220KV AC 8KV ETI/PSI/67(11/96) with
A & C slip 1-6 No. -- -- -- 15 -- -- 15
38 46-99-0732 42KV 10KA metal oxide gapless type
lightning arrestor
ETI/PSI/71(Rev-1) 1/87
with A & C slip 1& 5 (8/94) No. -- 15 -- -- 15
39 46-99-0744 Single pole high speed based differential
relay of make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 02 02 -- -- 02
40 46-99-0756 IDMT single pole over current relay
Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 03 -- -- 03 03
41 46-99-0768 IDMT single pole over current relay with
instantaneous tripping.
Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 02 -- -- 02 02
53
Year of 09-10 Year of 10-11 Year of 11-12 Sl. No
P.L. No Description of Store RDSO’s Drawing No/Specn. No.
Unit Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
Yearly P.I
Quota
Qty. Recd.
% Recd.
42 46-99-0770 Instantaneous high stability restricted
earth fault relay for HV/LV.
Make- Alind / Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 04 04 -- -- 04
43 46-99-0781 Single pole voltage polarized, inverse
time, over voltage relay for Capacitor
bank. Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 01 -- -- 01 -- -- 01
44 46-99-0793 Single pole voltage polarized, inverse
time under voltage relay for
Capacitor bank. Make- Alind/ Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 01 -- -- 01 -- -- 01
45 46-99-0800 IDMT single pole over current relay
for capacitor bank. Make- Alind/
Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) & 2
(04/02)
No. 02 -- -- 02 -- -- 02
46 46-99-0811 Unbalanced current protection relay
for capacitor bank. Make- Alind/
Ashida
ETI/PSI/65 (1/97) with
A & C slip. 1 (3/99) &
2 (04/02)
No. 02 -- -- 02 -- -- 02
47 46-99-0823 Silica gel breather clear vision
transparent, oil seal type threaded
terminal to suit with 25 KV Alind
Vacumm Interruptor, Alind vacumm
CB & AT
Capacity to contain 250
gm. Of Silica Desiccant
Model DTO-B or
similar.
No. 210 -- -- 210 250 119 210
48 46-99-0835 Feeder wire splice (150 sqmm) (ID-1100) RDSO’S Drg.
No RE/33/P/1100
(Assembly of ID-
1101,1102,1103,1104)
Set 140 -- -- 140 -- -- 140
49 46-99-0847 Alluminium alloy revets, size
6x36mm for fabrication of BFB
steady arm.
RDSO’S Drg. No
ETI/OHE/P/2540 item
No 7,IS Span No 2907.
No. 1400 -- -- 1400 1500 107 1400
50 46-99-0859 Alluminium copper Bi-metallic strip,
size-600x300x1mm
RDSO’s Spn. No
ETI/OHE/55 (4/90)
No. 220 220 220
54
ANNEXURE-XVIII AVAILABILITY OF CRITICAL STORE ITEM
Asansol Depot Madhupur Depot Sl. No.
Item
Population Spare Population Spare
Total Remarks
1. Auxiliary Transformer
100 KVA-NIL 10 KVA -193 Nos.
5 KVA –01 No. 10 KVA – 02 Nos.
100 KVA-02 Nos. 10 KVA-75 Nos.
NIL 01 No.
NIL 01 Nos.
2. Interrupter Vacuum-95 Nos.
SF6(ABB)-02 Nos. Vacuum-02 Nos.
ABB-01 No.
SF6(ABB)-19 Nos. Vacuum-12 Nos.
SF6(CGL)-06 Nos. NIL 03 Nos.
3. 132 KV Circuit Breaker
NIL NIL SF6 (BHEL)-01 No. SF6 (CGL)-02 Nos.
NIL NIL
4. 25 KV Circuit Breaker
Vacuum-04 Nos. SF6(ABB)-01 No.
Vacuum-01 No. SF6-01 No.
SF6-03 Nos. Vacuum-06Nos.
NIL 02 No.
5. Current Transformer
132 KV –Nil 25 KV–09 Nos.
25 KV-02 Nos.
132 KV CT-06 Nos. 25 KV CT-14 Nos.
02 Nos. 02 Nos.
02 Nos. 06 Nos.
6. Potential Transformer
Type- 1 –55 Nos. Type- II – 09 Nos.
Type- 1-01 No. (released)
Type-1 – 19 Nos. Type- II – 06 Nos.
01 nos. 03 Nos.
04 Nos. 03 Nos.
7. 120 KV LA NIL NIL 08 Nos NIL NIL
8. 42 KV LA 104 Nos. 02 Nos. 48 Nos. 07 Nos. 12 Nos.
9. Capacitor Bank 2 FPs 02 Cells 02 TSSs 18 Cells 05 Cells
SCRAP MANAGEMENT ANNEXURE –XIX
Achieved during the year in MT Target for year
in MT During the
month in MT Cumulative
in MT Sl No
Material Description 2008-09 2009-10 2010-11 2011-12 March’12 2011-12
Credit received
Remarks
1. Ferrous 29.896 94.106 143.482 100.00 03.307 79.4235 --
Copper 14.889 19.152 16.7885 20.00 0.0090 12.8461 --
Alluminium 0.750 0.721 2.383 2.00 0.1175 0.9925 -- 2. Non-ferrous
Brass 0.801 -- 2.223 -- -- 1.7830 --
55
ANNEXURE –XX
STOCK SHEETS, ACCOUNTS INSPECTION REPORTS & AUDIT INSPECTION REPORTS
Description Opening balance as on 01.06.10
Accretion Closed as on 30.07.10
Closing balance as on 01.08.10
Initial reply not submitted
Cases require further clarification
Cases pending with audit
Cases pending with accounts
Audit inspection report (Part-I)
-- -- -- -- -- -- -- --
Audit inspection report (Part-II)
-- 02 -- NIL -- -- 02 --
Accounts inspection Report-I
NIL -- -- NIL -- -- -- --
Accounts inspection Report-II
NIL -- -- NIL -- -- -- --
Stock sheets 01 -- 01 NIL -- -- -- --
ANNEXURE –XXI
AVAILABILITY OF TOWER CARS AT VARIOUS DEPOTS AND POH POSITION
Sl. No.
Tower wagon no
Type of Tower Wagon
DEPOT RKM TKM Km Run Year Of Coms
LAST POH
POH DUE
Age as on 01.04.2011
Return From POH
Remarks
1 ER-839 Mark-II JMT 45 126.64 1220 1981 09/2010 09/2014 30 Yrs. 09.09.2010 Working.
2 ER-843 Mark-II PAN 56.3 278.3 857 1988 05/2010 05/2014 23 Yrs. 24.05.2010 Working.
3 ER-774 Mark-III -- -- -- -- 1992 03/2004 03/2008 19 Yrs. 05.03.2004 Tower wagon at JMP for POH.
4 ER-782 Mark-III BRR 39 122.1 357 1998 08/2011 08/2015 13 Yrs. 13.08.2011 Working
5 ER-869 Mark-IV JSME -- -- 1200 03/2010 New recd. 03/2014 New -- Working
6 ER-816 Mark-II UDL 68 423.184 688 1964 10/2010 10/2014 47 Yrs. 28.10.10 Working
7 ER-832 Mark-II MDP 50 112 982 1975 01/2011 01/2015 36 Yrs. 29.01.11 Working
8 RU 02901 8-Wheeler ASN 49 112.5 374 02/2003 10/2011 10/2017 08 Yrs. -- Working
9 RU 00905 8-Wheeler ASN/CON -- -- -- 11/2001 03/2010 03/2016 09 Yrs. -- Meter is out of order.
10 RU-814 8-Wheeler PAN 56.3 160.6 91 06/1999 05/2009 05/2015 11 Yrs. 11.05.2009 Working
56
DETAILS OF MAINTENANCE OF TOWER WAGONS ANNEXURE –XXI/A
Tower Wgon No. Sl. No.
Date of last Maintenance ER-839 ER-843 RU-814 ER-782 ER-816 ER-832 ER-774 RU-2901 RU-00905 ER-869
1 Weekly 30.01.11 16.11.10 14.01.11 29.11.10 10.04.10 16.08.10 21.01.11 01.04.10 24.07.09 --
2 Fortnightly 25.04.10 22.08.10 22.03.10 25.03.10 28.04.10 20.08.10 29.01.11 -- 06.01.08 --
3 Monthly 23.03.12 02.03..12 07.12.11 23.02.12 05.03.12 12.01.12 03.08.11 02.02.12 26.01.12 29.03.12
4 Six Monthly 16.11.11 11.10.11 10.03.11 29.04.09 04.11.11 24.02.12 02.05.11 20.10.10 14.10.11 17.02.12
5 Yearly 17.01.06 25.07.07 24.09.10 23.12.09 07.10.09 13.08.09 07.08.07 18.12.10 10.08.07 --
6 Two Yearly 02.06.07 05.01.06 15.09.05 27.06.07 21.08.07 04.08.07 25.05.06 24.06.05 18.03.06 --
Remarks -- -- -- -- -- -- -- -- -- --
STAFF TAKEN UP FOR FAILURE / BREAKDOWN ANNEXURE –XXII
Sl. No. Name Designation Head quarter
Description of failure/Breakdown Action taken Reference letter No.
Nil
ANNEXURE –XXIII/A Minutes of CEEs conference held at Railway Board on 30th & 31st Aug’07 at Railway Board
Item No. Item Status Remarks
RE CRB
1.1 While addressing the CEEs, CRB mentioned that composite/porcelain insulator could be used in
non-polluted areas. However, for polluted zones, only composite insulators to be used. The detailed
instructions have already been issued by Board.
Being followed. Total 8278 Nos. Composite
Insulators have already been provided in this
Division up to December’11.
1.2 To facilitate the running of Garib Rath trains in the minimum OHE height above rail level to be kept
as 4.69 meters. RDSO has been advised to revise the SOD Revised 2004 accordingly. The power of
CEEs to reduce the height of contact wire has been frozen.
SS Wire rope parted due to lack of
lubrication and rubbing with the pulley
groove.
Pertains to RDSO
1.3 Rehabilitation of OHE should be planned particularly where life of OHE is more than 40 years old.
The life of other OHE components is under consideration in Board’s office.
Division to give reply of Railway Board’s letter No
2007/Elect(G)/ 220/2/Pt.I dated 17.11.2009 on
Codal life of TRD assets
Reply under preparation.
57
Item No. Item Status Remarks
1.4 For facilitating BCM and other engineering P.Way machines working’ the foundations may be
redesigned so that the clearance towards track could be enhanced without infringing the concrete block
of foundations. RDSO may examine.
-- Pertains to RDSO
1.5 The failure of core insulators in section insulators where potential difference is on higher side may be
taken care by replacing the core insulators on section insulator after some time or use section insulator
with double core insulators. RDSO may examine.
-- Pertains to RDSO
2.0 Discussion on Agenda Items.
2.1 TRD : AML and EDRE complimented Zonal Railways for reduction of 36.5% in punctuality loss cases
on account of TRD during the period April to July 2007.
Punctuality loss
2010-11 (Upto
current month)
2011-12 (Upto
current month)
85 39
2.2 On detailed analysis of TRD failures due to insulators in Board’s office, it was noticed that from
April’2007 to 23.08.07, out of 17 cases, 11 cases of failures of 9 Tonne porcelain insulators have been
reported, leading to loss of punctuality of trains,. It shows the trend that 9 tonne insulators are more
failure prone. RDSO may undertake the batch wise analysis of 9- tonne failure prone insulator and given
recommendations to contain the failures. RDSO was advised to issue guidelines incorporating cheek
checklist to identify failure prone in service insulators. RDSO was also advised to identify the batches, if
any, which is more failure prone.
There is no identified failureprone insulators
in this division. However, Make & Batch of
the following insulators are yet to be identified
or invisible.
Depot Stay Bkt 9-tonne
PAN -- -- 135
UDL 08 22 --
ASN 18 34 05
2.3 AM/L also emphasized that the proper inspection should be carried out while procuring insulators. It
was also mentioned that the new specification of porcelain /composite insulators have been issued and
have been frozen for five years. The 9 –tonne insulators of revised specifications are also likely to give
improved performance in the filed.
There is no failure of composite insulator of new
specification No. TI/SPC/OHE ISCOM/1070 and
porcelain insulator of new specification No.
TI/SPC/OHE INS/0070 till date.
3.0 Sidings.
3.1.1 CRS & ME had emphasized upon early completion of electrification of sidings. NIL 3.1.2 AML stressed that the target for completion of electrification of sidings of December’ 07 should be
strictly adhered to as Hon’ble MR is closely monitoring the progress.
NIL
3.1.3 CEE/ECR raised the issue of non availability of contact and catenary wire and other materials for
completion of sidings works from CORE/ALD and it was suggested that one of the Zonal Railways may
be nominated other than RE for centralized procurement of materials like contact and catenary wire.
Contact & catenary wires are being procured
through CMM/KKK.
3.1.4 Pertaining to SECR and EcoR. -- 3.1.5 Zonal Railways represented that the targets of electrification of sidings are difficult to be met since a lot
of items are centralized for procurement by CORE and CORE is not supplying these items timely,
therefore, electrification of siding works, is delayed. It was decided that the proposal for decentralization
of stores items shall be processed again in Boards office.
Procurement process has already been
decntralised.
3.1.6 AML directed that the proposal regarding decentralization of procurement of materials could again be
processed and a meeting can be convened between AM/L and AM/Stores to sort out the issue.
Procurement process has already been
decntralised.
58
Item No. Item Status Remarks 4.0 Standard Implantation
As deliberated in the last ESC meeting held at Nainital, Board has issued revised instructions vide letter
No. 2002/RE/161/11 dt. 10.08.2007 as under :
(i) Implantation of 2.8 m for lines will be adopted for electrification of main lines, new gauge –
conversion works where formation is adequate and track centers of 5.9 m (min) is available. Where
these track centers are not available implantation on Main lines will be 2.50 hrs. (ii) Existing Main lines – implantation of 2.5m will be adopted wherever track centers are not 5.9m. (iii) For all yard lines implantation of 2.36 m will be followed.
Details of removal of critically implanted
OHE masts are given below.
2010-11
2011-12
(up to March12)
145 nos. 100 nos.
ANNEXURE –XXIII/B
Compliance of CEDE’s Conference held on 05.05.09
Item No
Item Status Remarks
1.0 Review of CR -- Pertaining to CR 2.0 Review of ER 2.1 Performance - Target is fixed as 4.8 per one thousand TKM for 2009-10 Cumulative performance up to current
month. (in per thousand TKM)
Prop. Target 2010-11 2011-12
2.4 05.80 06.40
2.2 Mast hit by open door wagon. ER shall plan this work on priority. More emphasis shall be given for
removing infringement on routes where empty movement is frequent.
Removal of infringements is in progress. Total
nos. of infringements already removed are given
below.
1010-11
2011-12
(up to March’12)
145 nos. 100 nos.
2.3
(i)
Grid supply failure- Close liaison with supply authority and checked how redundancy can be built in
system
Close liaision is being maintained with the supply
authorities to improve reliability of power supply.
2.3
(ii)
SCADA maintenance shall be monitored and Isolation of any activity from SCADA shall be monitored
by CEDE and reported to RB.
AMC of SCADA has been given to the OEM and
is valid up to 2011. No activity has been isolated
from SCADA in this division.
3.0 Review of ECR. -- Pertaining to ECR.
4.0 Review of EcoR. -- Pertaining to EcoR.
5.0 Review of NR -- Pertaining to NR.
6.0 Review of NCR -- Pertaining to NCR.
7.0 Review of SR -- Pertaining to SR.
8.0 Review of SCR -- Pertaining to SCR.
9.0 Review of SER -- Pertaining to SER.
59
Item Status Remarks 10.0 Review of SECR -- Pertaining to SECR.
11.0 Review of SWR -- Pertaining to SWR.
12.0 Review of WR -- Pertaining to WR.
13.0 Review of WCR -- Pertaining to WCR.
14.0 SCADA 14.1 RDSO successfully completed trial at Umbala division of N.Rly. for “High speed data transfer
communication system” to achieve 9.6 KBPS data transfer speed with existing SCADA system and
modified communication scheme. Rly. Shall take necessary steps for upgrading the SCADA system for
high speed communication system. RDSO to issue modification sheet in this regard.
Modification sheet yet to be received by this
division.
14.2 All Zonal Railways were advised to send compliance of Inspection note of Member Electrical of BRC
– BCT division on 29.11.08. In inspection note, SCADA system operating on quad-cables must be
transferred to OFC cables in all Railways including small patches between “cable hut to switching
stations” . In this connection, it was advised to make the action plan and to send the target date
completion of work in co-ordination with S & T deptt. For ML”s Perusal. Railways have not sent the
same in proper format, hence Railways must send the compliance by format given at Annexure’A’
Compliance of ML’s inspection Note of BRC-
BCT division regarding SCADA has already
been sent to HQ as per prescribed annexure.
Though OFC cables are available on main line
sections, quad-cables are till existing on the
small patches between cable huts to all the
switching stations in this division.
S&T department has
already been requested to
supply the cost estimate
and action plan for
conversion of the existing
small patches quad-cables
between cable huts to all
the switching stations into
OFC cables.
14.3 Railways shall plan AMC of SCADA on regular basis Being followed.
14.4 RE & RVNL shall ensure in all Projects the SCADA shall have optical fibre as discussed in para2 of
the letter.
-- Pertaining to RE & RVNL.
14.5 RDSO shall finalize the specification of SCADA on TCP/IP open protocol for future procurement.
There shall be provision video wall. RDSO shall send the specification by 30.05.09.
Specification yet to be received.
15.0 Insulator 15.1 Board have issued the policy regarding provision of composite insulators in Vandalism Prone areas as
well as polluted zones.
Railway Board’s policy for provision of
composite insulators in Vandalism Prone areas
as well as polluted zones has been received
and is being followed.
Total 8278 Nos. Composite
Insulators have already
been provided in this
Division up to Dec’11.
15.2 In this connection Board also advised Zonal Railways vide letter No. 2008/Elect(G)/161/1/Pt dated
17.03.09 to identified the polluted zones & Vandalism prone locations (with personnel approval of
CEE of the Zonal Railways). The position shall be complied by Railways within week’s time and
summarized position shall be sent as per format ’C’.
List of poluuted zones and vandalism prone
locations have already been sent to HQ.
15.3 Board have issued a letter regarding Testing Machine for OHE Insulator testing which are portable,
easier to handle and does not require any foundation. RDSO have also issued the specification for this
machine. All divisions and construction organization shall have one such machine in OHE depot.
Procurement will be initiated through M&P.
15.4 All Railways must send the picture of insulator failure to RDSO through E-mail. Insulators shall also
be sent to RDSO on the request of RDSO. RDSO shall make standard pictorial view to identify
different cause of failures.
Will be ensured.
60
Item No
Item Status Remarks
16.0 Predictive maintenance. 16
Board have issued a letter regarding on line monitoring of hard spots (Flashes) by adopting OLIVER-G
vide letter No. 2004/RE/220/4/pt dated 29.11.2005. in which Zonal Railways were advised to
introduce initially at least one OLIVER system for current Collection Test. Vide Board’s letter No.
2004/RE/220/4/Pt dated 16.02.06 to send the progress of same along with field experience to be
communicated for Board’s perusal in PCDO.
Mapping of OHE in STN-JAJ section has
already been completed during 2008-09.
Current collection in the above section is
being conducted.
16.2 All electrified Railways mast have one Oliver ‘G’ plus equipment per Division. Target-30.12.09 Procurement was initiated through M&P.
16.3 All electrified Railways must have Thermo vision camera per electrified division. Target-30.12.09 01 No. Thermo vision camera has already
been procured in this division.
16.4 All Railways shall send the GPS data sheet to RDSO for better monitoring to RDSO. GPS mapping
data should be sent to RDSO by 30.09.09.
GPS data sheet of OHE for STN-JAJ section
will be sent to HQ shortly.
17.0 Others issue 17.1 M/S ABB has modified BM/CB 05.05.09 SCR. The failures in modified CBs shall be monitored by
RDSO and SCR
-- Pertaining to RDSO &
SCR
17.2 The work of Transmission line in SECR, NCR, NR has been fixed as March’2011. RE and Railways shall
study that where demand charges are more than Rs.150/- per KVA lying Transmission line is economical for
reducing Traction tariff. For all new sub-station on existing electrified tariff, Railways shall explore the
option of constructing transmission line from Existing connection.
-- Pertaining to SECR, NCR,
NR
17.3 Trails for corrosion resistant paint shall be completed by identified railways by 30.7.09. Corrosion resistant paint has been applied on
50 Nos. rusted OHE masts up to a heght of
75cm above the top of muff during the month
of Sep’09.
17.4 ECR must practice of joint Checking of Pantograph in Loco shed with TRD staff. -- Pertaining to ECR
17.5 ER must study the reason for high DVC tariff, as tariff in ECR is 3.69/- while in ER it is 4.10/- ER unit.
During 2008-09 DVC tariff was 3.72/- per
unit, in 2009-10 DVC tariff was 4.49/- per
unit and in 2010-11 DVC tariff was 3.05/-
per unit (provisional).
Increase in tariff is due to
adjustment of arrear fuel
surcharge with effect from
Apr’08 to Apr’09 due to
increase of fuel surcaharge
from 80.71 paisa/KWH to
138.45 paisa/KWH with
effect from Apr’08.
17.6 SER shall plan OHE replacement work in big way as assets are of 1955-1965. -- Pertaining to SER
17.7 ECoR has not finalized the SCADA work. This needs to be expedited -- Pertaining to ECoR
17.8 NR has given the PDC for conducting trials for modular OHE fitting – March’2010 and for motorized
isolator – March’2010. NR shall monitor it in close coordination with RDSO.
-- Pertaining to NR
17.9 NCR should prepare the action plan for power exchange and fix the target. -- Pertaining to NCR.
17.10 WCR pointed out the difficulty in maintenance of power transformer. RDSO shall collect the
information from all zonal railways for making STR.
-- Pertaining to WCR.
17.11 RDSO must comprehensive action plan for improving reliability of OHE. -- Pertaining to WCR.
18.0 Power exchange. -- Pertaining to NCR.
19.0 DRPC
61
Item No
Item Status Remarks
19.1 CORE and RVNL were advised to provide DRPC on all new substations. -- Pertaining to CORE and
RVNL.
19.2 RDSO will advise the suggested ratings for new substation. -- Pertaining to RDSO.
19.3 CORE/RVNL must ensure that area of room shall be such provided so that it can meet future
requirement. RDSO shall standardize the size of room.
-- Pertaining to CORE and
RVNL.
ANNEXURE-XXIII/C
Implementation of Recommendation No. 1.1 made in Part-I of Report of Railway Safety Review Committee-98 (Khanna Committee)
ItemNo./Para No.
Item Status Remarks
7.10
2.14.11
A register to drivers observation during his run must be maintained in all lobbies and this information should be conveyed to
Traction /Power Controller under exchange of private numbers. PRC/TLC should in turn convey this to concerned departments
who would rectify the defects and the same should be conveyed to lobby for information of driver.
N.A. This is related to Traction
Rolling Stock (Operation)
deapartment.
25.1
3.5.1(ii)
For the guidance of the inspecting officials, detailed checklists for various types of inspections need to be made out. For inspection
checklists are
available.
25.2
3.5.1(ii)
Each item of checklist to be covered after a specified period by designated levels and record maintained. Noted Being followed.
25.3
3.5.2
Apart from these detailed inspections, other field visits of the inspecting officials should be focused on random check of some
items out of the checklist, in addition to action taken on previously noticed shortcomings.
Noted Being followed.
ANNEXURE-XXIII/D
Implementation of Recommendation No. 1.1 made in Part-II of Report of Railway Safety Review Committee –98 (Khanna Committee)
Item No. Item Status Remarks 9
2.9.9
Purely on grounds of enhancing the safety of the system, creation of adequate infrastructure for maintenance (both for fixed and moving
assets) and line/terminal capacity must get the highest priority in the investment planning process on par with replacement and renewal of
over-aged assets.
Noted Shall be ensured.
12
2.11.5(ii)
A reassessment of the coadal life of major assets on IR should be done by a small disciplinary team of Railway and outside expert on the
basis of past performance of the assets, extent of use and other related factors.
Noted --
2.11.5(iii) IR must introduce a proper prioritization for the renewal of major assets based on the importance of the route, the extent of wear and tear, the
extent of use and most importantly, the performance of the assets from the safety angle and the cost of maintenance.
Noted --
21
3.1.2
The committee reiterates in the strongest possible terms that IR needs to improve its implantation of safety items by planning each-with
physical/financial benchmark spread over several years.
Noted --
65
4.11.2
A detailed divisional plan for arrangements to execute scheduled work involving line blocks be made for a week in advance covering all
departments and thereafter adhered to.
Being
followed.
--
95
3.10.03
On all Divisions concerned officers and supervisors should be provided with mobile breathalyzer equipment for testing running staff on the
footplate on a regular basis.
Not
available.
--
62
ANNEXURE –XXIII/E OHE Reliability :
Sl. No.
Item
Total on line
Progress During the
month
Progress up to
the month
No. of locations observed where
adjustment required during the month
No. of locations observed where
adjustment required, up to the month
Location attended during the month
Location attended up to the month
Remarks
1. Live line checking of OHE
by 8 wheeler tower wagon
in TKM
830 16 942 03 125 04 72 --
2. Checking of free movement
of ATDs
2273 1969 20064 04 95 03 86 --
3. Re-tensioning of FTAs 316 02 09 01 03 -- 02 --
4. Checking and adjustment of
cross-over & turn-out
917 36 434 08 94 08 80 --
5. Checking and adjustment of
regulating equipment
2273 701 8167 21 201 16 116 --
6. Cleaning of Insulators
Total No. of Insulators No. of Insulators cleaned during the month Cumulative No. of Insulators cleaned up to the month
Remarks
53997 1630 20090 --
7. Lead Sealed Insulators, if exist
Total No. of Insulators No. of Lead Sealed Insulators replaced during the month
Cumulative No. of Lead Sealed Insulators replaced up to the month
Remarks
2431 02 74 --
ANNEXURE –XXIII/F Minutes of the Performance Review meeting held in Railway Board on 28.09.2010.
Item No.
Item Status Remarks
4.0 Electrical Energy Management 4.1 Panto Entanglement in serious concern and needs to analyses the each case in depth at
higher level.
Analysis of Panto entanglement cases are being sent to HQ as per prescribed
Annexure 9.03 of ACTM Vol-III.
4.2 Insulator cleaning in polluted/corroded area needs special focus specially in CR. Progress during the month 366 Nos.
Cumulative : 1718 Nos.
--
4.3 Training of staff by conducting mock drill at model OHE in OHE depots after setting
target time for each maintenance activity shall be ensured.
-- --
63
Item No.
Item Status Remarks
4.4 Lightning arresters should be checked by Third Harmonic Distortion (THD)
measurement equipment. LA failures and OHE failures due to bad weather can be
avoided by use of this equipment. RDSO should issue the instruction for provision of
LA at alternate AT location. CORE should ensure the quality of the new LA.
Progress during the month : Nil
Cumulative : 07 Nos.
4.5 Current collection and use of Thermo vision camera should be ensured for checking of
hot spot.
Current collection test is being conducted in main lines quarterly. One no. thermo
vision camera has been procured by the division in 2010-11. Checking of hot spots
in TSS and switching stations are being done using thermo vision camera.
4.6 To reduce the breakage of insulators, it shall be ensured during maintenance that
cantilevers are having free movement to avoid failures due to bending stresses.
-- --
4.7 Railway should avoid the high voltage traction supply, which increases the Specific
energy consumption.
There are four take off points in the division. 123kV supply received at
BDME/GSS & JMT/GSS and 25 kV supply receiced at DTPS/GSS &
KMME/GSS.
4.8 Railway should ensure regular calibration of energy meter for correct recording of
energy consumption.
DVC & JSEB authorities has been requested for joint checking & calibration of
energy meters.
4.9 AM/L in his address emphasized the need of maintenance & stated as under : 4.9.1 Pantograph entanglement cases continue to be routinely ascribed to storms while
maintenance of stagger and gradients are not getting checked. Unsettled disputes of
tracks slewed/lifted may lead to acceptance of tolerance beyond specified limits.
Instructions are wherever track is attended implantation is to be honoured.
Being followed
--
4.10 Traction energy consumption has increased in SWR, WR. Railways to investigate in
details and correct entry of data at base level to be ensured.
-- Pertains to SWR & WR.
4.11 Railways shall plan for different means of energy conservation and optimum
manpower utilization. The effort made by NCR for “Automation of pumps by remote
operation & fault logging features” was appreciated.
1)Cold stand by of Traction transformers are being maintained.
2) Paralleling of double line feeders to TSS, where double line is available is being
done.
3) Proposal for upgradation at two Cap Bank sent for inclusion.
4.12 CR should prepare the proposal of solar based generating station. -- Pertains to CR.
REPORT OF NEW EQUIPMENT UNDER TRIAL ANNEXURE – XXIV
A. SS wire rope with Specification No. TI/SPC/OHE/WR/ 1060 (6/06) with A&C No. 1&2 Total Population of Modified 3
Pulley type ATD with modified Pulley Groove. Nos. received Nos. distributed to OHE Depots Nos. installed in Modified 3 Pulley
type ATD with modified Pulley Groove
Failure if any
388 198 182 100 Nil
B.
Total No. of Lightning Arrestor Total No. of Surge Counter provided Action taken for provision of Surge Counter
THRC Action taken for procurement of THRC
176 52 Procurement for remaining is under
process.
01 Leakage current monitor procured by
the division & the material received
on 06.05.10.
64
ANNEXURE –XXV 1.0 Special drive & inspection of OHE Sl. No.
Works Quantity of works
Works completed
Target of remaining work Action plan for remaining work
A) Action plan as per D.O. letter no. 2008/Elect. (G) / 161 / 8 / Punct. dated 08.09.2010 1. A drive to check turnouts /cross over OHE for its
proper adjustment / alignment and furnish
compliance in next 3 months.
917 nos. 434 nos.
-- --
2. Identification of 9-Tonne insulators having core
dia of 72 mm and approprite action . 5290 nos. 4942 nos.
-- GO-NOGO gauges mounted on Operating rod have been made
and given to the depot to identify 9-tonne insulators with 72
mm core diameter. Total 3262 nos. 9-tonne insulator with 72
mm core diameter have been identified.
3. Updated compilation of SMIs / MIs of RDSO in
every depot
13 depots 13 depots.
All TRD Depots of the Division have been provided with a compilation of all SMIs/MIs
of RDSO four years back. Also copies of RDSO’s SMIs/MIs are being circulated to all
field Officers and maintenance Depots as and when received by the Division. Bound updated compilation of SMIs/MIs has been prepared by the division and circulated to all
TRD Depots in January’11.
4. Provision of screens to 1.83 M height on all FOBs
to cover gaps wherever existing between two line. 15 nos. -- -- The same has been taken up with the Engineering
Department.wiil be complied with.
B) 1. Live line checking by TW 830 TKM 942 TKM -- --
2. Checking of anti-creep wire 602 nos. 282 Nos. -- --
3. Checking of buried rail connections 04 nos. 04 completed. --
4. Provision of missing structure bonds / Rail bonds 16157 nos. 1558 nos. -- --
5. The progress of seasonal cleaning of insulators. 53997 nos. 20090 nos. -- --
6. Replacement of Insulators by composite / antifog
insulators in polluted zones specially in NR &
NCR
4576 nos. 278nos.
-- --
7. To check the healthiness of the lightning arrester
in lightning prone area 138 nos. 102 Nos. -- --
8. Attention of critical implantation (< 2.36 M +
curve allowance) mast on main line 2727 nos. 99 nos. Another 355 nos. can be
removed through existing
works. Target date : 31.07.12
--
9. Joint checking of pantograph by TRD & TRS staff All 1738
-- Joint checking of Pantograph is being conducted
regularly in the Division.
10. Provision of bird & monkey scare measures at
portals & designated location -- 164
-- PVC pipes are being provided inside portal/TTC drop
arms to prevent bird nesting. PVC pipes have already
been provided at 1761 nos. locations up to the month.
65
Sl. No.
Works Quantity of works
Works completed
Target of remaining work
Action plan for remaining work
11. Tree branch trimming All 30433 nos. -- --
12. Cutting of trees with Engineering department 465 nos. 439 Nos. -- --
13. Replacement of rusted cantilever assembly 7985 nos. 190 nos. Another 2620 nos. can be replaced through existing sanctioned work.
14. Checking of RRA clamp to avoide necking &
parting of contact wire 2235 nos. 646 Nnos. -- --
15. Free movement of cantilever 21592 nos. 9006 Nos. -- --
16. Checking of P.G. clamps, splices by thermo vision
camera 8550 nos. 5666 Nos.
-- --
17. Checking of all the along / vertical feeders
opposite to TSS / SP/ SSP gantries 90 nos. 135 Nos.
-- --
18. Replacement of G - Jumpers / cross feeders of 105
sq. mm with 150 sqmm size in heavy loading
locations
-- --
There is no cross feeder of 105 sqmm exist on line in this division. RDSO specification
for 150 sqmm ‘G’ jumper yet to be received by the division.
19. Replacement of silver brazing joint in Contact
wire -- --
No records available regarding silver brazing joints in Contact wire.
20. Provision of anti theft Jumper in OOR OHE and
anticreep wire in theft prone area 2820 nos. 104 Nos.
For provision of anticreep jumpes, existing steel anticreep wires are required to be
replaced by copper catenary wire for which there is no sanctioned work.
2.0 Progress of Netra Car run : Sl. No.
Section Running date Nos. of bad location
Total Nos. location rectified/
attended
Target date for remaining location
Action Plan
1. KAN-ASN 20.07.2011 23 08 --
2. ASN-JAJ 21.07.2011 47 40 --
3. JAJ-ASN 22.07.2011 40 36 --
4. ASN-KAN 23.07.2011 44 34 --
5. ASN-DHN 29.07.2011 27 20 --
Report of the NETRA Car run has been received by the division
on 20.10.11 and circulated to all OHE depots vide this office letter
no. ACT/30/2342 dated 24.10.11.
3.0 Population of predictive Maintenance Tools :
Sl. No.
Division OLIVER-G Thermo Vision Camera GPS mapping for Netra Car
1. Asansol NIL 01 no. GPS mapping of 606 TKM OHE completed by
OLIVR-G up to the month.