67 m²SEN Base
8 m²
SENTherapy
Rms10 m²P12
12 m²SEN Office
56 m²SEN Base
67 m²SEN Base
8 m²
SENTherapy
Rms
84 m²Graphics
93 m²Textiles
14 m²
ServerRoom41 m²
DT Prep
90 m²
Design &Tecnology
11 m²DT Store 7 m²
Staff WCs
7 m²Staff WCs
12 m²
Cloakroom(Yr7)
10 m²Prac. Room
11 m²Prac. Room
12 m²
Cloakroom(Yr7)
12 m²
Control /Recording
Room
11 m²
DramaStore
61 m²
MusicClassroom
90 m²
DramaStudio
16 m²
StudentServices
8 m²
StudentWelfare
41 m²HoY Office
16 m²
Principal'sOffice
12 m²
Principal'sPA Office
52 m²
GeneralOffice
20 m²
SecureLobby
60 m²
MainEntrance
Foyer
9 m²
ParentRoom
9 m²
ParentRoom
4 m²Acc. WC
6 m²Plant
10 m²ICT St.
12 m²Staff Office
12 m²
SENChillout
19 m²Staff Office
18 m²Repro
211 m²Hall
89 m²
FoodTechnology
76 m²
SEN SocialArea
112 m²ICT Lab
151 m²
ActivityStudio
90 m²Kitchen
15 m²
HygieneRoom
9 m²Food Store
6 m²
Comm.Store
9 m²Mat Store
51 m²
SportsStore
5 m²
Plant ITHub 5 m²
Mat Store15 m²Store
20 m²Chair Store
10 m²
ExamOffice
14 m²
Comm.Office
10 m²FM Office
71 m²Change
71 m²Change
6 m²
ExternalStore
P20
594 m²Sport Hall
8 m²
StudentWelfare
42 m²
StaffSeminar
42 m²
StaffSeminar
3 m²
SecureStore
276 m²Dining Hall
116 m²Study Area
173 m²LRC
19 m²WCs
19 m²WCs
6 m²Acc. WC
6 m²Acc. WC
13 m²WCs
13 m²WCs
Legend
General Teaching Classrooms
SEN Base
Main Hall
LRC / Study Area
Dinning & Kitchen
Sports/ Activity
Administration / Staff Areas
Toilets / Change
Circulation
Plant
2 m²P11
3 m²WCs
4 m²Acc. WC
7 m²SMST.
2 m²WC(SEN)
ArchiveRoom
28 m²Stairwell 03
72 m²Stairwell 02
P085 m²
Lift 02
2 m²SEN St.
10 m²Music St.
5 m²Lift 01
P02
53 m²Stairwell 01
Plant
101 m²
AcademyExhibition/Breakout
Space
3 m²P18
1 m²P19
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 250
C
Bolder Academy Trust& Education Funding
Agency
Proposed GroundFloor Plan
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-12001 : 250Ground Floor Plan1
0
Scale 1:250
25m 50m 100m 250m
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
83 m²
ScienceLab
12 m²
Staff WorkRoom
14 m²Art Store
83 m²Art Studio
83 m²
ScienceLab
83 m²
ScienceLab
83 m²Art Studio
83 m²
ScienceLab
7 m²
Chem.Store
98 m²Art Studio
99 m²
SciencePrep
83 m²
ScienceLab
9 m²Staff Office
42 m²Staff Room
56 m²ICT Lab
56 m²ICT Lab
56 m²ICT Lab
83 m²
ScienceLab
105 m²
ScienceLab
83 m²
ScienceLab
83 m²
ScienceLab
56 m²ICT Lab
12 m²
Staff WorkRoom
7 m²
IT HubRoom
56 m²ICT Lab
19 m²WCs
19 m²WCs
4 m²Acc. WC
Legend
General Teaching Classrooms
Administration / Staff Areas
Toilets / Change
Circulation
Plant
28 m²Stairwell 03
55 m²Stairwell 02
55 m²Stairwell 01
5 m²Lift 01
6 m²Lift 02
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 250
C
Bolder Academy Trust& Education Funding
Agency
Proposed First FloorPlan
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-1201
1 : 250First Floor Plan1
0
Scale 1:250
25m 50m 100m 250m
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
7 m²
IT HubRoom
12 m²
Staff WorkRoom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
16 m²Staff Office
104 m²Plant
19 m²WCs
19 m²WCs
4 m²Acc. WC
Legend
Administration / Staff Areas
Toilets / Change
Circulation
Plant
Standard Classroom
5 m²Lift 01
55 m²Stairwell 01
5 m²Lift 01
56 m²Stairwell 02
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 250
C
Bolder Academy Trust& Education Funding
Agency
Proposed SecondFloor Plan
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-1202
1 : 250Second Floor Plan1
0
Scale 1:250
25m 50m 100m 250m
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
7 m²
IT HubRoom
12 m²
Staff WorkRoom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
56 m²
StandardClassroom
16 m²Staff Office
19 m²WCs
19 m²WCs
4 m²Acc. WC
Legend
Administration / Staff Areas
Toilets / Change
Circulation
Plant
Standard Classroom
56 m²Stairwell 02
55 m²Stairwell 01
5 m²Lift 01
6 m²Lift 02
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 250
C
Bolder Academy Trust& Education Funding
Agency
Proposed ThirdFloor Plan
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-1203
1 : 250Third Floor Plan1
0
Scale 1:250
25m 50m 100m 250m
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Flat Roof
Sedum Roof (Pitched)
Roof Light
Photovoltaics
Legend
Louvred Vent
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 250
C
Bolder Academy Trust& Education Funding
Agency
Proposed Roof Plan
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-1204
1 : 250Proposed Roof Plan1
0
Scale 1:250
25m 50m 100m 250m
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
10 528 9514782 8 6614 8
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed South EastElevation (Colour)
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2000
1 : 200Proposed South East Elevation (Colour)1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
28 147 9627 105 69
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed South WestElevation (Colour)
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2001
1 : 200Proposed South West Elevation (Colour)1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
5 5 810 8 52 9 9 107 12
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed North WestElevation (Colour)
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2002
1 : 200Proposed North West Elevation (Colour)1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
14 5 27 8 97 2 1086 10 14 58
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed North EastElevation (Colour)
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2003
1 : 200Proposed North East Elevation (Colour)1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
52108 9514782 8 6614 8
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed South EastElevation
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2004
1 : 200Proposed South East Elevation1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
28 147 9627 105 69
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed South WestElevation
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2005
1 : 200Proposed South West Elevation1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
5 5 810 8 52 9 9 107 12
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed North WestElevation
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2006
1 : 200Proposed North West Elevation1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
14 5 27 8 97 2 1086 10 14 58
Sou
th W
est
Nor
th E
ast
North West
South East
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed North EastElevation
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-2007
1 : 200Proposed North East Elevation1
01 Engineering brickwork, Staffordshire Blue (below DPC)
02 Brickwork, London Stock
04 Insulated colour-through render, colour: RGB 220, 4, 4
05 Insulated colour-through render, colour: White
06 Insulated metal panel, PPC
07 Metal framed windows, PPC (Velfac or similar)
08 Curtain wall glazing, PPC (Kawneer or similar)
09 Glazed metal doors, PPC
10 Solid panel metal doors, PPC
11 Metal louvre doors
12 Roof lights
13 Dormer roof light
14 Metal canopy
15 Metal coping, PPC
16 Metal fascia, PPC
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
Food Technology WCs KitchenWCs
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
Plant
HallLRC Study Area Dining Hall Dining Hall
5
7 7
8 8
5
4
4
3
3
2
2
1
1
6
6
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed SectionalElevation 1-1 & 2-2
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-3000
1 : 200Proposed Section Elevation 1-11
1 : 200Proposed Section Elevation 2-22
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
5
7 7
8 8
5
4
4
3
3
2
2
1
1
6
6
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Art Studio Staff Room
MainEntrance
FoyerSecureLobby
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
Staff Room Art StudioMainEntrance
FoyerSecureLobby
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed SectionalElevation 3-3 & 4-4
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-3001
1 : 200Proposed Section Elevation 3-33
1 : 200Proposed Section Elevation 4-44
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
5
7 7
8 8
5
4
4
3
3
2
2
1
1
6
6
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
StandardClassroom
StandardClassroom
ICT Lab
Stairwell 01
Stairwell 01
Stairwell 01
Stairwell 01
StandardClassroom
StandardClassroom
ICT Lab
StaffSeminar
StaffSeminar
StandardClassroom
StandardClassroom
StandardClassroom
StandardClassroom
ICT Lab ICT Lab
StandardClassroom
StandardClassroom
ICT Lab
HoY OfficePrincipal's
OfficePrincipal'sPA Office
GeneralOffice
WCs
WCs
WCs
WCs
Stairwell 02
Stairwell 02
Stairwell 02
Stairwell 02
Art Studio
Art Studio Art Studio
SEN BaseWCs
WCs
WCs
WCs
SENChillout
Stairwell 03
SEN Office
SENTherapy
RmsSEN
TherapyRms
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
Sport Hall Corridor Change
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed SectionalElevation 5-5 & 6-6
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-3002
1 : 200Proposed Section Elevation 5-55
1 : 200Proposed Section Elevation 6-66
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue
5
7 7
8 8
5
4
4
3
3
2
2
1
1
6
6
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
StandardClassroom
StandardClassroom
Textiles
WCs
WCs
WCs
WCs
Acc. WC
Acc. WC
Acc. WC
Acc. WCParentRoom
MainEntrance
Foyer
Hall Sport Hall
ScienceLab
Level 0
0
Level 1
3600
Level 2
7200
Level 3
10800
Level 4
14400
Dining Hall
Art Studio
SEN Base SEN BaseSEN Office
ScienceLab
SCALE @ A1:
DATE DRAWN:PROJECT NUMBER
REV NO.
STATUS
GENERAL NOTES
All rights reserved.
All drawings and written material appearing here,constitute original and unpublished work of the Architectand may not be duplicated, used or disclosed withoutwritten consent of the Architect.
Notes and material designations are typical for similarconditions unless otherwise indicated.
Do not scale from this drawing.
DATE DESCRIPTION
KEY PLAN
PROJECT
CLIENT
DRAWING NUMBER REVISION
c 2017 CallisonRTKL UK Ltd
DRAWN BY:
CHECKED BY:
CallisonRTKL, 25 Farringdon Street, 10th Floor, London, EC4A 4AB,T:+44(0)20 7306 0404
SHEET IDENTIFICATION
TITLE
1 : 200
C
Bolder Academy Trust& Education Funding
Agency
Proposed SectionalElevation 7-7 & 8-8
March 2017
WA
RGD
050-160086.00
Bolder Academy
Planning
BA-A-3003
1 : 200Proposed Section Elevation 8-88
1 : 200Proposed Section Elevation 7-77
0 2m 4m 8m 20m
Scale 1:200
27-01-2017 Draft 1 Planning Submission IssueA 07-02-2017 Draft 2 Planning IssueB 16-03-2017 Draft 3 Planning IssueC 30-03-2017 Final Planning Submision Issue