Ground Source Heat Pump System
In Educational Buildings
Invest in Earth…
Invest in “Energy Education”
Dr Giorgos FragogiannisMining Engineer
Geothermal HVAC Expert – ASHRAE Member
o Specialist in Geothermics
o IGSPA Certified Designer
o ISO9001:2008 in Design and
Installation GSHP
o Design – Installation –
Consultancy services
o Waterfurnace Dealer in
Greece (made in USA)
o Services all around in Greece (Office in Athens and Thessaloniki)
14 years Experience in Geothermal Services (Design – Installation)
Company Profile
The Problem… Energy Profile of Educational Buildings
Mean Yearly Energy Consumption
(kWh/m2/year)
0
10
20
30
40
50
60
70
80
90
100
0 5 10 15 20 25 30 35 40
Dep
th[m
]
Temperature [C]
ελάχιστη θερμοκρασία- 30/1
μέγιστη θερμοκρασία-1/8
The Free Source - Ground
Constant Temperature
Ground Source Heat Pump –
Electricity Consumption
Heating / Cooling delivered into
home
Qel = 1 [kWh]
Qheat =4-6 [kWh]
Basic Advance: The Highest Coefficient of Peroformance COP=Qheat/Qel
Qgr = 3-5 [kWh]
The Solution…Ground Source Heat Pump System
GSHP:
most energy – efficient, environmentally clean, and cost effective space conditioning system available – US-EPA
Case Study 1
o Prototype Demonstration Project
o Utilization of RES and Energy Saving
Strategies in 1ο High School of Pylaia
Thessalonikio Renovation of Existing Building
o Combination of RES Technology in
Covering Energy Demand
o ASHP replacement from GSHP
Case Studies GSHP Installation in Educational BuildingsInvest in Earth…
Renovation of Existing Building – Improving
Energy Efficient
Case Study 2
o New building Construction of
Kindergarten in Mun. Chalandrio Working since 2016
o GSHP for Heat – Cooling – and Hot
Water Production
Invest in Earth…
New Building Constaction
Case Studies GSHP Installation in Educational Buildings
E.E. Improvement
1ου High School of Pylaia
Χαρακτηριστικά Κτιρίου
o Κατασκευή το 1992
o Συνολική Δόμηση 3.583 m2
o Τρία Επίπεδα
o Αίθουσες διδασκαλίας, εργαστήρια
o Βιβλιοθήκη με χώρο αναγνωστηρίου
Στόχος Έργου: Συνολική Ενεργειακή και
Λειτουργική αναβάθμιση σχολικού κτιρίου
Βήματα Υλοποίησης
1. Ενεργειακή Επιθεώρηση
2. Εξωτερικός Ενεργειακός
Σύμβουλος καθ΄όλη τη διάρκεια του
έργου
3. Μελέτες Εφαρμογής Παρεμβάσεων
4. Υλοποίηση έργου Παρεμβάσεων
ΑΠΕ
5. Δράσεις Ενημέρωσης και
Ευαισθητοποίησης
6. Αξιολόγηση Παρεμβάσεων –
Τελική Ενεργειακή Επιθεώρηση
Case Studies GSHP Installation in Educational Buildings
E.E. Improvement
1ου High School of Pylaia
Δράσεις Έργου
o Αντικατάσταση Κουφωμάτων
o Αναβάθμιση Λεβητοστασίου Θέρμανσης
o Αντικατάσταση Φωτισμού
o Αντικατάσταση Αντλίας Θερμότητας
από Γεωθερμικό Σύστημα για την
Ψύξη / Θέρμανση της Βιβλιοθήκηςo Αυτοματισμός – Εγκατάσταση BMS
o Λοιπές δράσεις διάδοσης
Συνολικός Προϋπολογισμός 400.000 €
Case Studies GSHP Installation in Educational Buildings
E.E. Improvement
1ου High School of Pylaia
Αντικατάσταση Αντλίας Θερμότητας από Γεωθερμικό Σύστημα
για την Ψύξη / Θέρμανση της Βιβλιοθήκης
Χαρακτηριστικά Γεωθερμικού Συστήματος
Τρείς Γεωεναλλάκτες 100m βάθους
Μια Αντλία Θερμότητας 12kW Waterfurnace
Case Studies GSHP Installation in Educational Buildings
E.E. Improvement
1ου High School of Pylaia
Αντικατάσταση Αντλίας Θερμότητας από Γεωθερμικό Σύστημα
για την Ψύξη / Θέρμανση της Βιβλιοθήκης
Ενεργειακή και
λειτουργική Αναβάθμιση
ΑΝΤΛΙΑ ΘΕΡΜΟΤΗΤΑΣ
ΑΕΡΟΣ
ΓΕΩΘΕΡΜΙΚΗ ΑΝΤΛΙΑ
ΘΕΡΜΟΤΗΤΑΣ
Case Studies GSHP Installation in Educational Buildings
E.E. Improvement
1ου High School of Pylaia
Results
Case Studies GSHP Installation in Educational Buildings
E.E. Improvement
1ου High School of Pylaia
2 years later… Graffity of Mother Earth
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Building
o Constructed from 2013-15
o BSM 2.000 m2
Heating Cooling via GSHP
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Ground Source HP System
o 24 double- U, 65m Geoexchanger
o GSHP - Climaveneta 165kW
o SCOP 4,2
o Heating Distribution System: Fan Coil Unit
o Control via BMS
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Ground Loop Installation –
Borehole Field
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Manifolds and Network
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Mechanical Room
Μηχανοστάσιο ΕΠΑΘ
Borehole Field Manifold
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Yard
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
Προαύλιος Χώρος
Operation and Maintenance
Case Studies GSHP Installation in Educational Buildings
Kindergarten in Mun.
Chalandri
BMS Απομακρυσμένος Έλεγχος
BMS - User Guild for Stuff
Case Studies GSHP Installation in Educational Buildings
Operation and Maintenance
Kindergarten in Mun.
Chalandri
Ετήσιο Πρόγραμμα Συντήρησης• Καθαρισμός Φίλτρων Fan Coil
• Έλεγχος Δικτύων
• Έλεγχος Ηλεκτροκινούμενων Συστημάτων
• Έλεγχος Αυτοματισμών- Αισθητηρίων
Case Studies GSHP Installation in Educational Buildings
Operation and Maintenance
Kindergarten in Mun.
Chalandri
Καθημερινότητα Εμπειρία Χρήσης
Case Studies GSHP Installation in Educational Buildings
• Ανάδειξη θετικών και καλά εκτελεσμένων εφαρμογών
• Μέτρα για την αντιμετώπιση ελλείψεων σε υφιστάμενες εγκαταστάσεις γεωθερμικών
συστημάτων
• Θέσπιση Εθνικών Τεχνικών Προδιαγραφών – ΤΟΤΕΕ «Σχεδιασμού - Λειτουργίας και
Συντήρησης Γεωθερμικών Συστημάτων» βάση διεθνών προτύπων και εμπειριών
• Πιστοποίηση τεχνικών επαγγελμάτων. Αύξηση εξειδίκευσης και τεχνογνωσίας.
• Κίνητρα εγκατάστασης γεωθερμικών συστημάτων – Κανονιστικές Διατάξεις.
– Επανεξέταση ΚΕΝΑΚ 2017 στη βαθμονόμηση συστημάτων
– Τροποποίηση του εξοικονομώ κατοίκων ΙΙ
Προτάσεις - ΣημείαCase Studies GSHP Installation in Educational Buildings
Προτάσεις - Σημεία
Κίνητρα Εγκατάστασης
Στόχος near Net
Zero energy
Πως??
• Σταθερή τιμή πώλησης ηλεκτρικής ενέργειας ??
• Απαλλαγή φόρου κατά την εγκατάσταση
(ιδιωτικό τομέα) ??
• Υποχρέωση εγκατάστασης στα καινούργια
Δημόσια Κτήρια από το 2019 για την κάλυψη
μέρους (άνω των 50%) ή όλων των
ενεργειακών απαιτήσεων????
Γιατί??
➢ Υλικά Κατασκευής Γεωεναλλάκτη PE ή HDPE.
Χρόνος ζωής > 50 χρόνια
➢ Αξιοποιείται η ηλεκτρική ενέργεια η οποία
παράγεται από άλλες ΑΠΕ
➢ Μειώνεται η ετήσια κατανάλωση ηλεκτρικής
ενέργειας και εκπομπών CO2 στο κτίριο και στη
χώρα
➢ Αναπτύσσεται η αγορά σε εθνικό επίπεδο
50% Δωρεάν από τον
Ήλιο
50% Δωρεάν από
την Γή
Case Studies GSHP Installation in Educational Buildings
Προτάσεις - Σημεία
Κανονιστικές Διατάξεις - Νομοθεσία
Επανεξέταση ΚΕΝΑΚ 2017 στη βαθμονόμηση συστημάτων
+ Εισάγει μεθοδολογία υπολογισμού ετήσιας ενεργειακής απόδοσης συστημάτων
- Δεν λαμβάνονται υπόψη οι κλιματικές ζώνες στην ετήσια απόδοση και υποεκτιμούνται
οι γεωθερμικές αντλίες θερμότητας
Παραδειγμα Υπολογισμού SCOP κατά ΚΕΝΑΚ – Το Παράδοξο…
Αντλία Θερμότητας Αέρος
▪ Energy Label - Α++
▪ ηs35˚CΘΚ=235% για θερμή ζώνη
σύμφωνα με σήμανση
▪ SCOP = 5.59
Γεωθερμική Αντλία Θερμότητας
▪ Energy Label - Α++
▪ ηs35˚CΘΚ=197% για Μέσο Κλίμα
σύμφωνα με σήμανση
▪ SCOP = 4,7
Δεδομένα Εγκατάστασης
▪ Τόπος εγκατάστασης Γρεβενά.
Κλιματική Ζώνη Δ
▪ Συνθήκες σχεδιασμού 2,5% -5,0 oC
▪ Θερμοκρασία σχεδιασμού εσωτερικού
συστήματος 35 oC
Case Studies GSHP Installation in Educational Buildings
Προτάσεις - Σημεία
Κανονιστικές Διατάξεις - Νομοθεσία
Κανονισμός ΕΕ – 811/2013
Case Studies GSHP Installation in Educational Buildings
• Εξοικονόμηση Κατοίκον - 2018
Προτάσεις - Σημεία
Κανονιστικές Διατάξεις - Νομοθεσία
Case Studies GSHP Installation in Educational Buildings
Αν η εξοικονόμηση ενέργειας και η μείωση των εκπομπών CO2 , αποτελεί εθνική
πολιτική για τη «βιώσιμη ανάπτυξη», τότε η αξιοποίηση των Ε.Π.Α.Θ. αποτελεί
μονόδρομο γιατί οδηγεί:
• στη μείωση της κατά κεφαλήν δαπάνης ενέργειας,
• στην εξοικονόμηση ενεργειακών πόρων,
•στη μείωση της εξάρτησης της χώρας από εισαγόμενα ενεργειακά καύσιμα.
Η διεύρυνση της χρήσης των Ε.Π.Α.Θ. στη χώρα θα συμβάλει άμεσα στην
επίτευξη ενός επιπλέον κοινωνικού στόχου, που είναι η αξιοποίηση φτηνής και
φιλικής προς το περιβάλλον ενέργειας.
Η γη και ο ήλιος μας δίνει απλόχερα δωρεάν ενέργεια….. Ας την εκμεταλλευτούμε
Αντί επιλόγου…….