Grid25 Update
Generator Connections Liaison Group Meeting
18th June 2014
Outline
• Grid25 - 2014 Programme – Planning Applications
– New Builds
– Uprates
– Refurbishments
– Customer Connections
• Grid25 Programme – 2014 progress – Planning permission
– Energisation
– South West Stations
• ATR Updates
2014 Programme
Public Planning
•Planning Lodgements
▪Poolbeg 220kV Reactive Support ▪Louth 220kV Station Refurb ▪Bellacorick-CB 110kV LU Phase 2 ▪North South 400KV IC ▪Moy 110kV BB Uprate ▪Bellacorick-Moy 110Kv LU
•Planning Granted
▪Laois - Kilkenny 400kV reinforcement scheme ▪Aghada 220kV Station Busbar Reconfiguration ▪Knockraha 220kV Station ▪Poolbeg 220kV Reactive Support ▪Louth 220kV Station Refurb ▪Bellacorick-CB 110kV LU Phase 2
2014 Transmission Programme
New Build
•
Uprates
•
Refurbs
Stations: 7 x 220kV 4 x 110kV
Lines: 5 new circuits
Cables: 2 new circuits
Stations: 6 busbars
Lines: 200km
Cables: 1 circuit
Stations: Asset Replacement
Protection upgrades
Lines: 40km
2014 New Build
•
Stations
Ardnacrusha 110kV Finglas 110kV
Ryebrook 110kV Cloghboola 110kV
Carrickmines 220kV Killlonan 220kV
Knockanure 220kV Ballyvouskil 220kV Ballynahulla 220kV Kilpaddoge 220kV
Moneypoint 220kV
Overhead Lines
Binbane – Letterkenny 110kV Clashavoon – Dunmanway 110kV
Kinnegad – Mullingar 110kV Cloghboola – Trien 110kV
Mount Lucas – Thornsberry 110kV
Cables Cloghboola – Trien 110kV
Kilpaddoge – Moneypoint 220kV
Transformers
Woodland 400/220kV Dunstown 400/220kV
2014 Uprates
Stations – Busbars Trien 110kV
Carrick-on-Shannon 110kV Dunmanway 110kV Thornsberry 110kV
Cathaleen Falls 110kV Sligo 110kV
Protection Upgrades Raffeen 220kV Arklow 220kV Trabeg 110kV
Lines
Cullenagh – Gt Island 220kV Cunghill – Sligo 110kV
Cunghill – Glenree 110kV Ikerrin – Thurles 110kV
Cath Falls – Srananagh 110kV Kilbarry – Knockraha 1 110kV
Kilbarry – Mallow 110kV Cahir – Thurles 110kV
Clashavoon – Tarbert 220kV
Cables Cullenagh – Gt Island 220kV
2014 Refurbishments
Overhead Lines Dunstown – Turlough Hill 220kV Moneypoint – Prospect 220kV Cashla – Prospect 220kV re-sag
Maynooth – Woodland 220kV re-sag Maynooth – Shannonbridge 220kV re-sag
220kV Composite Insulators 110kV Cable Terminations
Stations Micafil bushings
Balteau CTs Tyco surge arrestors
Metal Theft
• Cloghboola 110kV windfarm
• Kill Hill 110kV windfarm
• Woodhouse 110kV windfarm
• Bruckana 110kV windfarm
2014 - New connections
Grid25 Update – 2014 Progress
Grid25 Progress
• Planning granted for Laois - Kilkenny 400kV Project
• Energisation of Binbane - Letterkenny 110kV New Circuit
• South West Stations Update
Laois-Kilkenny Reinforcement
Project (Midlands – S/E)
110kV building
400kV building
Transformers
Incoming 400kV Line
Gantry
New 400/110kV substation in Coolnabacky, Laois (c.2.8 acres)
Binbane-Letterkenny 110kV OHL Energised
• Circuit energised 10th May14
• 69km 110kV OHL
• Required to address quality of supply
issues and provide security of supply
in the area
• Station work ongoing
South West Stations Update
• New 220kV GIS stations
• Civils 100% complete
• Installation and HV testing of switchgear ongoing
• Moneypoint 400kV GIS
• Civils underway.
• Passed type test & FAT due end of 2014.
• Kilpaddoge – Moneypoint 220kV cable
• Due for installation Q4 2015
• Clashavoon – Tarbert 220kV HTLS uprate
• Planning permission required for section.
• Proceeding with uprate of remaining section later in 2014
ATR Updates
ATR Completions 2011-2020
• 26 ATRs Complete
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total 1 12 13 18 22 15 8 10 3 6
0
5
10
15
20
25
No
of
ATR
s
ATR Completions Per Year
ATR Communications
• Website ATR updates
• EirGrid Quarterly Updates
• CER – Quarterly Cap Ex Report
• Changes Impacting Customers