The 5th Asia/Oceania Meteorological Satellite Users’ Conference
The Current Status of GKThe Current Status of GK--2A 2A (GeoKOMPSAT(GeoKOMPSAT--2A) 2A)
Ground Segment Development & Ground Segment Development & Ground Segment Development & Ground Segment Development & Data Service Plan Data Service Plan
Nov. 2014Nov. 2014
HyunjongHyunjong Oh (Oh ([email protected]@korea.kr), research scientist), research scientistJaeDongJaeDong Jang, Jang, ByungByung--Il Lee, Il Lee, GwangJaeGwangJae Lee, Lee, JeongSikJeongSik Kim and Kim and HyukJinHyukJin YunYun
Satellite Operation DivisionSatellite Operation DivisionNational Meteorological Satellite CenterNational Meteorological Satellite Center
Korea Meteorological AdministrationKorea Meteorological Administration
Contents
1. Introduction of GK-2A
2. GK-2A Ground Segment Development(GSD)O tli f P j t- Outline of Project
- Concept of System Configuration- Systems Algorithm to Operation- Systems Algorithm to Operation
3. GK-2A Data Service Plan (Tentative)- Dissemination via Satellite and Landline
4 S4. Summary
1The 5th Asia/Oceania Meteorological Satellite Users’ Conference
1. Introduction of GK-2A
National-Space-Development-Plan
2The 5th Asia/Oceania Meteorological Satellite Users’ Conference
1. Introduction of GK-2A
Contents GK- 2A
GK-2A specification
Payload- Advanced Meteorological Imager (AMI)- Korean Space Environment Monitor (KSEM)
Spatial Resolution
O bit Dete mination andOrbit Determination and Prediction Accuracy
3km(using 2 ground stations)
Station Keeping Box
Mission Life Time 10 years
Image NavigationImage NavigationAccuracy
3 4 @ i i lif
3The 5th Asia/Oceania Meteorological Satellite Users’ Conference
Mass3.4 ton@mission life3.6 ton@full tank
2. GK-2A GSD : Backgrounds
GK 2ACOMS
To Provide Higher Meteorological Service Using Satellite
GK-2ALaunch Date : 2010.6 Comm. PayloadOcean Payload
Launch Date : 2018.5 Meteorological Payload
Resolution Up
COMS
yMeteorological Payload
- Resolution Up
Development of Ground Segment to Development of Ground Segment to Inherit the Mission of COMS andInherit the Mission of COMS and
Effective Operation of GEO Effective Operation of GEO Meteorological SatelliteMeteorological Satellite
2009.4
COMS Ground Segment GK-2A Ground Segment
2017.5
- Upgrade on Reception and Processing
4The 5th Asia/Oceania Meteorological Satellite Users’ Conference
Upgrade on Reception and Processing- Up-to-date IT Technology Adapted- Improve Data Service System
2. GK-2A GSD : MissionMission
Enhancing forecast/climate monitoring based on high resolution measurementsmeasurements
Generation of the baseline meteorological products , and application to hydrology, agriculture, disaster prevention etc.pp y gy, g , p
International Data Service via satellite broadcast system, LRIT/HRIT/UHRIT and via landline by website, FTP etc.
Supporting satellite operation with space weather monitoring
5
2. GK-2A GSD Project : Outline Project Scope
(A) Develop data acquisition(antenna, RF), image processing system(B) Develop Level 2 2+ products algorithms(B) Develop Level 2 , 2+ products algorithms (C) Develop integrated analysis and application system(D) Develop meteorological/space-weather data processing system(E) Establish satellite control system (developing by KARI )(F) Develop data management and service system(G) Integration test & In-orbit GS test(G) Integration test & In orbit GS test
GS Operation Concept6
2. GK-2A GSD Project : Strategies F f l j t For successful project
- Fully utilize the heritage and lessons of COMS project
D l t f d (COMS) > li ti / i f d: Development focused (COMS) -> application/service focused development with user readiness activities (GK-2A)
- Domestic cooperation with public/private sectors linked with this p p /pproject
- International cooperation to share the related information and techniquestechniques
* The 1st international GK-2A user conference will be held in second half of 2015
For stable GK-2A operation- Site diversity for satellite operation & data broadcast (NMSC<->KARI)
- Dual operation systems for hot-backup in NMSC
R t b k f d t t- Remote back-up of data storage
- Enhance the system of Research to Operation (R2O) with test bed & off-line simulator
7
2. GK-2A GSD : Configuration
MSGS LRIT/HRIT/UHRIT
RFRF RFRF
(at NMSC)
RF RFRF RF
BBBB BBBB
Command/Telemetry
BB BBBB BBCommon Test Bed
Satellite Control
LRIT/HRIT/UHRITLRIT/HRIT/UHRIT
Reception and Processing Reception and Processing
Off-line Simulator
Algorithm Optimization
RF/BBDB DB
Pre-processing
Level 1A/1B Level 1A/1B
Raw DataRaw DataPre-processing
GS System StabilizationProcessing/Analysis
Level 2/3Level 2/3
Processing/Analysis
Data Mgmt. and Service Data Mgmt. and Service(TBD)Foreign Sat.
Foreign Satellite Data
Level 0/1A/1B/2/3, Foreign Satellite DataLevel 1B
Level 0/1A/1B/2/3
8The 5th Asia/Oceania Meteorological Satellite Users’ Conference
Users
Preliminary version
2. GK-2A GSD : Meteorological products (52)
Scene & Surface Analysis (13)
Cloud & Precipitation (14)
Aerosol & Radiation (14)
Atmospheric condition & Aviation (11)
Cloud detection Cloud Top Temperature Aerosol Detection Atmospheric Motion Vector
Snow Cover Cloud Top Pressure Aerosol Optical Depth Vertical Temperature Profile
Sea Ice Cover Cloud Top Height Asian Dust Detection Vertical Moisture Profile
Fog Cloud Type Asian Dust Optical Depth Stability Index
Sea Surface Temperature Cloud Phase Aerosol Particle Size Total Precipitable Water
Land Surface Temperature Cloud AmountVolcanic Ash Detection and Height
Tropopause Folding Turbulence
Surface Emissivity Cloud Optical Depth Visibility Total OzoneSurface Emissivity Cloud Optical Depth Visibility Total Ozone
Surface Albedo Cloud Effective Radius Radiances SO2 Detection
Fire Detection Cloud Liquid Water PathDownward SW Radiation (SFC)
Convective Initiation
Vegetation Index Cloud Ice Water PathReflected SW Radiation (TOA)
Overshooting Top Detection
Vegetation Green Fraction Cloud Layer/HeightAbsorbed SW Radiation (SFC)
Aircraft Icing( )
Snow Depth Rainfall Rate Upward LW Radiation (TOA)
Current Rainfall PotentialDownward LW Radiation (SFC)
Probability of Rainfall Upward LW Radiation (SFC)
Products necessary for forecast and showing good performance will be operational 9
2. GK-2A GSD : analysis and application products (40)
Development of Integrated Analysis & Application FacilitiesDevelopment of Integrated Analysis & Application FacilitiesForecast support(21) Analysis support(19)Development of Integrated Analysis & Application FacilitiesDevelopment of Integrated Analysis & Application Facilitiespp y pp
Typhoon
Center position
Conceptualmodel
Objective analysis
Intensity & Central pressure Objective prediction
Max. wind speed & Radius of 15m/s WS Real-time analysis of severe weathermodel
Development & Weakening condition Typhoon conceptual model
Trajectory & Prediction ‘JANGMA’ conceptual model
Cloud analysis Wildfires analysis
Nowcasting Surface&Environmental
Precipitation analysis Drought analysis
Yellow dust analysis Flood analysis
Convective cloud analysis Heavy snow analysis
AnalysisSevere weather analysis Aerosol analysis
Aviation
Air-route cloud analysis Smog analysis
Turbulence analysis Fog analysis
i f i i l i i i l iAircraft icing analysis Time series analysis
Volcanic Ash analysis Spatial analysis
Marine
SST analysis Down-scaling analysis
Ocean current analysis Sat Data composition & analysisStatisticalAnalysis
MarineWeather
Ocean current analysis Sat. Data composition & analysis
Sea fog analysis Composition into uniform space-time grid
Sea ice analysis Data quality analysis
Predicted image products Data monitoring techNumerical WeatherPrediction
Predicted image products Data monitoring tech.
Error analysis of NWP input data
Forecast Sensitivity TestTool for integrated analysis and application will be developed and its standalone version will be open to users. 10
2. GK-2A GSD : Space weather data products (5) Korea Space Environment Monitor(KSEM)
Measurement of electron on mid energy range and magnetic fieldSupport forSupport for
Observation Products (5) 2A
Support for stable operation
of GEO-KOMPSAT-2A
Differential energy flux of electron and ion
- Real-time high energy particleof electron and ion energy particle distribution over the radiation belt
- 3D particle pdistribution /prediction
- Deep dielectric
Near Earth magnetic field
charging prediction index
- 2 Geomagnetic t i di
Satellite internal storm indicescharging current
11
2. GK-2A GSD: Systems for Research to Operation
* For smooth transition from research to operation, test bed and off-line simulator will be developed to make sure the scientific algorithms to be operational g p
* Algorithms will be installed after completion of optimization on test bed and verification on off-line simulator
Common Test BedAlgorithm Developers
S/W CodeS/W Code
…………….……….……………….…………….
. ……………….…………….
Off Line Simulator
OptimizationVerificationAlgorithms S/W Codes
Installation on Installation on …………….……….……………….……………..
Documentations
Off-Line SimulatorOperation SystemOperation System
Algorithm Stabilization and System Level Verification
12
2. GK-2A GSD : Milestone
Launch/IOT/OperationIntegrate Module
Satellite bus design and Review
Satellite system Satellite system integration
launch / IOT
PrepareTo
launch
Analysis of system
requirements
Satelliteoperation
Preliminarydesign Critical design
Instrument Integration
and test
System Integration
and test
Operation/utilization /service
StartEQSR/CDR
LaunchLaunchSRR PDR TRR
Environmental Test Delivery
/service
Preliminarydesign
Criticaldesign
Implementation/verification In Orbit Test Integration test
/OptimizationRequirementKick-off (Jul. 2014)
qAnalysis
Phase 1System Design/Algorithm Dev.
Implementation/Phase 2
Implementation/Verification
Phase 3Integration Test/
IOT of GS
13
3. GK-2A Data Service Plan : Via Satellite
• Broadcast all 16 channels data(UHRIT) of GK-2A meteorological observations within 3 minutes(to be confirmed) from image acquisition.
• Maintain L/HRIT broadcast corresponding to COMS five channelsp g- Develop the functions to generate COMS-like L/HRIT image data from GK-2A obs.- KMA will provide technical info. on receiving GK-2A L/HRIT for COMS S/MDUSs
• GOCI-II on GK-2B data will be broadcast by GK-2A HRIT (under consideration)
GK-2A (TBD) COMS -> GK-2A
Ult HRIT HRIT LRIT
GOCI II on GK 2B data will be broadcast by GK 2A HRIT (under consideration)*GOCI : Geostationary Ocean Color Imager
Ultra HRIT HRIT LRIT
Data Rate< 31 Mbps
uplink : S-bandD li k X b d
3 Mbps ~512 KbpsDownlink : X-band
Image Image(VIS, IR1, IR2, SWIR, WV)l h iData Type
To Be Determined
(VIS, IR1, IR2, SWIR, WV)Alpha-numeric textEncryption Key Message
Alpha-numeric textEncryption Key MessageLevel 2 Data (Cloud Info.)GOCI Image file
Obs. Mode FD, ENH FD, ENH
User MDUS SDUS 14
3. GK-2A Data Service Plan: Via Landline (DCPC-NMSC)
NMSC accomplished the construction of DCPC- NMSC and started normal operation on 29th March 2013 for providing COMS MI data as below list
- All five channels of COMS level 1B in binary and graphic file format- 10 level 2 products in binary and graphic file format(1) Cloud detection(1) Cloud detection(2) Land surface temperature(3) Total precipitable water(4) Cloud analysis
l d h i h(cloud top temperature/pressure/height, cloud type, cloud amount, cloud phase, cloud optical thickness)
(5) Fog(5) Fog(6) Rainfall Intensity(7) Atmospheric motion vector(8) Sea surface temperature(9) S i / d i(9) Sea ice/snow cover detection(10) Outgoing longwave radiance
15The 5th Asia/Oceania Meteorological Satellite Users’ Conference
http://dcpc.nmsc.kma.go.kr
3. GK-2A Data Service Plan: Via Landline (Website)
• Currently, NMSC provides COMS level 1B data of all five channels and level 2 products to users by posting the processed data on NMSC website (membership is needed)website (membership is needed)
• Upgraded & more user-friendly web-based system will be established for GK-2A data service
Products Resolution Period Start Date of Service
Cloud analysis (cloud type, phase and amount) 4 km 15 min.
Cloud top pressure/temperature/height 4 km 15 min
COMS Lv2 data list open to users
1 Apr. 2011(CTP/CTT/CTH) 4 km 15 min.
Atmospheric Motion Vector (AMV) 64 km 1 hour
Cloud detection (CD) 4 km 15 min.Fog (FOG) 4 km 15 min.Aerosol index (AI) 4 km 15 min.( )
Sea surface temperature (SST) 4 km 1-, 5-, 10-day composition
10 Aug. 2011Rain intensity (RI) 4 km 15 min.
Outgoing longwave radiation (OLR) 4 km 1 day
Upper tropospheric humidity (UTH) 36 km 15 min.
Land Surface Temperature(LST) 4 km 15 min.
10 Feb. 2012Snow and Sea Ice (SSI) 4 km 1 day/8 day
10 Feb. 2012Total Precipitation (TP) 4 km 15 min.
Clear Sky Radiance (CSR) 28 km 15 min.
http://nmsc.kma.go.kr/jsp/eng/contents/main/main.jsp
4. Summary
NMSC will establish the GK-2A ground segment 1 year before the g g ylaunch of GK-2A(May, 2018) and carry on integrated test for smooth transition to normal operation
All 16 channels data of GK-2A AMI will be broadcast via GK-2A within 3 minutes(TBC) after an image acquisition completion.
Maintain COMS L/HRIT service with corresponding 5 channels data of GK-2A
GK-2A user conference will be held annually (or 6-quarterly, TBC) to get users’ opinions and reflect them to GK-2A ground segment g p g gdevelopment projects such as user service system.