FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
Ground-Based Midcourse Defense (GMD)Fort Greely, Alaska
26 April 200426 April 2004
Presented by:Mr. Tom Devanney
Deputy Program DirectorGround-Based Midcourse Defense
Mr. Tom DevanneyDeputy Program Director
Ground-Based Midcourse Defense
Draft Deliberative Document For Discussion Purposes Only
DO NOT RELEASE Under FOIA
DCN: 9873
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 27/7/2005 6:35 PM7/7/2005 6:35 PM
Mission And Tasks
BMDS Mission• Provide Missile Defense Capabilities to COCOMs
Tasks• Build, Test, and Verify an Initial Defensive Operations Capability• Place the BMDS on Alert• Execute Concurrent Testing and Defensive Operations• Continue Development to Incrementally Improve Capability
Bottom Line: Field an Initial Missile Defense CapabilityBottom Line: Field an Initial Missile Defense CapabilityBottom Line: Field an Initial Missile Defense Capability
“The Defense Department… Shall Proceed With Plans to Deploy a Set of Initial Missile Defense Capabilities Beginning in 2004.”
President George W. Bush NSPD-23, 16 DEC 02
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 37/7/2005 6:35 PM7/7/2005 6:35 PM
MDA – Fort Greely
• Public Law 107-20: (July 24, 2001)– Sec. 1207: The Secretary of Defense may retain all or a portion of Fort
Greely, AK as the Secretary deems necessary to meet military operations logistics and personnel support requirements for missile defense.
• Memo - SECDEF to Director, BMDO (Now MDA):– Delegates authority to retain portions of Fort Greely, AK to meet Missile
Defense Requirements to Director, BMDO
• Memo for DASA (I&H) Attn: Mr. Paul Johnson: (10 Aug 01)– BMDO determined that specified buildings and land at Fort Greely are
necessary to create a Missile Defense Systems Test Bed– Asks the Army to withdraw the surplus property determination and grant
BMDO’s request for excess property– Identifies the buildings and land required to support the Missile Defense
System Test Bed and foreseeable missile defense needs– Proposes that the Army retain jurisdiction of the Fort Greely portion of the
Missile Defense System Test Bed
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 47/7/2005 6:35 PM7/7/2005 6:35 PM
GMD Fire Control Node (At Schriever AFB)
Remoted Workstations(At Cheyenne Mtn Ops Ctr)
Colorado Springs
Target
Kodiak
GMD CommunicationsNetwork ConnectsAll Components
Aegis BMD Radar / ESI
External SystemInterface (ESI)
Link 16GBMC2
• USS Lake Erie, Shiloh,and Port Royal
Pacific Ocean
GMD Fire Control Node
In-Flight Interceptor Communication System
Data Terminal
Interceptor(For Flight Tests)
Ground-BasedRadar - Prototype
Reagan Test Site (Testing)
Beale AFB
Upgraded EarlyWarning Radar Target
Vandenberg AFB
Eareckson Air Station
Cobra Dane
In-Flight InterceptorCommunication
System Data Terminal
DefenseSatellite
CommunicationsSystem
DSP/STSS
Boulder
GMD FireControl Node
In-Flight Interceptor
CommunicationSystem Data
Terminal
Interceptors
Ft. Greely
DefenseSatellite
CommunicationsSystem
Melbourne, FLIn-Flight InterceptorCommunicationSystem DataTerminal
Colorado Springs
GMD Fire Control Node (At Schriever AFB)
Remoted Workstations(At Cheyenne Mtn Ops Ctr)
DSP/STSS
Boulder
BuckleyAFB
In-Flight Interceptor Communication System
Data TerminalInterceptors Target
Vandenberg AFBBeale AFB
Upgraded EarlyWarning Radar
Aegis BMD Radar / ESI
External SystemInterface (ESI)
Link 16GFC/C
• USS Lake Erie, Shiloh,and Port Royal
Pacific Ocean
Eareckson Air Station
Cobra Dane
In-Flight InterceptorCommunication
System Data Terminal
DefenseSatellite
CommunicationsSystem
GMD CommunicationsNetwork ConnectsAll Components
InterceptorsDefenseSatellite
CommunicationsSystem
GMD FireControl Node
In-Flight Interceptor
CommunicationSystem Data
Terminal
GMD Program (U)
Sea-Based TestXBR (SBX)
In-Flight Interceptor
CommunicationSystem
Pacific Ocean
Sea-Based TestXBR (SBX)
In-Flight Interceptor
CommunicationSystem Data
Terminal
Adak, Alaska
Fylingdales - U.K.
Upgraded EarlyWarning Radar
Interceptors
GM-0010
Legend
Test
IDO 2004
IDO 2005
Beyond
In-Flight InterceptorCommunicationSystem DataTerminal
Eastern UnitedStates
Thule, Greenland*
Upgraded EarlyWarning Radar
*If approved by Danish/Greenland Governments 20 Interceptors
In-Flight Interceptor
CommunicationSystem Data
Terminal
3rd Site – 10 Interceptors
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 57/7/2005 6:35 PM7/7/2005 6:35 PM
China Russia
BerlinBerlin
Washington, DCWashington, DC
Los AngelesLos AngelesSeoulSeoul
BeijingBeijing
MoscowMoscow
TokyoTokyoFt GreelyFt Greely
3,6003,600
2,0002,0002,9002,900
2,2002,200
3,3003,300
3,5003,500
3,8003,8003,9003,900
Canada
Why Alaska? (U)
NorthPole
HawaiiHawaii3,4003,400
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 67/7/2005 6:35 PM7/7/2005 6:35 PM
Why Alaska? (U)
Washington
Hawaii
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 77/7/2005 6:35 PM7/7/2005 6:35 PM
Alaska’s Advantages (U)The Ideal Location
…. to Protect All 50 States … Attacks From East or West
• Fort Greely (Army Host Installation)– Optimal Location for Missile Flyout– Geotechnical Aspects Ideal for Missile Silos – Sparse Surrounding Population
• Eareckson Air Station (Air Force Host Installation)– Ideal Radar Location– Leverages Existing Site & Infrastructure
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 87/7/2005 6:35 PM7/7/2005 6:35 PM
GMD IDO Architecture
DSCSWPAC
DSCSEPAC
MILSTAR
JNIC SCHRIEVER
BEALE
VANDENBERG
Aegis
FORTGREELY
EARECKSONCOBRA DANE
HAWAII
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 97/7/2005 6:35 PM7/7/2005 6:35 PM
GMD Schedule (U)Concurrent Operations
and Test
Concurrent Operations
and Test
InitiateConstruction,
Continue Testing
InitiateConstruction,
Continue Testing
HW and SWIDO
Configuration
HW and SWIDO
Configuration
Initial Defensive
Operations
Initial Defensive
Operations
JNIC GFC/C NodeESI-DSP Integration
20/20 IDTIntg at RTS
Initial Training
BV 5
AK Circuit/CONUS Fiber RingGBI Greely
ESI-CD Integration
1st Site Integration
Greely GFC/C Node
Last Site Integration
Missile Storage Igloos
Shemya IDT Integration
Entry Control Station
VAFB IDT
BPEX 02-1Greely SiteConstruction
Launch SiteComponents
IFT-8
NEPAActivities
IFT-7
LogCCActivated
RTS NodeHW Upgrade
BPEX02-2
IGT-7
BV 3
IFT-9
Mechanical Electrical Building (MEB)Readiness & Control Bldg
IFT-10
COSOSSC Act
Beale OSSC Act
TB IGT-1
OSC Demo
FY 03 FY 04FY 021 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
FY 05
Confidence / T
est Realism
IGT-3DGT-1
FT-04-1
SBX Integration
Greely IDT Integration
(Both Enclosed)
Today
Fylingdales UEWRAdditional GBI Greely
GBI VAFB
IDO
LegendSensorsConstructionGFC/CLog Support
TestTraining/ExercisesCheckoutCompleted
EKV Did Not Separate*
IFTIFT--13B13B
BV 6
MILSAT COMIntegrated
GFC/C GCN DSCS
Eareckson OSSC Act
ESI-AEGIS BMD Integration
CONUS Fiber-Optic Ring
IDT BOD
* X
X
IFT-13C
FT-04-1
IFT-14
FTG-04-2
GM-04-0011
IGT-2
Power Plant Upgrade
Lease Fort Greely GFC/C Ring-Link
IGT-5IGT-4
Basic System
Hit-To-KillWorks
Basic System
Hit-To-KillWorks
Wkstation Input to CMOCGMD SIM 02
20/20 IDT Facility Cmp at RTS
Ft. GreelyOSSC Act
–– On ScheduleOn ScheduleFor IDOFor IDO
Beale UEWR Integration
Embedded Test Capability
STRRSystem Integration and Checkout (SICO)53 611
FTG-04-3
FTG-04-4 A/B
TEA MTEA M
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-03-02111-(Deploy & Sustainment)-(04-05-04)- 13/25/2004 2:18 PM3/25/2004 2:18 PM
GMD Synchronization
GM-0134
MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct
IFT 13C TLV LRR
IFT 13C GBI Emplace
MK2 OBV Silo Refurb
IFT 13C FRRIFT 13C ILC
IFT 14 TLV to KLC
IFT 14 TLV LRR
ESI 4.1 FQT
OBV 1.12 SW Pre FQTOBV 1.12 SW FQT
GBI SIM (EKV,CLE, Booster)CLE 2.5 FQT
IFT 14 Booster O/D
IFT 14 PAM O/D
IFT 14 GBI Emplace
IFT 14 PAM SRRIFT 14 GBI SRR
MK1 OBV Silo RefurbRITE SW 1.3 FQT
IFT 14 MRR
IFT 14 Auth to Connect
IFT 14 PTRRIFT 14 TRR
IFT 14 FRR
IFT 14 ILCJRE FQT
ESI 4A.1BM-1 Complete w/FQT
IFT 16A TLVto KLCIFT 15 TLV LRR
IFT 15 Gov’t Threat Data PkgIFT 15 ET 3.2.1 ISTC-1 BM 1
IFT 15 EKV O/DIFT 15 BAM O/D
IFT 15 PAM O/D
IFT 15 Booster O/D
IFT 15 GBI Emplace
IFT 15 GBI SRR
IFT 14 MK2 OBV Silo Refurb
IFT 15 Auth to Connect
IFT 15 TRR
IFT 15 PTRRIFT 15 MRR
IFT 15 ILC
IFT 15 FRR
IFT 17/18 Gov’t Threat Data Pkg
UEWR B5.2.2 FQT UEWR DT&E
UEWR BM1 Comp
IFT 15 TLV to KLC
GFC 4A.2.x ER
GFC 4A.2.x FQTGFC 4A.2.x BM1
CLE LAB 2.5 FQT
CLE LAB 2.6 BM1
IFT 16 Auth to Connect
IFT 16A PTRR
IFT 16A TRR
ET 3.3 FQT
New GEDBV+ SW FQT
CLE 2.6 FQT
BV+ Test FOF (VAFB/RTS)Avail to GFC/C
CD 2.4.1 FQT
IGT-2 PTRR
IGT-2 TRRIGT-2 RFR Complete
IGT-2 QLR
IAR 3.0 GFC Rel Rev (RR)IAR 3.0 IDT RRIAR 3.0 ESI RR
IAR 3.0 GFC Release ReportIAR 3.0 IDT Release ReportIAR 3.0 ESI Release Report
IAR 3.0 GCN Release Report
Upgrade Train ing
VAFB RIDT Slab & Util
VAFB RIDT ESSVAFB LF-23VAFB LF-02 VAFB LF-03
VAFB LF-21
VAFB Bldg 1768
VAFB Bldg 6510
VAFB MAB
VAFB Security Bldg
VAFB ESS Upgrade
VAFB Interceptor Storage VAFB PSE Storage
Operator Basic
Advanced Course
Staf f Basic
Staff Basic
CMOC BasicCMOC Basic
CMOC Basic
CMOC Basic
CMOC BasicCMOC Advanced
UEWR Maintenance TrgUEWR Operator TrgCOBRA DANE Maint Trg
Beale ET Node SRR
VAFB ET Node SRR
FGA ET Node ICOR Beale ET Node ICOR
SSC0 3SSC0 5 (CD)
SSC0 5 (Shemya)SSC0 5 (FGA) SSCO 6 (Beale)SSCO 6 (VAFB)
SICO-3 SICO 5 SICO 6IGT-2
IAR-3
FGA GCN ICOR FGA IDT ICOR
FGA ESI ICOR FGA GFC ICOR
SICO 3 PTRRFGA SSCO TRR
ET 3.2.2 PCIL-2 BM1
EAS IDT GCN HW Del
CD GCN HW Del
EAS IDT GCN I&CO
Cobra Dane GCN HW Del
Shemya GCN ICORShemya IDT I&CO
Shemya IDT ICORCobra Dane ICOR
JNIC ET 3.2.1 ICOR
JNIC, SPAWAR, FGA GFC I&CO
JNIC, SPAWAR, FGA GFC ICORCLE LAB I&CO
SICO 5 Shemya SSCO PTRRSICO 5 Shemya SSCO TRR
SICO 5 PTRR
SICO 5 TRR
SICO 5 Interim Test Rpt
VAFB CLE Lab I&COVAFB CLE I&CO
CLE/SILO (2) ICOR
VAFB ET ICOR
VAFB ET HW Del
VAFB SSCO PTRR
SICO 6 Beale SSCO PTRR
Beale SSCO TRR
SICO 6 PTRRSICO 6 TRR
IGT-3 PTRR
IGT-3 TRR
IDC-1 EKV O/DIDC-1 BAM O/D
IDC-1 B&S O/DIDC-1 GBI Complete
IDC-1 GBI Emplacement
IDC-2 EKV O/D
IDC-2 BAM O/D
IDC-2 PAM O/D
IDC-2 GBI Complete
IDC-2 GBI Emplacement
IDC-3 EKV O/D
IDC-3 BAM O/D
IDC-3 B&S ODIDC-3 GBI Complete
IDC-3 GBI Emplacement
IDC-4 EKV O/D
IDC-4 BAM O/D
IDC-4 B&S PAM ODIDC-4 GBI Complete
IDC-4 GBI Emplacement
IDC-5 EKV O/DIDC-5 BAM O/D
IDC-5 PAM OD
IDC-5 GBI CompleteIDC-5 GBI Emplacement
IDC-6 EKV O/DIDC-6 BAM O/D IDC-6 PAM O/D
IDC-6 GBI CompleteIDC-7 EKV O/DIDC-7 BAM O/D
SICO 6 VAFB RIDT Auth to Connect
SICO 5 FGA IDT Auth to Connect
IFT 13C GBI SRR
IFT 16A MRR
SICO 3 Test Rpt
STRR
IFT 13C TRRIFT 15 PAM SRRSICO 3 TRR VAFB SSCO TRRSICO 6 VAFB CLE Auth to Connect
Manufacturing Capability Assessment Parts, Materials, & Process Management Risk Management
IGT-3
Cobra Dane Phase I IATO
FGA CCTV/COMSEC Facility Certificat ion
Cobra Dane Phase I IATO
Long Haul Comm IATO Ext
LSM Phase II IATO Ext
NSM Phase IATO Ext
Cobra Dane IATO ExtET IATO ExtIDT IATO Ext
VAFB Security CONOPS
Cobra Dane CT&E
GFC IATO Ext
CLE IATO Ext
LHC Phase II IATO Ext
LSM IATO ExtNSM Phase II IATO Ext ET IATO Ext
IDT IATO ExtUEWR IATO Ext
VAFB Auth to Connect (GCN, RIDT)
CNE Penetration Testing
VAFB Auth to Connect (CLE, ET)ET Phase II IATOIDT Phase I I IATO
UEWR Phase II IATO
GFC/CLE Phase II IATO ExtFGA New Sensor Integration
Cobra Dane Phase I I IATO
FGA Classified Storage Accred
IDC-1 PAM O/D
IDC-2 B&S O/D
IDC-3 PAM OD
IDC-5 B&S OD
IDC-6 B&S O/D
Cobra Dane Phase I I IATO Ext
Advanced Course
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 107/7/2005 6:35 PM7/7/2005 6:35 PM
GMD Site Fort Greely Vicinity (U)
Allen Army Airfield
Main Cantonment Area
GMD Site
N(Mag)
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 117/7/2005 6:35 PM7/7/2005 6:35 PM
Fort Greely, AK
MABMAB
Readiness &Control
Readiness &Control
6- SILOsMF - 16- SILOsMF - 1DSCSDSCS
IDTIDTIDT
Entry ControlEntry Control
14 Additional Holes14 Additional Holes
• 800 Acres Cleared • 87,477 sf of Construction • 11 New and 25
Renovated Bldgs• 950,000 CY Dirt Moved
• 800 Acres Cleared • 87,477 sf of Construction • 11 New and 25
Renovated Bldgs• 950,000 CY Dirt Moved
• 35,000 CY Concrete Placed
• 3.75 Miles Fence• 2.6 Miles Utilidor
Completed
• 35,000 CY Concrete Placed
• 3.75 Miles Fence• 2.6 Miles Utilidor
Completed
FGA Facility Construction
Summary
FGA Facility Construction
Summary
Number of PersonnelGovernment - 5Contractors - 47
Number of PersonnelGovernment - 5Contractors - 47
• Electrical Substation• Water Supply• Utilities Building
• Fuel Unloading Facility• EKV Oxidizer• EKV Hyperbolic
• 2 Interceptor Storage Facilities• Mechanical Electrical Building
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 127/7/2005 6:35 PM7/7/2005 6:35 PM
Readiness & Control Building
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 137/7/2005 6:35 PM7/7/2005 6:35 PM
Missile Assembly Building (MAB)
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 147/7/2005 6:35 PM7/7/2005 6:35 PM
Interceptor Storage Facilities 71 & 72
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 157/7/2005 6:35 PM7/7/2005 6:35 PM
IFICS Data Terminal (IDT)
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 167/7/2005 6:35 PM7/7/2005 6:35 PM
Electrical Substation
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 177/7/2005 6:35 PM7/7/2005 6:35 PM
GMD Retained Buildings vs Garrison Master Plan
660
650
652
656
GMD Housing801, 804, 805,806, 808, 809, 810, 825, 827, 829, 830 & 831
655
653
658
663 661662
GMD Buildings601 – GMS Storage (23k SF)650 – BDISC Conference Ctr652 – GMD/BDISC Conf Ctr653 – BDISC Visitor Ctr655 – BDISC Test Ctr656 – GMD Storage658 – GMD Maintenance660 – BDISC Development Ctr661 – BDISC Admin (2nd & 3rd Fl)662 – TDY Housing (1st Fl)663 – GMD Admin
GMD Housing854, 856, 875,& 877
Master Plan Drawing fromFGA Real Property PlanningBoard Meeting – 21 Jan 04
601
GMD Controlled/OccupiedGMD Controlled/Army OccupiedArmy Owned/GMD Occupied
Demolition
Change Use
LEGEND
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 187/7/2005 6:35 PM7/7/2005 6:35 PM
Questions
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 197/7/2005 6:35 PM7/7/2005 6:35 PM
Back Up
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 207/7/2005 6:35 PM7/7/2005 6:35 PM
Entry Control Building
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 217/7/2005 6:35 PM7/7/2005 6:35 PM
EKV Oxidizer and Fuel Storage
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 227/7/2005 6:35 PM7/7/2005 6:35 PM
Water Supply Building with InstalledPotable Water Tank
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 237/7/2005 6:35 PM7/7/2005 6:35 PM
Utilities Building
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 247/7/2005 6:35 PM7/7/2005 6:35 PM
Mechanical-Electrical Building (MEB)
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 257/7/2005 6:35 PM7/7/2005 6:35 PM
Kwajalein
GMD, Huntsville, AL
Arlington, VA
Boston, MA
Colorado Springs, CO
Anchorage, AK
Boeing – Raytheon• UEWR, Cobra Dane
GBR And XBR
Boeing • Alliant, Booster
Ogden, UT Boeing • Lockheed Martin,
GBI
Denver, CO
Boeing - Raytheon• GBI – EKV• Radars
Tucson, AZ
Boeing – Orbital Science Corp.
• GBI – Booster
Chandler, AZ
Boeing• GBI-CLE• Radars• GFC
Corps of Eng• Construction Boeing Executive Group
• Bus Mgt, Contracts,Engineering
PRIME CONTRACTOR• Boeing Operations
- Northrop Grumman, GFC- Lockheed Martin, GBI - TBE, SE&I, Test And Eval
Boeing• Northrop Grumman,
GFC• TTEC
Boeing• Northrop Grumman,
GFC• Lockheed Martin, GBI
Boeing - Raytheon• GBI – EKV• GBI – Boosters• Target Launch
(VAFB)• GFC
Los Angeles, CA
Team GMD
TEAMTEAM
GMDGMD Forging America’s Shield
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY GM-04-01-02106-R27-(TABS Installation Familiar Brief)-(04-26-04)-(U) 267/7/2005 6:35 PM7/7/2005 6:35 PM
Eareckson• COBRA DANE Radar Upgrade• Power Plant Upgrade• GMD Communications
(IDT, DSCS, WPAC, EPAC) Systems Operational – Sep 04
Ft Greely• Missile Field & Fire Control• Six GBI Silos/Interceptors FY04• Ten Additional GBI
Silos/Interceptors FY05• GMD Communications
Systems Operational – Sep 04
Kodiak• Target Launch Site• On-Going Target Launch Program• EIS Completion Aug 03
Alaska Sites (U)